Docstoc

BOM / Bill-of-Material Template for CE Hardware Product

Document Sample
BOM / Bill-of-Material Template for CE Hardware Product Powered By Docstoc
					Planning Bill of Material template Version 1.0 Last updated on 8/11/2009 INDEX Product name Owner Date started on Date completed / updated on Revision Title Master BOM Packaging kit Electrical kit Mechanical kit Description Master Bill of Material Packaging Bill of Material Electrical Bill of Material Mechanical Bill of Material Owner Product Manager Packaging Lead Electrical Lead Mechanical Lead

Target cost $ Package BOM Product BOM

Master Bill of Material
Quantity required Estimated Extended Notes unit cost $ cost $ 0.00 See separate tab for details 0.00 See separate tab for details 0.00 See separate tab for details

Item # 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26

Description Packaging kit Electrical kit Mechanical kit

A C C E S S O R I E S

Manufacturing cost Test fee Supplier margin Sub-total $ Amortization (if applicable) 3rd party licenses Additional fees (if applicable) 0.00 See separate table below for details 0.00 Create a separate table if necessary

Grand Total $

Assumptions 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Additional Fee Table Description NRE Fee Tooling Fee Certification Fees FCC CE UL/cUL SRRC A-Tick C-Tick Wi-Fi WHQL TELEC (Japan) MIC (Korea) DGT (Taiwan) SIRIM (Malaysia) CCC (China Safety) PSB (Singapore Safety) BSMI (Taiwan Safety) eK (Korea Safety) PSE (Japan Safety) Details If applicable If applicable Estimated cost

Total additional Fees $

0

Packaging Bill of Material
Product name Owner Date assigned on Date completed / updated on Revision Package BOM target $0.00 0

Item # 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26

Description

Quantity required

Estimated Extended unit cost $ cost $

Notes

Total estimated packaging kit cost $ % of total package target cost #DIV/0!

Assumptions 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Electrical Bill of Material
Product name Owner Date assigned on Date completed / updated on Revision Product BOM target $0.00 0

Item # 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26

Description

Quantity required

Estimated Extended unit cost $ cost $

Notes

Total estimated electrical kit cost $ % of total product target cost

$0.00 #DIV/0!

Assumptions 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Mechanical Bill of Material
Product name Owner Date assigned on Date completed / updated on Revision Product BOM target $0.00 0

Item # 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26

Description

Quantity required

Estimated Extended unit cost $ cost $

Notes

Total estimated mechanicall kit cost $ % of total product target cost

$0.00 #DIV/0!

Assumptions 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16


				
DOCUMENT INFO
Shared By:
Categories:
Stats:
views:658
posted:11/21/2009
language:English
pages:4
Description: BOM / Bill-of-Material Template for CE Hardware Product