SOP - 60 day project

Reviews
Shared by: emm123
Stats
views:
1166
rating:
not rated
reviews:
0
posted:
10/30/2007
language:
English
pages:
0
Development Services – Standard Operating Procedures Development Process – (Feature Driven Development) This approach to development will allow for maximum production capacity. All developers will be working simultaneously on each and every project. Each project will be broken down into “features” then divided up among the developers. Each feature will have a specific deadline attached based on the project deadline. The following is the outline of how this process will flow. Day 0 Activity Sign off / GSA/Tech agreement received. (Accounting to email Development Manager when received). DSM to identify end of project date based upon 60 biz days; update Accounting with project end date Internal Kickoff meeting Within 5 biz days of payment & signed tech agreement Form the Project Team Conduct a project walkthrough with Project Team, Solutions Engineer and Account Manager, SEO Services Manager Build a Feature List Developed by the Project Team and approved by the Development Services Manager Plan by Feature Develop the sequence Set deadlines based on project timeline Assign features to team members Development Services Manager Develop Project Document – Detailed Feature List Adjust Project Timeline (Visio Gantt Chart) Set-up Project Site Discuss database structure and then document External Kickoff Meeting Required attendees include the Solutions Engineer, Account Manager, SEO Services Manager and the Development Services Manager; other project team members if necessary Discuss Features, Project Document, Timeline and Design (Look & Feel) Begin Draft Layout (Homepage and secondary page) Begin db structure Revise List and Notes Make necessary changes to project document and timeline Post to Project Site, send email with Project Site URL First Draft Layout Complete A homepage and secondary page to be designed Action List Email Template 5 Develop Visio Template Project Document Project site structure 8 See QA and SEO SOP document 10 Email Template 13 14 16 17 21 22 23 24 24 25 25 30 35 36 40 41 45 50 51 55 56 58 60 60+ based on kick-off meeting Approval of draft layout by Solutions Engineer, SEO Services Manager and Development Services Manager Publish to Project Site then email client 1st Conference Call with Client to review draft layout and revised project document Begin revisions to draft layout Complete Draft layout revisions; SEO Manager to review for consistency; email client Complete first draft of db structure Review DB structure with DSM and Project Team First Revision to DB 2nd Conference call with Client Present DB Structure Document and post to Project Site Begin Final Revisions to Draft Layout Begin WebController Complete Final Revisions post to site and sign-off by client Complete WebController and review with DSM DSM to email client for on-site meeting by day 40 On-site review with Client; DSM and One Project Team Member Begin WC revisions Complete WC revisions and begin retro fit to front-end Complete retro fitting front-end begin basic QA; SEO Services Manager to review site add SEO code. Basic QA complete; publish to Project Site and email client Conference Call with client to review site Begin final tweaks and begin Final QA See QA and SEO document Email client for final wrap-up meeting Complete final tweaks, QA and SEO Final Wrap up with Project Document and final invoice Set site live upon receiving final payment Accounting to email DSM that we received final payment SEO services Manager to submit site to search engines Email Template Email Template DB Strucuture Template Email Template QA SOP Email Template Items to consider 1) Hosting – Where? When is it set-up? a. DNS switches b. Email, FTP, LiveStats, etc. 2) Scope Creep a. How is it handled?

Related docs
SOP A
Views: 42  |  Downloads: 3
SOP Format
Views: 4  |  Downloads: 0
SOP Blank Form
Views: 96  |  Downloads: 4
DSM-SOP
Views: 473  |  Downloads: 33
Outline for the SOP
Views: 48  |  Downloads: 3
SOP No______
Views: 4  |  Downloads: 0
SOP___R_
Views: 14  |  Downloads: 2
what is a SOP
Views: 686  |  Downloads: 76
SOP 39
Views: 0  |  Downloads: 0
Hot work permit SOP
Views: 10  |  Downloads: 1
SOP template
Views: 9  |  Downloads: 0
premium docs
Other docs by emm123
Referral Biz Ideas
Views: 870  |  Downloads: 76
TurboChargeYourOnlineMarketing
Views: 721  |  Downloads: 82
06PRATradeshowbooths
Views: 1185  |  Downloads: 3
Marketing Plan Workbook
Views: 5243  |  Downloads: 1452
Web Application Development
Views: 3143  |  Downloads: 357
Site Planning
Views: 3304  |  Downloads: 484
Information Architecture
Views: 1474  |  Downloads: 176
FDD_Process
Views: 630  |  Downloads: 44
FDD for Web Development
Views: 1114  |  Downloads: 134
FDD for Small Teams
Views: 551  |  Downloads: 41
Quality Assurance and Basic SEO
Views: 893  |  Downloads: 63
Project_Document
Views: 2294  |  Downloads: 254
DSM-SOP
Views: 473  |  Downloads: 33
Disaster Recovery Plan - SOP
Views: 4609  |  Downloads: 586
Emails
Views: 664  |  Downloads: 40