					ENTSO-E Network Codes
  Development Plan
    GCRP/JGCRP Belfast
     20th February 2013
Background

• ENTSO-E Network Code provisions will have to
  be translated into EirGrid and SONI Grid Codes
• The Requirements for Generators (RfG) code is
  the most advanced
• RfG expected to go forward for Committee
  deliberation / approval later this year
• TSOs will have three years following approval to
  ensure Grid Codes are consistent with RfG and
  other Network Codes
Impact on EirGrid/SONI Grid Codes

• The ENTSO-E codes may end up replacing or
  superseding large portions of the existing Grid
  Codes (80-90%?)
• ENTSO-E SDC want change processes to be
  developed and trialled for RfG and then used for
  other codes – assume RfG is final
• EirGrid/SONI to explore best way to proceed
• RAs keen to see progress in this area
                                                       • Operati
                                                         onal
                                                                                                       December 2012
                                                                                        Introduction to Network Codes




                                       • Requi           Security
                                         reme            Networ
                                         nts             k             • Capa
                                         for                             city
                                                         (OS)            Alloc
Overview of Current & Future Network




                                         Gene
                                         rator                           ation
                                                       • Operati
                                         s                               &
                                                         onal
                                                                         Cong
                                                         Plannin
                                         (RfG)                           estio
                                                         g&
                                                                         n
                                       • Dema            Scheduli
                                                                         Mana
                                         nd              ng
                                                                         geme
                                         Conn                            nt
                                         ectio           (OPS)
                                         n             • Load            (CAC
                                         Code            Frequen         M)
                                                         cy
                                         (DCC)                         • Forw
                                                         Control
                                                                         ard
                                       • HVDC            &
                                                                         Capa
                                         Conn            Reserve
                                                                         city
                                         ectio           s
                                                                         Alloc
                                         n                               ation
                                         Code            (LFCR)
                                                       • Operati         (FCA)
                                         (HVD            onal
                                         C)                            • Balan
                                                         Procedu
                                                                         cing
                                       • Conn            res in an
                                                                         Netw
                                         ectio           Emerge
                                                                         ork
                                         n               ncy
                                                                         Code
                                         Proce
                                         dures           (EP)
                                                                           (BAL)
                                                       • Staff




                                                                       Market Related
                                       Related Codes




                                                       Related Codes
                                          (CP)           Training
                                        Connection




                                                         Operation
                                                          System




                                                                           Codes
                                                          (ST)
Codes
Other Considerations

• Alignment of Definitions in NCs vs current GCs
• Single Document vs Multiple Documents?
• Retrospection – EirGrid Grid Code – changes
  apply retrospectively – not the case for NCs
• Shared parts of the EirGrid / SONI Grid Codes?
• JGCRP member views?

				