146 by chrstphr

VIEWS: 0 PAGES: 1

									Daily Field Report
Mountain View Tel: 650.967.2365 Fax: 650.967.2785 Fairfield Tel: 707.423.2523 Fax: 707.423.1725 Fullerton Tel: 714.441.3090 Fax: 714.441.3091 Oakland Tel: 510.267.1970 Fax: 510.267.1972 San Ramon Tel: 925.275.2550 Fax: 925.275.2555

Job No.

Page

1993-1
Project Client Report No.

1 146

of

1

Leona Quarry
Location

City of Oakland
Grading or Excavation Contractor Date

Day of Week

Oakland, CA
General Contractor

DeSilva Gates
Contractor’s Foreman

3/1/05
Eng. Tech

Tuesday
Assistants

DeSilva Gates
General Contractor’s Superintendent

Mark
Specialty Contractor

PF

-

Contractor’s Foreman

Kent Peyton

Field Observations

Time:

11AM

Weather: Cloudy, mild

- I visited the site between approximately 8:30 a.m. and 11:00 a.m. - DeSilva Gates was not doing any grading due to recent rains. The soils in the cut/fill areas remained too wet to resume grading operations in the upper bowl area. A dozer was used to trim additional soils from the slope face that sits to the north of the intersection of “A” Street with “K” Street. There remains 50-feet or so of cut on the slope. - The “I” Street pond remained about 2-feet deep. Water was being pumped from the Baker tank into the on site storm drain system so that it can flow to the lower pond an eventually through the filtration system. The filtration system was not in operation at the time of my site visit, apparently because it was being back flushed. - The water level in the lower pond was about 4-feet below the drain opening

Follow-up from prior report

Yes

No

What should be observed, checked, or tested during the next visit:

The DFR is preliminary

This DFR is final

Continued on next page

P:\1-STANDARDS\Forms\Construction Svc\DFR Masters\DFR10 Verdana.doc


								