					DELHI STATE INDUSTRIAL & INFRASTUCTURE DEVELOPMENT CORPORATION LIMITED
                              NIT No. 51 /2008-09
                                                              DSIIDC – 6

Name of work              :        Development Works in Unauthorized Colonies.
Sub – Head                :        Construction of Cement Concrete road and S.W. Drain
                                   at Road No. 5, Sangam Vihar (Wazirabad)


Name of Contractor                 :
Date of receipt of
Application                        :
Tender Issued on                   :
Date of opening of
Tender                             :

                                                     INDEX

Sl. No.         Details                                                       Page No.
1.              N.I.T. DSIIDC-6                                               1 to 5
2.              Percentage/Item Rate                                          6 to 7
3.              Acceptance                                                    8
4.              Schedule A to F                                               9 to 14
5.              General specifications & special conditions                   15 to 18
6               Condition for cement                                          19
7               Condition for steel                                           20
8               Form of Performance guarantee                                 21 to 22
9.              Confirmation                                                  23
10.             Important Instructions for The Tenderers                      24
11.             Declaration by the Tenderer                                   25
12.             Schedule of Quantities                                        26 to 29
13.             Correction Slips                                              NIL

This NIT contains 1 to 29 pages including upto date correction slips.




                                                         Executive Engineer (CD-I)
                                                                DSIIDC




                                               -1-
                                                 EXECUTIVE ENGINEER (CD – I)
                                                     DSIIDC DELHI
                                                      GOVERNMENT OF DELHI
                                                                                                                                   DSlIDC-6
                               DELHI STATE INDUSTRIAL & INFRASTRUCTURE DEVELOPMENT
                                                CORPORATION LIMITED
                                               NOTICE INVITING TENDER

1.     Percentage/Item rate tenders are invited on behalf of the Managing Director DSIIDC from approved and eligible contractors of
       C.P.W.D. (and those of appropriate list of Department of Telecommunication, M.E.S., Railway, D.D.A., N.D.M.C., M.C.D., I
       and F Deptt. (Delhi), DJB & Delhi State P.W.D.), for the work of Development work in Unathorised Colonies.
       Sub-Head : C/o C.C. Roads & S.W Drain at Road No. 5, Sangam Vihar (Wazirabad)


The enlistment of the contractors should be valid on the last date of sale of tenders.
In case only the last date of sale of tender is extended, the enlistment of contractor shoud be valid on the original date of sale of tender.

In case both the last date of receipt of application and sale of tenders are extended, the enlistment of contractor should be valid on
either of the two date i.e. original date of sale of tender or on the extended date of sale of tenders.

     1.1     The work is estimated to cost Rs. 64,05,237/- . This estimate, however, is given merely as a rough guide

 1.1.1 The authority competent to approved NIT for the combined cost and belonging to the major dicipline will consolidate NITs for
calling the tenders. He will also nominate Division which will deal with all matters relating to the invitation of tenders.

For composite tender, besides indicating the combined estimated cost put to tender, should clearly indicate the estimated cost for each
component separately. The eligibility of tenderer will correspond to the combined estimated cost of different components put to tender.

1.2 Tenders well be issued to eligible contracters provided they produce definite proof from the appropriate authority, which shall be to
the satisfaction of the competent authority, of having satisfactorily completed similar works of magnitude specified below.

       Criteria of eligibility for issue of tender document

       Three similar works each costing not less than Rs. 25.630 lacs or Two similar works each costing not less than Rs. 38.44 lacs or
       one similar work costing not less than Rs. 51.25 lacs in last 7 years ending 2007-08 (Date)
       For the purpose of this clause ‘Similar Work’ means the works of Const. of Cement Concrete Roads / Pavement and Brick
       Masonry Storm Water Drains.

       Note :- Above condition is applicable (1) for CPWD as well as Non CPWD contractors for works estimated to cost above Rs. 10
       Crores (2) Only for Non CPWD contractors for works estimated to cost upto Rs. 10 Crores.


1.3          Presentation of valid Registration /Enlistment certificate.

1.4          Presentation of Employees Provident Fund Commissioner Registration.

1.5          presentation of V A T Registration valid as on date along with a certificate
             of the contractor that upto date returns have been filed along with the copies of such returns submitted
             to the department of Trade and Taxes

1.6          The contractor will produce duly self attested copies of all the document along with the originals for
             verification at the Time of issue of tender documents.


2          Agreement shall be drawn with the successful tenderer on prescribed standard form No. DSIIDC-7/8,
           which is available with DSIIDC office. Tenderer shall quote his rates as per various terms and conditions
           of the said form & general specification and special conditions, which will form part of the agreement.



                                                            -2-
3        The time allowed for carrying out the work will be 06 months from the Date of start as defined in
         schedule ‘F’ or from the fist date of handing over of site, whichever is later, in accordance with the
         phasing, if any, indicated in the tender documents.

4        The site for the work is available. or Site for the work shall be made available in parts as specified below
         :-

5        Applications for issue of forms shall be received by 24.04.2008 (4 P.M.) and tender documents shall be
         issued by 24.04.2008 (4 P.M.)

           Tender documents consisting of plans, specifications, the schedule of quantities of the various classes
           of work to be done and the set of terms & conditions of contract to be complied with by the contractor
           whose tender may be accepted and other necessary documents can be seen in the office of the
           Executive Engineer (CD – I) between hours of 11.00 A.M. & 04.00 P.M. from 11.04.2008 to
           24.04.2008 everyday except on Sundays and Public Holidays. Tender documents, excluding standard
           form, will be issued from his office & the office of CAO (HQ), DSIIDC, N-36, Bombay Life
           Building, Connaught Circus, New Delhi, during the hours specified above, on payment of the
           following :-

    i.     Rs 1000/-only in cash as cost of tender and

    ii. Earnest money of Rs. 1,28,105/- in the form of cash receipt (upto Rs. 10,000/-) / Receipt, Treasury
        challan/ Deposit at Call receipt of a scheduled bank / fixed deposit receipt of a scheduled bank /
        demand draft of a scheduled bank issued in favour of Executive Engineer (CD-I), DSIIDC. 50% of
        earnest Money or Rs. 20 Lakh, Whichever is less, will have to be deposited in the shape of prescribed
        above and balance amount of earnest money can be accepted in the form of Bank Guarantee issued by
        a scheduled bank.



6   Tenders, which should always be placed in sealed envelope, with the name of work and due date written
    on the envelopes, will be received by the Executive Engineer (CD –I), Technical Centre Building,
    Wazirpur Indl. Area, Delhi-52 upto 11.30 AM on 28.04.2008 and will be opened by EE(CD–I) or his
    authorized representative in his office on the same day at 12.00 Noon.


7        The contractor whose tender is accepted, will be required to furnish performance guarantee of 5% (five
         percent) of the tendered amount with in the period specified in schedule ‘F’. This Guarantee shall be in
         the form of cash (in case) guarantee amount is less than Rs. 10,000/-) or Deposit at call receipt of any
         scheduled bank/Banker`s cheque of any scheduled bank/Demand Draft of any scheduled bank/ pay order
         of any scheduled bank (in case guarantee amount is less than Rs. 1,00,000/-) or Government securities of
         fixed deposit receipts or guarantee Bonds of any Scheduled Bank or the Statew Bank of India in
         accordance with the prescribed form.

8    The description of the work is as follows :

     Const. of Cement Concrete Roads and Brick Masonry Storm Water Drains.



         Copies of other drawings and documents pertaining to the works will be open for inspection           by the
         tenderers at the office of the above mentioned officer viz. EE (CD – I).




                                                   -3-
      Tenderers are advised to inspect and examine the site and its surroundings and satisfy themselves before
      submitting their tenders as to the nature of the ground and sub-soil (so far as is practicable), the form and
      nature of the site, the means of access to the site, the accommodation they may require and in general,
      shall themselves obtain all necessary information as to risks, contingencies and other circumstances
      which may influence or affect their tender. A tenderer shall be deemed to have full knowledge of the site
      whether he inspects it or not and no extra charges consequent on any misunderstanding or otherwise shall
      be allowed. The tenderer shall be responsible for arranging and maintaining at his own cost all materials,
      tools & plants, water, electricity, access, facilities for workers and all other services required for
      executing the work unless otherwise specifically provided for in the contract documents. Submission of a
      tender by a tenderer implies that he has read this notice and all other contract documents and has made
      himself aware of the scope and specifications of the work to be done and of conditions and rates at which
      stores, tools and plant, etc. will be issued to him by the DSIIDC and local conditions and other factors
      having a bearing on the execution of the work.

9    The competent authority on behalf of the DSIIDC does not bind itself to accept the lowest or
     any other tender and reserves to itself the authority to reject any or all the tenders received
     without the assignment of any reason. All tenders in which any of the prescribed conditions
     is not fulfilled or any condition including that of conditional rebate is put forth by the
     tenderer, shall be summarily rejected.


10    Canvassing, whether directly or indirectly, in connection with the tenders, is strictly prohibited and the
      tenders, submitted by the contractors, who resort to canvassing, will be liable to rejection.

11     The competent authority on behalf of MD, DSIIDC reserves to himself the right of accepting the whole
      or any part of the tender and the tenderer shall be bound to perform the same at the rate quoted.

12    The contractor shall not be permitted to tender for works in the DSIIDC (responsible for award and
      execution of contracts) in which his near relative is posted as Divisional Accountant or as an officer in
      any capacity between the grades of Superintending Engineer and Junior Engineer (both inclusive) He
      shall also intimate the names of persons who are working with him in any capacity or are subsequently
      employed by him and who are near relatives to any gazetted officer in the DSIIDC
       Any breach of this condition by the contractor would render him liable to be debarred from tendering in
      DSIIDC.

13    No Engineer of gazetted rank or other Gazetted officer employed in Engineering or Administrative duties
      in the Engineering Department of the DSIIDC is allowed to work as a contractor for a period of one
      years after his retirement from Govt. service, without previous permission of the MD, DSIIDC in
      writing. This contract is liable to be cancelled if either the contractor or any of his employee is found at
      any time to be such a person who had not obtained the permission of the MD, DSIIDC as aforesaid
      before submission of the tender or engagement in the contractors service.

14    The tender for the work shall remain open for acceptance for a period of 60 days from the date of
      submission of the tenders. If any tenderer withdraws his tender before the said period or issue of letter of
      acceptance, whichever is earlier or makes any modifications in the terms and conditions of the tender
      which are not acceptable to DSIIDC, then DSIIDC shall, without prejudice to any other right or remedy,
      be at liberty to forfeit 50% of the earnest money as aforesaid. Further the tenderer shall not be allowed to
      participate in the retendering process of the work.

15 This notice inviting Tender shall form a part of the contract document. The successful tenderer/contractor,
   on acceptance of his tender by the Accepting Authority, shall, within 15 days form the stipulated date of
   start of the work sign the contract consisting of :



                                                -4-
     A). The notice inviting tender, all the documents including additional conditions, specifications and
         drawings, if any, forming the tender as issued at the time of invitation of tender and acceptance thereof
         together with any correspondence leading thereto.



     B). Standard DSIIDC form 7/8.




1     For Composite Tenders

     16.1.1 The tenderer must associate with himself agencies of the appropriate class eligible to tender for
            the other components individually.

     16.1.2 It will be obligatory on the part of the tenderer to sign the tender documents for all the
            components. (The schedule of quantities, conditions and special conditions etc.)

     16.1.3 After the work is awarded, the contractor will have to enter into separate agreements for each
            component with the officer concerned.
     16.1.4 Executive Engineer-in-charge of minor component shall make interim payments in respect of
            minor component of work. Executive Engineer-in-charge of major component shall make the
            payment against final bill of the composite contract.

     16.2    The Executive Engineer Incharge of the major component will call tenders for the composite
             work. The cost of tender document and Earnest Money will be fixed with respect to the combined
             estimated cost put to tender for the composite tender. Security Deposit will be worked out
             separately for each component corresponding to the estimated cost of the respective component of
             works. The Earnest Money will become part of the security deposit of the major component of
             work.

     16.3    On acceptance of the composite tender by the competent authority the letter of acceptance will be
             issued by the Executive Engineer Incharge of the major component on behalf of the MD, DSIIDC,
             making it clear in the letter of acceptance that the contractor will have to execute separate
             agreements for different component of work with the concerned officer of the respective discipline
             (Designation to be given).

17       If any tenderer submit false information and/or documents his EMD shall be forfeited and he will be
         debarred for future tendering in DSIIDC for a period of two years.

18       The tenderer should go through & comply with the “IMPORTANT INSTRUCTIONS” for the
         tenderer at Page ------------ before submitting the tender.


                                                    Signature of Divisional Officer / Sub – Divisional Officer
                                                           For & on behalf of MD, DSIIDC




                                                -5-
                                                                                         DSIIDC-7/8
                                       GOVERNMENT OF DELHI
    DELHI STATE INDUSTRIAL & INFRASTRUCTURE DEVELOPMENT CORPORATION
                                  LIMITED

STATE              :       DELHI                CIRCLE                : Zone-II

BRANCH             :       DSIIDC               DIVISION              : CD – I

ZONE               :       ZONE - II            SUB-DIVISION          :   AEE – IV


                       Percentage Rate Tender / Item Rate Tender & Contract for Works

   (A)          Tender for the work of : Development Works in Unathorised Colonies

                Sub-Head : C/o of C.C. Roads & S.W. Drain at Road No. 5 Sangam Vihar (Wazirabad)


         (i)       To be submitted by 11.30 AM on 28.04.2008 to EE (CD–I) Technical Centre Building,
                   Wazirpur Indl. Area, Delhi-52.
         (ii)      To be opened in presence of tenderers who may be present at 12.00 Noon. on
                   28.04.2008 in the office of EE (CD – I).


Issued to : ……………………………………………………………………………
                                                 (Contractor)

Signature of officer issuing the documents …………………………………………….

Designation : EE (CD–I)

Date of Issue : ………………………




                                              -6-
                                              TENDER



  I/We have read and examined the notice inviting tender, schedule A,B,C,D,E & F, specifications
  applicable, Drawings & Designs, General Rules and Directions, Conditions of Contract, clauses of
  contract, Special conditions, Schedule of Rate & other documents and Rules referred to in the
  conditions of contract and all other contents in the tender document for the work.

  I/We hereby tender for the execution of the work specified for the MD, DSIIDC within the time
  specified in Schedule ‘F’, viz, schedule of quantities and in accordance in all respects with the
  specifications, designs, drawings and instructions in writing referred to in Rule-1 of General Rules and
  Directions and in Clause 11 of the conditions of contract and with such materials as are provided for,
  by, and in respects in accordance with, such conditions so far as applicable.

  We agree to keep the tender open for sixty (60) days from the date of submission of tender thereof and
  not to make any modifications in its terms and conditions.

  A sum of Rs. 1,28,105/- has been deposited with EE(CD-I), DSIIDC in cash / Deposit at call receipt
  of a scheduled bank / fixed deposit receipt of scheduled bank / demand draft of a scheduled Bank /
  bank guarantee issued by a schedule bank as earnest money. If I/we fail to furnish the prescribed
  performance guarantee within prescribed period, I/we agree that the said MD, DSIIDC or his
  successors in office shall without prejudice to any other right or remedy, be at liberty to forfeit the said
  earnest money absolutely, further if I/we fail to commence the work as specified, I/we agree that MD,
  DSIIDC or his successors in office shall without prejudice to any other right or remedy available in
  law, be at liberty to forfeit the said earnest money and the performance guarantee absolutely otherwise
  the said earnest money shall be retained by him towards security deposit to execute all the works
  referred to in the tender documents upon the terms and conditions contained or referred to therein and
  to carry out such deviations as may be ordered, upto maximum of the percentage mentioned in
  Schedule ‘F’ and those in excess of that limit at the rates to be determined in accordance with the
  provision contained in Clause 12.2 and 12.3 of the tender form. Further I/We agree in case of for
  forfeiture of earnest money or both Earnest Money and performance guarantee as aforesaid, I/We shall
  be debarred for participation in the re-tendering process of the work.

  I/we hereby declare that I/we shall treat the tender documents, drawings and other records connected
  with the work as secret/confidential documents and shall not communicate information derived there-
  from to any person other than a person to whom I/we am/are authorized to communicate the same or
  use the information in any manner prejudicial to the safety of the State.



  Dated : ……………………                                            Signature of Contractor
                                                              Postal Address

  Witness :

  Address :

Occupation :




                                          -7-
                                               ACCEPTANCE

The above tender (as modified by you as provided in the letters mentioned hereunder) is accepted by me for
and    on   behalf    of   the   MD,     DSIIDC      for   a   sum     of     Rs.   …………………..         (Rupees
……………………………………………………………….).



The letters referred to below shall form part of this contract Agreement :

i.

ii.

iii.




                                                                             For & on behalf of the MD, DSIIDC

                                                                               Signature ………………………….

                                                                             Designation ………………………….


Dated : ……………………..




                                               -8-
                                               SCHEDULES

SCHEDULE ‘A’

Schedule of quantities (Enclosed)                 :       Page 26 to 29
SCHEDULE ‘B’

Schedule of materials to be issued to the contractor.

S.No.     Description of Quantity        Rates in figurers & words at          Place of issue
          Item                                    which the material will be
                                                  charged to the contractor

All materials   to be arranged by the conctractor himself .




                                                -9-
SCHEDULE ‘C’
Tools and plants to be hired to the contractor         NIL
S.No.      Description                 Hire Charges per day                                   Place of Issue
   1.                2.                               3.                                                   4.
   --                --                               --                                                    --




SCHEDULE ‘D’
Extra schedule for specific requirements / documents for the work, if any.




SCHEDULE ‘E’
Schedule of component of Cement, Steel, Other Materials Labour etc. for price escalation.


CLAUSE 10 CC

Component of Cement                      Xc         ...........................................................................%
Expressed as percent to total
value of work

Component of Steel                       Xs         ...........................................................................%
Expressed as percent to total
value of work

Component of civil (except               Xm         ...........................................................................%
Cement and steel)/ Electrical
Construction Materials
Expressed as percent to total
value of work

Component of Labour                      Y          ...........................................................................%
Expressed as percent to total
value of work

Component of POL                         Z          ...........................................................................%
Expressed as percent to total
value of work




                                                 - 10 -
SCHEDULE ‘F’
Reference to General Conditions of contract.

Name of work :       C/o Developments Works in Unauthorised Colonies
Sub-Head      :C/o C.C. Roads & S.W. Drain at Road No. 5, Sangam Vihar (Wazirabad)


Estimated cost of work                   :        Rs. 64,05,237/-

i. Earnest money                         :        Rs. 1,28,105/-

ii. Performance Guarantee                :        5% of the tendered value

iii. Security Deposit                    :        5% of tendered value

General Rules & Directions               :-
Officer inviting tender                          Executive Engineer (CD –I)

Maximum percentage for quantity of items of work to
be executed beyond which rates are to be determined
in accordance with the clause 12.2 & 12.3                                See below

Definitions :

2 (v)           Engineer-in-charge                         EE-(CD-I)
2 (viii)        Accepting Authority                        EE-(CD-I)/CE-II
2 (x)           Percentage on cost of materials and labour 15%
                to cover all overheads and profits.
2 (xi)          Standard Schedule of Rates                 DSR 2007 with upto date correction slip as
                                                           on the date of receipt of the tender.
2 (xii)         Department                                 DSIIDC
9 (ii)          Standard DSIIDC contract form              DSIIDC form 7/8 as modified & corrected
                                                           upto correction slip no. DGW / CON / 234,
                                                           Dated 22/01/2008

Clause 1
   i)       Time allowed for submission of performance Guarantee from the
            date of issue of letter of acceptance.                              4 days.

    ii)     Maximum allowable extension beyond the period provided in (i)
            Above.                                                              3 days.




                                               - 11 -
Clause 2
Authority for fixing compensation under clause 2.                          S.E. / C.E. -II
Clause 2 A
Whether Clause 2A shall be applicable                                      No
Clause 5
Number of days from the date of issue of letter of acceptance for
reckoning date of start.                                                   7 days
Mile Stone(s) as per table given below:

                                             Table of Mile Stone(s)

S. No.   Description of              Time Allowed (from date Amount to be withheld in case of
         Physical Progress           of start)               non-achievement of milestone.
1.       1/8th (of whole work)       1/4th (of whole work)   In the event of not achieving the
2.       3/8th (of whole work)       1/2 (of whole work)     necessary progress as assessed from
3.       3/4th (of whole work)       3/4 th (of whole work)  the running payments, 1% of the
4.       Full                        Full                    tendered value of work will be with-
                                                             held for failure of each mile stone.

Time allowed for execution of work.                                        6 Months

Clause 6, 6A
Clause applicable – (6 or 6 A)                                             6-A Applicable

Clause 7
Gross work to be done together with net                             Rs. 5.00 Lacs (min) or
Payment/adjustment of advances for material                         Mutually agreed upon
collected, if any, since the last such payment
for being eligible to interim payment.

Clause 10A
List of testing equipment to provided by the contractor at site lab.

1. Cube Testing Machine.         2. Sieves of Required Size.
3. Weighing Machine / Balance 4. Slump Testing Apparatus.
5. Measuring Tape.               6. Silt Content Measuring Cylinder.
And other testing equipment as and when required as per direction of Engr. In charge.

Clause 10 B(ii)
Whether clause 10 B (ii) shall be applicable                                        No
Clause 10 CA
Materials covered under this clause                        Nearest Material for which all India whole sale price
                                                           Index to be followed.
1 Cement.
2 Steel Reinforcement.

Clause 10CC
Clause 10 CC to be applicable in contracts with
stipulated period of completion exceeding the period                       18 Months     (Deleted)
shown in next column.

                                                 - 12 -
Clause 11
Specifications to be followed for execution of                                   C.P.W.D. Specification 1996, Vol. I
work                                                                             to VI & revised C.P.W.D.

                                                                                 specification 2002 for cement
                                                                                 mortar, cement concrete & R.C.C. work
                                                                                 in Pursuance to IS 456–2000
                                                                                 with upto date correction slips as
                                                                                 on the date of receipt of the tender.

Clause 12
12.2 & Deviation Limit beyond which
12.3    clauses 12.2 & 12.3 shall apply for                                      30%
         building work.

12.5         Deviation limit beyond which clause
             12.2 & 12.3 shall apply for foundation work                  100%

Clause 16
Competent Authority for deciding reduced rates           S.E. / CE-II
Clause 18
List of mandatory machinery, tools & plants to be deployed by the contractor at site.

1. Concrete Mixer               2. Plate / Needle Vibrator.
3. Level Machine & Staff.       4. Road Roller / Vibratory Roller 8 to 10 Tonnes.
5. Vibratory Compactor.         6. All Equipment Necessary for Laying Compaction of Ready Mix Concrete.
And as required as par items of work
Clause 36 (i)
                      Requirement of Technical representative (s) and recovery rate,
                     as per O.M. No. DGW/MAN/122 dtd. 6/1/2005 issued by CPWD.
          Minimum                              Designation (Principal     Minimum                Rate at which recovery shall
                                  Discipline




          Qualification    of                  Technical/     Technical   Experience             be made from to contractor in
                                                                                        Number
 S. No.




          Technical                            representative)                                   the event of not fulfilling
          Representative                                                                         provision of clause 36 (i)




                                                 Principal Technical                                              Fifteen
          Graduate Engineer     Civil              Representative                      1                          thousand
1.                                                                                               Rs. 15,000.00
              (Degree)                                                     5 Years     No.                        only (pm)




Assistant Engineers retired from Government services that are holding Diploma will be treated at par with
Graduate Engineers.



Clause 42
i. a.  Schedules / Statement for determining
       theoretical quantity of cement & bitumen

                                                             - 13 -
          on the basis of Delhi schedule of rate.2007
          with upto date correction slips printed by C.P.W.D.

ii.       Variations permissible on theoretical
          quantities.

a)        Cement for works with estimated cost
          put to tender not more than Rs. 5 Lacs.           3 % plus / minus.

          For works with estimated cost put to
          Tender more than Rs. 5 Lacs.                      2% plus / minus.

b)        Bitumen for all works                      2.5% plus only & nil on minus side.

c)        Steel Reinforcement and structural
          steel sections for each diameter,                 2% plus / minus.
          Section and category.

d).       All other materials.                                      Nil


            RECOVERY RATES FOR QUANTITIES BEYOND PERMISSIBLE VARIATION

S. No.       Description of item        Rates in figures and works at which recovery shall be made from
                                        the contractor.

                                        Excess beyond                     Less use beyond the
                                        Permissible variation             Permissible variation

      1. Cement                                                             Twice the Procurement
                                                                            Rate at the time of
      2. Steel reinforcement                                                execution or decided by
                                                                            the Engineer-in-charge.

                                                                            NOT APPLICABLE
      3. Structural Sections
      4. Bitumen issued free
      5. Bitumen issued at stipulated fixed price.




                      GENERALSPECIFICATIONS & SPECIAL CONDITIONS


                                                  - 14 -
1. The entire works shall be done as per CPWD specifications for Delhi 1996 Vol. I to VI with
   upto date correction slips. If the specifications for any item are not available in the CPWD
   specification referred above, relevant ISI specifications shall be followed. In case ISI
   specifications are also not available, the decision of the Engineer-in-charge, given in writing
   shall be final.


2. Whenever any reference to any Indian standard specifications occurs in the document relating
   to this contract the same shall be inclusive of all the amendments issued there to or revisions
   thereof, if any, upto the date of receipt of tenders.



3. The work shall be carried out in the manner complying in all respects with requirement of
   relevant bye-laws or the local bodies under the jurisdiction of which the entire work is to be
   executed or as directed by the Engineer-in-charge and nothing extra will be paid on this
   account.


4. The contractor shall carry out performance tests of entire installation as per standard
   specifications before the work is finally accepted and nothing extra whatsoever shall be
   payable to the contractor for the tests.



5. The contractor shall be responsible to arrange at his own cost all necessary T&P required for
   the execution of work.


6. The contractor shall make his own arrangement for water and temporary electric connections,
   if required, and make necessary payment for it direct to the department concerned.



7. The contractor shall deemed to have fully acquainted himself with the nature and extent of the
   work and working conditions at site before submitting the tender. The work shall be executed
   as per preference of items approved by Engineer-in-charge. If the materials, drawing, designs
   etc. are not available due to any conditions the programme of the contractors shall be
   modified accordingly and no compensations/damages shall be payable.


8. The contractor shall take all safety measures precautions by exhibiting necessary caution
   boards, red flags, red lights, and barriers to avoid any accident during execution of work. The
   contractor shall be responsible for all damages and accident due to negligence on his part. The
   contractor shall also provied helmets, safety belts etc. required for labours.
9. No payment will be made to the contractor for damages caused by rains or other natural
   calamites or riots during execution of the work and no claims on this account will be
   entertained.

                                      - 15 -
10. The rates of all items of work shall, unless clearly specified otherwise are including cost of
    all labour, material and other inputs involved in the execution of the item.



11. The Mandatory tests required for materials shall be got done from the labs approved by
    DSIIDC & all the testing charges shall be borne by the contractor cost of sample and its
    carriage shall be borne by the contractor also. Nothing extra shall be paid on this account by
    the department.


12. The contractor shall make all efforts to machanise the construction work to maximum
    possible extent by using the latest T & P / machinery and equipment etc. He shall use steel
    scaffolding and shuttering. Whenever, this is not possible the other type of shuttering used
    shall be of proper size and shape. Similarly scaffolding other than steel shall be as per site
    requirement and prior approval of Engineer-in-charge shall have to be obtained in writing.
    The contractor with relation to site requirement shall arrange adequate quality of shuttering
    and scaffolding. No time lag on this account shall be allowed. All safety arrangements is to be
    taken care of by the contractor to avoid any accident in the use of shuttering and scaffolding
    etc.



13. The time of completion shall be essence of the contract and to be strictly adhered to by the
    contractor. He shall provide a pert chart showing all the activity and events for timely
    completion of the project.


14. The contractor shall make his on arrangement for water at his own cost which should be fit
    for construction purposes. Water should be got tested in an approved laboratory. Nothing
    extra shall be paid on this account.



15. The various items of the work shall be taken up simultaneously wherever possible to speed up
    the work. Nothing extra shall be paid on this account.


16. The contractor shall maintain in good condition all work during execution till completion of
    entire work allotted to him.




17. Tenders with any conditions including that of conditional rebate shall be rejected forthwith.




                                      - 16 -
18 The contractor should make necessary arrangement for round the clock working including
   working on sundays and holidays except National holidays the planing should be done
   accordingly.


19 All arrangement for required power and electricity is to be done by the contractor. The
   payment for electric connection and consumption etc. to be borne by the contractor.


20 The contractor shall provide at his on cost all the instruments including surveying instruments
   etc. required for the purpose of checking at the site of work. Complete layout including
   setting up Benchmarks, taking and fixing levels for all works required to be executed under
   the project shall be done by the contractor


21 The contractor shall make arrangement for sufficient quantity of all the materials required for
   construction of work conforming to required/ related specifications.


22 Proper labour hutments with all the required civic amenities as per CPWD Norms shall be
   constructed by the contractor at site of work. He has to remove all the hutments at
   completion


23 The Contractor shall make necessary arrangements for medical aid to all his workers including
   availability of first aid box all the time aid the site of work


24 Development work i.e. electrification, horticulture, roads, water supply etc. and internal and
   external services may also be carried out simultaneously by other agency with the work being
   tendered for against the enclosed contract documents. The contractor shall afford necessary
   facilities for the same. No claim in the matter shall be entertained


25 Payment of 1% cess to the labour department as per “Building & other construction workers
   welfare cess Act 1996” shall be borne by the contractor.


26 In the opinion of Engineer –in-charge, the ground of delay, if justified, may be relexaed upto
   3rd mile stone.


27 The design and drawing may be revised any time during execution of work by competent
   authority. No claim shall be entertained on this account


28 Even ISI marked material may be subjected to the quality test at the discretion of the
   Engineer-in-charge. Whenever ISI marked materials are brought to the site of work the
   contractor shall, if required by the engineer-in-charge , furnish manufacturers test certificate
   or test certificates confirm to the relevant IS Codes. However cement /steel will be necessarily


                                      - 17 -
    tested before start of work and will not be used till test certificates are obtained and approved
    by Engineer-in-charge


29 Bidder should be registered with Employees Provident Fund Commissioner, Government of
   India.
30 Any material/excavated Material of the site shall not be disposed off without the prior written
   permission of the Engineer-in-charge. The disposed material should be dumped at the place
   authorized by Engineer-in-charge.


31 The work may be inspected by central Vigilance Commission or any other agency on behalf
   of DSIIDC. Any deduction/ compensation proposed by CVC or DSIIDC in regard to
   defective work or work not confirming to specifications, loss of time, amount shall be
   deducted from bills. No claim of the contractor whatsoever shall be entertained on this
   account.


32 The department will be responsible only to the contractor and his authorized representative
   and none else, with whom contractor may be in liasion or associated in any manner.

33 The contractor shall also make necessary agreement at his own cost for diesel generator sets
   required for the work, so that the same can be used by him during failure/none availability of
   electricity. Necessary permission etc. if required shall be taken by him from the concerned
   authorities. Nothing extra shall be paid on this account


34 Nothing extra, what so ever shall be payable to the contractor for executing the     work      as
   per general specifications and special conditions in all the above paras.


35 Nothing extra shell be paid over and above the acquired rate of R.M.C. item in the Schedule
   of Quantity.




                                                      (SIGNATURE OF CONTRACTOR )




                                       - 18 -
                               CONDITIONS FOR CEMENT

1.      The contractor shall procure 43 grade (conforming to IS: 8112) ordinary Portland cement as
        required in the work from reputed manufacturers of cement having a production capacity of the
        one million tones per annum or more such as ACC, L&T, Rewa, Vikram, Shri Cement, Birla Jute
        & Cement Corporation of India, J.P. etc. as approved by Ministry of Industry, Government of
        India and holding license to use ISI certification mark for their product. The tenderers may also
        submit a list of names of cement manufacturers which they propose to use in the work. The tender
        accepting authority reserves right to accept or reject name(s) of cement manufacturer(s), which the
        tenderer proposes to use in the work. No change in tendered rates will be accepted if the tender
        accepting authority does not accept the list of cement manufacturers, give by the tenderer, fully or
        partially. Supply of cement shall be taken in 50 kg. Bags bearing manufacturers name and ISI
        marking. Samples of cement arranged by the contractor shall be taken by the Engineer-in-charge
        and got tested in accordance with provisions of relevant BIS codes. In case test results indicate
        that the cement arranged by the contractor does not conform to the relevant BIS codes, the same
        shall stand rejected and shall be removed from the site by the contractor at his own cost within a
        week time of written order from the Engineer-in-charge to do so.
2.      the cement shall be brought at site in bulk supply of approximately 25 tonnes or as decided by the
        Engineer-in-charge.
3.      The cement godown of the capacity to store a minimum of 1000 bags of cement or as decided by
        Engineer-in-charge shall be constructed by the contractor at site of work for which no extra
        payment shall be made. Double lock provision shall be made to the door of the cement godown.
        The keys of one lock shall remain with Engineer-in-charge or his authorized representative and
        the key of the other lock shall remain with the contractor. The contractor shall be responsible for
        the watch & ward and safety of the cement godown. The contractor shall facilitate the inspection
        of the cement godown by the Engineer-in-charge at any time.
a. The cement shall be got tested by Engineer-in-charge and shall be used on work only, after test results
   have been received. The contractor shall supply free of charge the cement required for testing.
4.      The actual issues and consumption of cement on work shall be regulated and proper accounts
        maintained as provided in clause 10 of the contract. The theoretical consumption of cement shall
        be worked out as per procedure prescribed in clause 42 of the contract and shall be governed by
        conditions laid therein.
5.      Cement brought to site and cement remaining unused after completion of work shall not be
        removed from site without written permission of the Engineer-in-charge.
6.      Damaged cement shall be removed from site immediately by the contractor on receipt of the
        notice in writing from the Engineer-in-charge. If he does not do so within three days of the receipt
        of such notice, the Engineer-in-charge shall get it removed at the cost of the contractor.




                                          - 19 -
                                     CONDITIONS FOR STEEL

1.      The contractor shall procure steel reinforcement bars conforming to relevant BIS codes from main
        producers as approved by Ministry of Steel and secondary producers or re-rollers having valid BIS
        license. For TMT bars conforming to relevant BIS codes, procurement shall be made from the main
        producers and secondary producers having valid BIS licence. The contractor shall have to obtain and
        furnish test certificates to the Engineer-in-charge in respect of all supplies of steel brought by him to
        the site of work. Samples shall also be taken and got tested by the Engineer-in-charge as per the
        provision in this regard in relevant BIS codes. In case the test results indicate that the steel arranged
        by the contractor does not conform to relevant BIS codes, the same shall stand rejected and shall be
        removed from the site of the work by the contractor as his own cost within a week time from the
        written orders from the site of the work by the contractor as his own cost within a week time from the
        written orders from the Engineer-in-charge to do so.
2.      the steel reinforcement shall be brought to the site in bulk supply of 10 tonnes or more or as decided
        by the Engineer-in-charge.
3.      The steel reinforcement shall be stored by the contractors at site of work in such a way as to prevent
        distortion and corrosion and nothing extra shall be paid on this account. Bars of different sizes and
        lengths shall be stores separately to facilitate easy counting and checking.
4.      For Checking nominal mass, tensile strength, bend test, rebend test etc. specimen of sufficient length
        shall be cut from each size of the bar at random of frequency not less than specified below:

Size of Bar                         For consignment Below 100 For consignment                  above    100
                                    Tonnes                    tonnes

Under 10mm dia bars                 One sampe for each 25 tonnes or One sample for each 40 tonnes of
                                    part thereof                    part thereof

10mm to 16mm dia bars               One sample for each 35 tonnes or One sample for each 45 tonnes or
                                    part thereof                     part thereof

Over 16mm dia bars                  One sample for each 45 tonne or One sample for each 50 tonnes or
                                    part thereof                    part thereof

5.      The contractor shall supply free of charge the steel required for testing. The cost of tests shall be
        borne by the contractor.
6.      the actual issues and consumption of steel on work site shall be calculated and proper accounts
        maintained as provided in clause 10 of the contrarct. The theoretical consumption of steel shall be
        worked out as per procedure prescribed in clause 42 of the contract and shall be governed by
        conditions laid therein.
7.      Steel brought to site and remaining unused shall not be removed from site without written permission
        of the Engineer-in-charge.




                                              - 20 -
                                  Form of Bank Guarantee Bond
                                    (Performance Guarantee)

In consideration of the Managing Director of DSIIDC (hereinafter called “The DSIIDC”) having offered to
accept          the          terms          and         conditions        of         agreement          between
…………………………………………………………………………………….…..                                                                        and
………………………………………………..……………(hereinafter called “the said Contractor(s)”) .........
for the work ...... (hearin after called “the said agreement” ) having agreed to production of irrevocable Bank
Guarantee for Rs………………………………… (Rupees …………………………………………
……………………………………………only) as a security / Guarantee from the contractor(s) for
compliance of his obligations in accordance with the terms and conditions in the said agreement.


    1.   We ………………………………………………….(hereinafter refereed to as “the Bank”) hereby
         undertake to pay to the DSIIDC   an   amount  not exceeding       Rs.
         …………………………….…………………            (Rupees……………………          ………………
         …………… ……………………………… only) on demand by the DSIIDC.


    2.   We…………………………...(indicate the name of the Bank) do hereby undertake to pay the amount
         due and payable under this Guarantee without any demure, merely on a demand from the DSIIDC
         stating that the amount claimed is required to meet the recoveries due or likely to be due from the
         said contractor(s). Any such demand made on the Bank shall be conclusive as regard the amount due
         and payable by the bank under this Guarantee. However, our liability under this Guarantee shall be
         restricted to an amount not exceeding Rs. ……………………………………………….. (Rupees
         …………………………………………………. Only).


    3.   We the said bank further undertake to pay to the DSIIDC any money so demanded notwithstanding
         any dispute or disputes raised by the contractor(s) in any suit proceeding pending before any court or
         tribunal related thereto, our liability under this present being abusolute and unequivocal.

         The payment so made by us under this bond shall have been a valid discharge or our liability for
         payment thereunder and the Contractor(s) shall have no claim against us for making such payment


    4.   We ………………. (indicate the name of the Bank) further agree that the Guarantee herein
         contained shall remain in full force and effect during the period that would be taken for the
         performance of the said agreement and that it shall continue to be enforceable till all the dues of the
         DSIIDC under or by virtue of the said agreement have been fully paid and its claims satisfied or
         discharged or till Engineer-in-charge on behalf of the DSIIDC certified that the terms and conditions
         of the said agreement have been fully and properly carried out the said Contractor(s) and accordingly
         discharges this Guarantee.


    5.   We …………………………..(indicate the name of the Bank) further agree that the DSIIDC shall
         have the fullest liberty without our consent and without effecting in any manner our obligations
         hereunder to very any of the terms and conditions of the said agreement or to extend time of
         performance by the said contractor(s) from time to time or to postpone for any time or from time to
         time any of the powers exercisable by the DSIIDC against the said contractor(s) and to forbearance or
         enforce any of the terms and conditions relating to the said agreement and we shall not be relieved
         from our liability by reason of any such variation, extension being granted to the said contractor(s) or

                                               - 21 -
     for any forbearance, act of omission on the part of the SDIIDC or any indulgence by the DSIIDC to
     the said contractor(s) or by any such matter or thing whatsoever which under the law relating to
     sureties would, but for this provision, have effect of so relieving us.


6.   The guarantee will not be discharged due to the change in the constitution of the Bank or the
     contractor(s).


7.   We …………………………………… (indicate the name of the bank) lastly undertake not to revoke
     this guarantee except with the previous consent of the Delhi State Industrial & Infrastructure
     Development corporation Ltd. in writing.


8.   This guarantee shall be valid up to ………………………….. unless extended on demand by Delhi
     State Industrial & Infrastructure Corporation Ltd. Notwithstanding anything mentioned above, out
     liability     against     this      guarantee        is     restricted     to     Rs.     ………………..
     (Rupees…………………………………………………………………………. Only) and unless a
     claim in writing is lodged with us within six months of the date of expiry or the extended date of
     expiry of this guarantee all our liabilities under this guarantee shall stand discharged.


Dated that ………………………….. day of ……………………… for …………………… (indicate the
name of the Bank).




                                        - 22 -
                                         CONFIRMATION
       I/We confirm that the General Specifications and special conditions appended in the tender
documents have been fully examined and full cognizance taken thereof in arriving at the item unit
prices and total amount and tendered sums contained therein my/our tender. It is further certified that
I/We have not been blacklisted/ debarred from tendering by any of the departments the registration of
which is deemed valid in DSIDC.




                                                                                       Contractor




                                          - 23 -
                IMPORTANT INSTRUCTIONS FOR THE TENDERERS


1   All document shall be duly attested by the tenderers.


2   The tenderer shall bring all the original document for verification at the time of issue of
    tender.


3   The tender shall be opened in the presence of tenderers who wish to be present.


4   Without sufficient proof of required eligibility for the work, tenders shall not be issued.


5   If any tenderer submits false information and/or documents, his earnest money deposit shall
    be forfeited and he shall also be black-listed /debarred by the Corporation for future tendering
    for two years.


6   The managing Director, DSIIDC reserves the right to reject all/any tender without assigning
    any reason and can award the work to more than one tenderer.




                                                               EXECUTIVE ENGINEER (CD–I)




                                        - 24 -
                  DECLARATION BY THE TENDERER


1. I HEREBY ACCEPT ALL THE TERMS AND CONDITIONS OF THE TENDER.


2. IT IS CERTIFIED THAT WE HAVE NOT BEEN BLACK LISTED BY ANY OF THE
   DEPARTMENTS REGISTRATION OF WHICH IS VALID IN D.S.I.I.D.C.




                                              SIGNATURE OF TENDERER




                           - 25 -
       DELHI STATE INDUSTRIAL AND INFRASTRUCTURE DEVELOPMENT CORPORATION LTD.

Name of work          :       Development works in Unauthorized Colonies.
Sub – Head            :       Construction of Roads & S. W. Drains at Road No. 5, Sangam Vihar (Wazirabad)

                                                  SCHEDULE OF QUANTITIES

Sl.
                                 Description of Item                               Qty.         Unit         Rate   Amount
No.
 1.   Demolishing cement concrete including disposal of material upto 50m.
      (a) 1:4:8 or leaner mix.                                                       180.00       Cum
 2.   Carriage of material by mechanical transport including loading unloading
      and stacking lead upto 5km.
      Lime, moorum, building rubbish.                                                180.00       Cum
 3.   Earth work in excavation by mechanical means (hydraulic
      excavator)/manual means in foundation trenches or drains (not exceeding
      1.5m width or 10 sqm on plan) including dressing of sides and ramming
      of bottoms, lift upto 1.5 M, including getting at the excavated soil and
      disposal of surplus excavated soil as directed, within a lead of 50 m.
      (a) All kinds of soil.                                                         577.50       Cum
 4.   Brick work with bricks of class designation 75 in foundation and plinth in
      (a) Cement mortar 1:6 (1 cement : 6 coarse sand)                               412.27       Cum
 5.   12 mm cement plaster of mix
      (a) 1:4 (1 cement : 4 coarse sand)                                            1710.00       Sqm
 6.   Neat cement punning
                                                                                    2805.00       Sqm




                                                                 -- 26 --
7.    Providing and laying in position cement concrete of specified grade
      excluding the cost of centering and shuttering. All work upto plinth level.
       (a) 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm
      nominal size)                                                                  10.50    Cum
      (b) 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm
      nominal size)                                                                 451.16    Cum
8.    Providing and fixing 25mm thick with cement concrete 1:2:4 (1 cement :
      2 coarse sand : 4 graded stone aggregate 1.25mm nominal size) on the top
      of S.W. drain walls including centring and shuttering etc. complete.          805.00     Sqm
9.    Constructing brick masonry road gully chamber 50×45×60 cm with brick
      of class designation 75 in cement mortar 1:5 (1 cement : 5 fine sand)
      including 500 × 450 mm pre-cast RCC horizontal grating with frame
      complete as per standard design.
      (a) With FPS Bricks
                                                                                    50 nos.   Each
10.   Excavation trenches of required width for pipes, cables, etc. including
      excavation for sockets, and dressing of sides, ramming of bottoms, depth
      upto 1.5 including getting our the excavated soild, and then returning the
      soil as required, in layers not exceeding 20cm in depth including
      consolidating each deposited layer by ramming, watering, etc. and
      disposing of surplus excavated soil as directed with a lead of 50 m.
      All kinds of soil
      (a) Pipes cables etc. exceeding 80mm dia but not exceeding 300 mm dia.        381.00    Metre
11.   Providing and laying non-pressure NP2 class (light duty) RCC pipes with
      collars : jointed with stiff mixture of cement mortar in the proportion of
      1:2 (1 cement : 2 fine sand) including testing of joints etc. complete.
      (a) 150 mm dia RCC pipe.                                                      381.00    Metre




                                                               -- 27 --
12..   Supplying & stacking of good earth at site including royalty & carriage upto
       15 km (earth measured in stacks will be reduced by 20% for payment)             1372.50        Cum
13.    Filling available excavated earth (excluding rock) in trenches plinth, sides
       of foundations etc. in layers not exceeding 20 cm in depth : consolidating
       each deposited layer by ramming and watering, lead up to 50m and lift
       up to 1.5 m                                                                     1565.00        Cum
14.    Supplying and stacking of graded stone aggregate at site of size range.
          (a) 63 mm to 45 mm                                                            171.10        Cum
15.    Laying spreading and compacting stone aggregate of specified sizes to
       WBM specification including spreading in uniform thickness, hand
       picking, rolling with 3 wheeled road/ vibratory roller 8-10 tonne in stages
       to proper grade and camber, applying and brooming requisite type of
       screening/binding material to fill up interstices of coarse aggregate
       watering and compacting to the required density.                                 171.60        Cum
16.    Supplying and stacking of moorum at site.
                                                                                         27.45        Cum
17.    Centring and shuttering including strutting, propping etc. and removal of
       form for:
          (a) Foundations, footings, bases of columns, etc., for mass concrete.
          (b) Suspended floors, roofs, landings, balconies & access plat form           443.47        Sqm
                                                                                        180.00        Sqm
18.    Providing & fixing in position premoulded joint filler in        expansion
                                                                                                 per cm depth
       joints.                                                                                         per cm
                                                                                                    width.Per
                                                                                      58366.50    mtr. Length

19.    Preparation of subgrade by excavating earth to an average of 22.5 cm
       depth, dressing to camber and consolidating with road roller including




                                                                 -- 28 --
      making good the undulations etc. and disposal of surplus earth lead          1372.50   Sqm
      upto 50 metres.

20.   Providing and laying in position specified grade of reinforced cement
      concrete excluding the cost of centring ,shuttering ,finishing and
      reinforcement-All work upto plinth level.
      (a) 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20
      mm nominal size)                                                               40.50   Cum

21.   Reinforcement for RCC work including straightening cutting, bending,
      placing in position and binding all complete.
      Thermo-Mechanically Treated bars.(TMT bars)                                  4050.00    Kg
22.   Providing and laying C.C. pavement of mix M20 with ready mixed
      concrete from batching plant. The ready mix concrete shall be laid and
      finished with screed board vibrator, vacuum dewatering process and
      finally finished by floating, brooming with wire brush etc. complete as
      per specifications and directions of Engineer – in – charge. (The penal
      shuttring shall be paid for separately)                                       512.40   Cum
23.   Providing and laying 60mm thick factory made cement concrete
      interlocking paver block of M-30 grade made by block making machine
      with strong vbratory compaction and of approved size and design/shape
      laid in required colour and pattern ver and including 50mm thick
      compacted bed of course sand, filling the joints with coarse sand etc, all
      complete as per the direction of Engineer in charge.                         1512.00   Sqm




        CONTRACTOR                                                                                 EE(CD) – I




                                                               -- 29 --

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:0
posted:7/5/2013
language:Unknown
pages:29
caifeng li caifeng li
About