           Categories

• Special Provisions prior to 2/10:
  – Category A -   Earthwork
  – Category B -   Subbase and Aggregate Base
    Courses
  – Category C -   Flexible Bases, Pavements, &
    Shoulders
  – Category D -   Rigid Bases, Pavements, &
    Shoulders
  – Category E -   Structures


                                    www.dot.state.pa.us
           Categories
• New Revisions:
 – Category A split into:
   • Small Excavation - 50,000 to 1,000,000 CY
   • Large Excavation - > 1,000,000 CY
 – Flexible Base Replacement (316), Stone
   Matrix Asphalt (419), & Manual Bituminous
   Patching (450) added to Category C
 – Concrete Pavement Patching (516) added to
   Category D



                                    www.dot.state.pa.us
           Categories
• New Revisions:
 – ATPB (360) & CTPB (303) moved from
   Categories C & D (respectively) to Category B
 – Milling (491 & 492) added as new Category F
 – *Notes added to Categories B, C, & D to:
   • Exclude ineligible work items
   • Explain how adjustment will be computed
     when work is measured & paid for under
     varying units of measure (e.g. on a “Material
     Used Basis” or on an “Area Basis”).


                                     www.dot.state.pa.us
          Categories
• Excluded Work Items:
 – Presplit Blasting items associated with
   Section 203 (Category A)
 – Cleaning Existing Ditches item associated
   with Section 204 (Category A)
 – Shoulder Backfill items associated with
   Sections 654 & 656 (Category C)
 – Patching Joint, New Pavement Joint, &
   Subbase Material for Concrete Pavement
   Patching items associated with Section 516
   (Category D)
                                  www.dot.state.pa.us
           Categories
• Items Paid on Material Used Basis:
 – “Coarse Aggregate” and “Bituminous
   Material” items associated with Cold-
   Recycled Base Course (Sections 341 & 342)
 – “Coarse Aggregate for . . .” and “Bituminous
   Material for . . .” items associated with FB-1
   Wearing & Binder, Seal Coats, & Surface
   Treatments (Sections 439, 440, 470, 471,
   480, & 481)
   • Adjustment will be computed based on the “Coarse
     Aggregate” / “Coarse Aggregate for . . .” item
     quantity only.
                                      www.dot.state.pa.us
           Categories
• Items Paid on an Area Basis Where
  Depth is Not Indicated in Item
  Description:
 – Seal Coats and Surface Treatments (Sections
   470, 471, 480, & 481)
   • A depth equal to the maximum allowable size
     of the type of aggregate used, as specified in
     Section 703.2, Table C, will be assumed.




                                      www.dot.state.pa.us
   Fuel Usage Factors
• Category A
 – Small Excavation: 0.34 gal/CY
 – Large Excavation: 0.25 gal/CY
• Category B
 – Increased from 0.62 to 0.71 gal/Ton
• Category C
 – Reduced from 2.98 to 2.00 gal/Ton




                                   www.dot.state.pa.us
   Fuel Usage Factors
• Category D
 – Increased from 0.98 to 1.77 gal/CY
• Category E
 – Reduced from 8.00 to 4.00 gal/$1000 of
   work performed
• Category F
 – Established at 1.15 gal/CY




                                  www.dot.state.pa.us
   Conversion Factors
• Category B (CY -> Tons)
 – New CF established at 3,240 lbs./CY
• Category C (SY -> Tons)
 – Reduced from 120 to 110 lbs / inch of depth
   / SY
• Category F (SY -> CY)
 – Established 2 inches as average depth for
   variable depth milling (Sect. 491).
 – Established 1 inch as average depth for
   profile milling (Sect. 492).
                                  www.dot.state.pa.us
 Category E Structures
• Consider all work identified on                       S
  -drawing / BPAA-drawing
  – Lump sum item (8xxx-xxxx) with one or
    more associated items; or
  – Rehab work tabbed as one or more separate
    contract items
• Exclude:
  – Fabricated Structural Steel
  – Prestressed Concrete Bridge Beams
  – Bearings & Bearing Pads
  – Design-related work           www.dot.state.pa.us
 Category E Structures
• Include:
  – Items on S-drawing or BPAA-drawing
    tabbed as “Roadway Items”; and
  – Removal, Painting & Containment, and
    Causeways (whether or not tabbed on S-
    drawing or BPAA-drawing).
• Value of all applicable Structure
  work for the project must exceed
  $1,000,000.

                                  www.dot.state.pa.us
 Category E - Example 1
• A project includes the following contract items:


                 Item: 8600-0007                              Item Type:    Contract Item
          Description: RETAINING WALL, AS DESIGNED, S-25499   Unit Price:   $2,769,000.00


                 Item: 9070-0050                              Item Type:    Contract Item
                         ZONE PAINTING EXISTING STRUCTURAL
          Description:                                        Unit Price:   $100,000.00
                         STEEL USING ORGANIC ZINC COATING

                Item: 9075-0001                               Item Type:    Contract Item
          Description: CONTAINMENT                            Unit Price:    $35,000.00




                                                                               www.dot.state.pa.us
 Category E - Example 1
• Item 8600-0007 has the following Component
  Item Schedule:
      Seq     Item                           Description               UoM     Quantity    Unit Price     Total

      10    8600-0007 CLASS 3 EXCAVATION                                CY       376.000     $200.02     $75,207.52

      20    8600-0007 PREFABRICATED BASE DRAIN                          LF      1210.249      $10.20     $12,344.54

      30    8600-0007 CLASS AA CEMENT CONCRETE                          CY       550.000     $499.00    $274,450.00

      40    8600-0007 LEAN CEMENT CONCRETE                              CY          .000       $0.00          $0.00

      50    8600-0007 SELECTED BORROW EXCAVATION, STRUCTURE BACKFILL    CY      3620.000      $50.00    $181,000.00

      60    8600-0007 36" DIAMETER DRILLED CAISSONS, SHAFT SECTION      LF      3667.000     $130.00    $476,710.00

      70    8600-0007 30" DIAMETER ROCK SOCKETS                         LF       237.000     $240.00     $56,880.00

      80    8600-0007 FABRICATED STRUCTURAL STEEL                       LB    727056.000       $1.20    $872,467.20

      90    8600-0007 WOOD LAGGING                                      SF      9379.000      $11.00    $103,169.00

      100   8600-0007 ROCK ANCHORS                                     EACH       79.000 $9,073.06      $716,771.74




                                                                                               www.dot.state.pa.us
 Category E - Example 1
• The value of all Structure work for the project is
  computed as follows:
  –   Retaining Wall (LS)                $2,769,000.00
  –   Fabricated Structural Steel       ($ 872,467.20)
  –   Painting Existing Structural Steel $ 100,000.00
  –   Containment                        $    35,000.00

  – Total Value                        $2,031,532.80
• The Total Value of all Structure work exceeds
  $1,000,000
  – Payments made under the above items, excluding the
    Fab Steel component item, are subject to price
    adjustment under Category E.
                                             www.dot.state.pa.us
   Payment / Rebate
• Price Adjustments to be computed
  on a quarterly basis.
 – Initial adjustment quarter to begin as of the
   month/year when the first item of
   applicable work is performed.
 – New adjustment quarters to begin every 3
   months thereafter.
• Quarterly price adjustments
  amounting to less than $1,000 will
  be disregarded.
                                    www.dot.state.pa.us
   Payment / Rebate
• Example:
 – Consider a project that includes items for
   Class 1 Excavation, Milling, and Superpave
   HMA Wearing Course.
 – If Class 1 Excavation operation is the first of
   these items to be initiated and work begins
   in August 2012:
   • Initial Adjustment Quarter: August thru October
     2012
   • New Adjustment Quarters would begin in
     November 2012, February 2013, May 2013, etc.

                                       www.dot.state.pa.us
     Implementation
• Revised specification has been
  approved by FHWA and is to be
  included in all projects let after
  February 25, 2010.
• A revised Excel spreadsheet has
  been provided by BoCM.



                             www.dot.state.pa.us
Thank You


        www.dot.state.pa.us
Questions


        www.dot.state.pa.us

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:8
posted:9/13/2013
language:
pages:20