									Wk Content                               Resources                    Elements /    Regist   Practical                            Resources                         Elements /    Regist
                                                                      Performance   ration                                                                          Performance   ration
                                                                      Criteria                                                                                      Criteria.
     Unit 1 BCG1000A -                20Hrs               Communication.
1    Introduction                        Video - So You Want to                              Introduction to workshop.
     -Course structure & sequence        be a Builder                                        Safety tests                         Drop Saw       Router
     -overview of units                                                                      Puzzles – to determine entry level   Drill Press    Sander
     -method of a) presentation          Basic Building &                                    skills & knowledge of students,      Materials      Plans.
                  b) assessment          Construction – Longman                              establish workshop
                  c) recording                                                               routines/procedures & enforce
     -expectation of students            Support Materials –                                 OH&S
     -Work readiness/work placement      BCG1000A
     -accountability & industry
     expectations
     Introduction to communication                                    1.1
     Effective site communication                                     1.2
                                                                      1.3
     Signage                             Support Materials –          2.1                    2nd Puzzle - as test
2                                        BCG1000A                     2.2
     Basic terms used in building        Support Materials –          2.3
3    industry                            BCG1000A                     2.4                    Cement Float.                        Tools & Materials
                                                                      3.1
     Industry personnel                  Support Materials –          3.2
4                                        BCG1000A                     4.1
     Workplace meetings                                               4.2

     Unit 2 BCG1001A -                35 Hrs              Occupational Health & Safety
5    Introduction to OH&S                General OH&S induction
                                                                      1.2
     Session 1                           training for construction.   1.3
                                                                                             Tool Box                             Materials :-    CD Ply 12mm
     OH&S Responsibility                 Board of Studies.            1.4                                                                         Screws
                                                                      2.1                    See Activity 5 from Hand & Power                     Handle material
6    Session 2                           BCG1001A Support             2.2                    Tools – BCG 1005A Support                            Glue & nails
                                                                      2.3
     OH&S Communication.                 Materials.                   2.4                    Materials for plan. Page 158
                                                                      3.1                                                         Tools :-        Drop saw
     Session 3                           It is expected that all      3.2                    (Teachers may wish to vary                           Router
                                                                      3.3
7    OH&S Planning & action              teachers will follow the     3.4
                                                                                             dimensions)                                          Screw Gun
                                         OH&S course presented        3.5                                                                         Hand tools
     Session 4                           in the Workcover             4.1
8    Workplace emergencies & first aid   approved Board of Studies    4.2
                                                                      4.3
                                                                                                                                  Plan :-         BCG1005A P158
     for construction work.              developed package.           4.4
                                                                      4.5
     Session 5                                                        5.1
9    Injury management & workers                                      5.2
                                                                      5.3
     compensation                                                     5.4
                                                                      5.5
     Assessment 1                        Board of studies resource    6.1
                                                                      6.2
                                                                      7.1
10   Emergency Care Certificate          Royal Life saving Society.   7.2
                                                                      7.3
Wk Content                                  Resources                        Reg’n Practical
                                                                      Elements                                       Resources                            Elements Reg’n
   Unit 3 BCG1002A -                    20 Hrs              Plan & Organise Work

11   Time Management                       BCG 1002A Support          1.1          Work Method Statement for Tool   Materials :-   Radiata pine
                                           Materials                  2.1          Box - Post completion.                          70 x 30 x 4.2 cut to
                                                                      3.2                                                           3/1.4m lengths
12   Work Scheduling                       Work Method Statements     3.3          Work Method Statement for Saw                    Screws
                                                                      4.1          Horse.                                           Glue & nails
                                           Basic Building &           4.2
13   Basic Quality Concepts                Construction - Longman     4.3                                           Tools :-       Drop Saw
                                                                      5.1          Saw Horse                                       Screw Gun
                                                                      5.2                                                          Hand tools
     Selected exercises, activities &                                 6.1
14   assessment tasks                                                 7.3                                           Plan :-

                                                                                                                    Jig :-           See plan for
                                                                                                                                     cutting jig used
                                                                                                                                     with drop saw.
                                                                                                                    Note :- 2 legs cut from 1.4m
                                                                                                                    length splay cut using handsaw &
                                                                                                                    finished / trimmed on drop saw.

     Unit 4 BCG1005A -                  20 Hrs              Hand & Power Tools
                                                                      1.1   1.2
15   Basic Hand Tools                      BCG 1005A Support          1.3   1.4    Saw Horse   - (con’t)
                                           Materials.                 2.1   2.2
     Exercises & Activities                                           2.3   2.4
16                                         Basic Building &           2.5
                                           Construction - Longman     3.1   3.2
17   Basic Power Tools                                                3.3
                                                                      4.1   4.2
                                                                      4.2   4.4
18   Exercises & Activities.                                          5.1   6.1
                                                                      6.2   6.3
                                                                      7.1   7.2
                                                                      7.3   7.4

     Unit 5 BCG1004A -                  10 Hrs              Carry Out Measurements & Calculations

19   Basic Measuring, Calculations &       BCG1004A Support           1.1          Saw Horse - (con’t)
     Quantities                            Materials                  1.2
                                                                      2.1
20   Exercises 1 & 2, Activity 1           Basic Building &           3.1
                                           Construction – Longman.    3.2
                                                                      3.3
                                           Costing of group project   3.4
                                           eg Picnic table & slab.    3.5
Wk Content                                 Resources                   Elements /        Regist   Practical                           Resources                           Elements /    Regist
                                                                       Performance       ration                                                                           Performance   ration
                                                                       Criteria.                                                                                          Criteria.
     Unit 6 BCG1008A -                   10 Hrs            Use Simple Levelling Devices
21                                                                     1.1   1.3
     OH&S Assessment Task 2                Board of Studies Resource   1.4                        Completion of Sawhorse & suitable
                                                                       2.1   2.2                  group project.
22   Basic Levelling Equipment.            Basic Building &            2.3                        Eg. Pergolas, Storage areas,        As required for selected project.
     Notes, exercises & activities.        Construction – Longman.     3.1   3.2                  Covered walkways, Shade areas etc
                                                                       4.1   4.2                  depending upon individual school
23                                                                     4.3                        needs.
                                                                       5.1
     Unit 7 BCG1011A -                   10 Hrs             Handle Construction Materials & Safe disposal of Waste
     Section 1                                                         1.1   1.2   1.4
     Storage, Stacking & Protection of     BCG1011A Support            2.1   2.2   2.3            Group Project & Saw Horse
24   Building Materials                    Materials                   2.4   2.5   2.6            Completion
                                                                       3.1   3.2   3.3
     Section 2                             Basic Building &            4.2   4.3   4.4            Group project to include large
25   Manual Handling.                      construction – Longman.     5.1   5.2   5.3            material components to facilitate
                                                                       5.4                        assessment outcomes for handling
                                                                                                  & storage unit.
26
     Work Placement
27

     Revision & consolidation of
28   previous units. Review of work
     placement.


29   Year 11 Final Examinations.
30

     Variations.
Wk Contents                               Resources                 Elements /      Regist   Practical                     Resources                          Elements /    Regist
                                                                    Performance     ration                                                                    Performance   ration
                                                                    Criteria                                                                                  Criteria
     Unit 8 BCC1009A -                  10 Hrs              Carry Out Manual Excavation.
                                                                    1.1   1.2
     Manual excavation for footings &     BCC1009A Support          1.2   1.4                600mm Square concrete tile.   Materials - Formwork, Sand,
31   slabs                                Materials.                2.1   2.2                Individual project.                       Aggregate, Cement.
                                                                    2.2   2.4
32   Exercises & Activities               Basic Building &          3.1                                                    Tools -     Barrows, Hand tools,
                                          Construction - Longman    4.1                      (Can be used as pavers)                   Electric mixer –
                                                                    5.1   5.2                                                          Optional.

                                                                                                                           Personal Protective Equipment.


     Unit 9 BCC1012A - 10 Hrs                               Spread & Compact Materials Manually.
                                                                    1.1   1.2
33   Spread & Compact Materials           BCC1012A Support          1.2   1.4                Group project. – pathway or
                                          Materials.                2.1   2.2                mowing strips.
                                                                    2.2   2.4
34   Exercises & Activities.              Basic Building &          2.5
                                          Construction – Longman.   3.1   3.2


35
     Work Placement.
36
     Unit 10 BCC1003A - 10 Hrs                                Drain & De-water Site.
                                                                    1.1   1.2 1.3
37   Drain & De-water site.               BCC1003A Support          2.1   2.2 2.3            Group Project. (con’t)
                                          Materials.                3.1   3.2 3.3
     Exercises & Activities                                         3.4
38                                                                  4.1
                                                                    5.1   5.2
                                                                    6.1

39
     End of Year Review & tests
40
Wk Contents                                 Resources                 Elements /    Regist   Practical              Resources                       Elements /    Regist
                                                                      Performance   ration                                                          Performance   ration
                                                                      Criteria.                                                                     Criteria.
     Unit 11 BCG1010A - 30 Hrs                              Concreting to Simple Forms

1    The Placement & Finishing of           BCG1010A Support                                 Group Project –        Materials – as determined in
     Concrete. Exercises & activities       Materials                 1.2                    Picnic Table on Slab               Measurement &
     from resource package.                                           1.3                                                       Calculation unit.
2                                           Basic building &          1.4                                                       Wks 19 & 20
     - Types of concrete & concrete         construction – Longman.   2.1
     materials.                                                       2.2
3                                                                     2.3                                           Tools -     as required.
     - Types & uses of reinforcement                                  2.4
4                                                                     2.5
     - Erection / dismantle &                                         3.1
     maintenance of formwork.                                         3.2
5                                                                     3.3                                           P.P.E.
     - Preparation of forms for                                       4.1
     concreting                                                       4.3
6                                                                     4.4                                           OH&S considerations
     - Installation of formwork for slabs                             4.5
7    on ground.                                                       5.1
                                                                      5.2
     - Assist with placement of concrete.                             5.3
8                                                                     5.4
     - Use & maintenance of concreting
     tools.
9

10   Site Visit to concrete pour.
Wk Contents                               Resources                   Elements /    Regist   Practical                              Resources                  Elements /    Regist
                                                                      Performance   ration                                                                     Performance   ration
                                                                      Criteria.                                                                                Criteria

     Unit 12 BCG1003A - 20 Hrs                             Read & Interpret Plans

11   Interpretation of Plans              BCG1003A Support            1.1   1.2              Step Ladder.                           Materials –
                                          Materials.                  1.3
     Plans                                Basic Building &            2.1   2.2
12                                        Construction – Longman.     3.1   3.2
                                                                      3.3   3.4                                                     Tools –
13   Reading scale rule                                               4.1   4.2
                                                                      5.1                                                           Plans & Specifications –
14   Plan & document reading                                          6.1   6.2
                                                                                                                                    P.P.E.
     Exercises & activities from
     resource package.
15   Half Yearly Examinations
     Unit 13 BCG1006A - 20 Hrs                             Use Small Plant & Equipment.

16   Identification, selection, use &     BCG1006A Support            1.1                    Step Ladder - (con’t)
     maintenance of -                     Materials.                  1.2
     Compaction equipment                                             1.4
17   Pumping equipment                    Basic building &            2.1
     Power source equipment               Construction – Longman.     2.2
18   Concreting / bricklaying equipment                               2.3
     General equipment                                                3.1
19
     Exercises & activities from
     resource package.

20   End of unit test.



21   Revision for HSC Examination         Part B syllabus document.                          Completion of all practical projects
22   ensuring all HSC components from     Notes & exercises.                                 given throughout the course.
23   Part B of syllabus are addressed.
24

25   Trial HSC Examinations.
26

27                                        Past examination Papers
28   Continued preparation for HSC        & exercises.
29   Examination.
30

								
To top