									    【1  Project description and implementation method】
     1.1. Project description (including implementation method)                 6.1 (Exhibit 1)                                     Proposal form
     1.1.1 Obtaining Information on Demand and Trends in Regulations and Nuclear Power Policies

    Description
                § Describe the project contents specifically (including implementation method).
     contents

    § Project description (including implementation method)

                                                                              【Criteria for basic point evaluation】
                                                                              【Criteria for basic point evaluation】
                                                                              ・Is it consistent with the project objectives?
                                                                              ・Is it consistent with the project objectives?
                                                                              ・Do the contents of project conform to the intent of the
                                                                              ・Do the contents of project conform to the intent of the
                                                                              Agency for Natural Resources and Energy?
                                                                              Agency for Natural Resources and Energy?
                                                                              ・Is the bidder capable of researching overseas nuclear
                                                                              ・Is the bidder capable of researching overseas nuclear
                                                                              power trends?
                                                                              power trends?




                                                                             【Criteria for added-point evaluation】
                                                                          【Criteria for added-point evaluation】
                                                                             ・Are the proposals for the project original and innovative?
                                                                          ・Are the proposals for the project original and innovative?
                                                                             ・Is the implementation method efficient and effective, as well as
                                                                          ・Is the implementation method efficient and effective, as well as
                                                                             feasible?
                                                                          feasible?
                                                                             ・Does the bidder have experience in research on overseas nuclear
                                                                          ・Does the bidder have experience in research on overseas nuclear
                                                                             power trends and a strong research base?
                                                                          power trends and a strong research base?
7
    【1  Project description and implementation method】
     1.1. Project description (including implementation method)                                           6.1 (Exhibit 1) Proposal form
     1.1.2 Understanding Users’ Needs

     Description
                   § Describe the project contents specifically (including implementation method).
      contents

    § Project description (including implementation method)


                                                                                  【Criteria for basic point evaluation】
                                                                                  【Criteria for basic point evaluation】
                                                                                  ・Is it consistent with the project objectives?
                                                                                  ・Is it consistent with the project objectives?
                                                                                  ・Do the contents of project conform to the intent of the
                                                                                  ・Do the contents of project conform to the intent of the
                                                                                  Agency for Natural Resources and Energy?
                                                                                  Agency for Natural Resources and Energy?
                                                                                  ・Is the bidder capable of researching overseas nuclear
                                                                                  ・Is the bidder capable of researching overseas nuclear
                                                                                  power trends?
                                                                                  power trends?




                                                                                    【Criteria for added-point evaluation】
                                                                                 【Criteria for added-point evaluation】
                                                                                    ・Are the proposals for the project original and innovative?
                                                                                 ・Are the proposals for the project original and innovative?
                                                                                    ・Is the implementation method efficient and effective, as well as
                                                                                 ・Is the implementation method efficient and effective, as well as
                                                                                    feasible?
                                                                                 feasible?
                                                                                    ・Does the bidder have experience in research on overseas nuclear
                                                                                 ・Does the bidder have experience in research on overseas nuclear
                                                                                    power trends and a strong research base?
                                                                                 power trends and a strong research base?
8
    【1  Project description and implementation method】
     1.1. Project description (including implementation method)                                            6.1 (Exhibit 1) Proposal form
     1.1.3 Research on Competing Reactors, etc.

    Description
                § Describe the project contents specifically (including implementation method).
     contents

    § Project description (including implementation method)

                                                                              【Criteria for basic point evaluation】
                                                                              【Criteria for basic point evaluation】
                                                                              ・Is it consistent with the project objectives?
                                                                              ・Is it consistent with the project objectives?
                                                                              ・Do the contents of project conform to the intent of the
                                                                              ・Do the contents of project conform to the intent of the
                                                                              Agency for Natural Resources and Energy?
                                                                              Agency for Natural Resources and Energy?
                                                                              ・Is the bidder capable of researching overseas nuclear
                                                                              ・Is the bidder capable of researching overseas nuclear
                                                                              power trends?
                                                                              power trends?




                                                                             【Criteria for added-point evaluation】
                                                                          【Criteria for added-point evaluation】
                                                                             ・Are the proposals for the project original and innovative?
                                                                          ・Are the proposals for the project original and innovative?
                                                                             ・Is the implementation method efficient and effective, as well as
                                                                          ・Is the implementation method efficient and effective, as well as
                                                                             feasible?
                                                                          feasible?
                                                                             ・Does the bidder have experience in research on overseas nuclear
                                                                          ・Does the bidder have experience in research on overseas nuclear
                                                                             power trends and a strong research base?
                                                                          power trends and a strong research base?
9
     【1  Project description and implementation method】
      1.1. Project description (including implementation method)                                           6.1 (Exhibit 1) Proposal form
      1.1.4 Assistance for Field Study

      Description
                    § Describe the project contents specifically (including implementation method).
       contents

     § Project description (including implementation method)


                                                                                   【Criteria for basic point evaluation】
                                                                                   【Criteria for basic point evaluation】
                                                                                   ・Is it consistent with the project objectives?
                                                                                   ・Is it consistent with the project objectives?
                                                                                   ・Do the contents of project conform to the intent of the
                                                                                   ・Do the contents of project conform to the intent of the
                                                                                   Agency for Natural Resources and Energy?
                                                                                   Agency for Natural Resources and Energy?
                                                                                   ・Is the bidder capable of researching overseas nuclear
                                                                                   ・Is the bidder capable of researching overseas nuclear
                                                                                   power trends?
                                                                                   power trends?




                                                                              【Criteria for added-point evaluation】
                                                                           【Criteria for added-point evaluation】
                                                                              ・Are the proposals for the project original and innovative?
                                                                           ・Are the proposals for the project original and innovative?
                                                                              ・Is the implementation method efficient and effective, as well as
                                                                           ・Is the implementation method efficient and effective, as well as
                                                                              feasible?
                                                                           feasible?
                                                                              ・Does the bidder have experience in research on overseas nuclear
                                                                           ・Does the bidder have experience in research on overseas nuclear
                                                                              power trends and a strong research base?
                                                                           power trends and a strong research base?
10
     【2  Project implementation plan】
                                                                                                               6.1 (Exhibit 1) Proposal form

      Description      § To ensure that good results are obtained, describe major milestones of the project implementation plan (work contents and schedule)
       contents          conducted by the bidder, and state specifically and objectively the basis for the schedule proposed.


     §   Work contents and schedule
     n    Schedule
         (Include the following items in the description.)
                                                                                                                                  Example of
         •     Work description, persons in charge, start date, end date, title of document prepared, milestones
                                                                                                                                  description
          Quarter                           1                        2                       3                        4
          1.1.1
                                                                                                 【Criteria for basic point evaluation】
                                                                                                 【Criteria for basic point evaluation】
          ○○                                                                                     ・Is the schedule appropriate?
                                                                                                 ・Is the schedule appropriate?
                                                                                                 ・Can the bidder meet the objectives according to the schedule?
          1.1.2                                                                                  ・Can the bidder meet the objectives according to the schedule?

          ○○
          1.1.3
          ○○
                                                                                                                        Report
          Other                                              Interim report                                             writing

     n    Innovativeness and ideas that will ensure that work is completed on time
             •      The schedule used in the past XXX was utilized as a template to create this schedule.
             •      XXXXXXXXXXXXXXXXXXXXXXXXXXXX                                                    【Criteria for added-point evaluation】
             •      ・・・・・・・・・・・・・・・                                                              【Criteria for added-point evaluation】
                                                                                                    ・Are reasons, innovativeness, and experience which indicate this
                                                                                                 ・Are reasons, innovativeness, and experience which indicate this
                                                                                                    schedule is reasonably achievable shown?
                                                                                                 schedule is reasonably achievable shown?
                                                                                                    ・Is the schedule set up carefully such that the project
                                                                                                 ・Is the schedule set up carefully such that the project
                                                                                                    implementation timing and term is established in accordance with
                                                                                                 implementation timing and term is established in accordance with
                                                                                                    the objectives and the findings of the research can be reflected in
                                                                                                 the objectives and the findings of the research can be reflected in
                                                                                                    the later project and reported effectively?
                                                                                                 the later project and reported effectively?
11
     【3 Project implementation system】                     6.1 (Exhibit 1) Proposal form
      3.1 Organizational expertise and experience in similar projects

      Description
                     § Describe organizational expertise, know-how, and past experience relevant to the project.
       contents



                                                                                                                             Example of
     § Expertise and know-how
        Ø   XXXXXXXXXX                                                                                                       description
        Ø   Separately described in the proposal, “reference to XXX”, etc.

                                                                                                             【Criteria for basic point evaluation】
                                                                                                             【Criteria for basic point evaluation】
                                                                                                             ・Do they have experience (expertise obtained) in
     § Past Experience                                                                                       ・Do they have experience (expertise obtained) in
                                                                                                             similar projects?
                                                                                                             similar projects?
        (Include the following in the description.)                                                          ・Does the organization have the ability to examine
                                                                                                             ・Does the organization have the ability to examine
                                                                                                             the research contents from various perspectives?
        Ø Client (* it is not mandatory to disclose the actual name. Instead, the                            the research contents from various perspectives?
                                                                                                             (Does the organization have different specialized
           name may be written as, for example, “Central government                                          (Does the organization have different specialized
                                                                                                             departments, or a balanced structure?)
                                                                                                             departments, or a balanced structure?)
           department A” or something similar.)
        Ø Summary of implementation

        Ø Implementation timing

        Ø Principal persons in charge of project implementation, etc.
                                                                                                                      【Criteria for added-point evaluation】
                                                                                                                   【Criteria for added-point evaluation】
                                                                                                                      ・Do they have a reservoir of expertise, know-
                                                                                                                   ・Do they have a reservoir of expertise, know-
                                                                                                                      how, and others useful for this project?
                                                                                                                   how, and others useful for this project?
                                                                                                                      ・Do they have implementation experience of
                                                                                                                   ・Do they have implementation experience of
                                                                                                                      research which is cited in various materials, or
                                                                                                                   research which is cited in various materials, or
                                                                                                                      have they achieved valuable research outcomes?
                                                                                                                   have they achieved valuable research outcomes?
                           If additional information is available, attach it to this as “annex”.
12
     【3 Project implementation system】                                     6.1 (Exhibit 1) Proposal form
      3.2  Expertise and past experience in similar projects of persons who will be engaged in this project

      Description
                          § Describe expertise, accumulated know-how, and past experience in similar projects of persons who will be engaged in this project.
       contents




     § Name of person in charge
                                                                                                        Example of description
       (Include the following items in the description.)
          Ø   Division and position
              Work to undertake                                                                              【Criteria for basic point evaluation】
          Ø                                                                                                  【Criteria for basic point evaluation】
                                                                                                             ・Do they have experience in similar projects?
          Ø   Role                                                                                           ・Do they have experience in similar projects?
                                                                                                             ・Do they have implementation experience of
          Ø   Work experience (customer business category, work implemented and its                          ・Do they have implementation experience of
                                                                                                             research which is cited in various materials, or have
              contents, positioning in the organization, implementation term)                                research which is cited in various materials, or have
                                                                                                             they achieved valuable research outcomes?
          Ø   Career summary, skills, expertise, etc.                                                        they achieved valuable research outcomes?
          Ø   Past successes


     § Name of person in charge                                                                                【Criteria for added-point evaluation】
                                                                                                             【Criteria for added-point evaluation】
        (Include the following items in the description.)                                                      ・Do they have a reservoir of expertise, know-how,
                                                                                                             ・Do they have a reservoir of expertise, know-how,
                                                                                                               and others useful for this project?
          Ø   Division and position                                                                          and others useful for this project?
                                                                                                               ・Do they have implementation experience of
          Ø   Work to undertake                                                                              ・Do they have implementation experience of
                                                                                                               research which is cited in various materials, or have
              Role                                                                                           research which is cited in various materials, or have
          Ø                                                                                                    they achieved valuable research outcomes?
                                                                                                             they achieved valuable research outcomes?
          Ø   Work experience (customer business category, work implemented and its
              contents, positioning in the organization, implementation term)
          Ø   Career summary, skills, expertise, etc.
          Ø   Past successes

                               If additional information is available, attach it to this as “annex”.
13
     【4 Attached material】
                                                                                                      6.1 (Exhibit 1) Proposal form
      4.1. Worker-hours for project implementation
      Description   § Describe total labor cost and worker-hours necessary to enable the project implementation method proposed in “2, Project
       contents       implementation plan”.


     § [Name of contract item] Detailed estimation
                                                                                                           Example of description

                                          Work
                                                                                                    Worker-hours
                                                                                                     (man-hrs)
                                                      Item
     No.

           1.1.1      ●●●-related item                                                       


           1.1.2      ○○○-related item                                                       


                      Total




                     ・The figures are reference values only and they do not need to coincide
                     exactly with worker-hours and labor costs set out in the contract.
14

								