Bid Form, Scope of Work and Specifications For by qiant230

VIEWS: 70 PAGES: 7

									                       Invitation for Bid
To:         Contractors
Re:       Fond du Lac Housing will be accepting bids for
the following work
Project #: 09-1572 LOOP DR

Project Description
                  Flooring restoration work


Bid Documents
                  Bid Documents may be obtained free of charge…
                  Starting: Monday October 26, 2009
                      8 am to 4 pm, Monday through Friday
                      Fond du Lac Housing Division
                      Fond du Lac Reservation
                      932Trettel Lane
                      Cloquet, Minnesota 55720
                      (218) 878-8050


Bid Submittal
                  Bids are due at the time and on the date below…
                      2 pm, Monday November 9 , 2009
                      Fond du Lac Housing Division
                      Fond du Lac Reservation
                      932Trettel Lane
                      Cloquet, Minnesota 55720
                      (218) 878-8050


Bid Opening
                  Bids will be opened and read aloud at the time and on the date specified below…
                      2:30 pm, Monday November 9 , 2009

Questions
                  Questions regarding the Bid Documents should be directed to…
                    Ed Jaakola
                    Fond du Lac Housing Construction Supervisor
                    (218) 878-8050
Invitation to Bid
                    All qualified Contractors are invited and encouraged to submit Bids for this project.
                    Native American Preference Applies to the greatest extent
                    feasible but all are encouraged to submit bids.

Instructions to Bidders
                    Bids must be received by the above time and date and may be mailed or hand
                    delivered, allowing adequate time for bids to be received by due time and date.

                    Only complete and legible bids that are typed or written in ink and submitted on the
                    provided bid form will be accepted.

                    Bids must be submitted in a sealed envelope with “Bid for 09-1572 Loop Dr. fire” and
                    the Contractors Company name clearly written or typed on the outside.


TERO Plan
                    Bidder must submit with its bid a compliance plan listing General Contractor,
                    Owners/Partners, Core Crew Employees, Subcontractors, and any other positions
                    available to be hired out of the TERO office.
                    FAILURE TO PROVIDE A COMPLETED TERO COMPLIANCE PLAN WILL RESULT
                    IN A REJECTION OF BID




                                                                                                            2
         Bid Form, Scope of Work and Specifications For
                 1572 Loop Drive
Project #: 09-1572 Loop Dr. Fire
Date of Posting: Monday, October 26, 2009 8:00 A.M.
Date for Bids Due: November 9, 2009 2:00 P.M.
Public Opening of Bids: November 9, 2009 2:30 P.M. FDL Housing Office
Scope prepared by Ed Jaakola

Address: 1572 Loop Dr.


              BID WILL ONLY BE ACCEPTED ON THIS FORM


Company Name: _______________________________


WORK TO BE WARRANTEED FROM DATE OF FINAL INSPECTION.
WORK WILL BEGIN WITHIN 7 DAYS OF ENTERING INTO CONTRACT
AND NOTICE TO PROCEED

Warranty
                     Contractor will provide a warranty as detailed below in addition to the specific
                     warranties provided by building materials, products, and systems

                     Contractors warranty is a contractual agreement between the Contractor, Fond du Lac
                     Band of Lake Superior Chippewa

                     Materials and Workmanship;
                     During the one-year period from and after the warranty date, the dwelling shall be free
                     from defects caused by faulty workmanship and defective materials due to
                     noncompliance with building standards

                     Plumbing, Mechanical, and Electric Systems;
                     During the two-year period from and after the warranty date, the dwelling shall be free
                     from defects caused by faulty installation of plumbing, electrical, heating and cooling
                     systems

                     Major Construction Defects;
                     During the ten-year period from and after the warranty date, the home shall be free
                     from major construction defects




                                                                                                               3
Date: 10/26/09
Project: 09-1572 Loop Dr. Fire
Address: 1572 Loop Dr. Cloquet MN 55720
Type of work: Flooring


Description and scope of work are as follows:



1. FLOORING

          Install new vinyl flooring in kitchen, dining, bathrooms, and entry way
          Install new carpet and pad in living, hallway, bedrooms, family room and on
          stairs
          Install luan underlayment where required
          Install metal transition strips as needed
          Provide all labor necessary to clean jobsite when work is completed
          All work to be done according to 2006 IBC
          Contractor to furnish all labor and material to complete the above work
          according to the attached specifications




                                                                                        4
In submitting this bid, the Bidder represents that…
 The Bidder has examined all the Bid Documents. To include Bid Form, Scope of Work, Specification, and Fond du
     Lac Band of Lake Superior Chippewa Tribal and Federal conditions.
 The Bidder has visited the site and is familiar with the specific conditions under which the project will be
     constructed.
 The Bidder understands the federal, state, local, tribal laws and regulations applicable to construction activities
     required for this type of project.
 This Bid is genuine, and not made in the interest of, or on behalf of, an undisclosed person, firm or corporation.
 This Bid will remain in effect for 30 days after the day of Bid opening.
 The Bidder acknowledges that the Owner has the right to reject this Bid, or all Bids, to waive irregularities in the
     bidding, and to accept a Bid other than the lowest bid.



 Contractor has 60 days from the “Notice to Proceed” to complete all work


The undersigned agrees, if this Bid is accepted, to enter into a Contract with the Owner
To perform and furnish the Work in accordance with the Bid Documents for the
Guaranteed Maximum Price and within the Contract Time indicated.

 TOTAL LABOR AND MATERIAL FOR ALL; FIRM/FIXED PRICE:
 $__________________

 Date: _________________________________________
 Company Name: ________________________________
 Signature: _____________________________________
 Printed Name and Title: __________________________
 Address: ______________________________________




Governing Authority
                               Contractors and their employees must comply with Fond du Lac Reservation policies,
                               ordinances, and laws relating to contract work performed on the Reservation

                               For more information, contact Fond du Lac Housing Division, Fond du Lac Reservation,
                               932 Trettle Lane, Cloquet, Minnesota 55720, (218) 878-8050


Building Codes
                               All work on this project will be governed by the following codes or the most currently
                               adopted version of each if different from that below:
                               2007 Minnesota State Building Code
                               2006 International Building Code
                               2006 International Residential Code
                               Guidelines for the Rehabilitation of Existing Buildings
                               2005 National Electrical Code
                               2000 International Mechanical and Fuel Gas Codes
                               2006 International Fire Code




                                                                                                                        5
Permits and Fees
                 Contractor will include all required permits and fees required to construct the project


Home Owner Instruction
                 Collect and deliver all warranties, manuals, parts lists, etc. for delivery to home owner
                 at close of project;
                 Provide list of sub-contractors on project;
                 Instruct owner on operation of mechanical system;
                 Provide contact name and telephone numbers to respond to home owner questions


Warranty
                 Contractor will provide a warranty as detailed below in addition to the specific
                 warranties provided by building materials, products, and systems

                 Contractors warranty is a contractual agreement between the Contractor, and Fond du
                 Lac Reservation

                 Materials and Workmanship;
                 During the one-year period from and after the warranty date, the dwelling shall be free
                 from defects caused by faulty workmanship and defective materials due to
                 noncompliance with building standards

                 Plumbing, Mechanical, and Electric Systems;
                 During the two-year period from and after the warranty date, the dwelling shall be free
                 from defects caused by faulty installation of plumbing, electrical, heating and cooling
                 systems

                 Major Construction Defects;
                 During the ten-year period from and after the warranty date, the home shall be free
                 from major construction defects



Specifications
General          Remove all extra construction materials, packing material, and waste from job site and
                 dispose of properly at close of project;
                 Remove packing materials and exposed labels from windows, doors, cabinets,
                 appliances, plumbing fixtures, mechanical equipment, etc.;
                 Preserve permanent labels relating to service or maintenance requirements;
                 Vacuum carpets and sweep vinyl floors;
                 Wash windows and mirrors;
                 Vacuum sawdust and waste from cabinets and closet shelving
                 Contractor to supply dumpsters

Substitutions    All references to specific manufacturers or proprietary products are for establishment of
                 a level of expected quality. Subject to compliance with the requirements of the
                 specifications, other equivalent manufacturers and products are acceptable with
                 approval of contract officer.




                                                                                                             6
Floor Finishes   Tackles carpet edge;
                 7/16 inch thick, 6 pound carpet pad;
                 32 ounce face weight plush carpeting, Shaw;
                 Carpet and pad at living, bedrooms, stair, and corridors;
                 Prepare floors to receive vinyl flooring;
                 Vinyl flooring, Congoleum;
                 Vinyl flooring at kitchen, dining, baths, and entry;
                 Extend flooring from adjacent room into closets
                 Rustoleum epoxy shield garage floor coating epoxy paint floor finish in utility room




                                                                                                        7

								