  Lag pull-out (withdrawal) capacities (lbs) in typical lumber:
                                                                               Lag Bolt Specifications
                                                                                Specific Gravity        5/16" shaft per 3" thread depth             5/16" shaft per 1" thread depth

  Douglas Fir, Larch                                                                  .50                           1330                                         266

  Douglas Fir, South                                                                  .46                            1175                                        235

  Engelmann Spruce, Lodgepole Pine (MSR 1650 f & higher)                              .46                            1175                                        235

  Hem, Fir                                                                            .43                           1060                                         212

  Hem, Fir (North)                                                                    .46                            1175                                        235

  Southern Pine                                                                       .55                           1535                                         307

  Spruce, Pine, Fir                                                                   .42                           1025                                         205

  Spruce, Pine, Fir (E of 2 million psi and higher grades of MSR and MEL)             .50                           1330                                         266

 Sources: Uniform Building Code; American Wood Council, NDS 2005, Table 11.2 A, 11.3.2 A
 Notes:
 1) Thread must be embedded in a rafter or other structural roof member.
 2) See IBC for required edge distances.
 **Note: To maintain waterproofing it is important that the aluminum flashing is properly placed under one full course above the mounting block with at least some of the flashing extending
 up under the course above that as well. See instructions on back.




BI7.2.3-6                                                                                                                                                               Feb-2012, Rev 5
  QBase Composition Mount Installation Instructions
                                        (formerly called New Roof Composition Mount)
Installation Tools Required: tape measure, roofing bar, chalk line, stud finder, caulking gun, one tube of sealant compatible with
roofing material, drill with 7/32" bit, drill or impact gun with 1/2" deep socket.

  WARNING: Quick Mount PV products are NOT designed for and should NOT be used to anchor fall protection equipment.



                                          1                                                2                                                      3

Layout your array out over the roofing paper using Align QBase vertical holes over center rafter mark   Remove QBase and drill 2 each 7/32" pilot holes
a chalk line to mark rafter centers and the rail and horizontal holes over snapped line. Mark           into rafter. Hold drill square to rafter.
location center.                                   holes for drilling.




                                        4                                                  5                                                      6

Fill pilot holes with sealant compatible with       Secure post (item 2) to QBase turning post onto Allow roofing to proceed to the point that the
roofing material. Seat grade 8 cap screw (item 3)   captive base plate bolt.                        flashing should be installed.
through bottom of QBase (item 1). Place QBase
over drilled holes and secure lags (item 4) in
place, to a solid, snug fit.




                                        7                                                  8                                                     9

Install flashing (item 5) over mount.               Allow roofing to proceed to the next mount          Apply sealant where post and flashing meet.
                                                    course.                                             Install EPDM counter flashing collar (item 6) . Seal
                                                                                                        post with hardware (item 7-10) if not installing
                                                                                                        racking right away.



BI7.2.3-6                       925-478-8269 www.quickmountpv.com info@quickmountpv.com                                                   Feb-2012, Rev 5
                                         2700 Mitchell Dr., Bldg. 2 Walnut Creek, CA 94598

				
DOCUMENT INFO
Shared By:
Tags:
Stats:
views:0
posted:10/3/2013
language:English
pages:2