Docstoc

MULTICON INTERNATIONAL CONTAINER TERMINAL

Document Sample
MULTICON INTERNATIONAL CONTAINER TERMINAL Powered By Docstoc
					COMPANY PROFILE

MULTI CON
INTERNATIONAL CONTAINER TERMINAL

MULTI CON

INTERNATIONAL CONTAINER TERMINAL

MULTICON INDRAJAYA TERMINAL, PT ( MIT ) is designed to be the modern Container Terminal capable of providing world-class container terminal services. MULTICON is located on the Marunda Industrial Area, around 3.5 km away from Tanjung Priok Port. MULTICON having 100.000 sq meter full concrete container yard, having completed facilities with the supporting infrastructure for multi container services. MULTICON the only one container terminal in Indonesia that open 24 hours. MULTICON prepared to handle large container movement with monthly capacity for throughput up to 50.000 TEUs, washing container up to 25.000 TEUs, repairing container up to 10.000 TEUs, container haulage from port to Multicon terminal up to 8.000 TEUs.

MULTICON MULTI CON
TERMINAL FASILITIES : MULTICON using first in first out and one way system for container trucking export and import. Having 2 gates in with capacity 8 lines for trucking container Import, and 4 lines for trucking container Export at one time. Having 4 gates out with capacity 14 lines for trucking container out or export at one time. MULTICON prepared to handle large container movement with monthly capacity for throughput up to 50.000 TEUs.

INTERNATIONAL CONTAINER TERMINAL

MULTICON MULTI CON
OFFICE & SYSTEM FASILITIES : MULTICON have employed the latest information system technology and using Electronic Data Interchange – EDI to connected with shipping line computer system and to assist in achieving high productivity and performance levels. Having 10 gates for customer service, 5 gates for container export and 5 gates for container import. Having well-trained employee with dedicated employee for each customer as a customer service, logistics and maintenance - repair.

INTERNATIONAL CONTAINER TERMINAL

MULTICON MULTI CON
CONTAINER YARD FASILITIES : MICT having 100.000 sq meter full concreted container yard, 1.000 sq meter PTI - Pre Trip Inspection area complete with electricity and power plug for reefer. Exclusive storage area and exclusive gate out for each customer. Having 8 container loaders for container export and container import and 2 container loader for container repair and iso tank container. Having 40.000 sq meter free exclusive storage area.

INTERNATIONAL CONTAINER TERMINAL

MULTICON MULTI CON
WASHING FASILITIES : MULTICON having 750 sq meter dry container washing area with 16 lines high pressure washing machine for 16 TEUs at one time. The container washing division prepare to handle with capacity up to 25.000 TEUs per month. Having 1000 sq meter container inspection area with well-trained employee as IICL (Institute of International Container Lessors) certified inspector and Cargo Worthy experience.

INTERNATIONAL CONTAINER TERMINAL

MULTICON MULTI CON
REPAIR FASILITIES : MULTICON having 8.000 sq meter maintenance and repair container.

INTERNATIONAL CONTAINER TERMINAL

Warehouse with completed repair tools and container spare part.
Having employee welder, repairer. well-trained as certified IICL criteria

Having 20 group repairer, prepared to handle 10.000 TEUs container repair, 1000 TEUs GOH container per month.

MULTICON MULTI CON
ISO TANK FASILITIES : MULTICON having 4.000 sq meter maintenance cleaning and testing iso tank container area with waste water treatment Facilities. Warehouse with iso tank spare part and completed high pressure water cleaning and repair tools for tank cleaning and 2.5 year and 5.0 years periodic testing, have well-trained employee as experience cleaner, certified welder, ITCO criteria repairer. Having 10 group cleaner, 4 group quality control and tester, prepared to handle 1.000 TEUs iso tank container cleaning and testing per month.

INTERNATIONAL CONTAINER TERMINAL

MULTICON MULTI CON
REEFER FASILITIES : MULTICON having 1.000 sq meter PTI-Pre Trip Inspection area complete with electricity and power plug for reefer. Warehouse with completed reefer tools and reefer spare part for pre trip inspection and repair. Having well-trained employee as Thermoking, Carrier and Daikin certified employee. Prepared to handle 1.000 Reefer for pre trip inspection, pre cooling, monitoring per month.

INTERNATIONAL CONTAINER TERMINAL

MULTICON MULTI CON
HANDLING EQUIPMENT FASILITIES : MULTICON having 8 unit sideloader empty container which can handle 6 high up to 8 high, and 2 unit forklift. Having experienced operator for handling this heavy equipment, also having well-trained mechanics which have experienced in handling machine of side loaders.

INTERNATIONAL CONTAINER TERMINAL

MULTICON MULTI CON

INTERNATIONAL CONTAINER TERMINAL