Docstoc

Table No 3

Document Sample
Table No 3 Powered By Docstoc
					76




Table No 3.01                                 SUSTAINABLE HEALTH, WASTE REMOVAL WATER AND SANITATION

PRIORITY ISSUE                   Poor – Non Existent Waste Management RELATED ISSUES (1) Prevalence of diseases
                                 Limited land fill sites (1) Environmental degradation and associated health risk.
KEY LOCALISED LA 21               Sustainable harnessing of natural assets
SUSTAINABILITY                    Gender equity guidelines
GUIDELINES – LINK TO KPI’S         Localised strategic development guidelines emphasising the spatial dimensions shown in Map No 17
                                   Disaster management framework link to ENVIRONMENTAL, EPIDEMIC, FLOOD hazards risks
         STRATEGY                    OBJECTIVES             No PROJECT NAME & Guideline output                                    CODE
                                 o To promote local        64    Develop a district wide waste disposal plan                 1    WM1
                                    management of solid
                                    waste                     65   Devolve the solid waste management to ( Hib+ Umd)               1   WM2
S17. Initiate an interim                                      66   Establish a local waste management system for Ezinqoleni ,      1   WM3
waste disposal program in                                          Dududu and St Faiths
the district.                                                 67   Capacity building for solid waste management SMME               1   W4
                                                                   linkages to recycling.
                                                              68   Undertake waste management education                            1   WM4
                                                              69   Identification of a cemetery site in the Ugu North.             P   C1
                                 o To ensure that suitable,   70   Develop a district wide cemeteries and crematoria plan          1   C2
                                    community agreed to,
                                                              71   Explore the devolution of the existing regional cemetery to a   1   C3
                                    arrangements are made
                                    in relation to burial          local municipality
                                    needs reduce the          72   Sensitize communities on KZN Cemeteries and Crematoria          1   C4
S18. Improve       access   to      prevalence of diseases.        related legislation
decent burial processes                                       73   Est. village cemeteries on suitable land in district            3   C5
                                                              74   Development of an indigent policy                               3   C6
                                                              75   Bi-annual indaba on burial & settlement Patterns and explore    3   C7
                                                                   local solutions to burial processes
77




Table No 3.01                                                         SUSTAINABLE SAFTEY AND SECURITY

PRIORITY ISSUE                        Minimal community participation in safety and security management, Lack of communication and
                                      projection of a positive image., A sense of moral decline in the district. RELATED ISSUES Hazardous road
                                      conditions and high accident rates (1) Prevalence of diseases
                                      Limited land fill sites (1) Environmental degradation and associated health risk.
KEY LOCALISED LA 21                    Gender equity guidelines
SUSTAINABILITY GUIDELINES –             Localised strategic development guidelines emphasising the spatial location of crime.
LINK TO KPI’S                          Disaster management framework link to ENVIRONMENTAL, EPIDEMIC, FLOOD hazards response
                                       risks
            STRATEGY                         OBJECTIVES               No    PROJECT NAME & Guideline output                     CODE
                                      o To reduce instances of      76      Development of a District Safety & Security Forum 2 S1
 S19.           Ensure Effective          violent crime reported and
Development of co-ordination and          unreported in the district To   77    Alignment of community policing forums according    2   S2
participation avenues between the         improve social cohesion by            to Municipal boundaries
Department & Communities.                 integrated participation in
                                          social events by 10% per
                                          annum
                                      o   To facilitate efficient         78    Link GIS, Media, and SAPS district statistics       3   S3
                                          management of and access
                                                                          79     Conduct regular community road shows               3   S4
                                          to crime related information
                                      o   Locate crime patterns
                                          spatially .for more efficient   80    Provide patrol support to SAPS during peak          1   SF
S20. Development of a district            management                            seasons (Hib+ Umdoni)
wide communication strategy via the   o   To provide for safe             81    Explore re-location of certain police stations to   1   S6
GIS system and the media                  locations for victims of              areas of need
                                          crime                           82    Establish a place of safety for victims of crime    3   S7
                                      o   To ensure that the beaches
                                          are safe for bathers and        83    Explore the extension of service to high crime      1   S8
S21. Improve safety and security
                                          visitors.                             areas
conditions within the district.
                                      o   To equip life savers with the   84    District wide safe swimming (lifesavers and         1   S9
                                          necessary equipment to                facilities)
                                          keep the beaches safe for       85    Safe facility for victims of abuse (women)          1   S10
                                          tourism, locals and disaster
                                          management.                     86    Police facilities needs assessment/Audit            3   S11
78




Table No 3.01                         SUSTAINABLE EDUCATION AND SKILLS DEVELOPMENT

PRIORITY ISSUE                        Inaccessibility of schools, lack of Educational Quality Facilities., RELATED ISSUES Hazardous road
                                      conditions and high accident rates (2) Young girls leave school in order to care for siblings
KEY LOCALISED LA 21                     Gender equity guidelines
SUSTAINABILITY GUIDELINES –             Localised strategic development guidelines emphasising the spatial location of facilities and
LINK TO KPI’S                             settlements which should be integrated and avoid dispersed arrangements..
                                         Disaster management framework link to ENVIRONMENTAL, EPIDEMIC, FLOOD hazards risks
            STRATEGY                          OBJECTIVES              No     PROJECT NAME & Guideline output                           CODE
                                      o To improve access to        87       Explore the expansion of the Bicycle project to       3   ED1
S22. Improve Accessibility &             facilities                          two more municipalities ( Nkweletsheni/Mkunya &
Facilities                            o                                      St Faiths)
                                                                    88       Identify mobility problems encountered by             2   I2
                                                                             scholars eg. Flooding rivers and explore solutions.
                                                                        89        Encourage settlement closer to existing schools
                                                                                  and main arterials.                                      P
                                      o   To encourage students to      90        Joint priotisation of schools that need additional
                                          take subjects on Higher                 classrooms , toilets & Fencing with the DEC
                                          Grade, maths and science      91        Undertake school facilities needs                    2   ED2
. S23. Improve Quality of education   o   To improve the quality of
                                                                                  assessment/Audit
faclities                                 facilities and teaching
                                                                        92        Develop a local COLTS program with DEC
                                          capacity
                                                                                  districts                                                P
                                                                        93        Undertake school expertise needs                     3   ED3
                                                                                  assessment/Audit
                                      o   To improve the quality of     94        Develop a Skills register in each municipality in    2   ED4
                                          skills in the district                  collaboration with the SMME desk
                                                                        95        Establish a technical training and skill center in   2   ED5
S23.   Skills Development                                                         Umzumbe area
                                                                        96        Speed up the SETA programme in all sectors           3   ED6
                                                                                  within the district
                                                                        97        Develop employment equity plan                           P
79




Table No 3.01                 SUSTAINABLE LAND REFORM AND HUMAN SETTLEMENT

PRIORITY ISSUE                Unresolved land claims, lack of security of tenure, young children heading households. Young girls leave school in
                              order to care for siblings and access to housing – RELATED TO ISSUES OF EDUCATION ABOVE.
KEY LOCALISED LA 21             Gender equity guidelines
SUSTAINABILITY GUIDELINES       Localised strategic development guidelines emphasising Integration, spatial location of settlements &, LRAD .in
– LINK TO KPI’S                   relation to the LED localized guidelines.
                                            Disaster management framework link to ENVIRONMENTAL, EPIDEMIC, FLOOD hazards
                                           risks
           STRATEGY                    OBJECTIVES                  No      PROJECT NAME & Guideline output                                 CODE
                              o   To provide potential farmers   98        Awareness on Land Rights & Reform Products                  1     L1
 S24. Develop an integrated       with appropriate information
                                  and support                    99        Establish data base of available land (private &            1     L2
land reform program
                                                                           state)
                                                                 100       Co-ordanate and hold a district land & agric Indaba         1     L3
                                                                 101       Identify local land needs
                              o   Housing to be built to
                                                                 102       Provide support for emerging farmers                        1     L4
                                  standard, with 100%
                                  soundness.                     103       Task team to speed up land claims resolution                1     L5
                              o   Existing houses repaired to
                                  community agreed standards     104        Speed up LRAD / release of state land projects             1     L6
                              o   Every project to include a     105       Improve access roads to small scale farms                   1     L7
                                  maintenance programme
                              o   At least 500 households        106       Establish information centre.                               1     L8
S25. Initiate a settlement        access the rural housing       107       Redevelopment of houses destroyed by violence               1     L9
redevelopment program             programme per year.
                                                                 108       Undertake a socio-economic/ settlement/ street              1    L10
                                                                           children survey
                                                                 109       Further exploration of housing opportunities in             1    L11
                                                                           Dududu, Morison’s Post, Ezinqoleni, and St faiths
                                                                 110       Identify other appropriate rural housing                    1    L12
                                                                           opportunities
                                                                 111       Identify Suitable Housing options for HIV/AIDS              1    L13
                                                                           orphans and the aged in the district.
80




Table No 3.01                                                          SUSTAINABLE ROADS & TRANSPORTATION
PRIORITY ISSUE                                Poor accessibility and mobility of the rural poor – RELATED TO ISSUES OF(1) Hazardous road conditions
                                              and high accident rates (2) Poor access issue for small and medium scale farmers
KEY LOCALISED LA 21                             Gender equity, barrier free access guidelines
SUSTAINABILITY GUIDELINES –                     Localised strategic development guidelines emphasising Integration, spatial location of settlements in relation
LINK TO KPI’S                                     to the LED localized guidelines.
                                              Disaster management framework link to ENVIRONMENTAL, EPIDEMIC, FLOOD hazards risks
             STRATEGY                                OBJECTIVES             No       PROJECT NAME & Guideline output                                           CODE
 S26. Develop coastal road and key inland     o   Communities access services     112,113   Marine drive, (Hibisscuss Coast), R102, (Sezela- Scottburgh)   1    T1
access roads into a genuine activity              to an acceptable standard and
                                                                                  114,115   P68, (Umtentweni- Phungashe) , R612 ( Umzinto – Jolivet)       1    T2
corridors with associated activity spines,        to acceptable convenience
traffic lights at appropriate places for          levels                          116       N2 (Ezinqoleni- Port Shepstone),                               1    T3
economic enhancement and safety and           o   Reduce accident rates by 5%
convenience purposes.                             p.a.                            117       R78 ( Dududu – Nkweletsheni)                                        T4

                                              o   Communities access              118       P383 – P732 (Southbroom to Gcilima)                                 T5
                                                  services to an acceptable       119       Bridge -Umkomazi linking uMbumbulu & Dududu ( Ndaya)                T6
S27      Strengthen road networks that            standard and to acceptable
                                                                                  120       D686-D150 Mellville- Madlala-Umzumbe)                          1    T7
link various municipalities                       convenience levels
                                                                                  121       Mfume to Embo road                                             1   T8
                                                                                  122       D942-D949 (kwaGolweni-KwaDweshula)                             1   T9
                                                                                  123       P57 Izingolweni –Mpunzi Drift                                  1   T10
                                                                                  124       Bridge Crossing Umzimkhulu linking kz 214 & 215                1   T11
                                                                                  125       P58 (Harding –lanqenqa- Izingolweni)                           1   T12
                                                                                  126       D971 D982 9DududuKenterton - Jollivet                          2   T13
                                              o   Communities access              127       Develop a rail network sustainability plan                     1   T14
                                                  services to an acceptable       128       Development of a district public transport system              2   T15
S28. Development of           a    district       standard and to acceptable      129       Upgrade Margate airport to be a tourism gateway                2   T16
transportation solution                           convenience levels              130       Upgrade and maintain small & medium scale farmer roads.        1   T17
                                                                                  131       Institutionalise representation of municipalities in RRTFs     p   T18
81




Table No 3.01                       SUSTAINABLE ENERGY AND HEALTH CARE
PRIORITY ISSUE                      Poor access to Electricity & Energy -RELATED TO THE ISSUE OF (1):Health hazards due lack of
                                    sustainable energy source (2) High levels of poverty and lack of job opportunities

KEY LOCALISED LA 21                  Gender equity guidelines, advocating for the rights of children in relation to energy sourcing
SUSTAINABILITY GUIDELINES            Localised strategic development guidelines with an emphasis on the spatial location of settlements .in
– LINK TO KPI’S                       relation to environmental assets such as forests, LED localized guidelines and the more specific SEA
                                      guidelines in relation to the location of power lines, woodlot management
                                     Disaster management link to fire hazards risk./ risks of inappropriate use/ location of high voltage power
                                      lines

           STRATEGY                          OBJECTIVES               No     PROJECT NAME & Guideline output                              CODE
                                    o   Communities access to an     132     Commission an Electricity Master Plan which is          2     E1
                                        acceptable standard and to           aligned with the spatial framework & the ISRDP
                                        acceptable convenience       133     Identification of areas that need to benefit from       3     E2
 S29. Extend the electricity            levels of electricity &              alternative sources of energy
network according to the district       energy supply                134     District wide woodlot access project                    3     E3
spatial framework.                  o   Optimally use Strategic
                                        harnessing of 100% of
                                        environmental resources
                                        and reduce health hazards
                                        by 10% per annum
                                                                     135     Ndongeni Mining project                                 2    ED7
                                    o   Create at least 1 500 new
                                                                     136     Idwala Carbonates Community Development &               2    EDS
                                        permanent income
S30. Energy and SMME                    opportunities                        Training
Programme.                                                           137     Imbokotho Mining- Skills Training/ Development          2    EDS
                                                                             and Human Settlement project.
82




Table No 3.01                  SUSTAINABLE ENERGY AND HEALTH CARE
PRIORITY ISSUE                 Inadequate Primary Health Care Facilities for rural areas -RELATED TO ISSUE OF (1): Access to clean drinking ,
                               sanitation and poverty relief.
                               .
KEY LOCALISED LA 21               Gender equity guidelines, advocating for children, people with disabilities
SUSTAINABILITY GUIDELINES         Localised strategic development guidelines emphasising Integration, spatial location of settlements .in relation to
– LINK TO KPI’S                     the sustainable livelihoods guidelines.
                                             Disaster management link to epidemic risk./ risk inadequate response of emergency
                                              services
          STRATEGY                      OBJECTIVES                   No      PROJECT NAME & Guideline output                                    CODE
                               o   Optimally use Strategic          138      Establish an appropriate district health system that          2      H1
                                   harnessing of 100% of                     incorporates:
                                   environmental resources                            environmental health services
                                   and reduce health hazards                          prevention of infectious diseases
                                   by 10% per annum                                   health promotion and education
                                                                                      community rehabilitation services
                               o   To improve primary health                          treatment of minor injuries and diseases
                                   care services in order to                 provision of essential medicines and primary health
                                   promote well being with a                 care
S31. District primary health       special focus on; women;         139      Take over district health activities from province.           3      H2
care development                   children, and people with
                                   disabilities                     140      Initiate appropriate 24 hour emergency services               3      H3
                                                                    141      Feeding schemes: children, women, aged, people                2     HG7
                                                                             with disabilities
                                                                    142      Develop specific care programmes elderly, women,              2     HGD
                                                                             disabled people and drug abuse                                       8

                                                                    143      Develop programmes for street children.                       2     HC9
                                                                    144      Programme for street traders
83




Table No 3.01                     INTEGRATED HIV/AIDS INSTITUTIONAL AND PREVENTION PROGRAMME
PRIORITY ISSUE                    Poor co-ordination of HIV/AIDS related activities, need for a cohesive prevention programme -
                                  INTERSECTORAL RELATION ACROSS ALL SECTORS and high levels of poverty and lack of job
                                  opportunities

KEY LOCALISED LA 21                Gender equity guidelines, advocating for the rights of children.
SUSTAINABILITY GUIDELINES          Localised strategic development guidelines with an emphasis on the spatial location of settlements .in
– LINK TO KPI’S                     relation to HIV/AIDS guidelines ,LED localized guidelines.
                                   Disaster management link to preparedness strategy / sector risk profiles

         STRATEGY                          OBJECTIVES                 No   PROJECT NAME & Guideline output                                CODE
                                  o   To initiate appropriate co-    145   Initiate “Draft District HIV/Aids Strategy Institutional   2    I1
S44. Establish    an agreed
                                      ordination of HIV/AIDS               Structure” –Forum and Task Teams
upon HIV/Aids     Institutional
                                      services, care, prevention     146   Appoint a district Co-ordinator                            3    12
structure
                                      and human rights
                                      advocacy                                                                                        3    13

S45. Initiate a district wide                                        147   Develop/ adopt a cohesive Prevention Policy                3   HIV/
integrated prevention strategy. o     Reduce HIV infection rate by                                                                        DM1
                                      2% per annum                   148   Commission specific range of local sector risk             3
                                  o   Reduction in Aids related
                                                                           profiles
                                      deaths reported at State
                                      hospitals
                                                                     149   Co-ordinate an effective range of education &              2   HIV/E
                                                                           training programmes based on                                     1
                                                                           o Barrier free access
                                                                           o Appropriate feeding regimes ( E.g. breast
                                                                               feeding or formula feeding)
84



Mm
Table No 3.01                        INTEGRATED HIV/AIDS CARE PROGRAMME
PRIORITY ISSUE                       Poor co-ordination of HIV/AIDS related activities - INTERSECTORAL RELATION ACROSS ALL SECTORS
                                     and high levels of poverty and lack of job opportunities

KEY LOCALISED LA 21                   Gender equity guidelines, advocating for the rights of children.
SUSTAINABILITY GUIDELINES             Localised strategic development guidelines with an emphasis on the spatial location of settlements .in
– LINK TO KPI’S                        relation to HIV/AIDS guidelines ,LED localized guidelines.
                                      Disaster management link to preparedness strategy / risks of inappropriate settlement locations, risk
                                       profiles , costs of medication, care and human rights advocacy in all sectors.

          STRATEGY                            OBJECTIVES                No   PROJECT NAME & Guideline output                            CODE
                                     o   To initiate appropriate co-   150   Develop data base of service providers                 3   HIV7
46. Initiate an integrated care          ordination of HIV/AIDS
program     throughout   district,                                     151   Develop appropriate, HIV/AIDS barrier free             3    HIV8
                                         care, prevention and
which is sensitive to local              human rights advocacy               procedures.
conditions and needs                                                   152   Co-ordinate the existing network of care service       3    HIV9
                                         services.
                                                                             providers and develop care givers support.
                                                                       153   Develop a volunteer programme with appropriate         3   HIV10
                                                                             training and skills development and Initiate and
                                                                             monitor the training of trainers
                                                                       154   Develop a strategic youth support for those caring     3   HIV11
                                                                             for siblings and ailing parents & Develop
                                                                             appropriate “foster care” programmes
                                                                       155   Investigate “Best practice” orphans & elderly          3   HIV12
                                                                             accommodation        scenarios   and    implement
                                                                             accordingly in LMs
                                                                       156   Facilitate coping mechanisms and income                3   HIV13
                                                                             generating support.
                                                                       157   Initiate stress management and basic recreational      3   HIV14
                                                                             projects for care givers
85




Table No 3.01                        INTEGRATED HIV/AIDS CARE PROGRAMME
PRIORITY ISSUE                       Poor co-ordination of HIV/AIDS related activities - INTERSECTORAL RELATION ACROSS ALL SECTORS
                                     and high levels of poverty and lack of job opportunities

KEY LOCALISED LA 21                   Gender equity guidelines, advocating for the rights of children.
SUSTAINABILITY GUIDELINES             Localised strategic development guidelines with an emphasis on the spatial location of settlements .in
– LINK TO KPI’S                        relation to HIV/AIDS guidelines ,LED localized guidelines.
                                      Disaster management link to preparedness strategy / risks of inappropriate settlement locations, risk
                                       profiles , costs of medication, care and human rights advocacy in all sectors.

          STRATEGY                            OBJECTIVES                No   PROJECT NAME & Guideline output                            CODE
                                     o   To initiate appropriate co-   158   Develop appropriate counseling, welfare safety and     3    HIV2
                                         ordination of HIV/AIDS              access to medication.
46. Initiate an integrated care
                                         care, prevention and          159   Develop mother to child transmission prevention        P    HIV3
program     throughout   district,       human rights advocacy               program and access the required drugs.
which is sensitive to local
                                         services.                     160   Develop specific HIV/AIDS care sustainable             3    HIV4
conditions and needs
                                                                             livelihoods program for food security. (eg.
                                                                             Sustainable Community Gardens)
47 Initiate an integrated care                                         161   Initiate a volunteer program amongst the local legal   3    HIV5
program throughout district,                                                 fraternity to address land legal and human rights
which is sensitive to human and                                              issues associated the affected and infected peoples
land rights.                                                                 of the district.
                                                                       162   Develop an appropriate burial regulation procedure     3    HIV6
                                                                             which addresses the rights of clients in the context
                                                                             of customary and formal law.
86




Table No 3.01                        INTEGRATED HIV/AIDS MAYORESS CARE PROGRAMME
PRIORITY ISSUE                       The need for a focus on the care for children, education and NGO support.

KEY LOCALISED LA 21                   Gender equity guidelines, advocating for the rights of children.
SUSTAINABILITY GUIDELINES             Localised strategic development guidelines with an emphasis on the spatial location of settlements .in
– LINK TO KPI’S                        relation to HIV/AIDS guidelines ,LED localized guidelines.
                                      Disaster management link to risk profiles

          STRATEGY                            OBJECTIVES                 No   PROJECT NAME & Guideline output                           CODE
                                     o   To initiate focused specific   163   Initiate mayoresses forum                             P   HIV7
                                         HIV/AIDS care, prevention
                                                                        164   Develop an agreed to funding strategy                 P    HIV8
                                         and human rights
46. Initiate an integrated care          advocacy services based        165   Establish a trust fund                                P    HIV9
program     throughout   district,       on the needs of children.
which is sensitive to local                                             166   Establish data base of target groups                  P   HIV10
conditions and needs                                                    167   Develop NGO/CBO support strategy                      P   HIV11
                                                                        168   Initiate a monitoring and review process for          P   HIV12
                                                                              programmes initiated via the mayoresses forum
87




Table No 3.01                       FINANCE AND INSTITUTIONAL DEVELOPMENT

PRIORITY ISSUE                      Inappropriate institutional arrangements for developmental mandate
KEY LOCALISED LA 21                   Gender equity guidelines, advocating for the rights of people with disabilities.
SUSTAINABILITY GUIDELINES             Localised strategic development guidelines with an emphasis on the poverty alleviation, LED,
– LINK TO KPI’S                         SERVICE delivery, HIV/AIDS, AND SUSTAINABILITY FRAMEWORK GUIDELINES.
                                      Disaster management link to prevention, preparedness, incident, response, rehabilitation, mitigation
                                        and development strategy. Linked to risk profiles and disaster management objectives.

           STRATEGY                          OBJECTIVES                 No    PROJECT NAME & Guideline output                            CODE
                                    o   To Increase municipal          169    Strategic Revenue Leverage Plan                       P         I2
                                        revenue in accordance with
S48. Leverage of                        the infrastructure and         170-   Develop a Strategic Asset Management Plan in          P         I3
external/internal / international       developmental mandate                 conjunction with the Strategic Revenue Leverage
revenue                                                                       Plan
                                                                       171    Develop an assets register                            2         I4
                                                                       172    Maintain assets register                              2         I5
                                                                       173    Develop Strategic investment policy study             2         I6
S49 Support services                o   To develop appropriate         174    Develop an effective & economical treasury            2         I7
enhancement based devolved              support services based on
powers and functions devolution         the devolution of powers and   175    Develop an incentive driven billing system            2         I8
                                        functions
                                                                       176    Financial Planning and systems changes project        2         I9
                                                                              Complying with the Municipal Systems Bill and
                                                                              GAMAP
88




Table No 3.01                      FINANCE AND INSTITUTIONAL DEVELOPMENT

PRIORITY ISSUE                     Inappropriate institutional arrangements for developmental mandate
KEY LOCALISED LA 21                  Gender equity guidelines, advocating for the rights of people with disabilities.
SUSTAINABILITY GUIDELINES            Localised strategic development guidelines with an emphasis on the poverty alleviation, LED,
– LINK TO KPI’S                        SERVICE delivery, HIV/AIDS, AND SUSTAINABILITY FRAMEWORK GUIDELINES.
                                     Disaster management link to prevention, preparedness, incident, response, rehabilitation, mitigation
                                       and development strategy. Linked to risk profiles and disaster management objectives.

           STRATEGY                          OBJECTIVES                No   PROJECT NAME & Guideline output                                CODE
                                   o   To Create a sustainable        177   Heads of department identify human resource needs          P   I10
                                       institution which responds           according to employment equity plan
                                       effectively to imbalances of   178   Heads of Department review recommended institutional       P   I11
                                       the past, promotes                   requirements in light of human resource needs and
                                       sustainable growth and               clarity on powers and functions
                                                                      179   Appoint HIV/Aids /people with disabilities /barrier free   P   I12
                                       development and seriously
                                                                            access Co-ordinator
                                       reduces poverty
                                                                      180   Appoint disaster management co-ordinator                   P   I13
50.      Create sustainable
institution which responds                                            181   Initiate DHS institutional alignment                       P   I14
effectively to imbalances of the                                      182    Water & Sanitation institutional alignment                2   I15
past, promotes sustainable
growth and development and                                            183   Skills Audit, training and development                     2   I16
seriously reduces poverty                                             184   Complete Employment Equity Plan                            2   I17
                                                                      185   Appropriate Office Space Arrangements                      2   I18
                                                                      186    GIS / IT Programmes                                       2   I19

                                                                      187   Communication Plan & IDP popular document                  2   I20

                                                                      188   Project Turn Around and Customer service programme         2   I21

				
DOCUMENT INFO
Shared By:
Tags: Table
Stats:
views:22
posted:12/5/2009
language:English
pages:13
Description: Table No 3