					6/15/2009 In Progress Action Items for TRANSAC
Item # 1 Meeting Date Topic 6/10/2009 Add column to the Priority/Decision Matrix Discussion A request was made and NWE agreed to add a status column to the Priority/Decision Matrix to show the varying stages of being worked on. A request was made to find out the status of PPL's Garrison pump storage economic study request in the WECC regional study process. Status IN PROGRESS: The column with the status information is being added and will be presented at the August 26th TRANSAC Meeting. DONE: The PPL study is scheduled to be studied in August 2009. This information is in the 2009 TEPCC Study Program document available on the WECC TEPCC document website. An email was sent 6/10/09 to the requesting party.

2

6/10/2009 Status of Garrison pump storage in the WECC study process

3 4 5 6 Note: the completed items shown on this tab will be moved to the 'Completed' tab during next update.

6/15/2009 Completed Action Items for TRANSAC
Item # Meeting Date Topic 1 7/19/2007 Discussion Status COMPLETED – John identified the verbiage in an email to the group.

2

8/16/2007

3

8/16/2007

Order 890 clarification Where in FERC Order 890 does it identifies/discuss/define what of term „generators‟ 'generators' mean? John mentioned that FERC Order 890 is very specific that it is not for generator interconnects – „generators‟ is a generic term – impacts/affect within MT is a NWE economic study. Goal Development Development of Local Transmission Planning goal will be with the help of TRANSAC. Once goal is decided, that would be the goal for future plans as well as the current plan – unless it has to change. The idea is to come up with the best possible goal now. OMS vs. RAS It was suggested that the text needed a better definition of remedial action scheme (automatically) vs. overload mitigation scheme (steady state post fault). Be as specific as possible. RJL: will look at that. Transient is RAS. Overload is mitigation scheme. Will describe more clearly. NTTG Activity Updates It was requested and agreed to that NWE will provide NTTG updates and meeting minutes to TRANSAC and NWE/TRANSAC individuals can respond back to NTTG. (Note of clarification: NWE will assume this request is for WECC TEPPC meeting minutes and not all WECC subcommittee minutes.) Also, we would add a regular agenda item “NTTG” as an administrative update for TRANSAS members. Economic Planning It was asked how to bifurcate the South Dakota arm of transmission into Studies: Principle 8 all of this. John Leland mentioned that he didn‟t know and would have to write something into the document regarding this. Cost Allocation: For things outside the tariff, the group would like NWE to explain how Principle 9 the concept of cost allocation works. People don‟t understand how we allocate costs between network upgrade vs. system improvement. GIA and TSR cost allocation – what is the difference between network upgrade vs. generation interconnection request. The Group would appreciate being educated on the topic. TRANSAC Member Comment NWE needs to clarify what is a generation interconnection request and what is a network service transmission system request. Response by John Leland – We will discuss the difference in a later meeting.

COMPLETED - The initial goal was presented during the November 15th meeting.

COMPLETED – text was adjusted to make the difference between RAS and overload mitigation more clear

4

8/16/2007

COMPLETED – an NTTG update item has been added to the agenda for all future TRANSAC meetings. Various NTTG meeting notices and meeting minutes are posted on the OASIS. COMPLETED – South Dakota is not part of NWE MT. It is separate and not included in our Attachment K an is noted as such. COMPLETED – This item was to be covered during the November 15th TRANSAC meeting, but due to time restrictions, it was covered during the December 20th meeting.

5

8/16/2007

6

8/16/2007

7

9/11/2007

FERC Technical Conference FERC Order 890 Attachment K

A request was made to make the FERC Technical Conference meeting dates and agenda available to members and to be posted on the OASIS.

8

9

10

11

12

Don't know the exact proceedure/process after Dec 7th deadline. Order 890 is changing our tariff and there are ongoing items that involve much more than Attachment K. Open process but don't know what/how things will happen after Dec 7th. TRANSAC Member Comment - You might ask this question of FERC staff at your meeting with them next Tuesday. Response by John Leland - This is a good idea. 11/15/2007 ComplianceStandards A request was made by TRANSAC to provide a link to the FERC COMPLETED - The FERC link to all Compliance Standards - in particular, the 23 standards that pertain to compliance standards and a list of the 23 planning. standards that apply strictly to planning have been compiled and sent out with the meeting material for the December 20th meeting. 11/15/2007 List of issues TRANSAC Members would like NorthWestern Energy to provide COMPLETED - NWE would like advice members with a list of issues that NorthWestern would like advice from from TRANSAC members throughout the committee members. entire process. To address this there was a more detailed process time line presented at the December 20th meeting along with a more detailed Calendar. 12/20/2007 Inform ETIC about Suggestion has been made to inform the ETIC (state legislative body) COMPLETE - NWE agreed to look into the Economic Study Cycle about the existence/purpose/calendar of the Economic Planning Study proper forum to notify them. The suggestion Cycle - perhaps at the next ETIC meeting (held in the Capital in Helena has been taken to, and will be handled by management. January 24th) 5/3/2007 Creation of secure Stakeholders in attendance asked NWE how it was going to make COMPLETE - A secure website has been website for Confidential available confidential material. NWE said it would look into the designed and demonstrated in-house in Nov. Material access probability of developing a website link from the OASIS that qualified Currently being tested in Dec. Demonstration individuals could get to. was presented at January 25, 2008 Meeting. 11/15/2007 12/20/2007 Allocation of Load Forecast Review Cost Allocation and Refund Methodology A request was made for a future agenda item to be a discussion of how the load forecast is allocated. TRANSAC Members would like NorthWestern Energy to review its Cost Allocation and Refund Methodology. COMPLETE - Was put on the agenda and discusses at the January 25, 2008 Meeting. COMPLETE - Was put on the agenda and discusses at the January 25, 2008 Meeting.

9/21/2007

COMPLETED – The announcement and agenda was posted on the OASIS and sent out to members via email. COMPLETED – question asked and email sent to TRANSAC on 10/12/07

13 14

15

8/16/2007

Internal Reliability Criteria used by others

16

11/15/2007

Reliability Criteria

17

1/25/2008

NWE's response to FERC Order 890-A

18

10/22/2008

19

12/18/2008

20

10/22/2008 12/18/2008

21

10/22/2008 12/18/2008

22

12/18/2008

COMPLETE - NWE's response to Order 890-A (reviewed and 'no comment') was presented at the March 20, 2008 TRANSAC Meeting. Public Meeting NorthWestern requests a discussion regarding when public meeting COMPLETE - Discussion at the 12/17/2008 rearding local transmission planning should be held. TRANSAC Meeting resulted in a consensus to wait on holding a public meeting until NWE has a proposed plan the public can react to. Economic Study Review of Economic Study report resulted in NEW agreeing to update the COMPLETE - Comments were integrated economic study of the Montana Wind and Wires Study based on into the final study report. Report was sent to comments at this meeting. customer and posted on the OASIS prior to 12/31/08. Review OASIS NWE requested that TRANSAC review the document at the 10/22 COMPLETE - Review of document Attachment K Business meeting. Proposed changes to the document were reviewed and completed at the 12/18/2008 TRANSAC Practice comments made by TRANSAC at the 12/18 meeting. NWE to make Meeting. Agreed to name change (remove changes and post the document on the OASIS for a 30-day comment OASIS from name). Posted on the OASIS period. for 30-day review 1/20/09 Review OASIS NWE requested that TRANSAC review the document at the 10/22 COMPLETE - Review of document Methodology, Criteria meeting. Proposed changes to the document were reviewed and completed at the 12/18/2008 TRANSAC and Process Business comments made by TRANSAC at the 12/18 meeting. NWE to make Meeting. Agreed to name change (remove Practice changes and post the document on the OASIS for a 30-day comment OASIS from name). Posted on the OASIS period. for 30-day review 1/20/09. Decision Rule Matrix After review of the current Decision Rule Matrix, TRANSAC COMPLETE: Examples with the decision participants requested a specific example applying the decision rule rule applied were presented and discussed matrix be presented and discussed in a conference call. January 29, 2009 during a TRANSAC conference call.

TRANSAC Member Comment - It would be helpful for our deliberations to have information about the internal reliability criteria used by other Pacific Northwest utilities such as PacifiCorp, particularly those related to application of RAS.Answer by John Leland - We will see what is available. A request was made for a future agenda item to be and outline and discussion of Reliability Criteria. The discussion is to include what requirements we have to meet. NorthWestern Energy will be drafting a response to comments received in FERC Order 890-A and will post our response on the OASIS, making it available to members prior to our next meeting.

COMPLETE - Begun the research and data collection in November. Data collection continues. Results were presented at the March 20th TRANSAC meeting. COMPLETE - Covered during the March 20, 2008 TRANSAC Meeting.

23

1/29/2009

Standards of Conduct & Due to FERC's decision regarding unnoticed communication between COMPLETE: Standards of Conduct & Antitrust Policy NWE's transmission group and the energy supply operations staff the Antitrust were reviewed and/or revised as standards of conduct and antitrust policy needs to be reviewed/amended. needed. Posted on the OASIS 3-17-09. Links to FERC TRANSAC members requested link and document information regarding COMPLETE - The document with the 18 MSTI/Collector docket the 18 questions FERC asked NEW on the MSTI/Collector projects. questions and the link with docket numbers Info to obtain all documents was emailed to TRANSAC members 3-20-09.

24

3/19/2009

25 26


				