					ISO/TC 67/SC 4 Materials, equipment and offshore structures for petroleum, petrochemical and natural gas industries — Drilling and production equipment
Secretariat:

ISO/TC 67/SC 4 US National Adoption Summary

American Petroleum Institute, 1220 L Street NW, Washington DC 20005 USA Tel. +1 202 682 8000 Fax. +1 202 962 4714

ISO/TC 67/SC 4 N 433
2009-05-06
Secretariat: Chairman: ANSI (Administered by API) Austin Freeman (austin.freeman@halliburton.com) Halliburton 2601 Beltline Road Carrollton, Texas 75006 USA Tel: + 1 972 418-3982 Fax: + 1 972 418-3728 Email: austin.freeman@halliburton.com Secretary: Ed Baniak (baniake@api.org) American Petroleum Institute 1220 L Street NW Washington, DC 20005 USA Tel: + 1 202 682-8135 Fax: + 1 202 962-4797 Email: baniake@api.org

Organizational Structure The organizational structure of ISO/TC 67/SC 4 is as follows: Workgroup WG 1 WG 2 WG 3 WG 4 WG 6 Drilling equipment Drilling well control equipment Wellhead and Christmas tree equipment Production equipment Subsea equipment Secretariat ANSI ANSI NEN NEN NSF Convenor (Mr. D. Lewis) dlewis@blade-energy.com (Mr. M. Grépinet) michel.grepinet@wanadoo.fr (Mr. R. Langereis) Ries.Langereis@c-a-m.com (Mr. E. Dijkhuis) edykhuis@wanadoo.nl (Mr. J.H. Neuenkirchen) JHN@StatoilHydro.com

Shaded Area below – Projects Currently Idle (No Activity) ISO TC67/SC4/WG Summary Report 1

Annex: US National Adoption Summary – In Process and Published
Document
Year

ISO/TC 67/SC 4 N 433
Dates/Comments Project Leader

Title (Includes “Petroleum and natural gas industries…)

API Document

Workgroup 1 – Drilling Equipment David Lewis, convenor (dlewis@blade-energy.com)
10407 10407-1 10407-2 1993 1993 2008 Drilling and production equipment - Drill stem design and operating limits Rotary drilling equipment - Part 1: Drill stem design and operating limits Rotary drilling equipment - Part 2: Inspection and classification of drill stem elements Rotary drilling equipment - Part 1: Rotary drill stem elements Rotary drilling equipment - Part 2: Threading and gauging of rotary shouldered threaded connections Drilling and production equipment Inspection, maintenance, repair and remanufacture of hoisting equipment API RP 7G:1998 API RP 7G Recommended Practice for Drill Stem Design and Operating Limits, 16th Edition Errata: May 2000 Addendum 1: November 2003 Current CD comment period opens 2005-01-10, terminated 2005-04-11. DIS in preparation. Will use OGP for editing. Chris North chris.north@nov.com

Current: In process of nationally adopting (proposed “Identical” adoption as API RP 7G-2)
API Spec 7-1: 2006 API Spec 7-2: 2008 Specification for Rotary Drill Stem Elements, 1st Edition (Modified 10424-1) Specification for Threading and Gauging of Rotary Shouldered Thread Connections, 1st Edition (Identical 10424-2) Recommended Practice for Procedures for Inspections, Maintenance, Repair and Remanufacture of Hoisting Equipment, 7th Edition (Modified 13534) Addendum 1: November 2003 Addendum 2: May 2005 Current: DIS ballot circulated 2008-02-28, closed 2008-07-23 Specification for Drilling and Production Hoisting Equipment (PSL 1 and PSL 2), 4th Edition (Modified 13535) Addendum 1: April 2004 Addendum: April 2005 Current: DIS Ballot circulated 2008-02-24, closed 2008-07-23 Alf Aker alf.henry.aker@dnv.com

10424-1 10424-2

2004 2007

13534

2000

API RP 8B: 2002

13535

2000

Drilling and production equipment Hoisting equipment

API Spec 8C: 2003

Alf Aker alf.henry.aker@dnv.com

13626

2003

14693

2003

Drilling and production equipment Specification for drilling and well-servicing structures Drilling and well-servicing equipment

Specification no longer a U.S. national adoption due to changes requested by API Subcommittee
API Spec 7K: 2005 Specification for Drilling and Well-servicing Equipment, 4th Edition (Modified 14693) Addendum 1: February 2006 Addendum 2: April 2006

Specification 5 will no longer a U.S. national adoption due to changes requested by API Subcommittee

th

Workgroup 2 – Drilling Well Control Equipment Michel Grépinet, Convenor (michel.grepinet@wanadoo.fr)
13533 13533 TECH CORR 1 13624-1 2001 2005 Drilling and production equipment - Drill through equipment Drilling and production equipment - Drillthrough equipment - Technical Corrigendum 1 Drilling well control systems - Design and operation of marine drilling riser systems API Spec 16A: 2004 API Spec 16A Errata 1: 2004 API RP 16Q: 1993 Specification for Drill-through Equipment, 3rd Edition (Modified 13533) Specification for Drill-through Equipment, 3rd Edition (Modified 13533)

Recommended Practice for Design, Selection, Operation and Maintenance of Marine Drilling Riser Systems, 1st Edition [formerly API RP 2Q and 2K] Current: DIS ballot terminated 2007-10-24. FDIS accepted for processing on 2008-09-05

Paul Stanton pstanton@technip.com

ISO TC67/SC4

2

Annex: US National Adoption Summary – In Process and Published
Document
Year

ISO/TC 67/SC 4 N 433
Dates/Comments Project Leader

Title (Includes “Petroleum and natural gas industries…)

API Document

TR 13624-2

13625 22830

2002

Drilling well control systems - Part 2: Applications of marine drilling riser system analysis Drilling and production equipment - Marine drilling riser couplings Drilling and production equipment – Control systems for drilling well control equipment and diverter systems

Current: CDTR ballot terminated. Document approved for DTR on 2008-08-18 Specification for Marine Drilling Riser Couplings, 1st Edition See 13628-12 Below Specification for Control Systems for Drilling Well Control Equipment and Control Systems for Diverter Equipment, 2nd Edition Current: NWI (N414) closed 2009-03-18 to reinstate project as CD. Publication target date 2011 Recommended Practice for Diverter Systems Equipment and Operations, 2nd Edition Current: NWI (N417) closed on 2009-04-30

Paul Stanton pstanton@technip.com Paul Stanton pstanton@technip.com Joe Roche jroche@signalint.com

API Spec 16R: 1997 API Spec 16D: 2004

NEW

NEW

Drilling and production equipment – Shallow gas diverter equipment

API RP 64: 2001

Michel Grepinet michel.grepinet@wanadoo.fr

Workgroup 3 – Wellhead and Christmas Tree Equipment Ries Langereis, Convenor (Ries.Langereis@c-a-m.com)
10423 2003 Drilling and production equipment Wellhead and Christmas tree equipment API Spec 6A: 2004 Specification for Wellhead and Christmas Tree Equipment, 19th Edition (Modified 10423) Errata 3: June 2006 (Contains Errata 1 & 2) Errata 4: August 2007 Addendum 1: February 2008 Addendum 2: December 2008 Addendum 3: December 2008 Addendum 4: December 2008 Current: DIS ballot circulated 2008-04-11, closed 2008-09-11. FDIS in preparation Ries Langereis Ries.Langereis@c-a-m.com

Workgroup 4 – Production Equipment Bert Dijkhuis, Convenor (edykhuis@wanadoo.nl)
10417 10428 2004 1993 Subsurface safety valve systems Design, installation, operation and redress Sucker rods (pony rods, polished rods, couplings and sub-couplings) Specification API RP 14B: 2005 API Spec 11B: 1998 Recommended Practice for Design, Installation, Repair and Operation of Subsurface Safety Valve Systems, 5th Edition (Identical 10417) Specification for Sucker Rods, 26th Edition Current: DIS ballot circulated 2007-10-17, terminated 2008-03-18. FDIS in preparation. Project leader has advised he is stopping work on the item. Proposed DIS in 2007 and FDIS in 2008. Document withdrawn as ISO project Specification for Pumping Units Errata: March 2009 Current: DIS ballot initiated 2006-10-26, terminated 2007-03-26. FDIS completed but lacks correct metric units. API Spec 11E issued based on FDIS without metric units. Proposed FDIS 2007. Document withdrawn as ISO project Specification for Subsurface Safety Valve Equipment, 11th Edition (Identical 10432) Benny Williams bwilliams@hfpumps.com

10431

1993

Pumping units - Specification

API Spec 11E: 2008

David Doyle ddoyle@lufkin.com

10432

2004

Downhole equipment - Subsurface safety valve equipment

API Spec 14A: 2005

ISO TC67/SC4

3

Annex: US National Adoption Summary – In Process and Published
Document
Year

ISO/TC 67/SC 4 N 433
Dates/Comments Project Leader

Title (Includes “Petroleum and natural gas industries…)

API Document

14310 15136-1

2008 2001

Downhole equipment - Packers and bridge plugs Progressing cavity pump systems for artificial lift -- Part 1: Pumps Progressing cavity pumps systems for artificial lift - Part 2: Surface drive systems Downhole equipment - Lock mandrels and landing nipples Drilling and production equipment - Part 1: Side-pocket mandrels Drilling and production equipment – Part 2: Flow control devices for side-pocket mandrels Drilling and production equipment – Part 3: Latches and related tools for sidepocket mandrels Drilling and production equipment -Part 4: Practices for side-pocket mandrels and related equipment Downhole equipment - Sand control screens Downhole equipment - Subsurface tubing mounted formation barrier valves and related equipment

API 11D1: 2002 Reaffirmed 2008 API 11D2 (prop’d)

Specification for Packers and Bridge Plugs, 1st Edition (Identical 14310) Current: DIS ballot circulated, terminates 2008-11-28 Shauna Noonan Shauna.G.Noonan @conocophillips.com

15136-2 16070 17078-1 17078-2

2006 2005 2004 2007

API 11D3: 2008 API 14L: 2007

Progressing Cavity Pump Systems for Artificial Lift – Surface Drive Systems, 1st Edition (Identical 15136-2) Specification for Lock Mandrels and Landing Nipples, 2nd Edition (Identical 16070)

17078-3

NEW

Current: Document approved for publication 2009-03-25

Wayne Mabry wmabry@slb.com Wayne Mabry wmabry@slb.com George Gillespie George.Gillespie@weatherford.com David McCalvin Dmccalvin@rosharon.oilfield.slb.com

17078-4

NEW

Current: DIS ballot circulated 2008-03-20, terminated 2008-08-22. FDIS in preparation Current: DIS ballot circulated 2008-06-01, terminated 2008-10-30. Accepted for FDIS processing on 2009-02-23. Two week review on 200904-07 Current: CD ballot circulated 2008-02-26, closed 2008-05-26. Accepted for DIS processing on 2009-03-13. DIS Ballot issued on 2009-03-26

17824

NEW

28781

NEW

Workgroup 6 – Subsea Equipment Jen-Henrik Neuenkirchen, convenor (JHN@StatoilHydro.com)
13628-1 2005 Design and operation of subsea production systems - Part 1: General requirements and recommendations API RP 17A: 2006 Recommended Practice for the Design and Operation of Subsea Production Systems – General Requirements and Recommendations, 4th Edition Identical 13628-1) Current: NWI (N421) for document revisions submitted 2009-03-27 and closes 2009-06-27 Current: For Revision to Clause 6 - Draft Amendment 1 sent to ballot 2007-10-28, terminated 2008-04-01. Drafting of ISO 21457 has rendered much of this amendment possibly obsolete. Once 21457 passed the DIS phase, this document will be re-visited. New DIS Ballot closed 2009-0401 André Maerli andmar@StatoilHydro.com

13628-1 AMENDMENT 1

Design and operation of subsea production systems - Part 1: General requirements and recommendationsAmendment 1

API Spec 17A: 2006

André Maerli andmar@StatoilHydro.com

ISO TC67/SC4

4

Annex: US National Adoption Summary – In Process and Published
Document
Year

ISO/TC 67/SC 4 N 433
Dates/Comments Project Leader

Title (Includes “Petroleum and natural gas industries…)

API Document

13628-1 AMENDMENT 2

13628-2

2006

13628-2 TECH CORR 1

2009

13628-3

2000

13628-4

1999

Design and operation of subsea production systems - Part 1: General requirements and recommendationsAmendment 2 Design and operation of subsea production systems - Part 2: Flexible pipe systems for subsea and marine applications Design and operation of subsea production systems - Part 2: Flexible pipe systems for subsea and marine applications Design and operation of subsea production systems - Part 3: Through flow line (TFL) systems Design and operation of subsea production systems - Part 4: subsea wellhead and tree equipment

API Spec 17A: 2006

API Spec 17J: 2008

Current: Revision to Annex L - Draft Amendment 2 sent to ballot 2007-1028. Terminated 2008-04-01. Drafting of ISO 21457 may impact this document. Assessment currently underway. New DIS Ballot closed 200904-01 Specification for Unbonded Flexible Pipe, 3rd Edition (Identical 13628-2)

André Maerli andmar@StatoilHydro.com

API Spec 17J Errata 1: 2009

Specification for Unbonded Flexible Pipe, 3rd Edition (Identical 13628-2)

API RP 17C: 2002

Recommended Practice on TFL (Through Flow Lines) Systems, 2nd Edition

API Spec 17D: 1992

Specification for Subsea Wellhead and Christmas Tree Equipment, 1st Edition Supplement 1: March 1993 Supplement 2: June 1996 Current: 2nd DIS Ballot Closed 2009-02-06. In comment resolution phase now Specification for Subsea Umbilicals, 3rd Edition (Identical 13628-5) Current: Approved for FDIS on 2008-11-28. FDIS in preparation Specification for Subsea Production Control Systems, 2nd Edition (Identical 13628-6) Current: NWI (N422) submitted for revision of document on 2009-03-27 and closes on 2009-06-27 Recommended Practice for Completion/Workover Risers, 2nd Edition (Identical 13628-7) NWI (N416) Submitted for next revision closed 2009-04-29. Will consider intervention control issues in next revision. NWI for Tech Corrigendum to be issued Recommended Practice for Remotely Operated Vehicle (ROV) Interfaces on Subsea Production Systems, 1st Edition (Identical 13628-8) NOTE: DOCUMENT TO BE WITHDRAWN WHEN 13628-13 IS PUBLISHED NOTE: DOCUMENT TO BE WITHDRAWN WHEN 13628-13 IS PUBLISHED

G. Ross Frazer andmar@StatoilHydro.com

13628-5

2002

13628-6

2006

Design and operation of subsea production systems - Part 5: Subsea Umbilicals Design and operation of subsea production systems - Part 6: Subsea production control systems

API Spec 17E: 2003

Ron Dee ronaldwilliam.dee@shell.com Roald Loug Hansen roloha@statoil.com

API Spec 17F: 2006

13628-7

2005

Design and operation of subsea production systems - Part 7: Workover/Completion riser systems

API RP 17G: 2006

Anthony Muff anthony.muff@fks.fmcti.com

13628-8

2002

Design and operation of subsea production systems - Part 8: Remotely Operated Vehicles (ROV) interfaces on subsea production systems Design and operation of subsea production systems - Part 8: Remotely Operated Vehicles (ROV) interfaces on subsea production systems Design and operation of subsea production systems - Part 9: Remotely operated tool (ROT) intervention system

API RP 17H:2004 Reaffirmed 2009

13628-8 TECH CORR 1

2005

13628-9

2000

API RP 17M: 2004 Reaffirmed 2009

Recommended Practice on Remotely Operated Tool (ROT) Intervention Systems, 1st Edition (Identical 13628-9) NOTE: DOCUMENT TO BE WITHDRAWN WHEN 13628-13 IS PUBLISHED

ISO TC67/SC4

5

Annex: US National Adoption Summary – In Process and Published
Document
Year

ISO/TC 67/SC 4 N 433
Dates/Comments Project Leader

Title (Includes “Petroleum and natural gas industries…)

API Document

13628-10

2005

13628-11

2007

13628-11 TECH CORR 1

2008

13628-12

NEW

Design and operation of subsea production systems - Part 10: Specification for bonded flexible pipe Design and operation of subsea production systems - Part 11: Flexible pipe systems for subsea and marine riser applications Design and operation of subsea production systems - Part 11: Flexible pipe systems for subsea and marine riser applications Design and operation of subsea production systems - Part 12: Dynamic production risers

API 17K: 2005

Specification for Bonded Flexible Pipe, 2nd Edition (Identical 13628-10)

API RP 17B: 2008 includes Technical Corrigendum 1) API RP 17B: 2008 (includes Technical Corrigendum 1) API RP 2RD: 1997

Recommended Practice for Flexible Pipe, 4th Edition (Identical 13628-11)

Recommended Practice for Flexible Pipe, 4th Edition (Identical 13628-11)

Specification for Marine Drilling Riser Couplings, 1st Edition Current: Related to 13625 (WG2) above. New Project Approved 2007-0912 Current: Will replace 13628-8 and 13628-9 when published New Project Approved 2007-05-10

Paul Stanton pstanton@technip.com

13628-13

NEW

13628-15

Design and operation of subsea production systems - Part 13: Remotely operated tools and interfaces on subsea production systems Design and operation or subsea production systems - Part 15: Subsea structures and manifolds Design and operation of subsea production systems – Part 16: Specification for flexible pipe ancillary equipment Design and operation of subsea production systems - Part 17: Recommended practice for flexible pipe ancillary equipment

API RP 17H (Prop’s) Note: 17H number to be retained for this doc API RP 17P (Prop’d)

Eric Luzi luzi@statoilhydro.com

Current: API Contract (2006-102560) source of work. Document completed. DIS Document Vote (N415) closed on 2009-04-14

Olla Melland Ross Frazer RFrazer@atpog.com Krassimir Doynov krassimir.doynov@exxonmobil.com

13628-16

NEW

API Spec 17L1 (Prop’d)

Current: CD Vote (N419) closed 2009-01-09

13628-17

NEW

API RP 17L2 (Prop’d)

Current: CD Vote (N420) closed 2009-01-09

Krassimir Doynov krassimir.doynov@exxonmobil.com

ISO TC67/SC4

6


				