Docstoc

Activity _ Association Sheet

Document Sample
Activity _ Association Sheet Powered By Docstoc
					Activity Name   Activity description                              Asset group   Asset No.
BOLR_INSP1      INSPECTION OF BURNER,LEAKS&CONTROLS               BOILER        BOILER-001
BOLR_INSP2      CHECK REFRACTORY&AIR PUMP                         BOILER        BOILER-001
BOLR_CLNG1      CLEANING OF FILTER,AIR CLEANER&OIL PRE-HEATER     BOILER        BOILER-001
BOLR_INSP3      INSPECTION OF WATER SIDE SURFACES&SAFETY VALVES   BOILER        BOILER-001
BOLR_CLNG2      CLEANING OF FIRESIDE SURFACES                     BOILER        BOILER-001

BOLR_INSP1      INSPECTION OF BURNER,LEAKS&CONTROLS               BOILER        BOILER-002
BOLR_INSP2      CHECK REFRACTORY&AIR PUMP                         BOILER        BOILER-002
BOLR_CLNG1      CLEANING OF FILTER,AIR CLEANER&OIL PRE-HEATER     BOILER        BOILER-002
BOLR_INSP3      INSPECTION OF WATER SIDE SURFACES&SAFETY VALVES   BOILER        BOILER-002
BOLR_CLNG2      CLEANING OF FIRESIDE SURFACES                     BOILER        BOILER-002
Activity priority Activity Cause   Activity Type   Tagging required   Owning Dept.   Shut down type
MEDIUM            PREVENTIVE       INSPECTION      YES                MECHANICAL     YES
HIGH              PREVENTIVE       INSPECTION      YES                MECHANICAL     YES
MEDIUM            PREVENTIVE       CLEANING        YES                MECHANICAL     YES
HIGH              PREVENTIVE       INSPECTION      YES                MECHANICAL     YES
HIGH              PREVENTIVE       CLEANING        YES                MECHANICAL     YES

MEDIUM          PREVENTIVE         INSPECTION      YES                MECHANICAL     YES
HIGH            PREVENTIVE         INSPECTION      YES                MECHANICAL     YES
MEDIUM          PREVENTIVE         CLEANING        YES                MECHANICAL     YES
HIGH            PREVENTIVE         INSPECTION      YES                MECHANICAL     YES
HIGH            PREVENTIVE         CLEANING        YES                MECHANICAL     YES
Activity source
ROUTINE
ROUTINE
ROUTINE
ROUTINE
ROUTINE

ROUTINE
ROUTINE
ROUTINE
ROUTINE
ROUTINE
                                                                                              Date rule
Schedule Name           Asset No     Asset group Schedule Type Activity Name effective from
MONTHLY BOLR_INSP       BOILER-001   BOILER     DATE RULE       BOLR_INSP1
HALF YEARLY BOLR_INSP   BOILER-001   BOILER     DATE RULE       BOLR_INSP2
HALF YEARLY BOLR_CLNG   BOILER-001   BOILER     DATE RULE       BOLR_CLNG1
ANNUAL BOLR_INSP        BOILER-001   BOILER     DATE RULE       BOLR_INSP3
ANNUAL BOLR_CLNG        BOILER-001   BOILER     DATE RULE       BOLR_CLNG2

MONTHLY BOLR_INSP       BOILER-002   BOILER     DATE RULE       BOLR_INSP1
HALF YEARLY BOLR_INSP   BOILER-002   BOILER     DATE RULE       BOLR_INSP2
HALF YEARLY BOLR_CLNG   BOILER-002   BOILER     DATE RULE       BOLR_CLNG1
ANNUAL BOLR_INSP        BOILER-002   BOILER     DATE RULE       BOLR_INSP3
ANNUAL BOLR_CLNG        BOILER-002   BOILER     DATE RULE       BOLR_CLNG2
Date rule                                 Meter Rule                         List Dates
to    base interval days Meter Rule effective from to   base Interval date        desc
             30
             180
             180
             365
             365

             30
             180
             180
             365
             365
Activity Name Operation Seq Department Codeshutdown type Required/not

                   10           MECH              YES

                   20           MECH              YES

                   30           MECH              YES

                   40           MECH              YES

                   50           MECH              YES

 BOLR_INSP1        60           MECH              YES

                   70           ELEC              YES

                   80           ELEC              YES

                   90           ELEC              YES

                  100           MECH              YES

                  110           ELEC              YES

                   10           MECH              YES

 BOLR_INSP2        20           MECH              YES

                   30           MECH              YES

                   10           ELEC              YES

                   20           MECH              YES
BOLR_CLNG1
                   30           MECH              YES

                   40           MECH              YES

                   10           MECH              YES
 BOLR_INSP3
                   20           MECH              YES

                   10           MECH              YES
BOLR_CLNG2
BOLR_CLNG2
             20   MECH   YES
Operation Description                                     Seq Resources Resource
INSPECT BURNER.                                                10       TECHNICIAN

INSPECT FOR FLUE GAS LEAK.                                     10       TECHNICIAN

INSPECT FOR HOT SPOTS.                                         10       TECHNICIAN

CHECK CAMS.                                                    10       TECHNICIAN

CHECK FOR TIGHT CLOSING OF FUEL VALVE.                         10       TECHNICIAN

CHECK FUEL AND AIR LINKAGE.                                    10       TECHNICIAN

CHECK INDICATING LIGHTS AND ALARMS.                            10       TECHNICIAN

CHECK OPERATING AND LIMIT CONTROLS.                            10       TECHNICIAN

CHECK SAFETY AND INTERLOCK CONTROLS.                           10       TECHNICIAN

CHECK FOR LEAKS,NOISE,VIBRATION,UNUSUAL CONDITIONS,ETC.        10       TECHNICIAN

CHECK LOW WATER CUT-OFF OPERATION.                             10       TECHNICIAN

INSPECT REFRACTORY.                                            10       TECHNICIAN

CHECK AIR PUMP BELT AND PULLEY ALIGNMENT.                      10       TECHNICIAN

INSPECT/REPAIR BURNER HOUSING TO REFRACTORY SEAL.              10       TECHNICIAN

CLEAN LOW WATER CUT-OFF.                                       10       TECHNICIAN

CLEAN OIL PUMP STRAINER AND FILTER.                            10       TECHNICIAN

CLEAN AIR CLEANER AND AIR/OIL SEPARATOR.                       10       TECHNICIAN

REMOVE AND CLEAN OIL PRE-HEATER.                               10       TECHNICIAN

INSPECT WATERSIDE SURFACES.                                    10       TECHNICIAN

CHECK OPERATION OF SAFETY VALVES.                              10       TECHNICIAN

CLEAN FIRESIDE SURFACES.                                       10       TECHNICIAN
CLEAN BREECHING.   10   TECHNICIAN
UOM   Usage    Assigned Unit
 HR     2.00        2

 HR     0.15        2

 HR     0.15        2

 HR     0.30        2

 HR     0.10        2

 HR     0.15        2

 HR     0.15        2

 HR     0.30        2

 HR     0.30        2

 HR     0.30        2

 HR     0.15        2

 HR     2.00        2

 HR     1.00        2

 HR     1.00        2

 HR     0.30        2

 HR     1.00        2

 HR     1.00        2

 HR     1.00        2

 HR     3.00        2

 HR     3.00        2

 HR     3.00        2
HR   2.00   2
Activity Name Item Seq Operation Seq Component Item Description
UOM   Quantity

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:3
posted:6/5/2013
language:Latin
pages:13