This Certificate of Substantial Completion can be used by contractors or engineers to
notify a project owner that a project has been substantially completed. This certificate
can be used by project owners for a work project or by contractors for a construction
project. Often, substantial completion of a project is a critical milestone that can trigger
progress payments or lien waivers. This certificate is ideal for small business projects or
contractors and subcontractors to an ongoing construction project.
          CERTIFICATE OF SUBSTANTIAL COMPLETION

Service Agreement Number: ______________________ [Instructions: Insert the service
agreement number or designated project number for this project]

Project Name: ______________________ [Instructions: Insert the name of the project]

Date: ______________________ [Instructions: Insert the date of this certificate]


THE UNDERSIGNED, ___________________ [Instructions: Insert the name of the
Contractor or Engineer issuing this certificate] (the “Contractor/Engineer”), hereby certifies
that the project pursuant to Service Agreement No: ______________________ [Instructions:
Insert the service agreement number or designated project number for this project], dated
the _______ day of ______________, 2_______, [Instructions: Insert the date of this
certificate] between __________________ [Instructions: Insert the name of the Owner of the
project] (the “Owner”) and ______________________ [Instructions: Insert the name of the
Contractor or Engineer issuing this certificate] Contractor/Engineer, has been substantially
completed as of the _____ day of _______________, 2_______ [Instructions: Insert the date
the project was substantially completed].

1.      Contractor/Engineer hereby certifies that the project is substantially completed in
compliance with the provisions of the Servicing Agreement, including but not limited to, all
specifications, amendments, and drawings.

2.      “Substantial Completion” occurs when the Work is sufficiently complete in accordance
with the Contract Documents so that Owner can occupy or utilize the Work for its intended use.
Substantial Completion requires the final inspection and approval of any agency having
jurisdiction, Owner’s design professional providing construction administration, and Project
Manager. Any work remaining after Substantial Completion shall be noted in a “punch list”
following such inspection, and such remaining work shall be completed within
_______________ [Instructions: Insert the length of time after substantial completion that
the Work will be fully completed] of Substantial Completion and prior to final payment.

3.      Contractor/Engineer further certifies that all payments due and owing to any and all
employees of Contractor/Engineer and to any other third parties in respect to the substantial
completion of the project, have been paid in full, or will be paid in full by the completion of the
project.

4.     Contractor/Engineer will obtain a full and final release from all suppliers, who provided
services or material to Contractor/Engineer in its performance of the project contemplated in the
Servicing Agreement and certifies that there are no liens by any supplier or subcontractor.

5.     Any and all defects in workmanship or materials used for or in connection with the
construction have or will be corrected.


© Copyright 2013 Docstoc Inc.                                                             2
6.      The tasks to be completed or corrected are further described in Exhibit A of this
Certificate. These tasks shall be completed or corrected by the _____ day of _______________,
2_______ [Instructions: Insert the date the project will be completed in full] of the issuance
of this Certificate of Substantial Completion.

7.    The total cost of the construction completed by Contractor/Engineer is
_____________________ dollars ($_______). [Instructions: Insert the total amount the
Owner owes the Contractors or Engineer].

DATED this ____ day of _______________, _______.




___________________________ [Instructions: Insert signature]
Name: ___________________________ [Instructions: Insert the name of the person signing
this certificate]
Title: ___________________________ [Instructions: Insert the title of the person signing
this certificate]




© Copyright 2013 Docstoc Inc.                                                        3
                                           Exhibit A

                                    Tasks to Be Completed

[Instructions: Insert a list of the tasks to be completed]




© Copyright 2013 Docstoc Inc.                                4

				
DOCUMENT INFO
Description: This Certificate of Substantial Completion can be used by contractors or engineers to notify a project owner that a project has been substantially completed. This certificate can be used by project owners for a work project or by contractors for a construction project. Often, substantial completion of a project is a critical milestone that can trigger progress payments or lien waivers. This certificate is ideal for small business projects or contractors and subcontractors to an ongoing construction project.