					Eagle Scout Leadership Service Project Workbook

Brian Yakel
Scout's name: 2007 Halethorpe Ave. Halethorpe, MD 21227 Address: 410-242-8762 Telephone No.:

Troop 306 Unit No.: Arrowhead District District: Baltimore Area Council Local council:

John Jenkins Unit leader's name: 108 S. Symington Ave. Catonsville MD 21228 Address: 410-744-7732 Telephone No.:

Richard Cassidy Unit advancement committee person's name: 415 Chalfonte Dr. Catonsville MD 21228 Address: 410-788-8216 Telephone No.:

PROJECT DESCRIPTION
Describe the project you plan to do.

My Eagle Project involves clearing and restoring an 1100 foot trail known as the Short Line Trail West. The entire Short Line Trail runs from Spring Grove Hospital to Charlestown Retirement Home. The trail I’m responsible for is found across from the Catonsville Armory on Mellor Ave and ends at the base of a hill leading up to Bloomsbury Ave. The area is currently overgrown with vegetation and has rocks and roots coming out of the ground that need to be removed. Donations for needed items for this project will be collected from local tool places such as ABC Rental, Home Depot and Lowe’s as well as anyone in the troop that wouldn’t mind lending them out and from some of my family members. The project will be divided into three parts. The first part of my project involves marking the trail with spray paint and marking tape for what needs to be removed. This part will also include dividing up the trail into sections in order to spread out the scouts to maximize the work effort. The second part of my project involves opening an entrance on Mellor Ave already marked by the Catonsville Rails to Trails (CRTT), and clearing the emerging trees that have been marked to flesh out the area making it wider using chainsaws and loppers. No fully grown trees will be harmed however. A chipper will be used to grind up the debris which will then be turned to mulch to fill in a ditch at the Mellor Ave entrance. All remaining mulch will be scattered around the area to decompose naturally. The third and final part of my project will be sending the scouts out to assigned sections with an adult supervisor to clear the remaining brush, rocks and roots Trash bags will be in each section to dispose of any trash or if needed weeds. When the scouts are finished, the trail will be properly prepared for the Catonsville Rails to Trails to have contractors come in and lay crush and run gravel. Just to be clear this is after the project is complete, the scouts will have no part in this.

What group will benefit from the project? _Catonsville Rails To Trails__________________410-299-8650_______
Name of religious institution, school, or community: P.O. BOX 3282 Street address: Catonsville City: Telephone No.: MD State: 21228 Zip code:

The Catonsville Rails to Trails (CRTT) is a non profit organization, where donations are tax deductible, which reconstructs no longer used trolley tracks into trails for recreation. Projects they have completed in the past are the #8 Street Car Path located on Frederick Road and the Trolley Line #9 Trail located on Edmondson Ave This particular trail was the Eagle Project of Aaron Tomarchio of troop 456 back in 1991. The Short Line Trail West which I am working on was once a railroad that ran through Catonsville. With the introduction of the trolley tracks this went from a passenger train to a freight train carrying lumber across Catonsville to build houses. Eventually even that use became outdated and the track was abandoned. My project will renew this trail’s use to the community as a place for recreational hiking and biking and as an alternative to driving cars. This is also a small portion of a larger plan the CRTT hopes in contributing to a national plan in making a trail that spans the country from Annapolis to California. To accomplish this goal they need to link the trail I am working on to one on the other side of Bloomsbury Ave and to one that they are currently working on located on Maiden Choice.

This concept was discussed with my unit leader on _____September 7, 2006____ (Date): The project concept was discussed with the following representative of the group that will benefit from the project. Steve Sprecher Representative's name: President of CRTT Representative’s Title: August 19, 2006 Date of meeting: 410-744-4542 Phone No.:

PROJECT DETAILS
Description: Present condition: The only way to get into the trail is to climb over a small gate or go through a small opening in the woods. It is also highly overgrown with vegetation and a small tree blocks part of the path about half way but can be climbed over. About a quarter of the way into the trail from the Mellor Ave entrance there is a small clearing that leads off into a baseball field on the left and to dumpsters on the right. The trail is also littered with rocks, roots, trash and there is a chair and a mattress at end of the trail on Bloomsbury Ave Methods: My plan for clearing the 1100 foot Short Line Trail West is a three part process. The first part of my project will be using spray paint and marking tape to mark areas that need to be cut by chainsaw, and to mark the sections I will divide the scouts into. This will be on September 23; rain date September 24. The adults and older scouts will be used for this part of my project. The second part of my project will be clearing an entrance to the trail on Mellor Ave. and cutting away trees on the boarder of the trail to make it 10ft wide or to the byway using chainsaws and loppers to clear trees The debris will be put through a chipper and the wood chips will be used to fill in a ditch by the new entrance on Mellor. All unused mulch will be scattered around the area to decompose naturally. Any trash will be thrown in provided trash bags. These will be disposed of in nearby dumpsters at the end of the day. This will be on September 30; rain date October 1. Once again adults and older scouts will be used for this part where the adults use the chainsaws and the scouts use the loppers. The troop first aid kit will be on site in case of any injuries such as with the chainsaw or chipper The third and final part of my project will have the scouts using rakes, shovels and if needed loppers to clear the remaining brush and weeds. These can be scattered into the woods to decompose naturally or thrown in provided trash bags along with any trash. These will be disposed of in near by dumpsters at the end of the day. This will be on October 14 and 21; rain dates October 15 and 22 respectively All scouts will participate in this portion of the project and will be divided into groups to work on specific parts of the trail so everyone is doing something and every part of the trail will be taken care of. To maximize the amount of work effort the scouts will eat lunch in shifts. The troop first aid kit will be on site in case of any injuries such as getting jabbed with a shovel. If the project remains unfinished or it rains on a rain date October 28 will be the (hopefully) last day with a rain date being October 29. On each work day scouts will be required to bring work gloves and safety glasses. Extras will be included for those that don’t own these items. The scout’s work is done when the trail has been properly prepared for the CRTT who will have their contractors come and lay out crush and run gravel. To be clear this will be done when the project is complete, the scouts will have no part in this. Ilex wood working company will donate a sign for the entrance of the trail reading “Short Line Trail West: Eagle Project of Brian Yakel Troop 306 2006. Small holes will be dug at the entrance of the trail to accommodate the poles of the sign and filled in with dirt to hold it in place.

Timeline: Date

What was done

Who was involved

Total time

March 9,2006 April 20, 2006

April 22, 2006

April 23, 2006

April 24, 2006

April 25, 2006

April 30, 2006

May 4, 2006

May 7, 2006

May 8, 2006

May 13, 2006

June 1, 2006

June 20, 2006

July 6, 2006

July 20, 2006

Life to Eagle Seminar Asked John France and Jane Cassidy to be my Eagle Advisors Contacted Kit Valentine of the Catonsville Rails to Trails (CRTT) about potential Eagle Projects I got a response from Mr. Valentine asking what kind of timeline I have to complete my project I told Mr. Valentine my timeline and how I needed a project that could be finished before winter because the weather would make out door work to hard Mr. Valentine gave me the Short Line Trail located on Mellor Ave across from the Catonsville Armory as my project Emailed my advisors letting them know I found a project Meeting with my advisors to discuss my project Called Mr. Valentine asking to meet with him at the Short Line Trail on May 13 Emailed my advisors telling them about the meeting on May 13 Meeting at the Short Line Trail regarding what I need to do Informed the committee I was ready to start my project Received the contact information for Steve Sprecher the president of the CRTT Presented my project to the committee where it was shot down Talked with Richard Cassidy, the committee advancement chair

My mom and I John France, Jane Cassidy, and I Kit Valentine and I

90min 10min

10min

Kit Valentine and I

10min

Kit Valentine and I

10min

Kit Valentine and I

10min

John France, Jane Cassidy, and I John France, Jane Cassidy, My Dad, and I Kit Valentine and I

10min

20min

15min

John France, Jane Cassidy, and I Jane Cassidy, Kit Valentine, My Mom, My Dad, and I John France, Jane Cassidy, and I Kit Valentine and I

10min

70min

15min

10min

The committee and I

30min

Richard Cassidy and I

30min

August 17, 2006

August 17, 2006

August 19, 2006

August 22, 2006

August 23, 2006

August 24, 2006

August 24, 2006

about what he wants to see in the project and to form a subcommittee to see my trail Sent emails to the subcommittee and Steve Sprecher about meeting at the trail to go over what needs to be done on August 19 Met with the sub committee consisting of my two advisors, John Jenkins my troop’s scout master, Mr. Cassidy and Dave Warshaw the committee chair about viewing the trail on August 19 The subcommittee and I met at the Short Line trail with Steve Sprecher the president of the CRTT to further discuss my project so everyone knows what is expected to be in my project My mom and I go back to the trail to measure 10 ft so we get an idea of how much work will be needed. We then measure the signs of The #8 Streetcar Path and the Trolley #9 Trail to get an idea of the size sign I’ll need for my trail Asked Mr. Jenkins if the company he works for, Ilex Woodworking could donate a sign for my project. Met with Mrs. Cassidy and discussed my project draft Sent my draft to John France to look at and see what I needed to fix Gave my second draft to my advisors and talked with Mr. Cassidy

John France, Jane Cassidy, John Jenkins, Richard Cassidy, Dave Warshaw, Steve Sprecher and I John France, Jane Cassidy, John Jenkins, Richard Cassidy, Dave Warshaw and I

15min

30min

John France, Jane Cassidy, John Jenkins, Dave Warshaw, Steve Specher, My Mom, and I

90min

My mom and I

1hr

John Jenkins and I

10min

Jane Cassidy and I

30min

John France and I

10min

August 31, 2006

John France, Jane Cassidy, Richard Cassidy, and I

20min

September 5, 2006

September 5, 2006

September 6, 2006

September 6, 2006

September 6,2006

September 7, 2006

Met with Michele Mazzocco at the Catonsville Library to go over and sign my Eagle Packet Called Mr. Richard and asked to meet with him on September 6 Went to Home Depot to get the prices for all of the items on my list Called Home Depot for estimates on how much a chipper and chainsaws would cost to rent Went over my project with Mr. Richard and got it approved Presented my project to the committee and got it approved Sent emails to friends, family and fellow scouts asking for help and/or donations Called Papa Johns and asked for donations of pizza Called ABC Rental and got chainsaws and a chipper donated for one rental use Purchased spray paint, marking tape and trash bags from Home Depot Created a business letter for each of the donations I’d need Oversaw the first day of my project. Received donations of donuts from Shoppers Went to Kendell Hardware and received donations of shovels and work gloves Talked with Steve Specher and Michele Mazzocco about moving the entrance Oversaw the second day of my project Received donations of

Michele Mazzocco, my Mom and I

30min

Richard Cassidy and I

10min

My Mom, My brother, and I Tool rental guy and I

1hr

15min

Jane Cassidy, Richard Cassidy, My mom and I The committee and I

30min

45min

September 9, 2006

Me

30min

September 10, 2006 September 12, 2006

Papa Johns manager and I Tom Ward and I

10min

10min

September 20, 2006 September 21, 2006 September 23, 2006 September 28, 2006 September 29, 2006

My mom, My brother, and I Me

1hr

30min

The scouts and I Shoppers manager and I Mrs. Kendell, My mom, My dad, and I

2hr. 30min 30min 2hr 30min

September 30, 2006

September 30, 2006 October 9, 2006

Steve Specher, Michele Mazzocco, My Mom, My Dad, John Jenkins, and I The scouts and I Lucky’s manager and I

20min

1hr. 45min 30min

October 11, 2006

October 13, 2006

October 14, 2006 October 21, 2006 November 4, 2006

November 9, 2006

November 11, 2006 December 7, 2006

December 11, 2006

December 18, 2006

December 26, 2006

January 5, 2007 January 10, 2007

January 11, 2007

ice and water from Lucky’s Received donations of loppers and rakes from Home Depot Received more donations of donuts from Shoppers Oversaw the third day of my project Oversaw the fourth day of my project Met with Steve Sprecher about broken glass on the trail Met with CRTT committee about graffiti on a log Oversaw the pick up of the broken glass Asked John Jenkins to clear a log with graffiti on it from the trail Dropped off volunteer forms to Steve Sprecher’s house. He wasn’t home I drop off the “Approvals for Completed Project” to Steve Sprecher’s house. He wasn’t home Steve Specher signs my project after John Jenkins cuts up the graffiti log I typed up my Eagle Project write up I made corrections to my Eagle Project write up I made corrections to my Eagle Project write up

Home Depot manager and I Shoppers manager and I The scouts and I The scouts and I Steve Sprecher, John Jenkins, My Mom, My Dad, and I The CRTT committee, My Mom and I Logan Jenkins, My Mom, My brother, and I John Jenkins and I

30min

30min

5hr. 2hr. 45min

1hr.

1hr. 10min

My mom and I

10min

My Mom and I

10min

Steve Specher, John Jenkins and I

10min

Me Me

1hr 30min 1hr.

Me

20min

September 23- marking everything that needs to be cut 9am- 3pm (rain day September 24) September 30- removal of the trees and other heavy stuff 9am-3pm (rain day October 1) October 14- pulling the weeds and removing rocks and roots 9am-3pm (rain day October 15) October 21- Cont. last week’s agenda 9am-3pm (rain day October 22) October 28- a day used if there is still anything to do or if it rained on a rain day 9am-3pm (rain day October 29)

“Before” Photographs

Approval Signatures for Project Plan
Project plans were reviewed and approved by:
Religious institution, school, or community representative: Date Scoutmaster/Coach/Advisor: Date

Unit committee member:

Date

Council or district advancement committee member: Date

IMPORTANT NOTE: You may proceed with your leadership project only when you have … □ □ □ Completed all the above mentioned planning details Shared the project plans with the appropriate persons Obtained approval from the appropriate persons

CARRYING OUT THE PROJECT
Hours I Spent Working on the Project
The length of time spent should be as adequate as is necessary for you to demonstrate your leadership of two or more individuals in planning and carrying out your project. Hours I spent:…Planning the project: ___6hr 50min__ Carrying out the project __24hr40min_ Total hours I spent working on the project: __31hr30min__ Hours Spent by Scouts, Venturers, or Other Individuals Working on the Project Name ___Chris Yakel_______________ Date No. of Hours

__Dave Warshaw____________ __Ross Haynes______________ __John Jenkins______________ __Logan Jenkins_____________ __Albert Hsu________________ __Vince Cassidy_____________ __Mike Bledsoe______________ __Chris Yakel_______________ __Dale Delp________________ __John Jenkins_____________ __Logan Jenkins____________ __Vince Cassidy____________ __Mike Bledsoe____________ __John France_____________ __Albert Hsu_______________ __Steve Yakel______________ __Don Martin_______________ __Jim Ryan________________ __Dave Warshaw___________ __Chris Yakel______________ __Mike Moyer______________ __Hank Krakat_____________ __Collin Molony____________ __Sean Molony____________ __Steve Yakel____________ __Sam Gruber___________ __Don Martin____________ __Vince Cassidy_________ __Chad Delp____________ __Paul Newman_________

_9/23/2006____ _9/23/2006____ _9/23/2006____ _9/23/2006____ _9/23/2006____ _9/23/2006____ _9/23/2006____ _9/23/2006____ _9/30/2006____ _9/30/2006____ _9/30/2006____ _9/30/2006____ _9/30/2006____ _9/30/2006____ _9/30/2006____ _9/30/2006____ _9/30/2006____ _9/30/2006____ _9/30/2006____ _9/30/2006____ _10/14/2006___ _10/14/2006___ _10/14/2006___ _10/14/2006___ _10/14/2006___ _10/14/2006___ _10/14/2006___ _10/14/2006___ _10/14/2006___ _10/14/2006___ _10/14/2006___

2hr. 30min 2hr. 30min 2hr. 2hr. 2hr. 2hr. 30min 1hr. 15min 1hr. 15min 1hr. 45min 1hr. 45min 3hr. 45min 1hr. 45min 1hr. 45min 1hr. 45min 1hr. 45min 1hr. 30min 1hr. 45min 1hr. 45min 30min 45min 5hr. 5hr. 5hr. 5hr. 5hr. 5hr. 3hr. 20min 5hr. 3hr. 4hr. 15min 2hr. 15min

__Dave Holub___________ __Brian Holub___________ __John France___________ __Josh Morrison__________ __Albert Hsu_____________ __Mike Bledsoe__________ __Travis Ryan___________ __Jim Ryan_____________ __Jon Gallagher__________ __John Newman__________ __Jeff Scharf_____________ __Joey Scharf____________ __John Jenkins___________ __Karen Yakel____________ __Chris Yakel_____________ __Hank Krakat____________ __Jeremy Fay____________ __Collin Molony___________ __Sean Molony___________ __Sam Gruber___________ __Logan Jenkins_________ __Bill Warshaw__________ __Vince Cassidy_________ __Mike Moyer___________ __Jimmy Warshaw_______ __Jane Cassidy__________ __Paul Newman__________ __John Jenkins__________ __Tim Molony____________ __Dave Warshaw_________ __John France___________ __Chad Delp_____________ __Don Martin____________ __Chris Yakel____________ __Logan Jenkins__________ __Karen Yakel ___________

_10/14/2006___ _10/14/2006___ _10/14/2006___ _10/14/2006___ _10/14/2006___ _10/14/2006___ _10/14/2006___ _10/14/2006___ _10/14/2006___ _10/14/2006___ _10/14/2006___ _10/14/2006___ _10/14/2006___ _10/14/2006___ _10/21/2006___ _10/21/2006___ _10/21/2006___ _10/21/2006___ _10/21/2006___ _10/21/2006___ _10/21/2006___ _10/21/2006___ _10/21/2006___ _10/21/2006___ _10/21/2006___ _10/21/2006__ _10/21/2006__ _10/21/2006__ _10/21/2006__ _10/21/2006__ _10/21/2006__ _10/21/2006__ _10/21/2006__ _11/11/2006__ _11/11/2006__ _11/11/2006__

2hr. 10min 2hr. 10min 4hr. 10min 4hr. 10min 4hr. 35min 2hr. 35min 3hr. 3hr. 3hr. 15min 2hr. 15min 2hr. 2hr. 2hr. 1hr. 2hr. 2hr. 2hr. 2hr. 2hr. 1hr. 55min 1hr. 55min 2hr. 2hr. 2hr. 2hr. 2hr. 2hr. 2hr. 2hr. 2hr. 2hr. 1hr. 25min 1hr. 1hr. 1hr. 1hr.

Total number of hours others worked on the project:

__162hr 55min__

For a grand total, add the total number of hours you spent on the project to the total number of hours others worked on the project: ___194hr25min___

Materials Required to Complete the Project
Type of Material Cost of Material

________________________________________________________ __spray cans___________ _ $.99 each __ __marking tape___________ $2.98 each______ __work gloves____________Donated by Kendell Hardware________ _*chain saws_________ ___Donated by ABC Rental_____________ __*chipper______________ Donated by ABC Rental______________ __shovels_______________ Donated by Kendell Hardware________ __rakes________________ Donated by Home Depot_____________ __loppers____________ Donated by Home Depot_____________ __trash bags (70/box)______ _$14.98 /box______________________ __Safety glasses__________Unneeded________________ _______ __radios/walkie talkies____ _Provided by the Troop______________ __troop first aid kit_______ _Provided by the Troop_______________ ________________________________________________________ ________________________________________________________ ________________________________________________________ ________________________________________________________ ________________________________________________________ ________________________________________________________ ________________________________________________________ ________________________________________________________ ________________________________________________________ ________________________________________________________ ________________________________________________________ ________________________________________________________ ________________________________________________________ ________________________________________________________ ________________________________________________________ ________________________________________________________ ________________________________________________________ ________________________________________________________ __*only to be used by adults NO SCOUTS are permitted to use power tools during the project ___________________________________ ________________________________________________________ ________________________________________________________ ________________________________________________________ ________________________________________________________ ________________________________________________________

Changes
List any changes made to the original project plan and explain why those changes were made.

-On September 23 we finished marking ahead of schedule, and because Mr. Warshaw and Mr. Hsu had their chainsaws with them we began removal of the marked trees. -On September 30 the entrance was changed from the top of the trail which would require a lot of clearing to an already existing opening on Mellor Ave. -On October 14 we completely finished clearing the trail to make it suitable for the CRTT. -On October 21 we concentrated on clearing the weeds by the entrance to make room for the sign. -I gathered a small group consisting of Chris Yakel, Logan Jenkins, and Karen Yakel to pick up broken glass on November 11.

September 23- marking everything that needs to be cut and begin chain sawing 9am- 11:30am

As people began to show up I had Chris Yakel and Logan Jenkins grab either end of a measuring tape and measure out 10 feet. I then had them stand at the top of the trail 10 feet apart side by side and walk down the trail. Behind them followed Ross Haynes and John Jenkins with spray paint cans to mark their steps. This would serve as the boundary of the trail. Luckily Dave Warshaw brought extra spray cans with him because the ones I got broke. The nozzles broke off when pressed. As we got to the bottom of the trail I had Chris and Logan extend the measuring tape to 220 feet and stand one behind the other. This would serve to mark the sections I would divide the scouts into in two weeks time. Vince Cassidy and Mike Bledsoe handled the paint this time. On the way back up the trail I had the boys mark any tree in the way of the 10 foot margin to be cut down. After the spray paint job was taken care of I went down the trail to make sure nothing was missed. As it turned out more trees were marked than needed, so I sent Chris, Logan, Vince, and Mike down the trail with pink ribbon and pointed out what to mark. Trees with pink ribbon were not to be cut down. Dave Warshaw and Albert Hsu had their chainsaws with them and because we had finished so far ahead of schedule I allowed them to cut down the paint marked trees. At this time there was nothing left to accomplish, so I dismissed every one that was ready to go. When Mr. Warshaw and Mr. Hsu were satisfied with what they accomplished , they also left. September 30- removal of the trees and other heavy stuff 9am-10:45am On the second day of my project the adults that brought their chainsaws finished cutting down the trees that were not taken care of the previous week. This also included cutting fallen trees and logs into smaller pieces so they could be more easily carried by everyone else. John Jenkins had picked up the chipper rented from ABC Rental. The mulch that was created was shot back into the woods to naturally decompose. Other objects removed from the trail besides the natural foliage was a mattress and a chair left at the bottom of the trail. These were taken to nearby dumpsters They were handled by John France, Steve Yakel, Vince Cassidy, and Mike Bledsoe. The original entrance that the CRTT had asked me to clear was too densely populated with trees and I knew they would never go for it. It was decided by John Jenkins, Steve Sprecher(CRTT president), and I to make the entrance an already existing opening on Mellor Ave that led straight to the trail. After another early day I dismissed my helpers. October 14- pulling the weeds and removing rocks, roots, and trash 9am-2pm As people began to show up I assigned them to a section of the trail and brought them to that section. A group was not formed until at least one adult was available to maintain order and productivity in the section while I was not around. Within the first hour atleast four to six workers were in each of the five sections. I did take note that smaller groups moved faster than larger groups. At 12pm the pizzas that I got donated from Papa Johns arrived and I called in the workers for lunch. After eating there was a brief reprieve before I sent everyone back to work. I took boys from sections that had been completed and had them work on the entrance. When all five sections of the trail had been finished I assembled the boys into a police line, and had them walk down the trail with trash bags to pick up any trash they could find. After two trips up and down the trail to make sure everything was picked up I dismissed them. October 21- Cont. last week’s agenda 9am-11pm Having received prior approval from the CRTT on the looks of the trail this day was spent touching up the entrance to make room for the trail sign, and so people could get in easier. When the job was completed and approved by Steve Sprecher another police line was assembled and the boys once again picked up any trash that had found its way on the trail in the past week. With the labor portion of the project finished I thanked and congratulated everyone who helped me and dismissed at 11am. November 11- Pick up broken glass 10am-11am It had been brought to my attention the week before by Steve Sprecher that there was broken glass still remaining on the trail. To take care of the problem I gathered a small group consisting of Chris Yakel, Karen Yakel, and Logan Jenkins to pick up the glass. Between the three of them the job only took an hour.

Photographs
“AFTER” Photographs

Including photographs of your completed project (along with the "before" photographs with the project description) helps present a clearer overall understanding of your effort.

Approvals for Completed Project
Start date of project: ____________ Completion date of project: _____________ The project was started and has been completed since I received the Life Scout rank, and is respectfully submitted for consideration. ____________________________________ Date: ___________ Applicant's signature This project was planned, developed, and carried out by the candidate.

____________________________________ Date: ___________ Signature of Scoutmaster/Coach/Advisor: ____________________________________ Date: ___________ Signature of the representative of religious institution, school, or community


				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:19
posted:11/29/2009
language:English
pages:15