					ISO/TC 67/SC 4 Materials, equipment and offshore structures for petroleum, petrochemical and natural gas industries — Drilling and production equipment
Secretariat:

ISO/TC 67/SC 4 WORK PROGRAMME SUMMARY

American Petroleum Institute, 1220 L Street NW, Washington DC 20005 USA Tel. +1 202 682 8000 Fax. +1 202 962 4714

N434 2009-04-16
Secretariat: Chairman: ANSI (Administered by API) Austin Freeman (austin.freeman@halliburton.com) Halliburton 2601 Beltline Road Carrollton, Texas 75006 USA Tel: + 1 972 418-3982 Fax: + 1 972 418-3728 Email: austin.freeman@halliburton.com Secretary: Ed Baniak (baniake@api.org) American Petroleum Institute 1220 L Street NW Washington, DC 20005 USA Tel: + 1 202 682-8135 Fax: + 1 202 962-4797 Email: baniake@api.org

Organizational Structure The organizational structure of ISO/TC 67/SC 4 is as follows: Workgroup WG 1 WG 2 WG 3 WG 4 WG 6 Drilling equipment Drilling well control equipment Wellhead and Christmas tree equipment Production equipment Subsea equipment Secretariat ANSI ANSI NEN NEN NSF Convenor (Mr. D. Lewis) dlewis@blade-energy.com (Mr. M. Grépinet) michel.grepinet@wanadoo.fr (Mr. R. Langereis) Ries.Langereis@c-a-m.com (Mr. E. Dijkhuis) edykhuis@wanadoo.nl (Mr. J.H. Neuenkirchen) JHN@StatoilHydro.com

Shaded Area below – Projects Currently Idle (No Activity) ISO TC67/SC4/WG Summary Report 1

Annex: Work Program – Currently Active and Published
Document
Year

ISO/TC 67/SC 4
Dates/Comments Project Leader

Title (Includes “Petroleum and natural gas industries…)

Related Docs|Cen Info

Workgroup 1 – Drilling Equipment David Lewis, convenor (dlewis@blade-energy.com)
10407 10407-1 10407-2 1993 1993 2008 Drilling and production equipment - Drill stem design and operating limits Rotary drilling equipment - Part 1: Drill stem design and operating limits Rotary drilling equipment - Part 2: Inspection and classification of drill stem elements Rotary drilling equipment - Part 1: Rotary drill stem elements Rotary drilling equipment - Part 2: Threading and gauging of rotary shouldered threaded connections Drilling and production equipment Inspection, maintenance, repair and remanufacture of hoisting equipment Drilling and production equipment Hoisting equipment Drilling and production equipment Specification for drilling and well-servicing structures Drilling and well-servicing equipment API RP 7G | CEN/TC 12 WI 4 API RP 7G | CEN/TC 12 WI 92 API RP 7G-2 | CEN/TC 12 WI 93 API Spec 7-1 | CEN/TC 12 WI 121 API Spec 7-2 | CEN/TC 12 WI 122 API RP 8B | CEN/TC 12 WI 35 API Spec 8C | CEN/TC 12 WI 36 API Spec 4F | CEN/TC 12 WI 51 API Spec 7K | CEN/TC 12 WI 100 DIS ballot circulated 2008-02-28, closed 2008-07-23 Alf Aker alf.henry.aker@dnv.com Alf Aker alf.henry.aker@dnv.com CD comment period opens 2005-01-10, terminated 2005-04-11. DIS in preparation. Will use OGP for editing. Chris North chris.north@nov.com

10424-1 10424-2

2004 2007

13534

2000

13535 13626

2000 2003

DIS Ballot circulated 2008-02-24, closed 2008-07-23

14693

2003

Workgroup 2 – Drilling Well Control Equipment Michel Grépinet, Convenor (michel.grepinet@wanadoo.fr)
13533 13533 TECH CORR 1 13624-1 TR 13624-2 2001 2005 Drilling and production equipment - Drill through equipment Drilling and production equipment - Drillthrough equipment - Technical Corrigendum 1 Drilling well control systems - Design and operation of marine drilling riser systems Drilling well control systems - Part 2: Applications of marine drilling riser system analysis Drilling and production equipment - Marine drilling riser couplings Drilling and production equipment – Control systems for drilling well control equipment and diverter systems Drilling and production equipment – Shallow gas diverter equipment API Spec 16A | CEN/TC 12 WI 39

API RP 16Q | CEN/TC 12 WI 49 API RP 16Q

DIS ballot terminated 2007-10-24. FDIS accepted for processing on 2008-0905 CDTR ballot terminated. Document approved for DTR on 2008-08-18

Paul Stanton pstanton@technip.com Paul Stanton pstanton@technip.com Paul Stanton pstanton@technip.com Joe Roche jroche@signalint.com Michel Grepinet michel.grepinet@wanadoo.fr

13625 22830

2002

API Spec 16R | CEN/TC 12 WI 50 API Spec 16D

See 13628-12 Below NWI (N414) closed 2009-03-18 to reinstate project as CD. Publication target date 2011 NWI (N417) closed on 2009-04-30

NEW

NEW

API RP 64

ISO TC67/SC4 Work Programme

2

Annex: Work Program – Currently Active and Published
Document
Year

ISO/TC 67/SC 4
Dates/Comments Project Leader

Title (Includes “Petroleum and natural gas industries…)

Related Docs|Cen Info

Workgroup 3 – Wellhead and Christmas Tree Equipment Ries Langereis, Convenor (Ries.Langereis@c-a-m.com)
10423 2003 Drilling and production equipment Wellhead and Christmas tree equipment API Spec 6A | CEN/TC 12 WI 158 DIS ballot circulated 2008-04-11, closed 2008-09-11. FDIS in preparation Ries Langereis Ries.Langereis@c-a-m.com

Workgroup 4 – Production Equipment Bert Dijkhuis, Convenor (edykhuis@wanadoo.nl)
10417 10428 2004 1993 Subsurface safety valve systems Design, installation, operation and redress Sucker rods (pony rods, polished rods, couplings and sub-couplings) Specification Pumping units - Specification API RP 14B | CEN/TC 12 WI 6 API Spec 11B | CEN/TC 12 WI 15 API Spec 11E | CEN/TC 12 WI 16 API Spec 14A | CEN/TC 12 WI 139 API 11D1 | CEN/TC 12 WI 95 API 11D2 (prop’d) | CEN/TC 12 WI 80 API 11D3 | CEN/TC 12 WI 109 API 14L | CEN/TC 12 WI 162 API Spec 11VI | CEN/TC 12 WI 117 API Spec 11VI | CEN/TC 12 WI 118 CEN/TC 12 119 Document approved for publication 2009-03-25 Wayne Mabry wmabry@slb.com Wayne Mabry wmabry@slb.com George Gillespie George.Gillespie@weatherford.com David McCalvin Dmccalvin@rosharon.oilfield.slb.com DIS ballot circulated 2007-10-17, terminated 2008-03-18. FDIS in preparation. Project leader has advised he is stopping work on the item. Proposed DIS in 2007 and FDIS in 2008. Document withdrawn as ISO project DIS ballot initiated 2006-10-26, terminated 2007-03-26. FDIS completed but lacks correct metric units. API Spec 11E issued based on FDIS without metric units. Proposed FDIS 2007. Document withdrawn as ISO project Benny Williams bwilliams@hfpumps.com David Doyle ddoyle@lufkin.com

10431

1993

10432 14310 15136-1

2004 2008 2001

Downhole equipment - Subsurface safety valve equipment Downhole equipment - Packers and bridge plugs Progressing cavity pump systems for artificial lift -- Part 1: Pumps Progressing cavity pumps systems for artificial lift - Part 2: Surface drive systems Downhole equipment - Lock mandrels and landing nipples Drilling and production equipment - Part 1: Side-pocket mandrels Drilling and production equipment – Part 2: Flow control devices for side-pocket mandrels Drilling and production equipment – Part 3: Latches and related tools for sidepocket mandrels Drilling and production equipment -Part 4: Practices for side-pocket mandrels and related equipment Downhole equipment - Sand control screens Downhole equipment - Subsurface tubing mounted formation barrier valves and related equipment

DIS ballot circulated, terminates 2008-11-28.

Shauna Noonan Shauna.G.Noonan @conocophillips.com

15136-2 16070 17078-1 17078-2

2006 2005 2004 2007

17078-3

NEW

17078-4

NEW

DIS ballot circulated 2008-03-20, terminated 2008-08-22. FDIS in preparation.

17824 28781

NEW NEW

DIS ballot circulated 2008-06-01, terminated 2008-10-30. Accepted for FDIS processing on 2009-02-23. Two week review on 2009-04-07 CD ballot circulated 2008-02-26, closed 2008-05-26. Accepted for DIS processing on 2009-03-13. DIS Ballot issued on 2009-03-26

ISO TC67/SC4 Work Programme

3

Annex: Work Program – Currently Active and Published
Document
Year

ISO/TC 67/SC 4
Dates/Comments Project Leader

Title (Includes “Petroleum and natural gas industries…)

Related Docs|Cen Info

Workgroup 6 – Subsea Equipment Jen-Henrik Neuenkirchen, convenor (JHN@StatoilHydro.com)
13628-1 2005 Design and operation of subsea production systems - Part 1: General requirements and recommendations Design and operation of subsea production systems - Part 1: General requirements and recommendationsAmendment 1 Design and operation of subsea production systems - Part 1: General requirements and recommendationsAmendment 2 Design and operation of subsea production systems - Part 2: Flexible pipe systems for subsea and marine applications Design and operation of subsea production systems - Part 2: Flexible pipe systems for subsea and marine applications Design and operation of subsea production systems - Part 3: Through flow line (TFL) systems Design and operation of subsea production systems - Part 4: subsea wellhead and tree equipment Design and operation of subsea production systems - Part 5: Subsea Umbilicals Design and operation of subsea production systems - Part 6: Subsea production control systems Design and operation of subsea production systems - Part 7: Workover/Completion riser systems Design and operation of subsea production systems - Part 8: Remotely Operated Vehicles (ROV) interfaces on subsea production systems Design and operation of subsea production systems - Part 8: Remotely Operated Vehicles (ROV) interfaces on subsea production systems API Spec 17A | CEN/TC 12 WI 141 API Spec 17A | CEN/TC 12 WI 141 NWI (N421) for document revisions submitted 2009-03-27 and closes 200906-27 For Revision to Clause 6 - Draft Amendment 1 sent to ballot 2007-10-28, terminated 2008-04-01. Drafting of ISO 21457 has rendered much of this amendment possibly obsolete. Once 21457 passed the DIS phase, this document will be re-visited. New DIS Ballot closed 2009-04-01 Revision to Annex L - Draft Amendment 2 sent to ballot 2007-10-28. terminated 2008-04-01. Drafting of ISO 21457 may impact this document. Assessment currently underway. New DIS Ballot closed 2009-04-01 André Maerli andmar@StatoilHydro.com André Maerli andmar@StatoilHydro.com

13628-1 AMENDMENT 1

13628-1 AMENDMENT 2

API Spec 17A | CEN/TC 12 WI 141

André Maerli andmar@StatoilHydro.com

13628-2

2006

API Spec 17J | CEN/TC 12 WI 159

13628-2 TECH CORR 1

2009

13628-3

2000

API RP 17C | CEN/TC 12 WI 40 API Spec 17D | CEN/TC 12 WI 160 API 17E 2nd DIS Ballot Closed 2009-02-06. In comment resolution phase now. G. Ross Frazer andmar@StatoilHydro.com Ron Dee ronaldwilliam.dee@shell.com Roald Loug Hansen roloha@statoil.com Anthony Muff anthony.muff@fks.fmcti.com

13628-4

1999

13628-5

2002

Approved for FDIS on 2008-11-28. FDIS in preparation.

13628-6

2006

API Spec 17F | CEN/TC 12 WI 145 API RP 17G

NWI (N422) submitted for revision of document on 2009-03-27 and closes on 2009-06-27 NWI (N416) Submitted for next revision closed 2009-04-29. Will consider intervention control issues in next revision. NWI for Tech Corrigendum to be issued NOTE: DOCUMENT TO BE WITHDRAWN WHEN 13628-13 IS PUBLISHED

13628-7

2005

13628-8

2002

API RP 17H

13628-8 TECH CORR 1

2005

API RP 17H

NOTE: DOCUMENT TO BE WITHDRAWN WHEN 13628-13 IS PUBLISHED

ISO TC67/SC4 Work Programme

4

Annex: Work Program – Currently Active and Published
Document
Year

ISO/TC 67/SC 4
Dates/Comments Project Leader

Title (Includes “Petroleum and natural gas industries…)

Related Docs|Cen Info

13628-9

2000

13628-10

2005

13628-11

2007

13628-11 TECH CORR 1

2008

13628-12

NEW

13628-13

NEW

13628-15

Design and operation of subsea production systems - Part 9: Remotely operated tool (ROT) intervention system Design and operation of subsea production systems - Part 10: Specification for bonded flexible pipe Design and operation of subsea production systems - Part 11: Flexible pipe systems for subsea and marine riser applications Design and operation of subsea production systems - Part 11: Flexible pipe systems for subsea and marine riser applications Design and operation of subsea production systems - Part 12: Dynamic production risers Design and operation of subsea production systems - Part 13: Remotely operated tools and interfaces on subsea production systems Design and operation or subsea production systems - Part 15: Subsea structures and manifolds Design and operation of subsea production systems – Part 16: Specification for flexible pipe ancillary equipment Design and operation of subsea production systems - Part 17: Recommended practice for flexible pipe ancillary equipment

API RP 17M, NORSOK U-CR-007 API 17K | CEN/TC 12 WI 165 API RP 17B | CEN/TC 12 WI 166 (VA)

NOTE: DOCUMENT TO BE WITHDRAWN WHEN 13628-13 IS PUBLISHED

API RP 2RD, 1st, June 1998 API RP 17H (Prop’s) Note: 17H number to be retained for this doc API RP 17P (Prop’d)

Related to 13625 (WG2) above. New Project Approved 2007-09-12

Paul Stanton pstanton@technip.com Eric Luzi luzi@statoilhydro.com

Will replace 13628-8 and 13628-9 when published New Project Approved 2007-05-10

API Contract (2006-102560) source of work. Document completed. DIS Document Vote (N415) closed on 2009-04-14

Olla Melland Ross Frazer RFrazer@atpog.com Krassimir Doynov krassimir.doynov@exxonmobil.com

13628-16

NEW

API Spec 17L1 (Prop’d)

CD Vote (N419) closed 2009-01-09

13628-17

NEW

API RP 17L2 (Prop’d)

CD Vote (N420) closed 2009-01-09

Krassimir Doynov krassimir.doynov@exxonmobil.com

ISO TC67/SC4 Work Programme

5


				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:20
posted:11/25/2009
language:English
pages:5