									A. (2565) ADJUST HANDHOLES

At the locations indicated in the Plans, adjust each handhole to an elevation as indicated in the Plans to the
satisfaction of the Engineer.

If any handhole or handhole cover to be adjusted is damaged by the Contractor’s operation, then provide
and install a new identical handhole or handhole cover at no expense to the Department.

If the Engineer determines, before adjustment, that a handhole or handhole cover is unusable due to
circumstances beyond the Contractors' control, then provide and install a new identical handhole or
handhole cover paid for as EXTRA WORK.

Provide new MnDOT approved handholes or handhole covers as listed on the MnDOT
Approved/Qualified Products Lists WEB site for Signals:
                    http://www.dot.state.mn.us/products/index.html

Adjusting handholes at the locations where indicated in the Plans are each measured as an integral unit
complete in place and is be paid for separately under Item No. 2565.602 (ADJUST HANDHOLE) at the
Contract price per EACH, which price is compensation in full for all costs incidental thereto.

               THIS ITEM INCLUDES THE FOLLOWING:

       1.      Adjust handhole to the elevation of the new surface to the satisfaction of the
               Engineer.

       2.      If required, provide and install new handhole(s) and cover(s) to the satisfaction of
               the Engineer.

       3.      Excavation and backfill.

       4.      Restoration as directed by the Engineer.

								