					CITY OF GREENACRES
INTEROFFICE MEMORANDUM 2004.12b7-001 TO: FROM: SUBJECT: DATE: Wadie Atallah, City Manager Stephen Uman, C.B.O. / Director, Department of Building Building Department Report December 6, 2004

==================================================================== Listed below is a brief summary of the activities undertaken by the Department of Building during the period of November 8, 2004 to November 26, 2004. 1. PERMITS/INSPECTIONS Building Permits Issued: Inspections Performed: Applications Submitted: 403 987 New Rentals (Residential): 168 New Contractor Registrations: Transfers: 2005 New Business Licenses: 2005 Total Business Licenses: 3. CODE ENFORCEMENT New Cases: Case Inspections: Active Cases: 22 88 148 22 2 37 1,858 2 2. OCCUPATIONAL LICENSES New Business (Commercial): (HomeOccupations): 4 7

4.

PRINCIPAL NEW CONSTRUCTION PROJECTS IN PROGRESS • • • Oak Terrace Phase IV (44 condominium units, Melaleuca Lane and Oak Terrace Drive. 36 units have been C.O.’d). Dawn Health Care (Two-story medical office building, 4849 Lake Worth Road). Magnolia Bay (112 condo units, on Grandiflora Drive, off 10th Ave N., west of Jog Rd. 50 units have been C.O.’d).

Memo: 2004.12B7.001

Page

2

• • • • • •

Washington Mutual Bank (4931 South Military Trail, outparcel at Military Crossing.) Church of Christ of the Palm Beaches (SE corner of Jog Road and Summit Blvd.) Seminole Palms, 120 Townhouse Units on Seminole Palms Drive off Lake Worth Road between Steak-n-Shake and Greenacres Bowling. The Pines, Final 8 buildings (32 townhouse units) on White Pine Circle north of Purdy Lane. Eckerd/CVS Pharmacy, (2998 Jog Road, Outparcel at Barclay Square) Temple Beth Tikvah, (4550 Jog Road, Addition plus Renovation)

5.

PRINCIPAL REMODELING/RENOVATION PROJECTS IN PROGRESS: • • • Medical Office (Dr. Sharab Mohammed, 3345 Jog Road) Quizno’s Subs in Woodlake Plaza. ColdStone Creamery in Riverbridge Center.

6.

ON-GOING SINGLE-FAMILY AND TWO-FAMILY DEVELOPMENTS: • Nautica Isles, south of Melaleuca Lane on Haverhill Road Extension. Builder: GL Homes. Approximately 900 C.O.’s have been issued, 62 homes are in various stages of construction, which leave approx. 15 to go. Manatee Key, on Nyack Lane, north of Bowman Street. Project consists of 13 twofamily buildings (26 residential units) Eagle Trace, 40 Single family homes on Eagle Ridge Drive inside Riverbridge.

• •

7.

Breakdown of Permits Processed (November 8, 2004 to November 26, 2004).
TYPE OF PERMIT NUMBER OF PERMITS 9 22 14 8 5 110 AVERAGE DAYS TO PROCESS ZONING BUILDING 2 N/A N/A N/A N/A 2 8 2 2 5 2 5 TARGET PROCESS TIME 10 2 2 5 2 5

Single Family Homes A/C Change-Out Water Heaters Fence Alarms Miscellaneous **

* Random sampling, 168 permits. ** Signs, re-roof, pools, sheds, irrigation, driveways, mobile homes, temporary use, garage doors, screens.