Introduction to NBCC - Infraline

Document Sample
Introduction to NBCC - Infraline Powered By Docstoc
					           INTERNATIONAL CONCLAVE
                       ON
  KEY INPUTS FOR ACCELERATED DEVELOPMENT
                       OF
          INDIAN POWER SECTOR FOR
              11th PLAN & BEYOND

              Presentation by

                  V.P.DAS
             Director (Projects)

National Buildings Construction Corporation Ltd
          INTRODUCTION TO NBCC

qA leading Public Sector undertaking under the aegis of Ministry of
 Urban Development, Govt. of India.

qEstablished in 1960 as a Wholly Owned Public Sector Enterprise
 by Govt. Of India .

qAs on date capital Invested by GOI is Rs.120 Crore.

qWide experience in various civil construction such as Power
 Sector, Housing, Hospitals, Hotels, Bridges, Cement Plants, Water
 Treatment Plants, Roads, Runways and Highways etc.
qInstitutional, Housing & Industrial Sectors

qRoads, Bridges, Airports & Marine Structures

qRCC Chimney, Cooling Towers, Main Plant / BOP Works & EPC
 Contracts

qTransmission Lines

qEnvironmental Works
qReal Estate

qProject Management and Consultant From Concept to
 Commissioning

qOperating in Overseas countries like; Botswana, Turkey
 etc.

qAnnual Business – Over Rs.1500 Crores
qPresence in Power Sector for more than
   25 years with major Power companies like
 NTPC, BHEL, MSEB, MPEB, APSEB, CSEB
 etc

qAn ISO 9001 accredited Company

qProjected Sales turnover of Rs 5000 Crore by
 2012
qDiversification in related areas mainly in Infrastructure
 Projects

qRoads & Highways


qReal Estate


qPower Sector
               POWER SECTOR
qIt is key input to Development

qOffers Business Opportunities

qRecognized by Govt. of India for PSU’s Participation

qGOI has approved NBCC to diversify in power plants
  Major Works executed in Power Sector
q Main Plant Civil & Structural Works for 2x500MW Power
  Plant for NTPC at Rihand (U.P.)

q 220 Mtr. High Chimney for 2x210 MW Power Plant for
  MPSEB at Birsinghpur.

q 275 Mtr. High Chimney & Cooling Tower for 2x500 MW
  Power Plant for NTPC at Simadhri , AP.

q 275 Mtr. High Chimney for 2x500 MW Power Plant for NTPC
  at Vindyachal, MP.

q 275 Mtr. High Chimney for 2x500 MW Power Plant for NTPC
  at Talcher, Orissa.

q 275 Mtr. High Chimney for 1x210 MW Power Plant for DVC
  at Mejia, West Bengal.
  Major Works executed in Power Sector
q 275 Mtr. High Chimney & Cooling Tower for 2x210 MW
  Power Plant for Punjab SEB at Bhatinda.

q 220 Mtr. High Chimney for 2x210 MW Power Plant for
  Rajasthan SEB at Suratgarh.

q 220 Mtr. High Chimney for1X210 MW Power Plant for NTPC
  at Unchahar, Rai Bareily, U.P

q 275 Mtr. High Chimney & Cooling Tower for 1X500 MW
  Power Plant for APSEB at Ramagundam, AP.

q Transmission Line for Power Grid at Sarna-Salal , J&K.

q Transmission Lines for Rajasthan SEB at Jodhpur and
  Jaisalmer.
Cooling Towers at Bhatinda
IDCT Cooling Towers at Ramagundam
 275 METERS HIGH    METERS 235 HIGH TV
 RCC CHIMNEY AT    TOWER AT PITAMPURA,
VINDHYACHAL (MP)         DELHI
COOLING TOWERS & CHIMNEY AT
      SIMHADRI, STPP (AP)
    ASIA’s LARGEST COOLING TOWER
               ( FOR NTPC )
      Height      :165 m
      Bottom Dia :110 m
      Top Dia     : 90 m




  Completed one month ahead of schedule
      Major Power Projects under execution
qMain Plant Civil & Structural Works for 2x250 MW
 Power Plant at Korba (East), Chattisgarh

qMain Plant Civil & Structural Works for 2x250 MW
 Power Plant for DVC at Chandrapura, Jharkhand

q275 Mtr. High Chimney for 1X500 MW Power Plant
 for NTPC at Vindhyachal, M.P

q275 Mtr. High Chimney for 2x500 MW Power Plant
 for NTPC at Sipat, Chattisgarh.
      Major Power Projects under execution
q220 Mtr. High Chimney for 1x250 MW Power Plant at
 Parli, Maharashtra

q275 Mtr. High Chimney for 2x660 MW and 1x660 MW
 Power Plant for NTPC at Barh, Bihar

q275 Mtr. High Chimney for 2x500 MW and 1x500 MW
 Power Plant for NTPC at Kahalgaon, Bihar

q220 Mtr. High Chimney & Cooling Tower 2x250 MW
 Power Plant at Mudnoor, Andhra Pradesh
  PHOTOGRAPHS OF
UNIT#1 & 2 OF KORBA THERMAL
   POWER PLANT 2X250MW
       UNDER CONSTRUCTION
           STATUS OF POWER INDUSTRY


qRapid Growth in Economy has Resulted in Heavy Demand for
 Power Supply, hence Large Gap Between Demand & Supply.

qEnergy Short Fall is :10% on Average Basis &
                      :13.5 % on Peak Hours

qTarget for Additional Power in 11th Plan is Approx. 76,000 MW
           STATUS OF POWER INDUSTRY


qMinimum Power Generation Required Per Annum
 15000 MW.

qTotal Fund Required for Setting up Power Plant Per Annum
 Rs.60,000 Crores.

qApprox. Expenditure Towards Civil Works Per Annum
 Rs.9000 Crores.
          NBCC’S STRENGTH
qHave been Associated with Power Majors
 like NTPC, BHEL, and State Utilities

qHandled all Civil & Structural Aspects in
 250/500 MW units

qIn the latest State of the Art Supercritical 660
 MW units supported by Excellent Technical
 Team consisting of Senior Technocrats

qExcellent Project Management Capability
      MAJOR CONSTRAINTS
 Due to rapid and large scale development
 in the field of Infrastructure the following
 constraints are being faced by the
 Construction Industry:

qShortage of fuel and technical know-how
 for manufacturing of Equipment for high
 capacity Power plants.
       MAJOR CONSTRAINTS
qShortage of Materials, skilled manpower and
 experienced Technocrats.

qIncrease in Construction Cost due to
 increase in cost of Materials and Wages.

qLimited qualified Construction Agencies

qUn-workable rates make the Industry suffer.
       REMEDIAL MEASURES
qTechnical know-how for manufacturing higher
 capacity equipment to be brought with
 participation of private sector.

qModern Technology to be adopted.

qGOI to control the price of Major construction
 Materials.

qUse of Modern Machineries in Construction

				