• We are requested to prepare all cables to CalFrame, and on CalFrame, prior to installation of CalFrame in ALICE (June). • We have ordered ~all cables and connectors necessary for this purpose:
– ~12000 CHF for cables and connectors – ~16000+3780 CHF for 95mm2 LV cables – ~18500 CHF for cable trays and LV distribution panels

• We have ~500 cables in ALICE DCDB that need to be made/labeled/installed in April/May. • When complete the SM installation becomes “easy”. All remaining service connections are at SM Electronics crate with the exception of LED fibers which must be run from SM to LED drivers. • Details of Cable Specifications and Orders can be seen at:
http://dsilverm.web.cern.ch/dsilverm/cabling/index.html

Awes - ALICE EMCal Meeting, Frascati, March 13-14, 2007

Awes - ALICE EMCal Meeting, Frascati, March 13-14, 2007

Awes - ALICE EMCal Meeting, Frascati, March 13-14, 2007

Awes - ALICE EMCal Meeting, Frascati, March 13-14, 2007

“Signal” cable trays

Awes - ALICE EMCal Meeting, Frascati, March 13-14, 2007

LV cable trays

Awes - ALICE EMCal Meeting, Frascati, March 13-14, 2007

LV Distribution Panels Primary

LV Distribution Panels
Secondary (SM)

Awes - ALICE EMCal Meeting, Frascati, March 13-14, 2007

Cooling water pipes

Awes - ALICE EMCal Meeting, Frascati, March 13-14, 2007

Cable Support (LV) frame to EMCal

LED Box (obsolete)

Awes - ALICE EMCal Meeting, Frascati, March 13-14, 2007

Routing cable STU

Max length 12metres

STU

ELMBs LEDs DDL & TTC

Awes - ALICE EMCal Meeting, Frascati, March 13-14, 2007

Details of Cable Plant
• LV Cables:
– 95mm2 cables to CalFrame to be installed by CERN – 95mm2 and 35mm2 cables between Patch Panels on CalFrame to be installed by CERN – LV sense wires to CalFrame to be installed by CERN – LV multi-wire sense wires on CalFrame prepared by EMCal, installed by CERN with LV – 48 FEE: 8-wire multi-contact cables (est. 1-2 weeks) – 36 TRU: 5-wire multi-contact cables (est. 1 week) – 24 RCU: 3-wire multi-contact cables (est. 1 week) Note: LV, sense, FEE, TRU, RCU all different connector types
Awes - ALICE EMCal Meeting, Frascati, March 13-14, 2007

Details of Cable Plant
• HV Cables:
– Four 37-wire HV cables to CalFrame to be installed by CERN with connectors. – Four HV patch Panel from 37-wire bulk connector to single wire HV LEMO connector to be built by CERN – 48 FEE HV: 2 LEMO connectors per cable

• Fiber Optic Cables:
– TTC fibers to two patch panels with TTOC16 by DAQ – DDL fibers to two patch panels by DAQ group – 25 TTC fibers on EMCal from DAQ group, installed by EMCal – 25 DDL fibers on EMCal from DAQ group, installed by EMCal
Awes - ALICE EMCal Meeting, Frascati, March 13-14, 2007

Details of Cable Plant
• Ethernet Cables:
– 26 Ethernet cables from O12 to CalFrame made by EMCal, installed by EMCal (or CERN). – Two Ethernet patch panels prepared by CERN (must replace steel mount plate) – 25 Ethernet cables to RCU with RJ45 connector on patch panel and “special” connector at RCU (est. <1 week)

• Trigger cables:
– 36 CAT7 cables with ethernet (RJ45) connectors at each end (as short as possible) for TRU-STU – 5 L0,L1 with special LVDS cables with LEMO connectors prepared and installed from STU to CTP by EMCal(?) – 2 LED trigger cables with LEMO connectors prepared and installed from CTP to LED drivers by EMCal(?)

Awes - ALICE EMCal Meeting, Frascati, March 13-14, 2007

Details of Cable Plant
• ELMB (=Slow control - Temp monitoring):
– CAN Bus cable from CR3 to CalFrame by DCS group – CAN Bus cable from A to C side and between ELMB mother boards by DCS group – 4 ELMB mother boards with ADC chips provided by DCS group – ELMBs and CAN Bus cables installed by DAQ group – 12 34-wire flat ribbon cables with connectors prepared by EMCal group. (est. ~1 day)

• Installation
– Installation of all cables (except LV) on CalFrame by CalFrame by EMCal group. Working at heights (~10m). (Est. ~1 week)

• Database
– All Details have been developed in spreadsheets (see web link) which have been “cleansed” for automatic input to DCDB where cables and node-names are defined. – Used to produce cable labels – Used to schedule cable installations by CERN group
Awes - ALICE EMCal Meeting, Frascati, March 13-14, 2007

Details of Cable Plant
• Installation plan
– All cables (some exceptions) are at CERN. – All connectors (some exceptions) are ordered and expected to be at CERN within the next week or so. – Propose that someone with technical expertise to make cables come to CERN for few days and attempt to make at least one of each cable/connector type to insure that all parts are correct and to estimate time necessary to make all cables. – Then schedule one or two later visits to make all cables, and then to install all cables. Installation must wait until CalFrame is at CERN, weight test is performed, and cable trays are installed. – Cable installation by EMCal can probably be done in parallel to LV cable installation since in different cable trays and can work on A or C side.

Awes - ALICE EMCal Meeting, Frascati, March 13-14, 2007

Temperature Readout
• By fiat, we’ve decided to use one 16-Channel ADC ELMB group per SM. One 34-wire flat ribbon cable. • Two types of temperature sensors - 2-wire and 4-wire that require 1 or 2 ADC channels each, respectively. The 4-wire allows a reference loop subtraction for better stability/reliability. • Propose that the ELMB for each SM be configured with 2 4-wire sensors and 12 2-wire sensors. • Use 2 2-wire sensors in opposite corners of FEE crate • Use 10 2-wire sensors to distribute across SM to measure temperature field. • Use 2 4-wire sensors on SM to insure stability of overall temperature scale.
Awes - ALICE EMCal Meeting, Frascati, March 13-14, 2007

EMCal FEE Crate
• Electronic:
– Once T-card is finalized need to layout IPCB and GTL bus (A and B) for EMCal FEE card spacing - Nantes? – Should produce all IPCBs and GTL buses ASAP. Should use new T-cards, IPCB, and GTL for next test beam. Also use them for APD/FEE test stations.

• Mechanical:
– Need final design of FEE crate structure and enclosure/door – Cooling manifold and cooling plates – IPCB support, FEE card rails.

Awes - ALICE EMCal Meeting, Frascati, March 13-14, 2007

Backup slides

Awes - ALICE EMCal Meeting, Frascati, March 13-14, 2007

EMCal FEE Installation in ALICE
Totals/SuperModule: • 4 FEE crates x 9 cards. Each with a GTL bus (A or B flavor) - each with LV and HV • 3 TRUs - each with LV, LVDS, and fiber optic trigger outputs • 2 RCUs - each with LV, TTC, L0, DDL, ethernet

• Readout of a Super Module of 24x48 towers will be grouped in 4 crates of 24x12 towers on a single GTL bus with 9 FEE cards, but 3 TRUs.
Awes - ALICE EMCal Meeting, Frascati, March 13-14, 2007

Overview of EMCal Cable Services
Cable/Patch Panels: Didier Gabrielle@CERN Goal is to use patch panels on/near EMCal. Install cable trays, Patch panels, distribution blocks and many cables on CalFrame before installation.
4x 48x 4x 24+1x 1x HV LV sense ethernet can-bus
scem 04.31.52.075.9 scem 04.08.61.975.0 scem 04.21.48.314.1 scem 04.21.70.104.6 scem 04.21.60.491.2

OD 12.4 OD OD OD 23 9.3 5.7 EMCAL

4x

EMC -TR - FO f ormenti / draka 1pair (EMC-LO / L1-A / L1-B / L1-C)

OD

5

24x

LO-Trigger

f ormenti / draka 1pair

OD

5

OD 17.4

1x 1x INSIDE L3 MAGNET 1x 1x

EMC-L1-jet EMC-L1-jet (opt.F)

f ormenti / draka 1pair scem04.67.10.500.0

OD OD

5 FROM V0 detector Rack I20

LED-Trigger-A LED-Trigger-C

scem 04.61.11.145.5 scem 04.61.11.145.5

OD OD

3 3

A SIDE

C SIDE

Note: Optical fibers: TTC, DDL not shown here. Responsibility of DAQ group.
Awes - ALICE EMCal Meeting, Frascati, March 13-14, 2007

ALICE Experiment Cave
0 8 9 15 EXD 4/29 16 17 24 25 33 34 37

Acorde

Acorde

Sniffer

Sniffer

Sniffer

TS/EL

EMC

FMD

MTR

MTR

MTR

MTR

TRD

TRD

TRD

TRD

TRD

TRD

TRD

TOF

SP LV LV

TOF

TOF

TOF
LV

TPC

TPC

TOF

TOF

TOF

TOF

EXD 5/29

V0

T0

T0

LV HV CO

LV

GASPWR SIG

DET DET SP SP

LV

LV

LV

LV

LV LV

LV LV SP

RO

RO

RO

RO

0

EMCAL side
Vacu PMD PMD TPC TPC TPC TPC
LV LV CP GP LV LV

L3 Magnet

O

12 SP

8

MCH MCH MCH MCH

LV LV 7 LV LV 0

EMCAL Low Voltage rack
15

TS/EL

TPC TPC

CP GP11

10

Access Side
11 19

A
RO LHV LHV

SSD SSD SSD

Rack Footprint
in UX25

Muon Arm Side

MCH

MTR

LV TR TR RO LV

SPD

TOF

TOF

EXD 2/29

C
36

24

TRI TRI TRI

CTP 20 CTP CTP CTP 23

TRI TRI TRI TRI

CTP CTP mult mult 16 17 18 19

TRD TRD TRD

CT CT CT

27

SDD SPD

LV SP 21 LV LV LV LV

TRI

35

28

Vacu

MCH

MTR

LHC

LHC

SPD
CPV PHOS
18

MCH MCH MCH

LV LV LV LV

EXD 3/29

LV LV

TS/EL
EXD 1/29

I
8 9 15 EXD 6/29 16 17 24 25

39

MCH

Central Trigger Processor
33 34 37

0

HMPID

TR LV LV

HMPID

HMPID

TS/EL

TS/EL

MTR

MTR

MTR

MTR

SDD

TRD

TRD

TRD

SPD

SPD

SSD

SSD

SSD

SSD

TRD

TRD

TRD

TRD

TOF
LV

TOF
LV

TOF

TPC

TOF

TOF

TOF

TOF

EXD 7/29

LV LV HV CO

LV LV

LV CO LHV LHV CO

LV LV

LV LV LV

LV LV

LV SP

RO

RO

RO

RO

Awes - ALICE EMCal Meeting, Frascati, March 13-14, 2007

EMCal LV Power Supplies
• EMCal LV in Rack O12 • Rack also includes 2 EMCal ethernet hubs for distribution to RCUs • Two “flavors” of Wiener Low Voltage Power supplies – 3x Wiener OM.21.004, 0-8V up to – 1x Wiener OM.21.001, 0-15V up to 25A – 4x 6U Wiener LV bins

• We need at least 1 of each + 2 bins for first 3 SMs (~25kCHF) if SMs on same side. If SMs on opposite sides then as well to order full LV system (~50kCHF) • LV patch panel at Power Supplies needs to be finalized.

Awes - ALICE EMCal Meeting, Frascati, March 13-14, 2007

ALICE Experiment
EMCal Rack Assignments CR1 = DAQ LDCs (rack Y13)

C

CR2 = HLT (rack ??) CR3 = DCS (rack Z02) CR4 = APD bias HV (rack Y10)
I

Muon Arm Side
UX25 = FEE Low Voltage (rack O12)
O A

Access Side

Awes - ALICE EMCal Meeting, Frascati, March 13-14, 2007

EMCal HV
• EMCal HV rack CR4-Y10 shared with PHOS • ISEG HV supply crate with CAN Controller (5.4kCHF). Use ISGG EHQ84 05p-156F module - 8 channels/module (3.7kCHF each). • Require one HV channel per FEE crate - 4 per SM for total of 44 HV channels: Requires 6 ISEG modules (48 HV channels). • Should purchase crate + 1 module soon, i.e for test beam (~9kCHF) • Use same HV supply for LED driver • Two bulk HV cables - one per side. CERN stock 56-wire = 28 HV per side. ERNI connector. • Need to finalize patch panels at Rack (ISEGERNI) and CalFrame (ERNI-LEMO). • HV distributed on LEMO cables on CalFrame (CERN stock)
Awes - ALICE EMCal Meeting, Frascati, March 13-14, 2007

Fan-In of TRU trigger signals
A SIDE C SIDE

1x LVDS 1x LVDS 1x LVDS 1x LVDS 1x LVDS 1x LVDS 1x LVDS 1x LVDS 1x LVDS 1x LVDS 1x LVDS 1x LVDS 1x LVDS 1x LVDS 1x LVDS 1x LVDS 1x LVDS 1x LVDS

EMC EMC EMC EMC EMC EMC EMC EMC EMC EMC EMC EMC EMC EMC EMC EMC EMC EMC

TRI SM 0 TRU 1 TRI SM 0 TRU 2 TRI SM 0 TRU 3 TRI SM 0 TRU 1 TRI SM 0 TRU 2 TRI SM 0 TRU 3 TRI SM 0 TRU 1 TRI SM 0 TRU 2 TRI SM 0 TRU 3 TRI SM 0 TRU 1 TRI SM 0 TRU 2 TRI SM 0 TRU 3 TRI SM 0 TRU 1 TRI SM 0 TRU 2 TRI SM 0 TRU 3 TRI SM 0 TRU 1 TRI SM 0 TRU 2 TRI SM 0 TRU 3

SM 5

SM11

1 TRU 0 SM TRI 2 TRU 0 SM TRI 3 TRU 0 SM TRI 1 TRU 0 SM TRI 2 TRU 0 SM TRI 3 TRU 0 SM TRI 1 TRU 0 SM TRI 2 TRU 0 SM TRI 3 TRU 0 SM TRI 1 TRU 0 SM TRI 2 TRU 0 SM TRI 3 TRU 0 SM TRI 1 TRU 0 SM TRI 2 TRU 0 SM TRI 3 TRU 0 SM TRI 1 TRU 0 SM TRI 2 TRU 0 SM TRI 3 TRU 0 SM TRI

EMC EMC EMC EMC EMC EMC EMC EMC EMC EMC EMC EMC EMC EMC EMC EMC EMC EMC

LVDS LVDS LVDS LVDS LVDS LVDS LVDS LVDS LVDS LVDS LVDS LVDS LVDS LVDS LVDS LVDS LVDS LVDS

1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x 1x BOX EMC-TRI-FO 18x LVDS 18x LVDS SIZE ????

SM 4

SM10

SM 3

SM9

SM 2

SM8

SM 1

SM7

SM 0

SM6

1x LVDS 1x LVDS 1x LVDS 1x LVDS

EMC_LO EMC_L1_A EMC_L1_B EMC_L1_C

RACK ???? AREA C

INSIDE L3 MAGNET

Awes - ALICE EMCal Meeting, Frascati, March 13-14, 2007

Trigger Fan-In from TRUs
• Use Module custom built for PHOS by Norwegian group to handle 5x8 TRUs: One LVDS cable per TRU with L0, L1a, L1b, L1c signals. • EMCal needs 33-fold (36fold?) fan-in • Mount on C-side of EMCal

Awes - ALICE EMCal Meeting, Frascati, March 13-14, 2007

Fiber Optic/Other Connections
• TriggerTimingControl and DDL fibers and Patch Panels at CalFrame done by DAQ group. • TTC fibers to each RCU using TTCOC16 passive splitter modules on A and C side (1kCHF each). • DDL fibers from CR1 to EMCal patch panel by DAQ group. DDL fiber to/from each RCU. • Pre-pulse NIM signal from CTP available for LED calibration pulse. • Fibers for TRUs to Jet Patch trigger board? • LVDS cable from Jet trigger to CTP.