Carson

Document Sample
Carson Powered By Docstoc
					                                         Nevada Prevailing Wage Comparison By County

                              2011 Difference
             Annual Growth     Between PW        Average Wage
              in PW rates,    Survey Avg. and    Premium over               # Cases PW Set   # Cases PW Set to
               2010 - 2011       PW rates         (DETR + 40%)               to Union Rate    Survey Average

Carson                8.32%              6.53%              65.30%                      32                  6
Churchill             3.09%              4.56%                                          27                 11
Clark                 2.35%              6.23%              45.75%                      34                  4
Douglas               5.85%              5.99%              49.19%                      30                  8
Elko                  1.41%             -2.52%              48.98%                      29                  9
Esmeralda            -2.50%              5.90%                                          30                  8
Eureka                0.25%              2.64%                                          27                 11
Humboldt              5.81%              3.41%                                          28                 10
Lander                3.97%              0.59%                                          29                  9
Lincoln               6.61%              4.76%                                          34                  4
Lyon                  8.59%              6.36%              42.16%                      29                  9
Mineral               4.99%              4.20%                                          27                 11
Nye                  -0.42%              3.61%                                          28                 10
Pershing              2.51%              4.14%                                          27                 11
Storey                2.57%              4.10%                                          28                 10
Washoe               -2.02%              5.97%              15.24%                      29                  9
White Pine           -0.78%             -0.77%                                          28                 10
                                                                                        29                  9
Total                 2.98%              3.86%                                      76.78%             23.22%
                                                 North
                                                            44.18%
                                                 South
                                                            45.75%

                   Excess Labor Cost - South
    2009                                         $   539,325,277
    2010                                         $   246,656,963
Total                                            $   785,982,240




                   Excess Labor Cost - North
   2009                                          $       86,052,754
    2010                                                $    99,663,603
Total                                                   $   185,716,357


   Total                     -$                    -$
        2009                                            $   625,378,030
        2010                                            $   346,320,567
Total                                                   $   971,698,597
note: Labor Costs are 50% of Project Cost
see Public Works Projects Tab for Total Dollar Amount
  Total Job
Classifications

              38
              38
              38
              38
              38
              38
              38
              38
              38
              38
              38
              38
              38
              38
              38
              38
              38
Expenditures on Public Works Projects in Nevada, 2009, 2010
                                       South

                                          2009                     2010
Public Works                       $ 3,279,010,674            $ 1,405,458,642
NSHE & School Districts            $   157,445,463            $   166,181,486
Total                              $ 3,436,458,145            $ 1,571,642,138

Materials 50%                      $ 1,718,229,073            $   785,821,069
Labor 50%                          $ 1,718,229,073            $   785,821,069

                                       North

Public Works                       $     427,373,377          $   560,677,442
NSHE & School Districts            $     134,316,281          $    89,853,923
Total                              $     561,689,658          $   650,531,365

Materials 50%                      $     280,844,829          $   325,265,683
Labor 50%                          $     280,844,829          $   325,265,683
                          Prevailing Classifications Union Collective Bargining Percentage of Benefits
Craft    Classification                                             Northern Nevada         %         Southern Nevada Local   % Benefits
Code                                                                   Local Union        Benefits              Union
     1   AIR BALANCE TECHNICIAN                                  Sheet Metal 26               29%    Sheet Metal 88                  24%
     2   ALARM INSTALLER                                         IBEW 401                            IBEW Local 357                  29%
     3   BOILERMAKER                                             NV Local 549                 37%    NV Local 549                    39%
     4   BRICKLAYER                                              NV Local 13                  26%    NV Local 13                     23%
     5   CARPENTER                                               Carp Local 971               28%    Regional Council                28%
     6   CEMENT MASON                                            NV Local 797                 24%    NV Local 797                    25%
     7   ELECTRICIAN COMMUNICATION TECHNICIAN                    IBEW Local 401               24%    IBEW Local 357                  28%
     8   ELECTRICIAN LINEMAN/GROUNDMAN/OPERATOR                  IBEW 401 & 1245              24%    IBEW 396                        29%
     9   ELECTRICIAN NEON SIGN                                   IBEW Local 401                      IBEW Local 357                  34%
    10   ELECTRICIAN WIREMAN                                     IBEW Local 401               26%    IBEW Local 357                  28%
    11   ELEVATOR CONSTRUCTOR                                    Elev Local 8                 33%    Elev Local 18                   29%
    12   FENCE ERECTOR                                           Laborers Local 169           29%    Laborers Local 872              41%
    13   FLOOR COVERER                                           Painters 567                 28%    Painters Local 159              43%
    14   GLAZIER                                                 Glaziers Local 767           19%    Glaziers Local 2001             26%
    15   HIGHWAY STRIPER                                         Laborers Local 169           25%    Laborers Local 872              40%
    16   HOD CARRIER BRICK MASON TENDER                          Laborers Local 169           28%    Laborers Local 872              39%
    17   HOD CARRIER PLASTERER TENDER                            Laborers Local 169           25%    Laborers Local 872              38%
    18   IRONWORKER                                                                                  Ironworkers Local 433           40%
    19   LABORER                                                 Laborers Local 169           28%    Laborers Local 872              41%
    20   MECHANICAL INSULATOR                                    Heat & Frost Local 69        29%    Heat & Frost Local 135          25%
    21   MILLWRIGHT                                              Millwrights Local 1827       32%    Millwrights Local 1827          32%
    22   OPERATING ENGINEER                                      OpEng Local 3                39%    OpEng Local 12                  35%
    23   PAINTER                                                 Painters 567                 24%    Painters 159                    24%
    24   PILEDRIVER (NON-EQUIPMENT)                              Piledrivers Local 34         39%    Southwest Carpenters            26%
    25   PLASTERER                                               Plasterers Local 797         24%    Plasterers Local 797            26%
    26   PLUMBER/PIPEFITTER                                      Plumbers Local 350           33%    Plumbers Local 525              30%
    27   REFRIGERATION MECHANIC                                  Plumbers Local 350           38%    Plumbers Local 525              30%
    28   ROOFER (DOES NOT INCLUDE SHEET METAL ROOFS)             Roofers Local 81             36%    Roofers Local 162               21%
    29   SHEET METAL WORKER                                      Sheet Metal Local 26         29%    Sheet Metal Local 88            24%
    30   SPRINKLER FITTER                                        Sprinkler Local 669          33%    Sprinkler Local 669             31%
    31   SURVEY TECHNICIAN                                       OpEng Local 3                35%    OpEng Local 12                  35%
    32   TAPER                                                   District Council 16          27%    Painters 159                    26%
    33   TILE/TERRAZZO WORKER/MARBLE MASON                       Bricklayers Local 13         25%    Bricklayers Local 13            21%
    34   TILE/TERRAZZO WORKER/MARBLE MASON FINISHER              Bricklayers Local 13         27%    Bricklayers Local 13            25%
    35   TRUCK DRIVER                                            Teamsters Local 533                 Teamseters Local 631            41%
    36   WELL DRILLER                                            OpEng Local 3                36%    OpEng Local 12                  35%
    37   EQUIPMENT GREASER                                       OpEng Local 3                35%    OpEng Local 12                  35%
    38   SOILS AND MATERIALS TESTER                              OpEng Local 3                35%    OpEng Local 12                  36%
                            Average  Fringe Benefit Percentage                              29.70%                                 31.00%
                                                                              Difference
 CARSON CITY                                           Annual      2011 PW   Between PW
 Average Construction Wage                            Growth,       Survey    Rates and      Union Y/ Union % Non-Union % DETR Mean
 $24.30                       PW 2010     PW 2011    2010 - 2011   Average   Survey Avg.        N     Difference Difference Wages
Average                                                    8.32%                     6.53%               5.57%      0.32%
                              ADD
                              SHEET
                              METAL
                              ZONE
AIR BALANCE TECHNICIAN        RATE                                                             Y        47.87%
Air Balance-Journeyman            46.60      48.35        3.76%      34.80         38.94%
Air Balance-Foreman               49.62      51.46        3.71%      34.80         47.87%
Air Balance-General Foreman       52.64      54.57        3.67%      34.80         56.81%

ALARM INSTALLER                                                                                N                    0.00%
Alarm Installer-Journeyman        23.63      26.47       12.02%      26.47          0.00%

BOILERMAKER                               Clark                                                Y         1.87%
Boilermaker                       59.50      65.94       10.82%      64.73          1.87%

                              ADD ZONE
BRICKLAYER                    RATE     Washoe                                                  Y         8.21%
Bricklayer-Journeyman             32.68      32.68        0.00%      31.51          3.71%
Bricklayer-Foreman                33.93      33.93        0.00%      31.51          7.68%
Bricklayer-General Foreman        35.68      35.68        0.00%      31.51         13.23%

                              ADD ZONE
CARPENTER                     RATE                                                             Y         5.23%
Carpenter-Journeyman              38.30      38.80        1.31%      38.18          1.62%                                     23.57
Carpenter-Foreman                 41.05      41.55        1.22%      38.18          8.83%                                     23.57

CEMENT MASON                                                                                   Y         3.18%
Cement Mason-Journeyman           34.40      34.40        0.00%      34.31          0.26%
Cement Mason-Foreman              36.40      36.40        0.00%      34.31          6.09%

ELECTRICIAN
COMMUNICATION
TECHNICIAN                                                                                     Y        12.05%
Communication Technician-
Installer                         25.73      29.36       14.11%      28.76          2.09%                                     21.35
Communication Technician          25.73      32.46       26.16%      28.76         12.87%                                     21.35
                                                                         6
                                                                                     Difference
 CARSON CITY                                                  Annual      2011 PW   Between PW
 Average Construction Wage                                   Growth,       Survey    Rates and      Union Y/ Union % Non-Union % DETR Mean
 $24.30                              PW 2010    PW 2011     2010 - 2011   Average   Survey Avg.        N     Difference Difference Wages
Average                                                           8.32%                     6.53%               5.57%      0.32%
Communication-Senior
Technician                              25.73       34.86       35.48%      28.76         21.21%                                     21.35

ELECTRICIAN-LINE                                (22 hrs)                                              Y        -2.23%
Electrician-Groundman                   39.19       40.50        3.34%      58.40         -30.65%
Electrician-Lineman                     57.91       59.90        3.44%      58.40           2.57%
Electrician-Foreman                     63.02       65.16        3.40%      58.40          11.58%
Electrician-General Foreman             68.12       70.45        3.42%      58.40          20.63%
Heavy Equipment Operator                47.86       49.49        3.41%      58.40         -15.26%

ELECTRICIAN-NEON SIGN            -                                                                    Y         0.57%
Electrician-Neon Sign                   44.31       45.52        2.73%      45.26          0.57%

ELECTRICIAN-WIREMAN              -                                                                    Y        11.96%
Wireman                                 46.39       50.78        9.46%      48.75          4.16%                                     29.99
Cable Splicer                           46.39       54.58       17.65%      48.75         11.96%                                     29.99
Wireman-Foreman                         46.39       54.58       17.65%      48.75         11.96%                                     29.99
Wireman-General Foreman                 46.39       58.38       25.85%      48.75         19.75%                                     29.99

ELEVATOR CONSTRUCTOR             -                                                                    Y         7.08%
Elevator Constructor-Journeyman
Mechanic                                46.01       78.21       69.98%      76.43          2.33%
Elevator Constructor-Mechanic in
Charge                                  46.01       85.48       85.79%      76.43         11.84%

FENCE ERECTOR                    -                                                                    N                    0.00%
Fence Erector                           37.56       37.69        0.35%      37.69          0.00%

                                 ADD
FLAGPERSON (not surveyed         LABORER
set by Laborers Union every      ZONE
year)                            RATE
Flagperson                              27.95       27.95        0.00%

FLOOR COVERER                                                                                         Y         3.65%
Floor Coverer-Journeyman                36.26       36.34        0.22%      36.31          0.08%                                     20.94
Floor Coverer-Foreman                   38.90       38.93        0.08%      36.31
                                                                                7          7.22%                                     20.94
                                                                                Difference
 CARSON CITY                                             Annual      2011 PW   Between PW
 Average Construction Wage                              Growth,       Survey    Rates and      Union Y/ Union % Non-Union % DETR Mean
 $24.30                           PW 2010    PW 2011   2010 - 2011   Average   Survey Avg.        N     Difference Difference Wages
Average                                                      8.32%                     6.53%               5.57%      0.32%

GLAZIER                       -                                                                  N                    1.91%
Glazier                              21.25     22.42        5.51%      22.00          1.91%

                              ADD
                              LABORER
                              ZONE
HIGHWAY STRIPER               RATE                                                               Y         0.00%
Highway Striper                      33.57     33.57        0.00%      33.57          0.00%

HOD CARRIER-BRICK MASON ADD ZONE
TENDER                  RATE      Elko                                                           Y         0.83%
Brick Mason-Journeyman      30.10    30.10                  0.00%      30.10          0.00%
Brick Maons-Foreman         30.60    30.60                  0.00%      30.10          1.66%

HOD CARRIER-PLASTER           ADD ZONE
TENDER                        RATE                                                               Y         3.81%
Plasterer Tender-Journeyman          33.76     34.26        1.48%      33.76          1.48%
Plasterer-Gun Tender                 34.76     35.26        1.44%      33.76          4.44%
Plasterer Tender-Foreman             35.12     35.62        1.42%      33.76          5.51%

                              SEE
                              AMENDME
IRON WORKER                   NT 1                                                               Y         4.80%
Ironworker-Journeyman                54.38     56.74        4.34%      57.31         -0.99%
Ironworker-Foreman                   57.68     60.04        4.09%      57.31          4.76%
Ironworker-General Foreman           61.04     63.40        3.87%      57.31         10.63%


LABORER                                                                                          Y         0.42%
SEE GROUP                     ADD ZONE
CLASSIFICATIONS               RATE  
Landscaper                           25.66     25.66        0.00%      30.26         -15.20%                                    20.10
Furniture Mover                      27.16     27.16        0.00%      30.26         -10.24%                                    20.10
Group 1                              30.82     30.82        0.00%      30.26           1.85%                                    20.10
Group 1A                             27.95     27.95        0.00%      30.26          -7.63%                                    20.10
Group 2                              30.92     30.92        0.00%      30.26
                                                                           8           2.18%                                    20.10
                                                                              Difference
 CARSON CITY                                           Annual      2011 PW   Between PW
 Average Construction Wage                            Growth,       Survey    Rates and      Union Y/ Union % Non-Union % DETR Mean
 $24.30                         PW 2010    PW 2011   2010 - 2011   Average   Survey Avg.        N     Difference Difference Wages
Average                                                   8.32%                     6.53%                5.57%      0.32%
Group 3                            31.07     31.07        0.00%      30.26          2.68%                                     20.10
Group 4                            31.32     31.32        0.00%      30.26          3.50%                                     20.10
Group 4A                           32.57     32.57        0.00%      30.26          7.63%                                     20.10
Group 5                            31.62     31.62        0.00%      30.26          4.49%                                     20.10
Group 6
Nozzlemen, Rodmen                  31.62     31.62        0.00%      30.26          4.49%                                     20.10
Gunmen, Materialmen                31.32     31.32        0.00%      30.26          3.50%                                     20.10
Reboundmen                         30.97     30.97        0.00%      30.26          2.35%                                     20.10
Gunite Foremen                     32.02     32.02        0.00%      30.26          5.82%                                     20.10

                                SEE
                                AMENDME
MECHANICAL INSULATOR            NT 2                                                           Y        -0.08%
Mechanical Insulator-Mechanic      57.06     54.56        -4.38%     56.77          -3.89%
Mechanical Insulator-Foreman       59.56     57.06        -4.20%     56.77           0.51%
Mechanical Insulator-General
Foreman                            61.06     58.56        -4.09%     56.77          3.15%

MILLWRIGHT 
Millwright                         49.70     25.01       -49.68%


OPERATING ENGINEER                                                                             Y         8.88%
SEE GROUP                       ADD ZONE
CLASSIFICATIONS                 RATE
Group 1                            41.33     43.08        4.23%      46.84          -8.03%                                    16.45
Group 1A                           44.09     45.84        3.97%      46.84          -2.13%                                    16.45
Group 2                            44.62     46.37        3.92%      46.84          -1.00%                                    16.45
Group 3                            44.89     46.64        3.90%      46.84          -0.43%                                    16.45
Group 4                            45.63     47.38        3.84%      46.84           1.15%                                    16.45
Group 5                            45.93     47.68        3.81%      46.84           1.79%                                    16.45
Group 6                            46.10     47.85        3.80%      46.84           2.16%                                    16.45
Group 7                            46.35     48.10        3.78%      46.84           2.69%                                    16.45
Group 8                            46.94     48.69        3.73%      46.84           3.95%                                    16.45
Group 9                            47.26     49.01        3.70%      46.84           4.63%                                    16.45
Group 10                           47.61     49.36        3.68%      46.84           5.38%                                    16.45
Group 10A                          47.80     49.55        3.66%      46.84
                                                                         9           5.79%                                    16.45
                                                                                 Difference
  CARSON CITY                                            Annual      2011 PW    Between PW
  Average Construction Wage                             Growth,       Survey     Rates and     Union Y/ Union % Non-Union % DETR Mean
  $24.30                          PW 2010    PW 2011   2010 - 2011   Average    Survey Avg.       N     Difference Difference Wages
Average                                                     8.32%                      6.53%               5.57%      0.32%
Group 11                             48.04     49.79        3.64%      46.84           6.30%                                    16.45
Group 11A                            49.68     51.43        3.52%      46.84           9.80%                                    16.45
Group 11B                            50.49     52.24        3.47%      46.84          11.53%                                    16.45
Foreman                              49.68     51.43        3.52%      46.84           9.80%                                    16.45
Add 7% to base rate for
"Second" Shift                -
Add 12.5% to base rate for
"Special" shift               -

OPERATING ENGINEER-STEEL
FABRICATOR & ERECTOR 
SEE GROUP                  ADD ZONE
CLASSIFICATIONS            RATE
Group 1                        56.63           58.38        3.09%      46.84          24.64%                                    17.88
Group 1 Truck Crane Oiler      50.46           52.21        3.47%      46.84          11.46%                                    17.88
Group 1 Oiler                  48.50           50.25        3.61%      46.84           7.28%                                    17.88
Group 2                        55.12           56.87        3.17%      46.84          21.41%                                    17.88
Group 2 Truck Crane Oiler      50.21           51.96        3.49%      46.84          10.93%                                    17.88
Group 2 Oiler                  48.29           50.04        3.62%      46.84           6.83%                                    17.88
Group 3                        53.88           55.63        3.25%      46.84          18.77%                                    17.88
Group 3 Truck Crane Oiler      49.99           51.74        3.50%      46.84          10.46%                                    17.88
Group 3 Oiler                  48.07           49.82        3.64%      46.84           6.36%                                    17.88
Group 3 Hydraulic              49.66           51.41        3.52%      46.84           9.76%                                    17.88
Group 4                        52.15           53.90        3.36%      46.84          15.07%                                    17.88
Group 5                        51.05           52.80        3.43%      46.84          12.72%                                    17.88
Add 7% to base rate for
"Second" Shift             -
Add 12.5% to base rate for
"Special" Shift

OPERATING ENGINEER -
PILEDRIVER 
SEE GROUP                     ADD ZONE
CLASSIFICATIONS               RATE
Group 1                              56.10     57.85        3.12%      46.84          23.51%                                    17.88
Group 1 Truck Crane Oiler            50.64     52.39        3.46%      46.84          11.85%                                    17.88
Group 1 Oiler                        48.72     50.47        3.59%      46.84
                                                                           10          7.75%                                    17.88
                                                                              Difference
 CARSON CITY                                           Annual      2011 PW   Between PW
 Average Construction Wage                            Growth,       Survey    Rates and     Union Y/ Union % Non-Union % DETR Mean
 $24.30                           PW 2010 PW 2011    2010 - 2011   Average   Survey Avg.       N     Difference Difference Wages
Average                                                   8.32%                     6.53%               5.57%      0.32%
Group 2                              54.56  56.31         3.21%      46.84         20.22%                                    17.88
Group 2 Truck Crane Oiler            50.43  52.18         3.47%      46.84         11.40%                                    17.88
Group 2 Oiler                        48.52  50.27         3.61%      46.84          7.32%                                    17.88
Group 3                              53.11  54.86         3.30%      46.84         17.12%                                    17.88
Group 3 Truck Crane Oiler            50.21  51.96         3.49%      46.84         10.93%                                    17.88
Group 3 Oiler                        48.29  50.04         3.62%      46.84          6.83%                                    17.88
Group 4                              51.60  53.35         3.39%      46.84         13.90%                                    17.88
Group 5                              50.49  52.24         3.47%      46.84         11.53%                                    17.88
Group 6                              49.38  51.13         3.54%      46.84          9.16%                                    17.88
Group 7                              48.42  50.17         3.61%      46.84          7.11%                                    17.88
Group 8                              47.46  49.21         3.69%      46.84          5.06%                                    17.88
Add 7% to base for "Second"
Shift                           -
Add 12.5% to base for "Special"
Shift                           -

PAINTER                                                                                       Y         4.99%
Brush/Roller Painter                 32.74   32.74        0.00%      32.03          2.22%                                    15.03
Spray Painter/Paperhanger            33.59   33.59        0.00%      32.03          4.87%                                    15.03
Sandblaster                          33.24   33.24        0.00%      32.03          3.78%                                    15.03
Structural Steel & Steeplejack       33.74   33.74        0.00%      32.03          5.34%                                    15.03
Swing Stage                          34.74   34.74        0.00%      32.03          8.46%                                    15.03
Special Coating Application-
Brush                                33.24   33.24        0.00%      32.03          3.78%                                    15.03
Special Coating Application-
Spray                                33.74   33.74        0.00%      32.03          5.34%                                    15.03
Special Coating Application-
Spray Steel                          33.99   33.99        0.00%      32.03          6.12%                                    15.03
                                 $1.00
                                 above
                                 highest
                                 Journeyma
Foreman                          n 




                                                                        11
                                                                                      Difference
 CARSON CITY                                                   Annual      2011 PW   Between PW
 Average Construction Wage                                    Growth,       Survey    Rates and      Union Y/ Union % Non-Union % DETR Mean
 $24.30                                PW 2010    PW 2011    2010 - 2011   Average   Survey Avg.        N     Difference Difference Wages
Average                                                            8.32%                     6.53%               5.57%      0.32%
                                                  Not
                                                  Surveyed
                                                  Laborers
PILEDRIVER                                        Union                                                Y
Piledriver-Journeyman                     58.47      58.47        0.00%
Piledriver-Foreman                        62.05      62.05        0.00%

                                   ADD ZONE
PLASTERER                          RATE     Washoe                                                     Y         1.71%
Plasterer-Journeyman                      34.27      34.77        1.46%      35.29          -1.47%
Plasterer-Foreman                         35.59      37.02        4.02%      35.29           4.90%

PLUMBER/PIPEFITTER                 -                                                                   Y        18.18%
Plumber-Journeyman                        45.20      45.20        0.00%      40.75         10.92%                                     29.66
Plumber-Foreman                           48.16      48.16        0.00%      40.75         18.18%                                     29.66
Plumber-General Foreman                   51.12      51.12        0.00%      40.75         25.45%                                     29.66

REFRIGERATION                                                                                          Y         4.52%
Refrigeration-Journeyman                  30.92      41.58       34.48%      39.78          4.52%                                     23.51

ROOFER (Does not include
sheet metal roofs)                 -                                                                   N                    0.00%
Roofer                                    18.88      20.45        8.32%      20.45          0.00%                                     25.31

                                   ADD ZONE
SHEET METAL WORKER                 RATE                                                                Y        12.21%
Sheet Metal-Journeyman                    46.60      48.35        3.76%      45.86          5.43%                                     35.73
Sheet Metal-Foreman                       49.62      51.46        3.71%      45.86         12.21%                                     35.73
Sheet Metal-General Foreman               52.64      54.57        3.67%      45.86         18.99%                                     35.73

SPRINKLER FITTER                                                                                       Y         3.29%
Sprinkler Fitter-Journeyman               34.52      53.45       54.84%      54.25          -1.47%
Sprinkler Fitter-Foreman                  34.52      56.20       62.80%      54.25           3.59%

Sprinkler Fitter-General Foreman          34.52      58.45       69.32%      54.25          7.74%

                                                                                12
                                                                                  Difference
 CARSON CITY                                               Annual      2011 PW   Between PW
 Average Construction Wage                                Growth,       Survey    Rates and      Union Y/ Union % Non-Union % DETR Mean
 $24.30                             PW 2010    PW 2011   2010 - 2011   Average   Survey Avg.        N     Difference Difference Wages
Average                                                        8.32%                     6.53%               5.57%      0.32%
                                ADD
                                OPERATIN
                                G ENG.
                                ZONE
SURVEYOR                        RATE                                                               Y         1.70%
Surveyor                               44.89     46.64        3.90%      45.86          1.70%                                     32.69

TAPER                           -                                                                  Y         1.23%
Taper                                  35.49     36.28        2.23%      35.84          1.23%

TILE SETTER/TERRAZZO
WORKER/MARBLE MASON-            ADD ZONE
FINISHER                        RATE     Washoe                                                    Y         1.02%
Tile, Terrazzo and Marble
Finisher                               32.48     24.77       -23.74%     24.52          1.02%

TILE SETTER/TERRAZZO
WORKER/MARBLE MASON                            Washoe                                              Y         4.15%
Tile Setter-Journeyman                 25.00     32.87       31.48%      33.64          -2.29%
Tile Setter-Foreman                    25.00     34.12       36.48%      33.64           1.43%
Tile Setter-General Foreman            25.00     35.87       43.48%      33.64           6.63%
Terrazzo/Marble Mason-
Journeyman                             25.00     34.37       37.48%      33.64          2.17%

Terrazzo/Marble Mason-Foreman          25.00     35.62       42.48%      33.64          5.89%
Terrazzo/Marble Mason-General
Foreman                                25.00     37.37       49.48%      33.64         11.09%

                                ADD
                                LABORER
                                ZONE
TRAFFIC BARRIER ERECTOR         RATE
Traffic Barrier Erector                30.82     30.82        0.00%

TRUCK DRIVER                                   Washoe                                              N                    0.00%
Truck Driver                           21.61     20.80        -3.75%     20.80          0.00%                                     16.27
                                                                            13
                                                                                     Difference
 CARSON CITY                                                  Annual      2011 PW   Between PW
 Average Construction Wage                                   Growth,       Survey    Rates and      Union Y/ Union % Non-Union % DETR Mean
 $24.30                            PW 2010    PW 2011       2010 - 2011   Average   Survey Avg.        N     Difference Difference Wages
Average                                                           8.32%                     6.53%               5.57%      0.32%
WELL DRILLER                                  Elko                                                    N                    0.00%
Well Driller                          21.32         54.49      155.58%      54.49          0.00%

                                   ADD
                                   OPERATIN
LUBRICATION AND SERVICE            G  ENG.
ENGINEER (MOBILE AND               ZONE
GREASE RACK)                       RATE                                                               Y         2.16%

Lubrication and Service Engineer
(mobile and grease rack)              46.10         47.85        3.80%      46.84          2.16%

SOIL TESTER (CERTIFIED)                       Nye                                                     Y        -0.30%
Soil Tester (Certified)               44.64         56.62       26.84%      56.79          -0.30%

SOILS AND MATERIALS
TESTER                                        Nye                                                     Y        -0.30%
Soils and Materials Tester            44.64         56.62       26.84%      56.79          -0.30%

Union Breakdown
Union                                                                                                 32
Non-Union                                                                                             6
Total                                                                                                 38




                                                                               14
DETR Mean
Wage + 40%  Wage
 Benefits  Premium
             65.30%




     33.00   17.58%
     33.00   25.92%
       -
       -
       -
       -
       -


       -

     29.89    -1.77%
     29.89     8.60%
                       15
DETR Mean
Wage + 40%  Wage
 Benefits  Premium
             65.30%

     29.89   16.63%
       -
       -
       -
       -
       -
       -
       -
       -
       -
       -
       -
       -
     41.99   20.95%
     41.99   30.00%
     41.99   30.00%
     41.99   39.05%
       -
       -

       -

       -
       -
       -
       -
       -



       -
       -
       -
       -
     29.32   23.96%
     29.32   32.79%   16
DETR Mean
Wage + 40%  Wage
 Benefits  Premium
             65.30%
       -
       -
       -
       -



       -
       -
       -

       -
       -
       -
       -

       -
       -
       -
       -
       -


       -
       -
       -
       -
       -

       -

       -
     28.14    -8.81%
     28.14    -3.48%
     28.14     9.52%
     28.14    -0.68%
     28.14     9.88%   17
DETR Mean
Wage + 40%  Wage
 Benefits  Premium
             65.30%
     28.14   10.41%
     28.14   11.30%
     28.14   15.74%
     28.14   12.37%
       -
     28.14   12.37%
     28.14   11.30%
     28.14   10.06%
     28.14   13.79%
       -


       -
       -
       -

       -
       -
       -
       -
       -

       -

       -
     23.03    87.06%
     23.03    99.04%
     23.03   101.35%
     23.03   102.52%
     23.03   105.73%
     23.03   107.03%
     23.03   107.77%
     23.03   108.86%
     23.03   111.42%
     23.03   112.81%
     23.03   114.33%
     23.03   115.15%   18
DETR Mean
Wage + 40%  Wage
 Benefits  Premium
              65.30%
     23.03   116.20%
     23.03   123.32%
     23.03   126.83%
     23.03   123.32%

       -

       -
       -

       -

       -
     25.03   133.22%
     25.03   108.57%
     25.03   100.74%
     25.03   127.19%
     25.03   107.57%
     25.03    99.90%
     25.03   122.24%
     25.03   106.70%
     25.03    99.03%
     25.03   105.38%
     25.03   115.32%
     25.03   110.93%

       -

       -
       -

       -

       -
     25.03   131.10%
     25.03   109.29%
     25.03   101.62%   19
DETR Mean
Wage + 40%  Wage
 Benefits  Premium
              65.30%
     25.03   124.95%
     25.03   108.45%
     25.03   100.82%
     25.03   119.16%
     25.03   107.57%
     25.03    99.90%
     25.03   113.13%
     25.03   108.69%
     25.03   104.26%
     25.03   100.42%
     25.03    96.59%

       -

       -
       -
       -
     21.04   55.59%
     21.04   59.63%
     21.04   57.97%
     21.04   60.35%
     21.04   65.10%

     21.04   57.97%

     21.04   60.35%

     21.04   61.53%




       -
       -



                       20
DETR Mean
Wage + 40%  Wage
 Benefits  Premium
             65.30%



       -
       -
       -
       -

       -
       -
       -
       -
       -
     41.52    8.85%
     41.52   15.98%
     41.52   23.11%
       -
       -
     32.91   26.33%
       -

       -
     35.43   -42.29%
       -

       -
     50.02    -3.34%
     50.02     2.87%
     50.02     9.09%
       -
       -
       -
       -

       -
       -
                       21
DETR Mean
Wage + 40%  Wage
 Benefits  Premium
             65.30%




       -
     45.77    1.91%
       -
       -
       -
       -


       -

       -
       -

       -
       -
       -
       -

       -

       -

       -
       -



       -
       -
       -
       -
     22.78    -8.68%
                       22
                                                    Annual    2011 PW     Difference                                     DETR
 CHURCHILL                                         Growth,     Survey Between PW Rates Union Y/ Union %     Non-Union    Mean
 Average Construction Wage $21.44 PW 2010 PW 2011 2010 - 2011 Average and Survey Avg.     N     Difference % Difference Wages
Average                                                 3.09%                      4.56%              5.07%       -2.28%

                              ADD
                              SHEET
                              METAL
                              ZONE
AIR BALANCE TECHNICIAN        RATE        CC                                              Y        47.87%
Air Balance-Journeyman            46.60         48.35    3.76%    34.80        38.94%
Air Balance-Foreman               49.62         51.46    3.71%    34.80        47.87%
Air Balance-General Foreman       52.64         54.57    3.67%    34.80        56.81%

ALARM INSTALLER                                                                           N                     0.00%
Alarm Installer                   25.69         26.77    4.20%    26.77         0.00%

BOILERMAKER                               Clark                                           Y         1.87%
Boilermaker                       59.50         65.94   10.82%    64.73         1.87%

                              ADD
                              ZONE
BRICKLAYER                    RATE        Washoe                                          Y         8.21%
Bricklayer-Journeyman             32.68         32.68    0.00%    31.51         3.71%
Bricklayer-Foreman                33.93         33.93    0.00%    31.51         7.68%
Bricklayer-General Foreman        35.68         35.68    0.00%    31.51        13.23%

                              ADD
                              ZONE
CARPENTER                     RATE                                                        Y         6.56%
Carpenter-Journeyman              38.30         38.80    1.31%    37.70         2.92%                                   19.72
Carpenter-Foreman                 41.05         41.55    1.22%    37.70        10.21%                                   19.72

CEMENT MASON                                                                              N
Cement Mason-Journeyman           34.40         26.50   -22.97%   26.50         0.00%                                   25.82
Cement Mason-Foreman              36.40         26.50   -27.20%   26.50         0.00%                                   25.82

ELECTRICIAN-COMMUNICATION                 Nye                                             Y         1.74%
TECHNICIAN 
Electrician-Communication
Technician-Installer              27.97         27.50    -1.68%   27.03         1.74%
Electrician-Communication
Technician-Technician             30.88         27.50   -10.95%   27.03         1.74%
                                                                   23
                                                     Annual    2011 PW     Difference                                     DETR
  CHURCHILL                                         Growth,     Survey Between PW Rates Union Y/ Union %     Non-Union    Mean
  Average Construction Wage $21.44 PW 2010 PW 2011 2010 - 2011 Average and Survey Avg.     N     Difference % Difference Wages
Average                                                  3.09%                      4.56%              5.07%       -2.28%
Electrician-Communication
Technician-Senior Technician         33.13   27.50    -16.99%     27.03             1.74%

ELECTRICIAN-LINE                -                                                          Y         -2.23%
Electrician-Groundman               39.19      40.50    3.34%    58.40          -30.65%
Electrician-Lineman                 57.91      59.90    3.44%    58.40            2.57%
Electrician-Foreman                 63.02      65.16    3.40%    58.40           11.58%
Electrician-General Foreman         68.12      70.45    3.42%    58.40           20.63%
Heavy Equipment Operator            47.86      49.49    3.41%    58.40          -15.26%

ELECTRICIAN-NEON SIGN           -           Clark                                          Y         0.57%
Electrician-Neon Sign               44.31      45.52    2.73%    45.26           0.57%

ELECTRICIAN-WIREMAN                                                                        Y         9.63%
Wireman                             47.69      50.78    6.48%    46.32           9.63%                                   25.80

ELEVATOR CONSTRUCTOR            -                                                          Y        13.48%
Journeyman Mechanic                 46.01      78.21    69.98%   72.12           8.44%
Mechanic In Charge                  46.01      85.48    85.79%   72.12          18.52%

                                ADD
                                LABORE
                                R ZONE
FENCE ERECTOR                   RATE                                                       N                     0.00%
Fence Erector                       30.82      43.19    40.14%   43.19           0.00%

                                            Is Not
                                ADD         Surveyed
                                LABORE      Comes
FLAGPERSON (not surveyed set    R ZONE      From
by Laborers Union every year)   RATE        Laborers 
Flagperson                          27.95      27.95    0.00%

FLOOR COVERER                                                                              Y         3.65%
Floor Coverer-Journeyman            36.26      36.34    0.22%    36.31           0.08%
Floor Coverer-Foreman               38.90      38.93    0.08%    36.31           7.22%

GLAZIER                         -                                                          N                     2.28%
                                                                  24
                                                    Annual    2011 PW     Difference                                     DETR
 CHURCHILL                                         Growth,     Survey Between PW Rates Union Y/ Union %     Non-Union    Mean
 Average Construction Wage $21.44 PW 2010 PW 2011 2010 - 2011 Average and Survey Avg.     N     Difference % Difference Wages
Average                                                 3.09%                      4.56%              5.07%       -2.28%
Glazier                             21.50   21.50      0.00%     21.02             2.28%

                              ADD
                              LABORE
                              R ZONE
HIGHWAY STRIPER               RATE                                                        Y         0.00%
Highway Striper                   33.57        33.57    0.00%    33.57          0.00%


                              ADD
HOD CARRIER-BRICK MASON       ZONE
TENDER                        RATE        Washoe                                          N                    -25.11%
Brick Mason-Journeyman            30.10        15.00   -50.17%   20.03         -25.11%
Brick Mason-Foreman               30.60        15.00   -50.98%   20.03         -25.11%

                              ADD
HOD CARRIER-PLASTERER         ZONE
TENDER                        RATE        CC                                              Y         3.81%
Plasterer Tender-Journeyman       33.76        34.26    1.48%    33.76          1.48%
Plasterer-Gun Tender              34.76        35.26    1.44%    33.76          4.44%
Plasterer Tender-Foreman          35.12        35.62    1.42%    33.76          5.51%

                              SEE
                              AMENDM
IRON WORKER                   ENT 1                                                       Y         4.80%
Ironworker                        54.38        56.74    4.34%    57.31         -0.99%
Ironworker-Foreman                57.68        60.04    4.09%    57.31          4.76%
Ironworker-General Foreman        61.04        63.40    3.87%    57.31         10.63%

                              ADD
LABORER                       ZONE                                                        Y         1.19%
SEE GROUP CLASSIFICATIONS     RATE
Landscaper                        25.66        25.66    0.00%    30.03         -14.55%                                   16.86
Furniture Mover                   27.16        27.16    0.00%    30.03          -9.56%                                   16.86
Group 1                           30.82        30.82    0.00%    30.03           2.63%                                   16.86
Group 1A                          27.95        27.95    0.00%    30.03          -6.93%                                   16.86
Group 2                           30.92        30.92    0.00%    30.03           2.96%                                   16.86
Group 3                           31.07        31.07    0.00%    30.03           3.46%                                   16.86
                                                                  25
                                                    Annual    2011 PW     Difference                                     DETR
 CHURCHILL                                         Growth,     Survey Between PW Rates Union Y/ Union %     Non-Union    Mean
 Average Construction Wage $21.44 PW 2010 PW 2011 2010 - 2011 Average and Survey Avg.     N     Difference % Difference Wages
Average                                                 3.09%                      4.56%              5.07%       -2.28%
Group 4                             31.32   31.32      0.00%     30.03             4.30%                                  16.86
Group 4A                            32.57   32.57      0.00%     30.03             8.46%                                  16.86
Group 5                             31.62   31.62      0.00%     30.03             5.29%                                  16.86
Group 6
Nozzlemen, Rodmen                   31.62   31.62      0.00%     30.03             5.29%                                  16.86
Gunman, Rodmen                      31.32   31.32      0.00%     30.03             4.30%                                  16.86
Reboundmen                          30.97   30.97      0.00%     30.03             3.13%                                  16.86
Gunite Foremen                      32.02   32.02      0.00%     30.03             6.63%                                  16.86

                                SEE
                                AMENDM
MECHANICAL INSULATOR            ENT 2- CC (52 hrs)                                         Y         -0.08%
Mechanical Insulator-Mechanic      57.06    54.56     -4.38%    56.77            -3.89%
Mechanical Insulator-Foreman       59.56    57.06     -4.20%    56.77             0.51%
Mechanical Insulator-General
Foreman                            61.06    58.56     -4.09%    56.77             3.15%

MILLWRIGHT                                                                                 Y          7.19%
Millwright                         49.70    49.95     0.50%     46.60             7.19%

                                ADD
OPERATING ENGINEER              ZONE                                                       Y         11.57%
SEE GROUP CLASSIFICATIONS       RATE 
Group 1                            41.33    43.08     4.23%     45.71            -5.75%                                   23.33
Group 1A                           44.09    45.84     3.97%     45.71             0.28%                                   23.33
Group 2                            44.62    46.37     3.92%     45.71             1.44%                                   23.33
Group 3                            44.89    46.64     3.90%     45.71             2.03%                                   23.33
Group 4                            45.63    47.38     3.84%     45.71             3.65%                                   23.33
Group 5                            45.93    47.68     3.81%     45.71             4.31%                                   23.33
Group 6                            46.10    47.85     3.80%     45.71             4.68%                                   23.33
Group 7                            46.35    48.10     3.78%     45.71             5.23%                                   23.33
Group 8                            46.94    48.69     3.73%     45.71             6.52%                                   23.33
Group 9                            47.26    49.01     3.70%     45.71             7.22%                                   23.33
Group 10                           47.61    49.36     3.68%     45.71             7.99%                                   23.33
Group 10A                          47.80    49.55     3.66%     45.71             8.40%                                   23.33
Group 11                           48.04    49.79     3.64%     45.71             8.93%                                   23.33
Group 11A                          49.68    51.43     3.52%     45.71            12.51%                                   23.33
Group 11B                          50.49    52.24     3.47%     45.71            14.29%                                   23.33
                                                                 26
                                                    Annual    2011 PW     Difference                                     DETR
 CHURCHILL                                         Growth,     Survey Between PW Rates Union Y/ Union %     Non-Union    Mean
 Average Construction Wage $21.44 PW 2010 PW 2011 2010 - 2011 Average and Survey Avg.     N     Difference % Difference Wages
Average                                                 3.09%                      4.56%              5.07%       -2.28%
Foreman                                49.68 51.43     3.52%     45.71            12.51%                                  23.33
Add 7% to base rate for "Second"
Shift                                -
Add 12.5% to base rate for "Special"
shift                                -

OPERATING ENGINEER-STEEL
FABRICATOR & ERECTOR                 ADD
 SEE GROUP CLASSIFICATIONS           ZONE
                                     RATE
Group 1                                  56.63   58.38   3.09%   45.71           27.72%                                   23.33
Group 1 Truck Crane Oiler                50.46   52.21   3.47%   45.71           14.22%                                   23.33
Group 1 Oiler                            48.50   50.25   3.61%   45.71            9.93%                                   23.33
Group 2                                  55.12   56.87   3.17%   45.71           24.41%                                   23.33
Group 2 Truck Crane Oiler                50.21   51.96   3.49%   45.71           13.67%                                   23.33
Group 2 Oiler                            48.29   50.04   3.62%   45.71            9.47%                                   23.33
Group 3                                  53.88   55.63   3.25%   45.71           21.70%                                   23.33
Group 3 Truck Crane Oiler                49.99   51.74   3.50%   45.71           13.19%                                   23.33
Group 3 Oiler                            48.07   49.82   3.64%   45.71            8.99%                                   23.33
Group 3 Hydraulic                        49.66   51.41   3.52%   45.71           12.47%                                   23.33
Group 4                                  52.15   53.90   3.36%   45.71           17.92%                                   23.33
Group 5                                  51.05   52.80   3.43%   45.71           15.51%                                   23.33
Add 7% to base rate for "Second"
Shift                                -
Add 12.5% to base rate for "Special"
Shift

OPERATING ENGINEER -                 ADD
PILEDRIVER                           ZONE
SEE GROUP CLASSIFICATIONS            RATE 
Group 1                                  56.10   57.85   3.12%   45.71           26.56%                                   23.33
Group 1 Truck Crane Oiler                50.64   52.39   3.46%   45.71           14.61%                                   23.33
Group 1 Oiler                            48.72   50.47   3.59%   45.71           10.41%                                   23.33
Group 2                                  54.56   56.31   3.21%   45.71           23.19%                                   23.33
Group 2 Truck Crane Oiler                50.43   52.18   3.47%   45.71           14.15%                                   23.33
Group 2 Oiler                            48.52   50.27   3.61%   45.71            9.98%                                   23.33
Group 3                                  53.11   54.86   3.30%   45.71           20.02%                                   23.33
Group 3 Truck Crane Oiler                50.21   51.96   3.49%   45.71           13.67%                                   23.33
                                                                  27
                                                    Annual    2011 PW     Difference                                     DETR
 CHURCHILL                                         Growth,     Survey Between PW Rates Union Y/ Union %     Non-Union    Mean
 Average Construction Wage $21.44 PW 2010 PW 2011 2010 - 2011 Average and Survey Avg.     N     Difference % Difference Wages
Average                                                 3.09%                      4.56%              5.07%       -2.28%
Group 3 Oiler                       48.29   50.04      3.62%     45.71             9.47%                                  23.33
Group 4                             51.60   53.35      3.39%     45.71            16.71%                                  23.33
Group 5                             50.49   52.24      3.47%     45.71            14.29%                                  23.33
Group 6                             49.38   51.13      3.54%     45.71            11.86%                                  23.33
Group 7                             48.42   50.17      3.61%     45.71             9.76%                                  23.33
Group 8                             47.46   49.21      3.69%     45.71             7.66%                                  23.33
Add 7% to base for "Second" Shift -

Add 12.5% to base for "Special" Shift -

PAINTER                                                                                    Y         -0.19%
Brush/Roller Painter                      32.74     32.74   0.00%   33.69        -2.82%
Spray Painter/Paperhanger                 33.59     33.59   0.00%   33.69        -0.30%
Sandblaster                               33.24     33.24   0.00%   33.69        -1.34%
Structural Steel & Steeplejack            33.74     33.74   0.00%   33.69         0.15%
Swing Stage                               34.74     34.74   0.00%   33.69         3.12%
Special Coating Application-Brush         33.24     33.24   0.00%   33.69        -1.34%
Special Coating Application-Spray         33.74     33.74   0.00%   33.69         0.15%
Special Coating Application-Spray
Steel                                     33.99     33.99   0.00%   33.69         0.89%
                                      $1.00
                                      above
                                      highest
                                      Journeym
Foreman                               an 

PILEDRIVER                                                                                 Y
Piledriver-Journeyman                     58.47     58.47   0.00%
Piledriver-Foreman                        62.05     62.05   0.00%

                                      ADD
                                      ZONE
PLASTERER                             RATE        Washoe                                   Y         -1.47%
Plasterer                                 34.27     34.77   1.46%   35.29        -1.47%

PLUMBER/PIPEFITTER                    -                                                    N                      0.00%
Plumber                                   32.38     32.38   0.00%   32.38         0.00%

                                                                     28
                                                    Annual    2011 PW     Difference                                     DETR
 CHURCHILL                                         Growth,     Survey Between PW Rates Union Y/ Union %     Non-Union    Mean
 Average Construction Wage $21.44 PW 2010 PW 2011 2010 - 2011 Average and Survey Avg.     N     Difference % Difference Wages
Average                                                 3.09%                      4.56%              5.07%       -2.28%
REFRIGERATION                     -       Lyon                                            N                        0.00%
Refrigeration                       27.55    29.40     6.72%     29.40             0.00%

ROOFER (Does not include sheet
metal roofs)                                                                              N                     0.00%
Roofer                                 21.28        21.28      0.00%    21.28   0.00%

                                   ADD
                                   ZONE
SHEET METAL WORKER                 RATE                                                   Y         8.82%
Sheet Metal                            46.60        48.35      3.76%    44.43   8.82%

SPRINKLER FITTER                   -           CC                                         Y         3.29%
Sprinkler Fitter-Journeyman            26.00        53.45     105.58%   54.25   -1.47%
Sprinkler Fitter-Foreman               26.00        56.20     116.15%   54.25    3.59%
Sprinkler Fitter-General Foreman       26.00        58.45     124.81%   54.25    7.74%

SURVEYOR                                                                                  N                     0.00%
Surveyor                               42.14        25.63     -39.18%   25.63   0.00%

TAPER                                          Lyon (4 hrs)                               Y         1.23%
Taper                                  35.49        36.28      2.23%    35.84   1.23%

                                   -ADD
TILE SETTER/TERRAZZO WORKER/ ZONE
MARBLE MASON                       RATE     Washoe                                        Y         1.59%
Tile, Terrazzo and Marble Finisher    32.48    24.77          -23.74%   24.52   1.02%
Tile Setter/Terrazzo Worker/Marble
Mason                                 35.99    34.37           -4.50%   33.64   2.17%     Y         2.17%

                                   ADD
                                   LABORE
                                   R ZONE Not
TRAFFIC BARRIER ERECTOR            RATE   Surveyed
Traffic Barrier Erector                30.82        30.82      0.00%

TRUCK DRIVER 
                                                                         29
                                                     Annual    2011 PW     Difference                                     DETR
  CHURCHILL                                         Growth,     Survey Between PW Rates Union Y/ Union %     Non-Union    Mean
  Average Construction Wage $21.44 PW 2010 PW 2011 2010 - 2011 Average and Survey Avg.     N     Difference % Difference Wages
Average                                                  3.09%                      4.56%              5.07%       -2.28%
Dump Trucks (Single or Multiple Units
Including Semi's & Double Transfer Units),
Dumpcretes and Bulk Cement Spreader)                                                       N                        0.00%
Under 4 yds. (water level)            20.80  19.65     -5.53%     19.65             0.00%                                  15.90
4 yds. & under 8 yds. (water level)   20.80  19.65     -5.53%     19.65             0.00%                                  15.90
8 yds. & under 18 yds. (water level)  20.80  19.65     -5.53%     19.65             0.00%                                  15.90

18 yds. & under 25 yds. ( water level)   20.80   19.65   -5.53%   19.65           0.00%                                    15.90

25 yds. & under 60 yds. (water level)    20.80   19.65   -5.53%   19.65           0.00%                                    15.90

60 yds. & under 75 yds. (water level)    20.80   19.65   -5.53%   19.65           0.00%                                    15.90
75 yds. & under 100 yds. (water
level)                                   20.80   19.65   -5.53%   19.65           0.00%                                    15.90
100 yds. & under 150 yds.(water
level)                                   20.80   19.65   -5.53%   19.65           0.00%                                    15.90
150 yds. & under 250 yds. ( water
level)                                   20.80   19.65   -5.53%   19.65           0.00%                                    15.90
250 yds. & under 350 yds. (water
level)                                   20.80   19.65   -5.53%   19.65           0.00%                                    15.90
350 yds. & over (water level)            20.80   19.65   -5.53%   19.65           0.00%                                    15.90
Transit Mix
Under 8 yds.                             20.80   19.65   -5.53%   19.65           0.00%                                    15.90
8 yds. & including 12 yds.               20.80   19.65   -5.53%   19.65           0.00%                                    15.90
Over 12 yds.                             20.80   19.65   -5.53%   19.65           0.00%                                    15.90
Transit Mix (Using Boom)
Transit mix with boom shall receive
16 cents per hour
above the appropriate yardage
classification rate of pay 
when such boom is used
Water & Jetting Trucks
Up to 2,500 gallons                      20.80   19.65   -5.53%   19.65           0.00%                                    15.90
2,500 gallons & over                     20.80   19.65   -5.53%   19.65           0.00%                                    15.90




                                                                   30
                                                     Annual    2011 PW     Difference                                     DETR
  CHURCHILL                                         Growth,     Survey Between PW Rates Union Y/ Union %     Non-Union    Mean
  Average Construction Wage $21.44 PW 2010 PW 2011 2010 - 2011 Average and Survey Avg.     N     Difference % Difference Wages
Average                                                  3.09%                      4.56%              5.07%       -2.28%
DW 20's & 21's & other similar Cat
type, Terry Cobra LeTourneau pulls,
Tournerocker, Euclid, & similar type
equipment when pulling Aqua/Pak,
Water Tank Trailers, & Fuel, and/or
Grease Tank Trailer, or other
miscellaneous Trailers, (except as
defined under "Dump Trucks")         20.80   19.65     -5.53%     19.65             0.00%                                  15.90
Heavy Duty Transport (High Bed)      20.80   19.65     -5.53%     19.65             0.00%                                  15.90
Heavy Duty Transport(Gooseneck low
bed)                                 20.80   19.65     -5.53%     19.65             0.00%                                  15.90
Tiltbed or Flatbed Pull Trailers     20.80   19.65     -5.53%     19.65             0.00%                                  15.90
Bootman, Comb. Bootman & Road
Oiler                                20.80   19.65     -5.53%     19.65             0.00%                                  15.90
Flat Rack (2 or 3 axle unit)         20.80   19.65     -5.53%     19.65             0.00%                                  15.90
Bus & Manhaul Drivers
Up to 18,000 lbs. (single unit)      20.80   19.65     -5.53%     19.65             0.00%                                  15.90
18,000 lbs. & over (single unit)     20.80   19.65     -5.53%     19.65             0.00%                                  15.90
Helicopter Pilot (transporting men/
materials)                           20.80   19.65     -5.53%     19.65             0.00%                                  15.90
Lift Jitneys                         20.80   19.65     -5.53%     19.65             0.00%                                  15.90
Winch Truck & "A" Frame Drivers
Up to 18,000 lbs.                    20.80   19.65     -5.53%     19.65             0.00%                                  15.90
18,000 lbs. and over                 20.80   19.65     -5.53%     19.65             0.00%                                  15.90
Warehousemen Spotter                 20.80   19.65     -5.53%     19.65             0.00%                                  15.90
Warehouse Clerk                      20.80   19.65     -5.53%     19.65             0.00%                                  15.90
Tire Repairmen                       20.80   19.65     -5.53%     19.65             0.00%                                  15.90
Truck Repairmen                      20.80   19.65     -5.53%     19.65             0.00%                                  15.90
Pick Up Truck & Pilot Cars (Jobsite) 20.80   19.65     -5.53%     19.65             0.00%                                  15.90
Pick Up Truck & Pilot Cars (Over the
road)                                20.80   19.65     -5.53%     19.65             0.00%                                  15.90
Truck Oil Greaser                    20.80   19.65     -5.53%     19.65             0.00%                                  15.90
Fuel Truck Driver                    20.80   19.65     -5.53%     19.65             0.00%                                  15.90
Fuel Man & Fuel Island Man           20.80   19.65     -5.53%     19.65             0.00%                                  15.90
Oil Tanker                           20.80   19.65     -5.53%     19.65             0.00%                                  15.90
Oil Tanker with Pup                  20.80   19.65     -5.53%     19.65             0.00%                                  15.90
Foreman:                             21.30   20.15     -5.40%     20.15             0.00%                                  15.90

                                                                  31
                                                    Annual    2011 PW     Difference                                     DETR
 CHURCHILL                                         Growth,     Survey Between PW Rates Union Y/ Union %     Non-Union    Mean
 Average Construction Wage $21.44 PW 2010 PW 2011 2010 - 2011 Average and Survey Avg.     N     Difference % Difference Wages
Average                                                 3.09%                      4.56%              5.07%       -2.28%
WELL DRILLER                              Pershing                                        N                        0.00%
Well Driller                        21.55    54.49   152.85%     54.49             0.00%

                                 ADD
                                 OPERATI
LUBRICATION AND SERVICE          NG
ENGINEER (MOBILE AND GREASE ENG.ZON
RACK)                            E RATE                                                   Y         2.16%
Lubrication and Service Engineer
(mobile and grease rack)            46.10         47.85   3.80%    46.84        2.16%

SOIL TESTER (CERTIFIED)                     Nye                                           Y         -0.30%
Soil Tester (Certified)            44.65          56.62   26.81%   56.79        -0.30%

SOILS AND MATERIALS TESTER                  Nye                                                     -0.30%
Soils and Materials Tester         44.65          56.62   26.81%   56.79        -0.30%

Union Breakdown
Union                                                                                    27
Non-Union                                                                                11
Total                                                                                    38




                                                                    32
DETR Mean
Wage + 40%     Wage
 Benefits     Premium
                 23.43%




      27.61      40.54%
      27.61      50.50%
        -
        -
      36.15     -26.69%
      36.15     -26.69%
        -
        -

        -

        -
                          33
DETR Mean
Wage + 40%     Wage
 Benefits     Premium
                 23.43%

        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
      36.12      40.59%
        -
        -
        -
        -
        -



        -
        -
        -




        -
        -
        -
        -
        -
        -
        -
        -
                          34
DETR Mean
Wage + 40%     Wage
 Benefits     Premium
                 23.43%
        -
        -



        -
        -
        -
        -


        -
        -
        -
        -


        -
        -
        -
        -
        -


        -
        -
        -
        -
        -

        -
        -
      23.60       8.71%
      23.60      15.07%
      23.60      30.57%
      23.60      18.41%
      23.60      30.99%
      23.60      31.63%
                          35
DETR Mean
Wage + 40%     Wage
 Benefits     Premium
                 23.43%
      23.60      32.69%
      23.60      37.99%
      23.60      33.96%
        -
      23.60      33.96%
      23.60      32.69%
      23.60      31.21%
      23.60      35.65%
        -


        -
        -
        -

        -
        -
        -
        -
        -

        -
        -
      32.66      31.90%
      32.66      40.35%
      32.66      41.97%
      32.66      42.80%
      32.66      45.06%
      32.66      45.98%
      32.66      46.50%
      32.66      47.27%
      32.66      49.07%
      32.66      50.05%
      32.66      51.12%
      32.66      51.71%
      32.66      52.44%
      32.66      57.46%
      32.66      59.94%
                          36
DETR Mean
Wage + 40%     Wage
 Benefits     Premium
                 23.43%
      32.66      57.46%

        -

        -
        -

        -
        -
        -
      32.66      78.74%
      32.66      59.85%
      32.66      53.85%
      32.66      74.12%
      32.66      59.08%
      32.66      53.21%
      32.66      70.32%
      32.66      58.41%
      32.66      52.53%
      32.66      57.40%
      32.66      65.02%
      32.66      61.66%

        -

        -
        -

        -
        -
      32.66      77.12%
      32.66      60.40%
      32.66      54.52%
      32.66      72.40%
      32.66      59.76%
      32.66      53.91%
      32.66      67.96%
      32.66      59.08%
                          37
DETR Mean
Wage + 40%     Wage
 Benefits     Premium
                 23.43%
      32.66      53.21%
      32.66      63.34%
      32.66      59.94%
      32.66      56.54%
      32.66      53.60%
      32.66      50.66%
        -

        -
        -
        -
        -
        -
        -
        -
        -
        -
        -

        -




        -
        -
        -
        -
        -
        -


        -
        -
        -
        -
        -
        -
                          38
DETR Mean
Wage + 40%    Wage
 Benefits    Premium
                23.43%
        -
        -
        -

        -
        -
        -


        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -


        -
        -

        -
        -



        -
        -
        -
        -

                         39
DETR Mean
Wage + 40%     Wage
 Benefits     Premium
                 23.43%


        -
      22.26     -11.73%
      22.26     -11.73%
      22.26     -11.73%

      22.26     -11.73%

      22.26     -11.73%

      22.26     -11.73%

      22.26     -11.73%

      22.26     -11.73%

      22.26     -11.73%

      22.26     -11.73%
      22.26     -11.73%
        -
      22.26     -11.73%
      22.26     -11.73%
      22.26     -11.73%
        -

        -

        -
        -
        -
      22.26     -11.73%
      22.26     -11.73%




                          40
DETR Mean
Wage + 40%     Wage
 Benefits     Premium
                 23.43%




      22.26     -11.73%
      22.26     -11.73%

      22.26     -11.73%
      22.26     -11.73%

      22.26     -11.73%
      22.26     -11.73%
        -
      22.26     -11.73%
      22.26     -11.73%

      22.26     -11.73%
      22.26     -11.73%
        -
      22.26     -11.73%
      22.26     -11.73%
      22.26     -11.73%
      22.26     -11.73%
      22.26     -11.73%
      22.26     -11.73%
      22.26     -11.73%

      22.26     -11.73%
      22.26     -11.73%
      22.26     -11.73%
      22.26     -11.73%
      22.26     -11.73%
      22.26     -11.73%
      22.26      -9.48%
        -
                          41
DETR Mean
Wage + 40%    Wage
 Benefits    Premium
                23.43%
        -
        -
        -




        -

        -
        -
        -
        -
        -
        -
        -




                         42
                                                           Annual                Difference
                                                           Growth,    2011 PW   Between PW                                    DETR
 CLARK                                                      2010 -     Survey    Rates and      Union    Union % Non-Union % Mean
 Average Construction Wage $25.12        PW 2010 PW 2011     2011     Average   Survey Avg.      Y/N    Difference Difference Wages
Average                                                       2.35%                     6.23%               7.37%      0.38%

AIR BALANCE TECHNICIAN                   ADD                                                     Y         10.62%
Air Balance Technician-Journeyman        SHEET
                                           58.52   59.52     1.71%      57.83          2.92%
Air Balance Technician-Foreman           METAL
                                           62.95   63.97     1.62%      57.83         10.62%
Air Balance Technician-General Foreman   ZONE
                                           67.37   68.42     1.56%      57.83         18.31%
                                         RATE
ALARM INSTALLER                                                                                  Y         12.76%
Alarm Installer-Journeyman                 54.38   55.95     2.89%      49.62         12.76%                                   24.59

BOILERMAKER                                                                                      Y          1.87%
Boilermaker                                59.50   65.94     10.82%     64.73          1.87%

BRICKLAYER                               ADD                                                     Y         -7.78%
Bricklayer-Journeyman                    ZONE
                                           45.46   44.71     -1.65%     48.48          -7.78%                                  20.07
                                         RATE-
CARPENTER                                ADD                                                     Y          7.81%
Carpenter-Journeyman                     ZONE
                                           48.70   48.95     0.51%      47.88          2.23%                                   26.57
Carpenter-Welder                         RATE
                                           49.70   49.95     0.50%      47.88          4.32%                                   26.57
Carpenter-Foreman                          51.83   52.08     0.48%      47.88          8.77%                                   26.57
Carpenter-General Foreman                  55.24   55.49     0.45%      47.88         15.89%                                   26.57

CEMENT MASON                             ADD                                                     Y          7.82%
Cement Mason-Journeyman                  ZONE
                                           46.28   46.28     0.00%      44.70          3.53%                                   22.63
Cement Mason-Foreman                     RATE
                                           48.28   48.28     0.00%      44.70          8.01%                                   22.63
Cement Mason-General Foreman               50.03   50.03     0.00%      44.70         11.92%                                   22.63

ELECTRICIAN- COMMUNICATION               ADD                                                     Y          8.24%
TECHNICIAN
Installer/Technician                     ZONE
                                           38.72   39.83     2.87%      50.87         -21.70%                                  25.33
Senior Installer/Technician              RATE
                                           54.38   55.95     2.89%      50.87           9.99%                                  25.33
Installer/Technician Foreman               58.78   60.53     2.98%      50.87          18.99%                                  25.33
Installer/Technician General Foreman       63.18   63.93     1.19%      50.87          25.67%                                  25.33


ELECTRICIAN-LINEMAN/GROUNDMAN/
HEAVY EQUIPMENT OPERATOR                                                                         Y          3.93%
Groundman                                  34.82   35.33     1.46%      48.56         -27.24%                                  29.85
Lineman                                    51.95   52.82     1.67%      48.56           8.77%                                  29.85
                                                                       43
                                                               Annual                Difference
                                                               Growth,    2011 PW   Between PW                                    DETR
 CLARK                                                          2010 -     Survey    Rates and      Union    Union % Non-Union % Mean
 Average Construction Wage $25.12         PW 2010 PW 2011        2011     Average   Survey Avg.      Y/N    Difference Difference Wages
Average                                                          2.35%                      6.23%               7.37%      0.38%
Foreman                                       56.89   57.86      1.71%      48.56          19.15%                                  29.85
General Foreman                               61.90   62.97      1.73%      48.56          29.67%                                  29.85
Heavy Equipment Operator                      42.69   43.37      1.59%      48.56         -10.69%                                  29.85

ELECTRICIAN-NEON SIGN                                                                                Y          0.57%
Electrician-Neon Sign                         44.31   45.52      2.73%      45.26          0.57%

ELECTRICIAN-WIREMAN                       ADD                                                        Y          9.33%
Wireman-Journeyman                        ZONE
                                            54.74     56.31      2.87%      54.73          2.89%                                   30.01
Wireman-Cable Splicer                     RATE
                                            55.25     56.83      2.86%      54.73          3.84%                                   30.01
Wireman-Foreman                               59.18   60.84      2.81%      54.73         11.16%                                   30.01
Wireman-General Foreman                       63.62   65.37      2.75%      54.73         19.44%                                   30.01

ELEVATOR CONSTRUCTOR                      -                                                          Y          1.86%
Elevator Constructor-Journeyman               46.01   64.58      40.36%     66.35          -2.67%
Elevator Constructor-Mechanic In Charge
Mechanic                                      46.01   70.59      53.42%     66.35           6.39%

FENCE ERECTOR                             -                                                          N                  0.00%
Fence Erector                                 16.97   17.46      2.89%      17.46          0.00%                                   15.37

FLAGPERSON (not surveyed set by           ADD      Not
Laborers Union every year)                LABORE Surveyed
Flagperson                                R ZONE
                                             41.44     41.44     0.00%
                                          RATE
FLOOR COVERER                                                                                        Y          4.01%
Floor Coverer-Joureyman                       41.83   42.40      1.36%      43.13          -1.69%                                  23.63
Floor Coverer-Foreman                         46.76   47.32      1.20%      43.13           9.71%                                  23.63

GLAZIER                                   -                                                          Y         17.91%
Glazier-Journeyman                            54.72   57.51      5.10%      50.55         13.77%                                   28.10
Glazier-Foreman                               58.81   61.70      4.91%      50.55         22.06%                                   28.10

HIGHWAY STRIPER                           -                                                          N                  0.00%
Highway Striper                               24.34   30.81      26.58%     30.81          0.00%

HOD CARRIER-BRICK MASON                   ADD                                                        Y          3.09%
Brick Mason
TENDER                                    LABORE
                                             43.31    43.31      0.00%      42.01          3.09%
                                          R ZONE                           44
                                          RATE
                                                             Annual                Difference
                                                             Growth,    2011 PW   Between PW                                    DETR
 CLARK                                                        2010 -     Survey    Rates and      Union    Union % Non-Union % Mean
 Average Construction Wage $25.12        PW 2010 PW 2011       2011     Average   Survey Avg.      Y/N    Difference Difference Wages
Average                                                         2.35%                     6.23%               7.37%      0.38%

HOD CARRIER-PLASTERER TENDER             ADD                                                       Y          3.76%
Plasterer Tender-Journeyman              LABORE
                                            44.34    44.34     0.00%      44.34          0.00%
Plasterer Tender-Foreman                 R ZONE
                                            46.34    46.34     0.00%      44.34          4.51%
Plasterer Tender-General Foreman         RATE
                                            47.34    47.34     0.00%      44.34          6.77%

IRON WORKER                              SEE                                                       Y          4.96%
Ironworker-Journeyman                    AMEND
                                           54.38     56.74     4.34%      57.22         -0.84%                                   26.25
Ironworker-Foreman                       MENT 1
                                           57.68     60.04     4.09%      57.22          4.93%                                   26.25
Ironworker-General Foreman                  61.04    63.40     3.87%      57.22         10.80%                                   26.25

LABORER
SEE GROUP CLASSIFICATIONS                 ADD                                                      Y          4.76%
Group 1                                   ZONE
                                             42.94   42.94     0.00%      42.47          1.11%                                   19.15
Group 2                                   RATE
                                             43.15   43.15     0.00%      42.47          1.60%                                   19.15
Group 3                                      43.25   43.25     0.00%      42.47          1.84%                                   19.15
Group 4                                      43.34   43.34     0.00%      42.47          2.05%                                   19.15
Group 5                                      43.44   43.44     0.00%      42.47          2.28%                                   19.15
Group 6A                                     46.10   46.10     0.00%      42.47          8.55%                                   19.15
Group 6B                                     45.60   45.60     0.00%      42.47          7.37%                                   19.15
Group 6C                                     45.35   45.35     0.00%      42.47          6.78%                                   19.15
Group 6D                                     45.96   45.96     0.00%      42.47          8.22%                                   19.15
Group 6E                                     45.60   45.60     0.00%      42.47          7.37%                                   19.15
Group 7                                      44.67   44.67     0.00%      42.47          5.18%                                   19.15
Foreman $2.00 above highest paid journeyman
supervised.
General Foreman $3.00 above highest paid foreman
supervised.
MECHANICAL INSULATOR                                                                               Y          7.77%
Mechanical Insulator-Journeyman              55.63   56.23     1.08%      55.23          1.81%                                   21.42
Mechanical Insulator-Foreman                 58.99   59.52     0.90%      55.23          7.77%                                   21.42
Mechanical Insulator-General Foreman         62.36   62.81     0.72%      55.23         13.72%                                   21.42

                                                                                                   Y         11.55%
Millwright-Journeyman                       49.70    49.95     0.50%      47.30          5.60%                                   31.07
Millwright-Welder                           50.70    50.95     0.49%      47.30          7.72%                                   31.07
Millwright-Foreman                          53.01    53.26     0.47%      47.30         12.60%                                   31.07
Millwright-General Foreman                  56.65    56.90     0.44%      47.30         20.30%                                   31.07
                                                                         45
                                                            Annual                Difference
                                                            Growth,    2011 PW   Between PW                                    DETR
 CLARK                                                       2010 -     Survey    Rates and      Union    Union % Non-Union % Mean
 Average Construction Wage $25.12         PW 2010 PW 2011     2011     Average   Survey Avg.      Y/N    Difference Difference Wages
Average                                                        2.35%                     6.23%               7.37%      0.38%

OPERATING ENGINEER                                                                                Y          5.73%
SEE GROUP CLASSIFICATIONS                 ADD
Group 1                                   ZONE
                                            53.92   55.67     3.25%      56.66          -1.75%                                  29.23
Group 2                                   RATE
                                            54.87   56.62     3.19%      56.66          -0.07%                                  29.23
Group 3                                     55.16   56.91     3.17%      56.66           0.44%                                  29.23
Group 4                                     56.65   58.40     3.09%      56.66           3.07%                                  29.23
Group 5                                     57.75   59.50     3.03%      56.66           5.01%                                  29.23
Group 6                                     56.87   58.62     3.08%      56.66           3.46%                                  29.23
Group 7                                     57.97   59.72     3.02%      56.66           5.40%                                  29.23
Group 8                                     56.98   58.73     3.07%      56.66           3.65%                                  29.23
Group 9                                     58.08   59.83     3.01%      56.66           5.59%                                  29.23
Group 10                                    57.10   58.85     3.06%      56.66           3.87%                                  29.23
Group 11                                    58.20   59.95     3.01%      56.66           5.81%                                  29.23
Group 12                                    57.27   59.02     3.06%      56.66           4.17%                                  29.23
Group 13                                    57.37   59.12     3.05%      56.66           4.34%                                  29.23
Group 14                                    57.40   59.15     3.05%      56.66           4.39%                                  29.23
Group 15                                    57.48   59.23     3.04%      56.66           4.54%                                  29.23
Group 16                                    57.60   59.35     3.04%      56.66           4.75%                                  29.23
Group 17                                    57.77   59.52     3.03%      56.66           5.05%                                  29.23
Group 18                                    57.87   59.62     3.02%      56.66           5.22%                                  29.23
Group 19                                    57.98   59.73     3.02%      56.66           5.42%                                  29.23
Group 20                                    58.10   59.85     3.01%      56.66           5.63%                                  29.23
Group 21                                    58.27   60.02     3.00%      56.66           5.93%                                  29.23
Group 22                                    58.37   60.12     3.00%      56.66           6.11%                                  29.23
Group 23                                    58.48   60.23     2.99%      56.66           6.30%                                  29.23
Group 24                                    58.60   60.35     2.99%      56.66           6.51%                                  29.23
Group 25                                    58.77   60.52     2.98%      56.66           6.81%                                  29.23
Add $.50 per hour for "Special" Shift
Add $1.00 per hour for "Multiple" Shift

OPERATING ENGINEER:
CRANES, PILEDRIVING, & HOISTING
EQUIPMENT
SEE GROUP CLASSIFICATIONS                 ADD
Group 1                                   ZONE
Engineer Oiler                            RATE
                                            57.60   59.35     3.04%      56.66          4.75%                                   29.23
                                                                        46
                                                             Annual               Difference
                                                             Growth,   2011 PW   Between PW                                   DETR
  CLARK                                                       2010 -    Survey    Rates and     Union    Union % Non-Union % Mean
  Average Construction Wage $25.12         PW 2010 PW 2011     2011    Average   Survey Avg.     Y/N    Difference Difference Wages
Average                                                        2.35%                    6.23%               7.37%      0.38%
Forklift Operator                            56.51   58.26     3.10%     56.66          2.82%                                  29.23
Group 2
Truck Crane Oiler                            57.60   59.35     3.04%     56.66          4.75%                                  29.23
Group 3
A-Frame or Winch Truck Operator              56.51   58.26     3.10%     56.66          2.82%                                  29.23
Ross Carrier Operator (Jobsite)              56.51   58.26     3.10%     56.66          2.82%                                  29.23
Group 4
Bridge-Type Unloader and Turntable           56.65   58.40     3.09%     56.66          3.07%                                  29.23
Operator
Helicopter Hoist Operator                    56.65   58.40     3.09%     56.66          3.07%                                  29.23
Group 5
Hydraulic Boom Truck (Pitman)                56.87   58.62     3.08%     56.66          3.46%                                  29.23
Stinger Crane (Austin-Western or Similar     56.87   58.62     3.08%     56.66          3.46%                                  29.23
Tugger Hoist Operator (1 Drum)
Type)                                        56.87   58.62     3.08%     56.66          3.46%                                  29.23
Group 6
Bridge Crane Operator                        56.98   58.73     3.07%     56.66          3.65%                                  29.23
Cretor Crane Operator                        56.98   58.73     3.07%     56.66          3.65%                                  29.23
Hoist Operator (Chicago Boom and Similar     56.98   58.73     3.07%     56.66          3.65%                                  29.23
Lift Mobile Operator
Type)                                        56.98   58.73     3.07%     56.66          3.65%                                  29.23
Lift Slab Machine Operator (Vagtborg and
Similar Types)                               56.98   58.73     3.07%     56.66          3.65%                                  29.23
Material Hoist/Manlift Operator              56.98   58.73     3.07%     56.66          3.65%                                  29.23
Polar Gantry Crane Operator                  56.98   58.73     3.07%     56.66          3.65%                                  29.23
Self Climbing Scaffold (or Similar Type)     56.98   58.73     3.07%     56.66          3.65%                                  29.23
Shovel, Backhoe, Dragline, Clamshell
Operator (Over 3/4 YD. and up to 5 CU.
YDS. M.R.C.)                                 56.98   58.73     3.07%     56.66          3.65%                                  29.23
Silent Piler                                 56.98   58.73     3.07%     56.66          3.65%                                  29.23
Tugger Hoist Operator (2 Drum)               56.98   58.73     3.07%     56.66          3.65%                                  29.23
Group 7
Pedestal Crane Operator                      57.10   58.85     3.06%     56.66          3.87%                                  29.23
Shovel, Backhoe, Dragline, Clamshell
Operator (over 5 CU. YDS. M.R.C.)            57.10   58.85     3.06%     56.66          3.87%                                  29.23
Tower Crane Repairman                        57.10   58.85     3.06%     56.66          3.87%                                  29.23
Tugger Hoist Operator (3 Drum)               57.10   58.85     3.06%     56.66          3.87%                                  29.23
Group 8
Crane Operator (up to and including 25 ton
capacity)                                    59.07   60.82     2.96%     56.66          7.34%                                  29.23
                                                                        47
                                                              Annual               Difference
                                                              Growth,   2011 PW   Between PW                                   DETR
  CLARK                                                        2010 -    Survey    Rates and     Union    Union % Non-Union % Mean
  Average Construction Wage $25.12          PW 2010 PW 2011     2011    Average   Survey Avg.     Y/N    Difference Difference Wages
Average                                                         2.35%                    6.23%               7.37%      0.38%
Crawler Transporter Operator                  57.27   59.02     3.06%     56.66          4.17%                                  29.23
Derrick Barge Operator (up to and
including 25 ton capacity)                    57.27   59.02     3.06%     56.66          4.17%                                  29.23
Hoist Operator, Stiff Legs, Guy Derrick or
Similar Type (up to and including 25 ton
capacity)                                     57.27   59.02     3.06%     56.66          4.17%                                  29.23
Shovel, Backhoe, Dragline, Clamshell
Operator (over 7 CU. YDS. M.R.C.)             57.27   59.02     3.06%     56.66          4.17%                                  29.23
Group 9
Crane Operator (over 25 tons up to and
including 50 tons M.R.C.)                     59.07   60.82     2.96%     56.66          7.34%                                  29.23
Derrick Barge Operator (over 25 tons, up to
and including 50 tons M.R.C.)                 57.44   59.19     3.05%     56.66          4.47%                                  29.23
Highline Cableway Operator                    57.44   59.19     3.05%     56.66          4.47%                                  29.23
Hoise Operator, Stiff Legs, Guy Derrick or
Similar Type (over 25 tons, up to and
including 50 tons M.R.C.)                     57.44   59.19     3.05%     56.66          4.47%                                  29.23
K-Crane                                       57.44   59.19     3.05%     56.66          4.47%                                  29.23
Polar Crane Operator                          57.44   59.19     3.05%     56.66          4.47%                                  29.23
Self Erecting Tower Crane Operator
Maximum Lifting Capacity Ten (10) Tons.
One (1) Ton Operator).                        57.44   59.19     3.05%     56.66          4.47%                                  29.23
Group 10
Crane Operator (over 50 tons, up to and
including 100 tons M.R.C.)                    60.49   62.24     2.89%     56.66          9.85%                                  29.23
Derrick Barge Operator (over 50 tons, up to
and including 100 tons M.R.C.)                58.44   60.19     2.99%     56.66          6.23%                                  29.23
Hoist Operator, Stiff Legs, Guy Derrick or
Similar Type (over 50 tons, up to and
including 100 tons M.R.C.)                    58.44   60.19     2.99%     56.66          6.23%                                  29.23

Mobile Tower Crane Operator (over 50
tons, up to and including 100 tons M.R.C.)   60.49   62.24      2.89%     56.66          9.85%                                  29.23
Group 11
Crane Operator (over 100 tons, up to and
including 200 tons M.R.C.)                   60.99   62.24      2.05%     56.66          9.85%                                  29.23

                                                                         48
                                                               Annual                Difference
                                                               Growth,    2011 PW   Between PW                                    DETR
  CLARK                                                         2010 -     Survey    Rates and      Union    Union % Non-Union % Mean
  Average Construction Wage $25.12           PW 2010 PW 2011     2011     Average   Survey Avg.      Y/N    Difference Difference Wages
Average                                                           2.35%                     6.23%               7.37%      0.38%
Derrick Barge Operator (over 100 tons, up
to and including 200 tons M.R.C.)              59.44   61.19     2.94%      56.66          8.00%                                   29.23
Hoist Operator, Stiff Legs, Guy Derrick or
Similar Type (over100 tons, up to and
including 200 tons M.R.C.)                     59.44   61.19     2.94%      56.66          8.00%                                   29.23

Mobile Tower Crane Operator (over 100
tons, up to and including 200 tons M.R.C.)     60.99   62.74     2.87%      56.66         10.73%                                   29.23
Tower Crane Operator and Tower Gantry          61.44   63.19     2.85%      56.66         11.52%                                   29.23
Group 12
Crane Operator (over 200 tons up to and
including 300 tons M.R.C.)                     63.63   65.38     2.75%      56.66         15.39%                                   29.23
Derrick Barge Operator (over 200 tons up
to and including 300 tons M.R.C.)              60.44   62.19     2.90%      56.66          9.76%                                   29.23
Hoist Operator, Stiff Legs, Guy Derrick or
Similar Type (over 200 tons up to and
including 300 tons M.R.C.)                     60.44   62.19     2.90%      56.66          9.76%                                   29.23
Mobile Tower Crane Operator (over 200
tons up to and including 300 tons M.R.C.)      63.63   65.38     2.75%      56.66         15.39%                                   29.23
Group 13
Crane Operator (over 300 tons)                 65.00   66.75     2.69%      56.66         17.81%                                   29.23
Derrick Barge Operator (over 300 tons)         61.44   63.19     2.85%      56.66         11.52%                                   29.23
Helicopter Pilot                               61.44   63.19     2.85%      56.66         11.52%                                   29.23
Hoist Operator, Stiff Legs, Guy Derrick or
Similar Type (over 300 tons)                   61.44   63.19     2.85%      56.66         11.52%                                   29.23
Mobile Tower Crane Operator (over 300          65.00   66.75     2.69%      56.66         17.81%                                   29.23
tons)
Add $ .50 per hour for "Special" Shift     -
Add $1.00 per hour for "Multiple" Shift    -


OPERATING ENGINEER-SURVEYOR                                                                          Y         12.75%

SEE GROUP CLASSIFICATIONS                    ADD
Group 1                                      ZONE
                                               55.84   57.59     3.13%      52.34         10.03%                                   29.70
Group 2                                      RATE
                                               56.65   58.40     3.09%      52.34         11.58%                                   29.70
Group 3                                        56.87   58.62     3.08%      52.34         12.00%                                   29.70
Group 4                                        57.15   58.90     3.06%      52.34         12.53%                                   29.70
                                                                           49
                                                       Annual                Difference
                                                       Growth,    2011 PW   Between PW                                    DETR
 CLARK                                                  2010 -     Survey    Rates and      Union    Union % Non-Union % Mean
 Average Construction Wage $25.12    PW 2010 PW 2011     2011     Average   Survey Avg.      Y/N    Difference Difference Wages
Average                                                  2.35%                     6.23%                7.37%      0.38%
Group 5                                57.27   59.02     3.06%      52.34         12.76%                                   29.70
Group 6                                57.37   59.12     3.05%      52.34         12.95%                                   29.70
Group 7                                57.40   59.15     3.05%      52.34         13.01%                                   29.70
Group 8                                57.77   59.52     3.03%      52.34         13.72%                                   29.70
Group 9                                57.90   59.65     3.02%      52.34         13.97%                                   29.70
Group 10                               58.40   60.15     3.00%      52.34         14.92%                                   29.70


OPERATING ENGINEER -TUNNEL                                                                   Y          4.04%
SEE GROUP CLASSIFICATIONS            ADD
Group 1                              ZONE
                                       55.77   57.52     3.14%      56.66          1.52%                                   29.23
Group 2                              RATE
                                       56.72   58.47     3.09%      56.66          3.19%                                   29.23
Group 3                                57.01   58.76     3.07%      56.66          3.71%                                   29.23
Group 4                                57.15   58.90     3.06%      56.66          3.95%                                   29.23
Group 5                                57.37   59.12     3.05%      56.66          4.34%                                   29.23
Group 6                                57.48   59.23     3.04%      56.66          4.54%                                   29.23
Group 7                                57.60   59.35     3.04%      56.66          4.75%                                   29.23
Group 8                                57.77   59.52     3.03%      56.66          5.05%                                   29.23
Group 9                                57.90   59.65     3.02%      56.66          5.28%                                   29.23

PAINTER                                                                                      Y          3.72%
Painter-Journeyman                     46.23   46.64     0.89%      46.47          0.37%                                   24.37
Painter-Foreman                        49.35   49.76     0.83%      46.47          7.08%                                   24.37

PILEDRIVER                                                                                   Y
Driverman, Rigman, Bridge and Dock     58.47   58.47      0.00%
Certified Welder
Carpenter                              58.47   58.47      0.00%
Piledriver-Foreman                     62.05   58.47     -5.77%
Diver-Diving (wet pay)                 58.47   58.47      0.00%
Stand-By Diver                         58.47   58.47      0.00%
Tender                                 58.47   58.47      0.00%

PLASTERER                            ADD                                                     Y          4.89%
Plasterer-Journeyman                 ZONE
                                       44.69   44.69     0.00%      44.75          -0.13%
Plasterer-Foreman                    RATE
                                       47.19   47.19     0.00%      44.75           5.45%
Plasterer-General Foreman              48.94   48.94     0.00%      44.75           9.36%

                                                                   50
                                                             Annual                Difference
                                                             Growth,    2011 PW   Between PW                                    DETR
  CLARK                                                       2010 -     Survey    Rates and      Union    Union % Non-Union % Mean
  Average Construction Wage $25.12       PW 2010 PW 2011       2011     Average   Survey Avg.      Y/N    Difference Difference Wages
Average                                                         2.35%                     6.23%               7.37%      0.38%
PLUMBER/PIPEFITTER                      -                                                          Y          8.42%
Plumber/Pipefitter-Journeyman               56.02    56.52     0.89%      55.69          1.49%                                   28.35
Plumber-Foreman                             59.83    60.38     0.92%      55.69          8.42%                                   28.35
Plumber-General Foreman                     63.65    64.23     0.91%      55.69         15.33%                                   28.35

REFRIGERATION                                                                                      N                     0.00%
Refrigeration-Journeyman                    36.24    35.17     -2.95%     35.17          0.00%                                   21.28
Refrigeration-Foreman                       36.24    35.17     -2.95%     35.17          0.00%                                   21.28
Refrigeration-General Foreman               36.24    35.17     -2.95%     35.17          0.00%                                   21.28

ROOFER                                  -                                                          Y          8.20%
(Does not include sheet metal roofs)
Roofer-Journeyman                           31.83    31.91     0.25%      31.78          0.41%                                   18.62
Roofer-Foreman                              36.25    36.86     1.68%      31.78         15.98%                                   18.62

SHEET METAL WORKER                      ADD                                                        Y          8.98%
Sheet Metal-Journeyman                  ZONE
                                          58.52      59.52     1.71%      58.70          1.40%                                   34.86
Sheet Metal-Foreman                     RATE
                                          62.95      63.97     1.62%      58.70          8.98%                                   34.86
Sheet Metal-General Foreman                 67.37    68.42     1.56%      58.70         16.56%                                   34.86

SPRINKLER FITTER                                                                                   Y         12.65%
Sprinkler Fitter-Journeyman                 55.15    56.30     2.09%      52.27          7.71%
Sprinkler Fitter-Foreman                    57.90    59.05     1.99%      52.27         12.97%
Sprinkler Fitter-General Foreman            60.15    61.30     1.91%      52.27         17.28%


TAPER                                                                                              Y         -1.50%
Taper                                       46.23    46.64     0.89%      47.35          -1.50%                                  21.03

TILE SETTER/TERRAZZO WORKER/              ADD
MARBLE MASON                              ZONE                                                     Y          7.96%
Tile Setter/Terrazzo Worker/Marble Mason- RATE
                                             32.48   34.63     6.62%      36.35         -4.73%                                   23.56
Tile Setter
Finisher                                     43.61   46.66     6.99%      36.35         28.36%                                   20.42
Terrazzo Worker/Marble Mason                 46.04   49.29     7.06%      49.17          0.24%                                   23.56


TRAFFIC BARRIER ERECTOR                 ADD
                                        LABORE                           51
                                        R ZONE
                                        RATE-
                                                             Annual                Difference
                                                             Growth,    2011 PW   Between PW                                    DETR
  CLARK                                                       2010 -     Survey    Rates and      Union    Union % Non-Union % Mean
  Average Construction Wage $25.12     PW 2010 PW 2011         2011     Average   Survey Avg.      Y/N    Difference Difference Wages
Average                                                        2.35%                      6.23%               7.37%      0.38%
Traffic Barrier Erector                    42.94    42.94      0.00%

TRUCK DRIVER                                                                                       Y         -0.68%
SEE GROUP CLASSIFICATIONS              ADD
Group 1                                ZONE
                                          46.13     46.13      0.00%      46.96          -1.77%                                  22.45
Group 2                                RATE
                                          46.23     46.23      0.00%      46.96          -1.55%                                  22.45
Group 3                                    46.44    46.44      0.00%      46.96          -1.11%                                  22.45
Group 4                                    46.62    46.62      0.00%      46.96          -0.72%                                  22.45
Group 5                                    46.82    46.82      0.00%      46.96          -0.30%                                  22.45
Group 6                                    47.12    47.12      0.00%      46.96           0.34%                                  22.45
Foreman $1.00 above highest paid
journeyman supervised.                     48.12    48.12      0.00%      47.96          0.33%                                   23.45

                                         ADD      Esmerald
WELL DRILLER                             OPERATI a                                                 N                     1.52%
Well Driller                             NG 56.87    19.42    -65.85%     19.42          0.00%
                                         ENGINE
Equipment Greaser                        ER ZONE                                                   Y          2.61%
                                         ADD
                                         RATE
EQUIPMENT GREASER (RACK)                 OPERATI
Equipment Greaser (rack)                 NG 55.16    56.91     3.17%      56.79          0.21%
                                         ENGINE
EQUIPMENT GREASER (GREASE                ADD
                                         ER ZONE
TRUCK)                                   OPERATI
                                         RATE
Equipment Greaser (grease truck)         NG 56.65    58.40     3.09%      56.79          2.84%
                                         ENGINE
EQUIPMENT GREASER (GREASE                ADD
                                         ER ZONE
TRUCK/MULTI-SHIFT)                       OPERATI
                                         RATE
Equipment Greaser (grease truck/multi-   NG 57.75    59.50     3.03%      56.79          4.77%
shift)                                   ENGINE
TUNNEL, EQUIPMENT GREASER                ER ZONE
                                         ADD
(GREASE TRUCK)                           RATE
                                         OPERATI
Tunnel, Equipment Greaser (grease truck) NG 57.37    59.12     3.05%      56.79          4.10%
                                         ENGINE
                                         ADD
                                         ER ZONE
FIELD SOILS AND MATERIAL TESTER RATE     OPERATI                                                   Y         28.95%
Field Soils and Material Tester          NG 54.87    56.62     3.19%      43.91         28.95%
                                         ENGINE                          52
                                         ER ZONE
                                         RATE
                                                         Annual                Difference
                                                         Growth,    2011 PW   Between PW                                      DETR
 CLARK                                                    2010 -     Survey    Rates and        Union    Union % Non-Union % Mean
 Average Construction Wage $25.12     PW 2010 PW 2011      2011     Average   Survey Avg.        Y/N    Difference Difference Wages
Average                                                     2.35%                       6.23%               7.37%      0.38%

FIELD ASPHALTIC CONCRETE (SOILS       ADD
AND MATERIAL TESTER)                  OPERATI
Field Asphaltic Concrete (soils and   NG 54.87   56.62     3.19%      43.91            28.95%              28.95%
material tester)                      ENGINE
Union Breakdown                       ER ZONE
Union                                 RATE                                        34
Non-Union                                                                         4
Total                                                                             38




                                                                     53
DETR Mean
Wage + 40%      Wage
 Benefits      Premium
                  45.75%




       34.43      62.52%
         -
         -
         -
         -
         -
       28.10      59.12%
         -
         -
       37.20      31.59%
       37.20      34.28%
       37.20      40.01%
       37.20      49.17%
         -
         -
       31.68      46.08%
       31.68      52.39%
       31.68      57.91%
         -
         -
       35.46      12.32%
       35.46      57.77%
       35.46      70.69%
       35.46      80.28%
         -


         -
       41.79     -15.46%
       41.79      26.39%
                           54
DETR Mean
Wage + 40%      Wage
 Benefits      Premium
                  45.75%
       41.79      38.45%
       41.79      50.68%
       41.79       3.78%
         -
         -
         -
         -
         -
       42.01      -5.20%
       42.01      33.17%
       42.01      44.07%
       42.01      52.16%
         -
         -
         -
         -
         -
         -
       21.52     -18.86%
         -

         -
         -
         -
         -
       33.08      28.17%
       33.08      43.04%
         -
         -
       39.34      46.19%
       39.34      56.84%
         -
         -
         -
         -
         -
         -
                           55
DETR Mean
Wage + 40%      Wage
 Benefits      Premium
                  45.75%
         -
         -
         -
         -
         -
         -
         -
       36.75      54.39%
       36.75      63.37%
       36.75      72.52%
         -
         -
         -
       26.81      60.16%
       26.81      60.95%
       26.81      61.32%
       26.81      61.66%
       26.81      62.03%
       26.81      71.95%
       26.81      70.09%
       26.81      69.15%
       26.81      71.43%
       26.81      70.09%
       26.81      66.62%
         -
         -
         -
         -
       29.99      87.51%
       29.99      98.48%
       29.99     109.45%
         -
         -
       43.50      14.83%
       43.50      17.13%
       43.50      22.44%
       43.50      30.81%
                           56
DETR Mean
Wage + 40%      Wage
 Benefits      Premium
                  45.75%
         -
         -
         -
       40.92      36.04%
       40.92      38.36%
       40.92      39.07%
       40.92      42.71%
       40.92      45.40%
       40.92      43.25%
       40.92      45.94%
       40.92      43.52%
       40.92      46.20%
       40.92      43.81%
       40.92      46.50%
       40.92      44.23%
       40.92      44.47%
       40.92      44.54%
       40.92      44.74%
       40.92      45.03%
       40.92      45.45%
       40.92      45.69%
       40.92      45.96%
       40.92      46.25%
       40.92      46.67%
       40.92      46.91%
       40.92      47.18%
       40.92      47.48%
       40.92      47.89%
         -
         -
         -
         -

         -
         -
         -
       40.92      45.03%
                           57
DETR Mean
Wage + 40%      Wage
 Benefits      Premium
                  45.75%
       40.92      42.37%
         -
       40.92      45.03%
         -
       40.92      42.37%
       40.92      42.37%
         -
       40.92      42.71%
       40.92      42.71%
         -
       40.92      43.25%
       40.92      43.25%
       40.92      43.25%
         -
       40.92      43.52%
       40.92      43.52%
       40.92      43.52%
       40.92      43.52%

       40.92      43.52%
       40.92      43.52%
       40.92      43.52%
       40.92      43.52%


       40.92      43.52%
       40.92      43.52%
       40.92      43.52%
         -
       40.92      43.81%

       40.92      43.81%
       40.92      43.81%
       40.92      43.81%
         -

       40.92      48.62%
                           58
DETR Mean
Wage + 40%      Wage
 Benefits      Premium
                  45.75%
       40.92      44.23%

       40.92      44.23%


       40.92      44.23%

       40.92      44.23%
         -

       40.92      48.62%

       40.92      44.64%
       40.92      44.64%


       40.92      44.64%
       40.92      44.64%
       40.92      44.64%


       40.92      44.64%
         -

       40.92      52.09%

       40.92      47.08%


       40.92      47.08%


       40.92      52.09%
         -

       40.92      52.09%

                           59
DETR Mean
Wage + 40%      Wage
 Benefits      Premium
                  45.75%

       40.92      49.53%


       40.92      49.53%


       40.92      53.32%
       40.92      54.42%
         -

       40.92      59.77%

       40.92      51.97%


       40.92      51.97%

       40.92      59.77%
         -
       40.92      63.12%
       40.92      54.42%
       40.92      54.42%

       40.92      54.42%
       40.92      63.12%
         -
         -
         -
         -
         -
         -
         -
       41.58      38.50%
       41.58      40.45%
       41.58      40.98%
       41.58      41.65%
                           60
DETR Mean
Wage + 40%      Wage
 Benefits      Premium
                  45.75%
       41.58      41.94%
       41.58      42.18%
       41.58      42.26%
       41.58      43.15%
       41.58      43.46%
       41.58      44.66%
         -
         -
         -
         -
       40.92      40.56%
       40.92      42.88%
       40.92      43.59%
       40.92      43.93%
       40.92      44.47%
       40.92      44.74%
       40.92      45.03%
       40.92      45.45%
       40.92      45.77%
         -
         -
       34.12      36.70%
       34.12      45.85%
         -
         -
         -
         -
         -
         -
         -
         -
         -
         -
         -
         -
         -
         -
                           61
DETR Mean
Wage + 40%      Wage
 Benefits      Premium
                  45.75%
         -
       39.69      42.40%
       39.69      52.13%
       39.69      61.83%
         -
         -
       29.79      18.05%
       29.79      18.05%
       29.79      18.05%
         -
         -
         -
       26.07      22.41%
       26.07      41.40%
         -
         -
       48.80      21.96%
       48.80      31.08%
       48.80      40.19%
         -
         -
         -
         -
         -
         -
         -
         -
       29.44      58.41%
         -

         -
       32.98       4.99%
       28.59      63.22%
       32.98      49.44%
         -
         -
         -
                           62
DETR Mean
Wage + 40%      Wage
 Benefits      Premium
                  45.75%
         -
         -
         -
         -
       31.43      46.77%
       31.43      47.09%
       31.43      47.76%
       31.43      48.33%
       31.43      48.97%
       31.43      49.92%

       32.83      46.57%
         -

         -
         -
         -
         -

         -
         -
         -

         -
         -
         -

         -
         -
         -

         -
         -
         -

         -
         -
                           63
DETR Mean
Wage + 40%    Wage
 Benefits    Premium
                45.75%
        -

        -




                         64
                                                                                       Difference
                                                                  Annual    2011 PW   Between PW                                       DETR
 DOUGLAS                                                         Growth,     Survey Rates and Survey Union  Union %      Non-Union %   Mean
 Average Construction Wage $20.78   PW 2010      PW 2011        2010 - 2011 Average       Avg.        Y/N  Difference     Difference   Wages
Average                                                             5.85%                     5.99%             4.98%          1.27%

                                     ADD
                                    SHEET
                                    METAL
                                    ZONE
AIR BALANCE TECHNICIAN              RATE                                                               Y       45.08%
Air Balance Technician-Journeyman       46.60           48.35       3.76%    35.47           36.31%
Air Balance Technician-Foreman          49.62           51.46       3.71%    35.47           45.08%
Air Balance Technician-General          52.64           54.57       3.67%    35.47           53.85%
Foreman
ALARM INSTALLER                                 CC                                                     N                       0.00%
Alarm Installer                         28.11           26.47       -5.83%   26.47            0.00%

BOILERMAKER                         -           Clark                                                  Y        1.87%
Boilermaker                             59.50           65.94      10.82%    64.73            1.87%

                                     ADD
                                    ZONE
BRICKLAYER                          RATE        Washoe                                                 N                       3.71%
Bricklayer                              32.68           32.68       0.00%    31.51            3.71%                                     26.43

                                     ADD
                                    ZONE
CARPENTER                           RATE                                                               Y        3.54%
Carpenter-Journeyman                    38.30           38.80       1.31%    38.80            0.00%                                     22.26
Carpenter-Foreman                       41.05           41.55       1.22%    38.80            7.09%                                     22.26

CEMENT MASON                                                                                           Y        2.94%
Cement Mason-Journeyman                 34.40           34.40       0.00%    34.39            0.03%                                     23.63
Cement Mason-Foreman                    36.40           36.40       0.00%    34.39            5.84%                                     23.63

ELECTRICIAN-COMMUNICATION TECHNICIAN                                                                   N                       4.27%
Communication Installer           27.97                 31.47      12.51%    30.18            4.27%
Communication Technician          30.88                 31.47       1.91%    30.18            4.27%
Senior Technician                 33.13                 31.47      -5.01%    30.18            4.27%

ELECTRICIAN-LINE                    -           -                                                      Y        -2.23%
Electrician-Groundman                   39.19           40.50       3.34% 65 58.40           -30.65%
                                                                                    Difference
                                                               Annual    2011 PW   Between PW                                      DETR
  DOUGLAS                                                     Growth,     Survey Rates and Survey Union  Union %     Non-Union %   Mean
  Average Construction Wage $20.78   PW 2010     PW 2011     2010 - 2011 Average       Avg.        Y/N  Difference    Difference   Wages
Average                                                          5.85%                      5.99%            4.98%         1.27%
Electrician-Lineman                      57.91       59.90       3.44%        58.40         2.57%
Electrician-Foreman                      63.02       65.16       3.40%        58.40        11.58%
Electrician-General Foreman              68.12       70.45       3.42%        58.40        20.63%
Heavy Equipment Operator                 47.86       49.49       3.41%        58.40       -15.26%

ELECTRICIAN-NEON SIGN                -           -                                                  Y        0.57%
Electrician-Neon Sign                    44.31       45.52       2.73%        45.26        0.57%

ELECTRICIAN-WIREMAN                  -           -                                                  Y       16.55%
Wireman                                  47.69       50.78       6.48%        46.83        8.43%                                    22.97
Cable Splicer                            51.18       54.58       6.64%        46.83       16.55%                                    22.97
Foreman                                  51.18       54.58       6.64%        46.83       16.55%                                    22.97
General Foreman                          54.67       58.38       6.79%        46.83       24.66%                                    22.97

ELEVATOR CONSTRUCTOR                 -           -                                                  Y        7.08%
Elevator Constructor-Journeyman          46.01       78.21      69.98%        76.43        2.33%
Elevator Constructor-Mechanic in
Mechanic                                 46.01       85.48      85.79%        76.43       11.84%
Charge
FENCE ERECTOR                                                                                       Y        0.00%
Fence Erector                            37.56       37.69       0.35%        37.69        0.00%

                                      ADD
                                     LABORER
FLAGPERSON (not surveyed set by      ZONE
Laborers Union every year)           RATE 
Flagperson                               27.95       27.95       0.00%

FLOOR COVERER                                                                                       Y        3.65%
Floor Coverer-Journeyman                 36.26       36.34       0.22%        36.31        0.08%
Floor Coverer-Foreman                    38.90       38.93       0.08%        36.31        7.22%

GLAZIER                                                                                             Y        1.91%
Glazier                                  21.50       22.42       4.28%        22.00        1.91%

                                      ADD
                                     LABORER
                                     ZONE
HIGHWAY STRIPER                                                                                     Y        0.00%
                                     RATE 
                                                                         66
                                                                                 Difference
                                                            Annual    2011 PW   Between PW                                       DETR
 DOUGLAS                                                   Growth,     Survey Rates and Survey Union  Union %      Non-Union %   Mean
 Average Construction Wage $20.78   PW 2010    PW 2011    2010 - 2011 Average       Avg.        Y/N  Difference     Difference   Wages
Average                                                       5.85%                     5.99%             4.98%          1.27%
Highway Striper                        33.57      33.57       0.00%    33.57            0.00%

                                     ADD
HOD CARRIER-BRICK MASON             ZONE
TENDER                              RATE                                                         Y        0.83%
Brick Mason-Journeyman                 30.10      30.10       0.00%    30.10            0.00%
Brick Mason-Foreman                    30.60      30.60       0.00%    30.10            1.66%

                               ADD
                              ZONE
HOD CARRIER-PLASTERER TENDER  RATE                                                               Y        3.81%
Plasterer Tender-Journeyman       33.76           34.26       1.48%    33.76            1.48%
Plasterer Tender-Gun Tender       34.76           35.26       1.44%    33.76            4.44%
Plasterer Tender-Foreman          35.12           35.62       1.42%    33.76            5.51%


                                    SEE
                                    AMENDM
IRON WORKER                         ENT 1                                                        Y        4.80%
Ironworker-Journeyman                  54.38      56.74       4.34%    57.31           -0.99%
Ironworker-Foreman                     57.68      60.04       4.09%    57.31            4.76%
Ironworker-General Foreman             61.04      63.40       3.87%    57.31           10.63%

                                     ADD
LABORER                             ZONE                                                         Y        -0.80%
SEE GROUP CLASSIFICATIONS           RATE
Landscaper                             25.66      25.66       0.00%    30.63           -16.23%                                    15.94
Furniture Mover                        27.16      27.16       0.00%    30.63           -11.33%                                    15.94
Group 1                                30.82      30.82       0.00%    30.63             0.62%                                    15.94
Group 1A                               27.95      27.95       0.00%    30.63            -8.75%                                    15.94
Group 2                                30.92      30.92       0.00%    30.63             0.95%                                    15.94
Group 3                                31.07      31.07       0.00%    30.63             1.44%                                    15.94
Group 4                                31.32      31.32       0.00%    30.63             2.25%                                    15.94
Group 4A                               32.57      32.57       0.00%    30.63             6.33%                                    15.94
Group 5                                31.62      31.62       0.00%    30.63             3.23%                                    15.94
Group 6
Nozzlemen, Rodmen                      31.62      31.62       0.00%    30.63            3.23%                                     15.94
Gunmen, Materialmen                    31.32      31.32       0.00% 67 30.63            2.25%                                     15.94
                                                                                        Difference
                                                                   Annual    2011 PW   Between PW                                       DETR
 DOUGLAS                                                          Growth,     Survey Rates and Survey Union  Union %      Non-Union %   Mean
 Average Construction Wage $20.78        PW 2010     PW 2011     2010 - 2011 Average       Avg.        Y/N  Difference     Difference   Wages
Average                                                              5.85%                     5.99%             4.98%          1.27%
Reboundmen                                   30.97       30.97       0.00%         30.63       1.11%                                     15.94
Gunite Foremen                               32.02       32.02       0.00%         30.63       4.54%                                     15.94

                                         SEE
                                         AMENDM
MECHANICAL INSULATOR                     ENT 2-                                                         Y        -0.08%
Mechanical Insulator-Mechanic                57.06       54.56       -4.38%        56.77       -3.89%
Mechanical Insulator-Foreman                 59.56       57.06       -4.20%        56.77        0.51%
Mechanical Insulator-General Foreman         61.06       58.56       -4.09%        56.77        3.15%

MILLWRIGHT                                                                                              N                       0.00%
Millwright                                   49.70       25.01      -49.68%        25.01       0.00%

                                          ADD
OPERATING ENGINEER                       ZONE                                                           Y        8.88%
SEE GROUP CLASSIFICATIONS                RATE 
Group 1                                      41.33       43.08       4.23%         46.84      -8.03%                                     22.08
Group 1A                                     44.09       45.84       3.97%         46.84      -2.13%                                     22.08
Group 2                                      44.62       46.37       3.92%         46.84      -1.00%                                     22.08
Group 3                                      44.89       46.64       3.90%         46.84      -0.43%                                     22.08
Group 4                                      45.63       47.38       3.84%         46.84       1.15%                                     22.08
Group 5                                      45.93       47.68       3.81%         46.84       1.79%                                     22.08
Group 6                                      46.10       47.85       3.80%         46.84       2.16%                                     22.08
Group 7                                      46.35       48.10       3.78%         46.84       2.69%                                     22.08
Group 8                                      46.94       48.69       3.73%         46.84       3.95%                                     22.08
Group 9                                      47.26       49.01       3.70%         46.84       4.63%                                     22.08
Group 10                                     47.61       49.36       3.68%         46.84       5.38%                                     22.08
Group 10A                                    47.80       49.55       3.66%         46.84       5.79%                                     22.08
Group 11                                     48.04       49.79       3.64%         46.84       6.30%                                     22.08
Group 11A                                    49.68       51.43       3.52%         46.84       9.80%                                     22.08
Group 11B                                    50.49       52.24       3.47%         46.84      11.53%                                     22.08
Foreman                                      49.68       51.43       3.52%         46.84       9.80%                                     22.08
Add 7% to base rate for "Second" Shift   -           -
Add 12.5% to base rate for "Special"     -           -
shift
OPERATING ENGINEER-STEEL                  ADD
FABRICATOR & ERECTOR                     ZONE
SEE GROUP CLASSIFICATIONS                RATE                                 68
                                                                                         Difference
                                                                    Annual    2011 PW   Between PW                                      DETR
 DOUGLAS                                                           Growth,     Survey Rates and Survey Union  Union %     Non-Union %   Mean
 Average Construction Wage $20.78        PW 2010     PW 2011      2010 - 2011 Average       Avg.        Y/N  Difference    Difference   Wages
Average                                                               5.85%                     5.99%             4.98%         1.27%
Group 1                                      56.63        58.38       3.09%    46.84           24.64%                                    22.08
Group 1 Truck Crane Oiler                    50.46        52.21       3.47%    46.84           11.46%                                    22.08
Group 1 Oiler                                48.50        50.25       3.61%    46.84            7.28%                                    22.08
Group 2                                      55.12        56.87       3.17%    46.84           21.41%                                    22.08
Group 2 Truck Crane Oiler                    50.21        51.96       3.49%    46.84           10.93%                                    22.08
Group 2 Oiler                                48.29        50.04       3.62%    46.84            6.83%                                    22.08
Group 3                                      53.88        55.63       3.25%    46.84           18.77%                                    22.08
Group 3 Truck Crane Oiler                    49.99        51.74       3.50%    46.84           10.46%                                    22.08
Group 3 Oiler                                48.07        49.82       3.64%    46.84            6.36%                                    22.08
Group 3 Hydraulic                            49.66        51.41       3.52%    46.84            9.76%                                    22.08
Group 4                                      52.15        53.90       3.36%    46.84           15.07%                                    22.08
Group 5                                      51.05        52.80       3.43%    46.84           12.72%                                    22.08
Add 7% to base rate for "Second" Shift   -           -
Add 12.5% to base rate for "Special"
Shift
                                          ADD
OPERATING ENGINEER -PILEDRIVER           ZONE
SEE GROUP CLASSIFICATIONS                RATE 
Group 1                                      56.10        57.85       3.12%    46.84           23.51%                                    22.08
Group 1 Truck Crane Oiler                    50.64        52.39       3.46%    46.84           11.85%                                    22.08
Group 1 Oiler                                48.72        50.47       3.59%    46.84            7.75%                                    22.08
Group 2                                      54.56        56.31       3.21%    46.84           20.22%                                    22.08
Group 2 Truck Crane Oiler                    50.43        52.18       3.47%    46.84           11.40%                                    22.08
Group 2 Oiler                                48.52        50.27       3.61%    46.84            7.32%                                    22.08
Group 3                                      53.11        54.86       3.30%    46.84           17.12%                                    22.08
Group 3 Truck Crane Oiler                    50.21        51.96       3.49%    46.84           10.93%                                    22.08
Group 3 Oiler                                48.29        50.04       3.62%    46.84            6.83%                                    22.08
Group 4                                      51.60        53.35       3.39%    46.84           13.90%                                    22.08
Group 5                                      50.49        52.24       3.47%    46.84           11.53%                                    22.08
Group 6                                      49.38        51.13       3.54%    46.84            9.16%                                    22.08
Group 7                                      48.42        50.17       3.61%    46.84            7.11%                                    22.08
Group 8                                      47.46        49.21       3.69%    46.84            5.06%                                    22.08
Add 7% to base for "Second" Shift        -           -
Add 12.5% to base for "Special" Shift    -           -


PAINTER                                              CC                                                 Y         4.59%
Brush/Roller Painter                         32.74        32.74       0.00% 69 32.03            2.22%                                    18.94
                                                                                         Difference
                                                                    Annual    2011 PW   Between PW                                      DETR
 DOUGLAS                                                           Growth,     Survey Rates and Survey Union  Union %     Non-Union %   Mean
 Average Construction Wage $20.78        PW 2010      PW 2011     2010 - 2011 Average       Avg.        Y/N  Difference    Difference   Wages
Average                                                               5.85%                     5.99%             4.98%         1.27%
Spray Painter/Paperhanger                    33.59       33.59        0.00%    32.03            4.87%                                    18.94
Sandblaster                                  33.24       33.24        0.00%    32.03            3.78%                                    18.94
Structural Steel & Steeplejack               33.74       33.74        0.00%    32.03            5.34%                                    18.94
Swing Stage                                  34.74       34.74        0.00%    32.03            8.46%                                    18.94
Special Coating Application-Brush            33.24       33.24        0.00%    32.03            3.78%                                    18.94
Special Coating Application-Spray            33.74       33.74        0.00%    32.03            5.34%                                    18.94
Special Coating Application-Spray Steel      33.99       33.99        0.00%    33.03            2.91%                                    18.94
                                         $1.00        $1.00
                                        above        above
                                        highest      highest
                                        Journeyma    Journeyman
Foreman                                 n 

PILEDRIVER                                                                                               Y
Piledriver-Journeyman                       58.47        58.47        0.00%
Piledriver-Foreman                          62.05        62.05        0.00%

                                        ADD
                                       ZONE
PLASTERER                              RATE                                                              Y        1.71%
Plasterer-Journeyman                        34.27        34.77        1.46%    35.29            -1.47%
Plasterer-Foreman                           35.59        37.02        4.02%    35.29             4.90%

PLUMBER/PIPEFITTER                      -            -                                                   Y       14.11%
Plumber                                     45.20        45.20        0.00%    39.61           14.11%

REFRIGERATION                           -            -                                                   Y        4.52%
Refrigeration                               30.92        41.58       34.48%    39.78            4.52%

ROOFER (Does not include sheet metal                                                                     N                      0.00%
roofs)
Roofer                                      19.69        17.16       -12.85%   17.16            0.00%                                    17.60

                                        ADD
                                       ZONE
SHEET METAL WORKER                     RATE                                                              Y       13.35%
Sheet Metal-Journeyman                      46.60        48.35        3.76%    45.40            6.50%
Sheet Metal-Foreman                         49.62        51.46        3.71%    45.40           13.35%
Sheet Metal-General Foreman                 52.64        54.57        3.67% 70 45.40           20.20%
                                                                                     Difference
                                                                Annual    2011 PW   Between PW                                      DETR
 DOUGLAS                                                       Growth,     Survey Rates and Survey Union  Union %     Non-Union %   Mean
 Average Construction Wage $20.78    PW 2010     PW 2011      2010 - 2011 Average       Avg.        Y/N  Difference    Difference   Wages
Average                                                           5.85%                     5.99%             4.98%         1.27%

SPRINKLER FITTER                     -           -                                                   Y        4.72%
Sprinkler Fitter-Journeyman              52.30        53.45       2.20%         53.51       -0.11%
Sprinkler Fitter-Foreman                 55.05        56.20       2.09%         53.51        5.03%
Sprinkler Fitter-General Foreman         57.30        58.45       2.01%         53.51        9.23%

SURVEYOR                                                                                             N                      0.00%
Surveyor                                 43.24        31.15      -27.96%        31.15       0.00%                                    31.44

TAPER                                -           -                                                   Y        1.23%
Taper                                    35.49        36.28       2.23%         35.84       1.23%

TILE SETTER/TERRAZZO WORKER/          ADD                                                            Y        1.02%
MARBLE MASON-FINISHER
Tile, Terrazzo and Marble Finisher   ZONE32.48        24.77      -23.74%        24.52       1.02%
                                     RATE
TILE SETTER/TERRAZZO WORKER/          ADD                                                            Y        4.15%
MARBLE MASON
Tile Setter-Journeyman               ZONE25.00        32.87      31.48%         33.64      -2.29%
Tile Setter-Foreman                  RATE25.00        34.12      36.48%         33.64       1.43%
Tile Setter-General Formean              25.00        35.87      43.48%         33.64       6.63%
Terrazzo/Marble Mason-Journeyman         25.00        34.37      37.48%         33.64       2.17%
Terrazzo/Marble Mason-Foreman            25.00        35.62      42.48%         33.64       5.89%
Terrazzo/Marble Mason-General            25.00        37.37      49.48%         33.64      11.09%
Foreman

                                      ADD
                                     LABORER
                                     ZONE
TRAFFIC BARRIER ERECTOR              RATE
Traffic Barrier Erector                  30.82        30.82       0.00%

TRUCK DRIVER                                     Washoe                                              N                      2.16%
Truck Driver                             21.61        20.80       -3.75%        20.36       2.16%                                    15.43

WELL DRILLER                                     CC                                                  N                      0.00%
Well Driller                             21.32        54.49     155.58%         54.49       0.00%



                                                                           71
                                                                                 Difference
                                                            Annual    2011 PW   Between PW                                       DETR
 DOUGLAS                                                   Growth,     Survey Rates and Survey Union  Union %      Non-Union %   Mean
 Average Construction Wage $20.78   PW 2010    PW 2011    2010 - 2011 Average       Avg.        Y/N  Difference     Difference   Wages
Average                                                       5.85%                     5.99%             4.98%          1.27%
                                     ADD
LUBRICATION AND SERVICE             LABORER
ENGINEER (MOBILE AND GREASE         ZONE
RACK)                               RATE                                                         Y        2.16%
Lubrication and Service Engineer       46.10      47.85       3.80%        46.84        2.16%
(mobile and grease rack)
SOIL TESTER (CERTIFIED)                                                                          Y        -0.30%
Soil Tester (Certified)                44.64      56.62      26.84%        56.79        -0.30%

SOILS AND MATERIALS TESTER                                                                                -0.30%
Soils and Materials Tester             44.64      56.62      26.84%        56.79        -0.30%

Union Breakdown
Union                                                                                            30
Non-Union                                                                                        8
Total                                                                                            38




                                                                      72
DETR Mean
Wage + 40%      Wage
 Benefits      Premium
                  49.19%




       37.00      -11.68%
         -


         -
       31.16      24.50%
       31.16      33.33%
         -
         -
       33.08       3.98%
       33.08      10.03%
         -
         -
         -
         -
         -
         -
         -
         -                  73
DETR Mean
Wage + 40%      Wage
 Benefits      Premium
                  49.19%
         -
         -
         -
         -
         -
         -
         -
         -
         -
       32.16      57.91%
       32.16      69.72%
       32.16      69.72%
       32.16      81.54%
         -
         -
         -
         -
         -
         -
         -
         -



         -
         -
         -
         -
         -
         -
         -
         -
         -
         -



         -
                           74
DETR Mean
Wage + 40%      Wage
 Benefits      Premium
                  49.19%
         -
         -


         -
         -
         -
         -


         -
         -
         -
         -
         -




         -
         -
         -
         -
         -

         -
         -
       22.32      14.98%
       22.32      21.71%
       22.32      38.11%
       22.32      25.25%
       22.32      38.56%
       22.32      39.23%
       22.32      40.35%
       22.32      45.95%
       22.32      41.69%
         -
       22.32      41.69%
       22.32      40.35%   75
DETR Mean
Wage + 40%      Wage
 Benefits      Premium
                  49.19%
       22.32      38.78%
       22.32      43.48%
         -


         -
         -
         -
         -
         -
         -
         -
         -

         -
         -
       30.91      39.36%
       30.91      48.29%
       30.91      50.01%
       30.91      50.88%
       30.91      53.27%
       30.91      54.24%
       30.91      54.79%
       30.91      55.60%
       30.91      57.51%
       30.91      58.55%
       30.91      59.68%
       30.91      60.29%
       30.91      61.07%
       30.91      66.38%
       30.91      69.00%
       30.91      66.38%
         -
         -
         -

         -
         -                 76
DETR Mean
Wage + 40%      Wage
 Benefits      Premium
                  49.19%
       30.91      88.86%
       30.91      68.90%
       30.91      62.56%
       30.91      83.97%
       30.91      68.09%
       30.91      61.88%
       30.91      79.96%
       30.91      67.38%
       30.91      61.17%
       30.91      66.31%
       30.91      74.37%
       30.91      70.81%
         -
         -
         -

         -
         -
       30.91      87.14%
       30.91      69.48%
       30.91      63.27%
       30.91      82.16%
       30.91      68.80%
       30.91      62.62%
       30.91      77.47%
       30.91      68.09%
       30.91      61.88%
       30.91      72.59%
       30.91      69.00%
       30.91      65.41%
       30.91      62.30%
       30.91      59.19%
         -
         -
         -
         -
         -
       26.52      23.47%   77
DETR Mean
Wage + 40%      Wage
 Benefits      Premium
                  49.19%
       26.52      26.68%
       26.52      25.36%
       26.52      27.24%
       26.52      31.02%
       26.52      25.36%
       26.52      27.24%
       26.52      28.19%




         -
         -
         -
         -
         -
         -


         -
         -
         -
         -
         -
         -
         -
         -
         -
         -
         -
       24.64      -30.36%
         -


         -
         -
         -
         -                  78
DETR Mean
Wage + 40%      Wage
 Benefits      Premium
                  49.19%
         -
         -
         -
         -
         -
         -
         -
       44.02      -29.23%
         -
         -
         -
         -
         -
         -
         -
         -
         -
         -
         -
         -
         -
         -
         -
         -



         -
         -
         -
         -
       21.60       -3.71%
         -
         -
         -
         -

                            79
DETR Mean
Wage + 40%    Wage
 Benefits    Premium
                49.19%



        -
        -
        -
        -
        -
        -
        -
        -




                         80
                                                      Annual    2011 PW           Difference Between                         Non-Union
 ELKO                                                Growth,     Survey              PW Rates and       Union    Union %          %
 Average Construction Wage $20.46   PW 2010 PW 2011 2010 - 2011 Average               Survey Avg.        Y/N    Difference   Difference
Average                                                      1.41%                             -2.52%                0.15%       -8.93%

AIR BALANCE TECHNICIAN                                                                                   Y          45.08%
Air Balance-Journeyman                  46.60       48.35   3.76%         35.47               36.31%
Air Balance-Foreman                     49.62       51.46   3.71%         35.47               45.08%
Air Balance-General Foreman             52.64       54.57   3.67%         35.47               53.85%

ALARM INSTALLER                                                                                          Y           0.00%
Alarm Installer                         30.88       31.61   2.36%         31.61                0.00%

BOILERMAKER                         -           Clark                                                    Y           1.87%
Boilermaker-Journeyman                  59.50       65.94   10.82%        64.73                1.87%
Boilermaker-Foreman                     59.50       65.94   10.82%        64.73                1.87%
Boilermaker-General Foreman             59.50       65.94   10.82%        64.73                1.87%

                                     ADD
                                    ZONE
BRICKLAYER                          RATE-       Eureka                                                   Y         -28.07%
Bricklayer                              32.68       32.68   0.00%         45.43              -28.07%

                                     ADD
                                    ZONE
CARPENTER                           RATE                                                                 Y          -0.46%
Carpenter                               38.30       38.80   1.31%         38.98               -0.46%

CEMENT MASON                                                                                             Y           0.54%
Cement Mason-Journeyman                 34.40       34.40   0.00%         35.21               -2.30%
Cement Mason-Foreman                    36.40       36.40   0.00%         35.21                3.38%

ELECTRICIAN-COMMUNICATION
TECHNICIAN                                                                                               Y           1.10%
Communication Technician                27.97       29.36   4.97%         29.04                1.10%

ELECTRICIAN-LINEMAN/GROUNDMAN/                  Humboldt                                                 Y           2.20%
Electrician-Groundman
HEAVY EQUIPMENT OPERATOR                39.19       40.50   3.34%         55.87              -27.51%
Electrician-Lineman                     57.91       59.90   3.44%         55.87                7.21%
Electrician-Foreman                     63.02       65.16   3.40%         55.87               16.63%
Electrician-General Foreman             68.12       70.45   3.42%         55.87               26.10%
Electrician-Equipment Specialist        47.86       49.49   3.41%         55.87              -11.42%
                                                                     81
                                                             Annual    2011 PW           Difference Between                         Non-Union
 ELKO                                                       Growth,     Survey              PW Rates and       Union    Union %          %
 Average Construction Wage $20.46          PW 2010 PW 2011 2010 - 2011 Average               Survey Avg.        Y/N    Difference   Difference
Average                                                             1.41%                             -2.52%                0.15%       -8.93%

ELECTRICIAN-NEON SIGN                      -           Clark                                                    Y           0.57%
Electrician-Neon Sign                          44.31       45.52   2.73%         45.26                0.57%

ELECTRICIAN-WIREMAN                        -           -                                                        Y           7.87%
Wireman                                        41.58       50.78   22.13%        50.60                0.36%
Cable Splicer                                  41.58       54.58   31.27%        50.60                7.87%
Foreman                                        41.58       54.58   31.27%        50.60                7.87%
General Foreman                                41.58       58.38   40.40%        50.60               15.38%

ELEVATOR CONSTRUCTOR                       -           Churchill                                                Y          13.48%

Elevator Constructor-Journeyman Mechanic       46.01       78.21   69.98%        72.12                8.44%
Elevator Constructor-Mechanic in Charge        46.01       85.48   85.79%        72.12               18.52%

                                            ADD
                                           LABORE
                                           R ZONE
FENCE ERECTOR                              RATE                                                                 Y           0.00%
Fence Erector                                  30.82       35.47   15.09%        35.47                0.00%

                                            ADD
                                           LABORE
FLAGPERSON (not surveyed set by            R ZONE
Laborers Union every year)                 RATE
Flagperson                                     27.95       27.95   0.00%

FLOOR COVERER                                          Churchill                                                Y           3.65%
Floor Coverer-Journeyman                       36.26       36.34   0.22%         36.31                0.08%
Floor Coverer-Foreman                          38.90       38.93   0.08%         36.31                7.22%

GLAZIER                                    -           -                                                        N                       -0.82%
Glazier                                        21.50       20.50   -4.65%        20.67               -0.82%

                                            ADD
                                           LABORE
                                           R ZONE
HIGHWAY STRIPER                            RATE                                                                 Y           0.00%
                                                                            82
                                                      Annual    2011 PW       Difference Between                         Non-Union
 ELKO                                                Growth,     Survey          PW Rates and       Union    Union %          %
 Average Construction Wage $20.46   PW 2010 PW 2011 2010 - 2011 Average           Survey Avg.        Y/N    Difference   Difference
Average                                                  1.41%                             -2.52%                0.15%       -8.93%
Highway Striper                       33.57      33.57   0.00%        33.57                0.00%

                                     ADD
                                    ZONE
HOD CARRIER-BRICK MASON TENDER      RATE                                                             Y           0.83%
Brick Mason-Journeyman                30.10      30.10   0.00%        30.10                0.00%
Brick Mason-Foreman                   30.60      30.60   0.00%        30.10                1.66%

                                     ADD
                                    ZONE
HOD CARRIER-PLASTERER TENDER        RATE      Washoe                                                 Y           3.90%
Plasterer Tender-Journeyman           33.76      34.26   1.48%        33.73                1.57%
Plasterer-Gun Tender                  34.76      35.26   1.44%        33.73                4.54%
Plasterer Tender-Foreman              35.12      35.62   1.42%        33.73                5.60%

                                    SEE
                                    AMENDM
IRON WORKER                         ENT 1-                                                           Y           4.80%
Ironworker-Journeyman                 54.38      56.74   4.34%        57.31               -0.99%
Ironworker-Foreman                    57.68      60.04   4.09%        57.31                4.76%
Ironworker-General Foreman            61.04      63.40   3.87%        57.31               10.63%

LABORER                              ADD                                                             Y          -6.16%
SEE GROUP CLASSIFICATIONS           ZONE
                                    RATE
Landscaper                            25.66      25.66   0.00%        32.38              -20.75%
Furniture Mover                       27.16      27.16   0.00%        32.38              -16.12%
Group 1                               30.82      30.82   0.00%        32.38               -4.82%
Group 1A                              27.95      27.95   0.00%        32.38              -13.68%
Group 2                               30.92      30.92   0.00%        32.38               -4.51%
Group 3                               31.07      31.07   0.00%        32.38               -4.05%
Group 4A                              31.32      31.32   0.00%        32.38               -3.27%
Group 4                               32.57      32.57   0.00%        32.38                0.59%
Group 5                               31.62      31.62   0.00%        32.38               -2.35%
Group 6                               29.72      29.72
Nozzlemen, Rodmen                     31.62      31.62   0.00%        32.38               -2.35%
Gunmen, Materialmen                   31.32      31.32   0.00%        32.38               -3.27%
Reboundmen                            30.97      30.97   0.00%        32.38               -4.35%
                                                                 83
                                                               Annual    2011 PW            Difference Between                         Non-Union
 ELKO                                                         Growth,     Survey               PW Rates and       Union    Union %          %
 Average Construction Wage $20.46            PW 2010 PW 2011 2010 - 2011 Average                Survey Avg.        Y/N    Difference   Difference
Average                                                               1.41%                              -2.52%                0.15%       -8.93%
Gunite Foremen                                   32.02       32.02    0.00%         32.38               -1.11%

                                             SEE
                                             AMENDM
MECHANICAL INSULATOR                         ENT 2- Washoe                                                         Y          -0.08%
Mechanical Insulator-Journeyman                  57.06       54.56    -4.38%        56.77               -3.89%
Mechanical Insulator-Foreman                     59.56       57.06    -4.20%        56.77                0.51%
Mechanical Insulator-General Foreman             61.06       58.56    -4.09%        56.77                3.15%

MILLWRIGHT                                                                                                         N                        0.00%
Millwright-Journeyman                            49.70       25.33   -49.03%        25.33                0.00%
Millwright-Welder                                50.70       25.33   -50.04%        25.33                0.00%
Millwright-Foreman                               53.01       25.33   -52.22%        25.33                0.00%
Millwright-General Foreman                       56.65       25.33   -55.29%        25.33                0.00%

                                              ADD
OPERATING ENGINEER                           ZONE                                                                  Y          -8.36%
SEE GROUP CLASSIFICATIONS                    RATE
Group 1                                          41.33       43.08    4.23%         55.65              -22.59%
Group 1A                                         44.09       45.84    3.97%         55.65              -17.63%
Group 2                                          44.62       46.37    3.92%         55.65              -16.68%
Group 3                                          44.89       46.64    3.90%         55.65              -16.19%
Group 4                                          45.63       47.38    3.84%         55.65              -14.86%
Group 5                                          45.93       47.68    3.81%         55.65              -14.32%
Group 6                                          46.10       47.85    3.80%         55.65              -14.02%
Group 7                                          46.35       48.10    3.78%         55.65              -13.57%
Group 8                                          46.94       48.69    3.73%         55.65              -12.51%
Group 9                                          47.26       49.01    3.70%         55.65              -11.93%
Group 10                                         47.61       49.36    3.68%         55.65              -11.30%
Group 10A                                        47.80       49.55    3.66%         55.65              -10.96%
Group 11                                         48.04       49.79    3.64%         55.65              -10.53%
Group 11A                                        49.68       51.43    3.52%         55.65               -7.58%
Group 11B                                        50.49       52.24    3.47%         55.65               -6.13%
Foreman                                          49.68       51.43    3.52%         55.65               -7.58%
Add 7% to base rate for "Second" Shift       -           -
Add 12.5% to base rate for "Special" shift   -           -


                                                                               84
                                                               Annual    2011 PW          Difference Between                         Non-Union
 ELKO                                                         Growth,     Survey             PW Rates and       Union    Union %          %
 Average Construction Wage $20.46            PW 2010 PW 2011 2010 - 2011 Average              Survey Avg.        Y/N    Difference   Difference
Average                                                              1.41%                             -2.52%                0.15%       -8.93%
OPERATING ENGINEER-STEEL                      ADD         ADD
FABRICATOR & ERECTOR                         ZONE        ZONE
SEE GROUP CLASSIFICATIONS                    RATE        RATE
Group 1                                          56.63       58.38   3.09%        55.65                4.91%
Group 1 Truck Crane Oiler                        50.46       52.21   3.47%        55.65               -6.18%
Group 1 Oiler                                    48.50       50.25   3.61%        55.65               -9.70%
Group 2                                          55.12       56.87   3.17%        55.65                2.19%
Group 2 Truck Crane Oiler                        50.21       51.96   3.49%        55.65               -6.63%
Group 2 Oiler                                    48.29       50.04   3.62%        55.65              -10.08%
Group 3                                          53.88       55.63   3.25%        55.65               -0.04%
Group 3 Truck Crane Oiler                        49.99       51.74   3.50%        55.65               -7.03%
Group 3 Oiler                                    48.07       49.82   3.64%        55.65              -10.48%
Group 3 Hydraulic                                49.66       51.41   3.52%        55.65               -7.62%
Group 4                                          52.15       53.90   3.36%        55.65               -3.14%
Group 5                                          51.05       52.80   3.43%        55.65               -5.12%
Add 7% to base rate for "Second" Shift       -           -
Add 12.5% to base rate for "Special" Shift

                                              ADD         ADD
OPERATING ENGINEER -PILEDRIVER               ZONE        ZONE
SEE GROUP CLASSIFICATIONS                    RATE        RATE
Group 1                                          56.10       57.85   3.12%        55.65                3.95%
Group 1 Truck Crane Oiler                        50.64       52.39   3.46%        55.65               -5.86%
Group 1 Oiler                                    48.72       50.47   3.59%        55.65               -9.31%
Group 2                                          54.56       56.31   3.21%        55.65                1.19%
Group 2 Truck Crane Oiler                        50.43       52.18   3.47%        55.65               -6.24%
Group 2 Oiler                                    48.52       50.27   3.61%        55.65               -9.67%
Group 3                                          53.11       54.86   3.30%        55.65               -1.42%
Group 3 Truck Crane Oiler                        50.21       51.96   3.49%        55.65               -6.63%
Group 3 Oiler                                    48.29       50.04   3.62%        55.65              -10.08%
Group 4                                          51.60       53.35   3.39%        55.65               -4.13%
Group 5                                          50.49       52.24   3.47%        55.65               -6.13%
Group 6                                          49.38       51.13   3.54%        55.65               -8.12%
Group 7                                          48.42       50.17   3.61%        55.65               -9.85%
Group 8                                          47.46       49.21   3.69%        55.65              -11.57%
Add 7% to base for "Second" Shift            -           -
Add 12.5% to base for "Special" Shift        -           -

                                                                             85
                                                            Annual    2011 PW            Difference Between                         Non-Union
 ELKO                                                      Growth,     Survey               PW Rates and       Union    Union %          %
 Average Construction Wage $20.46         PW 2010 PW 2011 2010 - 2011 Average                Survey Avg.        Y/N    Difference   Difference
Average                                                            1.41%                              -2.52%                0.15%       -8.93%
PAINTER                                                                                                         Y           2.21%
Brush/Roller Painter                          32.74       32.74    0.00%         32.90               -0.49%
Spray Painter/Paperhanger                     33.59       33.59    0.00%         32.90                2.10%
Sandblaster                                   33.24       33.24    0.00%         32.90                1.03%
Structural Steel & Steeplejack                33.74       33.74    0.00%         32.90                2.55%
Swing Stage                                   34.74       34.74    0.00%         32.90                5.59%
Special Coating Application-Brush             33.24       33.24    0.00%         32.90                1.03%
Special Coating Application-Spray             33.74       33.74    0.00%         32.90                2.55%
Special Coating Application-Spray Steel       33.99       33.99    0.00%         32.90                3.31%
                                           $1.00       $1.00
                                          above       above
                                          highest     highest
                                          Journeym    Journeyma
Foreman                                   an          n 

PILEDRIVER                                                                                                      Y
Piledriver-Journeyman                         58.47       58.47    0.00%
Piledriver-Foreman                            62.05       62.05    0.00%

                                           ADD
                                          ZONE
PLASTERER                                 RATE        Washoe                                                    Y          -1.47%
Plasterer                                     34.27       34.77    1.46%         35.29               -1.47%

PLUMBER/PIPEFITTER                        -           -                                                         N                      -16.78%
Plumber/Pipefitter                            36.24       19.00   -47.57%        22.83              -16.78%

REFRIGERATION                             -           -                                                         N                        0.00%
Refrigeration-Journeyman                      27.52       19.00   -30.96%        19.00                0.00%
Refrigeration-Foreman                         27.52       19.00   -30.96%        19.00                0.00%
Refrigeration-General Foreman                 27.52       19.00   -30.96%        19.00                0.00%

ROOFER                                                -                                                         N                        0.00%
(Does not include sheet metal roofs)      -
Roofer                                        18.64       20.11    7.89%         20.11                0.00%

SHEET METAL WORKER                                                                                              N                      -26.85%
Sheet Metal Worker                            30.00       20.00   -33.33%        27.34              -26.85%
                                                                            86
                                                          Annual    2011 PW            Difference Between                         Non-Union
 ELKO                                                    Growth,     Survey               PW Rates and       Union    Union %          %
 Average Construction Wage $20.46       PW 2010 PW 2011 2010 - 2011 Average                Survey Avg.        Y/N    Difference   Difference
Average                                                          1.41%                              -2.52%                0.15%       -8.93%

SPRINKLER FITTER                        -           -                                                         N                      -42.58%
Sprinkler Fitter-Journeyman                 52.30       19.00   -63.67%        33.09              -42.58%
Sprinkler Fitter-Foreman                    55.05       19.00   -65.49%        33.09              -42.58%
Sprinkler Fitter-General Foreman            57.30       19.00   -66.84%        33.09              -42.58%

SURVEYOR                                            Churchill                                                 N                        0.00%
Surveyor                                    46.85       25.63   -45.29%        25.63                0.00%

TAPER                                   -           -                                                         Y           1.23%
Taper                                       35.49       36.28    2.23%         35.84                1.23%

                                         ADD
TILE SETTER/TERRAZZO WORKER/            ZONE
MARBLE MASON-FINISHER                   RATE        Washoe                                                    Y           1.02%
Tile, Terrazzo and Marble Finisher          32.48       24.77   -23.74%        24.52                1.02%

                                         ADD
TILE SETTER/TERRAZZO WORKER/            ZONE
MARBLE MASON                            RATE                                                                  Y           4.15%
Tile Setter-Journeyman                      35.99       32.87    -8.67%        33.64               -2.29%
Tile Setter-Foreman                         35.99       34.12    -5.20%        33.64                1.43%
Tile Setter-General Formean                 35.99       35.87    -0.33%        33.64                6.63%
Terrazzo/Marble Mason-Journeyman            35.99       34.37    -4.50%        33.64                2.17%
Terrazzo/Marble Mason-Foreman               35.99       35.62    -1.03%        33.64                5.89%
Terrazzo/Marble Mason-General Foreman       35.99       37.37     3.83%        33.64               11.09%


                                         ADD    ADD
                                        LABORE LABORER
                                        R ZONE ZONE
TRAFFIC BARRIER ERECTOR                 RATE   RATE
Traffic Barrier Erector                     30.82       30.82    0.00%

                                         ADD         ADD
                                        ZONE        ZONE
TRUCK DRIVER                            RATE        RATE                                                      Y          -2.25%       -2.25%

                                                                          87
                                                               Annual    2011 PW      Difference Between                         Non-Union
  ELKO                                                        Growth,     Survey         PW Rates and       Union    Union %          %
  Average Construction Wage $20.46           PW 2010 PW 2011 2010 - 2011 Average          Survey Avg.        Y/N    Difference   Difference
Average                                                            1.41%                           -2.52%                0.15%       -8.93%
Dump Trucks (Single or Multiple Units Including
Semi's & Double Transfer Units), Dumpcretes and
Bulk Cement Spreader)
Under 4 yds. (water level)                     35.02    39.51    12.82%     40.42                 -2.25%
4 yds. & under 8 yds. (water level)            35.24    39.51    12.12%     40.42                 -2.25%
8 yds. & under 18 yds. (water level)           35.45    39.51    11.45%     40.42                 -2.25%
18 yds. & under 25 yds. ( water level)         35.62    39.51    10.92%     40.42                 -2.25%
25 yds. & under 60 yds. (water level)          36.04    39.51     9.63%     40.42                 -2.25%
60 yds. & under 75 yds. (water level)          37.48    39.51     5.42%     40.42                 -2.25%
75 yds. & under 100 yds. (water level)         38.43    39.51     2.81%     40.42                 -2.25%
100 yds. & under 150 yds.(water level)         38.90    39.51     1.57%     40.42                 -2.25%
150 yds. & under 250 yds. ( water level)       40.90    39.51    -3.40%     40.42                 -2.25%
250 yds. & under 350 yds. (water level)        43.90    39.51   -10.00%     40.42                 -2.25%
350 yds. & over (water level)                  45.40    39.51   -12.97%     40.42                 -2.25%
Transit Mix
Under 8 yds.                                   35.45    39.51    11.45%     40.42                 -2.25%
8 yds. & including 12 yds.                     35.56    39.51    11.11%     40.42                 -2.25%
Over 12 yds.                                   35.78    39.51    10.42%     40.42                 -2.25%
Transit Mix (Using Boom)
Transit mix with boom shall receive 16
cents per hour
above the appropriate yardage classification
rate of pay 
when such boom is used
Water & Jetting Trucks
Up to 2,500 gallons                            35.43    39.51    11.52%     40.42                 -2.25%
2,500 gallons & over                           35.45    39.51    11.45%     40.42                 -2.25%
DW 20's & 21's & other similar Cat type,
Terry Cobra LeTourneau pulls,
Tournerocker, Euclid, & similar type
equipment when pulling Aqua/Pak, Water
Tank Trailers, & Fuel, and/or Grease Tank
Trailer, or other miscellaneous Trailers,
(except as defined under "Dump Trucks")        35.73    39.51    10.58%     40.42                 -2.25%
Heavy Duty Transport (High Bed)                35.62    39.51    10.92%     40.42                 -2.25%

Heavy Duty Transport(Gooseneck low bed)    35.62      39.51     10.92%        40.42               -2.25%
Tiltbed or Flatbed Pull Trailers           35.62      39.51     10.92%        40.42               -2.25%
Bootman, Comb. Bootman & Road Oiler        35.51      39.51     11.26%        40.42               -2.25%
                                                                         88
                                                               Annual    2011 PW            Difference Between                         Non-Union
  ELKO                                                        Growth,     Survey               PW Rates and       Union    Union %          %
  Average Construction Wage $20.46           PW 2010 PW 2011 2010 - 2011 Average                Survey Avg.        Y/N    Difference   Difference
Average                                                               1.41%                              -2.52%                0.15%       -8.93%
Flat Rack (2 or 3 axle unit)                   33.34         39.51   18.51%         40.42               -2.25%
Bus & Manhaul Drivers
Up to 18,000 lbs. (single unit)                35.07         39.51   12.66%         40.42               -2.25%
18,000 lbs. & over (single unit)               35.18         39.51   12.31%         40.42               -2.25%
Helicopter Pilot (transporting men/
materials)                                     49.66         39.51   -20.44%        40.42               -2.25%
Lift Jitneys                                   35.29         39.51    11.96%        40.42               -2.25%
Winch Truck & "A" Frame Drivers
Up to 18,000 lbs.                              35.18         39.51   12.31%         40.42               -2.25%
18,000 lbs. and over                           35.29         39.51   11.96%         40.42               -2.25%
Warehousemen Spotter                           35.13         39.51   12.47%         40.42               -2.25%
Warehouse Clerk                                35.24         39.51   12.12%         40.42               -2.25%
Tire Repairmen                                 35.45         39.51   11.45%         40.42               -2.25%
Truck Repairmen                                35.78         39.51   10.42%         40.42               -2.25%
Pick Up Truck & Pilot Cars (Jobsite)           33.14         39.51   19.22%         40.42               -2.25%

Pick Up Truck & Pilot Cars (Over the road)     35.13         39.51   12.47%         40.42               -2.25%
Truck Oil Greaser                              35.18         39.51   12.31%         40.42               -2.25%
Fuel Truck Driver                              35.18         39.51   12.31%         40.42               -2.25%
Fuel Man & Fuel Island Man                     35.18         39.51   12.31%         40.42               -2.25%
Oil Tanker                                     35.62         39.51   10.92%         40.42               -2.25%
Oil Tanker with Pup                            36.04         39.51    9.63%         40.42               -2.25%
Foreman:                                       36.54         40.01    9.50%         40.92               -2.22%

WELL DRILLER                                           Lander                                                      N                        0.00%
Well Driller                                   31.91         22.34   -29.99%        22.34                0.00%

                                         ADD            ADD
                                         OPERATI       OPERATIN
                                         NG ENG.       G ENG.
LUBRICATION AND SERVICE ENGINEER ZONE                  ZONE
(MOBILE AND GREASE RACK)                 RATE          RATE                                                        Y           2.16%
Lubrication and Service Engineer (mobile
and grease rack)                            46.10            47.85    3.80%         46.84                2.16%

SOIL TESTER (CERTIFIED)                                Nye                                                         Y          -0.30%
Soil Tester (Certified)                        45.65         56.62   24.03%         56.79               -0.30%

                                                                               89
                                                      Annual    2011 PW        Difference Between                         Non-Union
 ELKO                                                Growth,     Survey           PW Rates and       Union    Union %          %
 Average Construction Wage $20.46   PW 2010 PW 2011 2010 - 2011 Average            Survey Avg.        Y/N    Difference   Difference
Average                                                   1.41%                             -2.52%                0.15%       -8.93%
SOILS AND MATERIALS TESTER                                                                                       -0.30%
Soils and Materials Tester            45.65     56.62    24.03%        56.79               -0.30%

Union Breakdown
Union                                                                                                 29
Non-Union                                                                                             9
Total                                                                                                 38




                                                                  90
DETR      DETR Mean
Mean      Wage + 40%      Wage
Wages      Benefits      Premium
                            48.98%




  21.86          30.60      26.78%
                   -
                   -
  22.03          30.84      11.54%
  22.03          30.84      18.02%
                   -

                   -
                   -
                   -
                   -
  21.60          30.24      33.93%
  21.60          30.24      98.08%
  21.60          30.24     115.48%
  21.60          30.24     132.97%
  21.60          30.24      63.66%
                                     91
DETR      DETR Mean
Mean      Wage + 40%      Wage
Wages      Benefits      Premium
                            48.98%
                   -
                   -
                   -
                   -
                   -
  23.64          33.10      53.43%
  23.64          33.10      64.91%
  23.64          33.10      64.91%
  23.64          33.10      76.40%
                   -
                   -

                   -
                   -
                   -



                   -
                   -
                   -



                   -
                   -
                   -
                   -
                   -
                   -
                   -
                   -
                   -
                   -



                   -
                                     92
DETR      DETR Mean
Mean      Wage + 40%      Wage
Wages      Benefits      Premium
                            48.98%
                   -
                   -


                   -
                   -
                   -
                   -


                   -
                   -
                   -
                   -
                   -


                   -
                   -
                   -
                   -
                   -
                   -
                   -
                   -
  15.50          21.70      18.25%
  15.50          21.70      25.16%
  15.50          21.70      42.03%
  15.50          21.70      28.80%
  15.50          21.70      42.49%
  15.50          21.70      43.18%
  15.50          21.70      44.33%
  15.50          21.70      50.09%
  15.50          21.70      45.71%
                   -
  15.50          21.70      45.71%
  15.50          21.70      44.33%
  15.50          21.70      42.72%
                                     93
DETR      DETR Mean
Mean      Wage + 40%      Wage
Wages      Benefits      Premium
                            48.98%
  15.50          21.70      47.56%
                   -


                   -
                   -
                   -
                   -
                   -
                   -
                   -
                   -
                   -
                   -
                   -

                   -
                   -
  21.78          30.49      41.28%
  21.78          30.49      50.33%
  21.78          30.49      52.07%
  21.78          30.49      52.96%
  21.78          30.49      55.39%
  21.78          30.49      56.37%
  21.78          30.49      56.93%
  21.78          30.49      57.75%
  21.78          30.49      59.68%
  21.78          30.49      60.73%
  21.78          30.49      61.88%
  21.78          30.49      62.50%
  21.78          30.49      63.29%
  21.78          30.49      68.67%
  21.78          30.49      71.32%
  21.78          30.49      68.67%
                   -
                   -
                   -

                                     94
DETR      DETR Mean
Mean      Wage + 40%      Wage
Wages      Benefits      Premium
                            48.98%

                   -
                   -
  21.78          30.49      91.46%
  21.78          30.49      71.23%
  21.78          30.49      64.80%
  21.78          30.49      86.51%
  21.78          30.49      70.41%
  21.78          30.49      64.11%
  21.78          30.49      82.44%
  21.78          30.49      69.68%
  21.78          30.49      63.39%
  21.78          30.49      68.60%
  21.78          30.49      76.77%
  21.78          30.49      73.16%
                   -
                   -
                   -

                   -
                   -
  21.78          30.49      89.72%
  21.78          30.49      71.82%
  21.78          30.49      65.52%
  21.78          30.49      84.67%
  21.78          30.49      71.13%
  21.78          30.49      64.86%
  21.78          30.49      79.92%
  21.78          30.49      70.41%
  21.78          30.49      64.11%
  21.78          30.49      74.96%
  21.78          30.49      71.32%
  21.78          30.49      67.68%
  21.78          30.49      64.53%
  21.78          30.49      61.39%
                   -
                   -
                   -
                                     95
DETR      DETR Mean
Mean      Wage + 40%      Wage
Wages      Benefits      Premium
                            48.98%
                   -
                   -
                   -
                   -
                   -
                   -
                   -
                   -
                   -




                   -
                   -
                   -
                   -
                   -
                   -


                   -
                   -
                   -
                   -
  25.42          35.59     -46.61%
                   -
                   -
  25.60          35.84     -46.99%
  25.60          35.84     -46.99%
  25.60          35.84     -46.99%
                   -
                   -
                   -
                   -
                   -
                   -
                   -
                                     96
DETR      DETR Mean
Mean      Wage + 40%      Wage
Wages      Benefits      Premium
                            48.98%
                   -
                   -
                   -
                   -
                   -
                   -
                   -
  31.04          43.46     -41.02%
                   -
                   -
                   -
                   -


                   -
                   -
                   -


                   -
                   -
                   -
                   -
                   -
                   -
                   -
                   -
                   -



                   -
                   -
                   -


                   -
                   -
                                     97
DETR      DETR Mean
Mean      Wage + 40%      Wage
Wages      Benefits      Premium
                            48.98%

                   -
  20.13          28.18      40.20%
  20.13          28.18      40.20%
  20.13          28.18      40.20%
  20.13          28.18      40.20%
  20.13          28.18      40.20%
  20.13          28.18      40.20%
  20.13          28.18      40.20%
  20.13          28.18      40.20%
  20.13          28.18      40.20%
  20.13          28.18      40.20%
  20.13          28.18      40.20%
                   -
  20.13          28.18      40.20%
  20.13          28.18      40.20%
  20.13          28.18      40.20%
                   -

                   -

                   -
                   -
                   -
  20.13          28.18      40.20%
  20.13          28.18      40.20%




  20.13          28.18      40.20%
  20.13          28.18      40.20%

  20.13          28.18      40.20%
  20.13          28.18      40.20%
  20.13          28.18      40.20%
                                     98
DETR      DETR Mean
Mean      Wage + 40%      Wage
Wages      Benefits      Premium
                            48.98%
  20.13          28.18      40.20%
                   -
  20.13          28.18      40.20%
  20.13          28.18      40.20%

  20.13          28.18      40.20%
  20.13          28.18      40.20%
                   -
  20.13          28.18      40.20%
  20.13          28.18      40.20%
  20.13          28.18      40.20%
  20.13          28.18      40.20%
  20.13          28.18      40.20%
  20.13          28.18      40.20%
  20.13          28.18      40.20%

  20.13          28.18      40.20%
  20.13          28.18      40.20%
  20.13          28.18      40.20%
  20.13          28.18      40.20%
  20.13          28.18      40.20%
  20.13          28.18      40.20%
  20.13          28.18      41.97%
                   -
                   -
                   -
                   -




                   -

                   -
                   -
                   -
                   -
                   -
                                     99
DETR    DETR Mean
Mean    Wage + 40%    Wage
Wages    Benefits    Premium
                        48.98%
                 -
                 -




                                 100
                                                               Annual 2011 PW Difference Between                               DETR
 ESMERALDA                                                    Growth,    Survey  PW Rates and    Union Y/ Union % Non-Union % Mean
 No Data For Construction DETR           PW 2010     PW 2011 2010 - 2011 Average  Survey Avg.       N    Difference Difference Wages
Average                                                             -2.50%                  5.90%           11.68%      -2.67%

                                          ADD
AIR BALANCE TECHNICIAN                   SHEET     Clark                                             Y      10.62%
Air Balance Technician-Journeyman        METAL
                                             58.52     59.52        1.71%          57.83    2.92%
Air Balance Technician-Foreman           ZONE62.95     63.97        1.62%          57.83   10.62%
Air Balance Technician-General Foreman   RATE67.37     68.42        1.56%          57.83   18.31%

ALARM INSTALLER                                      Nye                                             N                  0.00%
Alarm Installer                              54.38         22.00   -59.54%         22.00    0.00%

BOILERMAKER                                          Clark                                           Y       1.87%
Boilermaker                                  59.50         65.94   10.82%          64.73    1.87%

BRICKLAYER                                ADD      Eureka                                            Y      -1.58%
Bricklayer-Journeyman                    ZONE45.46     44.71        -1.65%         45.43    -1.58%
                                         RATE-
CARPENTER                                 ADD      Nye                                               Y      -5.31%
Carpenter-Journeyman                     ZONE48.70     48.95        0.51%          54.51   -10.20%
Carpenter-Welder                         RATE49.70     49.95        0.50%          54.51    -8.37%
Carpenter-Foreman                            51.83         52.08    0.48%          54.51    -4.46%
Carpenter-General Foreman                    55.24         55.49    0.45%          54.51     1.80%

CEMENT MASON                              ADD      Eureka                                            Y      40.11%
Cement Mason-Journeyman                  ZONE46.28    46.28         0.00%          34.40   34.53%
Cement Mason-Foreman                     RATE48.28    48.28         0.00%          34.40   40.35%
Cement Mason-General Foreman                 50.03         50.03    0.00%          34.40   45.44%

ELECTRICIAN-COMMUNICATION                 ADD                                                        N                  0.00%
TECHNICIAN 
Electrician-Communication Technician     ZONE38.72         26.78   -30.84%         26.78    0.00%
                                         RATE

ELECTRICIAN-LINEMAN/GROUNDMAN/
HEAVY EQUIPMENT OPERATOR                             White Pine                                      Y     -13.58%
Electrician-Groundman                        34.82         35.33    1.46%          58.40   -39.50%
Electrician-Lineman                          51.95         52.82    1.67%          58.40    -9.55%
Electrician-Foreman                          56.89         57.86    1.71%          58.40    -0.92%
Electrician-General Foreman                  61.90         62.97    1.73%          58.40     7.83%
Heavy Equipment Operator                     42.69         43.37    1.59%          58.40   -25.74%
                                                                             101
                                                               Annual 2011 PW Difference Between                               DETR
  ESMERALDA                                                   Growth,    Survey  PW Rates and    Union Y/ Union % Non-Union % Mean
  No Data For Construction DETR          PW 2010     PW 2011 2010 - 2011 Average  Survey Avg.       N    Difference Difference Wages
Average                                                           -2.50%                   5.90%            11.68%      -2.67%
ELECTRICIAN-NEON SIGN                                Clark                                          Y        0.57%
Electrician-Neon Sign                        44.31      45.52     2.73%          45.26     0.57%

ELECTRICIAN-WIREMAN                      ADD      Nye                                               Y       20.93%
Wireman                                 ZONE54.74    56.31        2.87%          49.48    13.80%
Cable Splicer                           RATE55.25    56.83        2.86%          49.48    14.85%
Foreman                                      59.18      60.84     2.81%          49.48    22.96%
General Foreman                              63.62      65.37     2.75%          49.48    32.11%

ELEVATOR CONSTRUCTOR                     -           Nye                                            Y        3.09%
Elevator Constructor-Journeyman Mechanic     46.01      64.58    40.36%          65.56     -1.49%
Elevator Constructor-Mechanic In Charge      46.01      70.59    53.42%          65.56      7.67%

FENCE ERECTOR                            -           Nye                                            N                   0.00%
Fence Erector                                13.00      18.43    41.77%          18.43     0.00%

                                         ADD    Not
                                        LABORER Surveyed
                                        ZONE    Set Union
FLAGPERSON                              RATE                                                        Y
Flagperson                                   41.44      22.16    -46.53%



FLOOR COVERER                                        Churchill                                      Y       23.55%
Floor Coverer-Journeyman                     36.26      42.40    16.93%          36.31    16.77%
Floor Coverer-Foreman                        38.90      47.32    21.65%          36.31    30.32%

GLAZIER                                  -           Nye                                            N                   0.00%
Glazier                                      21.50      21.50     0.00%          21.50     0.00%
Glazier-Foreman                              21.50      21.50     0.00%          21.50     0.00%

HIGHWAY STRIPER                    ADD      Nye                                                     Y        0.00%
Highway Striper                   LABORER
                                      33.57    42.94             27.91%          42.94     0.00%
                                  ZONE
HOD CARRIER-BRICK MASON TENDER    RATE      Eureka                                                  Y        0.00%
Brick Mason                           43.31    43.31              0.00%          43.31     0.00%

                                         ADD
HOD CARRIER-PLASTERER TENDER            LABORER CC                         102                      Y       36.28%
                                        ZONE
                                        RATE
                                                             Annual 2011 PW Difference Between                               DETR
  ESMERALDA                                                 Growth,    Survey  PW Rates and    Union Y/ Union % Non-Union % Mean
  No Data For Construction DETR        PW 2010     PW 2011 2010 - 2011 Average  Survey Avg.       N    Difference Difference Wages
Average                                                        -2.50%                    5.90%            11.68%      -2.67%
Plasterer Tender-Journeyman                44.34      44.34    0.00%          33.76     31.34%
Plasterer-Gun Tender                       46.34      46.34    0.00%          33.76     37.26%
Plasterer Tender-Foreman                   47.34      47.34    0.00%          33.76     40.23%

                                       SEE
IRON WORKER                            AMENDM Nye                                                 Y       60.63%
Ironworker-Journeyman                  ENT 1-
                                           54.38  56.74        4.34%          37.39     51.75%
Ironworker-Foreman                         57.68      60.04    4.09%          37.39     60.58%
Ironworker-General Foreman                 61.04      63.40    3.87%          37.39     69.56%


                                        ADD
                                       LABORER
LABORER                                ZONE                                                       N                   -6.10%
SEE GROUP CLASSIFICATIONS              RATE
Landscaper                                 42.94      22.16   -48.39%         23.60      -6.10%
Furniture Mover                            42.94      22.16   -48.39%         23.60      -6.10%
Group 1                                    42.94      22.16   -48.39%         23.60      -6.10%
Group 1A                                   42.94      22.16   -48.39%         23.60      -6.10%
Group 2                                    42.94      22.16   -48.39%         23.60      -6.10%
Group 3                                    42.94      22.16   -48.39%         23.60      -6.10%
Group 4                                    42.94      22.16   -48.39%         23.60      -6.10%
Group 4A                                   42.94      22.16   -48.39%         23.60      -6.10%
Group 5                                    42.94      22.16   -48.39%         23.60      -6.10%
Group 6                                    45.60
Nozzlemen, Rodmen                          42.94      22.16   -48.39%         23.60      -6.10%
Gunmen, Materialmen                        42.94      22.16   -48.39%         23.60      -6.10%
Reboundmen                                 42.94      22.16   -48.39%         23.60      -6.10%
Gunite Foremen                             42.94      22.16   -48.39%         23.60      -6.10%


MECHANICAL INSULATOR                               Douglas                                        Y        4.84%
Mechanical Insulator-Journeyman            55.63      56.23    1.08%          56.77     -0.95%
Mechanical Insulator-Foreman               58.99      59.52    0.90%          56.77      4.84%
Mechanical Insulator-General Foreman       62.36      62.81    0.72%          56.77     10.64%

MILLWRIGHT                              ADD      Churchill                                        Y       13.23%
Millwright-Journeyman                  ZONE49.70    49.95      0.50%          46.60      7.19%
Millwright-Welder                      RATE50.70    50.95      0.49%          46.60      9.33%
                                                                        103
                                                                Annual 2011 PW Difference Between                               DETR
 ESMERALDA                                                     Growth,    Survey  PW Rates and    Union Y/ Union % Non-Union % Mean
 No Data For Construction DETR            PW 2010     PW 2011 2010 - 2011 Average  Survey Avg.       N    Difference Difference Wages
Average                                                           -2.50%                    5.90%            11.68%      -2.67%
Millwright-Foreman                            53.01      53.26    0.47%         46.60      14.29%
Millwright-General Foreman                    56.65      56.90    0.44%         46.60      22.10%

OPERATING ENGINEER 
SEE GROUP CLASSIFICATIONS                  ADD      Nye                                              Y        4.58%
Group 1                                   ZONE53.92    55.67      3.25%         57.12       -2.54%
Group 2                                   RATE54.87    56.62      3.19%         57.12       -0.88%
Group 3                                       55.16      56.91    3.17%         57.12       -0.37%
Group 4                                       56.65      58.40    3.09%         57.12        2.24%
Group 5                                       57.75      59.50    3.03%         57.12        4.17%
Group 6                                       56.87      58.62    3.08%         57.12        2.63%
Group 7                                       57.97      59.72    3.02%         57.12        4.55%
Group 8                                       56.98      58.73    3.07%         57.12        2.82%
Group 9                                       58.08      59.83    3.01%         57.12        4.74%
Group 10                                      57.10      58.85    3.06%         57.12        3.03%
Group 11                                      58.20      59.95    3.01%         57.12        4.95%
Group 12                                      57.27      59.02    3.06%         57.12        3.33%
Group 13                                      57.37      59.12    3.05%         57.12        3.50%
Group 14                                      57.40      59.15    3.05%         57.12        3.55%
Group 15                                      57.48      59.23    3.04%         57.12        3.69%
Group 16                                      57.60      59.35    3.04%         57.12        3.90%
Group 17                                      57.77      59.52    3.03%         57.12        4.20%
Group 18                                      57.87      59.62    3.02%         57.12        4.38%
Group 19                                      57.98      59.73    3.02%         57.12        4.57%
Group 20                                      58.10      59.85    3.01%         57.12        4.78%
Group 21                                      58.27      60.02    3.00%         57.12        5.08%
Group 22                                      58.37      60.12    3.00%         57.12        5.25%
Group 23                                      58.48      60.23    2.99%         57.12        5.44%
Group 24                                      58.60      60.35    2.99%         57.12        5.65%
Group 25                                      58.77      60.52    2.98%         57.12        5.95%
Add $.50 per hour for "Special" Shift
Add $1.00 per hour for "Multiple" Shift

OPERATING ENGINEER:
CRANES, PILEDRIVING, & HOISTING
EQUIPMENT                                                                                            Y
SEE GROUP CLASSIFICATIONS                  ADD
Group 1                                   ZONE
Engineer Oiler                            RATE57.60      59.35    3.04%         57.12       3.90%
                                                                          104
                                                                   Annual 2011 PW Difference Between                               DETR
  ESMERALDA                                                       Growth,    Survey  PW Rates and    Union Y/ Union % Non-Union % Mean
  No Data For Construction DETR               PW 2010    PW 2011 2010 - 2011 Average  Survey Avg.       N    Difference Difference Wages
Average                                                              -2.50%                    5.90%            11.68%      -2.67%
Forklift Operator                                56.51      58.26    3.10%         57.12       2.00%
Group 2
Truck Crane Oiler                                57.60      59.35    3.04%         57.12       3.90%
Group 3
A-Frame or Winch Truck Operator                  56.51      58.26    3.10%         57.12       2.00%
Ross Carrier Operator (Jobsite)                  56.51      58.26    3.10%         57.12       2.00%
Group 4
Bridge-Type Unloader and Turntable               56.65      58.40    3.09%         57.12       2.24%
Operator
Helicopter Hoist Operator                        56.65      58.40    3.09%         57.12       2.24%
Group 5
Hydraulic Boom Truck (Pitman)                    56.87      58.62    3.08%         57.12       2.63%
Stinger Crane (Austin-Western or Similar         56.87      58.62    3.08%         57.12       2.63%
Tugger Hoist Operator (1 Drum)
Type)                                            56.87      58.62    3.08%         57.12       2.63%
Group 6
Bridge Crane Operator                            56.98      58.73    3.07%         57.12       2.82%
Cretor Crane Operator                            56.98      58.73    3.07%         57.12       2.82%
Hoist Operator (Chicago Boom and Similar         56.98      58.73    3.07%         57.12       2.82%
Lift Mobile Operator
Type)                                            56.98      58.73    3.07%         57.12       2.82%
Lift Slab Machine Operator (Vagtborg and         56.98      58.73    3.07%         57.12       2.82%
Material Hoist/Manlift Operator
Similar Types)                                   56.98      58.73    3.07%         57.12       2.82%
Polar Gantry Crane Operator                      56.98      58.73    3.07%         57.12       2.82%
Self Climbing Scaffold (or Similar Type)         56.98      58.73    3.07%         57.12       2.82%
Shovel, Backhoe, Dragline, Clamshell
Operator (Over 3/4 YD. and up to 5 CU.
YDS. M.R.C.)                                     56.98      58.73    3.07%         57.12       2.82%
Silent Piler                                     56.98      58.73    3.07%         57.12       2.82%
Tugger Hoist Operator (2 Drum)                   56.98      58.73    3.07%         57.12       2.82%
Group 7
Pedestal Crane Operator                          57.10      58.85    3.06%         57.12       3.03%
Shovel, Backhoe, Dragline, Clamshell
Operator (over 5 CU. YDS. M.R.C.)                57.10      58.85    3.06%         57.12       3.03%
Tower Crane Repairman                            57.10      58.85    3.06%         57.12       3.03%
Tugger Hoist Operator (3 Drum)                   57.10      58.85    3.06%         57.12       3.03%
Group 8
Crane Operator (up to and including 25 ton       59.07      60.82    2.96%         57.12       6.48%
capacity)
Crawler Transporter Operator                     57.27      59.02    3.06%         57.12       3.33%
Derrick Barge Operator (up to and including
25 ton capacity)                                 57.27      59.02    3.06%         57.12       3.33%
                                                                             105
                                                                   Annual 2011 PW Difference Between                               DETR
  ESMERALDA                                                       Growth,    Survey  PW Rates and    Union Y/ Union % Non-Union % Mean
  No Data For Construction DETR               PW 2010    PW 2011 2010 - 2011 Average  Survey Avg.       N    Difference Difference Wages
Average                                                              -2.50%                    5.90%            11.68%      -2.67%
Hoist Operator, Stiff Legs, Guy Derrick or
Similar Type (up to and including 25 ton
capacity)                                        57.27      59.02    3.06%         57.12       3.33%
Shovel, Backhoe, Dragline, Clamshell
Operator (over 7 CU. YDS. M.R.C.)                57.27      59.02    3.06%         57.12       3.33%
Group 9
Crane Operator (over 25 tons up to and
including 50 tons M.R.C.)                        59.07      60.82    2.96%         57.12       6.48%
Derrick Barge Operator (over 25 tons, up to
and including 50 tons M.R.C.)                    57.44      59.19    3.05%         57.12       3.62%
Highline Cableway Operator                       57.44      59.19    3.05%         57.12       3.62%
Hoise Operator, Stiff Legs, Guy Derrick or
Similar Type (over 25 tons, up to and
including 50 tons M.R.C.)                        57.44      59.19    3.05%         57.12       3.62%
K-Crane                                          57.44      59.19    3.05%         57.12       3.62%
Polar Crane Operator                             57.44      59.19    3.05%         57.12       3.62%
Self Erecting Tower Crane Operator
Maximum Lifting Capacity Ten (10) Tons.
One (1) Ton Operator).                           57.44      59.19    3.05%         57.12       3.62%
Group 10
Crane Operator (over 50 tons, up to and
including 100 tons M.R.C.)                       60.49      62.24    2.89%         57.12       8.96%
Derrick Barge Operator (over 50 tons, up to
and including 100 tons M.R.C.)                   58.44      60.19    2.99%         57.12       5.37%
Hoist Operator, Stiff Legs, Guy Derrick or
Similar Type (over 50 tons, up to and
including 100 tons M.R.C.)                       58.44      60.19    2.99%         57.12       5.37%
Mobile Tower Crane Operator (over 50 tons,
up to and including 100 tons M.R.C.)             60.49      62.24    2.89%         57.12       8.96%
Group 11
Crane Operator (over 100 tons, up to and
including 200 tons M.R.C.)                       60.99      62.74    2.87%         57.12       9.84%
Derrick Barge Operator (over 100 tons, up
to and including 200 tons M.R.C.)                59.44      61.19    2.94%         57.12       7.13%
Hoist Operator, Stiff Legs, Guy Derrick or
Similar Type (over100 tons, up to and
including 200 tons M.R.C.)                       59.44      61.19    2.94%         57.12       7.13%
Mobile Tower Crane Operator (over 100
tons, up to and including 200 tons M.R.C.)       60.99      62.74    2.87%         57.12       9.84%
                                                                             106
                                                              Annual 2011 PW Difference Between                                  DETR
  ESMERALDA                                                  Growth,    Survey  PW Rates and     Union Y/ Union % Non-Union % Mean
  No Data For Construction DETR             PW 2010 PW 2011 2010 - 2011 Average  Survey Avg.        N    Difference Difference Wages
Average                                                         -2.50%                     5.90%             11.68%       -2.67%
Tower Crane Operator and Tower Gantry         61.44   63.19      2.85%    57.12          10.63%
Group 12
Crane Operator (over 200 tons up to and
including 300 tons M.R.C.)                    63.63   65.38      2.75%    57.12          14.46%
Derrick Barge Operator (over 200 tons up to
and including 300 tons M.R.C.)                60.44   62.19      2.90%    57.12            8.88%
Hoist Operator, Stiff Legs, Guy Derrick or
Similar Type (over 200 tons up to and
including 300 tons M.R.C.)                    60.44   62.19      2.90%    57.12            8.88%
Mobile Tower Crane Operator (over 200 tons
up to and including 300 tons M.R.C.)          63.63   65.38      2.75%    57.12          14.46%
Group 13
Crane Operator (over 300 tons)                65.00   66.75      2.69%    57.12          16.86%
Derrick Barge Operator (over 300 tons)        61.44   63.19      2.85%    57.12          10.63%
Helicopter Pilot                              61.44   63.19      2.85%    57.12          10.63%
Hoist Operator, Stiff Legs, Guy Derrick or
Similar Type (over 300 tons)                  61.44   63.19      2.85%    57.12          10.63%
Mobile Tower Crane Operator (over 300         65.00   66.75      2.69%    57.12          16.86%
tons)
Add $ .50 per hour for "Special" Shift      -       -
Add $1.00 per hour for "Multiple" Shift     -       -

OPERATING ENGINEER-SURVEYOR

SEE GROUP CLASSIFICATIONS             ADD       ADD
Group 1                              ZONE55.84 ZONE
                                                  57.59      3.13%         57.12         0.82%
Group 2                              RATE56.65 RATE
                                                  58.40      3.09%         57.12         2.24%
Group 3                                  56.87     58.62     3.08%         57.12         2.63%
Group 4                                  57.15     58.90     3.06%         57.12         3.12%
Group 5                                  57.27     59.02     3.06%         57.12         3.33%
Group 6                                  57.37     59.12     3.05%         57.12         3.50%
Group 7                                  57.40     59.15     3.05%         57.12         3.55%
Group 8                                  57.77     59.52     3.03%         57.12         4.20%
Group 9                                  57.90     59.65     3.02%         57.12         4.43%
Group 10                                 58.40     60.15     3.00%         57.12         5.30%


OPERATING ENGINEER -TUNNEL
SEE GROUP CLASSIFICATIONS             ADD       ADD
Group 1                              ZONE55.77 ZONE
                                                  57.52      3.14%         57.12         0.70%
                                                                     107
                                     RATE      RATE
                                                           Annual 2011 PW Difference Between                               DETR
 ESMERALDA                                                Growth,    Survey  PW Rates and    Union Y/ Union % Non-Union % Mean
 No Data For Construction DETR       PW 2010     PW 2011 2010 - 2011 Average  Survey Avg.       N    Difference Difference Wages
Average                                                        -2.50%                  5.90%            11.68%      -2.67%
Group 2                                  56.72       58.47     3.09%          57.12    2.36%
Group 3                                  57.01       58.76     3.07%          57.12    2.87%
Group 4                                  57.15       58.90     3.06%          57.12    3.12%
Group 5                                  57.37       59.12     3.05%          57.12    3.50%
Group 6                                  57.48       59.23     3.04%          57.12    3.69%
Group 7                                  57.60       59.35     3.04%          57.12    3.90%
Group 8                                  57.77       59.52     3.03%          57.12    4.20%
Group 9                                  57.90       59.65     3.02%          57.12    4.43%


                                                  Churchill
PAINTER                                          (8 hrs)                                        Y       43.07%
Painter-Journeyman                       46.23       46.64     0.89%          33.69   38.44%
Painter-Foreman                          49.35       49.76     0.83%          33.69   47.70%


PILEDRIVER                                                                                      Y
Driverman, Rigman, Bridge and Dock
Carpenter                                58.47       58.47     0.00%
Certified Welder                         58.47       58.47     0.00%
Piledriver-Foreman                       62.05       62.05     0.00%
Diver-Diving (wet pay)                   58.47       58.47     0.00%
Stand-By Diver                           58.47       58.47     0.00%
Tender                                   58.47       58.47     0.00%

PLASTERER                             ADD      Clark                                            Y       -0.13%
Plasterer                            ZONE44.69    44.69        0.00%          44.75    -0.13%
                                     RATE
PLUMBER/PIPEFITTER                    -        Mineral                                          N                  -14.87%
Plumber/Pipefitter-Journeyman            34.28       26.10    -23.86%         30.66   -14.87%
Plumber-Foreman                          34.28       26.10    -23.86%         30.66   -14.87%
Plumber-General Foreman                  34.28       26.10    -23.86%         30.66   -14.87%

REFRIGERATION                                    Lander                                         Y      -11.59%
Refrigeration-Journeyman                 36.24       35.17     -2.95%         39.78   -11.59%
Refrigeration-Foreman                    36.24       35.17     -2.95%         39.78   -11.59%
Refrigeration-General Foreman            36.24       35.17     -2.95%         39.78   -11.59%

ROOFER                                     -
                                                                        108
                                                              Annual 2011 PW Difference Between                               DETR
  ESMERALDA                                                  Growth,    Survey  PW Rates and    Union Y/ Union % Non-Union % Mean
  No Data For Construction DETR         PW 2010     PW 2011 2010 - 2011 Average  Survey Avg.       N    Difference Difference Wages
Average                                                            -2.50%                  5.90%           11.68%      -2.67%
(Does not include sheet metal roofs)                Nye                                            Y        0.25%
Roofer                                      31.83         31.91    0.25%          31.83   0.25%

SHEET METAL WORKER                       ADD      Nye                                              Y        8.53%
Sheet Metal Worker-Journeyman           ZONE58.52     59.52        1.71%          58.94    0.98%
Sheet Metal Worker-Foreman              RATE62.95     63.97        1.62%          58.94    8.53%
Sheet Metal Worker-General Foreman          67.37         68.42    1.56%          58.94   16.08%

SPRINKLER FITTER                        -           Nye                                            N                   -0.36%
Sprinkler Fitter-Journeyman                 55.15         25.00   -54.67%         25.09   -0.36%
Sprinkler Fitter-Foreman                    57.90         25.00   -56.82%         25.09   -0.36%
Sprinkler Fitter-General Foreman            60.15         25.00   -58.44%         25.09   -0.36%


TAPER                                               Nye                                            Y       30.13%
Taper                                       46.23         46.64    0.89%          35.84   30.13%

TILE SETTER/TERRAZZO WORKER/               ADD
MARBLE MASON                              ZONE      Douglas                                        Y       43.07%
Tile Setter/Terrazzo Worker/Marble Mason- RATE32.48    34.63       6.62%          24.52   41.23%
Tile Setter
Finisher                                      43.61    46.66       6.99%          33.32   40.04%
Terrazzo Worker/Marble Mason                  46.04    49.29       7.06%          33.32   47.93%


                                         ADD
                                        LABORER
                                        ZONE
TRAFFIC BARRIER ERECTOR                 RATE
Traffic Barrier Erector                     42.94         22.16   -48.39%


                                         ADD
                                        ZONE
TRUCK DRIVER                            RATE        Clark                                          Y       -0.38%
SEE GROUP CLASSIFICATIONS
Group 1                                     46.13         46.13    0.00%          46.96   -1.77%
Group 2                                     46.23         46.23    0.00%          46.96   -1.55%
Group 3                                     46.44         46.44    0.00%          46.96   -1.11%
Group 4                                     46.62         46.62    0.00%          46.96   -0.72%
                                                                            109
                                                                   Annual 2011 PW Difference Between                               DETR
  ESMERALDA                                                       Growth,    Survey  PW Rates and    Union Y/ Union % Non-Union % Mean
  No Data For Construction DETR             PW 2010      PW 2011 2010 - 2011 Average  Survey Avg.       N    Difference Difference Wages
Average                                                                 -2.50%                  5.90%           11.68%      -2.67%
Group 5                                         46.82          46.82    0.00%          46.96   -0.30%
Group 6                                         47.12          47.12    0.00%          46.96    0.34%
Foreman $1.00 above highest paid
journeyman supervised.                          48.12          48.12    0.00%          46.96   2.47%

WELL DRILLER                                                                                            N                   0.00%
Well Driller                                    31.49          19.42   -38.33%         19.42   0.00%

                                              ADD
EQUIPMENT GREASER (RACK)                     OPERATI     Nye                                            Y        2.98%
Equipment Greaser (rack)                     NG ENG.
                                                 55.16         56.91    3.17%          56.79   0.21%
                                             ZONE
EQUIPMENT GREASER (GREASE                     ADD
                                             RATE
TRUCK)                                       OPERATI     Nye
Equipment Greaser (grease truck)             NG ENG.
                                                 56.65         58.40    3.09%          56.79   2.84%
                                             ZONE
EQUIPMENT GREASER (GREASE TRUCK/ RATE         ADD
MULTI-SHIFT)                                 OPERATI     Nye
Equipment Greaser (grease truck/multi-       NG ENG.
                                                 57.75         59.50    3.03%          56.79   4.77%
shift)                                       ZONE
TUNNEL, EQUIPMENT GREASER                    RATE
                                              ADD
(GREASE TRUCK)                               OPERATI     Nye
Tunnel, Equipment Greaser (grease truck) NG ENG. 57.37         59.12    3.05%          56.79   4.10%
                                             ZONE
                                              ADD
                                             RATE
FIELD SOILS AND MATERIAL TESTER              OPERATI     Nye                                            Y       -0.30%
Field Soils and Material Tester              NG ENG.
                                                 54.87         56.62    3.19%          56.79   -0.30%
                                             ZONE
FIELD ASPHALTIC CONCRETE (SOILS               ADD
                                             RATE
AND MATERIAL TESTER)                         OPERATI     Nye
Field Asphaltic Concrete (soils and material NG ENG.
                                                 54.87         56.62    3.19%          56.79   -0.30%
tester)                                      ZONE
Union Breakdown                              RATE
Union                                                                                                   30
Non-Union                                                                                               8
Total                                                                                                   38



                                                                                 110
DETR Mean
Wage + 40%    Wage
 Benefits    Premium




                       111
                                                       Annual     2011 PW Difference Between                     Non-Union    DETR
 EUREKA                                              Growth, 2010 Survey     PW Rates and    Union Y/ Union %         %       Mean
 No Data for Construction DETR       PW 2010 PW 2011    - 2011    Average     Survey Avg.       N     Difference Difference   Wages
Average                                                      0.25%                       2.64%             2.68%     -6.34%

                                      ADD
                                     SHEET
                                     METAL
                                     ZONE
AIR BALANCE TECHNICIAN               RATE        Elko                                             Y       45.08%
Air Balance-Journeyman                   58.52      48.35   -17.38%    35.47            36.31%
Air Balance-Foreman                      62.95      51.46   -18.25%    35.47            45.08%
Air Balance-General Foreman              67.37      54.57   -19.00%    35.47            53.85%

ALARM INSTALLER                                  Elko                                             Y        0.00%
Alarm Installer                          30.88      31.61    2.36%     31.61             0.00%

BOILERMAKER                          -           Clark                                            Y        1.87%
Boilermaker-Journeyman                   59.50      65.94   10.82%     64.73             1.87%
Boilermaker-Foreman                      59.50      65.94   10.82%     64.73             1.87%
Boilermaker-General Foreman              59.50      65.94   10.82%     64.73             1.87%

                                      ADD         ADD
                                     ZONE        ZONE
BRICKLAYER                           RATE--      RATE--                                           Y       -28.07%
Bricklayer                               32.68      32.68    0.00%     45.43           -28.07%

                                      ADD         ADD
                                     ZONE        ZONE
CARPENTER                            RATE        RATE                                             Y        4.90%
Carpenter-Journeyman                     38.30      38.80    1.31%     38.30             1.31%
Carpenter-Foreman                        41.05      41.55    1.22%     38.30             8.49%

CEMENT MASON                                                                                      Y        2.91%
Cement Mason-Journeyman                  34.40      34.40    0.00%     34.40             0.00%
Cement Mason-Foreman                     36.40      36.40    0.00%     34.40             5.81%

ELECTRICIAN-COMMUNICATION                        White
TECHNICIAN                                       Pine                                             N                   0.00%
Communication-Installer/Technician       27.97      17.49   -37.47%    17.49             0.00%


                                                                      112
                                                     Annual     2011 PW Difference Between                     Non-Union    DETR
 EUREKA                                            Growth, 2010 Survey     PW Rates and    Union Y/ Union %         %       Mean
 No Data for Construction DETR     PW 2010 PW 2011    - 2011    Average     Survey Avg.       N     Difference Difference   Wages
Average                                                     0.25%                      2.64%             2.68%     -6.34%
                                               White
ELECTRICIAN-LINE                   -           Pine                                             Y        -2.23%
Groundman                              39.19       40.50   3.34%     58.40           -30.65%
Lineman                                57.91       59.90   3.44%     58.40             2.57%
Foreman                                63.02       65.16   3.40%     58.40            11.58%
General Foreman                        68.12       70.45   3.42%     58.40            20.63%
Heavy Equipment Operator               47.86       49.49   3.41%     58.40           -15.26%

ELECTRICIAN-NEON SIGN                          Clark                                            Y        0.57%
Electrician-Neon Sign                  44.31       45.52   2.73%     45.26             0.57%

ELECTRICIAN-WIREMAN                -           -                                                Y       10.31%
Electrician-Wireman                    29.98       50.78   69.38%    49.48             2.63%
Electrician-Cable Splicer              29.98       54.58   82.05%    49.48            10.31%
Electrician-Foreman                    29.98       54.58   82.05%    49.48            10.31%
Electrician-General Foreman            29.98       58.38   94.73%    49.48            17.99%

ELEVATOR CONSTRUCTOR               -           Nye                                              Y        3.09%
Elevator Constructor-Journeyman
Mechanic                               46.01       64.58   40.36%    65.56            -1.49%
Elevator Constructor-Mechanic In
Charge                                 46.01       70.59   53.42%    65.56             7.67%

                                    ADD
                                   LABORE
                                   R ZONE
FENCE ERECTOR                      RATE        Elko                                             N                   0.00%
Fence Erector                          30.82       35.47   15.09%    35.47             0.00%

                                    ADD    ADD
                                   LABORE LABORE
                                   R ZONE R ZONE
FLAGPERSON                         RATE   RATE
Flagperson                             27.95       27.95   0.00%


FLOOR COVERER                                  Churchill                                        Y        3.65%
Floor Coverer-Journeyman               36.26       36.34   0.22%     36.31             0.08%
                                                                    113
                                                    Annual     2011 PW Difference Between                     Non-Union    DETR
  EUREKA                                          Growth, 2010 Survey     PW Rates and    Union Y/ Union %         %       Mean
  No Data for Construction DETR   PW 2010 PW 2011    - 2011    Average     Survey Avg.       N     Difference Difference   Wages
Average                                                   0.25%                       2.64%             2.68%     -6.34%
Floor Coverer-Foreman                 38.90      38.93    0.08%    36.31              7.22%

GLAZIER                           -           Elko                                             N                  -0.82%
Glazier                               21.50      20.50   -4.65%    20.67             -0.82%

                                   ADD    ADD
                                  LABORE LABORE
                                  R ZONE R ZONE
HIGHWAY STRIPER                   RATE   RATE                                                  Y        0.00%
Highway Striper                       33.57      33.57    0.00%    33.57              0.00%

HOD CARRIER-BRICK MASON
TENDER                                                                                         Y        2.31%
Brick Mason-Journeyman                43.31      43.31    0.00%    43.31              0.00%
Brick Mason-Foreman                   45.31      45.31    0.00%    43.31              4.62%

                                   ADD
HOD CARRIER-PLASTERER             ZONE
TENDER                            RATE        Washoe                                           Y        3.90%
Plasterer Tender-Journeyman           33.76      34.26    1.48%    33.73              1.57%
Plasterer-Gun Tender                  34.76      35.26    1.44%    33.73              4.54%
Plaster Tender-Foreman                35.12      35.62    1.42%    33.73              5.60%

                                  SEE
                                  AMENDM
IRON WORKER                       ENT 1                                                        Y        4.80%
Ironworker-Journeyman                 54.38      56.74    4.34%    57.31             -0.99%
Ironworker-Foreman                    57.68      60.04    4.09%    57.31              4.76%
Ironworker-General Foreman            61.04      63.40    3.87%    57.31             10.63%

                                   ADD         ADD
LABORER                           ZONE        ZONE                                             Y        -1.18%
SEE GROUP CLASSIFICATIONS         RATE        RATE 
Landscaper                            25.66      25.66    0.00%    30.75            -16.55%
Furniture Mover                       27.16      27.16    0.00%    30.75            -11.67%
Group 1                               30.82      30.82    0.00%    30.75              0.23%
Group 1A                              27.95      27.95    0.00%    30.75             -9.11%
Group 2                               30.92      30.92    0.00%    30.75              0.55%
                                                                  114
                                                         Annual     2011 PW Difference Between                     Non-Union    DETR
 EUREKA                                                Growth, 2010 Survey     PW Rates and    Union Y/ Union %         %       Mean
 No Data for Construction DETR         PW 2010 PW 2011    - 2011    Average     Survey Avg.       N     Difference Difference   Wages
Average                                                         0.25%                      2.64%             2.68%     -6.34%
Group 3                                    31.07       31.07    0.00%     30.75            1.04%
Group 4                                    31.32       31.32    0.00%     30.75            1.85%
Group 4A                                   32.57       32.57    0.00%     30.75            5.92%
Group 5                                    31.62       31.62    0.00%     30.75            2.83%
Group 6                                -           -
Nozzlemen, Rodmen                          31.62       31.62    0.00%     30.75            2.83%
Gunmen, Materialmen                        31.32       31.32    0.00%     30.75            1.85%
Reboundmen                                 30.97       30.97    0.00%     30.75            0.72%
Gunite Foremen                             32.02       32.02    0.00%     30.75            4.13%

                                       SEE
                                       AMENDM
MECHANICAL INSULATOR                   ENT 2- Washoe                                                Y        -0.08%
Mechanical Insulator-Journeyman            57.06       54.56    -4.38%    56.77           -3.89%
Mechanical Insulator-Foreman               59.56       57.06    -4.20%    56.77            0.51%

Mechanical Insulator-General Foreman       61.06       58.56    -4.09%    56.77            3.15%

MILLWRIGHT                                         Elko                                             N                   0.00%
Millwright-Journeyman                      49.70       25.33   -49.03%    25.33            0.00%
Millwright-Welder                          50.70       25.33   -50.04%    25.33            0.00%
Millwright-Foreman                         53.01       25.33   -52.22%    25.33            0.00%
Millwright-General Foreman                 56.65       25.33   -55.29%    25.33            0.00%

                                        ADD         ADD
OPERATING ENGINEER                     ZONE        ZONE                                             Y        8.88%
SEE GROUP CLASSIFICATIONS              RATE        RATE 
Group 1                                    41.33       43.08    4.23%     46.84           -8.03%
Group 1A                                   44.09       45.84    3.97%     46.84           -2.13%
Group 2                                    44.62       46.37    3.92%     46.84           -1.00%
Group 3                                    44.89       46.64    3.90%     46.84           -0.43%
Group 4                                    45.63       47.38    3.84%     46.84            1.15%
Group 5                                    45.93       47.68    3.81%     46.84            1.79%
Group 6                                    46.10       47.85    3.80%     46.84            2.16%
Group 7                                    46.35       48.10    3.78%     46.84            2.69%
Group 8                                    46.94       48.69    3.73%     46.84            3.95%
Group 9                                    47.26       49.01    3.70%     46.84            4.63%
Group 10                                   47.61       49.36    3.68%     46.84            5.38%
                                                                         115
                                                         Annual     2011 PW Difference Between                     Non-Union    DETR
 EUREKA                                                Growth, 2010 Survey     PW Rates and    Union Y/ Union %         %       Mean
 No Data for Construction DETR         PW 2010 PW 2011    - 2011    Average     Survey Avg.       N     Difference Difference   Wages
Average                                                        0.25%                       2.64%             2.68%     -6.34%
Group 10A                                  47.80       49.55   3.66%    46.84              5.79%
Group 11                                   48.04       49.79   3.64%    46.84              6.30%
Group 11A                                  49.68       51.43   3.52%    46.84              9.80%
Group 11B                                  50.49       52.24   3.47%    46.84             11.53%
Foreman                                    49.68       51.43   3.52%    46.84              9.80%
Add 7% to base rate for "Second"
Shift                                  -           -
Add 12.5% to base rate for "Special"
shift                                  -           -

OPERATING ENGINEER-STEEL                ADD         ADD
FABRICATOR & ERECTOR                   ZONE        ZONE
SEE GROUP CLASSIFICATIONS              RATE        RATE
Group 1                                    56.63       58.38   3.09%    46.84             24.64%
Group 1 Truck Crane Oiler                  50.46       52.21   3.47%    46.84             11.46%
Group 1 Oiler                              48.50       50.25   3.61%    46.84              7.28%
Group 2                                    55.12       56.87   3.17%    46.84             21.41%
Group 2 Truck Crane Oiler                  50.21       51.96   3.49%    46.84             10.93%
Group 2 Oiler                              48.29       50.04   3.62%    46.84              6.83%
Group 3                                    53.88       55.63   3.25%    46.84             18.77%
Group 3 Truck Crane Oiler                  49.99       51.74   3.50%    46.84             10.46%
Group 3 Oiler                              48.07       49.82   3.64%    46.84              6.36%
Group 3 Hydraulic                          49.66       51.41   3.52%    46.84              9.76%
Group 4                                    52.15       53.90   3.36%    46.84             15.07%
Group 5                                    51.05       52.80   3.43%    46.84             12.72%
Add 7% to base rate for "Second"
Shift                                  -           -
Add 12.5% to base rate for "Special"
Shift

OPERATING ENGINEER -                    ADD         ADD
PILEDRIVER                             ZONE        ZONE                                             Y
SEE GROUP CLASSIFICATIONS              RATE        RATE
Group 1                                    56.10       57.85   3.12%    46.84             23.51%
Group 1 Truck Crane Oiler                  50.64       52.39   3.46%    46.84             11.85%
Group 1 Oiler                              48.72       50.47   3.59%    46.84              7.75%
Group 2                                    54.56       56.31   3.21%    46.84             20.22%
Group 2 Truck Crane Oiler                  50.43       52.18   3.47%    46.84             11.40%
                                                                       116
                                                          Annual     2011 PW Difference Between                     Non-Union     DETR
 EUREKA                                                 Growth, 2010 Survey     PW Rates and    Union Y/ Union %         %        Mean
 No Data for Construction DETR          PW 2010 PW 2011    - 2011    Average     Survey Avg.       N     Difference Difference    Wages
Average                                                          0.25%                      2.64%             2.68%      -6.34%
Group 2 Oiler                               48.52       50.27    3.61%     46.84            7.32%
Group 3                                     53.11       54.86    3.30%     46.84           17.12%
Group 3 Truck Crane Oiler                   50.21       51.96    3.49%     46.84           10.93%
Group 3 Oiler                               48.29       50.04    3.62%     46.84            6.83%
Group 4                                     51.60       53.35    3.39%     46.84           13.90%
Group 5                                     50.49       52.24    3.47%     46.84           11.53%
Group 6                                     49.38       51.13    3.54%     46.84            9.16%
Group 7                                     48.42       50.17    3.61%     46.84            7.11%
Group 8                                     47.46       49.21    3.69%     46.84            5.06%
Add 7% to base for "Second" Shift             -           -
Add 12.5% to base for "Special" Shift   -           -


PAINTER                                             Elko                                             Y        2.05%
Brush/Roller Painter                        32.74       32.74    0.00%     32.90           -0.49%
Spray Painter/Paperhanger                   33.59       33.59    0.00%     32.90            2.10%
Sandblaster                                 33.24       33.24    0.00%     32.90            1.03%
Structural Steel & Steeplejack              33.74       33.74    0.00%     32.90            2.55%
Swing Stage                                 34.74       34.74    0.00%     32.90            5.59%
Special Coating Application-Brush           33.24       33.24    0.00%     32.90            1.03%
Special Coating Application-Spray           33.74       33.74    0.00%     32.90            2.55%
Special Coating Application-Spray
Steel                                       33.99       33.99    0.00%
Foreman $1.00 above highest Journeyman 

PILEDRIVER
Piledriver-Journeyman                       58.47       58.47    0.00%
Piledriver-Foreman                          62.05       62.05    0.00%

                                         ADD
                                        ZONE
PLASTERER                               RATE        Washoe                                           Y        -1.47%
Plasterer                                   34.27       34.77    1.46%     35.29           -1.47%

PLUMBER/PIPEFITTER                      -           Elko                                             N                  -16.78%
Plumber/Pipefitter                          36.24       19.00   -47.57%    22.83          -16.78%

REFRIGERATION                           -           Elko                                             N                   0.00%
                                                                          117
                                                         Annual     2011 PW Difference Between                     Non-Union     DETR
 EUREKA                                                Growth, 2010 Survey     PW Rates and    Union Y/ Union %         %        Mean
 No Data for Construction DETR         PW 2010 PW 2011    - 2011    Average     Survey Avg.       N     Difference Difference    Wages
Average                                                        0.25%                       2.64%             2.68%      -6.34%
Refrigeration-Journeyman                   27.55     19.00   -31.03%    19.00              0.00%
Refrigeration-Foreman                      27.55     19.00   -31.03%    19.00              0.00%
Refrigeration-General Foreman              27.55     19.00   -31.03%    19.00              0.00%

ROOFER                                                                                              N                   0.00%
(Does not include sheet metal roofs)   -
Roofer                                     16.04     18.73    16.77%    18.73              0.00%

SHEET METAL WORKER                                 Elko                                             N                  -26.85%
Sheet Metal                                30.00     20.00   -33.33%    27.34            -26.85%

SPRINKLER FITTER                       -           Elko                                             N                  -42.58%
Sprinkler Fitter-Journeyman                52.30     19.00   -63.67%    33.09            -42.58%
Sprinkler Fitter-Foreman                   55.05     19.00   -65.49%    33.09            -42.58%
Sprinkler Fitter-General Foreman           57.30     19.00   -66.84%    33.09            -42.58%

SURVEYOR                                           Nye                                              N                  17.27%
Surveyor                                   46.85     45.96    -1.90%    39.19             17.27%

TAPER                                  -           Elko                                             Y        1.23%
Taper                                      35.49     36.28     2.23%    35.84              1.23%

                                   ADD
TILE SETTER/TERRAZZO WORKER/ ZONE
MARBLE MASON-FINISHER              RATE     Washoe                                                  Y        1.02%
Tile, Terrazzo and Marble Finisher    32.48   24.77          -23.74%    24.52              1.02%

                                 ADD
TILE SETTER/TERRAZZO WORKER/ ZONE
MARBLE MASON                     RATE     Washoe                                                    Y        4.15%
Tile Setter-Journeyman              35.99   32.87             -8.67%    33.64             -2.29%
Tile Setter-Foreman                 35.99   34.12             -5.20%    33.64              1.43%
Tile Setter-General Formean         35.99   35.87             -0.33%    33.64              6.63%
Terrazzo/Marble Mason-Journeyman    35.99   34.37             -4.50%    33.64              2.17%
Terrazzo/Marble Mason-Foreman       35.99   35.62             -1.03%    33.64              5.89%
Terrazzo/Marble Mason-General
Foreman                             35.99   37.37              3.83%    33.64             11.09%

                                                                       118
                                                           Annual     2011 PW Difference Between                     Non-Union    DETR
 EUREKA                                                  Growth, 2010 Survey     PW Rates and    Union Y/ Union %         %       Mean
 No Data for Construction DETR           PW 2010 PW 2011    - 2011    Average     Survey Avg.       N     Difference Difference   Wages
Average                                                          0.25%                       2.64%             2.68%     -6.34%

                                          ADD    ADD
                                         LABORE LABORE
                                         R ZONE R ZONE
TRAFFIC BARRIER ERECTOR                  RATE   RATE
Traffic Barrier Erector                    30.82    30.82        0.00%

                                        ADD      ADD
                                       ZONE     ZONE
TRUCK DRIVER                           RATE     RATE                                                  Y        0.03%
Dump Trucks (Single or Multiple Units
Including Semi's & Double Transfer Units),
Dumpcretes and Bulk Cement Spreader)
Under 4 yds. (water level)                35.02    36.90         5.37%    36.90              0.00%
4 yds. & under 8 yds. (water level)       35.24    36.90         4.71%    36.90              0.00%
8 yds. & under 18 yds. (water level)      35.45    36.90         4.09%    36.90              0.00%
18 yds. & under 25 yds. ( water level)    35.62    36.90         3.59%    36.90              0.00%
25 yds. & under 60 yds. (water level)     36.04    36.90         2.39%    36.90              0.00%
60 yds. & under 75 yds. (water level)     37.48    36.90        -1.55%    36.90              0.00%

75 yds. & under 100 yds. (water level)     38.43    36.90       -3.98%    36.90              0.00%

100 yds. & under 150 yds.(water level)     38.90    36.90       -5.14%    36.90              0.00%
150 yds. & under 250 yds. ( water
level)                                     40.90    36.90       -9.78%    36.90              0.00%
250 yds. & under 350 yds. (water
level)                                     43.90    36.90      -15.95%    36.90              0.00%
350 yds. & over (water level)              45.40    36.90      -18.72%    36.90              0.00%
Transit Mix
Under 8 yds.                               35.45    36.90        4.09%    36.90              0.00%
8 yds. & including 12 yds.                 35.56    36.90        3.77%    36.90              0.00%
Over 12 yds.                               35.78    36.90        3.13%    36.90              0.00%
Transit Mix (Using Boom)
Transit mix with boom shall receive 16
cents per hour
above the appropriate yardage
classification rate of pay 
when such boom is used
                                                                         119
                                                         Annual     2011 PW Difference Between                     Non-Union    DETR
  EUREKA                                               Growth, 2010 Survey     PW Rates and    Union Y/ Union %         %       Mean
  No Data for Construction DETR        PW 2010 PW 2011    - 2011    Average     Survey Avg.       N     Difference Difference   Wages
Average                                                        0.25%                       2.64%             2.68%     -6.34%
Water & Jetting Trucks
Up to 2,500 gallons                      35.43    36.90        4.15%    36.90              0.00%
2,500 gallons & over                     35.45    36.90        4.09%    36.90              0.00%
DW 20's & 21's & other similar Cat
type, Terry Cobra LeTourneau pulls,
Tournerocker, Euclid, & similar type
equipment when pulling Aqua/Pak,
Water Tank Trailers, & Fuel, and/or
Grease Tank Trailer, or other
miscellaneous Trailers, (except as
defined under "Dump Trucks")             35.73    36.90        3.27%    36.90              0.00%
Heavy Duty Transport (High Bed)          35.62    36.90        3.59%    36.90              0.00%
Heavy Duty Transport(Gooseneck low
bed)                                     35.62    36.90        3.59%    36.90              0.00%
Tiltbed or Flatbed Pull Trailers         35.62    36.90        3.59%    36.90              0.00%
Bootman, Comb. Bootman & Road
Oiler                                    35.51    36.90        3.91%    36.90              0.00%
Flat Rack (2 or 3 axle unit)             33.34    36.90       10.68%    36.90              0.00%
Bus & Manhaul Drivers
Up to 18,000 lbs. (single unit)          35.07    36.90        5.22%    36.90              0.00%
18,000 lbs. & over (single unit)         35.18    36.90        4.89%    36.90              0.00%
Helicopter Pilot (transporting men/
materials)                               49.66    36.90      -25.69%    36.90              0.00%
Lift Jitneys                             35.29    36.90        4.56%    36.90              0.00%
Winch Truck & "A" Frame Drivers
Up to 18,000 lbs.                        35.18    36.90        4.89%    36.90              0.00%
18,000 lbs. and over                     35.29    36.90        4.56%    36.90              0.00%
Warehousemen Spotter                     35.13    36.90        5.04%    36.90              0.00%
Warehouse Clerk                          35.24    36.90        4.71%    36.90              0.00%
Tire Repairmen                           35.45    36.90        4.09%    36.90              0.00%
Truck Repairmen                          35.78    36.90        3.13%    36.90              0.00%
Pick Up Truck & Pilot Cars (Jobsite)     33.14    36.90       11.35%    36.90              0.00%
Pick Up Truck & Pilot Cars (Over the
road)                                    35.13    36.90        5.04%    36.90              0.00%
Truck Oil Greaser                        35.18    36.90        4.89%    36.90              0.00%
Fuel Truck Driver                        35.18    36.90        4.89%    36.90              0.00%
Fuel Man & Fuel Island Man               35.18    36.90        4.89%    36.90              0.00%
Oil Tanker                               35.62    36.90        3.59%    36.90              0.00%
                                                                       120
                                                     Annual     2011 PW Difference Between                     Non-Union    DETR
 EUREKA                                            Growth, 2010 Survey     PW Rates and    Union Y/ Union %         %       Mean
 No Data for Construction DETR     PW 2010 PW 2011    - 2011    Average     Survey Avg.       N     Difference Difference   Wages
Average                                                    0.25%                       2.64%             2.68%     -6.34%
Oil Tanker with Pup                  36.04     36.90       2.39%    36.90              0.00%
Foreman:                             36.54     37.40       2.35%    36.90              1.36%

WELL DRILLER                                 Lander                                             N                   0.00%
Well Driller                         31.91     22.34     -29.99%    22.34              0.00%

                                    ADD       ADD
                                   OPERATI   OPERATI
LUBRICATION AND SERVICE            NG ENG.   NG ENG.
ENGINEER (MOBILE AND GREASE        ZONE      ZONE
RACK)                              RATE      RATE                                               Y        2.16%
Lubrication and Service Engineer
(mobile and grease rack)             46.10     47.85       3.80%    46.84              2.16%

SOIL TESTER (CERTIFIED)                      Nye                                                Y        -0.30%
Soil Tester (Certified)              45.65     56.62      24.03%    56.79             -0.30%

SOILS AND MATERIALS TESTER                   Nye
Soils and Materials Tester           45.65     56.62      24.03%    56.79             -0.30%


Union Breakdown
Union                                                                                           27
Non-Union                                                                                       11
Total                                                                                           38




                                                                   121
DETR Mean Wage     Wage
 + 40% Benefits   Premium




                            122
                                                         Annual     2011 PW Difference Between                     Non-Union    DETR
 HUMBOLDT                                              Growth, 2010 Survey     PW Rates and    Union Y/ Union %         %       Mean
 Average Construction Wage $21.92      PW 2010 PW 2011    - 2011    Average     Survey Avg.       N     Difference Difference   Wages
Average                                                          5.81%                    3.41%               2.40%    -1.89%

                                        ADD
                                       SHEET
                                       METAL
                                       ZONE
AIR BALANCE TECHNICIAN                 RATE        Lander                                          Y         47.11%
Air Balance-Journeyman                     46.60       48.35    3.76%     34.98          38.22%
Air Balance-Foreman                        49.62       51.46    3.71%     34.98          47.11%
Air Balance-General Foreman                52.64       54.57    3.67%     34.98          56.00%

ALARM INSTALLER                                                                                    N                   -9.74%
Alarm Installer                            25.69       25.58    -0.43%    28.34          -9.74%

BOILERMAKER                            -           Clark                                           Y          1.87%
Boilermaker-Journeyman                     59.50       65.94   10.82%     64.73           1.87%
Boilermaker-Foreman                        59.50       65.94   10.82%     64.73           1.87%
Boilermaker-General Foreman                59.50       65.94   10.82%     64.73           1.87%

                                        ADD
                                       ZONE
BRICKLAYER                             RATE        Eureka                                          Y        -28.07%
Bricklayer                                 32.68       32.68    0.00%     45.43         -28.07%

                                        ADD         ADD
                                       ZONE        ZONE
CARPENTER                              RATE        RATE                                            Y         -1.47%
Carpenter                                  38.30       38.80    1.31%     39.38          -1.47%

CEMENT MASON                                                                                       Y          0.00%
Cement Mason                               17.00       34.40   102.35%    34.40           0.00%

ELECTRICIAN-COMMUNICATION TECHNICIAN                                                               N                    0.00%

Electrician-Communication Technician       27.97       25.66    -8.26%    25.66           0.00%

ELECTRICIAN-LINE                       -           -                                               Y          2.20%
Groundman                                  39.19       40.50    3.34%     55.87         -27.51%
Lineman                                    57.91       59.90    3.44%     55.87           7.21%
Foreman                                    63.02       65.16    3.40%     55.87
                                                                         123             16.63%
                                                      Annual     2011 PW Difference Between                     Non-Union    DETR
 HUMBOLDT                                           Growth, 2010 Survey     PW Rates and    Union Y/ Union %         %       Mean
 Average Construction Wage $21.92   PW 2010 PW 2011    - 2011    Average     Survey Avg.       N     Difference Difference   Wages
Average                                                     5.81%                      3.41%               2.40%    -1.89%
General Foreman                         68.12       70.45   3.42%     55.87           26.10%
Equipment Specialist                    47.86       49.49   3.41%     55.87          -11.42%

ELECTRICIAN-NEON SIGN               -           Clark                                           Y          0.57%
Electrician-Neon Sign                   44.31       45.52   2.73%     45.26            0.57%

ELECTRICIAN-WIREMAN                 -           -                                               Y         16.05%
Wireman                                 31.22       50.78   62.65%    47.03            7.97%
Cable Splicer                           31.22       54.58   74.82%    47.03           16.05%
Foreman                                 31.22       54.58   74.82%    47.03           16.05%
General Foreman                         31.22       58.38   87.00%    47.03           24.13%


ELEVATOR CONSTRUCTOR                -           Churchill                                       Y         13.48%
Elevator Constructor-Journeyman
Mechanic                                46.01       78.21   69.98%    72.12            8.44%
Elevator Constructor-Mechanic in
Charge                                  46.01       85.48   85.79%    72.12           18.52%

                                     ADD
                                    LABORE
                                    R ZONE
FENCE ERECTOR                       RATE        Elko                                            N                    0.00%
Fence Erector                           30.82       35.47   15.09%    35.47            0.00%

                                     ADD    ADD
                                    LABORE LABORE
                                    R ZONE R ZONE
FLAGPERSON                          RATE   RATE 
Flagperson                              27.95       27.95   0.00%

FLOOR COVERER                                   Elko                                            Y          3.65%
Floor Coverer-Journeyman                36.26       36.34   0.22%     36.31            0.08%
Floor Coverer-Foreman                   38.90       38.93   0.08%     36.31            7.22%

GLAZIER                             -           -                                               N                    0.00%
Glazier                                 21.50       20.50   -4.65%    20.50            0.00%

                                                                     124
                                                         Annual     2011 PW Difference Between                     Non-Union    DETR
 HUMBOLDT                                              Growth, 2010 Survey     PW Rates and    Union Y/ Union %         %       Mean
 Average Construction Wage $21.92      PW 2010 PW 2011    - 2011    Average     Survey Avg.       N     Difference Difference   Wages
Average                                                       5.81%                       3.41%               2.40%    -1.89%
                                        ADD    ADD
                                       LABORE LABORE
                                       R ZONE R ZONE
HIGHWAY STRIPER                        RATE   RATE                                                 Y          0.00%
Highway Striper                          33.57     33.57      0.00%     33.57             0.00%

                                        ADD       ADD
HOD CARRIER-BRICK MASON                ZONE      ZONE
TENDER                                 RATE      RATE                                              Y          0.83%
Brick Mason-Journeyman                   30.10     30.10      0.00%     30.10             0.00%
Brick Mason-Foreman                      30.60     30.60      0.00%     30.10             1.66%

                                        ADD
HOD CARRIER-PLASTERER                  ZONE
TENDER                                 RATE      Washoe                                            Y          3.90%
Plasterer Tender-Journeyman              33.76     34.26      1.48%     33.73             1.57%
Plasterer Tender-Gun Tender              34.76     35.26      1.44%     33.73             4.54%
Plasterer Tender-Foreman                 35.12     35.62      1.42%     33.73             5.60%

                                       SEE
                                       AMENDM
IRON WORKER                            ENT 1-                                                      Y          4.80%
Ironworker-Journeyman                    54.38     56.74      4.34%     57.31            -0.99%
Ironworker-Foreman                       57.68     60.04      4.09%     57.31             4.76%
Ironworker-General Foreman               61.04     63.40      3.87%     57.31            10.63%

                                        ADD    ADD
                                       LABORE LABORE
                                       R ZONE R ZONE
LABORER                                RATE   RATE                                                 Y        -14.41%
Laborer                                  30.82     25.66     -16.74%    29.98           -14.41%                                  19.36

                                       SEE
                                       AMENDM
MECHANICAL INSULATOR                   ENT 2- Clark                                                Y          2.71%
Mechanical Insulator-Mechanic            57.06     54.56      -4.38%    55.23            -1.21%
Mechanical Insulator-Foreman             59.56     57.06      -4.20%    55.23             3.31%

Mechanical Insulator-General Foreman     61.06     58.56      -4.09%    55.23
                                                                       125                6.03%
                                                         Annual     2011 PW Difference Between                     Non-Union    DETR
 HUMBOLDT                                              Growth, 2010 Survey     PW Rates and    Union Y/ Union %         %       Mean
 Average Construction Wage $21.92      PW 2010 PW 2011    - 2011    Average     Survey Avg.       N     Difference Difference   Wages
Average                                                         5.81%                     3.41%               2.40%    -1.89%


MILLWRIGHT                                         Pershing                                        N                    0.00%
Millwright-Journeyman                      49.70       31.51   -36.60%    31.51           0.00%
Millwright-Welder                          50.70       31.51   -37.85%    31.51           0.00%
Millwright-Foreman                         53.01       31.51   -40.56%    31.51           0.00%
Millwright-General Foreman                 56.65       31.51   -44.38%    31.51           0.00%

                                        ADD         ADD
OPERATING ENGINEER                     ZONE        ZONE                                            Y          8.88%
SEE GROUP CLASSIFICATIONS              RATE        RATE 
Group 1                                    41.33       43.08    4.23%     46.84          -8.03%
Group 1A                                   44.09       45.84    3.97%     46.84          -2.13%
Group 2                                    44.62       46.37    3.92%     46.84          -1.00%
Group 3                                    44.89       46.64    3.90%     46.84          -0.43%
Group 4                                    45.63       47.38    3.84%     46.84           1.15%
Group 5                                    45.93       47.68    3.81%     46.84           1.79%
Group 6                                    46.10       47.85    3.80%     46.84           2.16%
Group 7                                    46.35       48.10    3.78%     46.84           2.69%
Group 8                                    46.94       48.69    3.73%     46.84           3.95%
Group 9                                    47.26       49.01    3.70%     46.84           4.63%
Group 10                                   47.61       49.36    3.68%     46.84           5.38%
Group 10A                                  47.80       49.55    3.66%     46.84           5.79%
Group 11                                   48.04       49.79    3.64%     46.84           6.30%
Group 11A                                  49.68       51.43    3.52%     46.84           9.80%
Group 11B                                  50.49       52.24    3.47%     46.84          11.53%
Foreman                                    49.68       51.43    3.52%     46.84           9.80%
Add 7% to base rate for "Second"
Shift                                  -           -
Add 12.5% to base rate for "Special"
shift                                  -           -

OPERATING ENGINEER-STEEL                ADD         ADD
FABRICATOR & ERECTOR                   ZONE        ZONE
SEE GROUP CLASSIFICATIONS              RATE        RATE
Group 1                                    56.63       58.38    3.09%     46.84          24.64%
Group 1 Truck Crane Oiler                  50.46       52.21    3.47%     46.84          11.46%
Group 1 Oiler                              48.50       50.25    3.61%     46.84           7.28%
Group 2                                    55.12       56.87    3.17%     46.84
                                                                         126             21.41%
                                                         Annual     2011 PW Difference Between                     Non-Union    DETR
 HUMBOLDT                                              Growth, 2010 Survey     PW Rates and    Union Y/ Union %         %       Mean
 Average Construction Wage $21.92      PW 2010 PW 2011    - 2011    Average     Survey Avg.       N     Difference Difference   Wages
Average                                                        5.81%                      3.41%               2.40%    -1.89%
Group 2 Truck Crane Oiler                  50.21       51.96   3.49%    46.84            10.93%
Group 2 Oiler                              48.29       50.04   3.62%    46.84             6.83%
Group 3                                    53.88       55.63   3.25%    46.84            18.77%
Group 3 Truck Crane Oiler                  49.99       51.74   3.50%    46.84            10.46%
Group 3 Oiler                              48.07       49.82   3.64%    46.84             6.36%
Group 3 Hydraulic                          49.66       51.41   3.52%    46.84             9.76%
Group 4                                    52.15       53.90   3.36%    46.84            15.07%
Group 5                                    51.05       52.80   3.43%    46.84            12.72%
Add 7% to base rate for "Second"
Shift                                  -           -
Add 12.5% to base rate for "Special"
Shift

OPERATING ENGINEER -                   ADD          ADD
PILEDRIVER                            ZONE         ZONE                                            Y
SEE GROUP CLASSIFICATIONS             RATE         RATE 
Group 1                                  56.10         57.85   3.12%    46.84            23.51%
Group 1 Truck Crane Oiler                50.64         52.39   3.46%    46.84            11.85%
Group 1 Oiler                            48.72         50.47   3.59%    46.84             7.75%
Group 2                                  54.56         56.31   3.21%    46.84            20.22%
Group 2 Truck Crane Oiler                50.43         52.18   3.47%    46.84            11.40%
Group 2 Oiler                            48.52         50.27   3.61%    46.84             7.32%
Group 3                                  53.11         54.86   3.30%    46.84            17.12%
Group 3 Truck Crane Oiler                50.21         51.96   3.49%    46.84            10.93%
Group 3 Oiler                            48.29         50.04   3.62%    46.84             6.83%
Group 4                                  51.60         53.35   3.39%    46.84            13.90%
Group 5                                  50.49         52.24   3.47%    46.84            11.53%
Group 6                                  49.38         51.13   3.54%    46.84             9.16%
Group 7                                  48.42         50.17   3.61%    46.84             7.11%
Group 8                                  47.46         49.21   3.69%    46.84             5.06%
Add 7% to base for "Second" Shift      -           -
Add 12.5% to base for "Special" Shift -            -


PAINTER                                                                                            Y         -0.19%
Brush/Roller Painter                       32.74       32.74   0.00%    33.69            -2.82%
Spray Painter/Paperhanger                  33.59       33.59   0.00%    33.69            -0.30%
Sandblaster                                33.24       33.24   0.00%    33.69            -1.34%
Structural Steel & Steeplejack             33.74       33.74   0.00%    33.69
                                                                       127                0.15%
                                                         Annual     2011 PW Difference Between                     Non-Union    DETR
 HUMBOLDT                                              Growth, 2010 Survey     PW Rates and    Union Y/ Union %         %       Mean
 Average Construction Wage $21.92      PW 2010 PW 2011    - 2011    Average     Survey Avg.       N     Difference Difference   Wages
Average                                                         5.81%                     3.41%               2.40%    -1.89%
Swing Stage                                34.74       34.74    0.00%     33.69           3.12%
Special Coating Application-Brush          33.24       33.24    0.00%     33.69          -1.34%
Special Coating Application-Spray          33.74       33.74    0.00%     33.69           0.15%
Special Coating Application-Spray
Steel                                      33.99       33.99    0.00%     33.69           0.89%
                                        $1.00       $1.00
                                       above       above
                                       highest     highest
                                       Journeym    Journeym
Foreman                                an          an 

PILEDRIVER
Piledriver-Journeyman                      58.47       58.47    0.00%
Piledriver-Foreman                         62.05       62.05    0.00%

                                        ADD
                                       ZONE
PLASTERER                              RATE        Washoe                                          Y         -1.47%
Plasterer                                  34.27       34.77    1.46%     35.29          -1.47%

PLUMBER/PIPEFITTER                     -           -                                               Y         -0.44%
Plumber/Pipefitter                         45.20       45.20    0.00%     45.40          -0.44%

REFRIGERATION                          -           -                                               Y          4.52%
Refrigeration                              27.52       41.58   51.09%     39.78           4.52%

ROOFER                                 -           -
(Does not include sheet metal roofs)                                                               N                   -0.48%
Roofer                                     24.11       24.11    0.00%     24.11           0.00%

                                                    ADD
                                                   ZONE
SHEET METAL WORKER                                 RATE                                            Y         -0.96%
Sheet Metal Worker                         46.60       48.35    3.76%     48.82          -0.96%

SPRINKLER FITTER                       -           -                                               N                   -8.47%
Sprinkler Fitter-Journeyman                52.30       39.35   -24.76%    42.99          -8.47%
Sprinkler Fitter-Foreman                   55.05       39.35   -28.52%    42.99          -8.47%
                                                                         128
                                                      Annual     2011 PW Difference Between                     Non-Union    DETR
 HUMBOLDT                                           Growth, 2010 Survey     PW Rates and    Union Y/ Union %         %       Mean
 Average Construction Wage $21.92   PW 2010 PW 2011    - 2011    Average     Survey Avg.       N     Difference Difference   Wages
Average                                                       5.81%                    3.41%               2.40%    -1.89%
Sprinkler Fitter-General Foreman        57.30      39.35    -31.33%    42.99          -8.47%


SURVEYOR                                        Churchill                                       N                    0.61%
Surveyor                                37.79      25.63    -32.18%    25.63           0.00%

TAPER                               -           Elko                                            Y          1.23%
Taper                                   35.49      36.28     2.23%     35.84           1.23%

                                   ADD
TILE SETTER/TERRAZZO WORKER/ ZONE
MARBLE MASON-FINISHER              RATE     Douglas                                             Y          1.02%
Tile, Terrazzo and Marble Finisher    32.48   24.77         -23.74%    24.52           1.02%

                                 ADD
TILE SETTER/TERRAZZO WORKER/ ZONE
MARBLE MASON                     RATE     Douglas                                               Y          4.52%
Tile Setter-Journeyman              35.99   32.87            -8.67%    33.52          -1.94%
Tile Setter-Foreman                 35.99   34.12            -5.20%    33.52           1.79%
Tile Setter-General Formean         35.99   35.87            -0.33%    33.52           7.01%
Terrazzo/Marble Mason-Journeyman    35.99   34.37            -4.50%    33.52           2.54%
Terrazzo/Marble Mason-Foreman       35.99   35.62            -1.03%    33.52           6.26%
Terrazzo/Marble Mason-General
Foreman                             35.99   37.37            3.83%     33.52          11.49%

                                     ADD    ADD
                                    LABORE LABORE
                                    R ZONE R ZONE
TRAFFIC BARRIER ERECTOR             RATE   RATE 
Traffic Barrier Erector                 30.82      30.82     0.00%

                                     ADD
                                    ZONE
TRUCK DRIVER                        RATE     Elko                                               Y         -2.22%
Dump Trucks (Single or Multiple Units
Including Semi's & Double Transfer Units),
Dumpcretes and Bulk Cement Spreader)
Under 4 yds. (water level)             35.02    39.51       12.82%     40.42          -2.25%
4 yds. & under 8 yds. (water level)    35.24    39.51       12.12%     40.42
                                                                      129             -2.25%
                                                           Annual     2011 PW Difference Between                     Non-Union    DETR
  HUMBOLDT                                               Growth, 2010 Survey     PW Rates and    Union Y/ Union %         %       Mean
  Average Construction Wage $21.92       PW 2010 PW 2011    - 2011    Average     Survey Avg.       N     Difference Difference   Wages
Average                                                         5.81%                       3.41%               2.40%    -1.89%
8 yds. & under 18 yds. (water level)       35.45    39.51      11.45%     40.42            -2.25%
18 yds. & under 25 yds. ( water level)     35.62    39.51      10.92%     40.42            -2.25%
25 yds. & under 60 yds. (water level)      36.04    39.51       9.63%     40.42            -2.25%
60 yds. & under 75 yds. (water level)      37.48    39.51       5.42%     40.42            -2.25%

75 yds. & under 100 yds. (water level)     38.43    39.51       2.81%     40.42            -2.25%

100 yds. & under 150 yds.(water level)     38.90    39.51       1.57%     40.42            -2.25%
150 yds. & under 250 yds. ( water
level)                                     40.90    39.51       -3.40%    40.42            -2.25%
250 yds. & under 350 yds. (water
level)                                     43.90    39.51      -10.00%    40.42            -2.25%
350 yds. & over (water level)              45.40    39.51      -12.97%    40.42            -2.25%
Transit Mix
Under 8 yds.                               35.45    39.51      11.45%     40.42            -2.25%
8 yds. & including 12 yds.                 35.56    39.51      11.11%     40.42            -2.25%
Over 12 yds.                               35.78    39.51      10.42%     40.42            -2.25%
Transit Mix (Using Boom)
Transit mix with boom shall receive 16
cents per hour
above the appropriate yardage
classification rate of pay 
when such boom is used
Water & Jetting Trucks
Up to 2,500 gallons                        35.43    39.51      11.52%     40.42            -2.25%
2,500 gallons & over                       35.45    39.51      11.45%     40.42            -2.25%
DW 20's & 21's & other similar Cat
type, Terry Cobra LeTourneau pulls,
Tournerocker, Euclid, & similar type
equipment when pulling Aqua/Pak,
Water Tank Trailers, & Fuel, and/or
Grease Tank Trailer, or other
miscellaneous Trailers, (except as
defined under "Dump Trucks")               35.73    39.51      10.58%     40.42            -2.25%
Heavy Duty Transport (High Bed)            35.62    39.51      10.92%     40.42            -2.25%
Heavy Duty Transport(Gooseneck low
bed)                                       35.62    39.51      10.92%     40.42            -2.25%
Tiltbed or Flatbed Pull Trailers           35.62    39.51      10.92%     40.42            -2.25%
                                                                         130
                                                         Annual     2011 PW Difference Between                     Non-Union    DETR
  HUMBOLDT                                             Growth, 2010 Survey     PW Rates and    Union Y/ Union %         %       Mean
  Average Construction Wage $21.92     PW 2010 PW 2011    - 2011    Average     Survey Avg.       N     Difference Difference   Wages
Average                                                       5.81%                       3.41%               2.40%    -1.89%
Bootman, Comb. Bootman & Road
Oiler                                    35.51     39.51     11.26%     40.42            -2.25%
Flat Rack (2 or 3 axle unit)             33.34     39.51     18.51%     40.42            -2.25%
Bus & Manhaul Drivers
Up to 18,000 lbs. (single unit)          35.07     39.51     12.66%     40.42            -2.25%
18,000 lbs. & over (single unit)         35.18     39.51     12.31%     40.42            -2.25%
Helicopter Pilot (transporting men/
materials)                               49.66     39.51     -20.44%    40.42            -2.25%
Lift Jitneys                             35.29     39.51      11.96%    40.42            -2.25%
Winch Truck & "A" Frame Drivers
Up to 18,000 lbs.                        35.18     39.51     12.31%     40.42            -2.25%
18,000 lbs. and over                     35.29     39.51     11.96%     40.42            -2.25%
Warehousemen Spotter                     35.13     39.51     12.47%     40.42            -2.25%
Warehouse Clerk                          35.24     39.51     12.12%     40.42            -2.25%
Tire Repairmen                           35.45     39.51     11.45%     40.42            -2.25%
Truck Repairmen                          35.78     39.51     10.42%     40.42            -2.25%
Pick Up Truck & Pilot Cars (Jobsite)     33.14     39.51     19.22%     40.42            -2.25%
Pick Up Truck & Pilot Cars (Over the
road)                                    35.13     39.51     12.47%     40.42            -2.25%
Truck Oil Greaser                        35.18     39.51     12.31%     40.42            -2.25%
Fuel Truck Driver                        35.18     39.51     12.31%     40.42            -2.25%
Fuel Man & Fuel Island Man               35.18     39.51     12.31%     40.42            -2.25%
Oil Tanker                               35.62     39.51     10.92%     40.42            -2.25%
Oil Tanker with Pup                      36.04     39.51      9.63%     40.42            -2.25%
Foreman:                                 36.54     40.01      9.50%     40.42            -1.01%

WELL DRILLER                                                                                       N                    1.08%
Well Driller                             21.41     22.80      6.49%     22.80             0.00%

                                        ADD       ADD
                                       OPERATI   OPERATI
LUBRICATION AND SERVICE                NG ENG.   NG ENG.
ENGINEER (MOBILE AND GREASE            ZONE      ZONE
RACK)                                  RATE      RATE                                              Y          2.16%
Lubrication and Service Engineer
(mobile and grease rack)                 46.10     47.85      3.80%     46.84             2.16%

SOIL TESTER (CERTIFIED)                          Nye                                               Y         -0.30%
Soil Tester (Certified)                  44.65     56.62     26.81%     56.79
                                                                       131               -0.30%
                                                      Annual     2011 PW Difference Between                     Non-Union    DETR
 HUMBOLDT                                           Growth, 2010 Survey     PW Rates and    Union Y/ Union %         %       Mean
 Average Construction Wage $21.92   PW 2010 PW 2011    - 2011    Average     Survey Avg.       N     Difference Difference   Wages
Average                                                    5.81%                       3.41%               2.40%    -1.89%

SOILS AND MATERIALS TESTER                    Nye                                                         -0.30%
Soils and Materials Tester            44.65     56.62     26.81%    56.79             -0.30%

Union Breakdown
Union                                                                                          29
Non-Union                                                                                      9
Total                                                                                          38




                                                                   132
DETR Mean
Wage + 40%    Wage
 Benefits    Premium
               -5.33%




                        133
DETR Mean
Wage + 40%      Wage
 Benefits      Premium
                 -5.33%




       27.10     -5.33%




                          134
 LANDER                                         Annual     2011 PW Difference Between                     Non-Union    DETR
 Average Construction Wage                    Growth, 2010 Survey     PW Rates and    Union Y/ Union %         %       Mean
 $21.42                       PW 2010 PW 2011    - 2011    Average     Survey Avg.       N     Difference Difference   Wages
Average                                               3.97%                      0.59%              2.17%     -1.33%

                                           ADD
                                          SHEET
                                          METAL
                                          ZONE
AIR BALANCE TECHNICIAN                    RATE                                            Y        47.11%
Air Balance-Journeyman            58.52      48.35   -17.38%   34.98            38.22%
Air Balance-Foreman               62.95      51.46   -18.25%   34.98            47.11%
Air Balance-General Foreman       67.37      54.57   -19.00%   34.98            56.00%

ALARM INSTALLER                                                                           N                    0.00%
Alarm Installer                   30.88      25.58   -17.16%   25.58             0.00%

BOILERMAKER                   -           Clark                                           Y         1.87%
Boilermaker-Journeyman            59.50      65.94   10.82%    64.73             1.87%
Boilermaker-Foreman               59.50      65.94   10.82%    64.73             1.87%
Boilermaker-General Foreman       59.50      65.94   10.82%    64.73             1.87%

                               ADD
                              ZONE
BRICKLAYER                    RATE        Eureka                                          Y        -28.07%
Bricklayer                        32.68      32.68    0.00%    45.43            -28.07%

                               ADD         ADD
                              ZONE        ZONE
CARPENTER                     RATE        RATE                                            Y         3.70%
Carpenter-Journeyman              38.30      38.80    1.31%    38.74             0.15%
Carpenter-Foreman                 41.05      41.55    1.22%    38.74             7.25%

CEMENT MASON                                                                              Y        -10.60%
Cement Mason                      34.40      34.40    0.00%    38.48            -10.60%


ELECTRICIAN-COMMUNICATION                 Humboldt
TECHNICIAN                                                                                N                    0.00%
Communication Technician          27.97      25.66    -8.26%   25.66             0.00%


                                                               135
 LANDER                                              Annual     2011 PW Difference Between                     Non-Union    DETR
 Average Construction Wage                         Growth, 2010 Survey     PW Rates and    Union Y/ Union %         %       Mean
 $21.42                            PW 2010 PW 2011    - 2011    Average     Survey Avg.       N     Difference Difference   Wages
Average                                                     3.97%                     0.59%              2.17%     -1.33%

ELECTRICIAN-LINEMAN/GROUNDMAN/     Humboldt
HEAVY EQUIPMENT OPERATOR                                                                       Y         2.20%
Groundman                    39.19    40.50                3.34%    55.87            -27.51%
Lineman                      57.91    59.90                3.44%    55.87              7.21%
Foreman                      63.02    65.16                3.40%    55.87             16.63%
General Foreman              68.12    70.45                3.42%    55.87             26.10%
Equipment Specialist         47.86    49.49                3.41%    55.87            -11.42%

ELECTRICIAN-NEON SIGN              -           Clark                                           Y         0.57%
Electrician-Neon Sign                  44.31       45.52   2.73%    45.26             0.57%

ELECTRICIAN-WIREMAN                -           -                                               N                   -4.83%
Wireman                                31.07       42.60   37.11%   44.76             -4.83%
Cable Splicer                          31.07       42.60   37.11%   44.76             -4.83%
Foreman                                31.07       42.60   37.11%   44.76             -4.83%
General Foreman                        31.07       42.60   37.11%   44.76             -4.83%

                                               Churchill
ELEVATOR CONSTRUCTOR               -                                                           Y        13.48%
Elevator Constructor-Journeyman
Mechanic                               46.01       78.21   69.98%   72.12             8.44%
Elevator Constructor-Mechanic in
Charge                                 46.01       85.48   85.79%   72.12            18.52%

                                    ADD
                                   LABORE
                                   R ZONE Humboldt
FENCE ERECTOR                      RATE                                                        N                    0.00%
Fence Erector                          30.82       35.47   15.09%   35.47             0.00%

                                    ADD    ADD
                                   LABORE LABORE
                                   R ZONE R ZONE
FLAGPERSON                         RATE   RATE
Flagperson                             27.95       27.95   0.00%

FLOOR COVERER                                  Washoe                                          Y         3.65%
                                                                    136
  LANDER                                        Annual     2011 PW Difference Between                     Non-Union    DETR
  Average Construction Wage                   Growth, 2010 Survey     PW Rates and    Union Y/ Union %         %       Mean
  $21.42                      PW 2010 PW 2011    - 2011    Average     Survey Avg.       N     Difference Difference   Wages
Average                                               3.97%                      0.59%              2.17%     -1.33%
Floor Coverer-Journeyman          36.26       36.34   0.22%    36.31             0.08%
Floor Coverer-Foreman             38.90       38.93   0.08%    36.31             7.22%

GLAZIER                       -           -                                               N                    0.00%
Glazier                           21.50       20.50   -4.65%   20.50             0.00%

                               ADD    ADD
                              LABORE LABORE
                              R ZONE R ZONE
HIGHWAY STRIPER               RATE   RATE                                                 Y         1.73%
Highway Striper                   33.57       33.57   0.00%    33.00             1.73%

                               ADD
HOD CARRIER-BRICK MASON       ZONE        Humblodt
TENDER                        RATE                                                        Y         0.00%
Brick Mason                       30.10       30.10   0.00%    30.10             0.00%

                               ADD
HOD CARRIER-PLASTERER         ZONE
TENDER                        RATE        Washoe                                          Y         3.90%
Plasterer Tender-Journeyman       33.76       34.26   1.48%    33.73             1.57%
Plasterer-Gun Tender              34.76       35.26   1.44%    33.73             4.54%
Plasterer Tender-Foreman          35.12       35.62   1.42%    33.73             5.60%

                              SEE
                              AMENDM Humblodt
IRON WORKER                   ENT 1-                                                      Y         4.80%
Ironworker-Journeyman             54.38       56.74   4.34%    57.31            -0.99%
Ironworker-Foreman                57.68       60.04   4.09%    57.31             4.76%
Ironworker-General Foreman        61.04       63.40   3.87%    57.31            10.63%

LABORER                        ADD         ADD                                            Y         -4.45%
SEE GROUP CLASSIFICATIONS     ZONE        ZONE
                              RATE        RATE
Landscaper                        25.66       25.66   0.00%    31.80            -19.31%
Furniture Mover                   27.16       27.16   0.00%    31.80            -14.59%
Group 1                           30.82       30.82   0.00%    31.80             -3.08%
Group 1A                          27.95       27.95   0.00%    31.80            -12.11%
                                                               137
 LANDER                                             Annual     2011 PW Difference Between                     Non-Union    DETR
 Average Construction Wage                        Growth, 2010 Survey     PW Rates and    Union Y/ Union %         %       Mean
 $21.42                           PW 2010 PW 2011    - 2011    Average     Survey Avg.       N     Difference Difference   Wages
Average                                                   3.97%                       0.59%             2.17%     -1.33%
Group 2                              30.92      30.92     0.00%    31.80             -2.77%
Group 3                              31.07      31.07     0.00%    31.80             -2.30%
Group 4A                             31.32      31.32     0.00%    31.80             -1.51%
Group 4                              32.57      32.57     0.00%    31.80              2.42%
Group 5                              31.62      31.62     0.00%    31.80             -0.57%
Group 6                              29.72      29.72
Nozzlemen, Rodmen                    31.62      31.62     0.00%    31.80             -0.57%
Gunmen, Materialmen                  31.32      31.32     0.00%    31.80             -1.51%
Reboundmen                           30.97      30.97     0.00%    31.80             -2.61%
Gunite Foremen                       32.02      32.02     0.00%    31.80              0.69%

                                  SEE
                                  AMENDM
MECHANICAL INSULATOR              ENT 2- Washoe                                               Y         -0.08%
Mechanical Insulator-Journeyman      57.06      54.56    -4.38%    56.77             -3.89%
Mechanical Insulator-Foreman         59.56      57.06    -4.20%    56.77              0.51%
Mechanical Insulator-General
Foreman                              61.06      58.56    -4.09%    56.77             3.15%


                                             Humboldt
MILLWRIGHT                                                                                    N                    0.00%
Millwright-Journeyman                49.70      25.33   -49.03%    25.33             0.00%
Millwright-Welder                    50.70      25.33   -50.04%    25.33             0.00%
Millwright-Foreman                   53.01      25.33   -52.22%    25.33             0.00%
Millwright-General Foreman           56.65      25.33   -55.29%    25.33             0.00%

OPERATING ENGINEER                 ADD      ADD                                               Y         -1.07%
SEE GROUP CLASSIFICATIONS         ZONE     ZONE
Group 1                              41.33 RATE
                                  RATE        43.08       4.23%    51.55            -16.43%
Group 1A                             44.09      45.84     3.97%    51.55            -11.08%
Group 2                              44.62      46.37     3.92%    51.55            -10.05%
Group 3                              44.89      46.64     3.90%    51.55             -9.52%
Group 4                              45.63      47.38     3.84%    51.55             -8.09%
Group 5                              45.93      47.68     3.81%    51.55             -7.51%
Group 6                              46.10      47.85     3.80%    51.55             -7.18%
Group 7                              46.35      48.10     3.78%    51.55             -6.69%
Group 8                              46.94      48.69     3.73%    51.55             -5.55%
                                                                   138
  LANDER                                             Annual     2011 PW Difference Between                     Non-Union    DETR
  Average Construction Wage                        Growth, 2010 Survey     PW Rates and    Union Y/ Union %         %       Mean
  $21.42                           PW 2010 PW 2011    - 2011    Average     Survey Avg.       N     Difference Difference   Wages
Average                                                    3.97%                       0.59%             2.17%     -1.33%
Group 9                                47.26       49.01   3.70%    51.55             -4.93%
Group 10                               47.61       49.36   3.68%    51.55             -4.25%
Group 10A                              47.80       49.55   3.66%    51.55             -3.88%
Group 11                               48.04       49.79   3.64%    51.55             -3.41%
Group 11A                              49.68       51.43   3.52%    51.55             -0.23%
Group 11B                              50.49       52.24   3.47%    51.55              1.34%
Foreman                                49.68       51.43   3.52%    51.55             -0.23%
Add 7% to base rate for "Second"
Shift                              -           -
Add 12.5% to base rate for
"Special" shift                    -           -

OPERATING ENGINEER-STEEL            ADD         ADD
FABRICATOR & ERECTOR               ZONE        ZONE
SEE GROUP CLASSIFICATIONS          RATE        RATE
Group 1                                56.63       58.38   3.09%    51.55            13.25%
Group 1 Truck Crane Oiler              50.46       52.21   3.47%    51.55             1.28%
Group 1 Oiler                          48.50       50.25   3.61%    51.55            -2.52%
Group 2                                55.12       56.87   3.17%    51.55            10.32%
Group 2 Truck Crane Oiler              50.21       51.96   3.49%    51.55             0.80%
Group 2 Oiler                          48.29       50.04   3.62%    51.55            -2.93%
Group 3                                53.88       55.63   3.25%    51.55             7.91%
Group 3 Truck Crane Oiler              49.99       51.74   3.50%    51.55             0.37%
Group 3 Oiler                          48.07       49.82   3.64%    51.55            -3.36%
Group 3 Hydraulic                      49.66       51.41   3.52%    51.55            -0.27%
Group 4                                52.15       53.90   3.36%    51.55             4.56%
Group 5                                51.05       52.80   3.43%    51.55             2.42%
Add 7% to base rate for "Second"
Shift                              -           -
Add 12.5% to base rate for
"Special" Shift

OPERATING ENGINEER -                ADD         ADD
PILEDRIVER                         ZONE        ZONE                                            Y
SEE GROUP CLASSIFICATIONS          RATE        RATE 
Group 1                                56.10       57.85   3.12%    51.55            12.22%
Group 1 Truck Crane Oiler              50.64       52.39   3.46%    51.55             1.63%
Group 1 Oiler                          48.72       50.47   3.59%    51.55            -2.10%
                                                                    139
 LANDER                                               Annual     2011 PW Difference Between                     Non-Union    DETR
 Average Construction Wage                          Growth, 2010 Survey     PW Rates and    Union Y/ Union %         %       Mean
 $21.42                             PW 2010 PW 2011    - 2011    Average     Survey Avg.       N     Difference Difference   Wages
Average                                                     3.97%                       0.59%             2.17%     -1.33%
Group 2                                 54.56       56.31   3.21%    51.55              9.23%
Group 2 Truck Crane Oiler               50.43       52.18   3.47%    51.55              1.22%
Group 2 Oiler                           48.52       50.27   3.61%    51.55             -2.48%
Group 3                                 53.11       54.86   3.30%    51.55              6.42%
Group 3 Truck Crane Oiler               50.21       51.96   3.49%    51.55              0.80%
Group 3 Oiler                           48.29       50.04   3.62%    51.55             -2.93%
Group 4                                 51.60       53.35   3.39%    51.55              3.49%
Group 5                                 50.49       52.24   3.47%    51.55              1.34%
Group 6                                 49.38       51.13   3.54%    51.55             -0.81%
Group 7                                 48.42       50.17   3.61%    51.55             -2.68%
Group 8                                 47.46       49.21   3.69%    51.55             -4.54%
Add 7% to base for "Second" Shift   -           -
Add 12.5% to base for "Special"
Shift                               -           -


PAINTER                                                                                         Y         -0.45%
Brush/Roller Painter                    32.74       32.74   0.00%    33.78             -3.08%
Spray Painter/Paperhanger               33.59       33.59   0.00%    33.78             -0.56%
Sandblaster                             33.24       33.24   0.00%    33.78             -1.60%
Structural Steel & Steeplejack          33.74       33.74   0.00%    33.78             -0.12%
Swing Stage                             34.74       34.74   0.00%    33.78              2.84%
Special Coating Application-Brush       33.24       33.24   0.00%    33.78             -1.60%
Special Coating Application-Spray       33.74       33.74   0.00%    33.78             -0.12%
Special Coating Application-Spray
Steel                                   33.99       33.99   0.00%    33.78             0.62%
                                     $1.00       $1.00
                                    above       above
                                    highest     highest
                                    Journeym    Journeym
Foreman                             an          an 

PILEDRIVER
Piledriver-Journeyman                   58.47       58.47   0.00%
Piledriver-Foreman                      62.05       62.05   0.00%



                                                                     140
 LANDER                                                  Annual     2011 PW Difference Between                     Non-Union    DETR
 Average Construction Wage                             Growth, 2010 Survey     PW Rates and    Union Y/ Union %         %       Mean
 $21.42                                PW 2010 PW 2011    - 2011    Average     Survey Avg.       N     Difference Difference   Wages
Average                                                         3.97%                     0.59%              2.17%     -1.33%
                                        ADD
                                       ZONE
PLASTERER                              RATE        Washoe                                          Y         -1.47%
Plasterer                                  34.27       34.77    1.46%    35.29            -1.47%

PLUMBER/PIPEFITTER                     -           -                                               Y         -0.44%
Plumber/Pipefitter                         45.20       45.20    0.00%    45.40            -0.44%

REFRIGERATION                          -           -                                               Y        10.75%
Refrigeration-Journeyman                   27.52       41.58   51.09%    39.78            4.52%
Refrigeration-Foreman                      27.52       44.06   60.10%    39.78           10.76%
Refrigeration-General Foreman              27.52       46.53   69.08%    39.78           16.97%


                                                   Humboldt
ROOFER                                 -                                                           N                    0.00%

(Does not include sheet metal roofs)
Roofer                                     17.20       24.11   40.17%    24.11            0.00%

                                                    ADD
                                                   ZONE
SHEET METAL WORKER                                 RATE                                            Y         3.27%
Sheet Metal Worker                         46.60       48.35    3.76%    46.82            3.27%


                                                   Humboldt
SPRINKLER FITTER                       -                                                           N                   -8.47%
Sprinkler Fitter-Journeyman                52.30       39.35   -24.76%   42.99            -8.47%
Sprinkler Fitter-Foreman                   55.05       39.35   -28.52%   42.99            -8.47%
Sprinkler Fitter-General Foreman           57.30       39.35   -31.33%   42.99            -8.47%

                                                   Churchill
SURVEYOR                                                                                           N                    0.00%
Surveyor                                   46.85       25.63   -45.29%   25.63            0.00%



                                                                         141
 LANDER                                                Annual     2011 PW Difference Between                     Non-Union    DETR
 Average Construction Wage                           Growth, 2010 Survey     PW Rates and    Union Y/ Union %         %       Mean
 $21.42                              PW 2010 PW 2011    - 2011    Average     Survey Avg.       N     Difference Difference   Wages
Average                                                      3.97%                      0.59%              2.17%     -1.33%

                                                 Humboldt
TAPER                                -                                                           Y         1.23%
Taper                                    35.49      36.28    2.23%    35.84             1.23%

TILE SETTER/TERRAZZO                  ADD
WORKER/MARBLE MASON-                 ZONE
FINISHER                             RATE        Washoe                                          Y         1.02%
Tile, Terrazzo and Marble Finisher       32.48      24.77   -23.74%   24.52             1.02%

                                      ADD
TILE SETTER/TERRAZZO                 ZONE
WORKER/MARBLE MASON                  RATE        Washoe                                          Y         4.15%
Tile Setter-Journeyman                   35.99      32.87    -8.67%   33.64             -2.29%
Tile Setter-Foreman                      35.99      34.12    -5.20%   33.64              1.43%
Tile Setter-General Formean              35.99      35.87    -0.33%   33.64              6.63%

Terrazzo/Marble Mason-Journeyman         35.99      34.37    -4.50%   33.64             2.17%
Terrazzo/Marble Mason-Foreman            35.99      35.62    -1.03%   33.64             5.89%
Terrazzo/Marble Mason-General
Foreman                                  35.99      37.37    3.83%    33.64            11.09%


                                      ADD    ADD
                                     LABORE LABORE
                                     R ZONE R ZONE
TRAFFIC BARRIER ERECTOR              RATE   RATE
Traffic Barrier Erector                  30.82      30.82    0.00%

                                      ADD         ADD
                                     ZONE        ZONE
TRUCK DRIVER                         RATE        RATE                                            Y         -0.02%

Dump Trucks (Single or Multiple Units
Including Semi's & Double Transfer Units),
Dumpcretes and Bulk Cement Spreader)
Under 4 yds. (water level)           35.02          38.45    9.79%    38.47             -0.05%                                $25.42
4 yds. & under 8 yds. (water level)  35.24          38.45    9.11%    38.47             -0.05%                                $25.42
                                                                      142
 LANDER                                                  Annual     2011 PW Difference Between                     Non-Union    DETR
 Average Construction Wage                             Growth, 2010 Survey     PW Rates and    Union Y/ Union %         %       Mean
 $21.42                                PW 2010 PW 2011    - 2011    Average     Survey Avg.       N     Difference Difference   Wages
Average                                                        3.97%                      0.59%              2.17%     -1.33%

8 yds. & under 18 yds. (water level)     35.45     38.45       8.46%    38.47             -0.05%                                $25.42
18 yds. & under 25 yds. ( water
level)                                   35.62     38.45       7.94%    38.47             -0.05%                                $25.42
25 yds. & under 60 yds. (water
level)                                   36.04     38.45       6.69%    38.47             -0.05%                                $25.42
60 yds. & under 75 yds. (water
level)                                   37.48     38.45       2.59%    38.47             -0.05%                                $25.42
75 yds. & under 100 yds. (water
level)                                   38.43     38.45       0.05%    38.47             -0.05%                                $25.42
100 yds. & under 150 yds.(water
level)                                   38.90     38.45      -1.16%    38.47             -0.05%                                $25.42
150 yds. & under 250 yds. ( water
level)                                   40.90     38.45      -5.99%    38.47             -0.05%                                $25.42
250 yds. & under 350 yds. (water
level)                                   43.90     38.45     -12.41%    38.47             -0.05%                                $25.42
350 yds. & over (water level)            45.40     38.45     -15.31%    38.47             -0.05%                                $25.42
Transit Mix
Under 8 yds.                             35.45     38.45       8.46%    38.47             -0.05%                                $25.42
8 yds. & including 12 yds.               35.56     38.45       8.13%    38.47             -0.05%                                $25.42
Over 12 yds.                             35.78     38.45       7.46%    38.47             -0.05%                                $25.42
Transit Mix (Using Boom)
Transit mix with boom shall receive
16 cents per hour
above the appropriate yardage
classification rate of pay                         38.45     100.00%    38.47             -0.05%                                $25.42
when such boom is used
Water & Jetting Trucks
Up to 2,500 gallons                      35.43     38.45       8.52%    38.47             -0.05%                                $25.42
2,500 gallons & over                     35.45     38.45       8.46%    38.47             -0.05%                                $25.42




                                                                        143
 LANDER                                                  Annual     2011 PW Difference Between                     Non-Union    DETR
 Average Construction Wage                             Growth, 2010 Survey     PW Rates and    Union Y/ Union %         %       Mean
 $21.42                                PW 2010 PW 2011    - 2011    Average     Survey Avg.       N     Difference Difference   Wages
Average                                                        3.97%                      0.59%              2.17%     -1.33%

DW 20's & 21's & other similar Cat
type, Terry Cobra LeTourneau pulls,
Tournerocker, Euclid, & similar type
equipment when pulling Aqua/Pak,
Water Tank Trailers, & Fuel, and/or
Grease Tank Trailer, or other
miscellaneous Trailers, (except as
defined under "Dump Trucks")             35.73     38.45       7.61%    38.47             -0.05%                                $25.42
Heavy Duty Transport (High Bed)          35.62     38.45       7.94%    38.47             -0.05%                                $25.42
Heavy Duty Transport(Gooseneck
low bed)                                 35.62     38.45       7.94%    38.47             -0.05%                                $25.42
Tiltbed or Flatbed Pull Trailers         35.62     38.45       7.94%    38.47             -0.05%                                $25.42
Bootman, Comb. Bootman & Road
Oiler                                    35.51     38.45       8.28%    38.47             -0.05%                                $25.42
Flat Rack (2 or 3 axle unit)             33.34     38.45      15.33%    38.47             -0.05%                                $25.42
Bus & Manhaul Drivers
Up to 18,000 lbs. (single unit)          35.07     38.45       9.64%    38.47             -0.05%                                $25.42
18,000 lbs. & over (single unit)         35.18     38.45       9.30%    38.47             -0.05%                                $25.42
Helicopter Pilot (transporting men/
materials)                               49.66     38.45     -22.57%    38.47             -0.05%                                $25.42
Lift Jitneys                             35.29     38.45       8.95%    38.47             -0.05%                                $25.42

Winch Truck & "A" Frame Drivers
Up to 18,000 lbs.                        35.18     38.45       9.30%    38.47             -0.05%                                $25.42
18,000 lbs. and over                     35.29     38.45       8.95%    38.47             -0.05%                                $25.42
Warehousemen Spotter                     35.13     38.45       9.45%    38.47             -0.05%                                $25.42
Warehouse Clerk                          35.24     38.45       9.11%    38.47             -0.05%                                $25.42
Tire Repairmen                           35.45     38.45       8.46%    38.47             -0.05%                                $25.42
Truck Repairmen                          35.78     38.45       7.46%    38.47             -0.05%                                $25.42

Pick Up Truck & Pilot Cars (Jobsite)     33.14     38.45      16.02%    38.47             -0.05%                                $25.42
Pick Up Truck & Pilot Cars (Over
the road)                                35.13     38.45       9.45%    38.47             -0.05%                                $25.42
Truck Oil Greaser                        35.18     38.45       9.30%    38.47             -0.05%                                $25.42
Fuel Truck Driver                        35.18     38.45       9.30%    38.47             -0.05%                                $25.42
Fuel Man & Fuel Island Man               35.18     38.45       9.30%    38.47             -0.05%                                $25.42
Oil Tanker                               35.62     38.45       7.94%    38.47             -0.05%                                $25.42
                                                                        144
 LANDER                                              Annual     2011 PW Difference Between                     Non-Union    DETR
 Average Construction Wage                         Growth, 2010 Survey     PW Rates and    Union Y/ Union %         %       Mean
 $21.42                            PW 2010 PW 2011    - 2011    Average     Survey Avg.       N     Difference Difference   Wages
Average                                                    3.97%                       0.59%             2.17%     -1.33%
Oil Tanker with Pup                  36.04      38.45      6.69%    38.47             -0.05%                                $25.42
Foreman:                             36.54      38.95      6.60%    38.47              1.25%                                $25.42


WELL DRILLER                                                                                   N                    0.00%
Well Driller                         21.41      22.34      4.34%    22.34             0.00%

                                    ADD       ADD
                                   OPERATI   OPERATI
LUBRICATION AND SERVICE            NG ENG.   NG ENG.
ENGINEER (MOBILE AND               ZONE      ZONE
GREASE RACK)                       RATE      RATE                                              Y         2.16%
Lubrication and Service Engineer
(mobile and grease rack)             46.10      47.85      3.80%    46.84             2.16%

SOIL TESTER (CERTIFIED)                      Nye                                               Y         -0.30%
Soil Tester (Certified)              45.65      56.62     24.03%    56.79             -0.30%


SOILS AND MATERIALS TESTER                   Nye
Soils and Materials Tester           45.65      56.62     24.03%    56.79             -0.30%

Union Breakdown
Union                                                                                          28
Non-Union                                                                                      10
Total                                                                                          38




                                                                    145
DETR Mean
Wage + 40%    Wage
 Benefits    Premium
                8.08%




                        146
DETR Mean
Wage + 40%      Wage
 Benefits      Premium
                  8.08%




      $35.59      8.04%
      $35.59      8.04%
                          147
DETR Mean
Wage + 40%      Wage
 Benefits      Premium
                  8.08%

      $35.59      8.04%

      $35.59      8.04%

      $35.59      8.04%

      $35.59      8.04%

      $35.59      8.04%

      $35.59      8.04%

      $35.59      8.04%

      $35.59      8.04%
      $35.59      8.04%
       $0.00
      $35.59      8.04%
      $35.59      8.04%
      $35.59      8.04%
       $0.00

       $0.00

      $35.59      8.04%
       $0.00
       $0.00
      $35.59      8.04%
      $35.59      8.04%




                          148
DETR Mean
Wage + 40%      Wage
 Benefits      Premium
                  8.08%




      $35.59      8.04%
      $35.59      8.04%

      $35.59      8.04%
      $35.59      8.04%

      $35.59      8.04%
      $35.59      8.04%
       $0.00
      $35.59      8.04%
      $35.59      8.04%

      $35.59      8.04%
      $35.59      8.04%

       $0.00
      $35.59      8.04%
      $35.59      8.04%
      $35.59      8.04%
      $35.59      8.04%
      $35.59      8.04%
      $35.59      8.04%

      $35.59      8.04%

      $35.59      8.04%
      $35.59      8.04%
      $35.59      8.04%
      $35.59      8.04%
      $35.59      8.04%
                          149
DETR Mean
Wage + 40%      Wage
 Benefits      Premium
                  8.08%
      $35.59      8.04%
      $35.59      9.45%




                          150
                                                         Annual    2011 PW Difference Between                       Non-Union DETR
 LINCOLN                                                Growth,     Survey PW Rates and Survey            Union %        %     Mean
 Average Construction Wage $25.99      PW 2010 PW 2011 2010 - 2011 Average         Avg.        Union Y/N Difference Difference Wages
Average                                                      6.61%                        4.76%               5.70%     0.00%

AIR BALANCE TECHNICIAN                  ADD     Clark                                              Y         10.62%
Air Balance Technician-Journeyman      SHEET
                                          58.52    59.52     1.71%      57.83             2.92%
Air Balance Technician-Foreman         METAL
                                          62.95    63.97     1.62%      57.83            10.62%
Air Balance Technician-General Foreman ZONE
                                          67.37    68.42     1.56%      57.83            18.31%
                                       RATE
ALARM INSTALLER                                 Clark                                              Y         12.76%
Alarm Installer-Journeyman                54.38    55.95     2.89%      49.62            12.76%

BOILERMAKER                                       Clark                                            Y          1.87%
Boilermaker                               59.50     65.94   10.82%      64.73             1.87%

                                        ADD
                                       ZONE
BRICKLAYER                             RATE-      Clark                                            Y         -7.78%
Bricklayer-Journeyman                     32.68     44.71   36.81%      48.48            -7.78%

                                                  White
CARPENTER                                         Pine                                             Y          1.31%
Carpenter                                 38.30     38.80    1.31%      38.30             1.31%

                                        ADD
                                       ZONE
CEMENT MASON                           RATE       Clark                                            Y          7.82%
Cement Mason-Journeyman                   34.40     46.28   34.53%      44.70             3.53%
Cement Mason-Foreman                      36.40     48.28   32.64%      44.70             8.01%
Cement Mason-General Foreman              36.40     50.03   37.45%      44.70            11.92%

ELECTRICIAN- COMMUNICATION              ADD     White                                              N                    0.00%
TECHNICIAN
Installer/Technician                      38.72 Pine
                                       ZONE        17.49    -54.83%     17.49             0.00%
Senior Installer/Technician            RATE
                                          54.38    17.49    -67.84%     17.49             0.00%
Installer/Technician Foreman              58.78     17.49   -70.24%     17.49             0.00%
Installer/Technician General Foreman      63.18     17.49   -72.32%     17.49             0.00%

ELECTRICIAN-LINEMAN/GROUNDMAN/
HEAVY EQUIPMENT OPERATOR                          Clark                                            Y         17.59%
Groundman                                 34.82     40.50   16.31%      48.56           -16.60%
Lineman                                   51.95     59.90   15.30%      48.56            23.35%
Foreman                                   56.89     65.16   14.54%      48.56            34.18%
                                                                      151
                                                            Annual    2011 PW Difference Between                       Non-Union DETR
 LINCOLN                                                   Growth,     Survey PW Rates and Survey            Union %        %     Mean
 Average Construction Wage $25.99         PW 2010 PW 2011 2010 - 2011 Average         Avg.        Union Y/N Difference Difference Wages
Average                                                          6.61%                       4.76%               5.70%     0.00%
General Foreman                               61.90     70.45   13.81%     48.56            45.08%
Heavy Equipment Operator                      42.69     49.49   15.93%     48.56             1.92%

ELECTRICIAN-NEON SIGN                                 Clark                                           Y          0.57%
Electrician-Neon Sign                         44.31     45.52   2.73%      45.26             0.57%

ELECTRICIAN-WIREMAN                        ADD     Clark                                              Y          0.00%
Electrician-Wireman                       ZONE
                                             54.74    57.09     4.29%      57.09             0.00%
                                          RATE
ELEVATOR CONSTRUCTOR                       -       Clark                                              Y          1.86%
Elevator Constructor-Journeyman               46.01     64.58   40.36%     66.35            -2.67%
Elevator Constructor-Mechanic In Charge
Mechanic                                      46.01     70.59   53.42%     66.35             6.39%

FENCE ERECTOR                             -           Clark                                           N                    0.00%
Fence Erector                                 16.97     17.46   2.89%      17.46             0.00%

FLAGPERSON                                 ADD     Not Surveyed
Flagperson                                LABORE
                                             41.44    41.44     0.00%
                                          R ZONE
FLOOR COVERER                             RATE     Clark                                              Y          4.01%
Floor Coverer-Journeyman                      41.83     42.40   1.36%      43.13            -1.69%
Floor Coverer-Foreman                         46.76     47.32   1.20%      43.13             9.71%

GLAZIER                                   -           Clark                                           Y         17.91%
Glazier                                       54.72     57.51   5.10%      50.55            13.77%
Glazier-Foreman                               58.81     61.70   4.91%      50.55            22.06%

                                           ADD
                                          LABORE
                                          R ZONE
HIGHWAY STRIPER                           RATE                                                        Y          0.00%
Highway Striper                               33.57     42.94   27.91%     42.94             0.00%

HOD CARRIER-BRICK MASON                    ADD     Clark                                              Y          3.09%
TENDER     
Brick Mason                               LABORE
                                             43.31    43.31     0.00%      42.01             3.09%
                                          R ZONE
HOD CARRIER-PLASTERER TENDER              RATE
                                           ADD     Clark                                              Y          3.76%
Plasterer Tender-Journeyman               LABORE
                                             44.34    44.34     0.00%      44.34             0.00%
Plasterer Tender-Foreman                  R ZONE
                                             46.34    46.34     0.00%      44.34             4.51%
                                          RATE                           152
                                                         Annual    2011 PW Difference Between                       Non-Union DETR
  LINCOLN                                               Growth,     Survey PW Rates and Survey            Union %        %     Mean
  Average Construction Wage $25.99     PW 2010 PW 2011 2010 - 2011 Average         Avg.        Union Y/N Difference Difference Wages
Average                                                      6.61%                        4.76%               5.70%     0.00%
Plasterer Tender-General Foreman          47.34      47.34   0.00%      44.34             6.77%

IRON WORKER                            SEE                                                         Y          4.80%
Ironworker-Journeyman                  AMENDM
                                          54.38      56.74   4.34%      57.31            -0.99%
Ironworker-Foreman                     ENT 1
                                          57.68      60.04   4.09%      57.31             4.76%
Ironworker-General Foreman                61.04      63.40   3.87%      57.31            10.63%

LABORER
SEE GROUP CLASSIFICATIONS               ADD        ADD                                             Y          3.61%
Group 1                                LABORE
                                          42.94   LABORE
                                                     42.94   0.00%      42.94             0.00%
Group 2                                R ZONE
                                          43.15   R ZONE
                                                     43.15   0.00%      42.94             0.49%
Group 3                                RATE
                                          43.25   RATE
                                                     43.25   0.00%      42.94             0.72%
Group 4                                   43.34      43.34   0.00%      42.94             0.93%
Group 5                                   43.44      43.44   0.00%      42.94             1.16%
Group 6A                                  46.10      46.10   0.00%      42.94             7.36%
Group 6B                                  45.60      45.60   0.00%      42.94             6.19%
Group 6C                                  45.35      45.35   0.00%      42.94             5.61%
Group 6D                                  45.96      45.96   0.00%      42.94             7.03%
Group 6E                                  45.60      45.60   0.00%      42.94             6.19%
Group 7                                   44.67      44.67   0.00%      42.94             4.03%
Foreman $2.00 above highest paid
journeyman supervised.
General Foreman $3.00 above highest
paid foreman supervised.
MECHANICAL INSULATOR                              Clark                                            Y          7.77%
Mechanical Insulator-Journeyman           55.63      56.23   1.08%      55.23             1.81%
Mechanical Insulator-Foreman              58.99      59.52   0.90%      55.23             7.77%
Mechanical Insulator-General Foreman      62.36      62.81   0.72%      55.23            13.72%

MILLWRIGHT                                        Clark                                            Y         11.55%
Millwright-Journeyman                     49.70      49.95   0.50%      47.30             5.60%
Millwright-Welder                         50.70      50.95   0.49%      47.30             7.72%
Millwright-Foreman                        53.01      53.26   0.47%      47.30            12.60%
Millwright-General Foreman                56.65      56.90   0.44%      47.30            20.30%

OPERATING ENGINEER 
                                                  White
SEE GROUP CLASSIFICATIONS                         Pine                                             Y          3.29%
Group 1                                   44.82      53.93   20.33%     52.21             3.29%
Group 2                                   44.82      53.93   20.33%     52.21             3.29%
                                                                      153
                                                            Annual    2011 PW Difference Between                       Non-Union DETR
 LINCOLN                                                   Growth,     Survey PW Rates and Survey            Union %        %     Mean
 Average Construction Wage $25.99         PW 2010 PW 2011 2010 - 2011 Average         Avg.        Union Y/N Difference Difference Wages
Average                                                         6.61%                        4.76%               5.70%     0.00%
Group 3                                     44.82    53.93     20.33%     52.21              3.29%
Group 4                                     44.82    53.93     20.33%     52.21              3.29%
Group 5                                     44.82    53.93     20.33%     52.21              3.29%
Group 6                                     44.82    53.93     20.33%     52.21              3.29%
Group 7                                     44.82    53.93     20.33%     52.21              3.29%
Group 8                                     44.82    53.93     20.33%     52.21              3.29%
Group 9                                     44.82    53.93     20.33%     52.21              3.29%
Group 10                                    44.82    53.93     20.33%     52.21              3.29%
Group 11                                    44.82    53.93     20.33%     52.21              3.29%
Group 12                                    44.82    53.93     20.33%     52.21              3.29%
Group 13                                    44.82    53.93     20.33%     52.21              3.29%
Group 14                                    44.82    53.93     20.33%     52.21              3.29%
Group 15                                    44.82    53.93     20.33%     52.21              3.29%
Group 16                                    44.82    53.93     20.33%     52.21              3.29%
Group 17                                    44.82    53.93     20.33%     52.21              3.29%
Group 18                                    44.82    53.93     20.33%     52.21              3.29%
Group 19                                    44.82    53.93     20.33%     52.21              3.29%
Group 20                                    44.82    53.93     20.33%     52.21              3.29%
Group 21                                    44.82    53.93     20.33%     52.21              3.29%
Group 22                                    44.82    53.93     20.33%     52.21              3.29%
Group 23                                    44.82    53.93     20.33%     52.21              3.29%
Group 24                                    44.82    53.93     20.33%     52.21              3.29%
Group 25                                    44.82    53.93     20.33%     52.21              3.29%
Add $.50 per hour for "Special" Shift
Add $1.00 per hour for "Multiple" Shift

OPERATING ENGINEER:
CRANES, PILEDRIVING, & HOISTING                                                                       Y
EQUIPMENT
SEE GROUP CLASSIFICATIONS
Group 1                                     44.82    53.93     20.33%     52.21              3.29%
Group 2                                     44.82    53.93     20.33%     52.21              3.29%
Group 3                                     44.82    53.93     20.33%     52.21              3.29%
Group 4                                     44.82    53.93     20.33%     52.21              3.29%
Group 5                                     44.82    53.93     20.33%     52.21              3.29%
Group 6                                     44.82    53.93     20.33%     52.21              3.29%
Group 7                                     44.82    53.93     20.33%     52.21              3.29%
Group 8                                     44.82    53.93     20.33%     52.21              3.29%
Group 9                                     44.82    53.93     20.33%     52.21              3.29%
Group 10                                    44.82    53.93     20.33%     52.21              3.29%
                                                                        154
                                                            Annual    2011 PW Difference Between                       Non-Union DETR
 LINCOLN                                                   Growth,     Survey PW Rates and Survey            Union %        %     Mean
 Average Construction Wage $25.99         PW 2010 PW 2011 2010 - 2011 Average         Avg.        Union Y/N Difference Difference Wages
Average                                                          6.61%                       4.76%               5.70%     0.00%
Group 11                                      44.82     53.93   20.33%     52.21             3.29%
Group 12                                      44.82     53.93   20.33%     52.21             3.29%
Group 13                                      44.82     53.93   20.33%     52.21             3.29%
Add $ .50 per hour for "Special" Shift
Add $1.00 per hour for "Multiple" Shift   -

OPERATING ENGINEER-SURVEYOR

                                          ADD
                                          OPERATI
SEE GROUP CLASSIFICATIONS                 NG
Group 1                                   ENGINEE
                                              55.84     53.93   -3.42%     52.21             3.29%
Group 2                                   R ZONE
                                              56.65     53.93   -4.80%     52.21             3.29%
Group 3                                   RATE56.87     53.93   -5.17%     52.21             3.29%
Group 4                                       57.15     53.93   -5.63%     52.21             3.29%
Group 5                                       57.27     53.93   -5.83%     52.21             3.29%
Group 6                                       57.37     53.93   -6.00%     52.21             3.29%
Group 7                                        57.4     53.93   -6.05%     52.21             3.29%
Group 8                                       57.77     53.93   -6.65%     52.21             3.29%
Group 9                                        57.9     53.93   -6.86%     52.21             3.29%
Group 10                                       58.4     53.93   -7.65%     52.21             3.29%


OPERATING ENGINEER -TUNNEL
SEE GROUP CLASSIFICATIONS
Group 1                                       44.82     53.93   20.33%     52.21             3.29%
Group 2                                       44.82     53.93   20.33%     52.21             3.29%
Group 3                                       44.82     53.93   20.33%     52.21             3.29%
Group 4                                       44.82     53.93   20.33%     52.21             3.29%
Group 5                                       44.82     53.93   20.33%     52.21             3.29%
Group 6                                       44.82     53.93   20.33%     52.21             3.29%
Group 7                                       44.82     53.93   20.33%     52.21             3.29%
Group 8                                       44.82     53.93   20.33%     52.21             3.29%
Group 9                                       44.82     53.93   20.33%     52.21             3.29%

PAINTER                                               Clark                                           Y
Painter-Journeyman                            46.23     46.64   0.89%      46.47             0.37%
Painter-Foreman                               49.35     49.76   0.83%      46.47             7.08%

                                                                         155
                                                         Annual    2011 PW Difference Between                       Non-Union DETR
  LINCOLN                                               Growth,     Survey PW Rates and Survey            Union %        %     Mean
  Average Construction Wage $25.99     PW 2010 PW 2011 2010 - 2011 Average         Avg.        Union Y/N Difference Difference Wages
Average                                                        6.61%                      4.76%               5.70%     0.00%
PILEDRIVER
Driverman, Rigman, Bridge and Dock         58.47     58.47    0.00%
Certified Welder
Carpenter                                  58.47     58.47    0.00%
Piledriver-Foreman                         62.05     62.05    0.00%
Diver-Diving (wet pay)                     58.47     58.47    0.00%
Stand-By Diver                             58.47     58.47    0.00%
Tender                                     58.47     58.47    0.00%

PLASTERER                               ADD     Clark                                              Y         -0.13%
Plasterer                              ZONE
                                          44.69    44.69      0.00%      44.75           -0.13%
                                       RATE
PLUMBER/PIPEFITTER                      -       Clark                                              Y          8.42%
Plumber/Pipefitter-Journeyman              56.02     56.52    0.89%      55.69            1.49%
Plumber-Foreman                            59.83     60.38    0.92%      55.69            8.42%
Plumber-General Foreman                    63.65     64.23    0.91%      55.69           15.33%

REFRIGERATION                                      Clark                                           N                    0.00%
Refrigeration-Journeyman                   36.24     35.17    -2.95%     35.17            0.00%
Refrigeration-Foreman                      36.24     35.17    -2.95%     35.17            0.00%
Refrigeration-General Foreman              36.24     35.17    -2.95%     35.17            0.00%

ROOFER                                 -           Clark                                           Y          8.20%
(Does not include sheet metal roofs)
Roofer-Journeyman                          16.04     31.91    98.94%     31.78            0.41%
Roofer-Foreman                             16.04     36.86   129.80%     31.78           15.98%

SHEET METAL WORKER                      ADD     Clark                                              Y          8.98%
Sheet Metal-Journeyman                 ZONE
                                          58.52    59.52      1.71%      58.70            1.40%
Sheet Metal-Foreman                    RATE
                                          62.95    63.97      1.62%      58.70            8.98%
Sheet Metal-General Foreman                67.37     68.42    1.56%      58.70           16.56%

SPRINKLER FITTER                                   Clark                                           Y         12.65%
Sprinkler Fitter-Journeyman                55.15     56.30    2.09%      52.27            7.71%
Sprinkler Fitter-Foreman                   57.90     59.05    1.99%      52.27           12.97%
Sprinkler Fitter-General Foreman           60.15     61.30    1.91%      52.27           17.28%


TAPER                                              Clark                                           Y         -1.50%
Taper                                      46.23     46.64    0.89%      47.35           -1.50%
                                                                       156
                                                          Annual    2011 PW Difference Between                       Non-Union DETR
 LINCOLN                                                 Growth,     Survey PW Rates and Survey            Union %        %     Mean
 Average Construction Wage $25.99       PW 2010 PW 2011 2010 - 2011 Average         Avg.        Union Y/N Difference Difference Wages
Average                                                          6.61%                     4.76%               5.70%     0.00%

TILE SETTER/TERRAZZO WORKER/               ADD     Clark                                            Y         -3.20%
Tile Setter/Terrazzo Worker/Marble Mason- ZONE
MARBLE MASON                                 32.48    34.63      6.62%      36.35         -4.73%
Tile Setter
Finisher                                  RATE
                                             43.61    46.66      6.99%      49.17         -5.10%    Y
Terrazzo Worker/Marble Mason                 46.04    49.29      7.06%      49.17          0.24%


TRAFFIC BARRIER ERECTOR                  ADD         ADD
Traffic Barrier Erector                 LABORE
                                           42.94    LABORE
                                                       42.94     0.00%
                                        R ZONE      R ZONE
TRUCK DRIVER                            RATE        RATE
SEE GROUP CLASSIFICATIONS                ADD         White                                          Y          0.00%
Group 1                                 ZONE
                                           46.13    Pine
                                                       36.90    -20.01%     36.90          0.00%
Group 2                                 RATE
                                           46.23       36.90    -20.18%     36.90          0.00%
Group 3                                    46.44       36.90    -20.54%     36.90          0.00%
Group 4                                    46.62       36.90    -20.85%     36.90          0.00%
Group 5                                    46.82       36.90    -21.19%     36.90          0.00%
Group 6                                    47.12       36.90    -21.69%     36.90          0.00%
Foreman $1.00 above highest paid           48.12       36.90    -23.32%     36.90          0.00%
journeyman supervised.
                                         ADD
WELL DRILLER                             OPERATI    Esmerald                                        N                    0.00%
Well Driller                             NG 56.87   a 19.42     -65.85%     19.42          0.00%
                                         ENGINEE
                                         ADD
                                         R ZONE      White
EQUIPMENT GREASER (RACK)                 OPERATI
                                         RATE       Pine (9                                         Y          2.16%
Equipment Greaser (rack)                 NG 55.16   hrs)47.85   -13.25%     46.84          2.16%
                                         ENGINEE
EQUIPMENT GREASER (GREASE                R ZONE
                                         ADD
TRUCK)                                   RATE
                                         OPERATI
Equipment Greaser (grease truck)         NG 56.65      47.85    -15.53%     46.84          2.16%
                                         ENGINEE
EQUIPMENT GREASER (GREASE                ADD
                                         R ZONE
TRUCK/MULTI-SHIFT)                       OPERATI
                                         RATE
Equipment Greaser (grease truck/multi-   NG 57.75      47.85    -17.14%     46.84          2.16%
shift)                                   ENGINEE
TUNNEL, EQUIPMENT GREASER                R ZONE
                                         ADD
(GREASE TRUCK)                           RATE
                                         OPERATI
Tunnel, Equipment Greaser (grease truck) NG 57.37      47.85    -16.59%     46.84          2.16%
                                         ENGINEE                          157
                                         R ZONE
                                         RATE
                                                      Annual    2011 PW Difference Between                       Non-Union DETR
 LINCOLN                                             Growth,     Survey PW Rates and Survey            Union %        %     Mean
 Average Construction Wage $25.99   PW 2010 PW 2011 2010 - 2011 Average         Avg.        Union Y/N Difference Difference Wages
Average                                                   6.61%                        4.76%               5.70%     0.00%

                                    ADD
FIELD SOILS AND MATERIAL TESTER OPERATI Clark                                                   Y         28.95%
Field Soils and Material Tester     NG 54.87   56.62      3.19%     43.91             28.95%
                                    ENGINEE
FIELD ASPHALTIC CONCRETE (SOILS R ZONE
                                    ADD
AND MATERIAL TESTER)                OPERATI Clark
                                    RATE                                                        Y
Field Asphaltic Concrete (soils and NG 54.87   56.62      3.19%     43.91             28.95%
material tester)                    ENGINEE
                                    R ZONE
Union Breakdown                     RATE
Union                                                                                           34
Non-Union                                                                                       4
Total                                                                                           38




                                                                  158
DETR Mean
Wage + 40%    Wage
 Benefits    Premium




                       159
                                                           Annual    2011 PW Difference Between                 Non-Union DETR
 LYON                                                     Growth,     Survey    PW Rates and    Union Union %        %     Mean
 Average Construction Wage $19.91        PW 2010 PW 2011 2010 - 2011 Average     Survey Avg.     Y/N Difference Difference Wages
Average                                                         8.59%                    6.36%            4.98%     0.25%

                                          ADD
                                         SHEET
                                         METAL
                                         ZONE
AIR BALANCE TECHNICIAN                   RATE                                                    Y       45.61%
Air Balance Technician-Journeyman            46.60     48.35    3.76%          35.34    36.81%
Air Balance Technician-Foreman               49.62     51.46    3.71%          35.34    45.61%
Air Balance Technician-General Foreman       52.64     54.57    3.67%          35.34    54.41%

ALARM INSTALLER                                                                                  N                  0.00%
Alarm Installer                              28.38     28.01    -1.30%         28.01     0.00%

BOILERMAKER                              -           Clark                                       Y        1.87%
Boilermaker                                  59.50     65.94   10.82%          64.73     1.87%

                                          ADD
                                         ZONE
BRICKLAYER                               RATE--      Washoe                                      Y        8.21%
Bricklayer-Journeyman                        32.68     32.68    0.00%          31.51     3.71%
Bricklayer-Foreman                           33.93     33.93    0.00%          31.51     7.68%
Bricklayer-General Foreman                   35.68     35.68    0.00%          31.51    13.23%

                                          ADD         ADD
                                         ZONE        ZONE
CARPENTER                                RATE        RATE                                        Y        2.85%
Carpenter-Journeyman                         38.30     38.80    1.31%          39.06    -0.67%                              22.16
Carpenter-Foreman                            41.05     41.55    1.22%          39.06     6.37%

CEMENT MASON                                                                                     Y        2.94%
Cement Mason-Journeyman                      34.40     34.40    0.00%          34.39     0.03%                              21.45
Cement Mason-Foreman                         36.40     36.40    0.00%          34.39     5.84%                              21.45

ELECTRICIAN-COMMUNICATION TECHNICIAN                                                             N                  1.74%
Electrician-Communication Installer  27.97             27.50    -1.68%         27.03     1.74%
Electrician-Communication Technician 30.88             27.50   -10.95%         27.03     1.74%

                                                                         160
                                                            Annual    2011 PW Difference Between                 Non-Union DETR
  LYON                                                     Growth,     Survey    PW Rates and    Union Union %        %     Mean
  Average Construction Wage $19.91        PW 2010 PW 2011 2010 - 2011 Average     Survey Avg.     Y/N Difference Difference Wages
Average                                                            8.59%                   6.36%           4.98%     0.25%
Electrician-Communication Senior
Technician                                    33.13       27.50   -16.99%         27.03    1.74%

ELECTRICIAN-LINE                          -           -                                             Y     -2.23%
Electrician-Groundman                         39.19       40.50    3.34%          58.40   -30.65%
Electrician-Lineman                           57.91       59.90    3.44%          58.40     2.57%
Electrician-Foreman                           63.02       65.16    3.40%          58.40    11.58%
Electrician-General Foreman                   68.12       70.45    3.42%          58.40    20.63%
Heavy Equipment Operator                      47.86       49.49    3.41%          58.40   -15.26%

ELECTRICIAN-NEON SIGN                     -           Clark                                         Y      0.57%
Electrician-Neon Sign                         44.31       45.52    2.73%          45.26    0.57%

ELECTRICIAN-WIREMAN                       -           -                                             Y     17.83%
Wireman                                       35.22       50.78   44.18%          46.32    9.63%                             22.46
Cable Splicer                                 35.22       54.58   54.97%          46.32   17.83%                             22.46
Foreman                                       35.22       54.58   54.97%          46.32   17.83%                             22.46
General Foreman                               35.22       58.38   65.76%          46.32   26.04%                             22.46

ELEVATOR CONSTRUCTOR                      -           -                                             Y     13.48%
Elevator Constructor-Journeyman
Mechanic                                      46.01       78.21   69.98%          72.12    8.44%
Elevator Constructor-Mechanic in Charge       46.01       85.48   85.79%          72.12   18.52%

FENCE ERECTOR                                                                                       N                0.00%
Fence Erector                                 32.72       43.19   32.00%          43.19    0.00%

                                           ADD    ADD
                                          LABORE LABORE
                                          R ZONE R ZONE
FLAGPERSON                                RATE   RATE 
Flagperson                                    27.95       27.95    0.00%

FLOOR COVERER                                                                                       Y      3.65%
Floor Coverer-Journeyman                      36.26       36.34    0.22%          36.31    0.08%
Floor Coverer-Foreman                         38.90       38.93    0.08%          36.31    7.22%

                                                                            161
                                                      Annual    2011 PW Difference Between                 Non-Union DETR
 LYON                                                Growth,     Survey    PW Rates and    Union Union %        %     Mean
 Average Construction Wage $19.91   PW 2010 PW 2011 2010 - 2011 Average     Survey Avg.     Y/N Difference Difference Wages
Average                                                     8.59%                   6.36%            4.98%     0.25%
GLAZIER                             -           -                                            N                -2.89%
Glazier                                 21.50       20.50   -4.65%         21.11    -2.89%

                                     ADD    ADD
                                    LABORE LABORE
                                    R ZONE R ZONE
HIGHWAY STRIPER                     RATE   RATE                                              Y       0.00%
Highway Striper                         33.57       33.57   0.00%          33.57    0.00%

                                ADD
                               ZONE
HOD CARRIER-BRICK MASON TENDER RATE     Storey                                               Y       0.83%
Brick Mason-Journeyman            30.10    30.10            0.00%          30.10    0.00%
Brick Mason-Foreman               30.60    30.60            0.00%          30.10    1.66%

                                     ADD
                                    ZONE
HOD CARRIER-PLASTERER TENDER        RATE        Storey                                       Y       3.81%
Plasterer Tender-Journeyman             33.76       34.26   1.48%          33.76    1.48%
Plasterer Tender-Gun Tender             34.76       35.26   1.44%          33.76    4.44%
Plasterer Tender-Foreman                35.12       35.62   1.42%          33.76    5.51%

                                    SEE
                                    AMENDM
IRON WORKER                         ENT 1                                                    Y       4.80%
Ironworker-Journeyman                   54.38       56.74   4.34%          57.31   -0.99%
Ironworker-Foreman                      57.68       60.04   4.09%          57.31    4.76%
Ironworker-General Foreman              61.04       63.40   3.87%          57.31   10.63%

                                     ADD         ADD
LABORER                             ZONE        ZONE                                         Y      -0.18%
SEE GROUP CLASSIFICATIONS           RATE        RATE
Landscaper                              25.66       25.66   0.00%          30.44   -15.70%                             18.37
Furniture Mover                         27.16       27.16   0.00%          30.44   -10.78%                             18.37
Group 1                                 30.82       30.82   0.00%          30.44     1.25%                             18.37
Group 1A                                27.95       27.95   0.00%          30.44    -8.18%                             18.37
Group 2                                 30.92       30.92   0.00%          30.44     1.58%                             18.37
                                                                     162
                                                         Annual    2011 PW Difference Between                 Non-Union DETR
 LYON                                                   Growth,     Survey    PW Rates and    Union Union %        %     Mean
 Average Construction Wage $19.91      PW 2010 PW 2011 2010 - 2011 Average     Survey Avg.     Y/N Difference Difference Wages
Average                                                       8.59%                    6.36%            4.98%     0.25%
Group 3                                   31.07      31.07    0.00%          30.44     2.07%                              18.37
Group 4                                   31.32      31.32    0.00%          30.44     2.89%                              18.37
Group 4A                                  32.57      32.57    0.00%          30.44     7.00%                              18.37
Group 5                                   31.62      31.62    0.00%          30.44     3.88%                              18.37
Group 6
Nozzlemen, Rodmen                         31.62      31.62    0.00%          30.44     3.88%                              18.37
Gunmen, Materialmen                       31.32      31.32    0.00%          30.44     2.89%                              18.37
Reboundmen                                30.97      30.97    0.00%          30.44     1.74%                              18.37
Gunite Foremen                            32.02      32.02    0.00%          30.44     5.19%                              18.37

                                       SEE
                                       AMENDM
MECHANICAL INSULATOR                   ENT 2- Douglas                                          Y       -0.08%
Mechanical Insulator-Mechanic             57.06      54.56    -4.38%         56.77    -3.89%
Mechanical Insulator-Foreman              59.56      57.06    -4.20%         56.77     0.51%
Mechanical Insulator-General Foreman      61.06      58.56    -4.09%         56.77     3.15%

MILLWRIGHT                                                                                     N                  0.00%
Millwright                                49.70      25.44   -48.81%         25.44     0.00%

                                        ADD        ADD
OPERATING ENGINEER                     ZONE       ZONE                                         Y       10.03%
SEE GROUP CLASSIFICATIONS              RATE       RATE 
Group 1                                   41.33      43.08    4.23%          46.35    -7.06%                              24.16
Group 1A                                  44.09      45.84    3.97%          46.35    -1.10%                              24.16
Group 2                                   44.62      46.37    3.92%          46.35     0.04%                              24.16
Group 3                                   44.89      46.64    3.90%          46.35     0.63%                              24.16
Group 4                                   45.63      47.38    3.84%          46.35     2.22%                              24.16
Group 5                                   45.93      47.68    3.81%          46.35     2.87%                              24.16
Group 6                                   46.10      47.85    3.80%          46.35     3.24%                              24.16
Group 7                                   46.35      48.10    3.78%          46.35     3.78%                              24.16
Group 8                                   46.94      48.69    3.73%          46.35     5.05%                              24.16
Group 9                                   47.26      49.01    3.70%          46.35     5.74%                              24.16
Group 10                                  47.61      49.36    3.68%          46.35     6.49%                              24.16
Group 10A                                 47.80      49.55    3.66%          46.35     6.90%                              24.16
Group 11                                  48.04      49.79    3.64%          46.35     7.42%                              24.16
Group 11A                                 49.68      51.43    3.52%          46.35    10.96%                              24.16
                                                                       163
                                                               Annual    2011 PW Difference Between                 Non-Union DETR
 LYON                                                         Growth,     Survey    PW Rates and    Union Union %        %     Mean
 Average Construction Wage $19.91            PW 2010 PW 2011 2010 - 2011 Average     Survey Avg.     Y/N Difference Difference Wages
Average                                                              8.59%                   6.36%            4.98%     0.25%
Group 11B                                        50.49       52.24   3.47%         46.35    12.71%                              24.16
Foreman                                          49.68       51.43   3.52%         46.35    10.96%                              24.16
Add 7% to base rate for "Second" Shift       -           -

Add 12.5% to base rate for "Special" shift   -           -

OPERATING ENGINEER-STEEL                      ADD         ADD
FABRICATOR & ERECTOR                         ZONE        ZONE
SEE GROUP CLASSIFICATIONS                    RATE        RATE
Group 1                                          56.63       58.38   3.09%         46.35    25.95%                              24.16
Group 1 Truck Crane Oiler                        50.46       52.21   3.47%         46.35    12.64%                              24.16
Group 1 Oiler                                    48.50       50.25   3.61%         46.35     8.41%                              24.16
Group 2                                          55.12       56.87   3.17%         46.35    22.70%                              24.16
Group 2 Truck Crane Oiler                        50.21       51.96   3.49%         46.35    12.10%                              24.16
Group 2 Oiler                                    48.29       50.04   3.62%         46.35     7.96%                              24.16
Group 3                                          53.88       55.63   3.25%         46.35    20.02%                              24.16
Group 3 Truck Crane Oiler                        49.99       51.74   3.50%         46.35    11.63%                              24.16
Group 3 Oiler                                    48.07       49.82   3.64%         46.35     7.49%                              24.16
Group 3 Hydraulic                                49.66       51.41   3.52%         46.35    10.92%                              24.16
Group 4                                          52.15       53.90   3.36%         46.35    16.29%                              24.16
Group 5                                          51.05       52.80   3.43%         46.35    13.92%                              24.16
Add 7% to base rate for "Second" Shift       -           -

Add 12.5% to base rate for "Special" Shift

                                              ADD         ADD
OPERATING ENGINEER -PILEDRIVER               ZONE        ZONE                                        Y
SEE GROUP CLASSIFICATIONS                    RATE        RATE
Group 1                                          56.10       57.85   3.12%         46.35    24.81%                              24.16
Group 1 Truck Crane Oiler                        50.64       52.39   3.46%         46.35    13.03%                              24.16
Group 1 Oiler                                    48.72       50.47   3.59%         46.35     8.89%                              24.16
Group 2                                          54.56       56.31   3.21%         46.35    21.49%                              24.16
Group 2 Truck Crane Oiler                        50.43       52.18   3.47%         46.35    12.58%                              24.16
Group 2 Oiler                                    48.52       50.27   3.61%         46.35     8.46%                              24.16
Group 3                                          53.11       54.86   3.30%         46.35    18.36%                              24.16
Group 3 Truck Crane Oiler                        50.21       51.96   3.49%         46.35    12.10%                              24.16
Group 3 Oiler                                    48.29       50.04   3.62%         46.35     7.96%                              24.16
                                                                             164
                                                            Annual    2011 PW Difference Between                 Non-Union DETR
 LYON                                                      Growth,     Survey    PW Rates and    Union Union %        %     Mean
 Average Construction Wage $19.91         PW 2010 PW 2011 2010 - 2011 Average     Survey Avg.     Y/N Difference Difference Wages
Average                                                           8.59%                   6.36%            4.98%     0.25%
Group 4                                       51.60       53.35   3.39%         46.35    15.10%                              24.16
Group 5                                       50.49       52.24   3.47%         46.35    12.71%                              24.16
Group 6                                       49.38       51.13   3.54%         46.35    10.31%                              24.16
Group 7                                       48.42       50.17   3.61%         46.35     8.24%                              24.16
Group 8                                       47.46       49.21   3.69%         46.35     6.17%                              24.16
Add 7% to base for "Second" Shift         -           -
Add 12.5% to base for "Special" Shift     -           -


PAINTER                                                                                           Y       -0.75%
Brush/Roller Painter                          32.74       32.74   0.00%         33.88    -3.36%
Spray Painter/Paperhanger                     33.59       33.59   0.00%         33.88    -0.86%
Sandblaster                                   33.24       33.24   0.00%         33.88    -1.89%
Structural Steel & Steeplejack                33.74       33.74   0.00%         33.88    -0.41%
Swing Stage                                   34.74       34.74   0.00%         33.88     2.54%
Special Coating Application-Brush             33.24       33.24   0.00%         33.88    -1.89%
Special Coating Application-Spray             33.74       33.74   0.00%         33.88    -0.41%
Special Coating Application-Spray Steel       33.99       33.99   0.00%         33.88     0.32%
                                           $1.00       $1.00
                                          above       above
                                          highest     highest
                                          Journeym    Journeym
Foreman                                   an          an 

PILEDRIVER
Piledriver-Journeyman                         45.20       45.20   0.00%
Piledriver-Foreman                            48.16       48.16   0.00%

                                           ADD
                                          ZONE
PLASTERER                                 RATE        Washoe                                      Y       -1.47%
Plasterer                                     34.27       34.77   1.46%         35.29    -1.47%

PLUMBER/PIPEFITTER                        -           -                                           Y       14.31%
Plumber/Pipefitter-Journeyman                 45.20       45.20   0.00%         42.13     7.29%
Plumber/Pipefitter-Foreman                    48.16       48.16   0.00%         42.13    14.31%
Plumber/Pipefitter-General Foreman            51.12       51.12   0.00%         42.13    21.34%
                                                                          165
                                                             Annual    2011 PW Difference Between                 Non-Union DETR
 LYON                                                       Growth,     Survey    PW Rates and    Union Union %        %     Mean
 Average Construction Wage $19.91          PW 2010 PW 2011 2010 - 2011 Average     Survey Avg.     Y/N Difference Difference Wages
Average                                                              8.59%                  6.36%           4.98%     0.25%

REFRIGERATION                              -           -                                             N                0.00%
Refrigeration Journeyman                       30.92       29.40    -4.92%         29.40    0.00%                             19.70

ROOFER  
(Does not include sheet metal roofs)                                                                 N                0.00%
Roofer                                         20.48       21.95    7.18%          21.95    0.00%

                                            ADD         ADD
                                           ZONE        ZONE
SHEET METAL WORKER                         RATE        RATE                                          Y     10.17%
Journeyman                                     46.60       48.35    3.76%          46.71    3.51%
Foreman                                        49.62       51.46    3.71%          46.71   10.17%
General Foreman                                52.64       54.57    3.67%          46.71   16.83%

SPRINKLER FITTER                           -           -                                             Y     11.98%
Sprinkler Fitter-Journeyman                    26.00       53.45   105.58%         50.04    6.81%
Sprinkler Fitter-Foreman                       26.00       56.20   116.15%         50.04   12.31%
Sprinkler Fitter-General Foreman               26.00       58.45   124.81%         50.04   16.81%

SURVEYOR                                                                                             N                0.00%
Surveyor                                       42.14       27.51   -34.72%         27.51    0.00%

TAPER                                      -           -                                             Y    -14.78%
Taper                                          35.49       36.28    2.23%          42.57   -14.78%

                                            ADD
TILE SETTER/TERRAZZO WORKER/               ZONE
MARBLE MASON                               RATE        Douglas                                       Y      1.02%
Tile, Terrazzo and Marble Finisher             19.00       24.77   30.37%          24.52    1.02%    Y      3.15%

Tile Setter/Terrazzo Worker/Marble Mason       25.00       34.37   37.48%          33.32    3.15%

                                            ADD    ADD
                                           LABORE LABORE
                                           R ZONE R ZONE
TRAFFIC BARRIER ERECTOR                    RATE   RATE
                                                                             166
                                                             Annual    2011 PW Difference Between                 Non-Union DETR
  LYON                                                      Growth,     Survey    PW Rates and    Union Union %        %     Mean
  Average Construction Wage $19.91         PW 2010 PW 2011 2010 - 2011 Average     Survey Avg.     Y/N Difference Difference Wages
Average                                                          8.59%                     6.36%            4.98%     0.25%
Traffic Barrier Erector                       30.82     30.82    0.00%

TRUCK DRIVER                                                                                       N                  3.43%
Truck Driver                                  20.80     20.80    0.00%          20.11      3.43%                              21.72

WELL DRILLER                                          Storey                                       Y        0.00%
Well Driller                                  21.32     54.49   155.58%         54.49      0.00%

                                            ADD        ADD
                                           OPERATI    OPERATI
LUBRICATION AND SERVICE                    NG ENG.    NG ENG.
ENGINEER (MOBILE AND GREASE                ZONE       ZONE
RACK)                                      RATE       RATE                                         Y        2.16%
Lubrication and Service Engineer (mobile
and grease rack)                              46.10     47.85    3.80%          46.84      2.16%

SOIL TESTER (CERTIFIED)                               Nye                                          Y       -0.30%
Soil Tester (Certified)                       44.14     56.62   28.27%          56.79     -0.30%

SOILS AND MATERIALS TESTER                            Nye
Soils and Materials Tester                    44.14     56.62   28.27%          56.79     -0.30%


Union Breakdown
Union                                                                                              29
Non-Union                                                                                          9
Total                                                                                              38




                                                                          167
DETR Mean
Wage + 40%      Wage
 Benefits      Premium
                  42.16%




       31.02      25.06%
         -
         -
         -
       30.03      14.55%
       30.03      21.21%
         -
         -
         -
         -

                           168
DETR Mean
Wage + 40%      Wage
 Benefits      Premium
                  42.16%

         -
         -
         -
         -
         -
         -
         -
         -
         -
         -
         -
         -
         -
       31.44      61.49%
       31.44      73.58%
       31.44      73.58%
       31.44      85.66%
         -
         -

         -
         -
         -
         -
         -
         -



         -
         -
         -
         -
         -
         -
         -
                           169
DETR Mean
Wage + 40%      Wage
 Benefits      Premium
                  42.16%
         -
         -
         -



         -
         -
         -


         -
         -
         -
         -


         -
         -
         -
         -
         -


         -
         -
         -
         -
         -

         -
         -
       25.72      -0.23%
       25.72       5.61%
       25.72      19.84%
       25.72       8.68%
       25.72      20.23%
                           170
DETR Mean
Wage + 40%      Wage
 Benefits      Premium
                  42.16%
       25.72      20.81%
       25.72      21.78%
       25.72      26.64%
       25.72      22.95%
         -
       25.72      22.95%
       25.72      21.78%
       25.72      20.42%
       25.72      24.50%
         -


         -
         -
         -
         -
         -
         -
         -
         -

         -
         -
       33.82      27.37%
       33.82      35.53%
       33.82      37.09%
       33.82      37.89%
       33.82      40.08%
       33.82      40.96%
       33.82      41.47%
       33.82      42.21%
       33.82      43.95%
       33.82      44.90%
       33.82      45.93%
       33.82      46.49%
       33.82      47.20%
       33.82      52.05%
                           171
DETR Mean
Wage + 40%      Wage
 Benefits      Premium
                  42.16%
       33.82      54.45%
       33.82      52.05%
         -

         -
         -

         -
         -
       33.82      72.60%
       33.82      54.36%
       33.82      48.56%
       33.82      68.14%
       33.82      53.62%
       33.82      47.94%
       33.82      64.47%
       33.82      52.97%
       33.82      47.29%
       33.82      51.99%
       33.82      59.35%
       33.82      56.10%
         -

         -
         -

         -
         -
       33.82      71.03%
       33.82      54.89%
       33.82      49.21%
       33.82      66.48%
       33.82      54.27%
       33.82      48.62%
       33.82      62.19%
       33.82      53.62%
       33.82      47.94%
                           172
DETR Mean
Wage + 40%      Wage
 Benefits      Premium
                  42.16%
       33.82      57.73%
       33.82      54.45%
       33.82      51.16%
       33.82      48.33%
       33.82      45.49%
         -
         -
         -
         -
         -
         -
         -
         -
         -
         -
         -
         -
         -




         -
         -
         -
         -
         -
         -


         -
         -
         -
         -
         -
         -
         -
                           173
DETR Mean
Wage + 40%      Wage
 Benefits      Premium
                  42.16%
         -
         -
       27.58       6.60%
         -
         -
         -
         -
         -


         -
         -
         -
         -
         -
         -
         -
         -
         -
         -
         -
         -
         -
         -
         -
         -


         -
         -

         -
         -



         -
                           174
DETR Mean
Wage + 40%      Wage
 Benefits      Premium
                  42.16%
         -
         -
         -
       30.41      -31.60%
         -
         -
         -
         -




         -

         -
         -
         -
         -
         -
         -
         -




                            175
 MINERAL                                                Annual     2011 PW Difference Between                     Non-Union DETR
 Average Construction Wage                            Growth, 2010 Survey     PW Rates and    Union Y/ Union %         %     Mean
 $19.03                               PW 2010 PW 2011    - 2011    Average     Survey Avg.       N     Difference Difference Wages
Average                                                      4.99%                      4.20%              2.14%    -2.34%

AIR BALANCE TECHNICIAN                            Lyon                                           Y        45.61%
Air Balance-Journeyman                    58.52     48.35   -17.38%   35.34            36.81%
Air Balance-Foreman                       62.95     51.46   -18.25%   35.34            45.61%
Air Balance-General Foreman               67.37     54.57   -19.00%   35.34            54.41%

ALARM INSTALLER                                   Lyon                                           N                   0.00%
Alarm Installer                           28.38     28.01    -1.30%   28.01             0.00%

BOILERMAKER                           -           Clark                                          Y         1.87%
Boilermaker                               59.50     65.94   10.82%    64.73             1.87%

                                       ADD
                                      ZONE
BRICKLAYER                            RATE        Washoe                                         Y         8.21%
Bricklayer-Journeyman                     32.68     32.68    0.00%    31.51             3.71%
Bricklayer-Foreman                        33.93     33.93    0.00%    31.51             7.68%
Bricklayer-General Foreman                35.68     35.68    0.00%    31.51            13.23%

                                       ADD         ADD
                                      ZONE        ZONE
CARPENTER                             RATE        RATE                                           Y         4.08%
Carpenter-Journeyman                      38.30     38.80    1.31%    38.60             0.52%
Carpenter-Foreman                         41.05     41.55    1.22%    38.60             7.64%

CEMENT MASON                                      Lyon                                           Y         2.94%
Cement Mason-Journeyman                   34.40     34.40    0.00%    34.39             0.03%
Cement Mason-Foreman                      36.40     36.40    0.00%    34.39             5.84%

ELECTRICIAN-COMMUNICATION
TECHNICIAN                                                                                       N                  -7.99%
Electrician-Communication Installer       27.97     23.48   -16.05%   25.52            -7.99%
Electrician-Communication
Technician                                30.88     23.48   -23.96%   25.52            -7.99%
Electrician-Communication Senior
Technician                                33.13     23.48   -29.13%   25.52            -7.99%

ELECTRICIAN-LINEMAN/GROUNDMAN/
HEAVY EQUIPMENT OPERATOR                          Lyon                                           Y         -2.23%
                                                                       176
  MINERAL                                            Annual     2011 PW Difference Between                     Non-Union DETR
  Average Construction Wage                        Growth, 2010 Survey     PW Rates and    Union Y/ Union %         %     Mean
  $19.03                           PW 2010 PW 2011    - 2011    Average     Survey Avg.       N     Difference Difference Wages
Average                                                    4.99%                     4.20%              2.14%    -2.34%
Electrician-Groundman                  39.19       40.50   3.34%    58.40          -30.65%
Electrician-Lineman                    57.91       59.90   3.44%    58.40            2.57%
Electrician-Foreman                    63.02       65.16   3.40%    58.40           11.58%
Electrician-General Foreman            68.12       70.45   3.42%    58.40           20.63%
Heavy Equipment Operator               47.86       49.49   3.41%    58.40          -15.26%

ELECTRICIAN-NEON SIGN              -           Clark                                          Y         0.57%
Electrician-Neon Sign                  44.31       45.52   2.73%    45.26            0.57%

ELECTRICIAN-WIREMAN                -           -                                              Y        10.31%
Wireman                                47.69       50.78   6.48%    49.48            2.63%
Cable Splicer                          51.18       54.58   6.64%    49.48           10.31%
Wireman-Foreman                        51.18       54.58   6.64%    49.48           10.31%
Wireman-General Foreman                54.67       58.38   6.79%    49.48           17.99%

ELEVATOR CONSTRUCTOR               -           Lyon                                           Y        13.48%
Elevator Constructor-Journeyman
Mechanic                               46.01       78.21   69.98%   72.12            8.44%
Elevator Constructor-Mechanic In
Charge                                 46.01       85.48   85.79%   72.12           18.52%

FENCE ERECTOR                                  Lyon                                           N                   0.00%
Fence Erector                          32.72       43.19   32.00%   43.19            0.00%

                                    ADD    ADD
                                   LABORE LABORE
                                   R  ZONE R  ZONE
FLAGPERSON                         RATE    RATE
Flagperson                             27.95       27.95   0.00%

FLOOR COVERER                                  Lyon                                           Y         3.65%
Floor Coverer-Journeyman               36.26       36.34   0.22%    36.31            0.08%
Floor Coverer-Foreman                  38.90       38.93   0.08%    36.31            7.22%

GLAZIER                            -           Lyon                                           N                  -2.89%
Glazier                                21.50       20.50   -4.65%   21.11           -2.89%



                                                                    177
 MINERAL                                        Annual     2011 PW Difference Between                     Non-Union DETR
 Average Construction Wage                    Growth, 2010 Survey     PW Rates and    Union Y/ Union %         %     Mean
 $19.03                       PW 2010 PW 2011    - 2011    Average     Survey Avg.       N     Difference Difference Wages
Average                                               4.99%                     4.20%              2.14%    -2.34%
                               ADD    ADD
                              LABORE LABORE
                              R  ZONE R  ZONE
HIGHWAY STRIPER               RATE    RATE                                               Y         0.00%
Highway Striper                  33.57        33.57   0.00%    33.57            0.00%

                               ADD
HOD CARRIER-BRICK MASON       ZONE
TENDER                        RATE       Storey                                          Y         -9.59%
Brick Mason-Journeyman           30.10        30.10   0.00%    33.57          -10.34%
Brick Mason-Foreman              30.60        30.60   0.00%    33.57           -8.85%

                               ADD
HOD CARRIER-PLASTERER         ZONE
TENDER                        RATE       CC                                              Y         3.81%
Plasterer Tender-Journeyman      33.76        34.26   1.48%    33.76            1.48%
Plasterer Tender-Gun Tender      34.76        35.26   1.44%    33.76            4.44%
Plasterer Tender-Foreman         35.12        35.62   1.42%    33.76            5.51%

                              SEE
                              AMENDM
IRON WORKER                   ENT 1                                                      Y         -0.02%
Ironworker-Journeyman            54.38        57.29    5.35%   57.30           -0.02%
Ironworker-Foreman               57.68        57.29   -0.68%   57.30           -0.02%
Ironworker-General Foreman       61.04        57.29   -6.14%   57.30           -0.02%

                               ADD        ADD
                              ZONE       ZONE
LABORER                       RATE       RATE                                            Y         -3.69%
SEE GROUP CLASSIFICATIONS
Landscaper                       25.66        25.66   0.00%    31.55          -18.67%
Furniture Mover                  27.16        27.16   0.00%    31.55          -13.91%
Group 1                          30.82        30.82   0.00%    31.55           -2.31%
Group 1A                         27.95        27.95   0.00%    31.55          -11.41%
Group 2                          30.92        30.92   0.00%    31.55           -2.00%
Group 3                          31.07        31.07   0.00%    31.55           -1.52%
Group 4                          31.32        31.32   0.00%    31.55           -0.73%
Group 4A                         32.57        32.57   0.00%    31.55            3.23%
Group 5                          31.62        31.62   0.00%    31.55            0.22%
                                                               178
 MINERAL                                             Annual     2011 PW Difference Between                     Non-Union DETR
 Average Construction Wage                         Growth, 2010 Survey     PW Rates and    Union Y/ Union %         %     Mean
 $19.03                            PW 2010 PW 2011    - 2011    Average     Survey Avg.       N     Difference Difference Wages
Average                                                     4.99%                    4.20%              2.14%    -2.34%
Group 6
Nozzlemen, Rodmen                      31.62       31.62    0.00%    31.55           0.22%
Gunmen, Materialmen                    31.32       31.32    0.00%    31.55          -0.73%
Reboundmen                             30.97       30.97    0.00%    31.55          -1.84%
Gunite Foremen                         32.02       32.02    0.00%    31.55           1.49%

                                   SEE
                                   AMENDM
MECHANICAL INSULATOR               ENT 2- Douglas                                             Y         -0.08%
Mechanical Insulator-Mechanic          57.06       54.56    -4.38%   56.77          -3.89%
Mechanical Insulator-Foreman           59.56       57.06    -4.20%   56.77           0.51%
Mechanical Insulator-General
Foreman                                61.06       58.56    -4.09%   56.77           3.15%

MILLWRIGHT                                     Lyon                                           N                   0.00%
Millwright                             49.70       25.44   -48.81%   25.44           0.00%

                                    ADD         ADD
OPERATING ENGINEER                 ZONE        ZONE                                           Y         8.88%
SEE GROUP CLASSIFICATIONS          RATE        RATE 
Group 1                                41.33       43.08    4.23%    46.84          -8.03%
Group 1A                               44.09       45.84    3.97%    46.84          -2.13%
Group 2                                44.62       46.37    3.92%    46.84          -1.00%
Group 3                                44.89       46.64    3.90%    46.84          -0.43%
Group 4                                45.63       47.38    3.84%    46.84           1.15%
Group 5                                45.93       47.68    3.81%    46.84           1.79%
Group 6                                46.10       47.85    3.80%    46.84           2.16%
Group 7                                46.35       48.10    3.78%    46.84           2.69%
Group 8                                46.94       48.69    3.73%    46.84           3.95%
Group 9                                47.26       49.01    3.70%    46.84           4.63%
Group 10                               47.61       49.36    3.68%    46.84           5.38%
Group 10A                              47.80       49.55    3.66%    46.84           5.79%
Group 11                               48.04       49.79    3.64%    46.84           6.30%
Group 11A                              49.68       51.43    3.52%    46.84           9.80%
Group 11B                              50.49       52.24    3.47%    46.84          11.53%
Foreman                                49.68       51.43    3.52%    46.84           9.80%
Add 7% to base rate for "Second"
Shift                              -           -

                                                                     179
 MINERAL                                               Annual     2011 PW Difference Between                      Non-Union DETR
 Average Construction Wage                           Growth, 2010 Survey     PW Rates and     Union Y/ Union %         %      Mean
 $19.03                              PW 2010 PW 2011    - 2011    Average     Survey Avg.        N     Difference Difference Wages
Average                                                     4.99%                       4.20%               2.14%      -2.34%
Add 12.5% to base rate for "Special"
shift                                -       -

OPERATING ENGINEER-STEEL                ADD         ADD
FABRICATOR & ERECTOR                   ZONE        ZONE
SEE GROUP CLASSIFICATIONS              RATE        RATE
Group 1                                    56.63       58.38   3.09%   46.84        24.64%
Group 1 Truck Crane Oiler                  50.46       52.21   3.47%   46.84        11.46%
Group 1 Oiler                              48.50       50.25   3.61%   46.84         7.28%
Group 2                                    55.12       56.87   3.17%   46.84        21.41%
Group 2 Truck Crane Oiler                  50.21       51.96   3.49%   46.84        10.93%
Group 2 Oiler                              48.29       50.04   3.62%   46.84         6.83%
Group 3                                    53.88       55.63   3.25%   46.84        18.77%
Group 3 Truck Crane Oiler                  49.99       51.74   3.50%   46.84        10.46%
Group 3 Oiler                              48.07       49.82   3.64%   46.84         6.36%
Group 3 Hydraulic                          49.66       51.41   3.52%   46.84         9.76%
Group 4                                    52.15       53.90   3.36%   46.84        15.07%
Group 5                                    51.05       52.80   3.43%   46.84        12.72%
Add 7% to base rate for "Second"
Shift                                  -           -
Add 12.5% to base rate for "Special"
Shift

OPERATING ENGINEER -                    ADD         ADD
PILEDRIVER                             ZONE        ZONE                                        Y
SEE GROUP CLASSIFICATIONS              RATE        RATE
Group 1                                    56.10       57.85   3.12%   46.84        23.51%
Group 1 Truck Crane Oiler                  50.64       52.39   3.46%   46.84        11.85%
Group 1 Oiler                              48.72       50.47   3.59%   46.84         7.75%
Group 2                                    54.56       56.31   3.21%   46.84        20.22%
Group 2 Truck Crane Oiler                  50.43       52.18   3.47%   46.84        11.40%
Group 2 Oiler                              48.52       50.27   3.61%   46.84         7.32%
Group 3                                    53.11       54.86   3.30%   46.84        17.12%
Group 3 Truck Crane Oiler                  50.21       51.96   3.49%   46.84        10.93%
Group 3 Oiler                              48.29       50.04   3.62%   46.84         6.83%
Group 4                                    51.60       53.35   3.39%   46.84        13.90%
Group 5                                    50.49       52.24   3.47%   46.84        11.53%
Group 6                                    49.38       51.13   3.54%   46.84         9.16%
Group 7                                    48.42       50.17   3.61%   46.84         7.11%
                                                                       180
 MINERAL                                               Annual     2011 PW Difference Between                     Non-Union DETR
 Average Construction Wage                           Growth, 2010 Survey     PW Rates and    Union Y/ Union %         %     Mean
 $19.03                              PW 2010 PW 2011    - 2011    Average     Survey Avg.       N     Difference Difference Wages
Average                                                       4.99%                    4.20%              2.14%     -2.34%
Group 8                                  47.46       49.21    3.69%    46.84           5.06%
Add 7% to base for "Second" Shift    -           -
Add 12.5% to base for "Special"
Shift                                -           -

PAINTER                                          Lyon                                           Y         -0.75%
Brush/Roller Painter                     32.74       32.74    0.00%    33.88          -3.36%
Spray Painter/Paperhanger                33.59       33.59    0.00%    33.88          -0.86%
Sandblaster                              33.24       33.24    0.00%    33.88          -1.89%
Structural Steel & Steeplejack           33.74       33.74    0.00%    33.88          -0.41%
Swing Stage                              34.74       34.74    0.00%    33.88           2.54%
Special Coating Application-Brush        33.24       33.24    0.00%    33.88          -1.89%
Special Coating Application-Spray        33.74       33.74    0.00%    33.88          -0.41%
Special Coating Application-Spray
Steel                                    33.99       33.99    0.00%    33.88           0.32%
                                      $1.00       $1.00
                                     above       above
                                     highest     highest
                                     Journeym    Journeym
Foreman                              an          an 



PILEDRIVER
Piledriver-Journeyman                    58.47       58.47    0.00%
Piledriver-Foreman                       62.05       62.05    0.00%

                                      ADD
                                     ZONE
PLASTERER                            RATE        Washoe                                         Y         -1.47%
Plasterer                                34.27       34.77    1.46%    35.29          -1.47%

PLUMBER/PIPEFITTER                   -           -                                              N                  -14.87%
Plumber/Pipefitter-Journeyman            45.20       26.10   -42.26%   30.66         -14.87%
Plumber/Pipefitter-Foreman               48.16       26.10   -45.81%   30.66         -14.87%

Plumber/Pipefitter-General Foreman       51.12       26.10   -48.94%   30.66         -14.87%

REFRIGERATION                        -           Lyon                                           N                   0.00%
                                                                       181
 MINERAL                                                 Annual     2011 PW Difference Between                     Non-Union DETR
 Average Construction Wage                             Growth, 2010 Survey     PW Rates and    Union Y/ Union %         %     Mean
 $19.03                                PW 2010 PW 2011    - 2011    Average     Survey Avg.       N     Difference Difference Wages
Average                                                       4.99%                      4.20%              2.14%    -2.34%
Refrigeration                              27.55     29.40    6.72%    29.40             0.00%

ROOFER                                             Lyon                                           N                   0.00%

(Does not include sheet metal roofs)
Roofer                                     20.48     21.95    7.18%    21.95             0.00%

                                        ADD
                                       ZONE
SHEET METAL WORKER                     RATE        Lyon                                           Y        10.17%
Sheet Metal Worker-Journeyman              46.60     48.35    3.76%    46.71             3.51%
Sheet Metal Worker-Foreman                 49.62     51.46    3.71%    46.71            10.17%
Sheet Metal Worker-General
Foreman                                    52.64     54.57    3.67%    46.71            16.83%

SPRINKLER FITTER                       -           Lyon                                           Y        11.98%
Sprinkler Fitter Journeyman                26.00     53.45   105.58%   50.04             6.81%
Sprinkler Fitter Foreman                   26.00     56.20   116.15%   50.04            12.31%
Sprinkler Fitter General Foreman           26.00     58.45   124.81%   50.04            16.81%


SURVEYOR                                                                                          N                   0.00%
Surveyor                                   42.14     46.09    9.37%    46.09             0.00%

TAPER                                  -           Lyon                                           Y        -14.78%
Taper                                      35.49     36.28    2.23%    42.57           -14.78%

                                        ADD
TILE SETTER/TERRAZZO                   ZONE
WORKER/MARBLE MASON                    RATE-       Douglas                                        Y         1.02%
Tile, Terrazzo and Marble Finisher         19.00     24.77   30.37%    24.52             1.02%
Tile Setter/Terrazzo Worker/Marble
Mason                                      25.00     34.37   37.48%    33.32             3.15%    Y         3.15%

                                        ADD    ADD
                                       LABORE LABORE
                                       R  ZONE R  ZONE
TRAFFIC BARRIER ERECTOR                RATE    RATE
Traffic Barrier Erector                    30.82     30.82    0.00%
                                                                        182
 MINERAL                                          Annual     2011 PW Difference Between                     Non-Union DETR
 Average Construction Wage                      Growth, 2010 Survey     PW Rates and    Union Y/ Union %         %     Mean
 $19.03                         PW 2010 PW 2011    - 2011    Average     Survey Avg.       N     Difference Difference Wages
Average                                                  4.99%                    4.20%              2.14%    -2.34%

TRUCK DRIVER                               Lyon                                            N                   0.00%
Truck Driver                       20.80        20.80   0.00%    20.80            0.00%

WELL DRILLER                               CC                                              N                   0.00%
Well Driller                       31.49        54.49   73.04%   54.49            0.00%

                                 ADD
                                 OPERATI
LUBRICATION AND SERVICE          NG ENG.
ENGINEER (MOBILE AND GREASE ZONE
RACK)                            RATE     Lyon                                             Y         2.16%
Lubrication and Service Engineer
(mobile and grease rack)            46.10    47.85      3.80%    46.84            2.16%

SOIL TESTER (CERTIFIED)                    Nye                                             Y         -0.30%
Soil Tester (Certified)            44.14        56.62   28.27%   56.79           -0.30%

SOILS AND MATERIALS TESTER                 Nye
Soils and Materials Tester         44.14        56.62   28.27%   56.79           -0.30%


Union Breakdown
Union                                                                                      27
Non-Union                                                                                  11
Total                                                                                      38




                                                                 183
DETR Mean
Wage + 40%    Wage
 Benefits    Premium




                       184
                                                                                  Difference
                                                            Annual      2011 PW  Between PW                        Non-Union DETR
 NYE                                                     Growth, 2010 - Survey Rates and Survey Union Y/ Union %        %     Mean
 Average Construction Wage $21.90        PW 2010 PW 2011     2011       Average      Avg.          N    Difference Difference Wages
Average                                                          -0.42%                    3.61%            3.53%    -0.83%

                                          ADD
AIR BALANCE TECHNICIAN                   SHEET Lander                                              Y       47.11%
Air Balance Technician-Journeyman        METAL
                                           58.52  48.35         -17.38%     34.98        38.22%
Air Balance Technician-Foreman           ZONE
                                           62.95  51.46         -18.25%     34.98        47.11%
Air Balance Technician-General Foreman   RATE
                                           67.37  54.57         -19.00%     34.98        56.00%


ALARM INSTALLER                                                                                    N                  0.00%
Alarm Installer                              28.38      22.00   -22.48%     22.00         0.00%

BOILERMAKER                              -           Clark                                         Y        1.87%
Boilermaker                                  59.50      65.94   10.82%      64.73         1.87%

BRICKLAYER                                           Eureka                                        Y       -24.95%
Bricklayer-Journeyman                        32.68      32.68    0.00%      45.43        -28.07%
Bricklayer-Foreman                           33.93      33.93    0.00%      45.43        -25.31%
Bricklayer-General Foreman                   35.68      35.68    0.00%      45.43        -21.46%

CARPENTER                                 ADD     ADD                                              Y        -5.31%
Carpenter-Journeyman                       48.70 ZONE
                                         ZONE       48.95        0.51%      54.51        -10.20%                               21.15
Carpenter-Welder                           49.70 RATE
                                         RATE       49.95        0.50%      54.51         -8.37%                               21.15
Carpenter-Foreman                            51.83      52.08    0.48%      54.51         -4.46%                               21.15
Carpenter-General Foreman                    55.24      55.49    0.45%      54.51          1.80%                               21.15

CEMENT MASON                                         Eureka                                        Y        3.88%
Cement Mason-Journeyman                      46.28      34.40   -25.67%     34.40         0.00%
Cement Mason-Foreman                         48.28      36.40   -24.61%     34.40         5.81%
Cement Mason-General Foreman                 50.03      36.40   -27.24%     34.40         5.81%

ELECTRICIAN- COMMUNICATION                ADD                                                      N                  0.00%
Electrician-Communication Technician
TECHNICIAN                                 38.72 Esmerald
                                         ZONE       26.78       -30.84%     26.78         0.00%
                                         RATE    a

ELECTRICIAN-LINEMAN/GROUNDMAN/                       White
HEAVY EQUIPMENT OPERATOR                             Pine                                          Y        -2.23%
Electrician-Groundman                        34.82      40.50   16.31%      58.40        -30.65%                               26.71
Electrician-Lineman                          51.95      59.90   15.30%      58.40          2.57%                               26.71
                                                                      185
                                                                                 Difference
                                                           Annual      2011 PW  Between PW                        Non-Union DETR
  NYE                                                   Growth, 2010 - Survey Rates and Survey Union Y/ Union %        %     Mean
  Average Construction Wage $21.90      PW 2010 PW 2011     2011       Average      Avg.          N    Difference Difference Wages
Average                                                           -0.42%                  3.61%            3.53%    -0.83%
Electrician-Foreman                          56.89       65.16   14.54%      58.40       11.58%                               26.71
Electrician-General Foreman                  61.90       70.45   13.81%      58.40       20.63%                               26.71
Heavy Equipment Operator                     42.69       49.49   15.93%      58.40      -15.26%                               26.71

ELECTRICIAN-NEON SIGN                                Clark                                        Y        0.57%
Electrician-Neon Sign                        44.31       45.52    2.73%      45.26       0.57%

ELECTRICIAN-WIREMAN                      ADD                                                      N                 -4.16%
Electrician-Wireman                     ZONE
                                          54.74          23.06   -57.87%     24.06       -4.16%
Electrician-Cable Splicer               RATE
                                          55.25          23.06   -58.26%     24.06       -4.16%
Electrician-Foreman                          59.18       23.06   -61.03%     24.06       -4.16%
Electrician-General Foreman                  63.62       23.06   -63.75%     24.06       -4.16%

ELEVATOR CONSTRUCTOR                     -                                                        Y        3.09%
Elevator Constructor-Journeyman Mechanic   46.01         64.58   40.36%      65.56       -1.49%
Elevator Constructor-Mechanic In Charge    46.01         70.59   53.42%      65.56        7.67%

FENCE ERECTOR                            -           -                                            N                  0.00%
Fence Erector                                13.00       18.43   41.77%      18.43       0.00%

                                         ADD          ADD
FLAGPERSON                              LABOR        LABORE
Flagperson                              ER41.44      R ZONE
                                                        41.44     0.00%
                                        ZONE         RATE
                                        RATE
FLOOR COVERER                                        Churchill                                    Y        3.65%
Floor Coverer-Journeyman                     36.26       36.34    0.22%      36.31       0.08%
Floor Coverer-Foreman                        38.90       38.93    0.08%      36.31       7.22%

GLAZIER                                  -           -                                            N                  0.00%
Glazier                                      21.50       21.50    0.00%      21.50       0.00%

                                                      ADD
                                                     LABORE
                                                     R ZONE
HIGHWAY STRIPER                                      RATE                                         Y        0.00%
Highway Striper                              33.57       42.94   27.91%      42.94       0.00%

                                                                       186
                                                                                Difference
                                                          Annual      2011 PW  Between PW                        Non-Union DETR
 NYE                                                   Growth, 2010 - Survey Rates and Survey Union Y/ Union %        %     Mean
 Average Construction Wage $21.90      PW 2010 PW 2011     2011       Average      Avg.          N    Difference Difference Wages
Average                                                        -0.42%                    3.61%            3.53%    -0.83%
HOD CARRIER-BRICK MASON TENDER          ADD    Eureka                                            Y        2.31%
Brick Mason-Journeyman                 LABOR
                                         30.10    43.31       43.89%     43.31          0.00%
Brick Mason-Foreman                    ER30.60    45.31       48.07%     43.31          4.62%
                                       ZONE
                                       RATE
                                        ADD
HOD CARRIER-PLASTERER TENDER           LABOR Clark                                               Y        3.76%
Plasterer Tender-Journeyman            ER44.34    44.34        0.00%     44.34          0.00%
Plasterer Tender-Gun Tender            ZONE
                                         46.34    46.34        0.00%     44.34          4.51%
Plasterer Tender-Foreman               RATE
                                         47.34    47.34        0.00%     44.34          6.77%

                                       SEE
IRON WORKER                            AMEND                                                     Y       60.63%
Ironworker-Journeyman                  MENT 1-
                                         54.38      56.74      4.34%     37.39         51.75%
Ironworker-Foreman                        57.68     60.04      4.09%     37.39         60.58%
Ironworker-General Foreman                61.04     63.40      3.87%     37.39         69.56%

LABORER 
SEE GROUP CLASSIFICATIONS                 ADD     ADD                                            Y        3.61%
Group 1                                    42.94 ZONE
                                         ZONE       42.94      0.00%     42.94          0.00%                                23.62
Group 2                                    43.15 RATE
                                         RATE       43.15      0.00%     42.94          0.49%                                23.62
Group 3                                    43.25    43.25      0.00%     42.94          0.72%                                23.62
Group 4                                    43.34    43.34      0.00%     42.94          0.93%                                23.62
Group 5                                    43.44    43.44      0.00%     42.94          1.16%                                23.62
Group 6A                                   46.10    46.10      0.00%     42.94          7.36%                                23.62
Group 6B                                   45.60    45.60      0.00%     42.94          6.19%                                23.62
Group 6C                                   45.35    45.35      0.00%     42.94          5.61%                                23.62
Group 6D                                   45.96    45.96      0.00%     42.94          7.03%                                23.62
Group 6E                                   45.60    45.60      0.00%     42.94          6.19%                                23.62
Group 7                                    44.67    44.67      0.00%     42.94          4.03%                                23.62
Foreman $2.00 above highest paid
journeyman supervised.
General Foreman $3.00 above highest paid
foreman supervised.

                                       SEE
MECHANICAL INSULATOR                   AMEND Clark                                               Y        7.77%
Mechanical Insulator-Journeyman        MENT 2-
                                         57.06  56.23         -1.45%     55.23          1.81%
Mechanical Insulator-Foreman              59.56     59.52     -0.07%     55.23          7.77%
Mechanical Insulator-General Foreman      61.06     62.81      2.87%     55.23         13.72%
                                                                   187
                                                                                   Difference
                                                             Annual      2011 PW  Between PW                        Non-Union DETR
 NYE                                                      Growth, 2010 - Survey Rates and Survey Union Y/ Union %        %     Mean
 Average Construction Wage $21.90         PW 2010 PW 2011     2011       Average      Avg.          N    Difference Difference Wages
Average                                                           -0.42%                    3.61%            3.53%    -0.83%

MILLWRIGHT                                 ADD                                                      Y       -45.41%
Millwright-Journeyman                       49.70 Churchill
                                          ZONE       25.44      -48.81%     46.60         -45.41%
Millwright-Welder                         RATE
                                            50.70    25.44      -49.82%     46.60         -45.41%
Millwright-Foreman                          53.01     25.44     -52.01%     46.60         -45.41%
Millwright-General Foreman                  56.65     25.44     -55.09%     46.60         -45.41%




OPERATING ENGINEER                                                                                  Y        4.72%
SEE GROUP CLASSIFICATIONS                  ADD     ADD
Group 1                                     53.92 ZONE
                                          ZONE       55.67        3.25%     57.12          -2.54%                               19.26
Group 2                                     54.87 RATE
                                          RATE       56.62        3.19%     57.12          -0.88%                               19.26
Group 3                                     55.16     56.91       3.17%     57.12          -0.37%                               19.26
Group 4                                     56.65     58.40       3.09%     57.12           2.24%                               19.26
Group 5                                     57.75     59.50       3.03%     57.12           4.17%                               19.26
Group 6                                     56.87     58.62       3.08%     57.12           2.63%                               19.26
Group 7                                     57.97     59.72       3.02%     57.12           4.55%                               19.26
Group 8                                     56.98     58.73       3.07%     57.12           2.82%                               19.26
Group 9                                     58.08     59.83       3.01%     57.12           4.74%                               19.26
Group 10                                    57.10     58.85       3.06%     57.12           3.03%                               19.26
Group 11                                    58.20     59.95       3.01%     57.12           4.95%                               19.26
Group 12                                    57.27     59.02       3.06%     57.12           3.33%                               19.26
Group 13                                    57.37     59.12       3.05%     57.12           3.50%                               19.26
Group 14                                    57.40     59.15       3.05%     57.12           3.55%                               19.26
Group 15                                    57.48     59.23       3.04%     57.12           3.69%                               19.26
Group 16                                    57.60     59.35       3.04%     57.12           3.90%                               19.26
Group 17                                    57.77     59.52       3.03%     57.12           4.20%                               19.26
Group 18                                    57.87     59.62       3.02%     57.12           4.38%                               19.26
Group 19                                    57.98     59.73       3.02%     57.12           4.57%                               19.26
Group 20                                    58.10     59.85       3.01%     57.12           4.78%                               19.26
Group 21                                    58.27     60.02       3.00%     57.12           5.08%                               19.26
Group 22                                    58.37     60.12       3.00%     57.12           5.25%                               19.26
Group 23                                    58.48     60.23       2.99%     57.12           5.44%                               19.26
Group 24                                    58.60     60.35       2.99%     57.12           5.65%                               19.26
Group 25                                    58.77     60.52       2.98%     57.12           5.95%                               19.26
Add $.50 per hour for "Special" Shift
Add $1.00 per hour for "Multiple" Shift
                                                                      188
                                                                                Difference
                                                          Annual      2011 PW  Between PW                        Non-Union DETR
 NYE                                                   Growth, 2010 - Survey Rates and Survey Union Y/ Union %        %     Mean
 Average Construction Wage $21.90      PW 2010 PW 2011     2011       Average      Avg.          N    Difference Difference Wages
Average                                                        -0.42%                    3.61%            3.53%    -0.83%

OPERATING ENGINEER:
CRANES, PILEDRIVING, & HOISTING
SEE GROUP CLASSIFICATIONS 
EQUIPMENT                                 ADD     ADD
Group 1                                  ZONE    ZONE
Engineer Oiler                             57.60 RATE
                                         RATE       59.35      3.04%     57.12          3.90%                                19.26
Forklift Operator                          56.51    58.26      3.10%     57.12          2.00%                                19.26
Group 2
Truck Crane Oiler                          57.60    59.35      3.04%     57.12          3.90%                                19.26
Group 3
A-Frame or Winch Truck Operator            56.51    58.26      3.10%     57.12          2.00%                                19.26
Ross Carrier Operator (Jobsite)            56.51    58.26      3.10%     57.12          2.00%                                19.26
Group 4
Bridge-Type Unloader and Turntable         56.65    58.40      3.09%     57.12          2.24%                                19.26
Helicopter Hoist Operator
Operator                                   56.65    58.40      3.09%     57.12          2.24%                                19.26
Group 5
Hydraulic Boom Truck (Pitman)              56.87    58.62      3.08%     57.12          2.63%                                19.26
Stinger Crane (Austin-Western or Similar   56.87    58.62      3.08%     57.12          2.63%                                19.26
Tugger Hoist Operator (1 Drum)
Type)                                      56.87    58.62      3.08%     57.12          2.63%                                19.26
Group 6
Bridge Crane Operator                      56.98    58.73      3.07%     57.12          2.82%                                19.26
Cretor Crane Operator                      56.98    58.73      3.07%     57.12          2.82%                                19.26
Hoist Operator (Chicago Boom and Similar   56.98    58.73      3.07%     57.12          2.82%                                19.26
Lift Mobile Operator
Type)                                      56.98    58.73      3.07%     57.12          2.82%                                19.26
Lift Slab Machine Operator (Vagtborg and   56.98    58.73      3.07%     57.12          2.82%                                19.26
Material Hoist/Manlift Operator
Similar Types)                             56.98    58.73      3.07%     57.12          2.82%                                19.26
Polar Gantry Crane Operator                56.98    58.73      3.07%     57.12          2.82%                                19.26
Self Climbing Scaffold (or Similar Type)   56.98    58.73      3.07%     57.12          2.82%                                19.26
Shovel, Backhoe, Dragline, Clamshell
Operator (Over 3/4 YD. and up to 5 CU.
YDS. M.R.C.)                               56.98    58.73      3.07%     57.12          2.82%                                19.26
Silent Piler                               56.98    58.73      3.07%     57.12          2.82%                                19.26
Tugger Hoist Operator (2 Drum)             56.98    58.73      3.07%     57.12          2.82%                                19.26
Group 7
Pedestal Crane Operator                    57.10    58.85      3.06%     57.12          3.03%                                19.26
Shovel, Backhoe, Dragline, Clamshell
Operator (over 5 CU. YDS. M.R.C.)          57.10    58.85      3.06%     57.12          3.03%                                19.26
Tower Crane Repairman                      57.10    58.85      3.06%     57.12          3.03%                                19.26
                                                                   189
                                                                                       Difference
                                                                 Annual      2011 PW  Between PW                        Non-Union DETR
  NYE                                                         Growth, 2010 - Survey Rates and Survey Union Y/ Union %        %     Mean
  Average Construction Wage $21.90            PW 2010 PW 2011     2011       Average      Avg.          N    Difference Difference Wages
Average                                                               -0.42%                   3.61%             3.53%    -0.83%
Tugger Hoist Operator (3 Drum)                  57.10    58.85         3.06%    57.12          3.03%                                19.26
Group 8
Crane Operator (up to and including 25 ton      59.07    60.82        2.96%     57.12          6.48%                                19.26
Crawler Transporter Operator
capacity)                                       57.27    59.02        3.06%     57.12          3.33%                                19.26
Derrick Barge Operator (up to and including     57.27    59.02        3.06%     57.12          3.33%                                19.26
25 ton capacity)
Hoist Operator, Stiff Legs, Guy Derrick or
Similar Type (up to and including 25 ton
capacity)                                       57.27    59.02        3.06%     57.12          3.33%                                19.26
Shovel, Backhoe, Dragline, Clamshell
Operator (over 7 CU. YDS. M.R.C.)               57.27    59.02        3.06%     57.12          3.33%                                19.26
Group 9
Crane Operator (over 25 tons up to and
including 50 tons M.R.C.)                       59.07    60.82        2.96%     57.12          6.48%                                19.26
Derrick Barge Operator (over 25 tons, up to
and including 50 tons M.R.C.)                   57.44    59.19        3.05%     57.12          3.62%                                19.26
Highline Cableway Operator                      57.44    59.19        3.05%     57.12          3.62%                                19.26
Hoise Operator, Stiff Legs, Guy Derrick or
Similar Type (over 25 tons, up to and
including 50 tons M.R.C.)                       57.44    59.19        3.05%     57.12          3.62%                                19.26
K-Crane                                         57.44    59.19        3.05%     57.12          3.62%                                19.26
Polar Crane Operator                            57.44    59.19        3.05%     57.12          3.62%                                19.26
Self Erecting Tower Crane Operator
Maximum Lifting Capacity Ten (10) Tons.
One (1) Ton Operator).                          57.44    59.19        3.05%     57.12          3.62%                                19.26
Group 10
Crane Operator (over 50 tons, up to and
including 100 tons M.R.C.)                      60.49    62.24        2.89%     57.12          8.96%                                19.26
Derrick Barge Operator (over 50 tons, up to
and including 100 tons M.R.C.)                  58.44    60.19        2.99%     57.12          5.37%                                19.26
Hoist Operator, Stiff Legs, Guy Derrick or
Similar Type (over 50 tons, up to and
including 100 tons M.R.C.)                      58.44    60.19        2.99%     57.12          5.37%                                19.26

Mobile Tower Crane Operator (over 50 tons,
up to and including 100 tons M.R.C.)            60.49    62.24        2.89%     57.12          8.96%                                19.26
Group 11
Crane Operator (over 100 tons, up to and
including 200 tons M.R.C.)                      60.99    62.74        2.87%     57.12          9.84%                                19.26
                                                                          190
                                                                                      Difference
                                                                Annual      2011 PW  Between PW                        Non-Union DETR
  NYE                                                        Growth, 2010 - Survey Rates and Survey Union Y/ Union %        %     Mean
  Average Construction Wage $21.90           PW 2010 PW 2011     2011       Average      Avg.          N    Difference Difference Wages
Average                                                              -0.42%                    3.61%            3.53%    -0.83%
Derrick Barge Operator (over 100 tons, up
to and including 200 tons M.R.C.)               59.44       61.19    2.94%     57.12          7.13%                                19.26
Hoist Operator, Stiff Legs, Guy Derrick or
Similar Type (over100 tons, up to and
including 200 tons M.R.C.)                      59.44       61.19    2.94%     57.12          7.13%                                19.26

Mobile Tower Crane Operator (over 100
tons, up to and including 200 tons M.R.C.)      60.99       62.74    2.87%     57.12          9.84%                                19.26
Tower Crane Operator and Tower Gantry           61.44       63.19    2.85%     57.12         10.63%                                19.26
Group 12
Crane Operator (over 200 tons up to and
including 300 tons M.R.C.)                      63.63       65.38    2.75%     57.12         14.46%                                19.26
Derrick Barge Operator (over 200 tons up to
and including 300 tons M.R.C.)                  60.44       62.19    2.90%     57.12          8.88%                                19.26
Hoist Operator, Stiff Legs, Guy Derrick or
Similar Type (over 200 tons up to and
including 300 tons M.R.C.)                      60.44       62.19    2.90%     57.12          8.88%                                19.26
Mobile Tower Crane Operator (over 200
tons up to and including 300 tons M.R.C.)       63.63       65.38    2.75%     57.12         14.46%                                19.26
Group 13
Crane Operator (over 300 tons)                  65.00       66.75    2.69%     57.12         16.86%                                19.26
Derrick Barge Operator (over 300 tons)          61.44       63.19    2.85%     57.12         10.63%                                19.26
Helicopter Pilot                                61.44       63.19    2.85%     57.12         10.63%                                19.26
Hoist Operator, Stiff Legs, Guy Derrick or
Similar Type (over 300 tons)                    61.44       63.19    2.85%     57.12         10.63%                                19.26
Mobile Tower Crane Operator (over 300           65.00       66.75    2.69%     57.12         16.86%                                19.26
Add $ .50 per hour for "Special" Shift
tons)                                       -           -
Add $1.00 per hour for "Multiple" Shift     -           -


OPERATING ENGINEER -TUNNEL
SEE GROUP CLASSIFICATIONS                     ADD     ADD
Group 1                                        55.77 ZONE
                                             ZONE       57.52        3.14%     57.12          0.70%                                19.26
Group 2                                        56.72 RATE
                                             RATE       58.47        3.09%     57.12          2.36%                                19.26
Group 3                                         57.01       58.76    3.07%     57.12          2.87%                                19.26
Group 4                                         57.15       58.90    3.06%     57.12          3.12%                                19.26
Group 5                                         57.37       59.12    3.05%     57.12          3.50%                                19.26
Group 6                                         57.48       59.23    3.04%     57.12          3.69%                                19.26
                                                                         191
                                                                                Difference
                                                          Annual      2011 PW  Between PW                        Non-Union DETR
 NYE                                                   Growth, 2010 - Survey Rates and Survey Union Y/ Union %        %     Mean
 Average Construction Wage $21.90      PW 2010 PW 2011     2011       Average      Avg.          N    Difference Difference Wages
Average                                                         -0.42%                  3.61%             3.53%    -0.83%
Group 7                                    57.60       59.35     3.04%     57.12        3.90%                                19.26
Group 8                                    57.77       59.52     3.03%     57.12        4.20%                                19.26
Group 9                                    57.90       59.65     3.02%     57.12        4.43%                                19.26

PAINTER                                            Lander                                        Y        -1.60%
Painter-Journeyman                         46.23       32.74   -29.18%     33.78        -3.08%
Painter-Foreman                            49.35       33.74   -31.63%     33.78        -0.12%

PILEDRIVER                                                                                       Y
Piledriver-Journeyman                      34.27       34.27    0.00%
Piledriver-Foreman                         35.59       35.59    0.00%

PLASTERER                               ADD    Clark                                             Y        -0.13%
Plasterer                              ZONE
                                         44.69    44.69         0.00%      44.75        -0.13%
                                       RATE

PLUMBER/PIPEFITTER                     -           Mineral                                       N                  0.00%
Plumber/Pipefitter-Journeyman              34.28       26.10   -23.86%     26.10        0.00%
Plumber/Pipefitter-Foreman                 34.28       26.10   -23.86%     26.10        0.00%
Plumber/Pipefitter-General Foreman         34.28       26.10   -23.86%     26.10        0.00%

REFRIGERATION                          -           Lander                                        Y       -26.09%
Refrigeration-Journeyman                   27.55       29.40    6.72%      39.78       -26.09%
Refrigeration-Foreman                      27.55       29.40    6.72%      39.78       -26.09%
Refrigeration-General Foreman              27.55       29.40    6.72%      39.78       -26.09%

ROOFER-                                -           -
(Does not include sheet metal roofs)                                                             Y        0.25%
Roofer                                     20.48       31.91   55.81%      31.83        0.25%

SHEET METAL WORKER                      ADD     ADD                                              Y        8.53%
Sheet Metal Worker-Journeyman            46.60 ZONE
                                       ZONE       59.52        27.73%      58.94        0.98%
Sheet Metal Worker-Foreman               49.62 RATE
                                       RATE       63.97        28.92%      58.94        8.53%
Sheet Metal Worker-General Foreman         52.64       68.42   29.98%      58.94       16.08%

SPRINKLER FITTER                       -           -                                             N                 -0.36%
Sprinkler Fitter-Journeyman                26.00       25.00    -3.85%     25.09        -0.36%
Sprinkler Fitter-Foreman                   26.00       25.00    -3.85%     25.09        -0.36%
                                                                     192
                                                                                Difference
                                                          Annual      2011 PW  Between PW                        Non-Union DETR
 NYE                                                   Growth, 2010 - Survey Rates and Survey Union Y/ Union %        %     Mean
 Average Construction Wage $21.90      PW 2010 PW 2011     2011       Average      Avg.          N    Difference Difference Wages
Average                                                       -0.42%                     3.61%            3.53%    -0.83%
Sprinkler Fitter-General Foreman          26.00      25.00    -3.85%     25.09          -0.36%




SURVEYOR                                                                                         N                 17.27%
Surveyor                                  42.14      45.96     9.07%     39.19         17.27%                                23.76

TAPER                                                                                            Y       30.13%
Taper                                      46.23    46.64      0.89%     35.84         30.13%
    
TILE SETTER/TERRAZZO WORKER/              ADD     ADD
MARBLE MASON                               32.48 ZONE
Tile Setter/Terrazzo Worker/Marble Mason ZONE       34.63      6.62%     36.35          -4.73%   Y        -4.73%
Finisher                                   46.04 RATE
Tile Setter/Terrazzo Worker/Marble Mason RATE       49.29      7.06%     49.17           0.24%   Y         0.24%

                                        ADD        ADD
TRAFFIC BARRIER ERECTOR                LABOR      LABORE
Traffic Barrier Erector                ER42.94    R ZONE
                                                     42.94     0.00%
                                       ZONE       RATE-
                                       RATE-
                                        ADD
                                       ZONE
TRUCK DRIVER                           RATE       Lyon                                           N                  3.43%
SEE GROUP CLASSIFICATIONS
Group 1                                   46.13      20.80   -54.91%     20.11          3.43%                                22.01
Group 2                                   46.23      20.80   -55.01%     20.11          3.43%                                22.01
Group 3                                   46.44      20.80   -55.21%     20.11          3.43%                                22.01
Group 4                                   46.62      20.80   -55.38%     20.11          3.43%                                22.01
Group 5                                   46.82      20.80   -55.57%     20.11          3.43%                                22.01
Group 6                                   47.12      20.80   -55.86%     20.11          3.43%                                22.01
Foreman $1.00 above highest paid          48.12      20.80   -56.77%     20.11          3.43%                                22.01
journeyman supervised.


                                                  Esmerald
WELL DRILLER                                      a                                              N                  0.00%
Well Driller                              31.49      19.42   -38.33%     19.42          0.00%

EQUIPMENT GREASER (RACK)                         ADD OP.                                         Y        2.98%
Equipment Greaser (rack)                  46.10 ENG.
                                                   56.91      23.45%     56.79          0.21%
                                                ZONE               193
                                                RATE 
                                                                                Difference
                                                          Annual      2011 PW  Between PW                        Non-Union DETR
 NYE                                                   Growth, 2010 - Survey Rates and Survey Union Y/ Union %        %     Mean
 Average Construction Wage $21.90      PW 2010 PW 2011     2011       Average      Avg.          N    Difference Difference Wages
Average                                                        -0.42%                    3.61%            3.53%    -0.83%

EQUIPMENT GREASER (GREASE                           ADD OP.
Equipment Greaser (grease truck)
TRUCK)                                     46.10   ENG.
                                                      58.40   26.68%     56.79          2.84%
                                                   ZONE
EQUIPMENT GREASER (GREASE TRUCK/                    ADD OP.
                                                   RATE 
MULTI-SHIFT)
Equipment Greaser (grease truck/multi-     46.10   ENG.
                                                      59.50   29.07%     56.79          4.77%
shift)                                             ZONE
TUNNEL, EQUIPMENT GREASER                          RATE 
                                                    ADD OP.
Tunnel, Equipment Greaser (grease truck)
(GREASE TRUCK)                             46.10   ENG.
                                                      59.12   28.24%     56.79          4.10%
                                                   ZONE
FIELD SOILS AND MATERIAL TESTER                     ADD OP.
                                                   RATE                                          Y        -0.30%
Field Soils and Material Tester            44.14   ENG.
                                                      56.62   28.27%     56.79          -0.30%
                                                   ZONE
FIELD ASPHALTIC CONCRETE (SOILS                    RATE 
                                                    ADD OP.
AND MATERIAL TESTER)                               ENG.
Field Asphaltic Concrete (soils and        44.14   ZONE
                                                      56.62   28.27%     56.79          -0.30%
material tester)                                   RATE 
Union Breakdown
Union                                                                                            28
Non-Union                                                                                        10
Total                                                                                            38




                                                                   194
DETR Mean
Wage + 40%     Wage
 Benefits     Premium
               108.11%




      29.61     65.32%
      29.61     68.69%
      29.61     75.89%
      29.61     87.40%
          0
          0
          0
          0
          0
          0
          0
          0
          0


          0
     37.394      8.31%
     37.394     60.19%
                         195
DETR Mean
Wage + 40%     Wage
 Benefits     Premium
               108.11%
     37.394     74.25%
     37.394     88.40%
     37.394     32.35%
          0
          0
          0
          0
          0
          0
          0
          0
          0
          0
          0
          0
          0
          0
          0
          0
          0

         0
         0
         0

         0
         0
         0
         0
         0
         0
         0



         0
         0
         0
                         196
DETR Mean
Wage + 40%     Wage
 Benefits     Premium
               108.11%
         0
         0
         0
         0

         0
         0
         0
         0
         0

          0
          0
          0
          0
          0
          0
          0
     33.068     29.85%
     33.068     30.49%
     33.068     30.79%
     33.068     31.06%
     33.068     31.37%
     33.068     39.41%
     33.068     37.90%
     33.068     37.14%
     33.068     38.99%
     33.068     37.90%
     33.068     35.09%
          0
          0
          0
          0

         0
         0
         0
         0
                         197
DETR Mean
Wage + 40%     Wage
 Benefits     Premium
               108.11%
          0
          0
          0
          0
          0
          0
          0
          0
          0
          0
          0
     26.964    106.46%
     26.964    109.98%
     26.964    111.06%
     26.964    116.59%
     26.964    120.66%
     26.964    117.40%
     26.964    121.48%
     26.964    117.81%
     26.964    121.89%
     26.964    118.25%
     26.964    122.33%
     26.964    118.88%
     26.964    119.26%
     26.964    119.37%
     26.964    119.66%
     26.964    120.11%
     26.964    120.74%
     26.964    121.11%
     26.964    121.52%
     26.964    121.96%
     26.964    122.59%
     26.964    122.96%
     26.964    123.37%
     26.964    123.82%
     26.964    124.45%
          0
          0
                         198
DETR Mean
Wage + 40%     Wage
 Benefits     Premium
               108.11%
          0
          0
          0
          0
          0
     26.964    120.11%
     26.964    116.07%
          0
     26.964    120.11%
          0
     26.964    116.07%
     26.964    116.07%
          0
     26.964    116.59%
     26.964    116.59%
          0
     26.964    117.40%
     26.964    117.40%
     26.964    117.40%
          0
     26.964    117.81%
     26.964    117.81%
     26.964    117.81%
     26.964    117.81%
     26.964    117.81%
     26.964    117.81%
     26.964    117.81%
     26.964    117.81%


     26.964    117.81%
     26.964    117.81%
     26.964    117.81%
          0
     26.964    118.25%

     26.964    118.25%
     26.964    118.25%
                         199
DETR Mean
Wage + 40%     Wage
 Benefits     Premium
               108.11%
     26.964    118.25%
          0
     26.964    125.56%
     26.964    118.88%
     26.964    118.88%


     26.964    118.88%

     26.964    118.88%
          0

     26.964    125.56%

     26.964    119.51%
     26.964    119.51%


     26.964    119.51%
     26.964    119.51%
     26.964    119.51%


     26.964    119.51%
          0

     26.964    130.83%

     26.964    123.22%


     26.964    123.22%


     26.964    130.83%
          0

     26.964    132.68%
                         200
DETR Mean
Wage + 40%     Wage
 Benefits     Premium
               108.11%

     26.964    126.93%


     26.964    126.93%


     26.964    132.68%
     26.964    134.35%
          0

     26.964    142.47%

     26.964    130.64%


     26.964    130.64%

     26.964    142.47%
          0
     26.964    147.55%
     26.964    134.35%
     26.964    134.35%

     26.964    134.35%
     26.964    147.55%
          0
          0
          0
          0
          0
          0
     26.964    113.32%
     26.964    116.84%
     26.964    117.92%
     26.964    118.44%
     26.964    119.26%
     26.964    119.66%
                         201
DETR Mean
Wage + 40%     Wage
 Benefits     Premium
               108.11%
     26.964    120.11%
     26.964    120.74%
     26.964    121.22%
          0
          0
          0
          0
          0
          0
          0
          0
          0
          0
          0
          0
          0
          0
          0
          0
          0
          0
          0
          0
          0
          0
          0
          0
          0
          0
          0
          0
          0
          0
          0
          0
          0
          0
          0
                         202
DETR Mean
Wage + 40%     Wage
 Benefits     Premium
               108.11%
          0
          0
          0
          0
          0
     33.264     38.17%
          0
          0
          0
          0
          0
          0
          0
          0

         0
         0
         0


          0
          0
     30.814    -32.50%
     30.814    -32.50%
     30.814    -32.50%
     30.814    -32.50%
     30.814    -32.50%
     30.814    -32.50%
     30.814    -32.50%
          0
          0


         0
         0
         0
         0
         0
                         203
DETR Mean
Wage + 40%    Wage
 Benefits    Premium
              108.11%
         0
         0
         0
         0
         0
         0
         0
         0
         0
         0
         0
         0
         0

         0
         0




                        204
                                                           Annual     2011 PW    Difference                      Non-Union    DETR
 PERSHING                                                Growth, 2010 Survey Between PW Rates Union Y/ Union %        %       Mean
 Average Construction Wage $28.71        PW 2010 PW 2011    - 2011    Average and Survey Avg.    N    Difference Difference   Wages
Average                                                            2.51%                   4.14%            5.29%     1.82%

                                          ADD
                                         SHEET
                                         METAL
                                         ZONE
AIR BALANCE TECHNICIAN                   RATE        Washoe                                        Y       46.57%
Air Balance Technician-Journeyman            46.60      48.35     3.76%     35.11        37.71%
Air Balance Technician-Foreman               49.62      51.46     3.71%     35.11        46.57%
Air Balance Technician-General Foreman       52.64      54.57     3.67%     35.11        55.43%

ALARM INSTALLER                                      Churchill                                     N                  0.00%
Alarm Installer                              25.69      26.77     4.20%     26.77         0.00%

BOILERMAKER                              -           Churchill                                     Y        1.87%
Boilermaker-Journeyman                       59.50      65.94    10.82%     64.73         1.87%
Boilermaker-Foreman                          59.50      65.94    10.82%     64.73         1.87%
Boilermaker-General Foreman                  59.50      65.94    10.82%     64.73         1.87%

                                          ADD
                                         ZONE
BRICKLAYER                               RATE--      Washoe                                        Y        8.21%
Bricklayer-Journeyman                        32.68      32.68      0.00%    31.51         3.71%
Bricklayer-Foreman                           33.98      33.93     -0.15%    31.51         7.68%
Bricklayer-General Foreman                   35.68      35.68      0.00%    31.51        13.23%

                                          ADD         ADD
                                         ZONE        ZONE
CARPENTER                                RATE        RATE                                          Y        3.57%
Carpenter-Journeyman                         38.30      38.80     1.31%     38.79         0.03%
Carpenter-Foreman                            41.05      41.55     1.22%     38.79         7.12%

CEMENT MASON                                                                                       Y        2.91%
Cement Mason-Journeyman                      17.00      34.40    102.35%    34.40         0.00%
Cement Mason-Foreman                         17.00      36.40    114.12%    34.40         5.81%

ELECTRICIAN-COMMUNICATION TECHNICIAN        Humboldt                                               N                  0.00%
Electrician-Communication Technician-
Installer                             27.97    25.66              -8.26%    25.66         0.00%
                                                                      205
                                                             Annual     2011 PW    Difference                      Non-Union    DETR
  PERSHING                                                 Growth, 2010 Survey Between PW Rates Union Y/ Union %        %       Mean
  Average Construction Wage $28.71         PW 2010 PW 2011    - 2011    Average and Survey Avg.    N    Difference Difference   Wages
Average                                                             2.51%                    4.14%            5.29%     1.82%
Electrician-Communication Technician-
Technician                                     30.88       25.66   -16.90%    25.66         0.00%
Electrician-Communication Technician-
Senior Technician                              33.13       25.66   -22.55%    25.66         0.00%

ELECTRICIAN-LINE                           -           -                                             Y       -2.23%
Electrician-Groundman                          39.19       40.50    3.34%     58.40        -30.65%
Electrician-Lineman                            57.91       59.90    3.44%     58.40          2.57%
Electrician-Foreman                            63.02       65.16    3.40%     58.40         11.58%
Electrician-General Foreman                    68.12       70.45    3.42%     58.40         20.63%
Heavy Equipment Operator                       47.86       49.49    3.41%     58.40        -15.26%

ELECTRICIAN-NEON SIGN                                  Churchill                                     Y        0.57%
Electrician-Neon Sign                          44.31       45.52    2.73%     45.26         0.57%

ELECTRICIAN-WIREMAN                                                                                  Y        4.53%
Electrician-Wireman                            47.69       50.78    6.48%     48.58         4.53%

ELEVATOR CONSTRUCTOR                       -           Churchill                                     Y       13.48%

Elevator Constructor-Journeyman Mechanic       46.01       78.21   69.98%     72.12         8.44%
Elevator Construction-Mechanic In Charge       46.01       85.48   85.79%     72.12        18.52%

                                            ADD
                                           LABORE
                                           R ZONE
FENCE ERECTOR                              RATE        Washoe                                        N                  0.00%
Fence Erector                                  30.82       48.07   55.97%     48.07         0.00%

                                            ADD    ADD
                                           LABORE LABORER
                                           R ZONE ZONE
FLAGPERSON                                 RATE   RATE 
Flagperson                                     27.95       27.95    0.00%

FLOOR COVERER                                          Churchill                                     Y        3.65%
Floor Coverer-Journeyman                       36.26       36.34    0.22%     36.31         0.08%
Floor Coverer-Foreman                          38.90       38.93    0.08%     36.31         7.22%
                                                                        206
                                                      Annual     2011 PW    Difference                      Non-Union    DETR
 PERSHING                                           Growth, 2010 Survey Between PW Rates Union Y/ Union %        %       Mean
 Average Construction Wage $28.71   PW 2010 PW 2011    - 2011    Average and Survey Avg.    N    Difference Difference   Wages
Average                                                      2.51%                    4.14%            5.29%     1.82%

GLAZIER                             -           Churchill                                     N                  2.28%
Glazier                                 21.50        21.50   0.00%    21.02          2.28%

                                     ADD    ADD
                                    LABORE LABORER
                                    R ZONE ZONE
HIGHWAY STRIPER                     RATE   RATE                                               Y        0.00%
Highway Striper                         33.57        33.57   0.00%    33.57          0.00%

                                     ADD
                                    ZONE        Humboldt
HOD CARRIER-BRICK MASON TENDER      RATE                                                      Y        0.83%
Brick Mason-Journeyman                  30.10        30.10   0.00%    30.10          0.00%
Brick Mason-Foreman                     30.60        30.60   0.00%    30.10          1.66%

                                     ADD
                                    ZONE
HOD CARRIER-PLASTERER TENDER        RATE        CC                                            Y        3.81%
Plasterer Tender-Journeyman             33.76        34.26   1.48%    33.76          1.48%
Plasterer Tender-Gun Tender             34.76        35.26   1.44%    33.76          4.44%
Plasterer Tender-Foreman                35.12        35.62   1.42%    33.76          5.51%

                                    SEE
                                    AMENDM
IRON WORKER                         ENT 1                                                     Y        4.80%
Ironworker-Journeyman                   54.38        56.74   4.34%    57.31         -0.99%
Ironworker-Foreman                      57.68        60.04   4.09%    57.31          4.76%
Ironworker-General Foreman              61.04        63.40   3.87%    57.31         10.63%

                                     ADD         ADD
LABORER                             ZONE        ZONE                                          Y        0.19%
SEE GROUP CLASSIFICATIONS           RATE        RATE
Landscaper                              25.66        25.66   0.00%    30.33         -15.40%
Furniture Mover                         27.16        27.16   0.00%    30.33         -10.45%
Group 1                                 30.82        30.82   0.00%    30.33           1.62%
Group 1A                                27.95        27.95   0.00%    30.33          -7.85%
Group 2                                 30.92        30.92   0.00%    30.33           1.95%
                                                                207
                                                         Annual     2011 PW    Difference                      Non-Union    DETR
 PERSHING                                              Growth, 2010 Survey Between PW Rates Union Y/ Union %        %       Mean
 Average Construction Wage $28.71      PW 2010 PW 2011    - 2011    Average and Survey Avg.    N    Difference Difference   Wages
Average                                                       2.51%                     4.14%             5.29%     1.82%
Group 3                                   31.07      31.07    0.00%     30.33           2.44%
Group 4                                   31.32      31.32    0.00%     30.33           3.26%
Group 4A                                  32.57      32.57    0.00%     30.33           7.39%
Group 5                                   31.62      31.62    0.00%     30.33           4.25%
Group 6
Nozzlemen, Rodmen                         31.62      31.62    0.00%     30.33           4.25%
Gunmen, Materialmen                       31.32      31.32    0.00%     30.33           3.26%
Reboundmen                                30.97      30.97    0.00%     30.33           2.11%
Gunite Foremen                            32.02      32.02    0.00%     30.33           5.57%

                                       SEE
                                       AMENDM
MECHANICAL INSULATOR                   ENT 2- Storey                                             Y       -0.08%
Mechanical Insulator-Mechanic             57.06      54.56    -4.38%    56.77           -3.89%
Mechanical Insulator-Foreman              59.56      57.06    -4.20%    56.77            0.51%
Mechanical Insulator-General Foreman      61.06      58.56    -4.09%    56.77            3.15%

MILLWRIGHT                                                                                       N                 19.18%
Millwright-Journeyman                     49.70      31.51   -36.60%    26.44          19.18%
Millwright-Welder                         50.70      31.51   -37.85%    26.44          19.18%
Millwright-Foreman                        53.01      31.51   -40.56%    26.44          19.18%
Millwright-General Foreman                56.65      31.51   -44.38%    26.44          19.18%

                                        ADD        ADD
OPERATING ENGINEER                     ZONE       ZONE                                           Y        8.85%
SEE GROUP CLASSIFICATIONS              RATE       RATE 
Group 1                                   41.33      43.08    4.23%     46.85           -8.05%
Group 1A                                  44.09      45.84    3.97%     46.85           -2.16%
Group 2                                   44.62      46.37    3.92%     46.85           -1.02%
Group 3                                   44.89      46.64    3.90%     46.85           -0.45%
Group 4                                   45.63      47.38    3.84%     46.85            1.13%
Group 5                                   45.93      47.68    3.81%     46.85            1.77%
Group 6                                   46.10      47.85    3.80%     46.85            2.13%
Group 7                                   46.35      48.10    3.78%     46.85            2.67%
Group 8                                   46.94      48.69    3.73%     46.85            3.93%
Group 9                                   47.26      49.01    3.70%     46.85            4.61%
Group 10                                  47.61      49.36    3.68%     46.85            5.36%
Group 10A                                 47.80      49.55    3.66%     46.85            5.76%
                                                                  208
                                                               Annual     2011 PW    Difference                      Non-Union    DETR
 PERSHING                                                    Growth, 2010 Survey Between PW Rates Union Y/ Union %        %       Mean
 Average Construction Wage $28.71            PW 2010 PW 2011    - 2011    Average and Survey Avg.    N    Difference Difference   Wages
Average                                                              2.51%                    4.14%             5.29%     1.82%
Group 11                                         48.04       49.79   3.64%    46.85           6.28%
Group 11A                                        49.68       51.43   3.52%    46.85           9.78%
Group 11B                                        50.49       52.24   3.47%    46.85          11.50%
Foreman                                          49.68       51.43   3.52%    46.85           9.78%
Add 7% to base rate for "Second" Shift       -           -
Add 12.5% to base rate for "Special" shift   -           -

OPERATING ENGINEER-STEEL                      ADD         ADD
FABRICATOR & ERECTOR                         ZONE        ZONE
SEE GROUP CLASSIFICATIONS                    RATE        RATE
Group 1                                          56.63       58.38   3.09%    46.85          24.61%
Group 1 Truck Crane Oiler                        50.46       52.21   3.47%    46.85          11.44%
Group 1 Oiler                                    48.50       50.25   3.61%    46.85           7.26%
Group 2                                          55.12       56.87   3.17%    46.85          21.39%
Group 2 Truck Crane Oiler                        50.21       51.96   3.49%    46.85          10.91%
Group 2 Oiler                                    48.29       50.04   3.62%    46.85           6.81%
Group 3                                          53.88       55.63   3.25%    46.85          18.74%
Group 3 Truck Crane Oiler                        49.99       51.74   3.50%    46.85          10.44%
Group 3 Oiler                                    48.07       49.82   3.64%    46.85           6.34%
Group 3 Hydraulic                                49.66       51.41   3.52%    46.85           9.73%
Group 4                                          52.15       53.90   3.36%    46.85          15.05%
Group 5                                          51.05       52.80   3.43%    46.85          12.70%
Add 7% to base rate for "Second" Shift       -           -
Add 12.5% to base rate for "Special" Shift

                                              ADD         ADD
OPERATING ENGINEER -PILEDRIVER               ZONE        ZONE                                          Y
SEE GROUP CLASSIFICATIONS                    RATE        RATE
Group 1                                          56.10       57.85   3.12%    46.85          23.48%
Group 1 Truck Crane Oiler                        50.64       52.39   3.46%    46.85          11.82%
Group 1 Oiler                                    48.72       50.47   3.59%    46.85           7.73%
Group 2                                          54.56       56.31   3.21%    46.85          20.19%
Group 2 Truck Crane Oiler                        50.43       52.18   3.47%    46.85          11.38%
Group 2 Oiler                                    48.52       50.27   3.61%    46.85           7.30%
Group 3                                          53.11       54.86   3.30%    46.85          17.10%
Group 3 Truck Crane Oiler                        50.21       51.96   3.49%    46.85          10.91%
Group 3 Oiler                                    48.29       50.04   3.62%    46.85           6.81%
Group 4                                          51.60       53.35   3.39%    46.85          13.87%
                                                                        209
                                                            Annual     2011 PW    Difference                      Non-Union    DETR
 PERSHING                                                 Growth, 2010 Survey Between PW Rates Union Y/ Union %        %       Mean
 Average Construction Wage $28.71         PW 2010 PW 2011    - 2011    Average and Survey Avg.    N    Difference Difference   Wages
Average                                                           2.51%                    4.14%             5.29%     1.82%
Group 5                                       50.49       52.24   3.47%     46.85         11.50%
Group 6                                       49.38       51.13   3.54%     46.85          9.14%
Group 7                                       48.42       50.17   3.61%     46.85          7.09%
Group 8                                       47.46       49.21   3.69%     46.85          5.04%
Add 7% to base for "Second" Shift         -           -
Add 12.5% to base for "Special" Shift     -           -


PAINTER                                                                                             Y       -3.06%
Brush/Roller Painter                          32.74       32.74   0.00%     34.69          -5.62%
Spray Painter/Paperhanger                     33.59       33.59   0.00%     34.69          -3.17%
Sandblaster                                   33.24       33.24   0.00%     34.69          -4.18%
Structural Steel & Steeplejack                33.74       33.74   0.00%     34.69          -2.74%
Swing Stage                                   34.74       34.74   0.00%     34.69           0.14%
Special Coating Application-Brush             33.24       33.24   0.00%     34.69          -4.18%
Special Coating Application-Spray             33.74       33.74   0.00%     34.69          -2.74%
Special Coating Application-Spray Steel       33.99       33.99   0.00%     34.69          -2.02%
Foreman $1.00 above highest Journeyman 

PILEDRIVER
Piledriver-Journeyman                         58.47       58.47   0.00%
Piledriver-Foreman                            62.05       62.05   0.00%

                                           ADD
                                          ZONE
PLASTERER                                 RATE        Washoe                                        Y        1.71%
Plasterer-Journeyman                          34.27       34.77   1.46%     35.29          -1.47%
Plasterer-Foreman                             35.59       37.02   4.02%     35.29           4.90%

PLUMBER/PIPEFITTER                        -           -                                             Y       17.62%
Plumber/Pipefitter                            45.20       45.20   0.00%     38.43         17.62%


REFRIGERATION                             -           Humboldt                                      Y        4.52%
Refrigeration                                 27.55       41.58   50.93%    39.78          4.52%

ROOFER                                    -           -
(Does not include sheet metal roofs)                                                                N                  4.80%
                                                                      210
                                                          Annual     2011 PW    Difference                      Non-Union    DETR
 PERSHING                                               Growth, 2010 Survey Between PW Rates Union Y/ Union %        %       Mean
 Average Construction Wage $28.71       PW 2010 PW 2011    - 2011    Average and Survey Avg.    N    Difference Difference   Wages
Average                                                          2.51%                   4.14%             5.29%     1.82%
Roofer                                      21.28      21.60     1.50%     20.61         4.80%

                                         ADD         ADD
                                        ZONE        ZONE
SHEET METAL WORKER                      RATE        RATE                                          Y        9.29%
Sheet Metal Worker                          46.60      48.35     3.76%     44.24         9.29%


SPRINKLER FITTER                        -           Humboldt                                      N                 -8.47%
Sprinkler Fitter-Journeyman                 52.30      39.35    -24.76%    42.99         -8.47%
Sprinkler Fitter-Foreman                    55.05      39.35    -28.52%    42.99         -8.47%
Sprinkler Fitter-General Foreman            57.30      39.35    -31.33%    42.99         -8.47%

SURVEYOR                                            Churchill                                     N                  0.00%
Surveyor                                    42.14      25.63    -39.18%    25.63         0.00%

TAPER                                   -           Washoe                                        Y        1.09%
Taper                                       35.49      36.28     2.23%     35.89         1.09%

                                         ADD
TILE SETTER/TERRAZZO WORKER/            ZONE
MARBLE MASON-FINISHER                   RATE        Washoe                                        Y        1.02%
Tile, Terrazzo and Marble Finisher          32.48      24.77    -23.74%    24.52         1.02%

                                         ADD
TILE SETTER/TERRAZZO WORKER/            ZONE
MARBLE MASON                            RATE        Washoe                                        Y        4.15%
Tile Setter-Journeyman                      35.99      32.87     -8.67%    33.64        -2.29%
Tile Setter-Foreman                         35.99      34.12     -5.20%    33.64         1.43%
Tile Setter-General Formean                 35.99      35.87     -0.33%    33.64         6.63%
Terrazzo/Marble Mason-Journeyman            35.99      34.37     -4.50%    33.64         2.17%
Terrazzo/Marble Mason-Foreman               35.99      35.62     -1.03%    33.64         5.89%
Terrazzo/Marble Mason-General Foreman       35.99      37.37      3.83%    33.64        11.09%




                                                                     211
                                                          Annual     2011 PW    Difference                      Non-Union    DETR
 PERSHING                                               Growth, 2010 Survey Between PW Rates Union Y/ Union %        %       Mean
 Average Construction Wage $28.71       PW 2010 PW 2011    - 2011    Average and Survey Avg.    N    Difference Difference   Wages
Average                                                          2.51%                    4.14%            5.29%     1.82%
                                         ADD    ADD
                                        LABORE LABORER
                                        R ZONE ZONE
TRAFFIC BARRIER ERECTOR                 RATE   RATE
Traffic Barrier Erector                     30.82     30.82     0.00%

TRUCK DRIVER                                       Churchill                                      N                  0.06%
Dump Trucks (Single or Multiple Units Including
Semi's & Double Transfer Units), Dumpcretes and
Bulk Cement Spreader)
Under 4 yds. (water level)                   20.80    19.65     -5.53%    19.65          0.00%
4 yds. & under 8 yds. (water level)          20.80    19.65     -5.53%    19.65          0.00%
8 yds. & under 18 yds. (water level)         20.80    19.65     -5.53%    19.65          0.00%
18 yds. & under 25 yds. ( water level)       20.80    19.65     -5.53%    19.65          0.00%
25 yds. & under 60 yds. (water level)        20.80    19.65     -5.53%    19.65          0.00%
60 yds. & under 75 yds. (water level)        20.80    19.65     -5.53%    19.65          0.00%
75 yds. & under 100 yds. (water level)       20.80    19.65     -5.53%    19.65          0.00%
100 yds. & under 150 yds.(water level)       20.80    19.65     -5.53%    19.65          0.00%
150 yds. & under 250 yds. ( water level)     20.80    19.65     -5.53%    19.65          0.00%
250 yds. & under 350 yds. (water level)      20.80    19.65     -5.53%    19.65          0.00%
350 yds. & over (water level)                20.80    19.65     -5.53%    19.65          0.00%
Transit Mix
Under 8 yds.                                 20.80    19.65     -5.53%    19.65          0.00%
8 yds. & including 12 yds.                   20.80    19.65     -5.53%    19.65          0.00%
Over 12 yds.                                 20.80    19.65     -5.53%    19.65          0.00%
Transit Mix (Using Boom)
Transit mix with boom shall receive 16
cents per hour
above the appropriate yardage classification
rate of pay                                           19.65    100.00%    19.65          0.00%
when such boom is used
Water & Jetting Trucks
Up to 2,500 gallons                          20.80    19.65     -5.53%    19.65          0.00%
2,500 gallons & over                         20.80    19.65     -5.53%    19.65          0.00%




                                                                    212
                                                               Annual     2011 PW    Difference                      Non-Union    DETR
  PERSHING                                                   Growth, 2010 Survey Between PW Rates Union Y/ Union %        %       Mean
  Average Construction Wage $28.71           PW 2010 PW 2011    - 2011    Average and Survey Avg.    N    Difference Difference   Wages
Average                                                              2.51%                     4.14%            5.29%     1.82%
DW 20's & 21's & other similar Cat type,
Terry Cobra LeTourneau pulls,
Tournerocker, Euclid, & similar type
equipment when pulling Aqua/Pak, Water
Tank Trailers, & Fuel, and/or Grease Tank
Trailer, or other miscellaneous Trailers,
(except as defined under "Dump Trucks")        20.80     19.65      -5.53%    19.65           0.00%
Heavy Duty Transport (High Bed)                20.80     19.65      -5.53%    19.65           0.00%

Heavy Duty Transport(Gooseneck low bed)        20.80     19.65      -5.53%    19.65           0.00%
Tiltbed or Flatbed Pull Trailers               20.80     19.65      -5.53%    19.65           0.00%
Bootman, Comb. Bootman & Road Oiler            20.80     19.65      -5.53%    19.65           0.00%
Flat Rack (2 or 3 axle unit)                   20.80     19.65      -5.53%    19.65           0.00%
Bus & Manhaul Drivers
Up to 18,000 lbs. (single unit)                20.80     19.65      -5.53%    19.65           0.00%
18,000 lbs. & over (single unit)               20.80     19.65      -5.53%    19.65           0.00%
Helicopter Pilot (transporting men/
materials)                                     20.80     19.65      -5.53%    19.65           0.00%
Lift Jitneys                                   20.80     19.65      -5.53%    19.65           0.00%
Winch Truck & "A" Frame Drivers
Up to 18,000 lbs.                              20.80     19.65      -5.53%    19.65           0.00%
18,000 lbs. and over                           20.80     19.65      -5.53%    19.65           0.00%
Warehousemen Spotter                           20.80     19.65      -5.53%    19.65           0.00%
Warehouse Clerk                                20.80     19.65      -5.53%    19.65           0.00%
Tire Repairmen                                 20.80     19.65      -5.53%    19.65           0.00%
Truck Repairmen                                20.80     19.65      -5.53%    19.65           0.00%
Pick Up Truck & Pilot Cars (Jobsite)           20.80     19.65      -5.53%    19.65           0.00%

Pick Up Truck & Pilot Cars (Over the road)     20.80     19.65      -5.53%    19.65           0.00%
Truck Oil Greaser                              20.80     19.65      -5.53%    19.65           0.00%
Fuel Truck Driver                              20.80     19.65      -5.53%    19.65           0.00%
Fuel Man & Fuel Island Man                     20.80     19.65      -5.53%    19.65           0.00%
Oil Tanker                                     20.80     19.65      -5.53%    19.65           0.00%
Oil Tanker with Pup                            20.80     19.65      -5.53%    19.65           0.00%
Foreman:                                       21.30     20.15      -5.40%    19.65           2.54%


WELL DRILLER                                                                                           N                  0.00%
                                                                        213
                                                          Annual     2011 PW    Difference                      Non-Union    DETR
 PERSHING                                               Growth, 2010 Survey Between PW Rates Union Y/ Union %        %       Mean
 Average Construction Wage $28.71       PW 2010 PW 2011    - 2011    Average and Survey Avg.    N    Difference Difference   Wages
Average                                                          2.51%                   4.14%             5.29%     1.82%
Well Driller                               21.55       54.49   152.85%    54.49          0.00%

                                         ADD         ADD
                                         OPERATI    OPERATI
                                         NG ENG.    NG ENG.
LUBRICATION AND SERVICE ENGINEER ZONE               ZONE
(MOBILE AND GREASE RACK)                 RATE       RATE                                          N                  2.16%
Lubrication and Service Engineer (mobile
and grease rack)                            46.10      47.85    3.80%     46.84          2.16%

SOIL TESTER (CERTIFIED)                             Nye                                           Y       -0.30%
Soil Tester (Certified)                    44.65       56.62   26.81%     56.79          -0.30%

SOILS AND MATERIALS TESTER                          Nye
Soils and Materials Tester                 44.65       56.62   26.81%     56.79          -0.30%


Union Breakdown
Union                                                                                             27
Non-Union                                                                                         11
Total                                                                                             38




                                                                    214
DETR Mean
Wage + 40%  Wage
 Benefits  Premium




                     215
                                                           Annual     2011 PW Difference Between                        Non-    DETR
 STOREY                                                  Growth, 2010 Survey     PW Rates and    Union Y/ Union % Union %       Mean
 No Data for Construction DETR           PW 2010 PW 2011    - 2011    Average     Survey Avg.       N     Difference Difference Wages
Average                                                            2.57%                    4.10%             3.95%    -1.53%

                                          ADD
                                         SHEET
                                         METAL
                                         ZONE
AIR BALANCE TECHNICIAN                   RATE        CC                                              Y       47.87%
Air Balance Technician-Journeyman            46.60        48.35    3.76%          34.80   38.94%
Air Balance Technician-Foreman               49.62        51.46    3.71%          34.80   47.87%
Air Balance Technician-General Foreman       52.64        54.57    3.67%          34.80   56.81%

ALARM INSTALLER                                      CC                                              N                  0.00%
Alarm Installer                              25.75        26.47    2.80%          26.47    0.00%

BOILERMAKER                              -           Clark                                           Y        1.87%
Boilermaker                                  59.50        65.94   10.82%          64.73    1.87%

                                          ADD
                                         ZONE
BRICKLAYER                               RATE        Washoe                                          Y        8.21%
Bricklayer-Journeyman                        32.68        32.68    0.00%          31.51    3.71%
Bricklayer-Foreman                           33.93        33.93    0.00%          31.51    7.68%
Bricklayer-General Foreman                   35.68        35.68    0.00%          31.51   13.23%

                                          ADD         ADD
                                         ZONE        ZONE
CARPENTER                                RATE        RATE                                            Y        3.07%
Carpenter-Journeyman                         38.30        38.80    1.31%          38.98    -0.46%
Carpenter-Foreman                            41.05        41.55    1.22%          38.98     6.59%

CEMENT MASON                                                                                         Y        3.00%
Cement Mason-Journeyman                      34.40        34.40    0.00%          34.37    0.09%
Cement Mason-Foreman                         36.40        36.40    0.00%          34.37    5.91%

ELECTRICIAN- COMMUNICATION TECHNICIAN                                                                N                  0.00%
Electrician-Communication Technician 27.97                26.63    -4.79%         26.63    0.00%
Electrician-Foreman                  30.88                26.63   -13.76%         26.63    0.00%
Electrician-General Foreman          33.13                26.63   -19.62%         26.63    0.00%

                                                                            216
                                                            Annual     2011 PW Difference Between                        Non-    DETR
  STOREY                                                  Growth, 2010 Survey     PW Rates and    Union Y/ Union % Union %       Mean
  No Data for Construction DETR           PW 2010 PW 2011    - 2011    Average     Survey Avg.       N     Difference Difference Wages
Average                                                             2.57%                    4.10%              3.95%   -1.53%
ELECTRICIAN-LINE                          -           CC                                              Y        -2.23%
Electrician-Groundman                         39.19        40.50    3.34%          58.40   -30.65%
Electrician-Lineman                           57.91        59.90    3.44%          58.40     2.57%
Electrician-Foreman                           63.02        65.16    3.40%          58.40    11.58%
Electrician-General Foreman                   68.12        70.45    3.42%          58.40    20.63%
Heavy Equipment Operator                      47.86        49.49    3.41%          58.40   -15.26%

ELECTRICIAN-NEON SIGN                     -           Clark                                           Y        0.57%
Electrician-Neon Sign                         44.31        45.52    2.73%          45.26    0.57%

ELECTRICIAN-WIREMAN                       -           -                                               N                  0.00%
Wireman                                       47.69        42.21   -11.49%         42.21    0.00%
Cable Splicer                                 51.18        42.21   -17.53%         42.21    0.00%
Wireman-Foreman                               51.18        42.21   -17.53%         42.21    0.00%
Wireman-General Foreman                       54.67        42.21   -22.79%         42.21    0.00%


ELEVATOR CONSTRUCTOR                      -           CC                                              Y        7.08%
Elevator Constructor-Journeyman
Mechanic                                      46.01        78.21   69.98%          76.43    2.33%
Elevator Constructor-Mechanic in Charge       46.01        85.48   85.79%          76.43   11.84%

FENCE ERECTOR                                         CC                                              N                  0.00%
Fence Erector                                 37.56        37.69    0.35%          37.69    0.00%

                                           ADD    ADD
                                          LABORE LABORE
                                          R ZONE R ZONE
FLAGPERSON                                RATE   RATE
Flagperson                                    27.95        27.95    0.00%

FLOOR COVERER                                         CC                                              Y        3.65%
Floor Coverer-Journeyman                      36.26        36.34    0.22%          36.31    0.08%
Floor Coverer-Foreman                         38.90        38.93    0.08%          36.31    7.22%

GLAZIER                                   -           -                                               Y        -2.23%
Glazier                                       21.50        31.51   46.56%          32.23    -2.23%

                                                                             217
                                                   Annual     2011 PW Difference Between                        Non-    DETR
 STOREY                                          Growth, 2010 Survey     PW Rates and    Union Y/ Union % Union %       Mean
 No Data for Construction DETR   PW 2010 PW 2011    - 2011    Average     Survey Avg.       N     Difference Difference Wages
Average                                                 2.57%                       4.10%             3.95%    -1.53%
                                  ADD
                                 LABORE
                                 R ZONE
HIGHWAY STRIPER                  RATE                                                        Y        0.00%
Highway Striper                    33.57        33.57   0.00%          33.57       0.00%

                                ADD      ADD
                               ZONE     ZONE
HOD CARRIER-BRICK MASON TENDER RATE     RATE                                                 Y        0.83%
Brick Mason-Journeyman            30.10    30.10        0.00%          30.10       0.00%
Brick Mason-Foreman               30.60    30.60        0.00%          30.10       1.66%

                                  ADD
                                 ZONE
HOD CARRIER-PLASTERER TENDER     RATE      CC                                                Y        3.81%
Plasterer Tender-Journeyman        33.76        34.26   1.48%          33.76       1.48%
Plasterer Tender-Gun Tender        34.76        35.26   1.44%          33.76       4.44%
Plasterer Tender-Foreman           35.12        35.62   1.42%          33.76       5.51%

                                 SEE
                                 AMENDM
IRON WORKER                      ENT 1                                                       Y        0.00%
Ironworker-Journeyman              54.38        57.31    5.39%         57.31       0.00%
Ironworker-Foreman                 57.68        57.31   -0.64%         57.31       0.00%
Ironworker-General Foreman         61.04        57.31   -6.11%         57.31       0.00%

                                  ADD       ADD
LABORER -                        ZONE      ZONE                                              Y        -1.41%
SEE GROUP CLASSIFICATIONS        RATE      RATE
Landscaper                         25.66        25.66   0.00%          30.82      -16.74%
Furniture Mover                    27.16        27.16   0.00%          30.82      -11.88%
Group 1                            30.82        30.82   0.00%          30.82        0.00%
Group 1A                           27.95        27.95   0.00%          30.82       -9.31%
Group 2                            30.92        30.92   0.00%          30.82        0.32%
Group 3                            31.07        31.07   0.00%          30.82        0.81%
Group 4                            31.32        31.32   0.00%          30.82        1.62%
Group 4A                           32.57        32.57   0.00%          30.82        5.68%
Group 5                            31.62        31.62   0.00%          30.82        2.60%
                                                                 218
                                                            Annual     2011 PW Difference Between                        Non-    DETR
 STOREY                                                   Growth, 2010 Survey     PW Rates and    Union Y/ Union % Union %       Mean
 No Data for Construction DETR            PW 2010 PW 2011    - 2011    Average     Survey Avg.       N     Difference Difference Wages
Average                                                            2.57%                     4.10%             3.95%    -1.53%
Group 6
Nozzlemen, Rodmen                            31.62        31.62    0.00%          30.82     2.60%
Gunmen, Materialmen                          31.32        31.32    0.00%          30.82     1.62%
Reboundmen                                   30.97        30.97    0.00%          30.82     0.49%
Gunite Foremen                               32.02        32.02    0.00%          30.82     3.89%

                                         SEE
                                         AMENDM
MECHANICAL INSULATOR                     ENT 2                                                        Y        -0.08%
Mechanical Insulator-Journeyman              57.06        54.56    -4.38%         56.77     -3.89%
Mechanical Insulator-Foreman                 59.56        57.06    -4.20%         56.77      0.51%
Mechanical Insulator-General Foreman         61.06        58.56    -4.09%         56.77      3.15%

MILLWRIGHT                                                                                            N                  0.00%
Millwright                                   49.70        25.01   -49.68%         25.01     0.00%

                                            ADD        ADD
OPERATING ENGINEER                         ZONE       ZONE                                            Y        8.88%
SEE GROUP CLASSIFICATIONS                  RATE       RATE
Group 1                                       41.33       43.08    4.23%          46.84    -8.03%
Group 1A                                      44.09       45.84    3.97%          46.84    -2.13%
Group 2                                       44.62       46.37    3.92%          46.84    -1.00%
Group 3                                       44.89       46.64    3.90%          46.84    -0.43%
Group 4                                       45.63       47.38    3.84%          46.84     1.15%
Group 5                                       45.93       47.68    3.81%          46.84     1.79%
Group 6                                       46.10       47.85    3.80%          46.84     2.16%
Group 7                                       46.35       48.10    3.78%          46.84     2.69%
Group 8                                       46.94       48.69    3.73%          46.84     3.95%
Group 9                                       47.26       49.01    3.70%          46.84     4.63%
Group 10                                      47.61       49.36    3.68%          46.84     5.38%
Group 10A                                     47.80       49.55    3.66%          46.84     5.79%
Group 11                                      48.04       49.79    3.64%          46.84     6.30%
Group 11A                                     49.68       51.43    3.52%          46.84     9.80%
Group 11B                                     50.49       52.24    3.47%          46.84    11.53%
Foreman                                       49.68       51.43    3.52%          46.84     9.80%
Add 7% to base rate for "Second" Shift      -         -
Add 12.5% to base rate for "Special" shift -          -

                                                                            219
                                                               Annual     2011 PW Difference Between                        Non-    DETR
 STOREY                                                      Growth, 2010 Survey     PW Rates and    Union Y/ Union % Union %       Mean
 No Data for Construction DETR               PW 2010 PW 2011    - 2011    Average     Survey Avg.       N     Difference Difference Wages
Average                                                              2.57%                      4.10%             3.95%    -1.53%
OPERATING ENGINEER-STEEL                      ADD         ADD
FABRICATOR & ERECTOR                         ZONE        ZONE
SEE GROUP CLASSIFICATIONS                    RATE        RATE
Group 1                                          56.63       58.38   3.09%         46.84      24.64%
Group 1 Truck Crane Oiler                        50.46       52.21   3.47%         46.84      11.46%
Group 1 Oiler                                    48.50       50.25   3.61%         46.84       7.28%
Group 2                                          55.12       56.87   3.17%         46.84      21.41%
Group 2 Truck Crane Oiler                        50.21       51.96   3.49%         46.84      10.93%
Group 2 Oiler                                    48.29       50.04   3.62%         46.84       6.83%
Group 3                                          53.88       55.63   3.25%         46.84      18.77%
Group 3 Truck Crane Oiler                        49.99       51.74   3.50%         46.84      10.46%
Group 3 Oiler                                    48.07       49.82   3.64%         46.84       6.36%
Group 3 Hydraulic                                49.66       51.41   3.52%         46.84       9.76%
Group 4                                          52.15       53.90   3.36%         46.84      15.07%
Group 5                                          51.05       52.80   3.43%         46.84      12.72%
Add 7% to base rate for "Second" Shift       -           -

Add 12.5% to base rate for "Special" Shift

                                              ADD         ADD
OPERATING ENGINEER -PILEDRIVER               ZONE        ZONE                                            Y
SEE GROUP CLASSIFICATIONS                    RATE        RATE
Group 1                                          56.10       57.85   3.12%         46.84      23.51%
Group 1 Truck Crane Oiler                        50.64       52.39   3.46%         46.84      11.85%
Group 1 Oiler                                    48.72       50.47   3.59%         46.84       7.75%
Group 2                                          54.56       56.31   3.21%         46.84      20.22%
Group 2 Truck Crane Oiler                        50.43       52.18   3.47%         46.84      11.40%
Group 2 Oiler                                    48.52       50.27   3.61%         46.84       7.32%
Group 3                                          53.11       54.86   3.30%         46.84      17.12%
Group 3 Truck Crane Oiler                        50.21       51.96   3.49%         46.84      10.93%
Group 3 Oiler                                    48.29       50.04   3.62%         46.84       6.83%
Group 4                                          51.60       53.35   3.39%         46.84      13.90%
Group 5                                          50.49       52.24   3.47%         46.84      11.53%
Group 6                                          49.38       51.13   3.54%         46.84       9.16%
Group 7                                          48.42       50.17   3.61%         46.84       7.11%
Group 8                                          47.46       49.21   3.69%         46.84       5.06%
Add 7% to base for "Second" Shift            -           -
Add 12.5% to base for "Special" Shift        -           -
                                                                             220
                                                            Annual     2011 PW Difference Between                        Non-    DETR
 STOREY                                                   Growth, 2010 Survey     PW Rates and    Union Y/ Union % Union %       Mean
 No Data for Construction DETR            PW 2010 PW 2011    - 2011    Average     Survey Avg.       N     Difference Difference Wages
Average                                                            2.57%                     4.10%             3.95%    -1.53%


PAINTER                                                                                               Y        2.40%
Brush/Roller Painter                          32.74       32.74    0.00%          32.84     -0.30%
Spray Painter/Paperhanger                     33.59       33.59    0.00%          32.84      2.28%
Sandblaster                                   33.24       33.24    0.00%          32.84      1.22%
Structural Steel & Steeplejack                33.74       33.74    0.00%          32.84      2.74%
Swing Stage                                   34.74       34.74    0.00%          32.84      5.79%
Special Coating Application-Brush             33.24       33.24    0.00%          32.84      1.22%
Special Coating Application-Spray             33.74       33.74    0.00%          32.84      2.74%
Special Coating Application-Spray Steel       33.99       33.99    0.00%          32.84      3.50%
Foreman $1.00 above highest Journeyman

PILEDRIVER
Piledriver-Journeyman                         58.47       58.47    0.00%
Piledriver-Foreman                            62.05       62.05    0.00%

                                           ADD
                                          ZONE
PLASTERER                                 RATE        Washoe                                          Y        1.71%
Plasterer-Journeyman                          34.27       34.77    1.46%          35.29     -1.47%
Plasterer-Foreman                             35.59       37.02    4.02%          35.29      4.90%

PLUMBER/PIPEFITTER                        -           -                                               N                  0.00%
Plumber/Pipefitter-Journeyman                 45.20       25.07   -44.54%         25.07     0.00%
Plumber/Pipefitter-Foreman                    48.16       25.07   -47.94%         25.07     0.00%
Plumber/Pipefitter-General Foreman            51.12       25.07   -50.96%         25.07     0.00%

REFRIGERATION                                                                                         Y        0.56%
Refrigeration                                 39.58       41.58    5.05%          41.35     0.56%

ROOFER                                                                                                N                  2.30%
(Does not include sheet metal roofs)
Roofer                                        18.57       20.88   12.44%          20.41     2.30%

                                           ADD         ADD
                                          ZONE        ZONE
SHEET METAL WORKER                        RATE        RATE                                            Y        9.91%
                                                                            221
                                                       Annual     2011 PW Difference Between                        Non-    DETR
 STOREY                                              Growth, 2010 Survey     PW Rates and    Union Y/ Union % Union %       Mean
 No Data for Construction DETR       PW 2010 PW 2011    - 2011    Average     Survey Avg.       N     Difference Difference Wages
Average                                                       2.57%                    4.10%              3.95%    -1.53%
Sheet Metal-Journeyman                   46.60       48.35    3.76%          46.82     3.27%
Sheet Metal-Foreman                      49.62       51.46    3.71%          46.82     9.91%
Sheet Metal-General Foreman              52.64       54.57    3.67%          46.82    16.55%

SPRINKLER FITTER                     -           -                                               Y        0.87%
Sprinkler Fitter-Journeyman              52.30       53.45    2.20%          55.55     -3.78%
Sprinkler Fitter-Foreman                 55.05       56.20    2.09%          55.55      1.17%
Sprinkler Fitter-General Foreman         57.30       58.45    2.01%          55.55      5.22%

                                      ADD
                                     OPERATI
                                     NG ENG.
                                     ZONE
SURVEYOR                             RATE                                                        N                -19.75%
Surveyor                                 44.89       20.16   -55.09%         25.12    -19.75%

TAPER                                -           -                                               Y        1.23%
Taper                                    35.49       36.28    2.23%          35.84     1.23%

                                      ADD
TILE SETTER/TERRAZZO WORKER/         ZONE
MARBLE MASON-FINISHER                RATE        Washoe                                          Y        1.02%
Tile, Terrazzo and Marble Finisher       32.48       24.77   -23.74%         24.52     1.02%

                                       ADD
TILE SETTER/TERRAZZO WORKER/          ZONE
MARBLE MASON                          RATE     Washoe                                            Y        4.15%
Tile Setter-Journeyman                   25.00   32.87       31.48%          33.64    -2.29%
Tile Setter-Foreman                      25.00   34.12       36.48%          33.64     1.43%
Tile Setter-General Formean              25.00   35.87       43.48%          33.64     6.63%
Terrazzo/Marble Mason-Journeyman         25.00   34.37       37.48%          33.64     2.17%
Terrazzo/Marble Mason-Foreman            25.00   35.62       42.48%          33.64     5.89%
Terrazzo/Marble Mason-General Foreman    25.00   37.37       49.48%          33.64    11.09%




                                                                       222
                                                       Annual     2011 PW Difference Between                        Non-    DETR
 STOREY                                              Growth, 2010 Survey     PW Rates and    Union Y/ Union % Union %       Mean
 No Data for Construction DETR       PW 2010 PW 2011    - 2011    Average     Survey Avg.       N     Difference Difference Wages
Average                                                     2.57%                       4.10%             3.95%    -1.53%
                                      ADD    ADD
                                     LABORE LABORE
                                     R ZONE R ZONE
TRAFFIC BARRIER ERECTOR              RATE   RATE
Traffic Barrier Erector                 30.82     30.82     0.00%

TRUCK DRIVER 
Dump Trucks (Single or Multiple Units Including
Semi's & Double Transfer Units), Dumpcretes and Washoe                                           N                  2.16%
Under 4 yds. (water level)
Bulk Cement Spreader)                      21.61  20.80     -3.75%         20.36       2.16%
4 yds. & under 8 yds. (water level)        21.61  20.80     -3.75%         20.36       2.16%
8 yds. & under 18 yds. (water level)       21.61  20.80     -3.75%         20.36       2.16%
18 yds. & under 25 yds. ( water level)     21.61  20.80     -3.75%         20.36       2.16%
25 yds. & under 60 yds. (water level)      21.61  20.80     -3.75%         20.36       2.16%
60 yds. & under 75 yds. (water level)      21.61  20.80     -3.75%         20.36       2.16%
75 yds. & under 100 yds. (water level)     21.61  20.80     -3.75%         20.36       2.16%
100 yds. & under 150 yds.(water level)     21.61  20.80     -3.75%         20.36       2.16%
150 yds. & under 250 yds. ( water level)   21.61  20.80     -3.75%         20.36       2.16%
250 yds. & under 350 yds. (water level)    21.61  20.80     -3.75%         20.36       2.16%
350 yds. & over (water level)              21.61  20.80     -3.75%         20.36       2.16%
Transit Mix
Under 8 yds.                               21.61  20.80     -3.75%         20.36       2.16%
8 yds. & including 12 yds.                 21.61  20.80     -3.75%         20.36       2.16%
Over 12 yds.                               21.61  20.80     -3.75%         20.36       2.16%
Transit Mix (Using Boom)
Transit mix with boom shall receive 16
cents per hour
above the appropriate yardage
classification rate of pay                        20.80   100.00%          20.36       2.16%
when such boom is used
Water & Jetting Trucks
Up to 2,500 gallons                        21.61  20.80     -3.75%         20.36       2.16%
2,500 gallons & over                       21.61  20.80     -3.75%         20.36       2.16%




                                                                     223
                                                               Annual     2011 PW Difference Between                        Non-    DETR
 STOREY                                                      Growth, 2010 Survey     PW Rates and    Union Y/ Union % Union %       Mean
 No Data for Construction DETR               PW 2010 PW 2011    - 2011    Average     Survey Avg.       N     Difference Difference Wages
Average                                                             2.57%                       4.10%             3.95%    -1.53%

DW 20's & 21's & other similar Cat type,
Terry Cobra LeTourneau pulls,
Tournerocker, Euclid, & similar type
equipment when pulling Aqua/Pak, Water
Tank Trailers, & Fuel, and/or Grease Tank
Trailer, or other miscellaneous Trailers,
(except as defined under "Dump Trucks")        21.61    20.80       -3.75%         20.36       2.16%
Heavy Duty Transport (High Bed)                21.61    20.80       -3.75%         20.36       2.16%

Heavy Duty Transport(Gooseneck low bed)        21.61    20.80       -3.75%         20.36       2.16%
Tiltbed or Flatbed Pull Trailers               21.61    20.80       -3.75%         20.36       2.16%
Bootman, Comb. Bootman & Road Oiler            21.61    20.80       -3.75%         20.36       2.16%
Flat Rack (2 or 3 axle unit)                   21.61    20.80       -3.75%         20.36       2.16%
Bus & Manhaul Drivers
Up to 18,000 lbs. (single unit)                21.61    20.80       -3.75%         20.36       2.16%
18,000 lbs. & over (single unit)               21.61    20.80       -3.75%         20.36       2.16%
Helicopter Pilot (transporting men/
materials)                                     21.61    20.80       -3.75%         20.36       2.16%
Lift Jitneys                                   21.61    20.80       -3.75%         20.36       2.16%
Winch Truck & "A" Frame Drivers
Up to 18,000 lbs.                              21.61    20.80       -3.75%         20.36       2.16%
18,000 lbs. and over                           21.61    20.80       -3.75%         20.36       2.16%
Warehousemen Spotter                           21.61    20.80       -3.75%         20.36       2.16%
Warehouse Clerk                                21.61    20.80       -3.75%         20.36       2.16%
Tire Repairmen                                 21.61    20.80       -3.75%         20.36       2.16%
Truck Repairmen                                21.61    20.80       -3.75%         20.36       2.16%
Pick Up Truck & Pilot Cars (Jobsite)           21.61    20.80       -3.75%         20.36       2.16%

Pick Up Truck & Pilot Cars (Over the road)     21.61    20.80       -3.75%         20.36       2.16%
Truck Oil Greaser                              21.61    20.80       -3.75%         20.36       2.16%
Fuel Truck Driver                              21.61    20.80       -3.75%         20.36       2.16%
Fuel Man & Fuel Island Man                     21.61    20.80       -3.75%         20.36       2.16%
Oil Tanker                                     21.61    20.80       -3.75%         20.36       2.16%
Oil Tanker with Pup                            21.61    20.80       -3.75%         20.36       2.16%
Foreman:                                       21.61    20.80       -3.75%         20.36       2.16%


                                                                             224
                                                          Annual     2011 PW Difference Between                        Non-    DETR
 STOREY                                                 Growth, 2010 Survey     PW Rates and    Union Y/ Union % Union %       Mean
 No Data for Construction DETR          PW 2010 PW 2011    - 2011    Average     Survey Avg.       N     Difference Difference Wages
Average                                                            2.57%                   4.10%             3.95%    -1.53%
WELL DRILLER                                        CC                                              N                  0.00%
Well Driller                               21.32         54.49   155.58%         54.49    0.00%

                                         ADD         ADD
                                         OPERATI    OPERATI
                                         NG ENG.    NG ENG.
LUBRICATION AND SERVICE ENGINEER ZONE               ZONE
(MOBILE AND GREASE RACK)                 RATE       RATE                                            Y        2.16%
Lubrication and Service Engineer (mobile
and grease rack)                            46.10        47.85    3.80%          46.84    2.16%

SOIL TESTER (CERTIFIED)                             Nye                                             Y        -0.30%
Soil Tester (Certified)                    44.64         56.62   26.84%          56.79    -0.30%

SOILS AND MATERIALS TESTER                          Nye
Soils and Materials Tester                 44.64         56.62   26.84%          56.79    -0.30%


Union Breakdown
Union                                                                                              28
Non-Union                                                                                          10
Total                                                                                              38




                                                                           225
DETR Mean
Wage + 40%    Wage
 Benefits    Premium




                       226
                                                           Annual     2011 PW Difference Between                 Non-Union     DETR
 WASHOE                                                  Growth, 2010 Survey     PW Rates and    Union Union %        %        Mean
 Average Construction Wage $22.58        PW 2010 PW 2011    - 2011    Average     Survey Avg.     Y/N Difference Difference    Wages
Average                                                          -2.02%                    5.97%            6.96%     -2.88%

                                          ADD
                                         SHEET
                                         METAL
                                         ZONE
AIR BALANCE TECHNICIAN                   RATE                                                      Y       46.57%
Air Balance Technician-Journeyman            46.60       48.35   3.76%      35.11         37.71%
Air Balance Technician-Foreman               49.62       51.46   3.71%      35.11         46.57%
Air Balance Technician-General Foreman       52.64       54.57   3.67%      35.11         55.43%

ALARM INSTALLER                                                                                    N                  0.00%
Alarm Installer                              27.41       27.95   1.97%      27.95         0.00%                                 21.48

BOILERMAKER                              -           Clark                                         Y        1.87%
Boilermaker                                  59.50       65.94   10.82%     64.73         1.87%

                                          ADD         ADD
                                         ZONE        ZONE
BRICKLAYER                               RATE-       RATE-                                         Y        8.21%
Bricklayer-Journeyman                        32.68       32.68   0.00%      31.51          3.71%
Bricklayer-Foreman                           33.93       33.93   0.00%      31.51          7.68%
Bricklayer-General Foreman                   35.68       35.68   0.00%      31.51         13.23%

                                          ADD         ADD
                                         ZONE        ZONE
CARPENTER                                RATE        RATE                                          Y        4.79%
Carpenter-Journeyman                         38.30       38.80   1.31%      38.34         1.20%                                 23.60
Carpenter-Foreman                            41.05       41.55   1.22%      38.34         8.37%                                 23.60

CEMENT MASON                                                                                       Y       14.53%
Cement Mason-Journeyman                      34.40       34.40   0.00%      30.91         11.29%                                25.45
Cement Mason-Foreman                         36.40       36.40   0.00%      30.91         17.76%                                25.45

ELECTRICIAN-COMMUNICATION TECHNICIAN                                                               Y        9.17%
Communication Installer            27.97                 29.36   4.97%      29.52         -0.54%                                18.01
Communication Technician           30.88                 32.46   5.12%      29.52          9.96%                                18.01
Senior Technician                  33.13                 34.86   5.22%      29.52         18.09%                                18.01

ELECTRICIAN-LINE                         -           -                                             Y       -2.23%
                                                                      227
                                                            Annual     2011 PW Difference Between                 Non-Union     DETR
  WASHOE                                                  Growth, 2010 Survey     PW Rates and    Union Union %        %        Mean
  Average Construction Wage $22.58        PW 2010 PW 2011    - 2011    Average     Survey Avg.     Y/N Difference Difference    Wages
Average                                                           -2.02%                    5.97%            6.96%     -2.88%
Electrician-Groundman                         39.19       40.50   3.34%      58.40        -30.65%
Electrician-Lineman                           57.91       59.90   3.44%      58.40          2.57%
Electrician-Foreman                           63.02       65.16   3.40%      58.40         11.58%
Electrician-General Foreman                   68.12       70.45   3.42%      58.40         20.63%
Heavy Equipment Operator                      47.86       49.49   3.41%      58.40        -15.26%


ELECTRICIAN-NEON SIGN                     -           Douglas                                       Y        0.57%
Electrician-Neon Sign                         44.31       45.52   2.73%      45.26         0.57%

ELECTRICIAN-WIREMAN                                                                                 Y       17.96%
Wireman                                       34.39       50.78   47.66%     46.27          9.75%                                25.21
Cable Splicer                                 34.39       54.58   58.71%     46.27         17.96%                                25.21
Wireman-Foreman                               34.39       54.58   58.71%     46.27         17.96%                                25.21
Wireman-General Foreman                       34.39       58.38   69.76%     46.27         26.17%                                25.21


ELEVATOR CONSTRUCTOR                      -           -                                             Y       13.44%
Elevator Constructor-Journeyman
Mechanic                                      46.01       78.21   69.98%     72.15          8.40%
Elevator Constructor-Mechanic in Charge       46.01       85.48   85.79%     72.15         18.48%

FENCE ERECTOR                                                                                       N                  0.00%
Fence Erector                                 37.89       48.07   26.87%     48.07         0.00%                                 14.99

                                           ADD        Not
                                          LABORE      Surveyed
                                          R ZONE      Set By
FLAGPERSON                                RATE        Union
Flagperson                                    27.95       27.95   0.00%

FLOOR COVERER                                                                                       Y        3.65%
Floor Coverer-Journeyman                      36.26       36.34   0.22%      36.31         0.08%
Floor Coverer-Foreman                         38.90       38.93   0.08%      36.31         7.22%

GLAZIER                                                                                             N                  -2.98%
Glazier Journeyman                            21.25       20.50   -3.53%     21.13         -2.98%


                                                                       228
                                                      Annual     2011 PW Difference Between                 Non-Union     DETR
 WASHOE                                             Growth, 2010 Survey     PW Rates and    Union Union %        %        Mean
 Average Construction Wage $22.58   PW 2010 PW 2011    - 2011    Average     Survey Avg.     Y/N Difference Difference    Wages
Average                                                    -2.02%                     5.97%            6.96%     -2.88%
                                     ADD       ADD
                                    LABORE    LABORER
                                    R ZONE    ZONE
HIGHWAY STRIPER                     RATE      RATE                                            Y        0.00%
Highway Striper                       33.57      33.57     0.00%      33.57          0.00%

                                     ADD
                                    ZONE
HOD CARRIER-BRICK MASON TENDER      RATE                                                      N                 -25.11%
Brick Mason-Journeyman                30.10      15.00    -50.17%     20.03         -25.11%
Brick Mason-Foreman                   30.60      15.00    -50.98%     20.03         -25.11%

                                     ADD       ADD
                                    ZONE      ZONE
HOD CARRIER-PLASTERER TENDER        RATE      RATE                                            Y        3.90%
Plasterer Tender-Journeyman           33.76      34.26     1.48%      33.73          1.57%
Plasterer Tender-Gun Tender           34.76      35.26     1.44%      33.73          4.54%
Plasterer Tender-Foreman              35.12      35.62     1.42%      33.73          5.60%

                                    SEE
                                    AMEND
IRON WORKER                         MENT 1                                                    Y        4.80%
Ironworker-Journeyman                 54.38      56.74     4.34%      57.31          -0.99%                                34.02
Ironworker-Foreman                    57.68      60.04     4.09%      57.31           4.76%                                34.02
Ironworker-General Foreman            61.04      63.40     3.87%      57.31          10.63%                                34.02

                                     ADD       ADD
LABORER                             ZONE      ZONE                                            Y       -0.24%
SEE GROUP CLASSIFICATIONS           RATE      RATE
Landscaper                            25.66      25.66     0.00%      30.46         -15.76%                                17.89
Furniture Mover                       27.16      27.16     0.00%      30.46         -10.83%                                17.89
Group 1                               30.82      30.82     0.00%      30.46           1.18%                                17.89
Group 1A                              27.95      27.95     0.00%      30.46          -8.24%                                17.89
Group 2                               30.92      30.92     0.00%      30.46           1.51%                                17.89
Group 3                               31.07      31.07     0.00%      30.46           2.00%                                17.89
Group 4                               31.32      31.32     0.00%      30.46           2.82%                                17.89
Group 4A                              32.57      32.57     0.00%      30.46           6.93%                                17.89
Group 5                               31.62      31.62     0.00%      30.46           3.81%                                17.89
Group 6
                                                                229
                                                               Annual     2011 PW Difference Between                 Non-Union     DETR
 WASHOE                                                      Growth, 2010 Survey     PW Rates and    Union Union %        %        Mean
 Average Construction Wage $22.58            PW 2010 PW 2011    - 2011    Average     Survey Avg.     Y/N Difference Difference    Wages
Average                                                              -2.02%                   5.97%             6.96%     -2.88%
Nozzlemen, Rodmen                                31.62      31.62    0.00%      30.46         3.81%                                 17.89
Gunmen, Materialmen                              31.32      31.32    0.00%      30.46         2.82%                                 17.89
Reboundmen                                       30.97      30.97    0.00%      30.46         1.67%                                 17.89
Gunite Foremen                                   32.02      32.02    0.00%      30.46         5.12%                                 17.89

                                             SEE
                                             AMEND
MECHANICAL INSULATOR                         MENT 2-                                                   Y       -0.08%
Mechanical Insulator-Mechanic                    57.06      54.56    -4.38%     56.77         -3.89%
Mechanical Insulator-Foreman                     59.56      57.06    -4.20%     56.77          0.51%
Mechanical Insulator-General Foreman             61.06      58.56    -4.09%     56.77          3.15%


MILLWRIGHT                                                                                             N                  0.00%
Millwright                                       49.70      14.80   -70.22%     14.80         0.00%

                                               ADD         ADD
                                             ZONE        ZONE
OPERATING ENGINEER                           RATE        RATE                                          Y       11.28%
SEE GROUP CLASSIFICATIONS
Group 1                                          41.33      43.08    4.23%      45.85         -6.04%                                25.53
Group 1A                                         44.09      45.84    3.97%      45.85         -0.02%                                25.53
Group 2                                          44.62      46.37    3.92%      45.85          1.13%                                25.53
Group 3                                          44.89      46.64    3.90%      45.85          1.72%                                25.53
Group 4                                          45.63      47.38    3.84%      45.85          3.34%                                25.53
Group 5                                          45.93      47.68    3.81%      45.85          3.99%                                25.53
Group 6                                          46.10      47.85    3.80%      45.85          4.36%                                25.53
Group 7                                          46.35      48.10    3.78%      45.85          4.91%                                25.53
Group 8                                          46.94      48.69    3.73%      45.85          6.19%                                25.53
Group 9                                          47.26      49.01    3.70%      45.85          6.89%                                25.53
Group 10                                         47.61      49.36    3.68%      45.85          7.66%                                25.53
Group 10A                                        47.80      49.55    3.66%      45.85          8.07%                                25.53
Group 11                                         48.04      49.79    3.64%      45.85          8.59%                                25.53
Group 11A                                        49.68      51.43    3.52%      45.85         12.17%                                25.53
Group 11B                                        50.49      52.24    3.47%      45.85         13.94%                                25.53
Foreman                                          49.68      51.43    3.52%      45.85         12.17%                                25.53
Add 7% to base rate for "Second" Shift       -
Add 12.5% to base rate for "Special" shift   -

                                                                          230
                                                                Annual     2011 PW Difference Between                 Non-Union    DETR
 WASHOE                                                       Growth, 2010 Survey     PW Rates and    Union Union %        %       Mean
 Average Construction Wage $22.58          PW 2010    PW 2011    - 2011    Average     Survey Avg.     Y/N Difference Difference   Wages
Average                                                             -2.02%                     5.97%            6.96%     -2.88%
OPERATING ENGINEER-STEEL                    ADD        ADD
FABRICATOR & ERECTOR                       ZONE       ZONE
SEE GROUP CLASSIFICATIONS                  RATE       RATE
Group 1                                       56.63       58.38     3.09%      45.85          27.33%                                25.53
Group 1 Truck Crane Oiler                     50.46       52.21     3.47%      45.85          13.87%                                25.53
Group 1 Oiler                                 48.50       50.25     3.61%      45.85           9.60%                                25.53
Group 2                                       55.12       56.87     3.17%      45.85          24.03%                                25.53
Group 2 Truck Crane Oiler                     50.21       51.96     3.49%      45.85          13.33%                                25.53
Group 2 Oiler                                 48.29       50.04     3.62%      45.85           9.14%                                25.53
Group 3                                       53.88       55.63     3.25%      45.85          21.33%                                25.53
Group 3 Truck Crane Oiler                     49.99       51.74     3.50%      45.85          12.85%                                25.53
Group 3 Oiler                                 48.07       49.82     3.64%      45.85           8.66%                                25.53
Group 3 Hydraulic                             49.66       51.41     3.52%      45.85          12.13%                                25.53
Group 4                                       52.15       53.90     3.36%      45.85          17.56%                                25.53
Group 5                                       51.05       52.80     3.43%      45.85          15.16%                                25.53
Add 7% to base rate for "Second" Shift        52.15       52.15     0.00%      45.85          13.74%                                25.53
Add 12.5% to base rate for "Special" Shift

                                          ADD          ADD
OPERATING ENGINEER -PILEDRIVER           ZONE         ZONE
SEE GROUP CLASSIFICATIONS                RATE         RATE 
Group 1                                       56.10       57.85     3.12%      45.85          26.17%                                25.53
Group 1 Truck Crane Oiler                     50.64       52.39     3.46%      45.85          14.26%                                25.53
Group 1 Oiler                                 48.72       50.47     3.59%      45.85          10.08%                                25.53
Group 2                                       54.56       56.31     3.21%      45.85          22.81%                                25.53
Group 2 Truck Crane Oiler                     50.43       52.18     3.47%      45.85          13.81%                                25.53
Group 2 Oiler                                 48.52       50.27     3.61%      45.85           9.64%                                25.53
Group 3                                       53.11       54.86     3.30%      45.85          19.65%                                25.53
Group 3 Truck Crane Oiler                     50.21       51.96     3.49%      45.85          13.33%                                25.53
Group 3 Oiler                                 48.29       50.04     3.62%      45.85           9.14%                                25.53
Group 4                                       51.60       53.35     3.39%      45.85          16.36%                                25.53
Group 5                                       50.49       52.24     3.47%      45.85          13.94%                                25.53
Group 6                                       49.38       51.13     3.54%      45.85          11.52%                                25.53
Group 7                                       48.42       50.17     3.61%      45.85           9.42%                                25.53
Group 8                                       47.46       49.21     3.69%      45.85           7.33%                                25.53
Add 7% to base for "Second" Shift         -
Add 12.5% to base for "Special" Shift     -           -


                                                                         231
                                                            Annual     2011 PW Difference Between                 Non-Union     DETR
 WASHOE                                                   Growth, 2010 Survey     PW Rates and    Union Union %        %        Mean
 Average Construction Wage $22.58         PW 2010 PW 2011    - 2011    Average     Survey Avg.     Y/N Difference Difference    Wages
Average                                                           -2.02%                    5.97%            6.96%     -2.88%
PAINTER                                                                                             Y        1.29%
Brush/Roller Painter                          32.74       32.74   0.00%      33.20         -1.39%                                18.74
Spray Painter/Paperhanger                     33.59       33.59   0.00%      33.20          1.17%                                18.74
Sandblaster                                   33.24       33.24   0.00%      33.20          0.12%                                18.74
Structural Steel & Steeplejack                33.74       33.74   0.00%      33.20          1.63%                                18.74
Swing Stage                                   34.74       34.74   0.00%      33.20          4.64%                                18.74
Special Coating Application-Brush             33.24       33.24   0.00%      33.20          0.12%                                18.74
Special Coating Application-Spray             33.74       33.74   0.00%      33.20          1.63%                                18.74
Special Coating Application-Spray Steel       33.99       33.99   0.00%      33.20          2.38%                                18.74
                                           $1.00       $1.00
                                          above       above
                                          highest     highest
                                          Journeym    Journeyma
Foreman                                   an          n 


PILEDRIVER                                                                                          Y
Piledriver-Journeyman                         58.47       58.47   0.00%
Piledriver-Foreman                            62.05       62.05   0.00%

                                           ADD         ADD
                                          ZONE        ZONE
PLASTERER                                 RATE        RATE                                          Y        1.71%
Plasterer - Journeyman                        34.27       34.77   1.46%      35.29         -1.47%                                18.89
Plasterer - Foreman                           35.59       37.02   4.02%      35.29          4.90%                                18.89

PLUMBER/PIPEFITTER                        -           -                                             Y       25.45%
Plumber/Pipefitter-Journeyman                 45.20       45.20   0.00%      38.39         17.74%                                33.47
Plumber/Pipefitter-Foreman                    48.16       48.16   0.00%      38.39         25.45%                                33.47
Plumber/Pipefitter-General Foreman            51.12       51.12   0.00%      38.39         33.16%                                33.47

REFRIGERATION                                                                                       Y        7.72%
Refrigeration                                 39.58       41.58   5.05%      38.60         7.72%                                 27.28

ROOFER (Does not include sheet metal
roofs)                                    -           -                                             N                  0.00%
Roofer                                        20.25       20.93   3.36%      20.93         0.00%                                 18.80


                                                                       232
                                                          Annual     2011 PW Difference Between                 Non-Union     DETR
 WASHOE                                                 Growth, 2010 Survey     PW Rates and    Union Union %        %        Mean
 Average Construction Wage $22.58       PW 2010 PW 2011    - 2011    Average     Survey Avg.     Y/N Difference Difference    Wages
Average                                                          -2.02%                   5.97%            6.96%     -2.88%
                                         ADD         ADD
                                        ZONE        ZONE
SHEET METAL WORKER                      RATE        RATE                                          Y       11.17%
Sheet Metal Worker-Journeyman               46.60       48.35    3.76%      46.29         4.45%                                17.90
Sheet Metal Worker-Foreman                  49.62       51.46    3.71%      46.29        11.17%                                17.90
Sheet Metal Worker-General Foreman          52.64       54.57    3.67%      46.29        17.89%                                17.90

SPRINKLER FITTER                        -           -                                             Y        1.37%
Sprinkler Fitter                            52.30       53.45    2.20%      52.73        1.37%


                                         ADD
                                        OPERATI
                                        NG ENG.
                                        ZONE
SURVEYOR                                RATE                                                      N                  0.00%
Surveyor                                    44.89       27.88   -37.89%     27.88        0.00%                                 39.80

TAPER                                                                                             Y        1.09%
Taper                                       35.49       36.28    2.23%      35.89        1.09%                                 19.38

                                                     ADD
TILE SETTER/TERRAZZO WORKER/                        ZONE
MARBLE MASON-FINISHER                               RATE                                          Y        1.02%
Tile, Terrazzo and Marble Finisher          32.48       24.77   -23.74%     24.52        1.02%                                 20.86

                                                     ADD
TILE SETTER/TERRAZZO WORKER/                        ZONE
MARBLE MASON                                        RATE                                          Y        4.15%
Tile Setter-Journeyman                      35.99       32.87    -8.67%     33.64        -2.29%                                20.86
Tile Setter-Foreman                         35.99       34.12    -5.20%     33.64         1.43%                                20.86
Tile Setter-General Formean                 35.99       35.87    -0.33%     33.64         6.63%                                20.86
Terrazzo/Marble Mason-Journeyman            35.99       34.37    -4.50%     33.64         2.17%                                20.86
Terrazzo/Marble Mason-Foreman               35.99       35.62    -1.03%     33.64         5.89%                                20.86
Terrazzo/Marble Mason-General Foreman       35.99       37.37     3.83%     33.64        11.09%                                20.86




                                                                      233
                                                         Annual     2011 PW Difference Between                 Non-Union     DETR
 WASHOE                                                Growth, 2010 Survey     PW Rates and    Union Union %        %        Mean
 Average Construction Wage $22.58      PW 2010 PW 2011    - 2011    Average     Survey Avg.     Y/N Difference Difference    Wages
Average                                                        -2.02%                    5.97%            6.96%     -2.88%
                                        ADD         ADD
                                       LABORE      LABORER
                                       R ZONE      ZONE
TRAFFIC BARRIER ERECTOR                RATE        RATE
Traffic Barrier Erector                   30.82       30.82    0.00%

TRUCK DRIVER                                                                                     N                  2.16%
Dump Trucks (Single or Multiple Units Including
Semi's & Double Transfer Units), Dumpcretes and
Bulk Cement Spreader)
Under 4 yds. (water level)                 28.61      20.80   -27.30%     20.36         2.16%                                 21.29
4 yds. & under 8 yds. (water level)        28.61      20.80   -27.30%     20.36         2.16%                                 21.29
8 yds. & under 18 yds. (water level)       28.61      20.80   -27.30%     20.36         2.16%                                 21.29
18 yds. & under 25 yds. ( water level)     28.61      20.80   -27.30%     20.36         2.16%                                 21.29
25 yds. & under 60 yds. (water level)      28.61      20.80   -27.30%     20.36         2.16%                                 21.29
60 yds. & under 75 yds. (water level)      28.61      20.80   -27.30%     20.36         2.16%                                 21.29
75 yds. & under 100 yds. (water level)     28.61      20.80   -27.30%     20.36         2.16%                                 21.29
100 yds. & under 150 yds.(water level)     28.61      20.80   -27.30%     20.36         2.16%                                 21.29
150 yds. & under 250 yds. ( water level)   28.61      20.80   -27.30%     20.36         2.16%                                 21.29
250 yds. & under 350 yds. (water level)    28.61      20.80   -27.30%     20.36         2.16%                                 21.29
350 yds. & over (water level)              28.61      20.80   -27.30%     20.36         2.16%                                 21.29
Transit Mix
Under 8 yds.                               28.61      20.80   -27.30%     20.36         2.16%                                 21.29
8 yds. & including 12 yds.                 28.61      20.80   -27.30%     20.36         2.16%                                 21.29
Over 12 yds.                               28.61      20.80   -27.30%     20.36         2.16%                                 21.29
Transit Mix (Using Boom)
Transit mix with boom shall receive 16
cents per hour
above the appropriate yardage
classification rate of pay 
when such boom is used                                20.80   100.00%     20.36         2.16%                                 21.29
Water & Jetting Trucks
Up to 2,500 gallons                        28.61      20.80   -27.30%     20.36         2.16%                                 21.29
2,500 gallons & over                       28.61      20.80   -27.30%     20.36         2.16%                                 21.29




                                                                    234
                                                               Annual     2011 PW Difference Between                 Non-Union     DETR
  WASHOE                                                     Growth, 2010 Survey     PW Rates and    Union Union %        %        Mean
  Average Construction Wage $22.58           PW 2010 PW 2011    - 2011    Average     Survey Avg.     Y/N Difference Difference    Wages
Average                                                              -2.02%                    5.97%            6.96%     -2.88%
DW 20's & 21's & other similar Cat type,
Terry Cobra LeTourneau pulls,
Tournerocker, Euclid, & similar type
equipment when pulling Aqua/Pak, Water
Tank Trailers, & Fuel, and/or Grease Tank
Trailer, or other miscellaneous Trailers,
(except as defined under "Dump Trucks")        28.61        20.80   -27.30%     20.36         2.16%                                 21.29
Heavy Duty Transport (High Bed)                28.61        20.80   -27.30%     20.36         2.16%                                 21.29

Heavy Duty Transport(Gooseneck low bed)        28.61        20.80   -27.30%     20.36         2.16%                                 21.29
Tiltbed or Flatbed Pull Trailers               28.61        20.80   -27.30%     20.36         2.16%                                 21.29
Bootman, Comb. Bootman & Road Oiler            28.61        20.80   -27.30%     20.36         2.16%                                 21.29
Flat Rack (2 or 3 axle unit)                   28.61        20.80   -27.30%     20.36         2.16%                                 21.29
Bus & Manhaul Drivers
Up to 18,000 lbs. (single unit)                28.61        20.80   -27.30%     20.36         2.16%                                 21.29
18,000 lbs. & over (single unit)               28.61        20.80   -27.30%     20.36         2.16%                                 21.29
Helicopter Pilot (transporting men/
materials)                                     28.61        20.80   -27.30%     20.36         2.16%                                 21.29
Lift Jitneys                                   28.61        20.80   -27.30%     20.36         2.16%                                 21.29
Winch Truck & "A" Frame Drivers
Up to 18,000 lbs.                              28.61        20.80   -27.30%     20.36         2.16%                                 21.29
18,000 lbs. and over                           28.61        20.80   -27.30%     20.36         2.16%                                 21.29
Warehousemen Spotter                           28.61        20.80   -27.30%     20.36         2.16%                                 21.29
Warehouse Clerk                                28.61        20.80   -27.30%     20.36         2.16%                                 21.29
Tire Repairmen                                 28.61        20.80   -27.30%     20.36         2.16%                                 21.29
Truck Repairmen                                28.61        20.80   -27.30%     20.36         2.16%                                 21.29
Pick Up Truck & Pilot Cars (Jobsite)           28.61        20.80   -27.30%     20.36         2.16%                                 21.29

Pick Up Truck & Pilot Cars (Over the road)     28.61        20.80   -27.30%     20.36         2.16%                                 21.29
Truck Oil Greaser                              28.61        20.80   -27.30%     20.36         2.16%                                 21.29
Fuel Truck Driver                              28.61        20.80   -27.30%     20.36         2.16%                                 21.29
Fuel Man & Fuel Island Man                     28.61        20.80   -27.30%     20.36         2.16%                                 21.29
Oil Tanker                                     28.61        20.80   -27.30%     20.36         2.16%                                 21.29
Oil Tanker with Pup                            28.61        20.80   -27.30%     20.36         2.16%                                 21.29
Foreman:                                       28.61        20.80   -27.30%     20.36         2.16%                                 21.29


WELL DRILLER                                           CC                                              N                  0.00%
Well Driller                                   21.32        54.49   155.58%     54.49         0.00%
                                                                          235
                                                          Annual     2011 PW Difference Between                 Non-Union     DETR
 WASHOE                                                 Growth, 2010 Survey     PW Rates and    Union Union %        %        Mean
 Average Construction Wage $22.58       PW 2010 PW 2011    - 2011    Average     Survey Avg.     Y/N Difference Difference    Wages
Average                                                        -2.02%                     5.97%            6.96%     -2.88%


                                         ADD         ADD
                                         OPERATI    OPERATI
                                         NG ENG.    NG ENG.
LUBRICATION AND SERVICE ENGINEER ZONE               ZONE
(MOBILE AND GREASE RACK)                 RATE       RATE                                          Y        2.16%
Lubrication and Service Engineer (mobile
and grease rack)                            46.10      47.85   3.80%      46.84          2.16%

SOIL TESTER (CERTIFIED)                             Nye                                           Y       -0.30%
Soil Tester (Certified)                    42.65       56.62   32.75%     56.79          -0.30%

SOILS AND MATERIALS TESTER                          Nye
Soils and Materials Tester                 42.65       56.62   32.75%     56.79          -0.30%

Union Breakdown
Union                                                                                             29
Non-Union                                                                                         9
Total                                                                                             38




                                                                    236
DETR Mean
Wage + 40%     Wage
 Benefits     Premium
                15.24%




      30.07      -7.06%
        -
        -
        -
        -


        -
        -
        -
        -
        -


        -
      33.04     17.43%
      33.04     25.76%
        -
        -         -0.65%
      35.63      -3.45%
      35.63       2.16%
        -
        -       27.81%
      25.21     16.44%
      25.21     28.74%
      25.21     38.26%
        -
        -
                           237
DETR Mean
Wage + 40%     Wage
 Benefits     Premium
                15.24%
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
      35.29     43.88%
      35.29     54.64%
      35.29     54.64%
      35.29     65.41%
        -
        -
        -

        -
        -
        -
        -
      20.99    129.06%
        -



        -
        -
        -
        -
        -
        -
        -
        -
        -
        -

                         238
DETR Mean
Wage + 40%     Wage
 Benefits     Premium
                15.24%



        -
        -
        -


        -
        -
        -
        -


        -
        -
        -
        -
        -


        -
      47.63     19.13%
      47.63     26.06%
      47.63     33.11%
        -

        -
        -
      25.05      2.45%
      25.05      8.44%
      25.05     23.05%
      25.05     11.59%
      25.05     23.45%
      25.05     24.05%
      25.05     25.05%
      25.05     30.04%
      25.05     26.25%
        -
                         239
DETR Mean
Wage + 40%     Wage
 Benefits     Premium
                15.24%
      25.05     26.25%
      25.05     25.05%
      25.05     23.65%
      25.05     27.84%
        -


        -
        -
        -
        -
        -
        -
        -
        -
        -


        -
        -
      35.74     20.53%
      35.74     28.25%
      35.74     29.74%
      35.74     30.49%
      35.74     32.56%
      35.74     33.40%
      35.74     33.88%
      35.74     34.58%
      35.74     36.23%
      35.74     37.12%
      35.74     38.10%
      35.74     38.63%
      35.74     39.30%
      35.74     43.89%
      35.74     46.16%
      35.74     43.89%
        -
        -
        -
                         240
DETR Mean
Wage + 40%     Wage
 Benefits     Premium
                15.24%

        -
        -
      35.74     63.34%
      35.74     46.07%
      35.74     40.59%
      35.74     59.11%
      35.74     45.38%
      35.74     40.00%
      35.74     55.64%
      35.74     44.76%
      35.74     39.39%
      35.74     43.84%
      35.74     50.80%
      35.74     47.73%
      35.74     45.91%
        -
        -

        -
        -
      35.74     61.85%
      35.74     46.58%
      35.74     41.21%
      35.74     57.55%
      35.74     45.99%
      35.74     40.65%
      35.74     53.49%
      35.74     45.38%
      35.74     40.00%
      35.74     49.26%
      35.74     46.16%
      35.74     43.05%
      35.74     40.37%
      35.74     37.68%
        -
        -
        -
        -
                         241
DETR Mean
Wage + 40%     Wage
 Benefits     Premium
                15.24%
        -
      26.24     24.79%
      26.24     28.03%
      26.24     26.70%
      26.24     28.60%
      26.24     32.41%
      26.24     26.70%
      26.24     28.60%
      26.24     29.55%




        -
        -
        -
        -
        -
        -
        -


        -
      26.45     31.48%
      26.45     39.98%
        -
        -
      46.86      -3.54%
      46.86       2.78%
      46.86       9.10%
        -
        -
      38.19      8.87%
        -

        -
      26.32     -20.48%
        -
        -
                          242
DETR Mean
Wage + 40%     Wage
 Benefits     Premium
                15.24%


        -
      25.06     92.94%
      25.06    105.35%
      25.06    117.76%
        -
        -
        -
        -




        -
      55.72     -49.96%
        -
        -       33.72%
      27.13     33.72%
        -


        -
      29.20     -15.18%
        -


        -
      29.20     12.55%
      29.20     16.83%
      29.20     22.83%
      29.20     17.69%
      29.20     21.97%
      29.20     27.96%
        -
        -


                          243
DETR Mean
Wage + 40%     Wage
 Benefits     Premium
                15.24%



        -
        -
        -
        -


        -
      29.81     -30.22%
      29.81     -30.22%
      29.81     -30.22%
      29.81     -30.22%
      29.81     -30.22%
      29.81     -30.22%
      29.81     -30.22%
      29.81     -30.22%
      29.81     -30.22%
      29.81     -30.22%
      29.81     -30.22%
        -
      29.81     -30.22%
      29.81     -30.22%
      29.81     -30.22%
        -

        -

        -
      29.81     -30.22%
        -
      29.81     -30.22%
      29.81     -30.22%




                          244
DETR Mean
Wage + 40%     Wage
 Benefits     Premium
                15.24%




      29.81     -30.22%
      29.81     -30.22%

      29.81     -30.22%
      29.81     -30.22%
      29.81     -30.22%
      29.81     -30.22%
        -
      29.81     -30.22%
      29.81     -30.22%

      29.81     -30.22%
      29.81     -30.22%
        -
      29.81     -30.22%
      29.81     -30.22%
      29.81     -30.22%
      29.81     -30.22%
      29.81     -30.22%
      29.81     -30.22%
      29.81     -30.22%

      29.81     -30.22%
      29.81     -30.22%
      29.81     -30.22%
      29.81     -30.22%
      29.81     -30.22%
      29.81     -30.22%
      29.81     -30.22%
        -
        -
        -
        -
                          245
DETR Mean
Wage + 40%    Wage
 Benefits    Premium
               15.24%
        -




        -

        -
        -
        -
        -
        -
        -
        -




                        246
                                                                Annual 2011 PW       Difference                                    DETR
 WHITE PINE                                                    Growth,    Survey Between PW Rates Union Y/ Union %     Non-Union Mean
 Average Construction Wage $20.95        PW 2010      PW 2011 2010 - 2011 Average and Survey Avg.    N     Difference % Difference Wages
Average                                                              -0.78%                  -0.77%             1.34%       0.01%

AIR BALANCE TECHNICIAN                               Elko                                             Y        45.08%
Air Balance Technician-Journeyman            58.52          48.35   -17.38%     35.47       36.31%
Air Balance Technician-Foreman               62.95          51.46   -18.25%     35.47       45.08%
Air Balance Technician-General Foreman       67.37          54.57   -19.00%     35.47       53.85%

ALARM INSTALLER                                      Nye                                              N                     0.00%
Alarm Installer                              30.88          22.00   -28.76%     22.00        0.00%

BOILERMAKER                              -           Clark                                            Y         1.87%
Boilermaker-Journeyman                       59.50          65.94   10.82%      64.73        1.87%
Boilermaker-Foreman                          59.50          65.94   10.82%      64.73        1.87%
Boilermaker-General Foreman                  59.50          65.94   10.82%      64.73        1.87%

                                         ADD
                                         ZONE
BRICKLAYER                               RATE-       Eureka                                           Y        -28.07%
Bricklayer                                   32.68          32.68    0.00%      45.43       -28.07%

                                         ADD          ADD
                                         ZONE        ZONE
CARPENTER                                RATE        RATE                                             Y         1.31%
Carpenter                                    38.30          38.80    1.31%      38.30        1.31%

CEMENT MASON                                         Eureka                                           Y         3.88%
Cement Mason-Journeyman                      34.40          34.40    0.00%      34.40        0.00%
Cement Mason-Foreman                         36.40          36.40    0.00%      34.40        5.81%
Cement Mason-General Foreman                 36.40          36.40    0.00%      34.40        5.81%

ELECTRICIAN-COMMUNICATION
TECHNICIAN                                                                                            N                     0.00%
Electrician-Communication Technician         38.72          17.49   -54.83%     17.49        0.00%


ELECTRICIAN-LINEMAN/GROUNDMAN/
HEAVY EQUIPMENT OPERATOR                 -           -                                                Y         -2.23%
Electrician-Groundman                        34.82          40.50   16.31%      58.40       -30.65%
Electrician-Lineman                          51.95          59.90   15.30%247   58.40         2.57%
                                                                 Annual 2011 PW       Difference                                    DETR
  WHITE PINE                                                    Growth,    Survey Between PW Rates Union Y/ Union %     Non-Union Mean
  Average Construction Wage $20.95         PW 2010     PW 2011 2010 - 2011 Average and Survey Avg.    N     Difference % Difference Wages
Average                                                               -0.78%                   -0.77%            1.34%       0.01%
Electrician-Foreman                            56.89         65.16   14.54%      58.40        11.58%
Electrician-General Foreman                    61.90         70.45   13.81%      58.40        20.63%
Heavy Equipment Operator                       42.69         49.49   15.93%      58.40       -15.26%


ELECTRICIAN-NEON SIGN                                  Clark                                            Y        0.57%
Electrician-Neon Sign                          44.31         45.52    2.73%      45.26        0.57%

ELECTRICIAN-WIREMAN                        -           -                                                Y        2.63%
Electrician Wireman                            29.98         50.78   69.38%      49.48        2.63%                                  20.34

ELEVATOR CONSTRUCTOR                       -           Nye                                              Y        3.09%

Elevator Constructor-Journeyman Mechanic       46.01         64.58   40.36%      65.56        -1.49%
Elevator Constructor-Mechanic In Charge        46.01         70.59   53.42%      65.56         7.67%

FENCE ERECTOR                                          Nye                                              N                    0.00%
Fence Erector                                  13.00         18.43   41.77%      18.43        0.00%

                                           ADD    Not
                                           LABORE Surveyed
                                           R ZONE Set by
FLAGPERSON                                 RATE   Union
Flagperson                                     27.95         27.95    0.00%

FLOOR COVERER                                          Clark                                            Y        4.01%
Floor Coverer-Journeyman                       36.26         42.40   16.93%      43.13        -1.69%
Floor Coverer-Foreman                          38.90         47.32   21.65%      43.13         9.71%

GLAZIER                                    -           Nye                                              N                    0.00%
Glazier                                        21.50         21.50    0.00%      21.50        0.00%

                                           ADD     ADD
                                           LABORE LABORER
                                           R ZONE ZONE
HIGHWAY STRIPER                            RATE   RATE                                                  Y        0.00%
Highway Striper                                33.57         33.57    0.00%      33.57        0.00%
                                                                           248
                                                        Annual 2011 PW       Difference                                    DETR
 WHITE PINE                                            Growth,    Survey Between PW Rates Union Y/ Union %     Non-Union Mean
 Average Construction Wage $20.95   PW 2010   PW 2011 2010 - 2011 Average and Survey Avg.    N     Difference % Difference Wages
Average                                                    -0.78%                    -0.77%             1.34%       0.01%
HOD CARRIER-BRICK MASON TENDER                Eureka                                          Y         2.31%
Brick Mason-Journeyman                43.31       43.31    0.00%      43.31          0.00%
Brick Mason-Foreman                   45.31       45.31    0.00%      43.31          4.62%

                                    ADD
                                    ZONE
HOD CARRIER-PLASTERER TENDER        RATE      Clark                                           Y         3.76%
Plasterer Tender-Journeyman           33.76       44.34   31.34%      44.34          0.00%
Plasterer Tender-Gun Tender           34.76       46.34   33.31%      44.34          4.51%
Plasterer Tender-Foreman              35.12       47.34   34.79%      44.34          6.77%

                                    SEE
                                    AMENDM
IRON WORKER                         ENT 1                                                     Y         4.80%
Ironworker-Journeyman                 54.38       56.74    4.34%      57.31         -0.99%
Ironworker-Foreman                    57.68       60.04    4.09%      57.31          4.76%
Ironworker-General Foreman            61.04       63.40    3.87%      57.31         10.63%

                                    ADD        ADD
LABORER                             ZONE      ZONE                                            Y         -1.18%
SEE GROUP CLASSIFICATIONS           RATE      RATE
Landscaper                            25.66       25.66    0.00%      30.75         -16.55%
Furniture Mover                       27.16       27.16    0.00%      30.75         -11.67%
Group 1                               30.82       30.82    0.00%      30.75           0.23%
Group 1A                              27.95       27.95    0.00%      30.75          -9.11%
Group 2                               30.92       30.92    0.00%      30.75           0.55%
Group 3                               31.07       31.07    0.00%      30.75           1.04%
Group 4                               31.32       31.32    0.00%      30.75           1.85%
Group 4A                              32.57       32.57    0.00%      30.75           5.92%
Group 5                               31.62       31.62    0.00%      30.75           2.83%
Group 6
Nozzlemen, Rodmen                     31.62       31.62    0.00%      30.75          2.83%
Gunmen, Materialmen                   31.32       31.32    0.00%      30.75          1.85%
Reboundmen                            30.97       30.97    0.00%      30.75          0.72%
Gunite Foremen                        32.02       32.02    0.00%      30.75          4.13%



                                                                249
                                                                   Annual 2011 PW       Difference                                    DETR
 WHITE PINE                                                       Growth,    Survey Between PW Rates Union Y/ Union %     Non-Union Mean
 Average Construction Wage $20.95            PW 2010     PW 2011 2010 - 2011 Average and Survey Avg.    N     Difference % Difference Wages
Average                                                               -0.78%                    -0.77%             1.34%       0.01%
                                             SEE
                                             AMENDM
MECHANICAL INSULATOR                         ENT 2- Clark                                                Y         7.77%
Mechanical Insulator-Journeyman                  57.06       56.23    -1.45%     55.23          1.81%
Mechanical Insulator-Foreman                     59.56       59.52    -0.07%     55.23          7.77%
Mechanical Insulator-General Foreman             61.06       62.81     2.87%     55.23         13.72%

MILLWRIGHT                                               Clark                                           Y        -46.45%
Millwright-Journeyman                            49.60       25.33   -48.93%     47.30         -46.45%
Millwright-Welder                                50.70       25.33   -50.04%     47.30         -46.45%
Millwright-Foreman                               53.01       25.33   -52.22%     47.30         -46.45%
Millwright-General Foreman                       56.65       25.33   -55.29%     47.30         -46.45%

OPERATING ENGINEER
                                             ADD          ADD
                                             ZONE        ZONE
SEE GROUP CLASSIFICATIONS                    RATE        RATE                                            Y         -2.32%
Group 1                                          41.33       43.08    4.23%      52.21         -17.49%
Group 1A                                         44.09       45.84    3.97%      52.21         -12.20%
Group 2                                          44.62       46.37    3.92%      52.21         -11.19%
Group 3                                          44.89       46.64    3.90%      52.21         -10.67%
Group 4                                          45.63       47.38    3.84%      52.21          -9.25%
Group 5                                          45.93       47.68    3.81%      52.21          -8.68%
Group 6                                          46.10       47.85    3.80%      52.21          -8.35%
Group 7                                          46.35       48.10    3.78%      52.21          -7.87%
Group 8                                          46.94       48.69    3.73%      52.21          -6.74%
Group 9                                          47.26       49.01    3.70%      52.21          -6.13%
Group 10                                         47.61       49.36    3.68%      52.21          -5.46%
Group 10A                                        47.80       49.55    3.66%      52.21          -5.09%
Group 11                                         48.04       49.79    3.64%      52.21          -4.64%
Group 11A                                        49.68       51.43    3.52%      52.21          -1.49%
Group 11B                                        50.49       52.24    3.47%      52.21           0.06%
Foreman                                          49.68       51.43    3.52%      52.21          -1.49%
Add 7% to base rate for "Second" Shift       -           -
Add 12.5% to base rate for "Special" shift   -           -

OPERATING ENGINEER-STEEL                     ADD          ADD
FABRICATOR & ERECTOR                         ZONE        ZONE              250
                                             RATE        RATE
                                                                Annual 2011 PW       Difference                                    DETR
 WHITE PINE                                                    Growth,    Survey Between PW Rates Union Y/ Union %     Non-Union Mean
 Average Construction Wage $20.95                     PW 2011 2010 - 2011 Average and Survey Avg.
                                             PW 2010 ADD
                                             ADD                                                     N     Difference % Difference Wages
Average                                      ZONE    ZONE         -0.78%                      -0.77%             1.34%       0.01%
SEE GROUP CLASSIFICATIONS                    RATE    RATE
Group 1                                          56.63       58.38   3.09%     52.21         11.82%
Group 1 Truck Crane Oiler                        50.46       52.21   3.47%     52.21          0.00%
Group 1 Oiler                                    48.50       50.25   3.61%     52.21         -3.75%
Group 2                                          55.12       56.87   3.17%     52.21          8.93%
Group 2 Truck Crane Oiler                        50.21       51.96   3.49%     52.21         -0.48%
Group 2 Oiler                                    48.29       50.04   3.62%     52.21         -4.16%
Group 3                                          53.88       55.63   3.25%     52.21          6.55%
Group 3 Truck Crane Oiler                        49.99       51.74   3.50%     52.21         -0.90%
Group 3 Oiler                                    48.07       49.82   3.64%     52.21         -4.58%
Group 3 Hydraulic                                49.66       51.41   3.52%     52.21         -1.53%
Group 4                                          52.15       53.90   3.36%     52.21          3.24%
Group 5                                          51.05       52.80   3.43%     52.21          1.13%
Add 7% to base rate for "Second" Shift       -           -
Add 12.5% to base rate for "Special" Shift

                                             ADD          ADD
OPERATING ENGINEER -PILEDRIVER               ZONE        ZONE                                         Y
SEE GROUP CLASSIFICATIONS                    RATE        RATE
Group 1                                          56.10       57.85   3.12%     52.21         10.80%
Group 1 Truck Crane Oiler                        50.64       52.39   3.46%     52.21          0.34%
Group 1 Oiler                                    48.72       50.47   3.59%     52.21         -3.33%
Group 2                                          54.56       56.31   3.21%     52.21          7.85%
Group 2 Truck Crane Oiler                        50.43       52.18   3.47%     52.21         -0.06%
Group 2 Oiler                                    48.52       50.27   3.61%     52.21         -3.72%
Group 3                                          53.11       54.86   3.30%     52.21          5.08%
Group 3 Truck Crane Oiler                        50.21       51.96   3.49%     52.21         -0.48%
Group 3 Oiler                                    48.29       50.04   3.62%     52.21         -4.16%
Group 4                                          51.60       53.35   3.39%     52.21          2.18%
Group 5                                          50.49       52.24   3.47%     52.21          0.06%
Group 6                                          49.38       51.13   3.54%     52.21         -2.07%
Group 7                                          48.42       50.17   3.61%     52.21         -3.91%
Group 8                                          47.46       49.21   3.69%     52.21         -5.75%
Add 7% to base for "Second" Shift            -           -
Add 12.5% to base for "Special" Shift        -           -


PAINTER                                                  Lander          251                          Y         -0.45%
                                                                Annual 2011 PW       Difference                                    DETR
 WHITE PINE                                                    Growth,    Survey Between PW Rates Union Y/ Union %     Non-Union Mean
 Average Construction Wage $20.95         PW 2010     PW 2011 2010 - 2011 Average and Survey Avg.    N     Difference % Difference Wages
Average                                                                -0.78%                -0.77%             1.34%       0.01%
Brush/Roller Painter                          46.23          32.74   -29.18%      33.78      -3.08%
Spray Painter/Paperhanger                     46.23          33.59   -27.34%      33.78      -0.56%
Sandblaster                                   46.23          33.24   -28.10%      33.78      -1.60%
Structural Steel & Steeplejack                46.23          33.74   -27.02%      33.78      -0.12%
Swing Stage                                   46.23          34.74   -24.85%      33.78       2.84%
Special Coating Application-Brush             46.23          33.24   -28.10%      33.78      -1.60%
Special Coating Application-Spray             46.23          33.74   -27.02%      33.78      -0.12%
Special Coating Application-Spray Steel       46.23          33.99   -26.48%      33.78       0.62%
Foreman $1.00 above highest Journeyman 


PILEDRIVER
Driverman, Rigman, Bridge and Dock
Carpenter                                     58.47          58.47    0.00%
Certified Welder                              58.47          58.47    0.00%
Piledriver-Foreman                            62.05          62.05    0.00%
Diver-Diving (wet pay)                        58.47          58.47    0.00%
Stand-By Diver                                58.47          58.47    0.00%
Tender                                        58.47          58.47    0.00%

PLASTERER                                             Clark                                           Y         -0.13%
Plasterer                                     44.69          44.69    0.00%       44.75      -0.13%

PLUMBER/PIPEFITTER                        -           Elko                                            N                   -16.78%
Plumber/Pipefitter-Journeyman                 34.28          19.00   -44.57%      22.83     -16.78%
Plumber/Pipefitter-Foreman                    34.28          19.00   -44.57%      22.83     -16.78%
Plumber/Pipefitter-General Foreman            34.28          19.00   -44.57%      22.83     -16.78%

REFRIGERATION                             -           Elko                                            N                     0.00%
Refrigeration-Journeyman                      36.24          19.00   -47.57%      19.00      0.00%
Refrigeration-Foreman                         36.24          19.00   -47.57%      19.00      0.00%
Refrigeration-General Foreman                 36.24          19.00   -47.57%      19.00      0.00%

ROOFER (Does not include sheet metal
roofs)                                    -           Eureka                                          N                     0.00%
Roofer                                        16.04          18.73   16.77%       18.73      0.00%

SHEET METAL WORKER                                    Nye                   252                       Y         8.53%
                                                                  Annual 2011 PW       Difference                                    DETR
 WHITE PINE                                                      Growth,    Survey Between PW Rates Union Y/ Union %     Non-Union Mean
 Average Construction Wage $20.95           PW 2010     PW 2011 2010 - 2011 Average and Survey Avg.    N     Difference % Difference Wages
Average                                                                 -0.78%                 -0.77%             1.34%       0.01%
Sheet Metal Worker-Journeyman                   30.00         59.52    98.40%      58.94       0.98%
Sheet Metal Worker-Foreman                      30.00         63.97   113.23%      58.94       8.53%
Sheet Metal Worker-General Foreman              30.00         68.42   128.07%      58.94      16.08%

SPRINKLER FITTER                            -           Nye                                             N                    -0.36%
Sprinkler Fitter-Journeyman                     52.30         25.00   -52.20%      25.09       -0.36%
Sprinkler Fitter-Foreman                        55.05         25.00   -54.59%      25.09       -0.36%
Sprinkler Fitter-General Foreman                57.30         25.00   -56.37%      25.09       -0.36%

SURVEYOR                                                Nye                                             N                    17.27%
Surveyor                                        46.85         45.96    -1.90%      39.19      17.27%                                  25.24

TAPER                                                   Nye                                             Y        30.13%
Taper                                           35.49         46.64    31.42%      35.84      30.13%

TILE SETTER/TERRAZZO WORKER/
MARBLE MASON                                            Clark                                           Y         -4.92%
Tile Setter/Terrazzo Worker/Marble Mason-
Finisher                                        32.48         34.63     6.62%      36.35       -4.73%
Tile Setter                                     43.61         46.66     6.99%      49.17       -5.10%
Terrazzo Worker/Marble Mason                    46.04         49.29     7.06%      49.17        0.24%   Y         0.24%


                                            ADD     ADD
                                            LABORE LABORER
                                            R ZONE ZONE
TRAFFIC BARRIER ERECTOR                     RATE   RATE
Traffic Barrier Erector                         30.82         30.82     0.00%

                                                         ADD
                                                        ZONE
TRUCK DRIVER                                            RATE                                            Y         0.00%
SEE GROUP CLASSIFICATIONS
Group 1                                         46.13         36.90   -20.01%      36.90       0.00%
Group 2                                         46.23         36.90   -20.18%      36.90       0.00%
Group 3                                         46.44         36.90   -20.54%      36.90       0.00%
Group 4                                         46.62         36.90   -20.85%      36.90       0.00%
Group 5                                         46.82         36.90   -21.19%253   36.90       0.00%
                                                              Annual 2011 PW       Difference                                    DETR
  WHITE PINE                                                 Growth,    Survey Between PW Rates Union Y/ Union %     Non-Union Mean
  Average Construction Wage $20.95      PW 2010     PW 2011 2010 - 2011 Average and Survey Avg.    N     Difference % Difference Wages
Average                                                             -0.78%                 -0.77%             1.34%       0.01%
Group 6                                    47.12          36.90   -21.69%      36.90       0.00%
Foreman $1.00 above highest paid
journeyman supervised.                     48.12          36.90   -23.32%      36.90       0.00%


                                                    Esmeralda
WELL DRILLER                                                                                        N                     0.00%
Well Driller                               31.91          19.42   -39.14%      19.42       0.00%

                                         ADD         ADD
                                         OPERATI    OPERATIN
                                         NG ENG.    G ENG.
LUBRICATION AND SERVICE ENGINEER ZONE               ZONE
(MOBILE AND GREASE RACK)                 RATE       RATE                                            Y         2.16%
Lubrication and Service Engineer (mobile
and grease rack)                            46.10         47.85    3.80%       46.84       2.16%

SOIL TESTER (CERTIFIED)                             Nye                                             Y         -0.30%
Soil Tester (Certified)                    45.65          56.62   24.03%       56.79       -0.30%

SOILS AND MATERIALS TESTER                          Nye
Soils and Materials Tester                 45.65          56.62   24.03%       56.79       -0.30%

Union Breakdown
Union                                                                                               28
Non-Union                                                                                           10
Total                                                                                               38




                                                                         254
DETR Mean
Wage + 40%    Wage
 Benefits    Premium
               54.20%




                        255
DETR Mean
Wage + 40%     Wage
 Benefits     Premium
                54.20%




      28.48     78.33%
        -
        -

        -
        -
        -
        -
        -
        -



        -
        -
        -
        -
        -
        -
        -
        -
        -
        -



        -
        -
        -                256
DETR Mean
Wage + 40%    Wage
 Benefits    Premium
               54.20%
        -
        -
        -
        -


        -
        -
        -
        -
        -


        -
        -
        -
        -
        -

        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -

                        257
DETR Mean
Wage + 40%    Wage
 Benefits    Premium
               54.20%


        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -


        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -

        -               258
DETR Mean
Wage + 40%    Wage
 Benefits    Premium
               54.20%
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -

        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -               259
DETR Mean
Wage + 40%    Wage
 Benefits    Premium
               54.20%
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -

        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -

        -
        -
        -
        -               260
DETR Mean
Wage + 40%     Wage
 Benefits     Premium
                54.20%
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
      35.34     30.07%
        -
        -
        -
        -

        -

        -
        -
        -
        -
        -



        -
        -
        -


        -
        -
        -
        -
        -
        -
        -                261
DETR Mean
Wage + 40%    Wage
 Benefits    Premium
               54.20%
        -

        -
        -


        -
        -
        -




        -

        -
        -
        -
        -
        -
        -
        -




                        262
2009 Total South Public Works Projects                $                   3,279,010,674
2010 Total South Public Works Projects                $                   1,405,458,642
2011 Total South Public Works Projects                $                     137,696,966



CL-2009-1              SNWA                           Wiser Construction LLC 
CL-2009-2              CWC
CL-2009-3              CWC
CL-2009-4              CWC                            NEW # CL-2011-2

CL-2009-5              CWC                            New # CL-2010-2

CL-2009-6              CWC
CL-2009-7              CCWRD
Apr-08
CL-2009-8              SNWA                           Canceled Duplicate LI-2008-68
CL-2009-9              CCSD                           Ryan Mechanical 
             8-May
CL-2009-10             LVVWD                          Canceled 
CL-2009-11             COH                            VT Construction 
              8-Jun
CL-2009-12             COH                            CANCELED NEW PWP 2010-99
CL-2009-13
               8-Jul
CL-2009-14             COH                            Merell Bros Inc 
CL-2009-15             COH                            JNJ Engineering Construction, Inc. 
CL-2009-16             COH                            Trade West Construction 
CL-2009-17             SNWA
CL-2009-18             CCMA                           Commercial Roofers Inc. 
CL-2009-19             CCWRD                          Insituform Technologies, Inc. 

CL-2009-20             CCWRD                          Las Vegas Paving Corporation 
CL-2009-21             CCWRD                          Insituform Technologies, Inc. 
CL-2009-22             SNWA                           Canceled New PWP 2010-3
             8-A ug
CL-2009-23                                         
CL-2009-24             LVVWD                          Canceled 
             8-A ug
CL-2009-25             CCSD                           U.S. Mechanical, LLC 
CL-2009-26             COH                            Canceled 
CL-2009-27             CWC
CL-2009-28             CWC
CL-2009-29             CWC                             
CL-2009-30             LVVWD                          R.P. Wedell & Sons Company 
CL-2009-31             LVVWD                          Contri Construction Company 

CL-2009-32             CLV                            Diamond Construction Company, Inc. 
CL-2009-33             CNLV                           Southwest Iron Works LLC 
CL-2009-34             UNLV                           Western Single Ply
                                                      American Asphalt and Grading
CL-2009-35             COH                            Company 
CL-2009-36             CCWRD                          NEW PWP #2010-248
             Sep-08
CL-2009-37             RTC                            St George Contracting Inc 
CL-2009-38             CLV                            1 Development Construction 
CL-2009-39             COH                            Harber Company, Inc.
CL-2009-40              CC       Diamond Construction Company, Inc. 




CL-2009-41              CC       Jaynes Corporation 
CL-2009-41              CC       Maximum Enterprises LLC 
                                 Whiting-Turner Contracting Company
CL-2009-42              RTC
CL-2009-43              CCWRD    Insituform Technologies, Inc. 
CL-2009-44              UNLV     Martin Harris Construction 
CL-2009-45              NC       Parsons Drilling Inc 
LI-2009-46              LCPD     Pearson Brothers Construction Inc 
CL-2009-47              UNLV     Lloyd's Refrigeration, Inc. 
CL-2009-48              SPWB     Tand, Inc 
LI-2009-49              LC       Pearson Brothers Construction Inc 
LI-2009-50              LC       Mills Construction 

CL-2009-51              CC       Southern Nevada Paving, Inc. 
CL-2009-52              CC       Tand, Inc 
CL-2009-53              CC       Mejia Contracting Co, Inc 
CL-2009-54              COH      Canceled New PWP 2010-44
CL-2009-55              CCSD     Communication Electronic Systems 
CL-2009-57              COH      J & J Enterprises, Inc. 
NY-2009-58              NC       Mills Construction 
CL-2009-59              CCMA     Martin Harris Construction 
CL-2009-60              CCSD     Lloyd's Refrigeration, Inc. 
CL-2009-61              CCSD     U.S. Mechanical, LLC 
CL-2009-62              COH      CG&B Enterprises, Inc
CL-2009-63              COH      Eagle View  Contractors
              Oc t-08
                                 Core Construction Services of
CL-2009-64              CSN      Nevada 
CL-2009-65              LVVWD    Canceled 
CL-2009-66              CCSD     Martin Harris Construction 
CL-2009-67              CNLV     Western State Contracting, Inc.
CL-2009-68              CCSD     Canceled Awarded under 100,000
CL-2009-69              CCSD     Pahor Mechanical Contractors, LLC 
CL-2009-70              CCMA     JBM Construction  Inc 
CL-2009-71              CCSD     Trade West Construction 
NY-2009-72              NC       LaHaye Electrical, Inc 
CL-2009-73              CC       Williams Brother Inc 
CL-2009-74              CC       Canceled New PWP 2010-78
CL-2009-75              LVVWD    K Construction Inc 
CL-2009-76              LVCCLD   Palmmetto Construction Inc.
CL-2009-77              LVCCLD   Canceled Awarded under 100,000
CL-2009-78              CCSD     Canceled Awarded under 100,000
CL-2009-79              CCDA     APEC Consultants Inc 
CL-2009-80              CLV      JNJ Engineering Construction, Inc. 
CL-2009-81              COH      Paso Robles Tank, Inc 
CL-2009-82              UMC      Canceled 
CL-2009-83              CC       Canceled 
                                 Core Construction Services of
CL-2009-84              UNLV     Nevada 
CL-2009-85              CCSD     Big Town Mechanical
CL-2009-86     CCSD     Tand, Inc 
CL-2009-87     UNLV     Subruban Elevator of Nevada 
CL-2009-88     CCSD     Communication Electronic Systems 
CL-2009-89     CLV      JNJ Engineering Construction, Inc. 
CL-2009-90     CCSD     C.I. Contractors, Inc. 

CL-2009-91     CC       Diamond Construction Company, Inc. 
CL-2009-92     UNLV     U.S. Mechanical, LLC 

CL-2009-93     CC       Las Vegas Paving Corporation 
CL-2009-94     CCSD     Hardy Construction Inc 
CL-2009-95     CCSD     Communication Electronic Systems 
CL-2009-96     NC       Canceled
CL-2009-97     CLV      Tab Contractors Inc 
CL-2009-98     CC       E & M Enterprises, Inc. 
CL-2009-99     SNWA     Canceled 
CL-2009-100    SPWB     El Camino Construction Company 
CL-2009-101    CSN      McCarthy Building Companies, Inc. 

CL-2009-102    CLV      Capriati Construction Corp 
CL-2009-103    LVVWD    JNJ Engineering Construction, Inc. 
CL-2009-104    LVVWD
CL-2009-105    CNLV     Southern Nevada Paving, Inc. 
CL-2009-106    CBC      Hardy Construction Inc 
CL-2009-107    CNLV     Southwest Iron Works LLC 
CL-2009-108    CC       Westpoint Development Group Inc 
CL-2009-109    CC       Trade West Construction 
CL-2009-110    SPWB     Burke & Associates, Inc. 
CL-2009-111    CC       Richardson Construction Inc 
CL-2009-112    CCDA     Las Vegas Paving Corporation 
NY-2009-113    NC       Welsco Corporation 
CL-2009-114F   CC       Fremont Construction Company, Inc 

CL-2009-115    CCMA

CL-2009-116    CCMA     Oakview Construction 
CL-2009-117    SPWB     Brimont Construction Inc 
                        Valleycrest Landscape Development
CL-2009-118    CBC      Inc 
LI-2009-119    SNWA     Canceled NO new  PWP

CL-2009-120    SNWA     Canceled NO new  PWP
CL-2009-121    SNWA     Canceled 
CL-2009-122    CC       Canceled
CL-2009-123    CC       B & H Construction, Inc. 
CL-2009-124    LVCCLD   Brimont Construction Inc 
CL-2009-125    LVCCLD   Richardson Construction Inc 
CL-2009-126    COH      Canceled New PWP 2010-41
CL-2009-127    LVVWD    Rice Construction Company 
CL-2009-128    CCSD     Commercial Roofers Inc. 
CL-2009-129    CC       Canceled Under 100,000
CL-2009-130    CLV      APCO Construction 

CL-2009-131    CC       Western States Contracting
CL-2009-132    CBC      Southern Nevada Paving, Inc. 
CL-2009-133    HDPL     1 Development Construction 
CL-2009-134    CBC      Las Vegas Advantage Electric 
CL-2009-135    CC       M & H Enterprises Inc 
CL-2009-136                    COH         Crisci Builders 
CL-2009-137                    COH         ACME Underground, Inc. 
CL-2009-138                    CRCN        Harber Company Inc 
CL-2009-139                    COH         Crisci Builders 
CL-2009-140                    COH         Rice Cosntruction 
LI-2009-141                    COC         Bearing Point, LLC 
CL-2009-142                    CCSD        Mountain Vista Development Inc 
ES-2009-143                    ECBC        K-W Western Inc 
                      8-Dec
CL-2009-144                    CCWRD       ACME Electric 

CL-2009-145                    CLV         J&J Engineering Construction, Inc.
CL-2009-146                    CSN         McCarthy Building Companies, Inc. 
CL-2009-147                    CCSD        Mikon Construction 
CL-2009-148                    CC          Canceled Under 100,000
CL-2009-149                    CCSD        Pahor Mechanical Contractors, LLC 
CL-2009-150                    CCSD        U.S. Mechanical, LLC 
CL-2009-151                    LVCVA       Canceled 
CL-2009-152                    CNLV        Canceled till further notice
CL-2009-153                    CBC         SAVI Construction 

CL-2009-154                    CCWRD
CL-2009-155                    CCWRD
CL-2009-156                    CCWRD       Las Vegas Paving Corporation 
CL-2009-157                    CCSD        Ryan Mechcanical Inc 
CL-2009-158                    COH         Las Vegas Paving Corp 
CL-2009-159                    SNWA        Canceled 
CL-2009-160                    SPWB        Williams Brother Inc 
CL-2009-161                    COH         Harber Company Inc 
CL-2009-162                    CCDA        CANCELED

CL-2009-163                    COH         CANCELED NEW PWP 2010-98
CL-2009-164                    CLV         SAVI Construction 
CL-2009-165                    SNWA        CANCELED
CL-2009-166                    SNWA
CL-2009-167                    CLV         Canceled Federal Project 
                                           Wulfenstein Construction Company
NY-2009-168                    NC          Inc. 
NY-2009-169                    NC          CANCELED
CL-2009-170                    CLV         Williams Brother Inc 
CL-2009-171                    CCSD        U.S. Mechanical, LLC 
                     Jan-09
CL-2009-172                         CLV
CL-2009-173                         CWC
                                CL-
2009-174                            CCSD   Awarded Under 100,000

CL-2009-175                    SNWA        Capriati Construction Corporation Inc 
CL-2009-176                    COH         Canceled Awarded under 100,000

CL-2009-177                    LVVWD       Capriati Construction Corporation Inc 
CL-2009-178                    CCWRD       J.F. Pacific Liners, Inc 
CL-2009-179                    CC          R & O Construction Company 
NY-2009-180                    NC          Awarded Under 100,000
CL-2009-181                    MVWD        Various 

CL-2009-182                    CC          Las Vegas Paving Corporation 
CL-2009-183                    CC          Wheeler's Electric Inc 
CL-2009-184              CBC                          Savanic Transport Inc 
CL-2009-185              CC                           Frehner Construction Co., Inc. 
CL-2009-186              SPWB                         Canceled Under 100,000
CL-2009-187              CLV                          Danoski Clutts Building Group LLC 
                                                      Core Construction Services of
CL-2009-188              SPWB                         Nevada 
CL-2009-189              CC                           Tab Contractors Inc 
CL-2009-190              COH                          Sletten Construction of Nevada, Inc. 
CL-2009-190-B            COH
CL-2009-191              NCSD                         Williams Brother Inc 
CL-2009-192              MCC                          Las Vegas Paving 
CL-2009-193              MCC                          Las Vegas Paving 
CL-2009-194              CCSD                         The Tiberti Company 
CL-2009-195              CLV                          Crisci Builders 
CL-2009-196              CLV                          CCB Builders Enterprises, Inc 

CL-2009-197              CLV                          Contri Construction Company 
CL-2009-198              CC                           R-Coat Painting and Drywall, Inc 
CL-2009-199              CNLV                         richarson Construction Inc 
CL-2009-200              COH                          Tiger Communications LLC 

CL-2009-201              CC                           Diamond Construction Company, Inc. 
CL-2009-202              CC                           Richardson Construction Inc 
CL-2009-203              COH                          Mr. Jeffrey T McComb 

CL-2009-204              COH                          Spirit Underground, LLC 
CL-2009-205              RTC                          St. George Contracting, Inc. 
CL-2009-206              LVVWD
CL-2009-207              CNLV                         Hardy Construction Inc 
CL-2009-208              CNLV                         Canceled new  till further notice
CL-2009-209              CRCN                         PAR Electrical Contractors Inc 
CL-2009-210              CC                           Fast Trac Electric 
CL-2009-211              CC                           Williams Brother Inc 
CL-2009-212-F            CC                           Las Vegas Paving Corporation 
CL-2009-213              CNLV                         Martin Harris Construction 
CL-2009-214              VVWD                         Awarded Under 100,000
                Feb-09
                         Lincoln County Power District
LI-2009-215              District                      Energy Erectors Inc 
CL-2009-215              COH                           Dataplus Communications 
CL-2009-216              CLV                           Rafael Construction, Inc 

CL-2009-217              CCSD                         U.S. Mechanical, LLC 
                                                      Core Construction Services of
CL-2009-218              CCSD                         Nevada 
CL-2009-219              CCSD                         Roche Constructors, Inc.
CL-2009-220              CCSD                         Red Rose Inc 
CL-2009-221              CCSD                         Commercial Roofers Inc. 
CL-2009-222              CCSD                         Ryan Mechanical Inc 
                                                      Core Construction Services of
CL-2009-223              CCSD                         Nevada 
CL-2009-224              CCSD                         Rafael Construction, Inc 
CL-2009-225              COM                          Wheeler Electric 
CL-2009-226              CCSD                         Red Rose Inc 

CL-2009-227              CC                           CANCELED
CL-2009-228              CC                           Gothic Landscaping, Inc. 
                                  Longivew Construction &
CL-2009-229              MCC      Development Inc 
CL-2009-230              CNLV
CL-2009-231              CCMA     Shaw-Lundquist Associates 
CL-2009-232              CC       Southwest Iron Works LLC 
CL-2009-233              CC       Gothic Landscaping, Inc. 
CL-2009-234              CC       Wiser Construction LLC 
CL-2009-235              CC       M & H Enterprises Inc 
CL-2009-236              ES       Parson Drilling, Inc.
CL-2009-237              UNLV     Rafael Construction, Inc 
CL-2009-238              CNLV     Whiting-Tuner 
CL-2009-239              LVVWD    Tand, Inc.
               Mar-09
CL-2009-240              CBC      Boulder Construction, Inc. 
CL-2009-241              CC       Hardy Construction Inc 
CL-2009-242              CCSD     McCarthy Building Companies, Inc. 
CL-2009-243              LVVWD    J&J Engineering Construction, Inc.
CL-2009-244              LVVWD
CL-2009-245              SNWA     Corrpro Companies Inc 
CL-2009-246              CSN      Various 
CL-2009-247              CSN
NY-2009-248              NY       E&M Enterprises
CL-2009-249              CC       Tand, Inc.
                                  Wulfenstein Construction Company
CL-2009-250              NC       Inc. 
CL-2009-251              LVVWD    Construction Services Unlimited Inc 
CL-2009-252              LVCCLD   M & H Enterprises Inc 
CL-2009-253              CCSD     Las Vegas Paving Corporation 
NY-2009-254              NC       Awarded Under 100,000
CL-2009-255              CCSD     Hellas Construction Inc 
CL-2009-256              CCSD     Hellas Construction Inc 
CL-2009-257              CCSD     Hellas Construction Inc 
CL-2009-258              LVVWD    WDC Exploration and Wells 
CL-2009-259              LVVWD    CANCELED
CL-2009-260              NLV      CANCELED
CL-2009-261              CLV      Canceled Under 100,000
NY-2009-262              TTB      CANCELED
CL-2009-263              COH      Ameresco Inc 
CL-2009-264              CC       APEC Consultants Inc 
CL-2009-265              SPWB     Trade West Construction 
NY-2009-266              NC       Intermountain Slurry Seal, Inc. 
CL-2009-267              CC       Flagship Construction Co, LLC 

CL-2009-268              CNLV     Quality Mechanical Contractors LLC 
CL-2009-269              CCSD     CANCELED
CL-2009-270              CLV      Canceled 11/13/09
CL-2009-271              CCMA     New PWP 2010-86
CL-2009-272              LVVWD    FHI Plant Services Inc 
CL-2009-273              CCSD     Mikon Construction 
CL-2009-274              CLV      Wiser Construction LLC 
CL-2009-275              SPWB     LVI Environemental of Nevada Inc 
CL-2009-276              CLV      Canceled 
CL-2009-277              CC       Communication Electronic Systems 
CL-2009-278              CBC      Henderson Masonry LLC 
CL-2009-279              CC       Diamond Construction Co. Inc.
CL-2009-280              CC
               A pr-09
CL-2009-281              COH      Byrd Underground LLC 
CL-2009-282              CCSD     Las Vegas Pavig Corporation 

CL-2009-283              CBC      Eldorado Rock, Inc.

CL-2009-284              CNLV     Southern Nevada Paving, Inc.
CL-2009-285              SNWA     KW Pipeline Inc 
CL-2009-286              CCMA     TAB Constractors, Inc.
CL-2009-287              CCWRD    Las Vegas Paving Corporation 
CL-2009-288              CNLV     CANCELED
CL-2009-289              CLV      Richardson Construction Inc 
CL-2009-290              COH      Western States Contracting Inc.
CL-2009-291              CLV      CANCELED 
CL-2009-292              NCBC     Dan O Construction 
CL-2009-293              COH      Awarded Under 100,000
CL-2009-294              CC       Wells Cargo Inc.
CL-2009-295              LVVWD
ES-2009-296              ECBC     Joy Engineering
                                  Legancy Construction &
CL-2009-297              COM      Development Inc.
CL-2009-298              UNLV     Craft Construction Co. 
CL-2009-299              CBC      Bravo Underground Inc 
CL-2009-300              COH      Awarded Under 100,000
CL-2009-301              CLV      Whiting and Turner 

CL-2009-302              CC       Construction Services Unlimited, Inc.
CL-2009-303              UNLV     Clark and Sullivan Constructors 
                                  1 Development Construction
CL-2009-304              CNLV     corporation
CL-2009-305              CC       CANCELED
CL-2009-306              RTC      CANCELED
               May -09
CL-2009-307              LVCCLD   Hi-Con, Inc 
CL-2009-308              LVCCLD   Craft Construction Co. 
CL-2009-309              CLV      Wells Cargo Inc.
CL-2009-310              CCMA     Access Technologies, Inc.

CL-2009-311              SPWB     VT Construction Inc.
CL-2009-312              CC       Awarded Under 100,000
CL-2009-313              CNLV     Tand, Inc 
CL-2009-314              CLV      Canceled New # 2010-23
CL-2009-315              CLV      Meadow Valley Contractors, Inc 
CL-2009-316              CC       Canceled 
CL-2009-317              HDPL     R&O Construction 
CL-2009-318              CLV      Agave Construction LLC 
CL-2009-319              CCSD     Tand, Inc 
LI-2009-320              COC      Anzalone Pumps, Inc.
LI-2009-321              COC      Tim Wilkin Trucking, LLC
LI-2009-322              COC      Anzalone Pumps, Inc.
CL-2009-323              CC       CG&B Enterprises, Inc.

CL-2009-324              CC       Tand, Inc 

CL-2009-325              CCSD     Capriati Construction Corporation Inc 
CL-2009-326              CCSD     Las Vegas Paving Corporation 
CL-2009-327              CCMA     APCO Construction
CL-2009-328              COH      Canceled New # 2010-17
CL-2009-329              LVVWD    Native Resources, LLC
CL-2009-330             CC      Canceled Awarded Under 100,000
CL-2009-331             COM     Danoski Clutts Building Group LLC
CL-2009-332             CLV     Industrial Support Technologists 
CL-2009-333             CC      CANCELED NEW PWP 2010-91
CL-2009-334             CLV     Crisci Builders
CL-2009-335             RTC
CL-2009-336             CCSD    Ryan Mechanical, Inc. 
                                Nev Cal Investors dba Fost Tree
CL-2009-337             CNLV    Electric
CL-2009-338             COH     Conti Technologies
CL-2009-339             CCDA    Canceled
CL-2009-340             CCSD    Hellas Construction, Inc.

CL-2009-341             NDWL
NY-2009-342             NC      Awarded Under 100,000
               Jun-09
CL-2009-343             CLV     Southwest Lawn Shaping 
CL-2009-344             CNLV    K.W. Pipeline 
CL-2009-345             CNLV    CANCELED NEW PWP 2010-100
CL-2009-346             CNLV    Michels Corporation
CL-2009-347             MCC     Mcarthy Building Companies Inc.
CL-2009-348             UMC     Hi-Con, Inc 
CL-2009-349             COH     Canceled New PWP 2010-44
CL-2009-350             UMC     Southwest Lawn Shaping 
CL-2009-351             NLV     Commercial Roofers

CL-2009-352             CBC     NEW PWP 2010-110
NY-2009-353             NC      Sierra Nevada Construction
CL-2009-354             UMC     Johnson Controls Inc
CL-2009-355             CLNV 
LI-2009-356             LC      Pearson Brothers Construction LLC
CL-2009-357             NC      CANCELED NEW PWP 2010-96
CL-2009-358             NC      Pearson Brothers Construction LLC
CL-2009-359             RTC     Las Vegas Paving Corporation 
CL-2009-360             SPWB    Big Town Mechanical 
CL-2009-361             CCSD    Tri-Signal Integration Inc 
CL-2009-362             CCSD    Tri-Signal Integration Inc 
LI-2009-363             NDW 
CL-2009-364             LVVWD   Construction Services Unlimited
                                Prime Contracting dba Prime Grading
CL-2009-365             LVCVA   and Paving
CL-2009-366             LVVWD   WDC Exploration & Wells
CL-2009-367             CNLV    NEW PWP # 2010-120
CL-2009-368             SPWB    Ace Fire Systems Inc.
CL-2009-369             CLV     B&H Construction, Inc
CL-2009-370             CSN     Various 
CL-2009-371             CC      Spirit Underground, LLC 

CL-2009-372             CLV     CANCELED UNDER 100,000
CL-2009-373             SPWB    Southern Nevada Paving, Inc. 
CL-2009-374             CCSD
CL-2009-375             CCSD
CL-2009-376             CCSD
CL-2009-377             CCSD
CL-2009-378             CCSD    Tri-Signal Integration Inc 
CL-2009-379             CCSD    Tri-Signal Integration Inc 
CL-2009-380             CCSD    Tri-Signal Integration Inc 
CL-2009-381              CNLV    CANCELED NEW PWP 2010-116

CL-2009-382-F            CC      Capriati Construction Corporation, Inc
CL-2009-383              CC      Southern Nevada Paving, Inc. 

CL-2009-384              CLV     Capriati Construction Corporation, Inc
LI-2009-385              NSP     Impact Construction

CL-2009-386              CLV     Construction Services Unlimited, Inc. 
CL-2009-387              CC      The Tiberti Company
CL-2009-388              CC      City Plan Development, Inc.

CL-2009-389              CLV     Canceled New PWP 2010-30
CL-2009-390              COH     Harber Company Inc
CL-2009-391              CLV     Canceled New PWP 2010-31
CL-2009-392              CC      Spirit Underground, LLC 
NY-2009-393              NYE     Wulfenstein Construction Co.,Inc.
CL-2009-394              COH     Canceled New PWP 2010-56
CL-2009-395              COH     Canceled New PWP 2010-57
CL-2009-396              COH     Canceled New PWP 2010-58
CL-2009-397              OPD
CL-2009-398              NANG    McKeon Door of Nevada Inc.
CL-2009-399              CC      williams Brother's, Inc.

CL-2009-400              CCSD    Trade Wset Construction
CL-2009-401              CNLV
NY-2009-402              NYE     Spirit Underground, LLC 

NY-2009-403              NYE     Harris Fence & Concrete
CL-2009-404              CLV     Boulder Construction, Inc.
CL-2009-405              CC      Tand, Inc.
CL-2009-406              CC      CANCELED
CL-2009-407              CC      CG&B Enterprises, Inc.
CL-2009-408              CC      CANCELED NEW PWP 2010-316
               A ug-09
CL-2009-409              CC      New PWP 2010-89
CL-2009-410              NC      NY-2009-410
CL-2009-411              CC      New PWP 2010-88

CL-2009-412              RTC

CL-2009-413              CC      Rebel Communications LLC
CL-2009-414              CC      Pahor Mechanical Contractors, Inc.
CL-2009-415              CLV      
CL-2009-416              CC      Cancele New PWP 2010-324
LI-2009-417              ASW     Boart Longue
CL-2009-418              MCC
CL-2009-419              CNLV 

NY-2009-420              NC      Ben Dotson Construction
CL-2009-421              COH
CL-2009-422              CCPC    U.S. Mechanical, LLC
CL-2009-423              CCSD    Canceled Less then $100,000.00
CL-2009-424              SPWB    Core Construction Services
CL-2009-425              CCSD    Tand, Inc.
CL-2009-426              RTCSN
                Sep-09
                        Canceled Awarded Under
CL-2009-427     CC      $100,000.00
CL-2009-428     CC      CANCELED NEW PWP 2010-92
CL-2009-429     CC      CANCELED NEW PWP 2010-93
CL-2009-430     CC      CANCELED NEW PWP 2010-94
                        RFI Communicatios & Security
CL-2009-431     SPWB    Systems
CL-2009-432     CBC     Southern Nevada Paving, Inc. 
CL-2009-433     CC
CL-2009-434     OM

CL-2009-435     CLVRA   Alpha Omega Strategies, LLC

NY-2009-436     NCBC    Pac-Van, Inc.
NY-2009-436 B   NCBC
NY-2009-436 C   NCBC    Wulfenstein Construction Co.,Inc.
Total 2009

Year 2010
CL-2010-1       CWC
CL-2010-2       CWC
CL-2010-3       SNWA    Canceled till futher notice
CL-2010-4       CCWRD   Sletten Construction
CL-2010-5       CCWRD
CL-2010-6       LVVWD
CL-2010-7       COH
CL-2010-8       CCSD    Big Town Mechanical, LLC
CL-2010-9       CCSD    Big Town Mechanical, LLC
CL-2010-10      CCSD
CL-2010-11      CCSD    Pahor Mechanical Contractors, Inc.
CL-2010-12      CCSD    Pahor Mechanical Contractors, Inc.
NY-2010-13      NYE     Contri Construction Comp.
CL-2010-14      SNWA    WDC Exploration & Wells

CL-2010-15      COH     El Camino Construction Company, Inc
CL-2010-16      UNLVR   HCI Underground, LLC
CL-2010-17      COH     Advanced Industrail Services, Inc.
CL-2010-18      CCSD    Canceled New PWP 2010-60
CL-2010-19      MCC     Las Vegas Paving Corp.
                        Wiser Construction, Limited-Liability
CL-2010-20      CLV     Company
CL-2010-21      RTC
CL-2010-22      CCSD    Canceled New # CL-2009-423
CL-2010-23      COLV    Martin Harris Construction
CL-2010-24      SNWA    Frehner Construction Company, Inc.
CL-2010-25      SNWA
CL-2010-26      LVVWD
ES-2010-27      EC
CL-2010-28      CC
CL-2010-29      CNLV
CL-2010-30      CLV     Southern Nevada Paving, Inc.
CL-2010-31      CLV
CL-2010-32      CCSD    Commercial Roofers, Inc.
CL-2010-33      UNLV    Dean Roofing Company
CL-2010-34      MVWD
CL-2010-35      CCSD    Ryan Mechanical, Inc.
NY-2010-36      NYE
CL-2010-37             CC      G and S Mechanical USA, Inc.
CL-2010-38             CCSD    Big Town Mechanical, LLC
CL-2010-39             CC      Johnson Controls, Inc.
CL-2010-40             CCWRD    
CL-2010-41             COH     Southwest Ironworks, LLC
CL-2010-42             COH 

CL-2010-43             COH     Canceled Awarded Under $100,000
CL-2010-44             COH
CL-2010-45             COH     CG&B Eterprises, Inc.
CL-2010-46             CLV     Tand, Inc.
ES-2010-47             EC 
CL-2010-48             COH
CL-2010-49             CCPC    B&H Construction, Inc.
CL-2010-50             MCC
CL-2010-51             COH     Awarded Under 100,000.00
CL-2010-52             CCLD    Big Town Mechanical, LLC
CL-2010-53             CCLD    Communication Electronic Systems
CL-2010-54             CCPC    Preferre Contracting, Inc.

CL-2010-55             COH     Fremont Construction Company, Inc.
             Oc t-09
CL-2010-56             COH
CL-2010-57             COH 
CL-2010-58             COH     Las Vegas Paving Corp.
CL-2010-59             COH     Commercial Roofers, Inc.
CL-2010-60             CCSD    Martin Harris Construction
                               CANCELED AWARDED UNDER
CL-2010-61             CCPC    $100000.00
CL-2010-62             LVVWD
CL-2010-63             CCPC    Tand, Inc.
CL-2010-64             CCPC    Richardson Construction, Inc.
CL-2010-65             CCPC    Capriati Construction Corporation
CL-2010-66             CCPC    Pace Contracting Company
CL-2010-67             COH
CL-2010-68             CCPC    Hardy Construction, Inc.
CL-2010-69             CCWRD
CL-2010-70             CNLV    Southern Nevada Paving, Inc.
CL-2010-71             ASWD
CL-2010-72             LC
CL-2010-73             CCWRD
CL-2010-74             CLV     Baldwin Development LLC
CL-2010-75             SPWB    VT Construction, Inc.
LI-2010-76             ASWD    Wiser Construction
CL-2010-77             MCC     Pride Contractors, LLc
             Nov -09
CL-2010-78             CCPC    Awarded Under 100,000.00
CL-2010-79             VVWD
CL-2010-80             CNLV    Franklin Construction Services, Inc.
CL-2010-81             CCPC    Spirit Underground, LLC.
CL-2010-82             CCPC    Tand, Inc.
CL-2010-83             CCPC    Capriati Construction Corporation
CL-2010-84             CCPC    CANCELED

CL-2010-85             MCC
CL-2010-86             BCCC    Western Single Ply
NY-2010-87             NCBC
CL-2010-88              CCPC    Las Vegas Electric, Inc.
CL-2010-89              CCPC    Highway Stripping & Signs, LLC
CL-2010-90              CCPC    Contri Construction Company
CL-2010-91              CCPC    City Plan Development, Inc.
CL-2010-92              CCPC    Central Environmental, Inc.
CL-2010-93              CCPC    Awarded Under 100,000.00
CL-2010-94              CCPC    Awarded Under 100,000.00
CL-2010-95              COH     Franklin Construction Services, Inc.
NY-2010-96              NC      JNJ Eng. Const.
CL-2010-97              CRCN    M&H Enterprises, Inc dbd Martin 
CL-2010-98              COH     Eldorado Rock, Inc.
CL-2010-99              COH
CL-2010-100             CNLV    Contri Construction Company
CL-2010-101             LVVWD
CL-2010-102             COH     P3 Construction Management

CL-2010-103             CCDA
CL-2010-104             NCBC
CL-2010-105             COH
CL-2010-106             COH     Las Vegas Paving Corp.
CL-2010-107             COH     Gothic Landscaping, Inc.
ES-2010-108             ECBC
              Dec -09
NY-2010-109             NCBC
CL-2010-109             SPWB    Construction Services Unlimited
CL-2010-110             CBC     Las Vegas Paving Corp.
CL-2010-111             COLV    Las Vegas Paving Corp.
CL-2010-112             UNLV    Clark and Sullivan Construction
CL-2010-113             UNLV    The Tiberti Company
CL-2010-114             UMC     Taylor International Corp.
NY-2010-115             NYBC    Hardy Construction, Inc.
CL-2010-116             CNLV
CL-2010-117             SNWA
CL-2010-118             CLV
CL-2010-119             CCPC    Commercial Roofers, Inc.
CL-2010-120             CNLV
CL-2010-121             CCPC    Hardy Construciton, Inc
LI-2010-122             NSP     Eagle View  Contractors
CL-2010-123             COH     Hardy Construction, Inc.
CL-2010-124             COH     Canceled NEW PWP 2010-215
CL-2010-125             CCPC    Boyd Martin Construction, LLC
CL-2010-126             CCSD    Mikon Construction Co., Inc.

CL-2010-127             CCPC    Southern Nevada Paving

CL-2010-128             CCPC    Southern Nevada Paving

CL-2010-129             CCPC    Wells Cargo, Inc.

CL-2010-130             CCPC    APEC Consultants, Inc.
LI-2010-131             PFA     Anazalone Pumps, Inc.

CL-2010-132             CSN
CL-2010-133             CCPC    Palmetto Construction, Inc.

CL-2010-134             CCDA
CL-2010-135             CLV     Amazon masonry, Inc.
CL-2010-136             CLV     Spirit Underground, LLC
              Jan-10
NY-2010-137            BWSD    Boart Longyard
CL-2010-138            SNHD
CL-2010-139            CNLV
CL-2010-140            CNLV
CL-2010-141            CCSD    Las Vegas Paving Corp.
CL-2010-142            CNLV    APCO Construction
                               Canceled Awarded Under
CL-2010-143            COH     100,000.00
CL-2010-144            CLV     Ace Fire Systems, Inc.
CL-2010-145            CCPC    Las Vegas Paving Corp.
LI-2010-146            COC     Hardy Construciton, Inc
                               Canceled Awarded Under
CL-2010-147            COH     100,000.00
CL-2010-148            CCDA    Scheidt & Bachmann

CL-2010-149            CLV     Las Vegas Paving Corp.
CL-2010-150            CCSD    Big Town Mechanical
CL-2010-151            CNLV     
                               Peterson Dean Roofing & Sheet
CL-2010-152            CCSD    Metal
CL-2010-153            CBC     Mountain Vista Development, Inc.
CL-2010-154            CLV     QH Las Vegas
CL-2010-155            COH     Preferred Contracting, Inc.
                               Canceled Awarded Under
CL-2010-156            CLV     100,000.00

CL-2010-157            BOHT    Quality Mechanical Contractors, LLC
CL-2010-158            CCWRD
                               City Plan Development, Inc. dba Savi
CL-2010-159            BOHT    Const.
              Feb-10
CL-2010-160            CLV     M&H Enterprises, Inc.
CL-2010-161            CNLV
CL-2010-162            CNLV
CL-2010-163            CCSD    Lloyd's Refrigeration, Inc.
CL-2010-164            SPWB    Commercial Roofers, Inc.
NY-2010-165            NCBC
CL-2010-166            CLV
CL-2010-167            SPWB    Ryan Mechanical, Inc.
CL-2010-168            CLV     APCO Construction
CL-2010-169            LVCVA
CL-2010-170            BCCC    TAB Contractors, Inc.
CL-2010-171            COH
CL-2010-172            CCPC    Contri Construction Company
CL-2010-173            CLV     Canceled Federally Funded
CL-2010-174            CCSD    Wells Cargo, Inc.
CL-2010-175            CBC     Canceled Under 100,000.00
CL-2010-176            CBC     Pipenology, Inc.
CL-2010-177            CNLV    El Camino Contracting Co. Inc.
CL-2010-178            CCWRD
CL-2010-179            UNLV    CG&B Enterprises, Inc.
CL-2010-180            CCPC    Meado Valley Contractors, Inc.
CL-2010-181            CCPC    Tracy Hoherz
CL-2010-182            CCPC    Las Vegas Paving Corp.
CL-2010-183            CCPC
CL-2010-184            LVCVA   Turner Construction Company
CL-2010-185            SPWB    Bombard Electric
CL-2010-186            CCWRD
CL-2010-187            SPWB    Pahor Mechanical Contractors, Inc.
CL-2010-188            CNLV    Peek Construction Company

CL-2010-189            CLV
CL-2010-190            CCLD    Commercial Roofers, Inc.
CL-2010-191            CCLD    The Original Roofing Company, LLC
CL-2010-192            CCSD    Las Vegas Paving Corp.

CL-2010-193            CCPC    Trade West Construction, Inc.
                               Canceled Awarded Under
CL-2010-194            CCPC    100,000.00

CL-2010-195            CCPC
CL-2010-196            CCPC    Martin-Harris Construction
CL-2010-197            CLV

CL-2010-198            CLV     M&H Enterprises, Inc.
CL-2010-199            CNLV
CL-2010-200            LVCVA   Modernfold of Nevada, LLC
CL-2010-201            UNLV    Eberhard Southwest Roofing, Inc.
              Mar-10
CL-2010-202            CNLV    CANCELED
CL-2010-203            CCSD    Lloyd's Refrigeration, Inc.
CL-2010-204            CCSD    Big Town Mechanical, LLC
CL-2010-205            CCSD    Big Town Mechanical, LLC
CL-2010-206            CCWRD
CL-2010-207            CLV     Tand, Inc.
CL-2010-208            CLV     Southern Nevada Paving, Inc.
CL-2010-209            LVVWD
CL-2010-210            UNLV    Pahor Mechanical Contractors, Inc.
CL-2010-211            CNLV
CL-2010-212            CLV     Hardy Construction
CL-2010-213            COH     Transcore
CL-2010-214            COH     Williams Brother, Inc.
CL-2010-215            COH     Spirit Underground, LLC
NY-2010-216            NCC
CL-2010-217            COH
CL-2010-218            COH     Southern Nevada Paving, Inc.
CL-2010-219            COH     Southern Nevada Paving, Inc.
CL-2010-220            LVVWD
CL-2010-221            LVVWD   Capriati Construction, Inc.
CL-2010-222            SPWB    Western Single Ply
CL-2010-223            CLV     American Pavement Preservation
CL-2010-224            UNLV    Avery Atlantic


CL-2010-225            RTC
CL-2010-226            UNLV    Construction 
CL-2010-227            CC
CL-2010-228            COC     JNJ Engineering Construction, Inc.
CL-2010-229            CNLV
CL-2010-230            UMC
CL-2010-231            CCSD    Big Town Mechanical, LLC
                               Interstate Plumbing and Air
CL-2010-232            CCSD    Conditioning
CL-2010-233            COH     Tand, Inc.
CL-2010-234            CCPC    Gothic Landscaping, Inc.
CL-2010-235             CCPC
CL-2010-236             CCSD    Big Town Mechanical, LLC
ES-2010-237             ESC
ES-2010-238             ESC
CL-2010-239             CCSD    Las Vegas Paving Corp.
CL-2010-240             SPWB    CG& B Enterprises, Inc.
CL-2010-241             CCPC    FastTrac Electric
CL-2010-242             SPWB    Palmetto Construction, Inc.
NY-2010-243             NCBC    Top Rank Builders
CL-2010-244             COH     Neal and Sons Enterprises
CL-2010-245             CLV     Peek Construction
CL-2010-246             CLV     Las Vegas Paving Corp.


CL-2010-247             RTC
CL-2010-248             CCWRD
              A pr-10
CL-2010-249             CCSD    Wells Cargo, Inc.
CL-2010-250             CCPC    Cobblestone Construction
CL-2010-251             CSN     Core Construction/Mojave Electric
CL-2010-252             UNLV
CL-2010-253             CCSD    Helix Electric, Inc.
CL-2010-254             CCSD    Helix Electric, Inc.
CL-2010-255             CCSD    Helix Electric, Inc.
CL-2010-256             CCSD    Helix Electric, Inc.
CL-2010-257             CCSD
CL-2010-258             COM
CL-2010-259             COH
CL-2010-260             MCC
CL-2010-261             CCSD    Big Town Mechanical, LLC
CL-2010-262             CCSD    Big Town Mechanical, LLC
CL-2010-263             CCWRD
CL-2010-264             CCPC    Western States Contracting, Inc.
CL-2010-265             CCPC    Cancel AWARDED UNDER 100,000
CL-2010-266             CCSD    Western States Contracting, Inc.
CL-2010-267             CLV     Thor Construction, Inc.
LI-2010-268             LCSD
CL-2010-269             CLV

CL-2010-270             CLV     Thor Construction, Inc.

CL-2010-271             CLV
CL-2010-272             CCWRD    
CL-2010-273             CCSD    Bombard Electric, LLC
CL-2010-274             CCSD    Bombard Electric, LLC
CL-2010-275             CCSD    Bombard Electric, LLC
CL-2010-276             CCSD    Bombard Electric, LLC
CL-2010-277             CCSD    Bombard Electric, LLC
CL-2010-278             CCSD    Bombard Electric, LLC
CL-2010-279             CCSD    Bombard Electric, LLC
CL-2010-280             COH
CL-2010-281             CCSD    U.S. Mechanical, LLC
CL-2010-282             CCSD    Big Town Mechanical, LLC
CL-2010-283             CCSD    Big Town Mechanical, LLC
CL-2010-284             CCSD
CL-2010-285             CCSD    Red Rose, Inc.
CL-2010-286             CCSD    The Original Roofing Company
CL-2010-287             CCSD    The Original Roofing Company
CL-2010-288             CCSD    Dean Roofing Company
                                American Pavement Preservation,
CL-2010-289             CCPC    LLC
CL-2010-290             COH     Hardy Construction, Inc
NY-2010-291             NYE
CL-2010-292             CCSD    Lloyd's Refrigeration, Inc.
CL-2010-293             CCSD    Lloyd's Refrigeration, Inc.
CL-2010-294             CCSD    Lloyd's Refrigeration, Inc.
CL-2010-295             LVVWD   Contri Construction Comp.
NY-2010-296             NYE
CL-2010-297             CCSD    Bombard Electric, LLC
CL-2010-298             CCSD
CL-2010-299             CCSD
CL-2010-300             CCSD
CL-2010-301             CCSD    Bombard Electric, LLC
CL-2010-302             CCSD
CL-2010-303             CCSD
CL-2010-304             CC      Williams Brother, Inc.
CL-2010-305             BC
CL-2010-306             COH     Fast Trac Electric
CL-2010-307             COH     Las Vegas Paving Corp.
CL-2010-308             CC      Turner Construction Company
CL-2010-309             CCPC
CL-2010-310             CNLV
              May -10
NY-2010-311             NYE
ES-2010-312             ESC
CL-2010-313             CCSD    Big Town Mechanical, LLC
CL-2010-314             CCSD    U.S. Mechanical, LLC
CL-2010-315             CCSD    Hasco, Inc.
CL-2010-316             CCPC    Hardy Construction, Inc
CL-2010-317             CLV     Las Vegas Electric, Inc.
CL-2010-318             LVVWD
CL-2010-319             CCPC
CL-2010-320             CCSD    Fast System
CL-2010-321             CCPA
CL-2010-322             CCPC    Meadow Valley Contractors, Inc.
CL-2010-323             SPWB    Palmetto Construction, Inc.
CL-2010-324             CCPC    Accurate Controls, Inc.
CL-2010-325             CCSD    CG&B Enterprises, Inc.
CL-2010-326             CCSD    Mikon Construction Co., Inc.
CL-2010-327             OPD
CL-2010-328             CLV     J N J Engineering Construction, Inc.
CL-2010-329             CCPC    Fremont Construction
CL-2010-330             CLV     Tand, Inc.
CL-2010-331             UNLV
CL-2010-332             NSP     Franklin Construction Services, Inc.
CL-2010-333             CCPC
CL-2010-334             CLV     Meadow Valley Contractors, Inc.
CL-2010-335             CLV
CL-2010-336             COM
CL-2010-337             CCSD    Pahor Mechanical Contractors, LLC
CL-2010-338             CLV
              Jun-10
CL-2010-339             CCPC
CL-2010-340            LVVWD   JNJ Engineering Construction, Inc.
CL-2010-341            CLV     Canceled Federally Funded
CL-2010-342            CLV     Environmental Assurance, LLC
CL-2010-343            COH     Capriati Construction, Inc.
CL-2010-344            CCPC    R-Coat Painting & Drywall, Inc.
CL-2010-345            LVVWD
CL-2010-346            LVVWD   Maile, Inc.
CL-2010-347            SPWB    Western States Contracting, Inc.
NY-2010-348            NYC     Valley Slurry Seal Co.
NY-2010-349            NYC
NY-2010-350            NYC
CL-2010-351            COH     Gothic Landscaping, Inc.
NY-2010-352            NYC
CL-2010-353            SPWB    Fremont Construction
CL-2010-354            CCSD
CL-2010-355            CLV     Wells Cargo, Inc.
CL-2010-356            COH     Vegas Valley Locking Systems, Inc.
CL-2010-357            SPWB    Clark Construction Group
CL-2010-358            CCSD

CL-2010-359            RTC
CL-2010-360            COH
CL-2010-361            COH
CL-2010-362            RTC
CL-2010-363            COH
CL-2010-364            COH     Schneider Electric
CL-2010-365            LVVWD
CL-2010-366            CCPC    Transcore Its, LLC
CL-2010-367            CC
CL-2010-368            UNLV
CL-2010-369            BCCC
CL-2010-370            CLV
CL-2010-371            CCPC    Spirit Underground
CL-2010-372            CLV
NY-2010-373            NCSD    CG&B Enterprises, Inc.
CL-2010-374            CCSD    Hufcor Nevada 
CL-2010-375            CCPC
CL-2010-376            CCPC
              Jul-10
CL-2010-377            CBC
CL-2010-378            COH     CANCELED
CL-2010-379            CCSD
CL-2010-380            LVVWD
CL-2010-381            CCSD    Canceled New PWP 2011-11
CL-2010-382            CCSD    Canceled New PWP 2011-12
CL-2010-383            CCSD    Canceled New PWP 2011-13
CL-2010-384            CCSD    Canceled New PWP 2011-14
CL-2010-385            CCSD    Communication Electronic Systems
CL-2010-386            CCSD    Communication Electronic Systems
CL-2010-387            RTC     New PWP CL-2010-36
CL-2010-388            CCPC
CL-2010-389            CLV
LI-2010-390            LC
CL-2010-391            CC
CL-2010-392            CCSD
CL-2010-393            COH
CL-2010-394             CBC
CL-2010-395             LVCVA
CL-2010-396             COH
              A ug-10
CL-2010-397             CBC
CL-2010-398             COH
CL-2010-399             COH
NY-2010-400             NCSD
NY-2010-401             NCSD
ES-2010-402             ESC
CL-2010-403             CLV
CL-2010-404             SPWB
CL-2010-405             COH
CL-2010-406             COH
CL-2010-407             CCLD
CL-2010-408             CLV
NY-2010-409             NCBC
NY-2010-409-B           NCBC
CL-2010-410             BCCC
NY-2010-411             NYC
CL-2010-412             CCPC
CL-2010-413             CCPC
CL-2010-414             CCPC
CL-2010-415             COH
CL-2010-416             LVCVA

CL-2010-417             SPWB
CL-2010-418             CCDA
CL-2010-419             COH
CL-2010-420             CCPC
CL-2010-421             CCPC
CL-2010-422             CCPC
CL-2010-423             SPWB
CL-2010-424             SPWB
              Sep-10
CL-2010-425             UNLV
CL-2010-426
CL-2010-427
CL-2010-428             SPWB
CL-2010-429             CCPC
Total 2010

Year 2011
CL-2011-1               CCWRD
CL-2011-2               CWC
CL-2011-3               CCWRD
CL-2011-4               CNLV
CL-2011-5               COH
CL-2011-6               COH
CL-2011-7               CC 
CL-2011-8               CNLV
CL-2011-9               CCSD
CL-2011-10              CCDA
CL-2011-11              CCSD
CL-2011-12              CCSD
CL-2011-13              CCSD
CL-2011-14   CCSD
CL-2011-15   CCSD
CL-2011-16   CCSD
CL-2011-17   CCSD
CL-2011-18   CCSD
CL-2011-19   CCSD
CL-2011-20   CCSD
CL-2011-21   CCSD
CL-2011-22   CCSD
CL-2011-23   SNWA
CL-2011-24   LVVWD
CL-2011-25   CCSD
CL-2011-26   CCSD
CL-2011-27   CNLV
CL-2011-28   CC
CL-2011-29   CCSD
CL-2011-30   CCSD
CL-2011-31   CCSD
CL-2011-32   CCSD
CL-2011-33   SPWB
CL-2011-34   CCPC
CL-2011-35   COH 
CL-2011-36   RTC

CL-2011-38   CLV
CL-2011-39   CCPC
CL-2011-40   UNLV
Total 2011
note as of October 1, 2010



340A 04 C1 Coyote Spring Valley Well & Moapa Transmission System - Arsenic 
CWC-300 System Conveyance & Operations Program (SCOP)-"Reach 3 Pipeline" 
CWC-700 System Conveyance & Operations Program (SCOP)-Reach 4 Tunnel 
CWC-900 System Conveyance & Operations Program (SCOP)-Reach 5 Pipeline
CWC-1000 System Conveyance & Operations Program (SCOP)-Boulkder Island Outfall
Diffuser

CWC-600 System conveyance & Operations Program (SCOP)-City of Henderson Pumping 
TS-0621 Corrosim Management Plan 

340A 03 C1 Coyote Spring Valley  Well and Transmission System Production Wells 
0011881 School Modernization Whitney ES 

C1260 Angel Park Disinfection System Addition 
2008-86-0007 Galleria Drive Half Street Improvements From Moiser to Pabco 

2008-86-0017 Pittman Wash Sewer Assessment Pilot Project 



wwtp  No 3 Decommissioning 2nd demolition Project Phase I 
Flow Meter Replacement and Miscellaneas Improvements at COH Water Treatment Plant 
2008-86-0019 Armillaria Sewer Lift Station Flood Protection Prject 
810M 01 C1 Lower Narrows and Homestead Weirs 
2262-1 MIA Roof Replacement - "C" Gates 
TS-634 E Flamingo Rehabilitation Las Vegas Valley East of I-15 Freeway 
Ts-0633 Sloan Interceptor Rehabilitation Sloan Lane Between E Washington Ave. and
Vegas 
TS-0620 Crosstown Interceptor Rehabilitation Project Phase 2
070F 04 C1 Lake Mead Intake No. 3 - Discharge Pipeline Alfred Merritt Smith Water 

CWC-400 System Conveyeance & Operations Program (SCOP)-"Reach 3 Tunnel"
C1232 Centennial 2635 Zone Reservoir and 2745 Zone Pumping Station 

0011350 Cooling Tower Replacement Theron Swainston Middle School 
131-08-MF-042-604 Convention Center Remodel & Addition 203 Water St 
CWC-100 SCOP-Reach 1 Pipeline 
CWC-200 System Conveyance & Operations Program (Scop) Reach 2 
CWC-500 System Conveyance & Operations Program 
C1249 Miscellaneous Valts Reconstruction and Repair Phase XIV 
C1217 Cactus 2538 Zone Reservoir Inlet/Outlet Pipeline and 2635 Zone Pumping Station 

09.1730.11-DC Rampart Trail Phase I, II and Angel Park Trailhead 
1318 ADA Accessibility & DOJ Compliance FY 08/09
5040-KC White Life Sciences Reroof 

131-09-FC-054-001 Railroad Channel Maintenance Ramps 
TS-0586 AWT Membrane and Ozonation Phase 1

005-09 RTC Vault Building Tenant Improvements 
08.15341.10-LED Centennial Hills Added Improvements-Added Pool Shade 
Wigwam/US 95 24-inch 2120 PZ Main and PRV 
601264 Sunset Park Area D Well Reconstruction 




Family Courts Building Remodel 
601265 Building HVA/C-R Maintenance Repairs 
Part 1 - RSFOQ#006-09 / Part II - RFFP - Unknown at this time Construction Management @
Risk 
TS-0632 West Twain Interceptor Rehabilitation 
5042-KC Concrete Replacement at HFA, CHE, & BSL-West 
2008-31 Gabbs Well Drilling 
LCPD0803 Headquarters Complex 
5041-KC FDH Building Retrofit Air Handlers 
09-A003 DETR Landscape 
TOH89 Thompson Opera House 
0003-40-01 Pioche Sewer Improvements 

B601231-08 Street Improvements on Valley View  Blvd Between Flamingo Road to Desert 
B601233-08 Sunrise Avenue Storm Drain 
601254 Fire Station No 18 Workout Room Expansion 
2006-86-0017 RMLT 13 & 14 & Equestrian Park Trailhead Project 
0012003 Fire Alarm Replacement @ Cimarron-Memorial High School 
131-08-PR-183-001 Burkholder Ballfield Netting 
2008-32 Calvada Building Demolition 
2303 Control Center Relocation 
0011347 Central Plant Modernization 
0011340 Central Plant Modernization 
131-08-PR-151-001 Whitney Mesa Nature Preserve 
131-08-FC-042-005 Pittman MacDonald Ranch Channel 



CSN Health Sciences Building Addition West Charleston 
C1260 Angel Park Disinfection System Addition 
0011582 Site Work Facilities / Audit 
Upper Las Vegas Wash Trail Phase I
0011955 Electrical Service for Portables 
0011341 Central Plant Modernization Cheyenne High School 
2315-2 Henderson Executive Airport Electrical Plan - Phase 2 
0000558 Underground Fire Line and Nevada Power Upgrade @ Valley HS
2008-33 Beatty Street Light Installation 
601297-08 Street Light Modernization 
601291-08 Hotel Rio Drive Bridge Repair 
M0155 Miscellaneous Backflow Installations 2008-2009 Phase XII
09-08 Summerlin Library Efficiency Remodel 
09-09 Sunrise Library Efficiency Remodel 
0011612 Water Service 
2359 MIA Laundry Remodel 
08.53541.06-LED Water Pollution Control Facililty 
2008-86-0012 Reservior Rehabilitation Improvements Project
2008-12 Operating Room Humidifier Replacement 
601259 Wetlands Park Nature Center 

456-PM Design Build of a New Pool to Replace Existing Pool at the McDermott Physical Edu
0000484 Plumbing Modernization Rowe ES
0011765 Fire Hydrant Installation Gragson Elementary School 
4477 Furnish and Install Elevator at Shadow Lane Medical Research 
0010993 Emergency Lighting/Intrusion Alarm Interface; Intercom, ALS PA Upgrades 
08.53541.05-LED Durango Hills Water Resource Center 
1548-04 Wallace Transportation - Bus Wash/Water Reclaim System Corrections 

601096-08 Range Wash Channel Reconstruction on Nellis Air Force Base - Phase 4
Central Cooling Plant Connector to Satellite Plant for GHS, WHI and TBE Buildings
B601309-08 Northern Clark County 215 Bruce Woodbury Beltway, Tenaya Way to Decatur

0011998 Rehab Existing Building 4220 McLeod Drive 
0002501 Intrusion Alarm PA ALS Exterior Lighting J D Smith Middle School 
2008-35 tonopah Fitness Center Remodel 
09.1730.02-LED Las Vegas Wash Middle Branch Storm Drain 
601319 Clark County Museum Candlelight Wedding Chapel - Phase I
070F 02 C1 Lake Mead Intake No. 3 - Pumping Station Underground 
07-M37 Erosion Remediation High Desert State Prison 
09107 Fire Station / college Instructional Center 

09.1730.07-LED Horse Drive / U.S. 95 Interchange Intersection of Horse Drive and U.S. 95
C1269 Kyle Canyon System Improvements - Old Town and Upper Rainbow 
C1279 Hard Rock Pressure Zone Conversion 
1321 Desert Horizons Park - Offsite Improvements 
08-0734-PD Police Department Remodel 
1305 Losee Road Improvements Phase I 
601328 Clark County Fairgrounds Rodeo Arena Bleachers Modular Office and Site 
601329 Clark County Fairgrounds Horse Stalls Reconfiguration 
07-C07A Southern Desert Correctional Center Expansion 
601207 Sunset Regional Park Phase 1 Improvements 
2318 MSE Wall, Taxi and Helix Bridges Expansion Joint Rehabilitation 
2008-04 Pipe Springs Well Drilling 
601335 Multiple County Facility Improvements Shade Structures 
2240 Landscape Renovations at McCarran International Airport and Seigfried and Roy Park

Parking Revenue Control System Infrastructure at the Gold Garage and Terminal 2 Parking
Lot 
Desert Regional Center, Building 1300 Accessibility Upgrades

Russell Road CMU Walls
090G 25 C3 Groundwater Development Cosntruction 

320Q 01 C1 Alfred Merrit Smith Water Treatment Facility Process Drainage Improvements 
320B 01 C1 AMSWTF Laboratory Space Remodel 
601344 Elevator Equipment Rooms- Code Compliance Retrofit 
601343 North Las Vegas Community Resource Center Fence 
09-07 Spring Valley Library Efficiency Remodel 
09-06 Clark County Library Efficiency Remodel 
131-08-QC-001 On Call Construction Services 
C1306 Miscellaneous Mian Extensions and Water Service Installations, Phase VII
MPID 0000243 Roof Replacement CVT Gilbert Elementary School 
601347 Desert Breez Park Restroom Repair 
08.15341.04-LED LV Museum Phase 3 Rehabilitation 300 Stewart Avenue 
B601324-08 Durango Drive from  Southern Beltway to Hacienda Avenue and Sunset Road

07-0696-STR 2007 Pavement Reconstruction Project 
C-09-00001 Green Valley Library Addition and Remodel 
08-0744-CC Boulder City Special Events Sign 
601360 Emergency Power DJJS/DFS Campus 
Downs 5 Morrell Park Phase 11   131-09-PR-165-001
2005-86-0072 Equestrian Tributary 1 Flood Control Project 
CRCPDP-31 IPS-3 and CWC Substation 69kV Ductbank Project Phase 1
131-08-ST-034-001 Burkholder Blvd Roadway & Trail Improvements 
131-09-GG-R09-001 Water Street Site A Utilities Relocation 
Caliente Fire House 
0011764 Renovation/Expansion at New Administration Site at Seigle 2
09-B-01 Fish Lake Valley Community Center Renovation Project 

TS-0624 Switchgear #5 and Duct Banks 

08.53541.03-LED Water Pollution Control Facility Nitrification Aeration Basin Improvements 
RFP-182 Fire/College Instruction Center 
0011865 Asphalt Playground Replacement 
601372 Searchlight Justice Center Tenant Improvements 
0011845 School Modernization Kirk Adams Elementary School  
0011846 School Modernization James Gibson Elementary School 
09-2150 Pavilion 3150 Paradise Road 
In-Fill Roadway Program - FY 2007
07-0710-MC(1) LADWP Building Public Restrooms 

TS-560A-P03 Moapa Valley Collection System - Lewis Force Mains Overton and Longdale 
TS-560A-P02 Moapa Valley Collection System - Lift Station 
TS-560A-P01 Moapa Valley Collection System - Gravity Sewer Overton and Longdale 
0011844 HVAC and Plumbing Modernization 
2005-86-0029 Major Avenue Rehab - Van Wagenen to Warm Springs 
810G 01 C1 Duck Creek Confluence and Upper Narrows Weirs 
07-M24 Door Control Panels Fire Door Replacement 
PCOH 8008860047 COH Water Treatment Plant Granular Activated Carbon 
2331-2 T-3 Concourse 1213 Bottleneck Power Project 

2008-86-0014 Miscellaneous Sanitary Sewer Protection Improvements Various Locations 
07.15341.18-DC Fire Training Center Burn Tower 
8106 01 C1 Duck Creek Confluence and Upper Narrow Weirs 
810V 01 C1 DU Westlands No. 1 Weir 
09.1730.16-TF N Street Improvements-Jefferson Avenue to Madison Avenue 

2008-42 Homestead Road Widening 
2008-41 Amargosa Valley Science & Technology Park Building 
09.1730.29-LED Las Vegas Wash Trail Phase 1
0010996 HVAC & Plumbing Modernization Helen Cannon Middle School 

09.1762.01-TRF Annual Slurry Seal 
CWC-1100 Site Prepartation 

0012022 Replace State Floor & Curtains 

840A 00 A1 Fire Station Weir Bank Protection Maintenance 
131-08-PR-166-002 Arroyo Grande Fields #5-8 SOD Replacement 

C1307 Rampart/Alta Pipeline Relocation, Phase I 
Project 627 Comprehensive System Wide Inspection Program 
Pinto Campus Social Service 1st and 2nd Floor - Tenant Improvements 
2009-01 Smoky Valley Arena Shelters Pahrump Nevada 
0027-93-01 Bowman Reservoir Discharge 
B601411-09 Silverado Ranch Boulevard From Decatur Boulevard to Valley View
Boulevard 
B601412-08 2009 School Flasher Improvements 
09-0763-MC Cemetery Paving - 2009 
2291 Terminal 1 Roadway Reconfiguration 
07-C89 UNLV Shadow Lane Biomedical Research Building 
08.15341.12-TF Doc Romeo Park/Majestic Park Scoreboards 

05-C67L(A) UNLV Student Services Bursar Office Remodel 
B601415-09 Harmon Avenue Relocation Las Vegas Boulevard to Koval Lane 
131-08-MF-058-002 City of Henderson Detention Center Expansion 
Detention Center Expansion-Air Blown Fiber Installation
Football Field Lighting Audio System & Security System Pahrump Valley High School 
PW 2009-002 Oasis Boulevard 2009 Overlay Project 
PW 2009-001 Pioneer Boulevard 2009 Overlay Project 
0011777 Security Gate System Chaparral High School 
08.15341.15-TF Druango Riley Park Phase 2
09.1730.25.TF Rancho Park Subdivision Street Rehabilitation 

09.1730.04-TF Meadows Alta Parallel Project Phase II (Lot 1) and Brush Street Storm Drain 
Cambridge Community Center Social Service Second Floor - Tenant 
#1324 Northeast Area Command Facility City of North Las Vegas Detention 
131-09-MF-036-016 Justice Facility Expansion Data/Voice Cable Installation 

B601418-09 Bruce Woodbury Beltway (North) Oso Blanca Bridge Over US 95 Ramps 
Regional Justice Center Specialty and Felony DUI Court Expansion 
131-09-PR-213-001 Streetscapes Turf Conversion 

2008-87-0043 Landwell 2200 Sewer Interceptor Sunset-Burkholder Between Galleria Dr 
09-015 Laughlin Transit Maintenance Facility 
2140-09 Major & Emergency Asphalt Replacement 
1325 Craig Ranch Regional Park - Phase 1
1326 Tropical Breeze Park 
CRCPDP-41 CWC Temporary Substation Project-Substation Construction 
B6011445-09 2009 Traffic Improvements Phase 2 
B601444-09 Paradise Road - Harmon Avenue To Desert Inn Road Phase 3A
B601440-09 PM 10 Paving Project 11 Phase 1 
1327 SkyView Multi-Generational Center 
Access Road & Site Preparation for Well #27



LCPD0902 Gemmill Substation Construction 
131-09-W-165-005 City of Henderson Utility Services Support Building 
09.1730.20-DC Las Vegas Blvd Neon Signs & Median Island Improvements 

0011850 Plumbing Kitchen Modernization and Door & Hardware Upgrade Fay Galloway ES

1558 Shirley and Bill Wallin Elementary School 
1554 Vincent L Triggs Elementary School 
0000474  Roof Replacement Bertha Ronzone ES 
0004452 Roof Replacement Marion Cahlan Elementary School 
0011968 Chiller Conversion Silvestri Middle School 

1560 Ruby Duncan Elementary School 
1559 Evelyn Stuckey Elementary School 
BCP-09-01 Stop Light at Pioneer & Oasis and Pioneer & Falcon Ridge 
0000471 Roof Replacement CC Ronnow ES

B601457-09 Northern CC-215 Bruce Woodbury Beltway - Decatur Boulevard to North 5th 
B601455-09 Clark County Wetlands Park Pond Restoration Project 
PW 2009-003 South Grapevine Camellia Circle & Sun Valley Drive 2009 Overlay 
1328 Tropical Parkway Storm Drain East On Tropical Parkway from North 5th Street 
2329 MRACC Office Build Out and Dumpster Facility Redesign 
B601462-09 Flamingo Wash Desert Inn Road to Eastern Avenue 
B601468-09 Flamingo Arroyo Trail Phase 2
B601456-09 Casino Drive - Harrah's Driveway To St - 163
Metro Communications Center 
Silverpeak Production Well Drilling Construction and Test Pumping 
5050-KC System Computing Services Electrical Renovations 
New City Hall & Civic Plaza 
C1194 Miscellaneous Site Improvements FY 2005/2006 Phase 1 

06-0667-WWTP Wastewater Treatment Plant Headworks Upgrade 
Jerome Mack Air Quality Monitoring 
0000558 HVAC and Electrical Upgrade and Modernization Valley High School
C1308 Polyethylene Service Replacement Laughlin Phase 1 El Mirage Estates 
C1281 Recycled Water Distribution System Valve Improvements 
340R 01 C1 Transmission System Pipelines Cathodic Protection Repairs 
Gowan Road Improvement 
"A" Building HVAC Remodel West Side 
Diagonal Taxiway Tonopah Airport 
La Cienega Drainage Improvements 2361

2009-06 Pahrump Are Chip Seal 
C1293 Trihalomethanes Treatment Project Phase 1 Alta 3205 Zone Reservoir 
09-17 Southwest Library and Service Center Rainbow Boulevard/Windmill Lane 
0004628 Remove & Replace Tennis and Basketball Courts
2009-07 Calvada Abatement and Demolition 
MPID#0004652 Remove and Replace Running Track Surface Valley High School 
MPID#0010596 Remove and Replace Running Track Surface Western High School 
MPID#0004640 Remove and Replace Running Track Surface Clark High School 
M0157 Drill and Develop Production Wells S-3 and S-4 
M0156 Drill Piute Valley Montioring Well PVM-1 
1333 Southeast Interceptor 
08.53541.04-LD WPCF Security Improvements & Expansion Maintenance Charging Area 
001-09 Tonopah Roof Project 
131-08-MF-145-001 City Wide Performance Contract 
Security Station Modification 
05-M16 Sewage Disposal System Upgrades Pioche Conservation Camp 
2009-08 Florence Avenue Reconstruction 
601512 Self Help Center 
1332 City of North Las Vegas Detention Center Dormitories A, B, and F HVAC Replacement

012019 Roof Replacement Frezier Hall at the Las Vegas Academy of Int'l Studies 
09.15341.03-DC Request For Prelimary Proposals Tropical Durango Park Phase I
2262-2 Mia Roof Replacement - Centinal Terminal McCarron International Airport 
M0162 Big Bend Water District On-Call Services Contract 2009-2014
MPID#0000577 Remove and Replace Asphalt and Add ADA Ramp 
07.15341.17-TF Desert Nature Preserve Trail 
07-C07A(A) Asbestos Flooring Abatement Southern Desert Correctional Center 
09.1730.21-LED Dexter Park Playground and Dog Park Addition Dexter Park Upland Blvd 
DJJS Fire Alarm System Modernization 
09-0771-RE Coping Stones Replacement 
B601525-09 Tropicana - Flamingo Wash Trails - Phase 1 
B601527-09 Spalling Repair On 1-215 
131-09-ST-164-001 Streetlight Pole Replacement Phase 1 
1499 Forebuss Elementary School Located Near Grand Canyon Dr and Fore Avenue 

07-0720-LT River Mountains Loop Trail Segment 3 & 4 Within the City Limits of Boulder City 

Federal Stimulus 2009-A Various Locations In North Las Vegas Construction of Pavement 
070F 02 C2 Intake No. 3 Connector Tunnel Alfred Merritt Smith Water Treatment Facility 
Terminal 3 Apron 
543-PO2 Emergency Repair Contract Services-Phase II 
1334 Water Bolsering Between North 5th and 
09.1730.22-DC Boulder Park Plaza 
131-09-FC-038-002 Section 19 Flood Control Improvements 
09.15341.07-TF RPP Teton Trails Park Phase III
2009-11 Tonopah Public Utillities Septage Drying Beds 
131-09-MF-063-009 Heritage Park - Senior & Aquntie Faclities Data/Voice Cable Install 
B601530-09 Duck Creek Railroad Detention Basin 
C1297 Charleston Heights 2168 Zone Reservoir Rehabilitation 
09-B-02 Goldfield Utilities Wastewater Pond Rehabilitation Project 

BCP-09-02 Senior Center Addition 
20903340 Renovate Room In MPE Emerging Diseases Laboratory 
04-0608-DR Bootleg Canyon Detention Basin Phase 1- Outfall
131-09-ST-165-001 Pioneer & Army Street Dust Paving 
09-25557 The Smiths Center Performing Arts Center 

Spring Mountain Youth Camp (SMYC) Wastewater Treatment Facilities Repairs 
90904873 Science and Engineering Building Tenant Improvements 

Cheyenne Ridge Park Lighting & Shade Shelter  #10277
Public Works Multi-use Service Center 
09-092 South Strip Transfer Terminal Security Electronic Systems Upgrade 

09-20 Whitney Library Efficiency Remodel 
09-21 West Charleston Library Efficiency Remodel 
Grand Teton Drive Storm Drain-Tee Pee Lane to US-95 
2353 CCRF - AVI System Installation at McCarren Rent-A-Center

07-C05 Indian Springs Correctional Center Work Camp, off  Site Erosion Control 20825 Cold 
Lead Based Paint Stabilization and Remediation Project 
1341 Water Bolstering Project Between North 5th and Donna
090200-LD Design/Build Water Pollution Control Facility 
09.1730.10-DC Oakey Meadows Storm Drain Phase 1 
Installation of Video Surveillance System at Bob Price Recreation Center 
C-09-0000Z Gibson Library 100 W Lake Mead Pkwy, Henderson NV 89015 
07.15341.03-LED Fire Station #42 Generator Enclosure 
0011116 Roof Replacement Adams Elementary School 
02734 Well #2 Reconditioning 
Rail City Linear Park Improvements Project 02261 
Well #3 Replacement 02194
Pinto Campus Parking Improvements 

B601587-09 Montessouri Street Improvement From Wigwam Avenue to Shelburne Avenue 

0005074 Playground and Retaining Wall Replacement William G Bennett ES 
0004610 Tennis and Basketball Court Replacement and Erosion Control 
2334 Terminal 1 Central Plant Reconfiguration McCarran International Airport 
2009-86-0000 Reservoir Rehabilitation Improvements Project R 18 and R 20 Various 
C1314 Searchlight Water System Improvements Restoration 
Countywide Heater Replacement 
BCP-09-3 City of Mesquite Police Headquarters 
09.53541.01-LD WPCF Nitrification RAS Valve Replacement 
Fire Station 22
Via Olivero Avenue and Valedez Street Special Improvement District 09.1730.34-DC
09-102 Ace Gold Line Phase III
PKGID 0011857 School Moderinization John F Mendoza Elementary School 

1343 WRF Offsite Power 
131-09-MF-063-013 Heritage Park Senior and Aquatic Facilities Audio 
2370 Radiosonde Launch Facility 
0012071 Remove and Replace Running Track Surface 
91-97-48-02 A Quary and Stockpile RipRap Lincoln County Acoma Quarry (29 Miles East
of )
2009-14 Re-roofing of the Rhyolite Depot 

09.15341.10-TF Durango Hills Golf Course Turf Removal 
1344 Southeast Interceptor Phase 1 Lake Meade/pecos to Alto/Nellis along Lake Meade 
1346 Southeast Interceptor Phase 3 From Owens Ave/Pecos Rd to Lake Meade/Pecos
1345 Southeast Interceptor Phase 2 From Alto/Nellis along Alto and Betty 
PW 2009-004 Mesquite Wastewater Treatment Plant Upgrade & Expansion 
2009-14 Entry Canopy NE Building 
131-09-W-129-001 Miscellaneous Utilities Phase 4
2009-15 Campus Landscaping and Irrigation 
1340 CNLV Detention Center Dormitories A, B, and F Roof Renovation 

09-0768-STR Federal Project No. AARA-0003(115), NDOT Project No. 60364
ALP NO. 3-32-0029-05 Resurface Unpaved Runways 
2009-16 UMC Lied Ambulatory Center Chiller Modifications 
B-1347 Parking Lot at Stanley and Bruce 
EM1 Emergency Buildings Paving 
Gabbs Sewer Improvement Project 
AIP NO 3-32-0002-10 Vault Generator Beatty Airport 
09-106 Construction Manager at Risk Boulder Highway 
07-M10 & 07-C07a Templifier & Heat Pumps Replacement / Concenser Water Pipe 
0012058 Fire Alarm Upgrade Durango High School 
0012047 Fire Alarm Upgrade Becker Middle School 
91-97-48-02B Schroeder Dam Decommissioning & Erosion 
C1300 Jean 3079 Zone Reservoir Addition 

#09-2171 Right Turn Stacking Lane Joe W Brown and Bel Air Drive 
M0165 Drill Piute Valley Monitoring Well PVM-1 
1348 Las Vegas Wash Trail Phase IV 
05-S03(S) Fire Alarm Facility Upgrade Southern Desert Correctional Center 
07.15431.05-DC Pavilion Pool Cover 
09-0486 West Charleston Storm Drains/Flood Control 
B601634 2009 Traffic Improvement Project - Phase 4B 

09.15341.09-LED Centennial Hills Park Added Improvements-Amphitheater Truss Footings 
07-C23(A) Off Site Improvements - Buchanan Boulevard Phase II
0012084 Fire Alarm Upgrade Las Vegas High School 
0012076 Fire Alarm Upgrade Greenspun  Middle School
0012082 Fire Alarm  Green Valley High School 
0012081 Fire Alarm Upgrade Cheyenne High School 
0012083 Fire Alarm Upgrade Walter Johnson Middle School 
0012085 Fire Alarm Upgrade O'Callaghan Middle School 
0012080 Fire Alarm Upgrade Thurman White Middle School 
1350 Fire Administration Building Emergency Generator and Enclosure 

B601643-09 Las Vegas Boulevard From Silverado Ranch Boulevard to Sunset Road 
B601642-09 Lower Duck Creek Detention Basin Offsite Improvements 

10.1730.05-DC Symphony Park Off-Site Electrical Conduit System 
Site Improvements Spring Valley State Park 

WPCF Dewatering Well Project 09.53541.03-LED 
Child Haven Family Services Campus Fence 
B601635-09 2009 Bus Stop Concrete Pad Repairs - Federal Funded 
09.1762.02-LED 2009 Asphalt Overlay Lamb Blvd from Charleston to Owens, Alexander
Rd 
131-09-ST-146-001 Green Valley Parkway-American Pacific ADA Ramp Improvements 
Stewart Avenue Sewer & Pavement Rehabiblitation & Beautification Phase 2
2009 Traffic Improvement Project - Phase 4C
Supply Type 2 Gravel on various projects
2009 Transportation Rebab Stimulus Project Phase 3 Volunteer Blvd
2009 Transportation Rebab Stimulus Project Phase 1 Green Valley Parkway
2009 Transporation Rehab Stimulus Project American Pacific Drive
Payne Substation, Overton Power District
Energy Retrofit CSMS #2, Nevada Army National Guard
Taxiway G Reconstruction 

Gym Floor Installation for Temp Structure Sandy Valley HS
North 5th Street Improvements Phase 1B Owens to Lake Mead Blvd
Landwell 2200 Sewer Interceptor Galleria Drive to Lake Mead Parkway 

Gabbs Recreation Hall - Phase I Foundation
WPCF Box Culvert Modification
B601645-09 Twain/Pecos-Mccleod Storm Drain 
B601646-09  Dening-Tunis Area Storm Drain At Duck Creek 
B601647-09 Cleveland Avenue From Walnut Road to Gateway Street 
B601648-09 Tropicana - Flamingo Wash Trails - Phase II

B601658-09 2009 Traffic Improvement Project - Phase 3 
Gabbs Mater Water Treatment Facility 
B601663-09 2009 Traffic Improvement Project - Phase 4A

10-042 Ace Gold Line Phase III Various Locations Along Las Vegas Boulevard and Warm 
601599-09 Supply and Install a Radio Communications System at the Clark County
Detention 
309 South Third Street Cooling Tower and Boiler Replacement 
WPCF Server Room HVAC System
RFP 601549-09 Upgraded Video Visitation System for the Clark County Detention Center 
Alamo Exploratory Drilling Project Drilling Exploratory Well
Bertha Howe Aevnue & John Deere Drive 
1354 Fire Station #54 Addition 

2009-27 Gabbs Recreation Hall - Phase II Erection 
Bird Viewing Preserve Access Driveway
RJC Air and Water Balance Modifications
Installation of Fire Hydrant at Portables
Academic & Student Services Building Electrical Revisions
Northwest Career & Technical Academy Access Road
ACE Express C-Line
Countywide Lamp & Ballast Replacement Clark Place Parking Garage
Countywide Playground ADA Safety Surfacing
Spring Mountain Youth Camp: Volleyball Pitt Turf Conversion
Stephanie Street Automotive Trailer Replacement

Campos Office & Parking Facility
Runway 9R-27L Safety Enhancements
Development Services Expansio: Security Camera Upgrades
Upgrade Truck Staging Area FETC
The Residence at Village Square, Affordable senior housing and commercial/retail
development

Calvada Administration Building
Phase 2 of 2009-436
Calvada Parking Lot




CWC-800 System Conveyance & Operations Program (SCOP)-"Hydropower Facilit (PR/
PGS)
CWC 1000 Reach 5 Outfall Diffusers 
080F 04 C1 Lake Mead Intake No. 3 - discharge Pipeline 
TS-0630 Laughlin WRF Aeration Piping Replacement and Laughlin 
TS-0640 Laughlin Lift Station No.2 Rehabilitation Project 
C1212 Sloan Zone Reservoir and 3205 Zone South Pumping Station 
2009-86-0016 Pittman Pecos Sewer Flood Protection Project 
0011861 HVAC School Modernization Charlotte Hill Elementary School 
0011873 HVAC School Modernization Dorothy Eisenberg Elementary School 
0011864 HVAC School Modernization  Helen Herr Elementary School 
011848 HVAC School Modernization Walter Jacobson Elementary School 
0011847 HVAC School Modernization Helen Jydstrup Elementary School 
BWSD Water Treatment Facility Treatment Facility
W0108 Las Vegas Vallely Groundwater Managmeent Program Miscellaneous Well 

Pittman Wash Sewer Relocation Valle Verde Drive to Sandwedge Channel 
 Las Vegas Co-Op Learning Center - Landscaping #0811-P163
Resevoior Rehabilitation Improvements Project R18 & $20
Cosmetology Lab
Hillside Dr. & Hafen Ln 2009 Overby Project

LV Wash-Middle Branch Rainbow Storm Drain Elkhorn to Grand Teton
Demolition of Tompkins Maintenance Facility
Installation of Fire Hydrant at Portables
Design/Build Water Pollution Control Facility
Lower Narrows & Homestead Weirs
DU Wetlands No.1 Weir
Bermuda 2745 Zone Plumbing Station Discharge Pipeline, Phase II
Goldfield Courthouse Rehabilitation Project
Gold Garage Expansion Joint Repair
Dual Left Turn Lanes Improvements
2009 Asphalt Overlay
Stewart Avenue Sewer & Pavement Rehabiblitation & Beautification Phase 2
Roof Replacement (Gymnasium & Cafeteria)
Campus Services Building & Classroom Building Complex Reroof Project
Intermediate Booster Station Upgrade
HVAC & Day Lighting at Gymnasium
Administration Fire Suppression
Terminal 1 Ticket Counter Conveyor Replacement
HVAC School Modernization @ Elaine Wynn ES
Development Services Expansion: Security Camera Upgrades
Indiana Springs Wastewatre Treatment System Upgrades
On-Call Pavement Patching & Misc Improvements
Bird Viewing Preserve Access Driveway

Automal Interchange Ramp Signals
Miscellaneous Utilities Phase 4
RMLT 13&14 Equestrian Park Trailhead
Neon Boneyard Park
Silverpeak Water Systems Improvements
Southwest Water Reclamation Facility Offsite Improvements
Wetlands Park Nature Center and Park Expansion
East Old Mill Road 2009- Overlay Project
Olsen Street Drainage Improvements
Laughlin Library Cooling Systems Replacement
Las Vegas Library Fire Alarm System Replacement
Lower Blue Diamond Detention Basin

Marshal's Locker Room Tenant Improvement for the Justice Facility

2009 Transportation Rehabilitation Stimulus Project Phase 3 Volunteer Blvd
2009 Transportation Rehabilitation Stimulus Project Phase 1 Green Valley Pkwy
2009 Transportation Rehabilitation Stimulus Project Phase 2 Americajn Pacific Dr
Valley View  Recreation Center Roof Replacement
Cosmetology Lab Expansion

Countywide Trash Enclosure Additions 601767
Big Bend Water District On-Call Services Contract 2009-2014 Phase II
CC 215 Bruce Woodbury Beltway Flamingo Rd Interchange Landscape B601762-09
Sunset Regional Park Improvements Phase 1A- Dog Park
Flamingo Road/Las Vegas Boulevard Pedestrian
Fire Station No. 20 601771
Heritage Park Campus Phase I- Dog Park 131-10-PR-135-001
Hollywood Regional Park Aquatic Center
Collection System Capacity Additions Package 1 TC-0643
Federal Stimulus- Street Rehabilitation 2009-B
Alamo Wastewater Treatment Facility Improvement Project
Pioche Upper Park Improvements
Collection System Capacity Additions Package 2  TS-0644
400 & 500 S. Main Strret Demolition
Erosion Remediation, High Desert State Prison
Alamo Wastewater Treatment Facility Improvement Project
Canyon Crest Blvd. And Horizon Blvd. Roadway Improvement Project BCP-09-04

Hotel Rio Drive Bridge Repair
2009 PRV Projects 
CNLV Detention Dormitory A Flooring Renovation
Blue Diamond Wash-Wigwam Avenue  B601789-09
Kell Lane Storm Nellis Boulevard To Lamont Street  B601787-09
Las Vegas Boulevard/Serene Avenue Storm Drain  B601786-09
Cactus Avenue and Rainbow Boulevard-Phase 1  B601785-09

Kitty Hawk Drive 2009 Overlay Project  09/10-7
MIA Roof Replacement- Central Terminal
Paving of Lola Lane
2009 Traffic Improvement Project- Phase 4A
2009 Traffic Improvement Project- Phase 3
Flamingo Arroyo Trail, Boulder Highway to Desert Inn Road
Fire Station No.22 
Countywide Playground ADA Surfacing  601707
Spring Mountain Youth Camp Volleyball Pitt Turf Coversion  601711
Stephanie Street Automotive Trailer Replacement
WRF Administration and Field Office Remodel
Gabbs Sewer Improvement Project
CCWRD Electrical Facilities Project Substation Construction
Miscellaneous Sanitary Sewer Protection Improvements Phase 1 & Phase 2
Pittman Wash Sewer Assessment Pilot Project
1346 Southeast Interceptor Phase 3 From Owens Ave/Pecos Rd to Lake Meade/Pecos
Kyle Canyon System Improvements-Lower Rainbow  C1270
Nevada State College-Elevator Installation 131-09-CM-026

Terminal 3 Passenger Loading Bridges
Pahrump Museum Addition
City Hall Roof Replacement
Stephanie Street Stimulus Project
Amargosa Mountain Bike Trail Plan
Goldfield Relining of Treatment Ponds Phase 2

Manhattan Water Piping
Sewer, Groundwater Monitoring, Well & Aeration
09-0768-STR Federal Project No. AARA-0003(115), NDOT Project No. 60364
2009 Asphalt Overlay, Rainbow Boulevard  09.1762.01-04LED
Imaging Suite Shielding
MPE StructureLab/Room 508
Sterile Processing Department Remodel
Tonopah Fire Station Metal Building
Fire Administration Emergency
Warm Springs Storage and Maintenance Building
Traffic Package 7A
Countywide Roof Replacement-Phase 1
Las Vegas Wash Trail Phase IV  #10198
Metro Substation At Eldora/Cimarron
Park Office/Cantact Station @ Kershaw-Ryan State Park
Amargosa Trailheads
Horizon Ridge PKWY-Jeffreys Street Traffic Signal
Metro Firearms Range
Replace Tennis Basketball Courts and Correct Drainage

Stimulus Package #3. Pulverize, Pave and Slurry Seal  B601822-09

Pulverize and Pave  B601-824-09

Pulverize and Pave  B601-825-09

County Fair Grounds: Plaza and Arena Concessions Remodel
Paneca Farmstead Association 2010 New Well

Electronic Door Access
West Flamingo Senior Center: HVAC Upgrades and Mold Mitigation

Terminal 3 Automated Transit System
WPCF Desert Inn Road Landscaping
North & South Environmental Enhancement Areas @ Floyd Lamb Park
BWSD Exploratory Drilling & Well Impr. Project
CMU Wall Repair
Central Freeway Channel Phase #2
Losee Road Improvements-Phase 2A
Site Security
Craig Ranch Maintenance Facility

Victory/Atlantic Sidewalk Ramps
Reed Whipple Center Fire Sprinkler Installation
Pulverize, Pave and Slurry Seal
Caliente Fire House Phase II Project, 2010 

Racetrack Raod Trail Crossing and Misc. Median Improvements
Parking Revenue Control System

2009 Annual Asphalt Overlay Bonanza (LV to Nellis)  and Maryland (Sahara to Stewart)
HVAC School Modernization @ Perkins ES
ADA Sidewalk Accessibility FY 09/10

Roof Replacement @ Valley High School
Public Works Administration- Engineering Remodel
New City Hall
Bird Viewing Preserve Onsite Improvements

Arts District Gateway

Humidifier Relocation
Corrosion Management Plan Phase 2 Bid Package 3

Cath Lab Remodel

Elkhorn Springs and Buffalo Drive Storm Drain System
Simmons Street Drainage Inpmrovements- Gowan Outfall
Water Bolstering Project Between North 5th & Donna Phase 11 Orr Ave & Barlett Ave
Kenny C. Guin Middle School
Roof Replacement for Plant/Boiler Room & Central Store/Warehouse
Amargosa Valley Science & Technology Park Pump House Electrical
Traffic Engineering Maintenance Improvements West Services Center CDL Lot
Cooling Tower Replacement Nevada State Veterans Home
Atrium Building Renovation
Sanitary Sewer Rehabilitation
Satellite C- Paradise Pad Ramp and Apron Reconstruction
Triangle Area Improvements
Duck Creek Drop Structure Near Nellis
Salvation Army Building Roof Recovering
Bus and Staff Parking and Quonset Hut Demolition
2009 Pavement Reconstruction Project- Survey
Buchanan Boulevard 
Major Street Rehabilitation FY 08/09
Enterprises Water Resource Center Site Development
Design Build of the UNLV Athletics Synthetic Turf
Desesrt Inn Deck
Serene Avenue Maryland Parkway To Spencer Street
Range Wash Channel Reconstruciton VI
Streetlight Modernization
Installation of Chillers
Henderson DMV Photovoltaic Installation
Enterprise Water Resource Center Site Development Package 1
HVAC Installation Clark County Armory
Tropical Breeze Park
Solar Covered Parking Bid Lot B Stupak Comm Center& Natural History Museum& Fire
Station #10
Whitney Library Roof Replacement
West Charleston Library Roof Replace
Replace Asphalt on Playground

Glendale Peak Communication Site Replacement

Regional Justice Center Sidewalk Repairs

Sandy Valley Communications Site Improvements
Clark County Detention Center North Tower Condenser Water Piping Replacement
Traffic Package 7
Lone Mountain Trail Pedestrain Bridges Cultural Corridor Trail Pedestrain Bridge Lone
Mountain Trail Ph. 2B
Lower Detention Basin of Las Vegas Wash-Wall Repair
North Hall Air Wall Replacement
Bigelow Physics Building Re-Roofing Project

Downtown Area Command
HVAC School Modernization/Selma F Bartlett ES
HVAC School Modernization/Patricia F Bendorf ES
HVAC School Modernization/Lilly and Wing Fong ES
Corrosiion Management Plan, Phase 2 Bid Package 4
Bonneville/Clark One-Way Couplet, Phase I
Main Street and Garces Traffic Signal
Cheyenne 2975 Zone Motor Operated Valves
CBC Chiller Re-Piping
Fire Station #50
Mob Museom Exhibit Fabrication 36697
Sunridge Heights/Coronado Center Traffic Signal
Horizon Ridge Pkwy/Mission Drive Traffit Signal
Horizon Ridge Pkwy/Jeffrey's Street Traffic Signal
Great Basin Drilling
Galleria Drive Street Improvements-Burns RD to Moser Dr
Arterial Reconstruction Program FY 2010
Anthem Pkwy Rehab-Reunion to Hampton
Miscellaneous Vaults, Reconstruction and Repair, Phase XVI
Searchlight Wells S-3 and S-4 Discharge Pipeline
Roof Replacement, Clark County Armory
2010 Annual Slurry Seal
Cooperative Extension Center Expansion


Sahara Ave Bus Rapid Transit-Construction Manager @ Risk
SCS Cooling Tower Project
VGT Airfield Improvements
Well #3 Replacement- Pump House & Transmission Line
Kiel Ranch Adobe Restoration
Elevator Modernization- 2040- Building
HVAC Modernization Jim Thorpe ES

HVAC Modernization Harriet Treem ES
Hidden Falls Park
Laughlin Regional Hearitage Greenway Tail
Searchlight Trails Improvements Phase 1
HVAC School Modernization Woolley ES
Courthouse Grid Tied Solar System
Silver Peak Tied Solar System
Replace Ashpalt of Playground Walter Long ES
Parking Lot Expansion, Henderson DMV
Traffic Signal System at Cameron Street and Hacienda Avenue
Concrete Flooring Paint/Coating Removal & Re-Sealing Women's Correctional Center
Beatty Ambulance Facility {hase 1 Metal Building
2010 Pavement & Parking Lots Identified Within The City of Henderson
Sandhill Owens Park and Trailhead
Cliff Shadows Parkway, Buckskin Avenue to Lone Mountain Road


Laughlin Transit Fueling Station
AWT Membrane & Ozonation Facilities Phase 1

Construction of Additional Parking, Fire Access and Fire Hydrant
Countywide Fire Station Security Improvements
50 KW Photovoltaic Solar Power System
Honeywell Energy System Upgrade
Roof Top Photovoltaic System @ Bailey Elementary School
Roof Top Photovoltaic System @ Dickens Elementary School
Roof Top Photovoltaic System @ Glyens Elementary School
Roof Top Photovoltaic System @ Roundy Elementary School
Roof Top Photovoltaic System @ Smalley Elementary School
City of Mesquite Fime Arts Center Modifications
Site "A" Dry Utility Installation
2010 Overlay Project Phase I
Nate Mack Elementary School HVAC Modernization
Andrew  Mitchell Elementary School HVAC Modernization
AWT Electrical Equipment Upgrade
Tropicana North Branch Detention Basin
Windmill Lane Durango Drive Sanitary Sewer Reconstruction
Asphalt Replacement
Covered Parking- Bid Lot East Las Vegas Community Center and All American Park
Pahranagat Valley Middle School
500 S. Main Street Parking garage
Solar Covered Parking- Bid Lot C2 Mirabelli Comm. Center, Veterans Memorial Comm. And
Ed Fountain Park
Solar Covered Parking- Bid Lot A Durango Hills Comm. Center and Cenntennial Comm.
Center
AWT Electrical Equipment Upgrade
Roof Top Photovotaic System @ Eileen Conners Elementary School
Roof Top Photovotaic System @ Robert L. Forbuss Elementary School
Roof Top Photovotaic System @ Judy and John L. Goolsby Elementary School
Roof Top Photovotaic System @ John R. Hummel Elemenatry School
Roof Top Photovotaic System @ William and Mary Scherkenbach Elementary School
Roof Top Photovotaic System @ Sandra Lee Thompson Elementary School
Northwest Career & Technical Academy
St. Rose Parkway Trail Phase II
HVAC School Modernization @ Dailey ES
HVAC School Modernization @ Kahre ES
HVAC School Modernization @ Edythe Katz ES
Roof Replacement
Roof Replacement @ Long ES
Roof Replacement @ Mendoza ES
Roof Replacement Sawyer MS
Roof Replacement @ Squires ES

Bunkerville 2009-Slurry Seal
Reunion Trails Park
Ranger Residence, Storage, Photovoltaic off  Grid Power and Site Improvements
HVAC School Modernization @ Mary & Zel Lowman ES
HVAC School Modernization @ Ernest May ES
HVAC School Modernization @ Ulis Newton ES
Desert Inn 3205 Zone Pumping Station Facility Improvements
Completion of Recreation Hall Phase 3
Roof Top Photovotaic System @ Kathy L. Batterman ES
Kay Carl ES
Don E. Hayden ES
Dr. Claude G. Perkins ES
Aldeane Comito Ries ES
Eva G. Simmons ES
Wendell P. Williams ES
Install Traffic Signal, Kyle Canyon Fire Station
Runway '15-33; Safety Enhancement
Burkholder Boulevard/Racetrack Road Traffic
2010 Pavement Main Fence Project Phase II
West Lobby, Restroom Renovation-CMAR
Clark Place Plate and Frame
Losee Road Sewer Line Phase 2A

Simkins Park Project
Solar PV Sytems
HVAC School Modernization @ Lunt ES
HVAC School Modernization @ Lynch ES
Gymnasium Bleacher Replacement @ Chaparral High 
Tropicana-Flamingo Wash Trail-Phase II   601921-10
ITS Communication Infrastructure Corridor 1A
Las Vegas Valley Water District-2010 On-Call Services Contract
Lower Flamingo Detention Basin and Tropicana/Deactur Park
Instructional Wall Upgrade @ James Gibson ES
VGT Airfield Improvements
Northern CC-215 Bruce Woodbury Beltway-North 5th Street Interchange
Boulder City RR Museum ADA Restrooms
Contract For Upgraded Video Visitation System for the Clark County Detention Center
Expand Parking Area @ Zel Lowman ES
Expand Parking and Install CMU Wall @ Lynch ES
Overton to Payne Foundations
Tropical Durango Park Phase 1&2
DJJS Recreation Area: Shade Structures and Basketball Courts Resurfacing
First ST. Beautification-Boulder Ave to Hoover Ave
Cooling Tower Replacement William S. Boyd School of Law
Miscellanous Improvements, Valley of Sire Visitor Center
Flamingo Boulder Highway North Sahara Ave. To Flamingo Wash
Las Vegas Wash Middle Branch Storm Drain Improvements Decatur Blvd. To Elkhorn Rd
Bus Turnout Project FY2005
Town Wash Conveyance, I-15 to the Virgin River
HVAC School Moderniaztion @ Mack Lyon ES
Decatur Blvd Street Rehabilitation-Additional Bus Turnouts Sahara Ave to Alta

CC 215 Beltway Improvements (Eastern Interchange Landscape)
On-Call Major Pavement Replacement Services
Asbestos Abatement and Demolition Stupak Center
Asbestos Abatement and Demolition Bonneville and Clark Connector
Silver Springs Park
Family Court 3rd Floor-Tenant Improvements
On-Call Minor Pavement Replacement Services
On-Call Concrete Replacement and Miscellaneous Services 
Advanced Clinical Training and Research Center, Parking Lot
Pahrump Chip Seal
Slurry Seal-Beatty/Amargosa
Type 2 Gravel-Pahrump
Morrell Park ADA Improvements
Nye County Detention Center-Pahrump
ADA Upgrades, DRC Building 1302
Theater Seating @ Valley High School
Bonanza Trail-Phase 2
Door Access Control Retrofits at City Facilities
UNLV Greenspun Building, Computer Room 1275 AC Units
Football Field Lighting Upgrade @ Basic High School
General market Bus Shelter Pad Construction/Assembly & Installation of Owner Provided
Bus Shelter
2010 On-Call Services for Electrical Power Distribution Equipment
site "A" Dry Utility Relocations
Integrated Bus Maintenance Facility (IBMF) Electronic Security Systems Upgrade
280 Water Street Building Remodel
Security Camera Systems Upgrades @ City Hall 
Polethylene Services Replacement, Laughlin-Phase II, Laughlin Estates
Annual Taffic Signal Maintenance
C-Gates Passenger Loading Bridge Relocation
NW Substation Project
Roof Replacement- A&B Concourses, Cluster Buildings & ARFF Station
Ann Road Special Improvement District
Traffic Signal System At Hualapai Way/Tropicana Ave
Vegas Valley Drive Sewer Rehabilitation
Football Field Turf Replacement @ Pahrump Valley High School
Gymnasium Bleacher Replacement @ Clark HS
RJC 3rd Floor Court Room & 4th Floor-Tenant Improvement
12 Playground Shade Covers @ Multiple Locations

Bus Shelters 2009
WRF Roof Replacement 
Metal Lockers @ Southeast Career and Technical Academy
Drill and Develop Searchlight Well No. S-4
Roof Replacement @ Halle Hewetson ES
Roof Replacement @ John Park ES
Roof Replacement @ Frank Garside MS
Roof Replacement @ Lomie Heard ES
LAN and Instructional Media Upgrade @ Bonanza HS
LAN and Instructional Media Upgrade @ Adams ES
ADA Access Bus Stop improvements
Spring  Mountain Youth Camp Dormitories
Sludge Dewatering Building Rehabilitation
Well control Building & Misc. Piping
HVAC Improvements @ North Las Vegas Airport
LAN and Instrusion Alarm Systems Upgrade
Amargosa Pedestrian Bride Over St. Rose Parkway
Street Light Efficiency Improvement Project 2010
Furnish and Install Telecommunications Infrastructure
2010-2011 Streetlight Knocked and Replacement Program

Bicentennial Park Restroom
Warm Springs Between Boulder Highway and Lake Mead Parkway
Eldorado Valley Regional Public Safety Training Facility Fencing
Pahrump Valley High School Addition and Remodel
Manse Elementary School (New Construction)
Goldfield Arsenic Treatment Project
CMAR Jones & Valley View  Corridor Improvements
Boiler Replacement, Southern Desert Correctional Center
2010 Arterial Reconstruction Program Phase 2
City of Henderson
Roof Replacement-West Las Vegas Library
Chuck Minker Sprinkler Installation
Buildings&Grounds Septic System-Phase 1 of Bldg Project
Building and Grounds Facility Erection and Concrete Work (Phase II)
Municipal Court Addition
Gabbs Exploratory Well
County parking Garage Structural Stabilization
11 shade Covers @ Multiple Locations
Annual Requirements Contract for Routine Electrical Services Countywide
Galleria Road Improvements Phase 3-Boulder Hwy  to Burns Rd
Furnish and Install Escalator Steps

Fencing State Land, North Las Vegas Readiness Center & Las Vegas Readiness Center
C-Gates Modernization Project
City of Henderson Council Chambers A/V Upgrades
Robert E. "Bob " Price Park
Coyote Springs Communication Tower Installation
Mountain Springs Communication Tower Installation
New Readiness Center
Lighting Retrofits @ Various Location- ARRA

Central Substation Replacement



CSN Lab Revision & Main Bldg. Fire Alarm
Countywide Contractor For On-Call Construction Services 602059




Indian Springs Wastewater Treatment System Upgrades
CWC-900 System Conveyance & Operations Program (SCOP)-"Reach 5 Pipline"
Enterprise Water Resousce Center Site Development Package 2
Upper Las Vegas Wash Trail Phase #2
Starr/Executive Airport/Volunteer/Via Inspirada
River Mountain Loop Trail Segent 14
McCarran Rent-A-Car Center Tile Replacement
Major Street Rehabilitation 
Theater Conversion/New Elevator @ Chaparral HS
VGT Apron Improvements
Roof Replacement @ Halle Hewetson ES
Roof Replacement @ John Park ES
Roof Replacement @ Frank Garside MS
Roof Replacement @ Lomie Heard ES
Roof Replacement @ Doriders ES
Roof Replacement @ Harris ES
Roof Replacement @ Tate ES
Roof Replacement @ Tomiyasu ES
LAN Upgrade @ Marc Kahre ES
LAN Upgrade @ Jack Dailey ES
LAN Upgrade @ Nate Mack ES
LAN Upgrade @ Ann Lynch ES
DU Wetlands No. 1 Weir
Cactus 2538 Zone Reservoir On-Site Improvements
LAN Upgrade @ Edythe & Lloyd Kats ES
LAN Upgrade @ Gwendolyn Woolley ES
North 5th Street Improvement, Phase 1C
IS Server Room Air Conditioning
Intrusion Alarm Upgrade
School Modernization @ Grant Bowler ES
Clock/Intercom System Replacement @ John Dooley ES
Clcok/Intercom System Replacment @ Clyde Cox ES
Temperature Controls Upgrade-Sahara DMV
Duck Creek Mountain Vista Street to Green Valley
WWTP No. 3 Decommission and Demolition Project-Phase 2
ADA Access Bus Stop improvements
Gowan Outfall, Lone Mountain Branch, Rancho Dr. to Decatur Blvd Lone Mtn. Rd from
Rancho to Decatur & Rancho from Lone Mtn. To Rainbow
Marion Street, vegas Valley Drive to Karen Ave
UNLV Potable Water System Improvements
                  note as of October 1, 2010



  $8,650,566.07     3/3/2009    05/21/09    5/22/2009
 $14,000,000.00    11/1/2008
$174,000,000.00    10/1/2008
 $20,000,000.00     6/1/2009                                                      Canceled 

$165,000,000.00     6/1/2009                                                      Canceled 

  $6,000,000.00     1/1/2009
 $30,000,000.00    10/1/2008                                                      Canceled 

                  10/15/2008                                                      Canceled 
  $3,519,600.00   10/16/2008    02/26/09    2/27/2009


                   12/6/2008                                                      Canceled 
  $3,062,986.89    4/23/2009    06/16/09    6/17/2009


                    3/1/2009



  $3,987,821.76    10/9/2008    11/18/08   11/20/2008    9/20/2009       11/3/2009 Completed
   $426,027.00    10/23/2008    11/18/08   11/20/2008        8/4/2009   10/21/2009 Completed
   $146,346.00     3/12/2009    05/05/09     5/6/2009   12/23/2009        1/6/2010 Completed
  $2,081,000.00    10/6/2008
  $2,306,660.00   12/11/2008    02/03/09    2/11/2009    1/14/2010                Completed
  $4,679,428.00     1/6/2009                                 7/8/2010    7/27/2010 Completed

  $6,116,355.00   10/14/2008    06/16/09    6/23/2009    3/11/2010       3/24/2010 Completed
 $12,875,372.00   12/18/2008    02/17/09     4/9/2009        9/8/2010     9/9/2010 Completed
                  10/27/2008                                                      Canceled 

 $31,000,000.00     3/1/2009
                  11/25/2008                                                      Canceled 

   $419,000.00      10/10/0/8   11/21/08    12/9/2008
                   10/1/2008                                                      Canceled 
 $20,000,000.00    12/1/2008
 $43,000,000.00    11/1/2008
 $14,000,000.00     1/1/2009
  $1,199,765.00   11/13/2008    01/05/09     1/7/2009    5/27/2010        8/3/2010 Completed
 $13,116,857.00   10/16/2008    11/05/08    11/7/2008        9/7/2010     9/8/2010 Completed

  $4,044,170.90   10/16/2008    11/19/08   11/19/2008     
   $768,328.00     6/18/2008    11/19/08    3/24/2009
   $327,850.00     10/1/2008    12/19/09    3/30/2009        5/7/2009    8/27/2009 Completed

   $203,422.67     10/1/2008    02/03/09    1/13/2009    9/23/2009       10/1/2009 Completed
 $59,000,000.00    2/26/2009


   $246,445.00    10/23/2008    11/13/08   12/12/2008
     $77,571.18   10/14/2008    10/28/08   10/28/2008
   $685,092.00    11/24/2009    01/05/10     1/6/2010
 $565,000.00     10/9/2008   11/05/08   11/17/2008
                                                                                 CC did not
                                                                                 Request Bid
                                                                                 # they
                                                                                 started
                                                                                 using it
                                                                                 Double PWP
$5,013,559.00   11/25/2008   12/16/08   12/19/2008
$5,013,559.00   12/18/2008   01/02/09     1/7/2009

 $100,000.00    11/21/2008   02/12/09     4/6/2009
$6,827,398.00    4/21/2009   06/16/09    6/23/2009       7/18/2010   8/26/2010 Completed
 $157,240.00    10/21/2008   12/02/08    12/2/2008    
  $80,080.00     10/8/2008   10/21/08    11/7/2008       9/21/2009   9/25/2009 Completed
 $195,990.00     3/23/2009   04/03/09    4/14/2009       6/25/2009   6/25/2009 Completed
 $115,400.00    10/15/2008   11/14/08   12/30/2008       1/15/2009   6/15/2009 Completed
$2,460,610.60   10/14/2008   10/21/08   10/21/2008       3/29/2009    5/8/2009 Completed
 $209,500.00    10/20/2008   11/04/08    11/7/2008
 $337,446.67     4/15/2009   05/04/09     5/5/2009

$4,591,497.60   10/20/2008   11/18/08   11/26/2008       9/15/2009   1/20/2010 Completed
$1,289,124.00   10/10/2008   11/05/08    11/7/2008        8/6/2009   10/8/2009 Completed
  $89,902.00     10/2/2008   10/22/08   10/27/2008       3/31/2009   4/13/2009
                  1/1/2008
 $317,500.00     10/9/2008   11/20/08    12/9/2008
 $237,180.85     10/1/2008   11/18/08    11/3/2008       7/20/2009   7/28/2009 Completed
  $42,470.00    10/30/2008   11/10/08    12/9/2008
$8,802,727.00    1/15/2009   02/17/09     2/3/2009
$1,765,610.00   11/12/2008   04/12/09    12/9/2008
$1,739,000.00   11/12/2008   04/12/09    12/9/2008
$1,334,342.92   10/23/2008   10/30/09   10/30/2009       7/25/2009   11/5/2009 Completed
$1,824,348.06    11/1/2008   08/18/09    8/19/2009       5/19/2010   5/17/2010 Completed



$4,000,000.00    10/5/2008   11/14/08     2/5/2009
                  6/1/2009                                                       Canceled 
$1,443,443.00   10/29/2008   11/06/08   11/24/2008
$3,581,660.00   12/17/2008   10/07/09   12/15/2009
                10/29/2008                                                       Canceled 
$2,198,000.00    12/3/2008   01/08/09   12/12/2008
$1,596,308.00   12/22/2008   02/03/09    2/11/2009        5/8/2008   4/26/2010 Completed
 $689,000.00    11/12/2008   12/11/08   12/12/2008
  $40,400.00    10/30/2008   11/10/08    11/7/2008
 $960,103.60     4/23/2009   05/22/09    5/27/2009       7/12/2010   7/14/2010 Completed
                11/13/2008
 $416,200.00      7/2/2009   07/22/09    8/11/2009       8/30/2010    9/1/2010 Completed
 $262,777.00     11/3/2008   01/20/09 01/21/009           6/8/2009   8/21/2009 Completed
                 11/3/2008                                                       Canceled 
                10/30/2008                                                       Canceled 
  $97,083.00     1/21/2009   02/25/09    4/16/2009
$5,499,090.00    1/22/2009   02/18/09    2/19/2009
$1,815,525.00   10/16/2008   11/04/08    11/5/2008       7/29/2009   8/12/2009 Completed
                11/25/2008                                                       Canceled 
                  9/1/2008                                                       Canceled 

$4,319,454.00   10/14/2008   01/06/09    3/31/2009
 $869,700.00     2/12/2009   03/12/09    3/13/2009
   $376,000.00     6/17/2008   05/14/09    5/15/2009
     $97,300.00   10/22/2008   01/14/09    1/21/2009
   $355,000.00    11/19/2008   03/12/09    3/13/2009
   $388,722.00     12/4/2008   12/17/08   12/19/2008
   $249,500.00    11/13/2008   11/21/08   11/21/2008

  $1,055,000.00   12/15/2008   01/20/09    1/22/2009    9/25/2009   11/25/2009 Completed
   $695,576.00     11/7/2008   11/25/08    6/17/2009    4/13/2009    6/15/2009 Completed

$116,820,814.40    1/29/2009   07/21/09    7/29/2009
   $538,470.00    11/14/2008   11/20/08   11/24/2008
   $132,000.00    11/26/2008   01/08/09     1/9/2009
                   11/3/2008
  $2,734,291.00   12/10/2008   01/07/09     1/7/2009
   $194,920.76    12/15/2008   01/07/09     1/8/2009
                   2/11/2009                                                  Canceled 
  $1,180,000.00    12/9/2008   12/22/08     1/9/2009    7/27/2009    9/14/2009 Completed
  $6,000,000.00    1/26/2009   01/29/09     2/5/2009

 $40,974,566.71   12/18/2008   02/18/09    2/18/2009
  $1,740,415.00     1/6/2009   02/03/09     2/5/2009   12/22/2009     8/3/2010 Completed
   $730,000.00      1/7/2009
   $332,000.00    11/20/2008   01/07/09     2/5/2009
   $573,121.00    12/18/2008   01/13/09    1/14/2009   10/27/2009    1/26/2010 Completed
  $5,444,828.15     3/5/2009   04/15/09    7/31/2009
   $216,428.00    12/10/2008   12/26/08     1/5/2009    3/25/2009     4/5/2010 Completed
   $105,500.00    12/10/2008   12/26/08     1/5/2009     4/7/2009     4/5/2010 Completed
 $14,913,728.00     1/8/2009   03/06/09    3/10/2009
 $10,050,947.55     1/8/2009   05/05/09     5/8/2009
  $1,293,285.00   11/12/2008   12/16/08     2/3/2009     1/4/2010    4/27/2010 Completed
   $194,510.00    12/29/2008   02/03/09     2/6/2009
   $210,000.00    12/30/2008   01/22/09    1/23/2009     2/2/2009    9/24/2009 Completed

 $12,000,000.00    1/14/2009

  $2,673,681.04    4/14/2009   06/02/09    6/17/2009
   $302,060.00      1/8/2009   01/21/09    1/27/2009    6/10/2009     8/5/2009 Completed

   $475,033.15     2/11/2009   05/19/09    6/17/2009
                   6/17/2009                                                  Canceled

                   6/16/2009                                                  Canceled
                   1/15/2009                                                  Canceled 
                   12/1/2008
   $408,819.96    12/30/2008   01/22/09    1/23/2009     8/7/2009     1/7/2010 Completed
   $182,000.00    12/19/2008   03/09/09    3/11/2009     7/7/2009    8/28/2009 Completed
   $596,062.00    12/19/2008   03/26/09    3/23/2009    11/6/2009     3/1/2010 Completed
                    1/7/2009
   $989,980.00     3/25/2009   06/02/09     6/5/2009
   $685,000.00    12/16/2008   01/22/09    1/26/2009
                   12/1/2008                                                  Canceled 
 $11,512,000.00     2/5/2009   07/01/09     7/9/2009

 $10,524,951.24   12/30/2008   04/07/09    4/10/2009
   $835,110.00     10/9/2008   11/12/08   11/19/2008    5/12/2009     8/5/2009 Completed
   $199,952.00    12/18/2008   12/30/08     2/3/2009     5/1/2009    5/18/2009 Completed
   $168,687.03      1/8/2009   02/10/09    2/11/2009    11/5/2009    12/3/2009 Completed
   $919,544.00     1/27/2009   02/23/09    2/25/2009    9/23/2009    1/27/2010 Completed
     $669,765.12      8/1/2008   11/03/09    11/2/2009    6/18/2010    7/22/2010 Completed
   $1,864,294.30      1/1/2009   05/05/09     6/8/2009
   $1,050,505.00     10/6/2008   01/13/09    1/21/2009   12/18/2009   12/29/2009 Completed
  $10,000,000.00     12/1/2008   07/13/09
     $430,294.30     12/1/2008   01/12/09    1/13/2009     8/4/2009    9/28/2009 Completed
     $130,625.00    12/22/2008   01/02/09     1/6/2009
   $4,168,138.00     2/12/2009   04/23/09    4/24/2009
     $169,600.00      2/3/2009   02/17/09    3/24/2009


   $4,884,795.00      7/6/2009   08/04/09    8/11/2009

     $886,288.00    12/30/2008   09/28/09    9/28/2009
   $5,613,000.00     1/29/2009   06/01/09     6/2/2009
     $264,430.00    12/16/2008   01/08/09     2/5/2009
                      1/1/2009                                                  Canceled 
   $3,215,000.00      2/5/2009   02/12/09    2/13/2009
   $2,959,000.00      2/5/2009   02/12/09    2/13/2009
                     1/15/2009                                                  Canceled 
                      6/1/2009
     $172,565.00     1/15/2009   02/10/09    2/11/2009    8/11/2009    8/19/2009 Completed

     $100,000.00      8/1/2009
     $100,000.00      9/1/2009
  $14,739,086.00      7/1/2009   08/04/09    8/11/2009
   $2,424,000.00     1/16/2009   02/12/09    2/13/2009
   $3,768,848.00     1/29/2009   04/14/09    3/30/2009    4/15/2010     8/5/2010 Completed
                     3/19/2009                                                 Canceled 
     $723,462.87     1/22/2009   02/03/09     2/3/2009     3/2/2009  5/25/2010 Completed
     $447,447.00     3/18/2009   04/04/09    4/20/2009    8/18/2009 10/21/2009 Completed
                      1/8/2009                                                 Caneled 

                     6/15/2009
     $426,920.00     1/20/2008   02/09/09    3/24/2009
                     3/19/2009                                                  Canceled 
   $5,600,000.00     5/14/2009
                         24/08                                                  Canceled 

      $80,642.84     1/23/2009   02/03/09     2/6/2009
                     1/16/2009
   $2,019,784.50     2/19/2009   04/01/09     4/2/2009
   $3,599,000.00     1/23/2009   02/12/09    2/13/2009


   $3,100,000.00      2/2/2009
   $6,000,000.00      9/1/2008

     $130,000.00      1/1/2009                                                  Canceled 

     $293,119.00     4/16/2009   10/08/09   10/12/2009    4/13/2010     5/3/2010 Completed
  $10,000,000.00     12/1/2008                                                  Canceled 

   $1,073,836.86     2/19/2009   04/07/09     4/8/2009
$1,341,900,000.00    1/30/2009   03/03/09     6/1/2009
     $257,938.00     2/24/2009   03/18/09    3/19/2009    8/13/2009    12/4/2009 Completed
      $58,014.00     2/13/2009
     $944,524.00     3/26/2009   04/06/09    6/22/2009

     $996,987.50     2/19/2009   03/17/09    3/19/2009   10/27/2009   11/16/2009 Completed
     $780,500.00     3/16/2009   04/21/09    4/23/2009    12/6/2009   10/29/2009 Completed
   $96,000.00      2/5/2009   02/24/09    2/25/2009
$21,228,451.00     7/9/2009   08/04/09    8/13/2009
                   2/3/2009                                                       Canceled 
  $469,962.00     2/17/2009   02/27/09     3/4/2009

  $500,000.00     2/12/2009   03/05/08     3/9/2009      8/25/2009     2/2/2010 Completed
 $3,100,152.00    2/19/2009   03/17/09    3/19/2009      4/16/2010    7/12/2010 Completed
$29,000,000.00    2/17/2009   04/21/09     5/7/2009
   $30,000.00     11/4/2010
  $237,535.00     1/27/2009   02/05/09    2/25/2009       5/5/2009    6/30/2009 Completed
  $188,184.00      2/5/2009   02/24/09     4/7/2009      5/15/2009     6/4/2009 Completed
  $795,700.00      2/5/2009   02/24/09     4/7/2009
  $234,850.00     2/10/2009   02/26/09    2/27/2009      4/29/2010    5/14/2010 Completed
  $494,000.00     2/24/2009   03/23/09     6/2/2009
  $433,525.60     2/25/2009   03/24/09     6/2/2009

 $8,720,628.00     3/5/2009   04/15/09    4/15/2009
  $215,000.00      2/1/2009   03/17/09    5/20/2009      6/30/2009    12/4/2009 Completed
  $760,000.00     3/11/2009   04/15/09    5/15/2009                               Canceled 
  $177,837.00     2/12/2009   03/03/09

  $130,295.00     2/26/2009   04/07/09    4/10/2009      9/17/2009   10/23/2009 Completed
   $87,695.22     2/27/2009   03/23/09     4/7/2009       9/6/2009   10/19/2009 Completed
  $165,860.00     2/24/2009   03/17/09    3/31/2009

 $4,500,000.00     4/1/2009   07/21/09    7/22/2009      5/23/2010     6/8/2010 Completed
  $246,445.00    10/13/2008   11/13/08     4/6/2009
 $1,000,000.00    3/31/2009
$11,124,572.00     4/7/2009   08/13/09    10/5/2009
$11,200,000.00    4/28/2009
  $462,654.65     2/25/2009
  $723,999.00      3/5/2009   03/16/09    3/18/2009      7/23/2009    7/28/2009
 $3,864,954.56    3/12/2009   10/06/09   10/21/2009
 $1,788,000.00    2/25/2009   09/01/09     9/3/2009       1/6/2010    1/20/2010 Completed
$20,500,000.00    4/14/2009   05/20/09    7/31/2009
   $50,213.20      3/3/2009                                                       Canceled 



 $1,640,749.10     4/6/2009   04/13/09    4/14/2009     10/27/2009    11/3/2009 Completed
  $120,500.00     2/24/2009   03/17/09    3/26/2009
 $1,045,540.00    2/25/2009   04/01/09     4/5/2009

  $639,900.00     3/10/2009   03/26/09    3/27/2009

$16,590,000.00    5/13/2009   07/02/09     7/2/2009
$14,122,700.00     5/6/2009   08/27/09    8/28/2009
  $668,197.00     3/25/2009   04/02/09     4/3/2009  
  $941,000.00     3/19/2009   04/23/09    4/24/2009      5/20/2010    6/21/2010 Completed
  $368,401.00      3/6/2009   04/02/09     4/3/2009

$17,894,000.00    4/22/2009   07/02/09     7/2/2009
$14,063,000.00    4/29/2009   07/02/09     7/2/2009
  $611,573.80     3/17/2009   04/14/09    5/12/2009
  $844,194.00      4/3/2009   04/02/09     3/3/2009

                   3/1/2009                                                       Canceled 
  $844,207.32      7/9/2009   08/04/09     8/5/2009     12/15/2009   12/23/2009 Completed
  $274,715.15     3/5/2009   03/24/09     4/7/2009     5/5/2009    5/11/2009 Completed
$14,000,000.00    8/4/2009
  $357,553.00    4/22/2009   06/16/09     7/9/2009    4/10/2010    4/27/2010 Completed
 $6,182,370.00    6/4/2009   07/07/09    7/22/2009
 $1,877,124.34   4/23/2009   08/04/08     8/6/2009     7/2/2010    7/12/2010 Completed
$10,434,675.53    4/9/2009   10/06/09   10/12/2009
 $3,532,752.00   5/13/2009   06/16/09    6/22/2009
  $121,300.00     4/2/2009   06/02/09   11/16/2009    9/25/2009   11/16/2009 Completed
  $573,546.00     4/7/2009   04/29/09    4/30/2009
$90,421,173.00   4/16/2009   05/20/09    9/21/2009
  $275,980.00    4/21/2009   09/10/09    9/17/2009


  $597,737.00     4/9/2009   04/28/09    4/29/2009
  $406,850.00    5/21/2009   06/08/09    6/15/2009     9/7/2010     9/8/2010 Completed
$20,175,000.00   5/14/2009   05/21/09    5/22/2009
  $540,041.00    4/22/2009   09/14/09    9/17/2009    3/16/2010    6/29/2010 Completed
  $550,000.00    4/28/2009
  $248,429.00     5/7/2009   06/16/09     7/9/2009   10/27/2009     4/7/2010 Completed
 $1,000,000.00    4/6/2009   04/01/09    6/19/2009
  $700,000.00     8/1/2009
  $978,444.72     5/1/2009   06/04/09   10/26/2009
  $143,490.00     4/7/2009   09/10/09   11/13/2009

 $1,119,191.68    5/8/2009   06/02/09     6/5/2009    8/21/2009    9/25/2009 Completed
 $1,239,445.00    5/8/2009   06/02/09     6/4/2009
$32,340,803.00    5/6/2009   06/11/09    6/16/2009
  $706,485.00     4/3/2009   04/23/09    4/24/2009
   $61,379.00    3/30/2009                                                  Canceled 
  $172,480.00     3/3/2009   03/23/09    4/24/2009
  $164,600.00     3/3/2009   04/23/09    4/24/2009
  $162,051.00     3/3/2009   04/23/09    4/24/2009    6/24/2009     7/9/2009 Completed
 $2,325,460.00   4/23/2009   07/07/09     7/3/2009     9/7/2010     9/8/2010 Completed
                 3/23/2009                                                  Canceled 
                 7/31/2009
                  4/2/2009                                                  Canceled 
                 4/22/2009                                                  Canceled 
$17,041,930.51   3/16/2009   03/03/09    6/17/2009
  $110,294.00    4/14/2009   05/06/09     5/6/2009    8/11/2009   10/26/2009 Completed
   $95,000.00     4/7/2009   04/08/09     5/6/2009    8/10/2009    8/17/2009 Completed
  $150,051.00    4/10/2009   06/02/09     6/5/2009    9/21/2009    9/25/2009 Completed
  $142,404.00    4/29/2009   05/15/09    5/21/2009

  $122,205.00    4/14/2009   05/20/09    7/31/2009    9/22/2009   12/15/2009 Completed
                 4/14/2009
                 5/18/2009
 $4,000,000.00    6/3/2009
  $248,380.00     5/4/2009   06/02/09     6/5/2009
  $182,840.00    4/17/2009   05/14/09    5/15/2009    6/30/2009     7/9/2009  Completed
 $3,650,000.00   4/14/2009   07/15/09    7/15/2009
   $65,320.00     4/7/2009   04/07/09     4/8/2009
                 4/15/2009                                                  Canceled 
   $88,000.00    4/29/2009   05/27/09    5/27/2009
  $204,878.50     4/9/2009   04/28/09    4/29/2009   11/10/2009   11/23/2009 Completed
  $846,885.00    4/29/2009   08/18/09    8/27/2009
 $1,087,643.00   4/29/2009
     $56,376.23     4/1/2009   06/16/09    6/15/2009     2/1/2010    4/29/2010 Completed
   $113,000.00     5/13/2009   05/21/09    5/22/2009

   $778,742.64     4/30/2009   05/26/09    5/28/2009    3/23/2010    4/20/2010 Completed

  $2,547,865.00     6/3/2009   12/02/09   12/15/2009
 $42,300,000.00     5/7/2009   05/21/09    5/22/2009
 $13,174,507.00    5/14/2009   07/07/09    8/31/2009
  $2,741,000.00     7/8/2009   08/04/09    8/11/2009
                   6/15/2009                                                  Canceled 
   $694,952.47     5/12/2009   06/09/09     6/9/2009
   $755,559.69      6/1/2009   06/02/09     6/2/2009    12/7/2009   12/22/2009 Completed
                   5/20/2009
   $136,556.30     5/18/2009   06/16/09    6/19/2008
     $70,000.00     5/7/2009                                                  Canceled 
 $12,954,811.00     5/1/2009   10/06/09   10/12/2009
   $500,000.00      6/2/2009
   $174,338.00     6/16/2009   07/07/09   11/16/2009

   $575,000.00      6/3/2009   06/09/09    8/20/2009
  $2,064,915.69    2/13/2009   03/03/09    4/22/2009     9/4/2009    4/29/2010 Completed
   $383,100.00     5/28/2009   06/09/09    6/10/2009     2/2/2010     2/2/2010 Completed
     $78,600.00     5/1/2009   06/01/09                 2/17/2010    2/26/2010 Completed
$245,980,000.00   12/27/2007   05/06/09     5/7/2009

   $219,700.00      6/1/2009   07/21/09    8/27/2009
  $1,342,273.00    3/27/2009   05/01/09     5/4/2009

   $249,948.44     6/10/2009   09/02/09   12/15/2009
                    6/1/2009
                   5/27/2009                                                  Canceled

   $119,900.00     5/29/2009   06/26/09    6/26/2009    10/9/2009    12/1/2009 Completed
   $361,012.00     5/29/2009   06/30/09     7/9/2009   11/19/2009   12/14/2009 Completed
  $1,856,277.10     6/1/2009   08/05/09    8/25/2009
     $96,245.00    6/15/2009   09/04/09   11/17/2009

   $256,953.32     5/21/2009   06/25/09     7/6/2009    9/23/2009    9/28/2009 Completed
   $120,000.00      6/1/2009                                                  Canceled 
  $1,400,000.00    5/21/2009   09/02/09   11/18/2009     2/5/2010    7/27/2010 Completed
                   5/26/2009
 $10,982,831.50     9/3/2009   10/21/09   10/22/2009
                   3/24/2009                                                  Canceled 
  $2,598,530.00     7/8/2009   07/23/09    7/29/2009
   $141,969.00     6/23/2009   07/01/09     7/2/2009
   $908,852.00     6/18/2009   06/25/09    6/26/2009
     $85,240.00     7/6/2009   08/18/09   12/10/2009
   $426,012.65      6/8/2009   06/18/09   12/10/2009
   $201,300.00      7/6/2009   08/18/09   12/10/2009
   $296,911.00      6/1/2009   06/10/09   11/16/2009

   $219,450.00     6/11/2009   07/07/09    7/10/2009    9/15/2009   10/12/2009 Completed

   $313,200.00      6/5/2009   06/25/09    6/26/2009
   $560,000.00      6/5/2009   06/25/09    6/26/2009
  $2,633,086.78    6/16/2009   08/04/09   12/11/2009
                   7/21/2009                                                  Canceled 
   $699,500.00      7/9/2009   09/09/09    9/17/2009
                  6/1/2009                                 9/8/2009     9/9/2009 Canceled
 $3,351,790.00   8/13/2009    08/25/09       8/25/2009
  $297,880.00    6/30/2009    07/24/09          
                  6/1/2009
  $165,167.12    6/25/2009    07/23/09      11/13/2009
 $2,250,000.00   6/25/2009
 $4,983,756.00   6/24/2009    07/09/09       7/10/2009

 $1,135,263.35   7/17/2009    10/21/09      11/18/2009
  $397,270.00    6/25/2009    09/15/09       9/29/2009
                  8/3/2009
  $192,500.00    6/18/2009    06/25/09       9/17/2009     9/4/2009    11/9/2009 Completed

  $125,000.00     7/2/2009
   $25,463.81    6/22/2009


  $182,580.00     7/8/2009    07/24/09       7/29/2009    10/6/2009    10/6/2009 Completed
$10,914,123.00   8/20/2009    11/04/09      11/18/2009
                 8/20/2009
 $6,493,970.00   8/20/2009    10/21/09      11/18/2009
$23,000,000.00   7/22/2009    08/25/09       8/25/2009
  $139,400.00    7/15/2009    08/03/09       8/10/2009   10/31/2009     2/1/2010 Completed
                  7/1/2009
  $275,000.00     7/1/2009    08/24/09       8/24/2009   10/13/2009   10/23/2009 Completed
  $180,800.00     7/7/2009    08/19/09      12/15/2009

                 9/17/2009
  $113,007.00     7/1/2009    08/19/09      10/26/2009
  $150,000.00     7/1/2009    08/17/09       8/17/2009
  $280,000.00     7/1/2009               
  $103,815.00    7/10/2009    08/12/09       8/13/2009
                 7/31/2009
   $70,000.00     7/1/2009    08/12/09       8/14/2009
  $749,400.00     9/8/2009    10/08/09      10/15/2009
 $2,526,089.00   7/27/2009    07/28/09        8/3/2009     8/5/2010    8/20/2010 Completed
  $154,400.00    7/15/2009    07/23/09       7/29/2009
  $122,900.00    7/15/2009    07/23/09       7/29/2009
  $900,000.00     8/6/2009
  $521,575.00    8/12/2009   09/09/209        1/3/1900

  $119,700.00     6/4/2009    08/11/09      10/14/2009
  $143,150.00    7/22/2009    08/18/09       9/17/2009
                 8/20/2009
  $490,857.00     8/4/2009    08/26/09        9/1/2009
 $3,486,000.00   7/16/2009    09/16/09       10/2/2009
 $1,000,000.00   7/10/2009    07/10/08       7/24/2009                          Canceled 
  $827,118.00    7/24/2009    08/18/09       8/27/2009    4/13/2010     5/6/2010 Completed

                 7/16/2009                                                      Canceled
  $213,073.80    7/30/2009    08/06/09       8/12/2009
  $350,000.00     8/6/2009
  $350,000.00    8/20/2009
  $350,000.00     8/6/2009
  $350,000.00     8/6/2009
  $136,000.00    8/20/2009    08/27/09       8/28/2009
  $136,000.00    8/20/2009    08/27/09       8/28/2009
  $136,000.00    8/20/2009    08/27/09       8/28/2009
                 7/29/2009

 $5,629,795.00    9/1/2009   05/04/10          5/7/2010
  $261,587.25     9/1/2009   10/06/09        10/12/2009   4/23/2010   4/22/2010 Completed

 $1,581,282.00   8/18/2009   09/19/09        11/16/2009
  $138,762.30     8/1/2009   08/17/09         8/17/2009   11/6/2009   11/6/2009 Completed

 $1,565,300.01   7/28/2009   11/04/09         11/4/2009
  $120,000.00     7/1/2009   08/31/09          9/1/2009
  $264,244.00     9/1/2009   10/20/09        10/22/2009   3/10/2010   3/17/2010 Completed

                  8/4/2009
  $332,993.32     8/1/2009   08/18/09         8/19/2009   3/23/2010    4/7/2010 Completed
                 8/24/2009
  $329,500.00     8/1/2009   10/06/09        10/16/2009   6/16/2010   6/21/2010 Completed
  $432,000.00    7/31/2009   08/18/09         9/14/2009
                  8/1/2009
                  8/1/2009
                  8/1/2009
  $250,000.00    8/27/2009
  $390,000.00     8/6/2009   10/14/09        10/22/2009
$11,870,000.00   9/15/2009   10/06/09        10/14/2009
                                                                               Part of 2008-
   $74,000.00    7/27/2009                                                     482
$12,000,000.00   9/16/2009
 $2,302,849.55   6/24/2009   07/21/09         7/22/2009
                                                                               Part of NY-
  $120,000.00    2/13/2009   03/17/09         7/22/2009                        2009-420
  $177,773.00    8/12/2009   09/28/09         9/28/2009
  $691,425.00     9/1/2009   04/04/10          4/5/2010
                  9/1/2009
  $126,912.00     9/1/2009   11/03/09        11/12/2009    3/4/2010    3/8/2010 Completed
                  9/1/2009


                  9/1/2009
  $455,777.00     9/1/2009   09/09/09        12/11/2009
                  9/1/2009

  $900,000.00    8/25/2009

  $150,000.00     8/6/2009   08/20/09         8/28/2009
  $628,554.32     9/1/2009   09/23/09         9/30/2009
  $125,000.00    8/25/2009                
                  6/9/2009
  $195,750.00     8/1/2009   08/28/09        11/17/2009
 $1,250,000.00   6/22/2009
  $550,000.00    9/10/2009              
                                                                               Part of NY-
   $12,500.00    9/18/2009   10/06/09        11/13/2009                        2009-403
  $485,706.00     9/1/2009
  $256,000.00     9/1/2009
                 9/22/2009
  $181,657.11    8/19/2009   08/19/09          9/9/2009   3/16/2010   3/17/2010 Completed
  $263,252.00    9/16/2009   09/24/09         9/28/2009
  $250,000.00    9/28/2009
                        9/1/2009
                        9/1/2009
                        9/1/2009
                        9/1/2009

       $231,210.00      9/1/2009    09/09/09    9/10/2009
      $1,537,976.00     6/2/2009    06/23/09    9/17/2009
       $320,000.00      9/1/2009
       $249,962.00      5/2/2009    07/20/09    9/24/2009

     $52,382,769.00   11/13/2008    05/27/09   10/14/2009
                                                                                   Per Keith to
      $1,431,584.00     9/1/2009    08/18/09    3/17/2010                          back date 
         $45,000.00     4/2/2010
         $45,900.00     6/8/2010   6/29/2010     7/6/2010
$3,279,010,673.68



     $39,000,000.00     1/1/2010
    $165,000,000.00     3/1/2010
     $23,000,000.00    12/8/2009
      $6,975,000.00     7/6/2010    09/07/10    9/13/2010
      $8,000,000.00     7/6/2010
     $19,000,000.00    11/3/2009
       $360,000.00    12/15/2009
      $2,498,620.00     1/6/2010    04/22/10    4/23/2010
      $2,579,710.00     1/6/2010    04/22/10    4/23/2010
      $4,721,000.00    1/20/2010
      $2,339,900.00    1/20/2010    05/13/10    5/14/2010
      $4,395,000.00    1/20/2010    05/13/10    5/14/2010
      $1,233,658.00     1/1/2010    01/28/10     2/9/2010
       $317,350.00    10/15/2009    12/22/09   12/24/2009

      $1,535,477.00   10/29/2009    01/05/10     1/6/2010
      $1,094,573.00    10/8/2009    11/03/09    12/4/2009
       $773,176.00     12/1/2009    12/01/09    12/2/2009      6/5/2010   6/17/2010 Completed
                      11/13/2009
       $806,188.89      9/1/2009                 3/1/2010     2/26/2010    3/1/2010 Completed

      $7,351,023.85    9/29/2009    11/18/09   11/19/2009
      $1,200,000.00    9/22/2009
                       9/22/2009
     $19,754,695.87    5/26/2009    07/21/10    7/28/2010
      $9,232,232.00    11/3/2009    11/19/09   11/19/2009
      $5,600,000.00    5/14/2009
      $9,000,000.00   12/22/2009
       $225,000.00     10/6/2009
       $150,000.00     10/6/2009
      $1,030,000.00    12/3/2009
      $3,374,500.00    10/1/2009    12/02/09    12/2/2009
      $3,200,000.00    10/1/2009
       $288,989.00     10/7/2009    02/11/10    2/12/2010
       $372,374.00     10/5/2009    10/10/09    2/18/2010     4/20/2010   5/10/2010 Completed
       $600,000.00    10/28/2009
       $588,000.00     10/7/2009    11/18/09   11/18/2009
       $306,671.00    10/23/2009
 $3,142,300.00     2/3/2010   04/06/10      4/22/2010
 $2,957,595.00                04/22/10      4/23/2010
  $275,000.00      9/1/2009   11/30/09     12/23/2009
 $2,534,147.60   11/19/2009   01/05/10       1/8/2010
  $433,435.00     10/1/2009   01/19/10     12/29/2009
  $485,706.00     10/1/2009

                  10/1/2009
  $120,000.00     11/1/2009
   1360257.81     12/1/2009   01/20/10      1/20/2010
 $1,884,209.60   10/26/2009   12/16/09     12/16/2009
  $105,000.00     12/8/2009
$11,600,000.00     4/1/2010
$15,236,879.00    11/1/2009   05/04/10       5/3/2010
  $145,000.00    10/22/2009
   $91,700.00     10/1/2009
  $369,135.00     10/2/2009   11/19/09      12/1/2009       3/16/2010       7/13/2010 Completed
  $138,500.00    10/28/2009   12/07/09      12/8/2009        3/9/2010       6/18/2010 Completed
 $2,534,147.60    10/1/2009   01/05/10       1/8/2010

   $99,852.00     11/5/2009   12/01/09     12/11/2009


  $845,910.00     12/1/2009
 $4,346,777.50    12/1/2009
  $696,514.00     12/1/2009   01/12/10      1/12/2010
  $118,835.00    11/24/2009   01/06/10       1/7/2010
  $441,854.00    11/16/2009   12/10/09     12/11/2009

                  11/1/2009
  $250,000.00    11/24/2009
  $902,140.37    11/19/2009   04/06/10      4/12/2010
  $389,553.00    11/18/2009   04/06/10       4/9/2010
  $140,700.00     12/1/2009   02/16/10      2/19/2010
 $3,929,809.00    12/1/2009   02/16/10      2/19/2010
 $1,630,000.00    11/1/2009
$13,199,472.00    12/1/2009   02/16/10      2/19/2010
 $6,000,000.00     2/1/2010
 $2,547,865.00    2/15/2010   12/02/09      9/16/2010
  $850,000.00     12/1/2009
  $800,000.00     12/1/2009
$10,000,000.00     3/1/2010
   $49,940.00     12/1/2009   12/01/09      12/1/2009
  $184,900.00     12/9/2009   12/10/09     12/14/2009        5/8/2010       5/18/2010 Completed
  $446,118.43     12/1/2009   01/19/10      1/27/2010
 $1,144,170.00    12/2/2009   12/08/09       1/5/2010


  $194,600.00     12/1/2009                                                           
  $200,000.00     11/9/2009
  $364,000.00     1/12/2009   02/17/10      9/16/2010
 $5,147,742.00     1/1/2010   02/16/10      2/19/2010
  $212,455.00     12/1/2009   02/16/10      2/19/2010       8/20/2010       8/30/2010 Completed
  $163,793.00     12/1/2009   05/05/10       5/6/2010
                   1/1/2010

  $350,000.00     1/15/2009
 $1,786,000.00     2/4/2010   08/03/10      8/25/2010
  $100,000.00    11/25/2009
  $605,737.00     12/1/2009   03/18/10      3/19/2010
  $461,198.00      1/1/2010   04/20/10      4/22/2010
 $2,940,344.00     1/12010    05/18/10      5/24/2010
 $3,500,555.00    12/3/2009   03/16/10      3/19/2010
 $1,243,309.00   10/29/2009   01/05/10       1/6/2010      9/7/2010    9/8/2010 Completed
   $78,596.00     12/3/2009
  $158,801.00    10/22/2009             
  $394,846.00    12/10/2009   01/06/10       1/8/2010
  $162,071.00     12/1/2009   02/04/10       2/9/2010
 $4,706,975.00   12/28/2009   01/12/10      1/20/2010
  $607,400.00     2/15/2010   09/07/10      9/13/2010  
  $425,000.00     7/12/2010
  $970,322.00      2/3/2010   04/07/10      4/13/2010
 $1,664,400.00    1/13/2010
  $126,200.00     1/14/2010   02/17/10      2/19/2010     7/20/2010   8/19/2010 Completed

$10,300,000.00 Sole Source
  $300,000.00      1/6/2010
  $569,393.00      2/2/2010
  $277,230.00      2/1/2010   03/08/10 38/2010
  $223,181.91      1/1/2010   02/24/10      2/24/2010
  $450,000.00     1/18/2010


  $399,000.00      1/8/2010
  $375,000.00      2/5/2010   01/05/10      2/16/2010
  $987,000.00     12/1/2009   01/26/10      2/28/2010
 $1,453,920.00     1/7/2010   03/09/10       4/7/2010
  $218,252.00     8/25/2009   12/14/09      3/17/2010
  $194,445.00     8/25/2009   12/16/09     12/21/2009
  $917,259.00      1/1/2010   04/06/10       4/7/2010
 $1,161,087.00     4/2/2010   06/29/10       7/6/2010
  $150,000.00      3/2/2010
  $401,000.00     1/19/2010
  $704,100.00     1/14/2010
  $393,000.00      1/1/2010   02/24/10      2/26/2010
 $1,350,000.00    12/7/2009
 $4,993,571.00     1/1/2010   05/18/10      5/21/2010
  $168,843.08      2/5/2010   03/15/10      4/20/2010
 $2,346,235.52     1/1/2010   03/23/10      9/14/2010
                   2/1/2010
 $2,524,482.00     1/1/2010   05/04/10      8/16/2010
  $587,112.00     1/21/2010   01/28/10      1/29/2010

 $2,642,272.93     2/1/2010   04/06/10       4/9/2010

 $1,763,600.00     2/1/2010   04/06/10       4/9/2010

 $3,254,515.52     2/1/2010   04/07/10       4/9/2010

  $164,000.00      2/1/2010   02/24/10      3/19/2010
  $190,950.00     2/23/2010   06/08/10      7/20/2010

  $159,933.63 Sole Source
  $150,008.00      1/1/2010   02/23/10      2/25/2010

$43,370,000.00 Sole Source
  $155,984.00     1/28/2009   03/30/10      3/31/2010
$22,837,880.95    1/27/2010   04/21/10      4/21/2010
   $946,662.00      2/1/2010   02/05/10    2/9/2010
   $150,000.00     2/12/2010
  $7,000,000.00     8/4/2010
  $4,600,000.00    3/25/2010
   $397,500.00      2/4/2010   02/11/10   2/12/2010
  $2,900,000.00    2/24/2010   04/08/10   7/19/2010

     $66,791.00     2/1/2010
   $203,850.00      2/4/2010   04/01/10    4/1/2010
  $5,038,050.00     3/1/2010   05/05/10    5/6/2010
   $134,417.60     2/10/2010   02/18/10   3/12/2010

                    2/1/2010
  $7,630,870.00     3/5/2010   01/20/10   1/20/2010

  $2,196,382.00    2/11/2010   04/07/10    4/7/2010
  $3,038,268.00    2/17/2010   03/11/10   3/12/2010
   $300,000.00     3/16/2010

  $3,063,827.00     3/4/2010   03/25/10   3/26/2010
   $352,141.56     2/25/2010   04/13/10   4/14/2010
$140,241,000.00    9/10/2009   11/17/09   2/27/2010
   $873,354.35      3/1/2010   03/01/10    3/2/2010

                   2/16/2010

   $590,000.00      3/1/2010   04/06/10   4/21/2010
  $2,000,000.00     5/1/2010

   $492,470.00      3/1/2010   04/06/10   4/21/2010


  $1,191,583.26    2/22/2010   03/11/10    4/7/2010
  $4,300,000.00    3/24/2010
   $650,000.00     3/12/2010
  $5,032,000.00    3/10/2010   03/25/10   3/26/2010
   $248,003.00     3/18/2010   03/18/10   3/24/2010
   $110,000.00     3/11/2010
   $350,000.00     3/26/2010
   $208,250.00     2/25/2010   03/23/10   3/26/2010
  $5,868,000.00     4/1/2010   04/21/10   4/21/2010
   $135,000.00     3/16/2010
 $29,397,810.00     6/8/2010
  $1,000,000.00     3/3/2010
   $326,305.00      3/1/2010   03/18/10   3/22/2010    9/3/2010   9/10/2010 Completed
                   3/31/2010
   $444,701.00     3/17/2010   03/25/10   3/26/2010
                   2/18/2010
   $267,730.00     3/18/2010   04/13/10   4/14/2010   8/10/2010   8/26/2010 Completed
  $1,055,691.00    4/12/2010   04/01/10    4/1/2010
  $9,200,000.00   11/15/2010
   $711,672.00     3/30/2010   04/23/10   4/26/2010    6/7/2010    6/7/2010 Completed
  $3,576,821.60     3/1/2010   06/15/10   6/21/2010
   $159,785.01      3/1/2010   04/20/10   4/22/2010   7/28/2010    8/3/2010 Completed
  $1,020,954.83     3/1/2010
  $1,020,000.00     3/1/2010
  $9,000,000.00    4/30/2010   07/13/10   7/16/2010
   $176,542.00     3/23/2010   03/29/10   3/29/2010   6/28/2010    7/7/2010 Completed
$12,600,000.00   1/13/2010
  $410,000.00    3/18/2010   06/21/10   6/30/2010
 $5,587,800.00   5/10/2010   06/16/10   9/16/2010

 $1,200,000.00   5/26/2010
   $97,800.00    3/25/2010   04/20/10   4/22/2010   6/13/2010   7/13/2010 Completed
  $128,627.00    3/25/2010   04/20/10   4/22/2010
  $138,000.00    3/17/2010   03/25/10   3/26/2010
                                                                         FEDERALL
  $229,000.00     3/1/2010   04/21/10   4/28/2010                        Y FUNDED

   $89,000.00     3/1/2010
                                                                         FEDERALL
  $420,000.00     3/1/2010                                               Y FUNDED
  $954,530.00     2/1/2010   02/25/10    3/1/2010
 $1,300,000.00   4/31/2010

 $4,657,593.57    5/5/2010   04/21/10   4/27/2010
  $450,000.00     5/1/2010
  $161,392.00    3/17/2010   04/13/10   4/23/2010
  $325,385.00     4/1/2010   05/18/10   5/19/2010


                  6/2/2010
 $2,200,000.00   4/23/2010   05/13/10   5/14/2010
 $2,178,000.00   4/23/2010   05/13/10   5/14/2010
 $2,270,110.00   4/23/2010   05/13/10   5/14/2010
 $1,000,000.00    7/1/2010
 $4,289,625.10    6/2/2010   08/18/10   8/20/2010
  $449,353.00     6/2/2010   05/25/10   5/26/2010
  $215,000.00     6/2/2010
  $992,718.00     4/1/2010   05/27/10    6/2/2010
 $5,523,000.00    6/3/2010
 $7,132,000.00   5/19/2010   07/07/10    7/8/2010
  $164,900.00     5/4/2010   06/15/10    5/3/2010
  $178,300.00     5/4/2010   06/15/10    5/3/2010
  $136,335.00     5/4/2010   06/15/10    5/3/2010
  $100,000.00    2/11/2010   03/02/10   3/10/2010
 $2,470,286.00    5/1/2010
  $898,850.00     5/1/2010   06/15/10    5/3/2010
  $592,000.00     5/1/2010   06/15/10    5/3/2010
  $316,950.00     6/1/2010
 $2,342,938.00    6/1/2010   06/01/10    6/3/2010
  $537,446.00    5/14/2010   04/28/10    5/6/2010
 $2,848,474.19   5/19/2010   04/21/10   4/21/2010
  $230,000.00    3/23/2010   03/22/10    8/3/2010

                                                                         TIGER Grant
$37,700,000.00   5/20/2010                                               Fed Fund
  $155,000.00     4/5/2010
 $5,100,000.00   6/16/2010
  $254,947.00     3/4/2010
  $200,000.00    6/15/2010
  $400,000.00     4/1/2010
 $2,301,986.00    5/5/2010   05/13/10   5/14/2010

 $2,443,730.00    5/4/2010   05/13/10   5/14/2010
 $4,158,296.02   4/15/2010   06/15/10    6/2/2010
  $695,694.06     4/1/2010   06/15/10   6/21/2010
  $787,475.00     4/1/2010
  $244,440.00     5/3/2010   05/13/10     5/14/2010
  $150,000.00    5/18/2010
  $120,000.00    5/18/2010
  $141,800.00    4/26/2010   05/13/10     5/14/2010
  $255,451.00    4/22/2010   04/29/10      5/6/2010
  $384,410.00     4/1/2010   07/06/10      7/9/2010
  $213,866.75    4/28/2010   05/11/10     5/11/2010
  $162,382.00     4/2/2010   08/17/10     8/19/2010
 $1,288,689.82    4/1/2010   07/06/10     9/14/2010
$31,471,000.00   4/30/2010   07/07/10      7/8/2010
  $964,700.00    4/26/2010   06/02/10      6/3/2010

                                                      FTA Federal
  $643,000.00     5/5/2010                            Funds
$59,000,000.00   5/27/2010


  $280,000.00    4/29/2010   05/13/10     5/14/2010
 $1,281,014.00    5/1/2010   09/07/10     9/10/2010
  $319,412.00     5/6/2010   05/26/10     5/27/2010
  $483,853.24     5/1/2010
  $256,600.00    4/27/2010   06/24/10     6/25/2010
  $260,750.00    4/27/2010   06/24/10     6/25/2010
  $258,200.00    4/27/2010   06/24/10     6/25/2010
  $265,850.00    4/27/2010   06/24/10     6/25/2010
  $400,000.00    4/27/2010
  $270,000.00    5/19/2010
  $275,000.00     4/1/2010
  $550,000.00    5/13/2010
 $2,654,804.00    6/9/2010   06/24/10     6/25/2010
 $3,194,700.00    6/8/2010   06/24/10     6/25/2010
 $4,000,000.00   12/1/2010
 $2,571,239.60    5/1/2010   07/06/10      7/9/2010
                  5/1/2010   06/15/10     6/21/2010
  $939,880.00     5/6/2010   05/13/10     5/14/2010
 $2,116,331.00   5/21/2010   05/21/10     6/25/2010
  $441,176.00    5/12/2010
$15,000,000.00   7/31/2010

 $3,511,662.00    5/3/2010   05/21/10     6/25/2010

  $900,000.00     5/7/2010
 $2,350,000.00   12/1/2010             
  $247,551.00    6/16/2010   06/24/10     6/25/2010
  $247,551.00    6/16/2010   06/24/10     6/25/2010
  $247,551.00    6/16/2010   06/24/10     6/25/2010
  $247,551.00    6/16/2010   06/24/10     6/25/2010
  $247,551.00    6/16/2010   06/24/10     6/25/2010
  $247,551.00    6/16/2010   06/24/10     6/25/2010
  $248,943.00    6/16/2010   07/08/10      7/9/2010
 $4,800,000.00    5/1/2010
 $2,849,000.00    6/1/2010   06/24/10     6/25/2010
 $2,560,000.00    6/1/2010   05/13/10     6/25/2010
 $2,826,300.00    6/1/2010   05/13/10     6/25/2010
  $910,000.00    6/10/2010
  $419,995.00    6/15/2010   06/24/10     6/25/2010
  $339,468.00    6/14/2010   06/24/10     6/25/2010
  $962,000.00     6/17/2010   06/24/10   6/25/2010
 $1,095,667.00    6/16/2010   06/24/10   6/25/2010

  $222,059.17      5/1/2010   07/06/10   7/13/2010
 $5,255,323.73     5/1/2010   07/06/10   9/14/2010  
  $250,000.00     5/19/2010
 $2,350,000.00    7/13/2010   08/12/10   8/13/2010
 $2,189,700.00    7/13/2010   08/12/10   8/13/2010
 $2,327,000.00    7/13/2010   08/12/10   8/13/2010
  $442,777.00      6/8/2010   07/15/10   7/22/2010
   $80,000.00     5/25/2010
  $247,551.00      7/1/2010   06/24/10   6/25/2010
  $300,000.00      7/1/2010
  $300,000.00      7/1/2010
  $300,000.00      7/1/2010
  $247,551.00      7/1/2010   07/08/10    7/9/2010
  $300,000.00      7/1/2010
  $300,000.00      7/1/2010
  $130,000.00     5/25/2010   06/07/10    6/8/2010
 $1,200,000.00     3/9/2010
  $139,145.00      6/1/2010   06/15/10    6/2/2010
  $541,700.00     5/20/2010   07/06/10   9/14/2010
  $300,000.00     4/29/2010   05/11/10   7/16/2010
  $170,000.00      5/1/2010
 $3,500,000.00     7/8/2010


  $365,000.00     6/18/2010
  $440,000.00     5/10/2010
 $2,637,000.00    6/14/2010   06/24/10   9/14/2010
 $2,649,000.00    6/14/2010   06/24/10   6/24/2010
  $159,829.00     6/17/2010   06/24/10   6/25/2010
  $812,000.00      6/1/2010   08/17/10   8/23/2010
 $1,198,124.30     6/1/2010   07/21/10   7/28/2010
  $511,280.00     6/30/2010
$17,159,295.00     6/1/2010
  $216,000.00     5/26/2010   06/24/10   6/25/2010
 $1,118,000.00    6/16/2010
$11,880,991.40     7/1/2010   08/17/10   8/19/2010
  $141,565.00     6/10/2010   06/17/10   6/21/2010
 $1,156,354.57   11/17/2009   11/23/09   5/13/2010
  $108,646.00     6/15/2010   06/24/10   6/25/2010
  $260,570.00     6/15/2010   06/24/10   6/25/2010
  $100,000.00     5/24/2010
 $1,274,500.00    6/14/2010   07/21/10   7/22/2010
  $229,031.00      6/1/2010   08/18/10   8/23/2010
 $1,495,595.00     7/5/2010   08/18/10   8/20/2010
  $100,000.00      5/4/2010
  $196,436.00     5/24/2010   08/05/10    8/9/2010
 $9,478,000.00     5/1/2010
$24,975,369.50    7/15/2010   09/15/10   9/16/2010
  $300,000.00     6/28/2010
$10,000,000.00    6/30/2010
  $663,200.00     6/17/2010   06/24/10   6/25/2010
  $220,000.00      7/1/2010


  $737,000.00      7/1/2010
  $872,275.00     6/29/2010   08/10/10   8/19/2010
  $100,000.00      7/1/2010
  $212,809.00      7/1/2010   07/15/10   7/16/2010
  $694,800.00      7/1/2010   08/18/10   8/20/2010
  $250,000.00      6/1/2010   08/03/10    8/6/2010
  $620,000.00     6/29/2010
  $381,763.45      7/1/2010   08/10/10   8/11/2010
  $344,890.00      7/6/2010   07/21/10    8/2/2010
 $1,303,277.55     7/1/2010   08/03/10    8/9/2010
  $230,000.00      7/1/2010
  $432,000.00      7/1/2010
  $211,774.45      8/1/2010   08/17/10   9/14/2010
$20,000,000.00    6/25/2010
  $264,184.00     7/15/2010   07/28/10   7/28/2010
  $420,000.00      7/1/2010
 $4,889,440.75     7/1/2010   09/15/10   9/16/2010
  $137,196.17      7/1/2010   07/08/10   7/30/2010
  $348,406.00     6/10/2010   07/27/10   7/29/2010
  $350,000.00     7/15/2010

  $450,000.00     7/14/2010
  $150,000.00     6/14/2010
  $195,000.00     7/21/2010
  $350,000.00     7/28/2010
 $1,000,000.00     7/1/2010
  $128,336.00      7/1/2010   07/08/10   8/20/2010
  $869,320.00     8/11/2010
  $801,741.00      7/1/2010   08/17/10   8/18/2010
 $1,028,059.00     7/1/2010
  $100,000.00     7/16/2010
 $4,100,000.00   10/14/2010
  $240,000.00     7/12/2010
  $430,871.26      7/1/2010   08/17/10   8/19/2010
 $3,533,492.00    7/19/2010
  $429,283.00      6/4/2010   06/04/10   6/25/2010
  $212,764.00     8/19/2010   08/26/10   8/27/2010
  $450,000.00      7/1/2010
  $500,000.00      7/1/2010


  $230,000.00     8/19/2010
                  8/10/2010
   $22,000.00      7/1/2010
  $744,240.00      9/7/2010




  $755,000.00     8/19/2010   08/26/10   8/27/2010
  $450,000.00     8/19/2010   08/26/10   8/27/2010
                   8/1/2010
  $230,000.00      8/1/2010
 $1,239,000.00     8/9/2010
  $150,000.00     8/10/2010
  $215,000.00     8/12/2010
  $225,000.00     8/19/2010
 $2,100,000.00     8/1/2010
       $100,000.00      9/2/2010
       $257,000.00     8/17/2010
       $550,000.00      8/1/2010


       $300,000.00      9/2/2010
      $3,000,000.00     9/1/2010
       $250,000.00      8/1/2010
     $28,000,000.00    9/22/2010
     $11,500,000.00    7/12/2010
       $450,000.00     9/10/2010
     $17,500,000.00     9/1/2010
       $350,000.00      9/2/2010
      $1,800,000.00    9/22/2010
       $110,000.00      9/9/2010
       $200,000.00     9/17/2010
       $125,000.00     9/10/2010
        $42,000.00      9/2/2010
       $300,000.00     9/20/2010
       $300,000.00     9/23/2010
       $102,100.00     9/16/2010
       $310,000.00      9/1/2010
       $410,000.00      9/1/2010
       $350,000.00      9/9/2010
       $865,000.00      9/1/2010
       $206,000.00      9/2/2010

       $175,000.00     9/23/2010
      $5,400,000.00     9/1/2010
       $195,000.00     9/22/2010
       $430,000.00      9/1/2010
       $320,000.00      9/1/2010
       $320,000.00      9/1/2010
     $24,000,000.00     9/1/2010
       $250,000.00     9/28/2010


      $1,200,000.00     9/8/2010



     $10,900,000.00    9/10/2010
     $25,000,000.00    10/1/2010
$1,405,458,641.92


     $11,060,000.00   10/28/2010
     $20,000,000.00    10/1/2010
      $9,200,000.00   11/15/2010
      $2,000,000.00   10/15/2010
      $7,500,000.00    10/1/2010
      $1,000,000.00    10/1/2010
       $200,000.00    10/14/2010
       $850,000.00     12/8/2010
       $476,420.00     10/5/2010
      $3,750,000.00    10/8/2010
      $1,700,000.00   10/19/2010
       $155,500.00    10/19/2010
       $219,391.00    10/19/2010
     $260,000.00    10/19/2010
     $662,560.00    10/21/2010
     $806,000.00    10/21/2010
     $709,760.00    10/21/2010
     $750,368.00    10/21/2010
      $70,000.00     10/6/2010
      $83,572.00     10/6/2010
     $103,000.00     10/7/2010
     $100,000.00    10/17/2010
    $5,400,000.00   10/14/2010
     $500,000.00    11/11/2010
     $175,000.00    10/21/2010
     $185,000.00    10/21/2010
   $30,000,000.00   11/17/2010
     $225,000.00    10/14/2010
     $128,615.00     10/5/2010
    $5,036,000.00    10/5/2010
     $100,000.00    10/20/2010
     $100,000.00    10/20/2010
     $175,000.00     10/6/2010
   $10,200,000.00    10/1/2010
    $7,250,000.00   11/15/2010
     $300,000.00    10/21/2010

   $15,700,000.00   10/18/2010
     $465,780.00     10/1/2010
     $100,000.00     10/1/2010
$137,696,966.00
ARRA
ARRA
003(115)
ARRA
ARRA




ARRA




ARRA
ARRA
ARRA




ARRA




ARRA-
003(140)
ARRA




ARRA 0003
(125)
ARRA
0003(129)
ARRA
0003(133)
ARRA
0003(125)
ARRA
ARRA
ARRA
ARRA




ARRA
2009 Total South Public Works Projects
2010 Total South Public Works Projects
2011 Total South Public Works Projects



CL-2009-9    CCSD   Ryan Mechanical 

CL-2009-25   CCSD   U.S. Mechanical, LLC 
CL-2009-34   UNLV   Western Single Ply
CL-2009-44   UNLV   Martin Harris Construction 
CL-2009-47   UNLV   Lloyd's Refrigeration, Inc. 
CL-2009-55   CCSD   Communication Electronic Systems 
CL-2009-60   CCSD   Lloyd's Refrigeration, Inc. 
CL-2009-61   CCSD   U.S. Mechanical, LLC 
CL-2009-64   CSN    Core Construction Services of Nevada 
CL-2009-66   CCSD   Martin Harris Construction 
CL-2009-68   CCSD   Canceled Awarded under 100,000
CL-2009-69   CCSD   Pahor Mechanical Contractors, LLC 

CL-2009-71 CCSD     Trade West Construction 
CL-2009-78 CCSD     Canceled Awarded under 100,000

CL-2009-84   UNLV   Core Construction Services of Nevada 
CL-2009-85   CCSD   Big Town Mechanical
CL-2009-86   CCSD   Tand, Inc 
CL-2009-87   UNLV   Subruban Elevator of Nevada 

CL-2009-88 CCSD     Communication Electronic Systems 

CL-2009-90 CCSD     C.I. Contractors, Inc. 
CL-2009-94 CCSD     Hardy Construction Inc 

CL-2009-95   CCSD   Communication Electronic Systems 
CL-2009-
101          CSN    McCarthy Building Companies, Inc. 
CL-2009-
128          CCSD   Commercial Roofers Inc. 
CL-2009-
142          CCSD   Mountain Vista Development Inc 
CL-2009-
146          CSN    McCarthy Building Companies, Inc. 
CL-2009-
147          CCSD   Mikon Construction 
CL-2009-
149          CCSD   Pahor Mechanical Contractors, LLC 
CL-2009-
150          CCSD   U.S. Mechanical, LLC 
CL-2009-
157          CCSD   Ryan Mechcanical Inc 
CL-2009-
171          CCSD   U.S. Mechanical, LLC 

CL-2009-
174          CCSD   Awarded Under 100,000
CL-2009-
191          NCSD   Williams Brother Inc 
CL-2009-
194          CCSD   The Tiberti Company 
CL-2009-
217          CCSD   U.S. Mechanical, LLC 
CL-2009-
218        CCSD   Core Construction Services of Nevada 
CL-2009-
219        CCSD   Roche Constructors, Inc.
CL-2009-
220        CCSD   Red Rose Inc 
CL-2009-
221        CCSD   Commercial Roofers Inc. 
CL-2009-
222        CCSD   Ryan Mechanical Inc 
CL-2009-
223        CCSD   Core Construction Services of Nevada 
CL-2009-
224        CCSD   Rafael Construction, Inc 
CL-2009-
226        CCSD   Red Rose Inc 
CL-2009-
237        UNLV   Rafael Construction, Inc 
CL-2009-
242        CCSD   McCarthy Building Companies, Inc. 
CL-2009-
246        CSN    Various 
CL-2009-
247        CSN
CL-2009-
253        CCSD   Las Vegas Paving Corporation 
CL-2009-
255        CCSD   Hellas Construction Inc 
CL-2009-
256        CCSD   Hellas Construction Inc 
CL-2009-
257        CCSD   Hellas Construction Inc 
CL-2009-
273        CCSD   Mikon Construction 
CL-2009-
282        CCSD   Las Vegas Pavig Corporation 
CL-2009-
298        UNLV   Craft Construction Co. 
CL-2009-
303        UNLV   Clark and Sullivan Constructors 
CL-2009-
319        CCSD   Tand, Inc 
CL-2009-
325        CCSD   Capriati Construction Corporation Inc 
CL-2009-
326        CCSD   Las Vegas Paving Corporation 
CL-2009-
336        CCSD   Ryan Mechanical, Inc. 
CL-2009-
340        CCSD   Hellas Construction, Inc.
CL-2009-
361        CCSD   Tri-Signal Integration Inc 
CL-2009-
362        CCSD   Tri-Signal Integration Inc 
CL-2009-
370        CSN    Various 
CL-2009-
374        CCSD
CL-2009-
375        CCSD
CL-2009-
376        CCSD
CL-2009-
377        CCSD
CL-2009-
378          CCSD    Tri-Signal Integration Inc 
CL-2009-
379          CCSD    Tri-Signal Integration Inc 
CL-2009-
380          CCSD    Tri-Signal Integration Inc 
CL-2009-
400          CCSD    Trade Wset Construction
CL-2009-
423          CCSD    Canceled Less then $100,000.00
CL-2009-
425          CCSD    Tand, Inc.
Total
2009


Year
2010
CL-2010-8    CCSD    Big Town Mechanical, LLC

CL-2010-9 CCSD       Big Town Mechanical, LLC
CL-2010-10 CCSD

CL-2010-11 CCSD      Pahor Mechanical Contractors, Inc.

CL-2010-12   CCSD    Pahor Mechanical Contractors, Inc.
CL-2010-16   UNLVR   HCI Underground, LLC
CL-2010-18   CCSD    Canceled New PWP 2010-60
CL-2010-22   CCSD    Canceled New # CL-2009-423
CL-2010-23   COLV    Martin Harris Construction
CL-2010-32   CCSD    Commercial Roofers, Inc.

CL-2010-33   UNLV    Dean Roofing Company
CL-2010-35   CCSD    Ryan Mechanical, Inc.
CL-2010-38   CCSD    Big Town Mechanical, LLC
CL-2010-60   CCSD    Martin Harris Construction
CL-2010-
112          UNLV    Clark and Sullivan Construction
CL-2010-
113          UNLV    The Tiberti Company
CL-2010-
126          CCSD    Mikon Construction Co., Inc.
CL-2010-
132          CSN
CL-2010-
141          CCSD    Las Vegas Paving Corp.
CL-2010-
150          CCSD    Big Town Mechanical
CL-2010-
152          CCSD    Peterson Dean Roofing & Sheet Metal
CL-2010-
163          CCSD    Lloyd's Refrigeration, Inc.
CL-2010-
174          CCSD    Wells Cargo, Inc.
CL-2010-
179          UNLV    CG&B Enterprises, Inc.
CL-2010-
192          CCSD    Las Vegas Paving Corp.
CL-2010-
201          UNLV    Eberhard Southwest Roofing, Inc.
CL-2010-
203           CCSD   Lloyd's Refrigeration, Inc.
CL-2010-
204           CCSD   Big Town Mechanical, LLC
CL-2010-
205           CCSD   Big Town Mechanical, LLC
CL-2010-
210           UNLV   Pahor Mechanical Contractors, Inc.
CL-2010-
224           UNLV   Avery Atlantic
CL-2010-
226           UNLV   Construction 
CL-2010-
231           CCSD   Big Town Mechanical, LLC
CL-2010-
232           CCSD   Interstate Plumbing and Air Conditioning
CL-2010-
236           CCSD   Big Town Mechanical, LLC
CL-2010-
239           CCSD   Las Vegas Paving Corp.
CL-2010-
249           CCSD   Wells Cargo, Inc.
CL-2010-
251           CSN    Core Construction/Mojave Electric
CL-2010-
252           UNLV
CL-2010-
253           CCSD   Helix Electric, Inc.
CL-2010-
254           CCSD   Helix Electric, Inc.
CL-2010-
255           CCSD   Helix Electric, Inc.
CL-2010-
256           CCSD   Helix Electric, Inc.
CL-2010-
257           CCSD
CL-2010-
261           CCSD   Big Town Mechanical, LLC
CL-2010-
262           CCSD   Big Town Mechanical, LLC
CL-2010-
266           CCSD   Western States Contracting, Inc.

LI-2010-268   LCSD
CL-2010-
273           CCSD   Bombard Electric, LLC
CL-2010-
274           CCSD   Bombard Electric, LLC
CL-2010-
275           CCSD   Bombard Electric, LLC
CL-2010-
276           CCSD   Bombard Electric, LLC
CL-2010-
277           CCSD   Bombard Electric, LLC
CL-2010-
278           CCSD   Bombard Electric, LLC
CL-2010-
279           CCSD   Bombard Electric, LLC
CL-2010-
281           CCSD   U.S. Mechanical, LLC
CL-2010-
282           CCSD   Big Town Mechanical, LLC
CL-2010-
283           CCSD   Big Town Mechanical, LLC
CL-2010-
284        CCSD
CL-2010-
285        CCSD   Red Rose, Inc.
CL-2010-
286        CCSD   The Original Roofing Company
CL-2010-
287        CCSD   The Original Roofing Company
CL-2010-
288        CCSD   Dean Roofing Company
CL-2010-
292        CCSD   Lloyd's Refrigeration, Inc.
CL-2010-
293        CCSD   Lloyd's Refrigeration, Inc.
CL-2010-
294        CCSD   Lloyd's Refrigeration, Inc.
CL-2010-
297        CCSD   Bombard Electric, LLC
CL-2010-
298        CCSD
CL-2010-
299        CCSD
CL-2010-
300        CCSD
CL-2010-
301        CCSD   Bombard Electric, LLC
CL-2010-
302        CCSD
CL-2010-
303        CCSD
CL-2010-
313        CCSD   Big Town Mechanical, LLC
CL-2010-
314        CCSD   U.S. Mechanical, LLC
CL-2010-
315        CCSD   Hasco, Inc.
CL-2010-
320        CCSD   Fast System
CL-2010-
321        CCPA
CL-2010-
325        CCSD   CG&B Enterprises, Inc.
CL-2010-
326        CCSD   Mikon Construction Co., Inc.
CL-2010-
331        UNLV
CL-2010-
337        CCSD   Pahor Mechanical Contractors, LLC
CL-2010-
354        CCSD
CL-2010-
357        SPWB   Clark Construction Group
CL-2010-
358        CCSD
CL-2010-
368        UNLV
NY-2010-
373        NCSD   CG&B Enterprises, Inc.
CL-2010-
374        CCSD   Hufcor Nevada 
CL-2010-
379        CCSD
CL-2010-
381        CCSD   Canceled New PWP 2011-11
CL-2010-
382          CCSD   Canceled New PWP 2011-12
CL-2010-
383          CCSD   Canceled New PWP 2011-13
CL-2010-
384          CCSD   Canceled New PWP 2011-14
CL-2010-
385          CCSD   Communication Electronic Systems
CL-2010-
386          CCSD   Communication Electronic Systems
CL-2010-
392          CCSD
NY-2010-
400          NCSD
NY-2010-
401          NCSD
    Sep-10
CL-2010-
425          UNLV
CL-2010-
428          SPWB
Total
2010

Year
2011
CL-2011-9    CCSD
CL-2011-11   CCSD
CL-2011-12   CCSD
CL-2011-13   CCSD
CL-2011-14   CCSD
CL-2011-15   CCSD
CL-2011-16   CCSD
CL-2011-17   CCSD
CL-2011-18   CCSD
CL-2011-19   CCSD
CL-2011-20   CCSD
CL-2011-21   CCSD
CL-2011-22   CCSD
CL-2011-25   CCSD
CL-2011-26   CCSD
CL-2011-29   CCSD
CL-2011-30   CCSD
CL-2011-31   CCSD
CL-2011-32   CCSD
CL-2011-40   UNLV
Total
2011
$                                                      157,445,463
$                                                      166,181,486
$                                                       11,921,186 note as of October 1, 2010



0011881 School Modernization Whitney ES                                    $3,519,600.00   10/16/2008   02/26/09

0011350 Cooling Tower Replacement Theron Swainston Middle School             $419,000.00    10/10/0/8   11/21/08
5040-KC White Life Sciences Reroof                                           $327,850.00    10/1/2008   12/19/09
5042-KC Concrete Replacement at HFA, CHE, & BSL-West                         $157,240.00   10/21/2008   12/02/08
5041-KC FDH Building Retrofit Air Handlers                                   $115,400.00   10/15/2008   11/14/08
0012003 Fire Alarm Replacement @ Cimarron-Memorial High School               $317,500.00    10/9/2008   11/20/08
0011347 Central Plant Modernization                                        $1,765,610.00   11/12/2008   04/12/09
0011340 Central Plant Modernization                                        $1,739,000.00   11/12/2008   04/12/09
CSN Health Sciences Building Addition West Charleston                      $4,000,000.00    10/5/2008   11/14/08
0011582 Site Work Facilities / Audit                                       $1,443,443.00   10/29/2008   11/06/08
0011955 Electrical Service for Portables                                     $180,000.00   10/29/2008
0011341 Central Plant Modernization Cheyenne High School                   $2,198,000.00    12/3/2008   01/08/09
0000558 Underground Fire Line and Nevada Power Upgrade @ Valley
HS                                                                           $689,000.00   11/12/2008   12/11/08
0011612 Water Service                                                        $100,000.00   10/30/2008
456-PM Design Build of a New Pool to Replace Existing Pool at the
McDermott Physical Edu                                                     $4,319,454.00   10/14/2008   01/06/09
0000484 Plumbing Modernization Rowe ES                                       $869,700.00    2/12/2009   03/12/09
0011765 Fire Hydrant Installation Gragson Elementary School                  $376,000.00    6/17/2008   05/14/09
4477 Furnish and Install Elevator at Shadow Lane Medical Research             $97,300.00   10/22/2008   01/14/09
0010993 Emergency Lighting/Intrusion Alarm Interface; Intercom, ALS
PA Upgrades                                                                  $355,000.00   11/19/2008   03/12/09
1548-04 Wallace Transportation - Bus Wash/Water Reclaim System
Corrections                                                                  $249,500.00   11/13/2008   11/21/08
0011998 Rehab Existing Building 4220 McLeod Drive                            $538,470.00   11/14/2008   11/20/08
0002501 Intrusion Alarm PA ALS Exterior Lighting J D Smith Middle
School                                                                       $132,000.00   11/26/2008   01/08/09

09107 Fire Station / college Instructional Center                          $6,000,000.00    1/26/2009   01/29/09

MPID 0000243 Roof Replacement CVT Gilbert Elementary School                  $685,000.00   12/16/2008   01/22/09

0011764 Renovation/Expansion at New Administration Site at Seigle 2        $4,168,138.00    2/12/2009   04/23/09

RFP-182 Fire/College Instruction Center                                    $5,613,000.00    1/29/2009   06/01/09

0011865 Asphalt Playground Replacement                                       $264,430.00   12/16/2008   01/08/09

0011845 School Modernization Kirk Adams Elementary School                  $3,215,000.00     2/5/2009   02/12/09

0011846 School Modernization James Gibson Elementary School                $2,959,000.00     2/5/2009   02/12/09

0011844 HVAC and Plumbing Modernization                                    $2,424,000.00    1/16/2009   02/12/09

0010996 HVAC & Plumbing Modernization Helen Cannon Middle School           $3,599,000.00    1/23/2009   02/12/09



0012022 Replace State Floor & Curtains                                       $130,000.00     1/1/2009
Football Field Lighting Audio System & Security System Pahrump Valley
High School                                                                  $237,535.00    1/27/2009   02/05/09

0011777 Security Gate System Chaparral High School                           $234,850.00    2/10/2009   02/26/09
0011850 Plumbing Kitchen Modernization and Door & Hardware Upgrade
Fay Galloway ES                                                              $639,900.00    3/10/2009   03/26/09
1558 Shirley and Bill Wallin Elementary School                         $16,590,000.00   5/13/2009   07/02/09

1554 Vincent L Triggs Elementary School                                $14,122,700.00    5/6/2009   08/27/09

0000474  Roof Replacement Bertha Ronzone ES                              $668,197.00    3/25/2009   04/02/09

0004452 Roof Replacement Marion Cahlan Elementary School                 $941,000.00    3/19/2009   04/23/09

0011968 Chiller Conversion Silvestri Middle School                       $368,401.00     3/6/2009   04/02/09

1560 Ruby Duncan Elementary School                                     $17,894,000.00   4/22/2009   07/02/09

1559 Evelyn Stuckey Elementary School                                  $14,063,000.00   4/29/2009   07/02/09

0000471 Roof Replacement CC Ronnow ES                                    $844,194.00     4/3/2009   04/02/09

5050-KC System Computing Services Electrical Renovations                 $573,546.00     4/7/2009   04/29/09
0000558 HVAC and Electrical Upgrade and Modernization Valley High
School                                                                 $20,175,000.00   5/14/2009   05/21/09

Gowan Road Improvement                                                  $1,000,000.00    4/6/2009   04/01/09

"A" Building HVAC Remodel West Side                                      $700,000.00     8/1/2009

0004628 Remove & Replace Tennis and Basketball Courts                    $706,485.00     4/3/2009   04/23/09
MPID#0004652 Remove and Replace Running Track Surface Valley High
School                                                                   $172,480.00     3/3/2009   03/23/09
MPID#0010596 Remove and Replace Running Track Surface Western
High School                                                              $164,600.00     3/3/2009   04/23/09
MPID#0004640 Remove and Replace Running Track Surface Clark High
School                                                                   $162,051.00     3/3/2009   04/23/09

MPID#0000577 Remove and Replace Asphalt and Add ADA Ramp                 $182,840.00    4/17/2009   05/14/09
1499 Forebuss Elementary School Located Near Grand Canyon Dr and
Fore Avenue                                                              $113,000.00    5/13/2009   05/21/09

20903340 Renovate Room In MPE Emerging Diseases Laboratory              $2,064,915.69   2/13/2009   03/03/09

90904873 Science and Engineering Building Tenant Improvements           $1,342,273.00   3/27/2009   05/01/09

0011116 Roof Replacement Adams Elementary School                         $908,852.00    6/18/2009   06/25/09
0005074 Playground and Retaining Wall Replacement William G Bennett
ES                                                                       $313,200.00     6/5/2009   06/25/09

0004610 Tennis and Basketball Court Replacement and Erosion Control      $560,000.00     6/5/2009   06/25/09
PKGID 0011857 School Moderinization John F Mendoza Elementary
School                                                                  $4,983,756.00   6/24/2009   07/09/09

0012071 Remove and Replace Running Track Surface                         $192,500.00    6/18/2009   06/25/09

0012058 Fire Alarm Upgrade Durango High School                           $154,400.00    7/15/2009   07/23/09

0012047 Fire Alarm Upgrade Becker Middle School                          $122,900.00    7/15/2009   07/23/09

09-0486 West Charleston Storm Drains/Flood Control                      $1,000,000.00   7/10/2009   07/10/08

0012084 Fire Alarm Upgrade Las Vegas High School                         $350,000.00     8/6/2009

0012076 Fire Alarm Upgrade Greenspun  Middle School                      $350,000.00    8/20/2009

0012082 Fire Alarm  Green Valley High School                             $350,000.00     8/6/2009

0012081 Fire Alarm Upgrade Cheyenne High School                          $350,000.00     8/6/2009
0012083 Fire Alarm Upgrade Walter Johnson Middle School                     $136,000.00     8/20/2009   08/27/09

0012085 Fire Alarm Upgrade O'Callaghan Middle School                        $136,000.00     8/20/2009   08/27/09

0012080 Fire Alarm Upgrade Thurman White Middle School                      $136,000.00     8/20/2009   08/27/09

Gym Floor Installation for Temp Structure Sandy Valley HS                    $74,000.00     7/27/2009           

Installation of Fire Hydrant at Portables                                   $137,000.00     9/22/2009

Northwest Career & Technical Academy Access Road                            $263,252.00     9/16/2009   09/24/09


                                                                       $157,445,462.69




0011861 HVAC School Modernization Charlotte Hill Elementary School         $2,498,620.00     1/6/2010   04/22/10
0011873 HVAC School Modernization Dorothy Eisenberg Elementary
School                                                                     $2,579,710.00     1/6/2010   04/22/10
0011864 HVAC School Modernization  Helen Herr Elementary School            $4,721,000.00    1/20/2010
011848 HVAC School Modernization Walter Jacobson Elementary
School                                                                     $2,339,900.00    1/20/2010   05/13/10
0011847 HVAC School Modernization Helen Jydstrup Elementary School
                                                                           $4,395,000.00    1/20/2010   05/13/10
 Las Vegas Co-Op Learning Center - Landscaping #0811-P163                  $1,094,573.00    10/8/2009   11/03/09
Cosmetology Lab                                                             $600,000.00    11/13/2009
Installation of Fire Hydrant at Portables                                   $137,000.00     9/22/2009
Design/Build Water Pollution Control Facility                             $19,754,695.87    5/26/2009   07/21/10
Roof Replacement (Gymnasium & Cafeteria)                                    $288,989.00     10/7/2009   02/11/10

Campus Services Building & Classroom Building Complex Reroof Project        $372,374.00     10/5/2009   10/10/09
HVAC & Day Lighting at Gymnasium                                            $588,000.00     10/7/2009   11/18/09
HVAC School Modernization @ Elaine Wynn ES                                 $2,957,595.00                04/22/10
Cosmetology Lab Expansion                                                   $441,854.00    11/16/2009   12/10/09

Imaging Suite Shielding                                                     $218,252.00     8/25/2009   12/14/09

MPE StructureLab/Room 508                                                   $194,445.00     8/25/2009   12/16/09

Replace Tennis Basketball Courts and Correct Drainage                       $587,112.00     1/21/2010   01/28/10

Electronic Door Access                                                      $159,933.63 Sole Source

Site Security                                                               $397,500.00      2/4/2010   02/11/10

HVAC School Modernization @ Perkins ES                                     $3,038,268.00    2/17/2010   03/11/10

Roof Replacement @ Valley High School                                      $3,063,827.00     3/4/2010   03/25/10

Kenny C. Guin Middle School                                                $5,032,000.00    3/10/2010   03/25/10

Bus and Staff Parking and Quonset Hut Demolition                            $444,701.00     3/17/2010   03/25/10

Design Build of the UNLV Athletics Synthetic Turf                           $711,672.00     3/30/2010   04/23/10

Replace Asphalt on Playground                                               $138,000.00     3/17/2010   03/25/10

Bigelow Physics Building Re-Roofing Project                                 $325,385.00      4/1/2010   05/18/10
HVAC School Modernization/Selma F Bartlett ES                       $2,200,000.00   4/23/2010   05/13/10

HVAC School Modernization/Patricia F Bendorf ES                     $2,178,000.00   4/23/2010   05/13/10

HVAC School Modernization/Lilly and Wing Fong ES                    $2,270,110.00   4/23/2010   05/13/10

CBC Chiller Re-Piping                                                $992,718.00     4/1/2010   05/27/10

Cooperative Extension Center Expansion                               $230,000.00    3/23/2010   03/22/10

SCS Cooling Tower Project                                            $155,000.00     4/5/2010

HVAC Modernization Jim Thorpe ES                                    $2,301,986.00    5/5/2010   05/13/10

HVAC Modernization Harriet Treem ES                                 $2,443,730.00    5/4/2010   05/13/10

HVAC School Modernization Woolley ES                                 $244,440.00     5/3/2010   05/13/10

Replace Ashpalt of Playground Walter Long ES                         $141,800.00    4/26/2010   05/13/10

Construction of Additional Parking, Fire Access and Fire Hydrant     $280,000.00    4/29/2010   05/13/10

50 KW Photovoltaic Solar Power System                                $319,412.00     5/6/2010   05/26/10

Honeywell Energy System Upgrade                                      $483,853.24     5/1/2010

Roof Top Photovoltaic System @ Bailey Elementary School              $256,600.00    4/27/2010   06/24/10

Roof Top Photovoltaic System @ Dickens Elementary School             $260,750.00    4/27/2010   06/24/10

Roof Top Photovoltaic System @ Glyens Elementary School              $258,200.00    4/27/2010   06/24/10

Roof Top Photovoltaic System @ Roundy Elementary School              $265,850.00    4/27/2010   06/24/10

Roof Top Photovoltaic System @ Smalley Elementary School             $400,000.00    4/27/2010

Nate Mack Elementary School HVAC Modernization                      $2,654,804.00    6/9/2010   06/24/10

Andrew  Mitchell Elementary School HVAC Modernization               $3,194,700.00    6/8/2010   06/24/10

Asphalt Replacement                                                  $939,880.00     5/6/2010   05/13/10

Pahranagat Valley Middle School                                      $441,176.00    5/12/2010

Roof Top Photovotaic System @ Eileen Conners Elementary School       $247,551.00    6/16/2010   06/24/10

Roof Top Photovotaic System @ Robert L. Forbuss Elementary School    $247,551.00    6/16/2010   06/24/10
Roof Top Photovotaic System @ Judy and John L. Goolsby Elementary
School                                                               $247,551.00    6/16/2010   06/24/10

Roof Top Photovotaic System @ John R. Hummel Elemenatry School       $247,551.00    6/16/2010   06/24/10
Roof Top Photovotaic System @ William and Mary Scherkenbach
Elementary School                                                    $247,551.00    6/16/2010   06/24/10
Roof Top Photovotaic System @ Sandra Lee Thompson Elementary
School                                                               $247,551.00    6/16/2010   06/24/10

Northwest Career & Technical Academy                                 $248,943.00    6/16/2010   07/08/10

HVAC School Modernization @ Dailey ES                               $2,849,000.00    6/1/2010   06/24/10

HVAC School Modernization @ Kahre ES                                $2,560,000.00    6/1/2010   05/13/10

HVAC School Modernization @ Edythe Katz ES                          $2,826,300.00    6/1/2010   05/13/10
Roof Replacement                                                $910,000.00    6/10/2010

Roof Replacement @ Long ES                                      $419,995.00    6/15/2010   06/24/10

Roof Replacement @ Mendoza ES                                   $339,468.00    6/14/2010   06/24/10

Roof Replacement Sawyer MS                                      $962,000.00    6/17/2010   06/24/10

Roof Replacement @ Squires ES                                  $1,095,667.00   6/16/2010   06/24/10

HVAC School Modernization @ Mary & Zel Lowman ES               $2,350,000.00   7/13/2010   08/12/10

HVAC School Modernization @ Ernest May ES                      $2,189,700.00   7/13/2010   08/12/10

HVAC School Modernization @ Ulis Newton ES                     $2,327,000.00   7/13/2010   08/12/10

Roof Top Photovotaic System @ Kathy L. Batterman ES             $247,551.00     7/1/2010   06/24/10

Kay Carl ES                                                     $300,000.00     7/1/2010

Don E. Hayden ES                                                $300,000.00     7/1/2010

Dr. Claude G. Perkins ES                                        $300,000.00     7/1/2010

Aldeane Comito Ries ES                                          $247,551.00     7/1/2010   07/08/10

Eva G. Simmons ES                                               $300,000.00     7/1/2010

Wendell P. Williams ES                                          $300,000.00     7/1/2010

HVAC School Modernization @ Lunt ES                            $2,637,000.00   6/14/2010   06/24/10

HVAC School Modernization @ Lynch ES                           $2,649,000.00   6/14/2010   06/24/10

Gymnasium Bleacher Replacement @ Chaparral High                 $159,829.00    6/17/2010   06/24/10

Instructional Wall Upgrade @ James Gibson ES                    $216,000.00    5/26/2010   06/24/10

VGT Airfield Improvements                                      $1,118,000.00   6/16/2010

Expand Parking Area @ Zel Lowman ES                             $108,646.00    6/15/2010   06/24/10

Expand Parking and Install CMU Wall @ Lynch ES                  $260,570.00    6/15/2010   06/24/10

Cooling Tower Replacement William S. Boyd School of Law         $100,000.00     5/4/2010

HVAC School Moderniaztion @ Mack Lyon ES                        $663,200.00    6/17/2010   06/24/10

Theater Seating @ Valley High School                            $420,000.00     7/1/2010

UNLV Greenspun Building, Computer Room 1275 AC Units            $348,406.00    6/10/2010   07/27/10

Football Field Lighting Upgrade @ Basic High School             $350,000.00    7/15/2010

NW Substation Project                                           $100,000.00    7/16/2010

Football Field Turf Replacement @ Pahrump Valley High School    $429,283.00     6/4/2010   06/04/10

Gymnasium Bleacher Replacement @ Clark HS                       $212,764.00    8/19/2010   08/26/10

Metal Lockers @ Southeast Career and Technical Academy           $22,000.00     7/1/2010

Roof Replacement @ Halle Hewetson ES                            $155,500.00
Roof Replacement @ John Park ES                           $170,000.00

Roof Replacement @ Frank Garside MS                       $219,391.00

Roof Replacement @ Lomie Heard ES                         $260,000.00

LAN and Instructional Media Upgrade @ Bonanza HS          $755,000.00     8/19/2010   08/26/10

LAN and Instructional Media Upgrade @ Adams ES            $450,000.00     8/19/2010   08/26/10

LAN and Instrusion Alarm Systems Upgrade                  $225,000.00     8/19/2010

Pahrump Valley High School Addition and Remodel         $28,000,000.00    9/22/2010

Manse Elementary School (New Construction)              $11,500,000.00    7/12/2010



Central Substation Replacement                           $1,200,000.00     9/8/2010

CSN Lab Revision & Main Bldg. Fire Alarm                $10,900,000.00    9/10/2010


                                                     $166,181,485.74




Theater Conversion/New Elevator @ Chaparral HS            $476,420.00     10/5/2010
Roof Replacement @ Halle Hewetson ES                     $1,700,000.00   10/19/2010
Roof Replacement @ John Park ES                           $155,500.00    10/19/2010
Roof Replacement @ Frank Garside MS                       $219,391.00    10/19/2010
Roof Replacement @ Lomie Heard ES                         $260,000.00    10/19/2010
Roof Replacement @ Doriders ES                            $662,560.00    10/21/2010
Roof Replacement @ Harris ES                              $806,000.00    10/21/2010
Roof Replacement @ Tate ES                                $709,760.00    10/21/2010
Roof Replacement @ Tomiyasu ES                            $750,368.00    10/21/2010
LAN Upgrade @ Marc Kahre ES                                $70,000.00     10/6/2010
LAN Upgrade @ Jack Dailey ES                               $83,572.00     10/6/2010
LAN Upgrade @ Nate Mack ES                                $103,000.00     10/7/2010
LAN Upgrade @ Ann Lynch ES                                $100,000.00    10/17/2010
LAN Upgrade @ Edythe & Lloyd Kats ES                      $175,000.00    10/21/2010
LAN Upgrade @ Gwendolyn Woolley ES                        $185,000.00    10/21/2010
Intrusion Alarm Upgrade                                   $128,615.00     10/5/2010
School Modernization @ Grant Bowler ES                   $5,036,000.00    10/5/2010
Clock/Intercom System Replacement @ John Dooley ES        $100,000.00    10/20/2010
Clcok/Intercom System Replacment @ Clyde Cox ES           $100,000.00    10/20/2010
UNLV Potable Water System Improvements                    $100,000.00     10/1/2010


                                                      $11,921,186.00
 2/27/2009

 12/9/2008
 3/30/2009        5/7/2009   8/27/2009 Completed
 12/2/2008    
12/30/2008       1/15/2009   6/15/2009 Completed
 12/9/2008
 12/9/2008
 12/9/2008
  2/5/2009
11/24/2008
                                      Canceled 
12/12/2008

12/12/2008
                                      Canceled 

 3/31/2009
 3/13/2009
 5/15/2009
 1/21/2009

 3/13/2009

11/21/2008
11/24/2008

  1/9/2009

  2/5/2009

 1/26/2009

 4/24/2009

  6/2/2009

  2/5/2009

 2/13/2009

 2/13/2009

 2/13/2009

 2/13/2009



                                      Canceled 

 2/25/2009        5/5/2009   6/30/2009 Completed

 2/27/2009       4/29/2010   5/14/2010 Completed

 3/27/2009
 7/2/2009

8/28/2009

 4/3/2009  

4/24/2009     5/20/2010   6/21/2010 Completed

 4/3/2009

 7/2/2009

 7/2/2009

 3/3/2009

4/30/2009

5/22/2009

6/19/2009




4/24/2009

4/24/2009

4/24/2009

4/24/2009     6/24/2009    7/9/2009 Completed

5/15/2009     6/30/2009    7/9/2009  Completed

5/22/2009

4/22/2009      9/4/2009   4/29/2010 Completed

 5/4/2009

6/26/2009

6/26/2009

6/26/2009

7/10/2009

9/17/2009      9/4/2009   11/9/2009 Completed

7/29/2009

7/29/2009

7/24/2009                          Canceled 
     8/28/2009

     8/28/2009

     8/28/2009
                                      Part of 2008-
                                      482




     9/28/2009




     4/23/2010

     4/23/2010



     5/14/2010

     5/14/2010
     12/4/2009



     7/28/2010
     2/12/2010

     2/18/2010   4/20/2010   5/10/2010 Completed
    11/18/2009
     4/23/2010
    12/11/2009

     3/17/2010

    12/21/2009

     1/29/2010




     2/12/2010

     3/12/2010

     3/26/2010

     3/26/2010

     3/26/2010

     4/26/2010    6/7/2010    6/7/2010 Completed

     3/26/2010

     5/19/2010
5/14/2010

5/14/2010

5/14/2010

 6/2/2010

 8/3/2010




5/14/2010

5/14/2010

5/14/2010

5/14/2010

5/14/2010

5/27/2010




6/25/2010

6/25/2010

6/25/2010

6/25/2010




6/25/2010

6/25/2010

5/14/2010




6/25/2010

6/25/2010

6/25/2010

6/25/2010

6/25/2010

6/25/2010

 7/9/2010

6/25/2010

6/25/2010

6/25/2010
6/25/2010

6/25/2010

6/25/2010

6/25/2010

8/13/2010

8/13/2010

8/13/2010

6/25/2010




 7/9/2010




9/14/2010

6/24/2010

6/25/2010

6/25/2010




6/25/2010

6/25/2010




6/25/2010




7/29/2010




6/25/2010

8/27/2010
8/27/2010

8/27/2010
2009 Total North Public Works Projects        $                 427,373,377
2010 Total North Public Works Projects        $                 560,677,442
2011 Total North Public Works Projects        $                  30,880,506




Year 2009
DO-2009-1     GARDNERVILLE TOWN BOARD         CANCELED 08/25/09
LY-2009-2     CITY OF FERNLEY                 MARV MCQUEARY EXCAVATING
WA-2009-3     WASHOE CO PUBIC WORKS           CAMPBELL CONSTRUCTION INC
WA-2009-4     CITY OF RENO                    CANCELED 09/26/09
WA-2009-5     WASHOE CO PUBIC WORKS           CANCELED 04/29/09
                                              CLARK & SULLIVAN
WA-2009-6     STATE PUBLIC WORKS BOARD        CONSTRUCTORS
                                              WEST COAST CONTRACTORS OF NV
WA-2009-7     WA CO RTC
WA-2009-8     CITY OF RENO                    GRANITE CONSTRUCTION CO
                                              SIERRA NEVADA CONSTRUCTION
WA-2009-9     CITY OF RENO                    INC
WA-2009-10    CITY OF RENO                    ATLAS CONTRACTORS INC
WA-2009-11    TMWA                            RENO-TAHOE CONSTRUCTION 
WA-2009-12    WCDWR                           UNDER 100,000
WA-2009-13    WCDWR                           CANCELED 04/22/09
WA-2009-14    WASHOE CO SCHOOL DIST           RHP MECHANICAL SYSTEMS
DO-2009-15    DOUGLAS CO BORD OF COMMSNRS     PETERSEN CONSTRUCTION
WA-2009-16    RENO- TAHOE AIRPORT AUTHORITY   ALPINE ENERGY
WA-2009-17    RENO -TAHOE AIRPORT AUTHORITY   ALPINE ENERGY
WA-2009-18    RENO- TAHOE AIRPORT AUTHORITY   ALPINE ENERGY

WA-2009-19    NSHE/UNR                        TRI-SIGNAL INTEGRATION

EL-2009-20    ELKO COUNTY                     ADVANTAGE POOL PLASTERING
WP-2009-21    SO NV WATER AUTHORITY           WDC EXPLORATION & WELLS
WA-2009-22    CITY OF RENO                    PECK BROTHERS CONSTRUCTION

WA-2009-23    CITY OF RENO                    UNDER 100,000/RENO CONCRETE
HU-2009-24    STATE PUBLIC WORKS BOARD        RESOURCE DEVELOPMENT CO

EL-2009-25    CITY OF WEST WENDOVER

CH-2009-26    CHURCHILL CO COMMISSIONERS      BOMBARD RENEWABLE ENERGY
WA-2009-27    NSHE/UNR                        Q & D CONSTRUCTION INC
LY-2009-28    CITY OF FERNLEY                 A & K EARTH MOVERS
LY-2009-29    CITY OF FERNLEY                 PEAVINE CONSTRUCTION
CC-2009-30    NSHE/WNC                        RHP MECHANICAL SYSTEMS


WP-2009-31    SO NV WATER AUTHORITY           DELAYED SEE WP-2010-7

CC-2009-32    CARSON CITY COUNTY              AM-ALARM INC

WA-2009-33    WASHOE CO PUBIC WORKS           CANCELED 08/25/09
WP-2009-34    CITY OF ELY                     OFLAHERTY PLUMBING & HEATING
WA-2009-35    WASHOE COPUBLIC WORKS           WES CONSTRUCTION
ST-2009-36    CANYON GID                     CAMPBELL CONSTRUCTION INC
WA-2009-37    WASHOE CO RTC                  WEST COAST PAVING
WA-2009-38    WASHOE CO RTC                  INTERMOUNTAIN SLURRY SEAL
                                             A & K EARTHMOVERS/UNDER
CC-2009-39    CARSON CITY RTC                100,000
CC-2009-40    CC BOARD OF SUPERVISORS        KG WALTERS CONSTRUCTION CO
WA-2009-41    CITY OF SPARKS                 PETERSEN CONSTRUCTION
CC-2009-42    CC RTC                         HERBACK GENERAL ENGINEERING
HU-2009-43    HUMBOLDT CO COMMISSIONERS      H E HUNEWILL CO LTD
EL-2009-44    ELKO PARK FOUNDATION           SCHELL CREEK CONSTRUCTION
WA-2009-45    CITY OF SPARKS                 Q & D CONSTRUCTION INC
EL-2009-46    ELKO CO SCHOOL DISTRICT        MICHAEL CLAY CORP
WA-2009-47    CITY OF SPARKS                 ISBELL CONSTRUCTION INC
CC-2009-48    CC RTC                         A & K EARTHMOVERS
EL-2009-49    ELKO PARK FOUNDATION           CANYON CONST/UNDER 100,000

PE-2009-50    LOVELOCK MEADOWS WTR DIST      HUMBOLDT DRILLING & PUMP CO INC
                                             UNDER 100,000/SHELL CREEK
WP-2009-51    STATE PUBLIC WORKS BOARD       CONSTR
WA-2009-52    TMWA                           WWW CONSTRUCTION
LY-2009-53    NEVADA STATE PARKS             KFC BUILDING CONCEPTS
                                             UNDER 100,000/IMPACT
CH-2009-54    NEVADA STATE PARKS             CONSTRUCTION

LY-2009-55    DEPT CONSERVATION & NAT RES    ACTION CONST UNDER 100,000
EL-2009-56    STATE PUBLIC WORKS BOARD       KFC BUILDING CONCEPTS

LY-2009-57    STAGECOACH GID                 UNDER 100,000MARV MCQUEARY
WA-2009-58    WASHOE CO PUBIC WORKS
DO-2009-59    KINGSBURY GID                  ASPEN DEVELOPERS CORP
                                             SIERRA NEVADA CONSTRUCTION
EU-2009-60    EUREKA COUNTY                  INC
WA-2009-61    RENO SPARKS CONVENTION CNTR    CANCELED 04/01/09
WA-2009-62    NEVADA STATE PARKS             KFC BUILDING CONCEPTS
                                             SIERRA NEVADA CONSTRUCTION
LY-2009-63    CITY OF FERNLEY                INC

WA-2009-64    STATE PUBLIC WORKS BOARD       DVERSFIED CNCRTE CTTNG/ 94,168
EL-2009-65    ELKO COUNTY                    PEAVINE CONSTRUCTION
                                             SIERRA NEVADA CONSTRUCTION
WA-2009-66    WASHOE CO RTC                  INC
CC-2009-67    CC BOARD OF SUPERVISORS        LYN MARIE TRUCKING INC
EL-2009-68    ELKO PARK FOUNDATION           UNDER 100,000
EL-2009-69    ELKO PARK FOUNDATION           UNDER 100,000
WA-2009-70    CITY OF RENO                   PETERSEN CONSTRUCTION
WA-2009-71    WASHOE CO PUBIC WORKS          SIERRA WINDOW FASHIONS


WA-2009-72    RENO-TAHOE AIRPORT AUTHORITY
                                             WEST COAST CONTRACTORS OF NV
WA-2009-73    WASHOE CO SCHOOL DIST
WA-2009-74    CITY OF RENO                   MOUNTAIN WEST CONTRACTORS
                                             SIERRA NEVADA CONSTRUCTION
WA-2009-75    NSHE/UNR                       INC
EL-2009--76   CITY OF ELKO                   MACH 4 CONSTRUCTION
WA-2009-77      WASHOE CO PUBIC WORKS              J SLASH B ENTERPRISES INC
WA-2009-78      RENO-TAHOE AIRPORT AUTHORITY       WWW CONSTRUCTION INC
WA-2009-79      WASHOE CO RTC                      ATLAS CONTRACTORS INC
WA-2009-80      STATE PUBLIC WORKS BOARD           F EVANS CONSTRUCTION INC
WA-2009-81      CITYOF RENO                        CANCELED 10/22/09
                                                   TRUCKEE MEADOWS
WA-2009-82      WASHOE CO PUBIC WORKS              CONSTRUCTION
                                                   SIERRA NEVADA CONSTRUCTION
WA-2009-83R     WA CO RTC                          INC
WA-2009-84      WA CO RTC                          ATLAS CONTRACTORS INC
WA-2009-85      CITY OF SPARKS                     RENO-TAHOE CONSTRUCTION 

DO-2009-86      TAHOE REGIONAL PLANNING AGENCY CENTRAL SIERRA CONSTRUCTION
                                               EAST SLOPE CNS & WM TREMAINE
DO-2009-87      TAHOE REGIONAL PLANNING AGENCY CONS

DO-2009-88      STATE PUBLIC WORKS BOARD           F EVANS CONSTRUCTION INC
WA-2009-89      WASHOE CO SCHOOL DIST              SONITROL OF SOUTHERN NEVADA
WA-2009-90      WASHOE CO SCHOOL DIST              MT ROSE HEATING & AIR
WA-2009-91      WASHOE CO SCHOOL DIST              K7 CONSTRUCTION INC
                                                   RENO-TAHOE CONSTRUCTION /
WA-2009-92      TMWA                               ARRA
EL-2009-93      GREAT BASIN COLLEGE                Q & D CONSTRUCTION INC
LY-2009-94      CITY OF FERNLEY                    CANYON CREEK CONSTRUCTION

WA-2009-95      TMWA                               MARV MCQUEARY EXCAVATING INC
WA-2009-96      CITY OF RENO                       NORTHERN NEVADA EXCAVATING
WA-2009-97      INCLINE VILLAGE GID-PUBLIC WORKS   MKD CONSTRUCTION
DO-2009-98      INCLINE VILLAGE GID-PUBLIC WORKS   MKD CONSTRUCTION
                                                   SIERRA NEVADA CONSTRUCTION
WA-2009-99      WASHOE CO SCHOOL DIST              INC
WA-2009-100     WASHOE CO SCHOOL DIST              POWERCOMM SOLUTIONS INC
                                                   CANCELED 03/11/09 COMBINED W 9 -
WA-2009-101     WASHOE CO SCHOOL DIST              100
                                                   CANCELED 03/11/09/COMBND W 9-
WA-2009-102     WASHOE CO SCHOOL DIST              100
DO-2009-103     DOUGLAS CO SCHOOL DIST             ISBELL CONSTRUCTION INC
WA-2009-104     CITY OF RENO                       CANCELED 09/30/09
WA-2009-105     RENO-TAHOE AIRPORT AUTHORITY       ADVANCE INSTALLATIONS INC
PE-2009-106     NEVADA STATE PARKS                 IMPACT CONSTRUCTION
WA-2009-107     WASHOE CO SCHOOL DIST              BT MANCINI/UNDER 100,000

WA-2009-108     WASHOE CO SCHOOL DIST              CANCELED 03/010/09UNDER 100,000
WA-2009-109     NSHE/UNR                           PINECREST CONSTRUCTION
WA-2009-110     WASHOE CO RTC                      ATLAS CONTRACTORS INC
DO-2009-111     DO CO BOARD OF COMMISSIONERS
EL-2009-112     CITY OF ELKO                       QUANTUM ELECTRIC LLC
DO-2009-113     TOWN OF MINDEN                     WES CONSTRUCTION
EU-2009-114     EUREKA CO PUBLIC WORKS             HE HUNEWILL CONSTRUCTION
EL-2009-115     ELKO CO SCHOOL DISTRICT            CANCELED 3/11/09
WA-2009-116     CITY OF SPARKS                     ATLAS CONTRACTORS INC
WA-2009-117     CITY OF SPARKS                     MOUNTAIN WEST EXCAVATION
WA-2009-118     WASHOE CO SCHOOL DIST              CANCELED 03/11/09/UNDER 100,000
WA-2009-119     WASHOE CO SCHOOL DIST              NELSON ELECTRIC CO
WA-2009-120     CITY OF RENO                       DELAYED SEE 2010-24
MI-2009-121   HAWTHORNE UTILITIES            DELAYED
CC-2009-122   CC BOARD OF SUPERVISORS        DELAYED
                                             UNDER 100,000/DAN O
WA-2009-123   NEVADA STATE PARKS             CONSTRUCTION
LY-2009-124   CITY OF FERNLEY                UNDER 100,000/SIERRA NV CONST
CH-2009-125   CITY OF FALLON                 A & K EARTHMOVERS
WA-2009-126   CITY OF RENO                   CANCELD 08/26/09
EL-2009-127   ELKO COUNTY                    OLSON FENCING INC
WA-2009-128   PANDA RSTRNT GRP/UNR           HBH CONSTRUCTION INC
WA-2009-129   TMWA                           CRUZ CONSTRUCTION
DO-2009-130   E FORK FIRE & PARMEDIC DIST    BISON CONSTRUCTION
DO-2009-131   DOUGLAS COUNTY                 APCO CONSTRUCTION INC

EL-2009-132   CITY OF ELKO                   HUMBOLDT DRILLING & PUMP CO INC
EL-2009-133   ELKO CO SCHOOL DISTRICT        Q & D CONSTRUCTION INC
LY-2009-134   DPT CNSRVTN & NTURL RSRCS      HORIZON CONSTR/UNDER 100,000
                                             TRUCKEE MEADOWS
WA-2009-135   NSHE/UNR                       CONSTRUCTION
DO-2009-136   GARDNERVILLE TOWN BOARD        QUALCON CONTRACTORS INC
WA-2009-137   WASHOE CO RTC
                                             SIERRA NEVADA CONSTRUCTION
WA-2009-138   WASHOE CO RTC                  INC
                                             SIERRA NEVADA CONSTRUCTION
WA-2009-139   WASHOE CO RTC                  INC


WA-2009-140   INCLINE VILLAGE GID            MARV MCQUEARY/UNDER 100,000
WA-2009-141   TMWA                           STATE PAINTING CO INC
LY-2009-142   CITY OF FERNLEY                NORTHERN NEVADA EXCAVATING

WA-2009-143   TMWA                           RENO-TAHOE CONSTRUCTION 
CH-2009-144   CITY OF FALLON                 DELAYED SEE CH-2010-28
CH-2009-145   CITY OF FALLON                 DELAYED SEE CH-2009-145
PE-2009-146   LOVELOCK MEADOWS WTR DIST      KNIFE RIVER
EL-2009-147   ELKO CO SCHOOL DISTRICT        Q & D CONSTRUCTION INC
EL-2009-148   ELKO CO SCHOOL DISTRICT        Q & D CONSTRUCTION INC

WA-2009-149   TMWA                           OLYMPUS & ASSO/UNDER 100,000
DO-2009-150   TOWN OF MINDEN                 MARV MCQUEARY EXCAVATING
HU-2009-151   HUMBOLDT CO COMMISSIONERS      BIG G CONSTRUCTION
                                             RHP MECHANICAL SYS/UNDER
LY-2009-152   CITY OF FERNLEY                100,000
WA-2009-153   WASHOE CO SCHOOL DIST          NELSON ELECTRIC CO
WA-2009-154   NSHE/UNR                       F EVANS CONSTRUCTION INC
                                             SIERRA NEVADA CONSTRUCTION
LY-2009-155   LYON CO BRD OF COMMISSIONERS   INC
WA-2009-156   CITY OF SPARKS                 CANCELED 03/02/09 
LY-2009-157   CITY OF FERNLEY
WA-2009-158   WASHOE CO RTC                  GRANITE CONSTRUCTION CO
EL-2009-159   CITY OF ELKO                   PEAVINE CONSTRUCTION
WA-2009-160   WASHOE CO SCHOOL DIST          PERMIAN BUILDERS LLC
WA-2009-161   WASHOE CO SCHOOL DIST          BURDICK EXCAVATING CO INC
EL-2009-162   CITY OF ELKO                   RESOURCE DEVELOPMENT CO
WP-2009-163   NV DIV OF STATE PARKS          HCI UNDERGROUND
EL-2009-164   NV DIV OF STATE PARKS            DELAYED SEE 2010-19
WA-2009-165   NSHE/UNR                        PENTA BUILDING GROUP
CC-2009-166   STATE PUBLIC WORKS BOARD        CANCELED 03/25/09
EL-2009-167   CITY OF WELLS                   NAVCO CONSTRUCTION
WA-2009-168   CITYOF RENO                     INTERMOUNTAIN SLURRY SEAL
WA-2009-169   NSHE/UNR                        TNT CONSTRUCTION
WA-2009-170   RENO-TAHOE AIRPORT AUTHORITY    G E CHEN CONSTRUCTION
WA-2009-171   RENO-TAHOE AIRPORT AUTHORITY    G E CHEN CONSTRUCTION
EU-2009-172   EUREKA CO PUBLIC WORKS          MKD CONSTRUCTION
CC-2009-173   STATE PUBLIC WORKS BOARD        SCHOLTEN ROOFING SERVICE CO
WA-2009-174   NSHE/UNR                        NSHE/UNR
WP-2009-175   CITY OF ELY                     DIRTWORKS
WA-2009-176   WASHOE CO RTC                   Q & D CONSTRUCTION INC
WA-2009-177   WASHOE CO SCHOOL DIST           CANCELED 6/3/09
WA-2009-178   WASHOE CO SCHOOL DIST           RENO-TAHOE CONSTRUCTION 
WA-2009-179   WASHOE CO SCHOOL DIST           CANCELED 06/03/09
WA-2009-180   WASHOE CO SCHOOL DIST           GRADEX CONSTRUCTION
WA-2009-181   WASHOE CO SCHOOL DIST           HASCO INC
WA-2009-182   WASHOE CO SCHOOL DIST


WA-2009-183   WASHOE CO SCHOOL DIST           03/04/09 UNDER 100,000


WA-2009-184   WASHOE CO SCHOOL DIST           03/04/09 UNDER 100,000


WA-2009-185   WASHOE CO SCHOOL DIST           03/04/09 UNDER 100,000

EL-2009-186   METROPOLIS WATER IRRIGATION DIST CANCELED 8/25/09
                                               KODIAK ROOFING &
WA-2009-187   WASHOE CO SCHOOL DIST            WATERPROOFING
                                               KODIAK ROOFING &
WA-2009-188   WASHOE CO SCHOOL DIST            WATERPROOFING
WA-2009-189   WASHOE CO SCHOOL DIST            D & D ROOFING
WA-2009-190   WASHOE CO SCHOOL DIST            WESTERN SINGLE PLY
LY-2009-191   CITY OF FERNLEY                  CANCELED 08/25/09
WA-2009-192   CITY OF RENO                     SIERRA EROSION CONTROL INC
WA-2009-193   WASHOE CO SCHOOL DIST            SONITROL OF SOUTHERN NEVADA
WA-2009-194   WASHOE CO SCHOOL DIST            GRANITE CONSTRUCTION CO
WA-2009-195   WASHOE CO SCHOOL DIST            CANCELED 06/04/09
WA-2009-196   CITY OF SPARKS                   RHP MECHANICAL SYSTEMS
                                               GERHARDT & BERRY
WA-2009-197   TMWA                             CONSTRUCTION
CC-2009-198   NV CMM FOR THE RCNSTRCTN V & T   Q & D CONSTRUCTION INC
                                               CANYON CONSTRUCTIONuUNDR
EL-2009-199   CITY OF ELKO                     100,000

WA-2009-200   RENO-TAHOE AIRPORT AUTHORITY    DIVERSIFIED CONCRETE CUTTING INC
CC-2009-201   STATE PUBLIC WORKS BOARD        BOMBARD ELECTRIC/ UNDR 100,000
WA-2009-202   WASHOE CO PUBIC WORKS           ISBELL CONSTRUCTION INC
EL-2009-203   CITY OF W WENDOVER              STAKER & PARSONS CO
CC-2009-204   CC RTC                          A & K EARTH MOVERS INC
WA-2009-205   WASHOE CO PUBIC WORKS
WA-2009-206   WASHOE CO SCHOOL DIST           D & D ROOFING
                                              GERHARDT & BERRY CONSTRUCTIN
WA-2009-207   INCLINE VILLAGE GID             INC

WA-2009-208   WASHOE CO SCHOOL DIST           CANCELED 05/27/09/UNDER 100,000
WA-2009-209   WASHOE CO SCHOOL DIST           D & D ROOFING
DO-2009-210   DOUGLAS CO BORD OF COMMSNRS     AQUA DRILLING & PUMP SRV
EL-2009-211   CITY OF W WENDOVER              RUBY DOME INC
DO-2009-212   KINGSBURY GID                   QUALCON CONTRACTORS INC
CC-2009-213   CARSON CITY AIRPORT AUTHORITY   GRANITE CONSTRUCTION CO
EL-2009-214   CITY OF ELKO                    CAMINO CONSTRUCTORS
WA-2009-215   RENO-TAHOE AIRPORT AUTHORITY    GRANITE CONSTRUCTION CO
                                              SIERRA NEVADA CONSTRUCTION
DO-2009-216   DOUGLAS CO BORD OF COMMSNRS     INC
WA-2009-217   STATE OF NEVADA PURCHASING      SAIC
WA-2009-218   RENO-TAHOE AIRPORT AUTHORITY    MULTIPLE PRIMES
WA-2009-218                                   WESTERN SINGLE PLY
WA-2009-218                                   D & D ROOFING
DO-2009-219   GARDNERVILLE RANCHOS GID        WILSON CONSTRUCTION INC
WA-2009-220   WASHOE CO RTC                   GRANITE CONSTRUCTION CO

WA-2009-221   CITY OF SPARKS                  CANCELED SEE WA-2009-315
DO-2009-222   KINGSBURY GID                   F & B INC/UNDER 100,000
HU-2009-223   CITY OF WINNEMUCCA              HE HUNEWILL CONSTRUCTION
HU-2009-224   CITY OF WINNEMUCCA              HE HUNEWILL CONSTRUCTION
HY-2009-225   CITY OF WINNEMUCCA              INTERMOUNTAIN SLURRY SEAL
WA-2009-226   TMWA                            Q & D CONSTRUCTION INC
EL-2009-227   ELKO CO SCHOOL DISTRICT         CONTINENTAL FLOORING CO
WA-2009-228   WASHOE COUNTY RTC
WA-2009-229   STATE PUBLIC WORKS BOARD        BUILDING SOLUTIONS
WA-2009-230   REG TRANSPORT COMM WASHOE CO
WE-2009-231   CITY OF RENO                  CAMPBELL CONSTRUCTION INC
                                            SIERRA NEVADA CONSTRUCTION
EU-2009-232   EUREKA CO BOARD & COMMISSIONS INC
WA-2009-233   REG TRANSPORT COMM WASHOE CO ATLAS CONTRACTORS INC
WA-2009-234   REG TRANSPORT COMM WASHOE CO GRAINTE CONSTRUCTION CO
EL-2009-235   CITY OF CARLIN                MACH 4 CONSTRUCTION
WA-2009-236   CITY OF RENO                  DELAYED SEE WA-2010-20
EU-2009-237   EUREKA CO BOARD & CMMSNRS     MKD CONSTRUCTION
EL-2009-238   ELKO CO PUBLIC WORKS
EL-2009-239   CITY OF ELKO                  MACH 4 CONSTRUCTION
DO-2009-240   DOUGLAS CO BORD OF COMMSNRS   CANCLED 11/17/09
WA-2009-241   CITY OF RENO                  RENO TAHOE CONSTRUCTION
WA-2009-242   TMWA                          ATLAS CONTRACTORS INC
WA-2009-243   WASHOE CO PUBIC WORKS
LY-2009-244   LYON CO SCHOOL DIST           WNW CONSTRUCTION 

CC-2009-245   STATE PUBLIC WORKS BOARD        SIMPLEX GRINNELL/UNDER 100,000
LY-2009-246   LY CO SCHOOL DIST               GRANIE CONSTRUCTION
DO-2009-247   DOUGLAS CO BORD OF COMMSNRS     J SLASH B ENTERPRISES INC
EU-2009-248   EUREKA CO BRD OF CO COMISHRS    BUILDING SOLUTIONS
CC-2009-249   CC BOARD OF SUPERVISORS         D & D ROOFING
WA-2009-250   NSHE/UNR                        RHP MECHANICAL
LY-2009-251   LYON CO SCHOOL DIST             K7 CONSTRUCTION INC
LY-2009-252   LYON CO SCHOOL DIST             RAFAEL CONSTRUCTION INC
WA-2009-253   WASHOE CO RTC                   ATLAS CONTRACTORS INC
EL-2009-254   CITY OF ELKO                    PEAVINE CONSTRUCTION
WA-2009-255   CITY OF SPARKS                  MKD CONSTRUCTION
LY-2009-256   LYON CO SCHOOL DIST             ATLAS CONTRACTORS INC
WA-2009-257   RENO-SPARKS CONVENTION CNTR     D & D ROOFING & SHEET METAL
DO-2009-258   ZEPHYR HEIGHTS GID              KUSTOM KOATINGS INC
WA-2009-259   CITY OF SPARKS                  TITAN ELECTRICAL CONTRACTING
CC-2009-260   CC BOARD OF SUPERVISORS         PECORILLA HYDROSEEDING
                                              OLCESE CONSTRUCTION/
WA-2009-261   CITY OF SPARKS                  UNDER100,000

WA-2009-262   NSHE/UNR                        CLARK & SULLIVAN CONSTRUCTION
WA-2009-263   WASHOE CO RTC
EL-2009-264   ELKO CO SCHOOL DISTRICT         CANCELED 5/27/09
LY-2009-265   CITY OF FERNLEY                 PEAVINE CONSTRUCTION
WA-2009-266   CITY OF SPARKS                  MKD CONSTRUCTION
WA-2009-267   WASHOE CO SCHOOL DIST           GRADEX CONSTRUCTION
CC-2009-268   CARSON CITY SCHOOL DIST         MULTIPLE PRIMES
CC-2009-268                                   DAVIS COMPANY CONTRACTORS     
C-2009-268                                    COMSTOCK DRYWALL
CC-2009-268                                   INTERMOUNTAIN ELECTRIC INC
CC-2009-268                                   NEWT CONCRETE CONSTRUCTION
CC-2009-268                                   SUNRIDGE PAINTING
CC-2009-268                                   ALCAL ARCADE CONTRACTING
CC-2009-268                                   VALLEY DOOR WORKS
CC-2009-269   CARSON CITY AIRPORT AUTHORITY
MI-2009-270   MINERAL COUNTY                  BOART LONGYEAR
WA-2009-271   CITY OF SPARKS                  Q & D CONSTRUCTION INC
WA-2009-272   CITY OF SPARKS                  BISON CONSTRUCTION
CC-2009-273   CARSON CITY COUNTY              ATLAS CONTRACTORS INC
WA-2009-274   NEVADA ARMY NATIONAL GUARD      GRANITE CONSTRUCTION CO
WP-2009-275   STATE PUBLIC WORKS BOARD        SCHELL CREEK CONSTRUCTION
WA-2009-276   CITY OF SPARKS                  ISBELL CONSTRUCTION INC

PE-2009-277   STATE PUBLIC WORKS BOARD        NELSON ELECTRIC CO INC

WA-2009-278   WASHOE CO PUBIC WORKS           REYMAN BROTHERS CONSTRUCTION
EU-2009-279   EUREKA COUNTY PUBLIC WORKS      PEAVINE CONSTRUCTION INC
WA-2009-280   REGIONAL TRANSPORTATION         GRANITE CONSTRUCTION CO
EL-2009-281   NV DEPT OF WILDLIFE             WASHBURN FENCING INC
LA-2009-282   LANDER CO BOARD OF COMMISSION   HUNEWILL CONSTRUCTION
WA-2009-283   WASHOE CO SCHOOL DIST           K7 CONSTRUCTION INC
DO-2009-284   DOUGLAS CO BORD OF COMMSNRS     SPIESS CONSTRUCTION CO INC
                                              DON GARCIA EXCAVATING &
CC-2009-285   CC BOARD OF SUPERVISORS         PAVING
                                              DON GARCIA EXCAVATING &
CC-2009-286   CC BOARD OF SUPERVISORS         PAVING
EL-2009-287   CITY OF CARLIN                  SCHELL CREEK CONSTRUCTION INC
EL-2009-288   ELKO CO SCHOOL DISTRICT         RUBY DOME INC
WA-2009-289   WASHOE CO RTC                   Q & D CONSTRUCTION INC
WA-2009-290   WASHOE CO RTC                   GRANITE CONSTRUCTION CO
WA-2009-291   GERLACH GID                     DELAYED SEE WA-2010-58
WA-2009-292   WASHOE CO RTC                   ATLAS CONTRACTORS INC
WP-2009-293   SOUTHERN NV WATR AUTHORITY      DUPLICATE SEE WP 2009-21
WA-2009-294   WASHOE CO SCHOOL DIST           SUNDT CONSTRUCTION
LY-2009-295   CITY OF FERNLEY                 Q & D CONSTRUCTION INC
WA-2009-296   WASHOE CO PUBIC WORKS           UNDER 100,000
WA-2009-297   WASHOE CO PUBIC WORKS           UNDER 100,000
CC-2009-298   CC BOARD OF SUPERVISORS         A & K EARTH MOVERS INC
HU-2009-299   CITY OF WINNEMUCCA              HUMBOLDT LAWN & LANDSCAPE
CC-2009-300   CARSON CITY                     MILES CONSTRUCTION
                                              KING CONSTRUCTION/UNDER
LY-2009-301   LYON CO SCHOOL DIST             100,000
EU-2009-302   EUREKA BOARD OF CO COMMIS       BUILDING SOLUTIONS
LY-2009-303   LYON CO SCHOOL DIST             HORIZON CONST/UNDER 100,000
WA-2009-304   WASHOE CO RTC                   DELAYED SEE WA-2010-41
EL-2009-305   ELKO COUNTY                     CHEAL CUSTOM FENCE CO
                                              SIERRA NEVADA CONSTRUCTION
LY-2009-306   CITY OF FERNLEY                 INC
                                              GARDNER ENGINEERING/UNDER
WA-2009-307   NSHE/UNR                        100,000
CH-2009-308   CHURCHILL CO COMMISSIONERS      GLACIER
                                              SIERRA NEVADA CONSTRUCTION
WA-2009-309   WASHOE CO RTC                   INC
DO-2009-310   DEPT CONSERVATION & NAT RES     BURDICK EXCAVATING CO INC
WA-2009-311   INCLINE VILLAGE GID             BURDICK EXCAVATING CO INC
WA-2009-312   CITY OF SPARKS                  PERMANENT PATCH PROGRAM
EL-2009-313   ELKO CO SCHOOL DISTRICT         CANYON CONSTRUCTION CO
PE-2009-314   PERSHING CO BRD OF COMMISNERS   UNDER 100,000/Z7 DEVELOPMENT
WA-2009-315   CITY OF SPARKS                  RENO-TAHOE CONSTRUCTION 
EL-2009-316   CITY OF ELKO                    Q & D CONSTRUCTION INC
WA-2009-317   WASHOE CO RTC                   ATLAS CONTRACTORS INC
WA-2009-318   WASHOE CO RTC                   GRANITE CONSTRUCTION CO
WA-2009-319   NSHE/UNR                        RHP MECHANICAL
DO-2009-320   DOUGLAS CO SCHOOL DIST          DESIGN-BUILD SOLUTIONS
CH-2009-321   CHURCHILL CO COMMISSIONERS      A & K EARTHMOVERS
WA-2009-322   WASHOE CO RTC                   DELAYED SEE WA-2010-42
WA-2009-323   CITY OF RENO                    WWW CONSTRUCTION INC
PE-2009-324   CITY OF LOVELOCK                DELAYED SEE PE-2010-52
CC-2009-325   CARSON CITY RTC                 A & A CONSTRUCTION
WA-2009-326   CITY OF RENO                    GRADEX CONSTRUCTION
WA-2009-327   CITY OF SPARKS                  PEAVINE CONSTRUCTION INC
WA-2009-328   WASHOE COUNTY RTC               Q & D CONSTRUCTION INC
WA-2009-329   WASHOE CO PUBIC WORKS           BUILDING SOLUTIONS
WA-2009-330   NSHE/UNR                        F EVANS CONST
WA-2009-331   WASHOE CO PUBIC WORKS           MARV MCQUERY EXCAVATING
EL-2009-332   CITY OF ELKO
WA-2009-333   WASHOE CO SCHOOL DIST           F & P CONSTRUCTION INC
WA-2009-334   WASHOE CO RTC                   GRANITE CONSTRUCTION CO
EL-2009-335   CITYOF CARLIN                   RUBY DOME INC
HU-2009-336   GOLCONDA FIRE PROTECTION DIST   MICHAEL CLAYCORP
WA-2009-337   NSHE/UNR-ICA                    CANCELED 12/30/09
MI-2009-338   MINERAL CO BRD OF CMMISNRS      CHEAL CUSTOM FENCE CO
EL-2009-339   ELKO CO SCHOOL DISTRICT         CANYON CONSTRUCTION
WA-2009-340   CITY OF SPARKS                   ATLAS CONTRACTORS INC
CC-2009-341   STATE PUBLIC WORKS BOARD         GOLDIE INC
CC-2009-342   MICHAEL HOHL MNGMNT GRP          METCALF BUILDERS
CC-2009-343   MICHAEL HOHL MNGMNT GRP          METCALF BUILDERS
                                               V & C CONSTRUCTIONUNDER
LY-2009-344   CITY OF YERINGTON                100,000
CC-2009-345   NV ARMY NATIONAL GUARD           A & K EARTH MOVERS
WA-2009-346   NV ARMY NATIONAL GUARD           A & K EARTH MOVERS
WA-2009-347   NV ARMY NATIONAL GUARD           INTERMOUNTAIN SLURRY SEAL
DO-2009-348   DOUGLAS COUNTY                   Q & D CONSTRUCTION INC
WA-2009-349   CITY OF SPARKS                   RDC INC
CC-2009-350   CC BOARD OF SUPERVISORS          HORIZON CONSTRUCTION INC
WA-2009-351   WASHOE CO SCHOOL DIST            CANCELED 10/01/09
WA-2009-352   CITY OF SPARKS                   PEAVINE CONSTRUCTION INC
HU-2009-353   CITY OF WINNEMUCCA               CHEAL CUSTOM FENCE CO
DO-2009-354   DOUGLAS CO BORD OF COMMSNRS      SPIESS CONSTRUCTION CO INC
LY-2009-355   LYON CO BRD OF COMMISSIONERS     GRADEX CONSTRUCTION
WA-2009-356   WASHOE CO AIRPORT AUTHORITY      ROYAL ELECTRIC CO
WA-2009-357   WASHOE CO AIRPORT AUTHORITY      Q & D CONSTRUCTION INC
HU-2009-358   HUMBOLDT CO HOSPITAL DIST        Q & D CONSTRUCTION INC
DO-2009-359   TOWN OF MINDEN                   CANCELED 1/15/10
CH-2009-360   CITY OF FALLON                   UNDER 100,000
                                               SIERRA NEVADA CONSTRUCTION
CH-2009-361   CITY OF FALLON                   INC
WA-2009-362   RENO-TAHOE AIRPORT AUTHORITY     Q & D CONSTRUCTION INC
CC-2009-363   CC RTC                           INTERMOUNTAIN SLURRY SEAL
CC-2009-364   STATE PUBLIC WORKS BOARD         FRANK LEPORI CONSTRUCTION
                                               KODIAK ROOFING &
WA-2009-365   RENO-TAHOE AIRPORT AUTHORITY     WATERPROOFING
DO-2009-366   DOUGLAS CO SCHOOL DIST           CANCELED 08/18/2009
WA-2009-367   INCLINE VILLAGE GID              RELIANT ELECTRIC
CC-2009-368   CC BOARD OF SUPERVISORS          F & P CONSTRUCTION INC
WA-2009-369   WASHOE CO SCHOOL DIST            LIGH TAC INC
                                               BUILDING SOLUTIONS/UNDER
LY-2009-370   CITY OF YERINGTON                100,000
                                               BISON CONSTRUCTION/UNDER
CC-2009-371   STATE PUBLIC WORKS BOARD         100,000
WA-2009-372   WASHOE CO PUBIC WORKS            MT ROSE HEATING & AIR
WA-2009-373   S TRUCKEE MEADOWS GID            CANCLED 12-23-09
CC-2009-374   CC SCHOOL DIST                   MULTIPLE PRIMES
CC-2009-374                                    MARV MCQUEARY EXCAVATING
CC-2009-374                                    CRUZ CONSTRUCTION CO INC
CC-2009-374                                    NEWT CONCRETE CONSTRUCTION
WA-2009-375   WASHOE CO SCHOOL DIST            JW MCCLENAHAN CO
EL-2009-376   ELKO CO SCHOOL DISTRICT          CANCELED 10/28/09
HU-2009-377   MCDERMITT SEWER DIST             CANCELED SEE HU-2010-36
LA-2009-378   LANDER CO SEWER & WATER DIST 2    CANCELED SEE LA-2010-7
MI-2009-379   HAWTHORNE UTILITIES              DELAYED SEE 2010-94
ST-2009-380   CANYON GID                       DELAYED SEE 2010-84
WA-2009-381   WASHOE CO RTC                    DELAYED SEE WA-2010-203
EL-2009-382   STATE PUBLIC WORKS BOARD         PEAVINE CONSTRUCTION INC
WA-2009-383   CITY OF SPARKS                   SYSTEM 3 INC.
WA-2009-384   TRUCKEE MEADOWS WATER            PEAVINE CONSTRUCTION INC
EL-2009-385   ELKO CO SCHOOL DISTRICT          RUBY DOME INC
WA-2009-386   WASHOE CO DPT WTR RESORCS        DELAYED SEE WA-2010-51
LA-2009-387   LANDER CO BOARD OF COMMISSION    HUNEWILL CONSTRUCTION INC
LY-2009-388   LYON COUNTY                      L A PERKS PLUMBING & HEATING

LA-2009-389   GVENORS BRD BATTLE MT GEN HOSP   SHAHEEN-BEAUCHAMP BUILDERS
CC-2009-390   CC RTC                           Z7 DEVELOPMENT/ARRA
WA-2009-391   WASHOE CO SCHOOL DIST            CANCELED 10/27/09
WA-2009-392   TMWA                             MKD CONSTRUCTION
WA-2009-393   TMWA                             MKD CONSTRUCTION
                                               DON M LAZARKO CONST/UNDER
WA-2009-394   NEVADA STATE PARKS               100,000
LY-2009-395   LYON CO BRD OF COMMISSIONERS     DELAYED SEE LY-2010-67
WA-2009-396   TMWA                             WWW CONSTRUCTION INC
WA-2009-397   WASHOE CO                        DEVCON CONSTRUCTION INC

CC-2009-398   CC BOARD OF SUPERVISORS          HUMBOLDT DRILLING & PUMP CO INC
HU-2009-399   HUMBOLDT CO SCHOOL DIST          MULTIPLE PRIMES
HU-2009-399                                    DESERT FIRE PROTECTION
HU-2009-399                                    FAST GLASS
HU-2009-399                                    MARCOR ENVIRONMENTAL
HU-2009-399                                    RICKS FLOORING
HU-2009-399                                    CR DRAKE & SONS ELECTRICAL
HU-2009-399                                    RHP MECHANICAL
HU-2009-399                                    BIG G CONSTRUCTION
HU-2009-399                                    H E HUNEWILL CO LTD
HU-2009-399                                    INSULPRO PROJECTS
HU-2009-399                                    RAY KELLER CONSTRUCTION
HU-2009-399                                    TALLMAN LUMBER CO
HU-2009-399                                    WN SALES
HU-2009-399                                    CB BROWN CO
                                               INNOVATIVE COMMUNICATION
HU-2009-399                                    SYSTEMS
PE-2009-400   HUMBOLDT CO SCHOOL DIST          MULTIPLE PRIMES
PE-2009-400                                    MARCOR ENVIRONMENTAL
PE-2009-400                                    RICKS FLOORING
PE-2009-400                                    RICKS FLOORING
PE-2009-400                                    ALPINE ROOFING
PE-2009-400                                    HSP PAINTING
PE-2009-400                                    RENO CONCRETE
                                               SIERRA NEVADA CONSTRUCTION
PE-2009-400                                    INC
PE-2009-400                                    FRANK EVANS CONSTRUCTION
PE-2009-400                                    CB BROWN CO
CC-2009-401   NV DEPT OF CORRECTIONS           NORESCO PHASE 1
CC-2009-402   NV DEPT OF CORRECTIONS           NORESCO PHASE 2
WA-2009-403   CITY OF RENO                     APS ENERGY SERVICES
Total 2009




Year 2010
LY-2010-1    CITY OF YERINGTON                CAMPBELL CONSTRUCTION
LY-2010-2    LYON COUNTY                      Q & D CONSTRUCTION
DO-2010-3    DOUGLAS COUNTY BOARD
WA-2010-4    CITY OF RENO                     GRANITE CONSTRUCTION
WA-2010-5    CITY OF RENO                     GRANITE CONSTRUCTION
WA-2010-6    CITY OF RENO                     SPANISH SPRINGS CONSTRUCTION
ST-2010-7    SOUTHERN NV WATER AUTHORITY
ST-2010-8    STOREY COUNTY                    MULTIPLE PRIMES

                                              MARV MCQUEARY EXCAVATING INC
WA-2010-9    WASHOE CO RTC                    ATLAS  CONTRACTORS INC
WA-2010-10   WASHOE CO RTC                    GRANITE CONSTRUCTION
WA-2010-11   WASHOE CO RTC
PE-2010-12   PERSHING CO WATER CONSERVATN
CH-2010-13   STATE PUBLIC WORKS BOARD         D & D ROOFING/UNDER 100,000
HU-2010-14   STATE PUBLIC WORKS BOARD         KODIAK ROOFING/UNDER 100,000
WA-2010-15   STATE PUBLIC WORKS BOARD         SUNDT CONSTRUCTION INC
WA-2010-16   CARSON CITY RTC                  A & K EARTHMOVERS
WA-2010-17   BOARD OF REGENTS UNR             J F DUNCAN INDUSTRIES
EL-2010-18   ELKO COUNTY                      MGM CONSTRUCTION
EL-2010-19   NV DIV OF STATE PARKS            IMPACT CONSTRUCTION
WA-2010-20   CITY OF RENO
EL-2010-21   NSHE BOARD OF REGEANTS           HIGH MARK CONSTRUCTION
                                              D & D ROOFING/UNDER /UNDER
CH-2010-22   CHURCHILL CO SCHOOL DIST         100,000
                                              BRIGGS ELECTRIC INC/UNDER
WA-2010-23   INCLINE VILLAGE GID              100,000 
WA-2010-24   CITY OF RENO                     DELAYED SEE WA-2011-10
WA-2010-25   WASHOE CO PUBLIC WORKS           ATLAS  CONTRACTORS INC
EL-2010-26   CITY OF WEST WENDOVER            GERBER CONSTRUCTION
LY-2010-27   CITY OF FERNLEY                  A&K EARTHMOVERS
CH-2010-28   CITY OF FALLON                   SIERRA NEVADA CONSTRUCTION
EL-2010-29   CITY OF WELLS                    STEEL SYSTEMS INC
WP-2010-30   STATE PUBLIC WORKS BOARD         NELSON ELECTRIC/UNDER 100,000
CH-2010-31   CITY OF FALLON                   SIERRA NEVADA CONSTRUCTION
WP-2010-32   WHITE PINE CO COMMISSION         CG&B ENTERPRISES INC
WA-2010-33   STATE PUBLIC WORKS BOARD         NELSON ELECTRIC CO
                                              CANCELED SEE CH-2010.-53
CH-2010-34   CHURCHILL CO COMMISSIONERS       DUPLICATE
                                              EMPIRE CONTRACTORS/UNDER
WA-2010-35   CITY OF SPARKS                   100,000 
HU-2010-36   MCDERMITT SEWER DIST             HIGH MARK CONSTRUCTION
LA-2010-37   LANDER CO SEWER & WATR DIST 2    VALLEY UNDERGROUND INC
DO-2010-38   GARDNERVILLE RANCHOS GID         PEEK CONSTRUCTION CO
                                              PRESENTATION PRODUCTS DBA
WA-2010-39   NSHE/UNR                         SPINITAR
WA-2010-40   NSHE/UNR
WA-2010-41   WASHOE CO RTC
WA-2010-42   WASHOE CO RTC                    GRANITE CONSTRUCTION
LY-2010-43   SILVER SPRINGS MUTUAL WATER CO
HU-2010-44   MCDERMITT SEWER DIST             UNDER 100,000
WA-2010-45   CITY OF SPARKS                   STEVE C HAMILTON INC
WA-2010-45                                    STEVE C HAMILTON INC
WA-2010-45                                      STEVE C HAMILTON INC
MI-2010-46    MINERAL CO SCHOOL DIST            HERBACK GENERAL ENGINEERING
WA-2010-47    WASHOE CO RTC

WA-2010-48    WASHOE CO SCHOOL DIST             Q & D CONSTRUCTION/ARRA
WA-2010-49    RENO-TAHOE AIRPORT AUTHORITY      ALPINE ENERGY
LA-2010-50    LANDER CO BRD OF COMMISSONERS
                                                LAYFIELD ENVIRONMENTAL SYS
WA-2010-51    WASHOE DEPT WATER RESOURCES       CORP
PE-2010-52    CITY OF LOVELOCK                  BEN F DOTSON CONSTRUCTION
CH-2010-53    CHURCHILL CO COMMISSIONERS        BOMBARD ELECTRIC
WA-2010-54    TMWA                              Q & D CONSTRUCTION
MI-2010-55    HAWTHORNE UTILITIES               CAMPBELL CONSTRUCTION CO INC
MI-2010-56    MINERAL CO SCHOOL DIST            HERBACK GENERAL ENGINEERING
HU-2010-57    MCDERMITT WATER SUPPLY            ARRA/UNDER 100,000
WA-2010-58    GERLACH GID                       KING CONSTRUCTION
WA-2010-59    CITY OF RENO                      CANCELED 4/30/10
WA-2010-60    CITY OF RENO                      PAR ELECTRICAL CONSTRACTORS

LY-2010-61    SILVER SPRINGS MUTUAL WATER CO    NORTHERN NEVADA EXCAVATIONG
WA-2010-62    WASHOE CO RTC                     MT ROSE HEATING & AIR
                                                UNDER 100,000/HI STANDARD
WA-2010-63    NEVADA STATE PARKS                SECURITY
WA-2010-64    WASHOE CO SCHOOL DIST             SIMPLEX GRINNELL LP

WA-2010-65    WASHOE CO SCHOOL DIST             FCC COMMUNICATION
WA-2010-66    WASHOE CO SCHOOL DIST             CANCELED 6/16/10
LY-2010-67    LYON CO SCHOOL DIST               FARR CONSTRUCTION CORP
                                                BRUCE MCKAY PUMP & WELL UNDR
WA-2010-68    STAGECOACH GID                    100
WA-2010-69    STMGID BOARD OF TRUSTEES          CANCELED 06/21/10
                                                BRIGGS ELECTRIC INC/UNDER
CC-2010-70    STATE PUBLIC WORKS BOARD          100,000 
                                                DANOSKI CLUTTS BUILDING GROUP
WP-2010-71    WP CO HOSPITAL DISTRICT           LLC
LY-2010-72    CITY OF YERINGTON
WP-2010-73    STATE PUBLIC WORKS BOARD          RESOURCE DEVELOPMENT CO
HU-2010-74    MC DERMITT WATER SYSTEM           UNDER 100,000/CARSON PUMP LLC




LY-2010-76A   CITY OF YERINGTON                 BOART LONGYEAR
EL-2010-76    CITY OF ELKO                      STAKER PARSON COMPANIES
LY-2010-77    CITY OF YERINGTON                 CANCELED 5/5/10
WA-2010-78    TMWA                              MKD CONSTRUCTION INC
ST-2010-79    CANYON GID                                               5/5/2010
WA-2010-80    CITY OF SPARKS                    RESOURCE DEVELOPMENT CO
WA-2010-80A   RENO-TAHOE AIRPORT AUTHORITY      G & G SPECIALTY CONTRACTORS
CH-2010-81    CHURCHILL  BRD OF COMMISSIONERS   K7 CONSTRUCTION
WA-2010-81    RENO-TAHOE AIRPORT AUTHORITY      ADVANCE INSTALLATIONS INC
WA-2010-82    CITY OF SPARKS                    GRANITE CONSTRUCTION
LY-2010-83    CITY OF YERINGTON                 CANCELED 5/5/10
ST-2010-84    CANYON GID                        PEAVINE CONSTRUCTION
EL-2010-85    CITY OF WEST WENDOVER             GERBER CONSTRUCTION
WP-2010-86     CITY OF ELY                      HYDRO TECH INC
LY-2010-87     CITY OF FERNLEY
EU-2010-88     EUREKA CO COMMISSIONERS          SIERRA NEVADA CONSTRUCTION
WA-2010-89     WASHOE CO PUBLIC WORKS           LEPORI CONSTRUCTION

EL-2010-90     ELKO COUNTY/JACKPOT              HUMBOLDT DRILLING & PUMP CO INC
EL-2010-91     ELKO COUNTY/JACKPOT              RECORD STEEL & CONSTRUCTION
EL-2010-92     STATE PUBLIC WORKS BOARD         BUILDING SOLLUTIONS
                                                GARDEN SHOP NURSERY
CH-2010-93     CITY OF FALLON                   LANDSCAPE
MI-2010-94     HAWTHORNE UTILITIES              KFC BUILDING CONCEPTS INC
WA-2010-95     WASHOE CO BOARD OF COMMISS       FARR CONSTRUCTION
WA-2010-96     WASHOE CO SCHOOL DIST            DIAMOND G CONSTRUCTION
WA-2010-97     WASHOE CO SCHOOL DIST
                                                HE HUNNEWILL CONST/UNDER
LA-2010-98     LANDER CO BOARD OF COMMISS       100,000
LY-2010-99     LYON CO BOARD OF COMMISSIONER
CC-2010-100    CC BOARD OF SUPERVISORS          EL CAMINO CONSTRUCTION
CC-2010-101    CC BOARD OF SUPERVISORS          CANCELED & COMBINED W 10-100
WA-2010-102    TMWA                             SIERRA NEVADA CONSTRUCTION

CH-2010-103    CHURCHILL CO BOARD OF COMMISNR A & K EARTHMOVERS

CC-2010-104    CARSON CITY                      RESOURCE DEVELOPMENT CO
DO-2010-105    MINDEN GARDNERVILLE SANITATION   KG WALTERS CONSTRUCTION
WA-2010-106    DO CO  COMMUNITY SERVICES        Q&D CONSTRUCTION
DO-2010-107    TMWA                             CAMPBELL CONSTRUCTION CO INC
WA-2010-108    WA CO BOARD OF COMMISSIONERS     A & K EARTHMOVERS
WA-2010-109    TMWA                             GERHARDT & BERRY
                                                UNDER 100,000/BISON
DO-2010-110    DO DEPT CONSERVATION             CONSTRUTION
                                                CANCELED 9/14/10 PER SUE/see ch-
CH-2010-111    CHURCHILL CO SCHOOL DIST         407
EL-2010-112    ELKO CO SCHOOL DIST              CANCELED 5/25/10
CH-2010-113    TOLAS WATERWORKS CO-OP           A&K EARTHMOVERS
EL-2010-114    ELKO CO SCHOOL DIST              MGM CONSTRUCTION
WA-2010-115    TMWA                             RENO TAHOE CONSTRUCTION
WP-2010-116    CITY OF ELY                      RECK BROTHERS LLC
CC-2010-117    CARSON CITY RTC                  VALLEY SLURRY SEAL CO
CC-2010-118    CARSON CITY RTC                  PEAVINE CONSTRUCTION
WA-2010-119    NSHE/UNR                         K7 CONSTRUCTION
WA-2010-120    NSHE/UNR                         RELIANT ELECTRIC LLC
WA-2010-121    WASHOE CO RTC                    KFC BUILDING CONCEPTS INC
WA-2010-122    WASHOE CO RTC                    BISON CONSRUCTION

HU-2010-123    STAR CITY PROPERTY OWNERS ASSO   HE HUNEWILL CONSTRUCTION
EL-2010-124    ELKO CO SCHOOL DIST
EL-2010--125   NV DIV OF WATER RESOURCES        ASSOCIATED UNDERWATER SRVS
HU-2010-126    MCDERMITT WATER SYSTEMS          BOART LONGYEAR
MI-2010-127    WALKER LAKE GID                  BOART LONGYEAR
WA-2010-128    WASHOE CO RTC                    NELSON ELECTRIC
                                                RHP MECHANICAL SYS/UNDER
WA-2010-129    WASHOE CO RTC                    100,000
CC-2010-130    CARSON CITY RTC                  V & C CONSTRUCTION INC
WA-2010-131   CITY OF RENO                     KFC BUILDING CONCEPTS INC
WA-2010-132   INCLINE VILLAGE GID              ASPEN DEVELOPERS
WA-2010-133   RED DEVELOPMENT/CITY OF SPARKS   Q & D CONSTRUCTION
WA-2010-134   RENO-TAHOE AIRPORT AUTHORITY     BISON CONSTRUTION
WA-2010-135   RENO-TAHOE AIRPORT AUTHORITY     ALPINE ENERGY INC
WA-2010-136   RENO-TAHOE AIRPORT AUTHORITY     ALPINE ENERGY
WA-2010-137   RENO TAHOE AIRPORT AUTHORITY     BISON CONSTRUTION
CH-2010-138   SAGE VALLEY MOBILE HOME PARK     UNDER $100,000
WA-2010-139   RENO-TAHOE AIRPORT AUTHORITY     G&S SPECIALTY CONTRACTORS
WA-2010-140   WASHOE CO RTC                    SYSTEM 3 INC
                                               FARR CONSTRUCTION/UNDER
EL-2010-141   CITY OF ELKO                     100,000 
WA-2010-142   CITY OF SPARKS                   GRANITE CONSTRUCTION
EU-2010-143   EUREKA CO PUBLIC WORKS           SIERRA NEVADA CONSTRUCTION
              CARSON CITY BOARD OF
CC-2010-144   SUPERVISORS                      HUMBOLDT DRILLING & PUMP CO INC
WA-2010-145   CITY OF SPARKS                   HORIZON CONSTRUCTION INC
WA-2010-146   CITY OF RENO                     INTERMOUNTAIN SLURRY SEAL
WA-2010-147   WASHOE CO PUBLIC WORKS
WA-2010-148   INCLINE VILLAGE GID              UNITED CONSTRUCTION
EL-2010-149   NEVADA STATE PARKS               UNDER 100,000
                                               CANCEL 6/15/10 DUPLICATE OF 10-
WA-2010-150   WASHOE CO SCHOOL DIST            48
CH-2010-151   CITY OF FALLON                   A & K EARTHMOVERS
EL-2010-152   STATE PUBLIC WORKS BOARD         PEAVINE CONSTRUCTION
WA-2010-153   TMWA                             Q & D CONSTRUCTION
HU-2010-154   STATE PUBLIC WORKS BOARD         BISON CONSTRUCTION
WA-2010-155   CITY OF RENO                     DEVCON CONSTRUCTION

CH-2010-156   CHURCHILL FACILITIES & GROUNDS   OASIS AIR CONDITIONING & HEATING
WA-2010-157   RENO-TAHOE AIRPORT AUTHORITY     GRANITE CONSTRUCTION

HU-2010-158   HUMBOLDT COUNTY COMMISSIONERS    SWEENEY CONSTRUCTION
WA-2010-159   WASHOE CO SCHOOL DIST            CANCELED 4/2/10
WA-2010-160   WASHOE CO SCHOOL DIST            CANCELED 4/2/10
WA-2010-161   WASHOE OC SCHOOL DIST            CANCELED 4/2/10
WA-2010-162   WASHOE CO SCHOOL DIST            CANCELED 4/2/10
EL-2010-163   BOARD OF REGENTS UNR             QUANTUM ELECTRIC LLC
WA-2010-164   WASHOE CO RTC                    GRANITE CONSTRUCTION
WA-2010-165   WA CO BOARD OF COMMISSIONERS     INTERSTATE PLUMBING
WA-2010-166   INCLINE VILLAGE GID               
WA-2010-167   CITY OF SPARKS                   RENO-TAHOE CONSTRUCTION INC
                                               HORIZON CONSTRUCTION UNDR
WA-2010-168   WASHOE CO PUBLIC WORKS           1000,000
WA-2010-169   RENO TAHOE AIRPORT AUTHORITY 
WA-2010-170   WASHOE CO SCHOOL DIST            COMMERCIAL SOLAR SERVICES
WA-2010-171   WASHOE CO SCHOOL DIST            FRANK LEPORI CONSTRUCTION
EL-2010-172   CITY OF ELKO                     DUPLICATE SEE EL-2010-178
WA-2010-173   WASHOE CO RTC                    VALLEY SLURRY SEAL INC
WA-2010-174   WASHOE CO RTC                    WEST COAST PAVING
WA-2010-175   WASHOE CO RTC                    SIERRA NEVADA CONSTRUCTION
WA-2010-176   WASHOE CO RTC                    GRANITE CONSTRUCTION
WA-2010-177   WASHOE CO RTC                    SPANISH SPRINGS CONSTRUCTION
EL-2010-178   CITY OF ELKO                     CAMINO CONSTRUCTERS
WA-2010-179   CITY OF SPARKS                   CANCELED 5/26/10




WA-2010-180   TMWA                             Q & D CONSTRUCTION
WA-2010-181   STATE PUBLIC WORKS BOARD         GARDNER ENGINEERING INC
WA-2010-182   STATE PUBLIC WORKS BOARD         SAVAGE & SON INC/UNDER 100,000
WA-2010-183   STATE PUBLIC WORKS BOARD         RELIANT ELECTRIC LLC
                                               GERHARDT & BERRY
WA-2010-184   CITY OF SPARKS                   CONSTRUCTION
WA-2010-185   TMWA                             GRADEX CONSTRUCTION CO
                                               DON M LAZORKO CONSTRUCTION
HU-2010-186   HUMBOLDT CO HOSPITAL DIST        INC
              DEPT OF CONSERVATION & NATURAL
WA-2010-187   RESOURCES
LY-2010-188   LYON CO COMMISSIONERS            FARR CONSTRUCTION/UNDER  
LY-2010-189   LYON CO SCHOOL DIST              A & K EARTHMOVERS
WA-2010-190   WASHOE CO SCHOOL DIST            RHP MECHANICAL SYS
WA-2010-191   INCLINE VILLAGE GID              DELAYED SEE WA-2011-12
WA-2010-192   CITY OF SPARKS                   GRANITE CONSTRUCTION
WA-2010-193   CITY OF RENO
WA-2010-194   WASHOE CO RTC                    SIERRA NEVADA CONSTRUCTION
WA-2010-195   WASHOE CO RTC                    SIERRA NEVADA CONSTRUCTION
WA-2010-196   WASHOE OC RTC                    Q & D CONSTRUCTION
WA-2010-197   WASHOE CO RTC
WA-2010-198   WASHOE CO RTC
WA-2010-199   WASHOE CO RTC

WA-2010-200   WASHOE CO SCHOOL DIST            POWERCOM SOLUTIONS

WA-2010-201   WASHOE CO SCHOOL DIST            CANCELED 4-7 COMBINING INTO 200

WA-2010-202   WASHOE CO SCHOOL DIST            CANCELED 4-7 COMBINING INTO 200
WA-2010-203   WASHOE CO RTC                    SIERRA NEVADA CONSTRUCTION


HU-2010-204   STATE PUBLIC WORKS BOARD         HE HUNNEWILL CONST Per Debbie all

EL-2010-205   STATE PUBLIC WORKS BOARD         HE HUNNEWILL CONST  one project
EL-2010-206   ELKO CO SCHOOL DIST              QUANTUM ELECTRIC LLC
EL-2010-207   ELKO CO SCHOOL DIST
WA-2010-208   UNR                              FIELDTRUF USA
HU-2010-209   STATE PUBLIC WORKS BOARD         HE HUNNEWILL
DO-2010-210   GARDNERVILLE RANCHOS GID         GRANITE CONSTRUCTION
WA-2010-211   CITY OF SPARKS                   Q & D CONSTRUCTION
WA-2010-212   TMWA                             STEVE C HAMILTON INC
CC-2010-213   STATE OF NEVADA PURCHASING       CANCELED 8/17/10
                                               CANCELED PER DORA DUPLICATE 8/
PE-2010-214   CITY OF LOVELOCK                 9/10
WA-2010-215   WASHOE CO SCHOOL DIST            D&D ROOFING & SHEET METAL
WA-2010-216   WASHOE CO SCHOOL DIST            D&D ROOFING & SHEET METAL
WA-2010-217   WASHOE CO SCHOOL DIST            D&D ROOFING & SHEET METAL
LY-2010-218   SO LYON CO HOSPITAL DISTRICT     DESERT ENGINEETING
DO-2010-219   GARDNERVILLE TOWN BOARD
WA-2010-220   WASHOE CO SCHOOL DIST           D&D ROOFING & SHEET METAL
LY-2010-221   STATE PUBLIC WORKS BOARD        UNDER 100,000/ R & R ROOFING INC
WA-2010-222   NSHE/UNR                        K7 CONSTRUCTION
WA-2010-223   NSHE/UNR                        SPINITAR
                                              GERHARDT & BERRY
WA-2010-224   CITY OF SPARKS                  CONSTRUCTION
EU-2010-225   EUREKA CO PUBLIC WORKS
WA-2010-226   WASHOE CO SCHOOL DIST           NELSON ELECTRIC
WA-2010-227   WASHOE CO SCHOOL DIST           CANCEL 5/13/10
WA-2010-228   WASHOE CO SCHOOL DIST           CANCEL 5/13/10
WA-2010-229   WASHOE CO SCHOOL DIST           CANCEL 5/13/10
WA-2010-230   WASHOE CO SCHOOL DIST           NELSON ELECTRIC CO
WA-2010-231   WASHOE CO SCHOOL DIST           UNITED CONSTRUCTION
WA-2010-232   WASHOE CO SCHOOL DIST           NELSON ELECTRIC CO
WA-2010-233   WASHOE CO SCHOOL DIST           RANGER CONSTRUCTION
WA-2010-234   WASHOE CO RTC                   UNDER 100,000
LY-2010-235   CITY OF YERINGTON               CARSON PUMP/ UNDER 100,000
              CARSON CITY BOARD OF
CC-2010-236   SUPERVISORS
WA-2010-237   WASHOE CO RTC                   GRANITE CONSTRUCTION
WA-2010-238   WASHOE CO SCHOOL DIST           UNITED CONSTRUCTION
WA-2010-239   CITY OF RENO                    Q & D CONSTRUCTION
WA-2010-240   TMWA                            Q&D CONSTRUCTION
                                              CANCELED 7/27/10/DUPLICATED SEE
EU-2010-241   EUREKA CO SCHOOL DIST           416
LY-2010-242   LYON CO BOARD OF COMMISSIONER
WA-2010-243   WASHOE CO RTC
WA-2010-244   WASHOE CO RTC                   SPANISH SPRINGS CONSTRUCTION
WA-2010-245   WASHOE CO RTC                   GRANITE CONSTRUCTION
WA-2010-246   WASHOE CO SCHOOL DIST           CANCELED UNDER 100,000
WA-2010-247   WASHOE CO SCHOOL DIST           CANCELED UNDER 100,000
LY-2010-248   CENTRAL LYON CO FIRE DIST       MULTIPLE PRIMES
LY-2010-248                                   RAPID CONSTRUCTION
LY-2010-248                                   MILES CONSTRUCTION
LY-2010-248                                   BUILDERS WHOLESALE
LY-2010-248                                   CAPITAL GLASS
LY-2010-248                                   EXCAL CONSTRUCTION
LY-2010-248                                   KEYSTONE MASONRY
LY-2010-248                                   LA THOMAS CO
LY-2010-248                                   OVERHEAD DOOR CO 
LY-2010-248                                   AD CONSTRUCTION
LY-2010-248                                   BUILDERS WHOLESALE
LY-2010-248                                   STATE FIRE PROTECTION
LY-2010-248                                   ALCAL ARCADE CONTRACTING
LY-2010-248                                   BLUE MOUNTAIN STEEL
LY-2010-248                                   DESERT ENGINEERING
LY-2010-248                                   JW MCCLENAHAN CO
LY-2010-249   LYON CO SCHOOL DIST             UNDER 100,000
                                              UNDER 100,000/Far West Erosion
WA-2010-250   WASHOE CO DEPT OF RESOURCES     Control Co
WA-2010-251   WASHOE CO SCHOOL DIST           COMMERCIAL SOLAR SERVICES
WA-2010-252   WASHOE CO SCHOOL DIST           UNITED CONSTRUCTION
EU-2010-253   EUREKA BOARD OF COMMISSIONERS   BISON CONSTRUTION
DO-2010-254   KINGSBURY GID                     SIERRA NEVADA CONSTRUCTION
              DOUGLAS CO BOARD OF
DO-2010-255   COMMISSIONERS                     KG CONSTRUCTION
WA-2010-256   ELKO CO SCHOOOL DISTRICT          CANCELED 5/26/10
WA-2010-257   BOARD OF REGENTS UNR
DO-2010-258   TOWN OF MINDEN
DO-2010-259   TOWN OF MINDEN
WA-2010-260   WASHOE CO RTC
WA-2010-261   WASHOE CO RTC
              DOUGLAS CO BOARD OF
DO-2010-262   COMMISSIONERS 
DO-2010-263   ROUND HILL GID
DO-2010-264   KINGSBURY GID                     SPIESS CONSTRUCTION
DO-2010-265   KINGSBURY GID                     UNDER 100,000/SPIESS CONST
DO-2010-266   KINGSBURY GID                     V & C CONSTRUCTION INC
DO-2010-267   KINGSBURY GID                     V & C CONSTRUCTION INC
DO-2010-268   KINGSBURY GID                     UNDER 100,000/SPIESS CONST
WA-2010-269   BJ'S RESTAURANTS INC              TERRA NOVA INDUSTRIES

ST-2010-270   STOREY COUNTY SCHOOL DIST         COMMERCIAL SOLAR SERVICES

WA-2010-271   WASHOE CO SCHOOL DIST             WEST COAST CONTRACTORS OF NV
WP-2010-272   SOUTHERN Nevada Water Authority

WA-2010-273   WASHOE CO SCHOOL DIST             WEST COAST CONTRACTORS OF NV
EL-2010-274   ELKO CO SCHOOL DIST               CARSON UNLIMITED
WA-2010-275   RENO-TAHOE AIRPORT AUTHORITY
                                                RFI COMMUNICATIONS & SECURITY
WA-2010-276   BOARD OF REGENTS NSHE             SYS
EL-2010-277   CITY OF ELKO
WA-2010-278   CITY OF RENO
DO-2010-279   DOUGLAS CO SCHOOL DIST            CANCELED 09/08/2010

WA-2010-280   NSHE/UNR                          RENO BUSINESS INTERIORS INC
EL-2010-281   CITY OF ELKO
WA-2010-282   NSHE/UNR                          SIERRA NEVADA CONSTRUCTION
WA-2010-283   WASHOE CO SCHOOL DIST             SMITH MECHANICAL INC
WA-2010-284   WASHOE CO SCHOOL DIST
WA-2010-285   WASHOE CO SCHOOL DIST
WA-2010-286   WASHOE CO SCHOOL DIST
              DOUGLAS CO BOARD
DO-2010-287   OFCOMMISSIONERS
WA-2010-288   WASHOE CO SCHOOL DIST             BOMBARD ELECTRIC
WA-2010-289   WASHOE CO SCHOOL DIST             NELSO ELECTRIC CO
WA-2010-290   WASHOE CO SCHOOL DIST             CANCELED/COMBINED W 10-231
LA-2010-291   LANDER CO BOARD OF COMMISS        HE HUNEWILL CONSTRUCTION
                                                PRO-TECH FIRE PROTECTION SYS
CC-2010-292   STATE PUBLIC WORKS BOARD          CORP
ST-2010-293   STOREY CO COMMUNITY CHEST INC     MULTIPLE PRIMES
ST-2010-293                                     HAUS PLUMBING & MECHANICAL
ST-2010-293                                     COMSTOCK DRYWALL
ST-2010-293                                     ALCAL ARCADE CONTRACTING
ST-2010-293                                     TEDESCO PACIFIC CONSTRUCTION
ST-2010-293                                     F & P CONSTRUCTION
ST-2010-293                                   NORT EAST MASONRY
ST-2010-293                                   RICKS FLOOR COMERING
ST-2010-293                                   BUILDERS WHOLESALE
ST-2010-293                                   SIERRA NEVADA CONSTRUCTION
ST-2010-293                                   UNITED ELECTRICAL SRVS
ST-2010-293                                   SOUTHAM & ASSOC
ST-2010-293                                   CUSTOM GLASS
ST-2010-293                                   BLUE MOUNTAIN STEEL
ST-2010-293                                   WOOD PAINTING
ST-2010-293                                   FLEET HEATING & AIR INC
ST-2010-293                                   EXCAL CONSTRUCTION
WA-2010-294   WASHOE CO SCHOOL DIST           KING CONSTRUCTION
WA-2010-295   WASHOE CO SCHOOL DIST           ADVANCE INSTALLATIONS INC
PE-2010-296   CITY OF LOVELOCK
PE-2010-297   CITY OF LOVELOCK
LY-2010-298   STATE PUBLIC WORKS BOARD

CC-2010-299   BOARD OF REGENTS OF NSHE/UNR    WESTERN SINGLE PLY
CC-2010-300   CITY OF ELY
PE-2010-301   PERSHING CO SCHOOL DIST         UNDER 100,000/MARCOR
WA-2010-302   WASHOE CO SCHOOL DIST           SIERRA NEVADA CONSTRUCTION
LY-2010-303   LYON CO BOARD OF COMMISSIONER   SIERRA NEVADA CONSTRUCTION
WA-2010-304   WASHOE CO RTC                   SPANISH SPRINGS CONSTRUCTION
HU-2010-305   HUMBOLDT CO SCHOOL DIST         RHP MECHANICAL

HU-2010-305                                   D & D ROOFING CO
HU-2010-306   HUMBOLDT CO SCHOOL DIST         MARCOR ABATEMENT
HU-2010-306                                   ALPINE ROOFING CO
HU-2010-306                                   CR DRAKE & SONS
HU-2010-306                                   D & D ROOFING CO
HU-2010-306                                   RHP MECHANICAL SYS
HU-2010-306                                   DESERT DESIGN ICN
HU-2010-306                                   JIM WARNER INSULATION
CC-2010-307   CARSON CITY SCHOOL DIST         UNITED ELECTRICAL SERVICES
LA-2010-308   LANDER CO SCHOOL DIST           STEVE C HAMILTON INC
PE-2010-309   PERSHING CO SCHOOL DIST
PE-2010-310   PERSHING CO SCHOOL DIST         MULTIPLE PRIMES
PE-2010-310                                   GOIDENBY CONSTRUCTION
PE-2010-310                                   UNITED ELECTRICAL SERVICES
PE-2010-310                                   MT ROSE HEATING & AIR
PE-2010-310                                   STEVE C HAMILTON INC
PE-2010-310                                   RASMOSSEN CONSTRUCTIN
WA-2010-311   CITY OF RENO
LY-2010-312   LYON CO UTILITIES DEPT          COONS CONSSTRUCTION LLC
WA-2010-313   CITY OF SPARKS                  GRANITE CONSTRUCTION
WA-2010-314   WASHOE CO RTC                   SIERRA NEVADA CONSTRUCTION
WA-2010-315   RENO TAHOE AIRPORT AUTHORITY    UNDER 100,000
WA-2010-316   WASHOE CO RTC
EL-2010-317   ELKO CO SCHOOL DIST             CANCELED 5-26/10
WA-2010-318   WASHOE CO PUBLIC WORKS
LY-2010-319   LYON CO BOARD OF COMMISSIONER
HU-2010-320   HUMBOLDT CO HOSPITAL DIST       R&O CONSTRUCTION CO
WA-2010-321   NSHE/UNR                        KODIAK ROOFING
WA-2010-322   BOARD OF REGENTS NSHE           FRANK EVAN CONSTRUCTION
EL-2010-323   STATE PUBLIC WORKS BOARD        KODIAK ROOFING
DO-2010-324   DOUGLAS CO SCHOOL DIST          NELSON ELECTRIC/TOTAL AWARD
EL-2010-325   CARSON CITY RTC                 A & K EARTHMOVERS
WA-2010-326   WASHOE CO SCHOOL DIST           GRADEX CONSTRUCTION CO
HU-2010-327   CITY OF WINNEMUCCA              VALLEY SLURRY SEAL CO
WA-2010-328   WASHOE CO RTC                   SIERRA NEVADA CONSTRUCTION
WA-2010-329   CITY OF RENO
WA-2010-330   WASHOE CO RTC                   GRANITE CONSTRUCTION
WA-2010-331   RENO-TAHOE AIRPORT AUTHORITY
WA-2010-332   STATE PUBLIC WORKS BOARD        K7 CONSTRUCTION
WA-2010-333   WASHOE CO SCHOOL DIST           SIERRA NEVADA CONSTRUCTION
WA-2010-334   CITY OF SPARKS                  SPANISH SPRINGS CONSTRUCTION
WA-2010-335   WASHOE CO RTC                   SIERRA NEVADA CONSTRUCTION

WA-2010-336   WASHOE CO SCHOOL DIST           GARDNER ENGINEERING INC
WA-2010-337   CITY OF RENO

EL-2010-338   STATE PUBLIC WORKS BOARD        R & R ROOFING/UNDER 100,000
WP-2010-339   CITY OF ELY                     CLEARY BUILDING CORP
EL-2010-340   CITY OF ELKO                    PEAVINE CONSTRUCTION
WA-2010-341   WASHOE CO RTC                   SIERRA NEVADA CONSTRUCTION
WA-2010-342   NSHE/UNR                        K7 CONSTRUCTION/UNDER 100,000
EL-2010-343   ELKO CO SCHOOL DIST             BISON CONSTRUCTION
WA-2010-344   STATE PUBLIC WORKS BOARD        FRANK LEPORI CONST
CC-2010-345   CARSON CITY SCHOOL DIST
WA-2010-346   WASHOE CO PUBLIC WORKS          K7 CONSTRUCTION
WA-2010-347   WASHOE CO RTC
WA-2010-348   CARSON CITY AIRPORT AUTHORITY
LA-2010-349   LANDER CO BOARD OF COMMISS
              CARSON CITY BOARD OF
CC-2010-350   SUPERVISORS                     F & P CONSTRUCTION
LY-2010-351   LYON CO BOARD OF COMMISSIONER
CC-2010-352   CARSON CITY RTC                 SIERRA NEVADA CONSTRUCTION
WA-2010-353   WASHOE COUNTY RTC               SIERRA NEVADA CONSTRUCTION
                                              GERHARDT & BERRY
WA-2010-354   CITY OF RENO                    CONSTRUCTION
WA-2010-355   SODEXO-UNR CONCESSIONAIRE       Q & D CONSTRUCTION
WA-2010-356   WASHOE CO SCHOOL DIST           UNDER 100,000
WA-2010-357   CITY OF WINNEMUCCA
DO-2010-358   DOUGLAS CO BOARD OF COMMISS     Q & D CONSTRUCTION
CC-2010-359   STATE PUBLIC WORKS BOARD        MURPHY BUILT CONSTRUCTION INC

LA-2010-360   LANDER CO BOARD OF COMMISS      LEGACY CONSTRUCTION
LA-2010-361   LANDER CO BOARD OF COMMISS
WA-2010-362   WASHOE CO RTC                   GRANITE CONSTRUCTION

CC-2010-363   STATE PUBLIC WORKS BOARD        RELIANT ELECTRIC
DO-2010-364   DOUGLAS CO SCHOOL DIST
DO-2010-365   DOUGLAS CO SCHOOL DIST
CH-2010-366   CHURCHILL CO SCHOOL DIST
WA-2010-367   WASHOE CO SCHOOL DIST           UNITED CONSTRUCTION
WA-2010-368    NSHE/UNR                        F EVANS CONSTRUCTION
WA-2010-369    WASHOE CO RTC                   CANCELED 6/22/10 DUPLICATE
EL-2010-370    CITY OF WEST WENDOVER           MODERN CONCRETE
WA-2010-371    STMGID BOARD OF TRUSTEES
WA-2010-372    LYON CO UTILITIES DEPT          DELAYED SEE LY-2011-15
WA-2010-373    TMWA
DO-2010-374    TOWN OF MINDEN
                                               UNDER 100,000/BUILDING
WA-2010-375    STATE PUBLIC WORKS BOARD        SOLUTIONS
EU-2010-376    EUREKA CO COUNTY COMMISSIONER   SIERRA NEVADA CONSTRUCTION
LY-2010-377    CITY OF YERINGTON               DELAYED SEE LY-2011-15
CC-2010-378    CC BOARD OF SUPERVISORS         SIERRA NEVADA CONSTRUCTION
CC-2010-379    CARSON CITY SCHOOL DIST         SOUTLAND INDUSTRIES

HU-2010-380    HUMBOLDT CO HOSPITAL DIST
EL-2010-381    SHOSHONE-PAIUTE TRIBE
PE-2010-382    CITY OF LOVELOCK
PE-2010-383    CITY OF LOVELOCK
EL-2010-384    STATE PUBLIC WORKS BOARD
EL-2010-385    CITY OF WEST WENDOVER
PE-2010-386    CITY OF LOVELOCK
WA-2010-387    CITY OF RENO
                                               MICHAEL R CLARK CONSTRUCTION
WA-2010-388    CITY OF SPARKS                  INC
WA-2010-389    NSHE/UNR
WA-2010-390    INCLINE VILLAGE GID             SPINIELLO COMPANIES
HU-2010-391    CITY OF WINNEMUCCA              BISON CONSTRUCTION
WA-2010-392    INCLINE VILLAGE GID

WA-2010-393    INCLINE VILLAGE GID             BURDICK EXCAVATING
EU-2010-394    EUREKA CO SCHOOL DIST
EU-2010-395    EUREKA CO SCHOOL DIST
CC-2010-396    CC BOARD OF SUPERVISORS
WA-2010-397    WASHOE CO SCHOOL DIST           RANGER CONSTRUCTION

WA-2010-398    WASHOE CO SCHOOL DIST           COMBINED WITH WA-2010-398
WA-2010-399    WASHOE CO SCHOOL DIST           COMBINED WITH WA-2010-398
WA-2010-400    WASHOE CO SCHOOL DIST           COMBINED WITH WA-2010-398

WA-2010-401    WASHOE CO PUBLIC WORKS

WA-2010-402    WASHOE CO PUBLIC WORKS
CC-2010-403    STATE PUBLIC WORKS BOARD        SIMPLEX GRINNELL LP
                                               UNDER 100,000/CENTRAL SIERRA
WA-2010-404    STATE PUBLIC WORKS BOARD        CONST
WA-2010-405    RENO-TAHOE AIRPORT AUTHORITY
CH-2010-406    CHURCHILL CO SCHOOL DIST
CH-2010-407    CHURCHILL CO SCHOOL DIST
CH-2010-408    CHURCHILL CO SCHOOL DIST

CH-2010-409    CHURCHILL CO SCHOOL DIST
HU-2010-410    CITY OF WINNEMUCCA
CC-2010-411    STATE PUBLIC WORKS BOARD
WA-2010-412   CITY OF SPARKS
DO-2010-413   DOUGLAS CO BOARD OF COMMISS     KG WALTERS CONSTRUCTION
              STOREY CO COMMUNITY
ST-2010-414   DEVELOPMENT DEPT                K7 CONSTRUCTION

WA-2010-415   WASHOE CO SCHOOL DIST          UNDER 100,000 CANCELED 8/26/10
EU-2010-416   EUREKA CO SCHOOL DIST          JB ENTERPRISES INC
WP-2010-417   CITY OF ELY
EL-2010-418   NEVADA DIV OF STATE PARKS
WA-2010-419   TMWA                           F & P CONSTRUCTION
WA-2010-420   CITY OF RENO
wl-2010-421   STATE PUBLIC WORKS BOARD
              PERSHING CO WATER CONSERVATION
PE-2010-422   DISTRICT

WA-2010-423   NSHE/UNR
EL-2010-424   CITY OF ELKO                    UNDER 100,000

CC-2010-425   STATE PUBLIC WORKS BOARD        PALMETTO CONSTRUCTIN INC
EL-2010-426   STATE PUBLIC WORKS BOARD        DELTA FIRE SYSTEM
WA-2010-427   NSHE/UNR
CH-2010-428   STATE PUBLIC WORKS BOARD
WA-2010-429   TMWA                            CAMPBELL CONSTRUCTION CO INC
EU-2010-430   EUREKA COUNTY SCHOOL DIST       STEVE C HAMILTON INC
                                              CASSINELLI LANDSCAPING/UNDER
WA-2010-431   STATE PUBLIC WORKS BOARD        100,000

EL-2010-432   STATE PUBLIC WORKS BOARD        GARDNER ENGINEERING INC
EL-2010-433   CITY OF ELKO
WA-2010-434   WASHOE CO SCHOOL DIST           NELSON ELECTRIC
WA-2010-435   WASHOE CO SCHOOL DIST           NELSON ELECTRIC
WA-2010-436   WASHOE CO SCHOOL DIST           NELSON ELECTRIC
WA-2010-437   NSHE/UNR
LA-2010-438   LANDER CO BOARD OF COMMISS
LA-2010-439   LANDER CO BOARD OF COMMISS
              STATE OF NEVADA PURCHASING
CC-2010-440   DIVISION

CC-2010-441   STATE PUBLIC WORKS BOARD        RAY HEATING PRODUCTS
CC-2010-442   CC BOARD OF SUPERVISORS         CRUZ CONSTRUCTION
WA-2010-443   WASHOE CO SCHOOL DIST           NELSON ELECTRIC
WA-2010-444   WASHOE CO SCHOOL DIST           NELSON ELECTRIC
CH-2010-445   CITY OF FALLON
WA-2010-446   CITY OF SPARKS
                                              WEST COAST CONTRACTORS OF
WA-2010-447   STATE PUBLIC WORKS BOARD        NEVADA
EL-2010-448   CITY OF ELKO
              WASHOE CO BOARD OF COUNTY
WA-2010-449   COMMISSIONERS
              WASHOE CO BOARD OF COUNTY
WA-2010-450   COMMISSIONERS
              WASHOE CO BOARD OF COUNTY
WA-2010-451   COMMISSIONERS
WA-2010-452   BOARD OF REGENTS/ NSHE
WA-2010-453   WASHOE CO SCHOOL DIST
WA-2010-454   WASHOE CO SCHOOL DIST
WA-2010-455   WASHOE CO SCHOOL DIST
EL-2010-456   STATE PUBLIC WORKS BOARD
WA-2010-457   WASHOE CO PUBLIC WORKS
LY-2010-458   LYON CO BOARD OF COMMISSIONER

WA-2010-459   WASHOE COUNTY RTC
LY-2010-460   MASON VALLEY SWIMMING POOL 
WP-2010-461   STATE PUBLIC WORKS BOARD        UNDER 100,000
              CARSON CITY PURCHASING &
CC-2010-462   CONTRACTS                       UNDER 100,000
WA-2010-463   WASHOE CO SCHOOL DIST
Total 2010


YEAR 2011
WA-2011-01    WASHOE CO PUBLIC WORKS
              WASHOE CO DPT OF WATER
WA-2011-02    RESOURCES
WA-2011-03    NSHE/UNR
WA-2011-04    RENO-TAHOE AIRPORT AUTHORITY

EU-2011-05    EUREKA CO COMMISSIONERS
DO-2011-06    TOWN OF MINDEN
WA-2011-07    CITY OF RENO
WA-2011-08    CITY OF RENO
WA-2011-09    CITY OF RENO
WA-2011-10    CITY OF RENO
WA-2010-11    WASHOE CO WATER RESOURCES       UNDER 100,000
WA-2011-12    INCLINE VILLAGE GID
EL-2011-13    ELKO COUNTY
DO-2011-14    DOUGLAS CO BOARD OF COMMISS

LY-2011-15    CITY OF YERINGTON
EL-2011-16    ELKO COUNTY SCHOOL DIST
LY-2011-17    LYON CO UTILITIES
WA-2011-18    TMWA
WA-2011-19    WASHOE CO SCHOOL DIST
WA-2011-20    WASHOE CO SCHOOL DIST
WA-2011-21    WASHOE CO SCHOOL DIST
DO-2011-22    DOUGLAS CO BOARD OF COMMISS
Total 2011
note as of 10.21.2010




MARTIN SLOUGH LINEAR PKWY PS 4                                             11/0/08
WATER CONVEYANCE INFRASTRUCTUR 3B TRUCKEE CANAL               $920,398.00 11/17/2008    7/23/2009
TRUCKEE RIIVER LEVEE FLOODWALL 395 TO E 2ND/GLENDALE         $2,715,101.80 11/20/2008
RENO STEAD EFFLUENT TRUCK FILL STATION                                     12/15/2008
ALTERNATIVE SENTENCING DIV T I                                             3/9/2009
UNR CENTER FOR MOLECULAR MEDCINE, NEW LABORATORY/ MEDICAL
OFFICE BUILDING                                             $54,935,000.00 10/21/2008

RTC 4TH STREET STATION                                      $12,872,000.00 2/5/2009
09 NEIGHBORHOOD ST REHABILITATION UNIT 1                     $3,672,506.00 1/27/2009

09 NEIGHBORHOOD ST REHABILITATION UNIT 2                     $1,548,007.00 1/28/2009
09 NEIGHBORHOOD ST REHABILITATION UNIT 3                     $1,501,104.85 1/29/2009
HIGHLAND CANAL RCB -FORMAL                                   $3,425,132.80 10/22/2008   9/10/2009
DESERT SPRINGS WATER BLENDING                                  $40,000.00 10/1/2008
PLEASANT VALLEY SEWER INTERCEPTOR REACH 3                                  1/1/2009
MDF COOLING RETROFIT AT 6 SCHOOLS                             $155,527.00 10/7/2008     5/4/2009
N VALLEY WASTEWATER TREATMENT FACILITY PHASE II A             $888,000.00 10/16/2008
SOUND INSULATION PHS 17.3 CONTRACTOR                          $455,837.00 12/10/2009 1/20/2010
SOUND INSULATION PHS 17.4 CONTRACTOR                          $697,788.00 12/11/2009 1/20/2010
SOUND INSULATION PHS 17.5 CONTRACTOR                          $461,134.00 12/11/2008 1/20/2010
CG ADA TRANSITION CHEMISTRY BUILDING-BUILDING FIRE ALARM
UPGRADE                                                       $112,000.00 10/9/2008

JACKPOT POOL RE-PLASTER                                        $93,100.00 10/27/2008    12/16/2008
HARBECKE RANCH IRRIGAION WELL CONSTRUCTION                    $906,662.00 10/29/2008    4/8/2009
TERRACE SPORTS COMPLEX WARM-UP AREA                           $162,945.28 9/8/2009

08 CDBG PEDSTRIAN RAMP                                         $55,968.50 10/1/2008     1/9/2009
HUMBOLT CONSERVATION CAMP WATER TANK REPLACEMENT              $222,176.44 10/16/2008    7/31/2009
WATER RECLAMATION FACILITY EXPANSION & UPGRADE:PHS 1
HEADWORKS                                                     $600,000.00 11/21/2008
DESIGN BUILD FOR SOLAR PHOTO VOLTAIC NET METERED SYSTEM-
FALLON                                                        $399,076.20 10/31/2008
APPLIED RESEARCH FACILITY RM 315 LAB REMODEL                  $146,173.32 10/9/2008     4/20/2009
WATER CONVEYANCE INFRASTRUCTURE 1B                            $456,960.00 1/23/2009
WATER CONVEYANCE INFRASTRUCTURE 2B                            $720,240.00 10/22/2008    9/8/2009
WNCBRISTLECONE PINE BLUILDING CHILLER REPLACEMENT             $948,362.00 2/19/2009



SPRING & HAMLIN INTERBASIN MONITOR WELL CONSTRUCTION         $2,462,300.00 3/23/2009

WARM SPRINGS CORRECTIONAL DOOR PANEL CONTROL UPGRDS           $435,000.00 11/5/2008     5/11/2009

SPARKS JUSTICE COURT                                                      6/1/2009
UPPER MURRY WATER                                             $535,278.00 11/19/2009
MICHAEL D THOMPSON TRAILHEAD-HUNTER CREEK                     $332,356.65 11/12/2008
CANYON GID SEWER IMPROVEMENT                       $2,357,644.00 3/3/2009
09 PREVENTIVE MAINTENANCE PATCHING                  $690,381.15 10/14/2008    1/27/2010
09 PREVENTIVE MAINTENANCE SLURRY                   $4,148,575.53 3/6/2009

CORPORATE YARD PAVING-PS 1                           $93,588.00 10/6/2008
CC ARSENIC WATER TREATMENT PLANT & PIPE LINE       $2,713,316.64 10/9/2008    10/9/2008
ROCK PARK WHITE WATER PARK PHS 2                    $551,257.25 10/17/2008    45/19/09
APPION WAY EXTENSION                                $400,117.35 10/22/2008
09 WINNEMUCCA EVENTS COMPLEX PARKING LOT PAVING     $134,774.00 10/1/2008
ELKO PEACE PARK RESTROOM FACILITY                   $330,000.00 10/10/2008
HULDA WAY IMPROVEMENTS PHS II                       $188,654.27 10/22/2008  6/18/2009
SPRING CREEK HIGH SCHOOL VALLEY ROOF REPAIR         $149,576.00 10/23/2008  10/2/2009
MUNI COURT HVAC UPGRADE                             $173,872.63 11/29/2008 4/8/2009
STEWART ST EXTENSION                               $3,236,570.00 11/20/2008
ELKO PEACE PARK ENTRY PORTAL                          $77,000.00 10/24/2008

IMPROVEMENT PLANS OREANO WELL                       $438,650.00 3/23/2009

ADA CIVIL UPGRDS ELY STATE PRSN                      $81,765.00 10/21/2008
ORR DITCY PUMP STA-08 PUMP INSTAL                   $120,822.38 11/6/2008     6/4/2009
BUCKLAND STA FIRE SUPPRESN SYS                      $220,070.40 11/20/2008    9/22/2009

NO. SHORE BOAT RAMP EXTNSION                         $82,429.15 11/21/2008    2/10/2009

BEACH 7 ELECTRIC LINE REPLACEMENT                    $23,240.25 11/21/2008    1/15/2009
ELKO INTRAGNCY DSPTCH CNTR REPR                     $298,082.00 11/25/2008    11/23/2009

CONTROL VALVE RETROFIT                               $25,452.00 12/9/2008     2/12/2009
6TH FLR HVAC IMPROVMNTS                             $135,075.00 11/18/2008
 WATER TANK 10B                                    $2,175,975.00 3/9/2009

EUREKA 08 WTR SYSTM IMPRVMNTS                      $2,114,007.00 4/20/2009
GRAPHIC WALL LIGHTING                                            1/8/2009
VEHICLE MAINTENANCE & STORG BLDG                    $413,385.51 3/18/2009     8/5/2009

WTR CNVYNC IFRSTRCTR PS9                           $1,414,862.04 12/19/2008

NNAMHS BUILDING 23  DEMOLITION                       $94,168.00 11/25/2008
NE NV REGNL RAILPORT PHS 1 CONST                  $20,000,000.00 10/23/2008

LEMMON DR AT US 395 CAPACITY IMPR                   $187,007.00 9/16/2009
CC WTRFL FIR WTRSHD IMPRV PS 1                      $214,636.92 11/25/2008    11/9/2009
ELKO PEACE PARK BRIDGE I                                        12/3/2008
ELKO PEACE PARK BRIDGE II                                       12/3/2008
09-10 PERMANENT PATCH PROGRAM                       $748,748.00 12/2/2008     5/24/2010
CRT HOUSE SFTY GLZNG FLM INSATLL                    $135,000.00 12/3/2008



SECURITY SYSTMS UPGRD ACAMS PS1                    $2,500,000.00 1/8/2009

ACADEMY OF ARTS & CAREER TECHNOLOGY ADDITION      $11,823,694.00 12/23/2008   2/3/2010
TERRACE SPRTS CMPLX ACCSS RAMP                      $115,429.42 1/13/2009     7/20/2009

CMPS GEN PAVING REPAVE W STDM                       $366,142.00 12/12/2008    10/26/2009
WELL #43 WATER WELL HOUSE                           $529,479.06 1/20/2009     11/12/2009
JAN EVANS DETNTN CNTR SOD RPLCMT               $190,500.00 11/18/2008
CONDUCTOR HEIGHTS DEMOLITION                   $108,076.00 4/21/2009
EAST LINCOLN WAY                               $253,453.67 3/27/2009    9/10/2009
BLDG 8 RMDL NO NV ADLT MNTL HLTH               $527,894.00 1/13/2008    9/18/2009
TRUCKEE RIVER BANK STABILIZATION OXBW PARK                  6/1/2009

VOCATIONAL ARTS TRAINING BLDG                  $319,332.11 11/12/2008

 VASSAR ST RECONSTRCTN                        $1,549,007.00 8/4/2009
LOS ALTOS PKWY RECONSTRUCTION                  $319,296.54 6/23/2009    10/1/2009
PEOPLES DRAIN DITCH IMPROVEMENT                $319,296.54 2/11/2009    8/18/2009

GSA TENANT IMPRVMNTS STE 2A                    $457,000.00 11/13/2008

TENANTS IMPRVMNT STE 3F TRNSPRTN               $141,256.80 11/12/2008   1/16/2009

SRA FRNT INTRGNCY DSPTCH CNTR &                $601,781.00 1/9/2009     4/8/2010
CCTB SECURITY INSTALLS-REED HI SCL             $101,599.41 2/10/2009    3/17/2010
MCQUEEN HI SCHL HVAC REPLCMNT                  $713,000.00 2/19/2009    10/15/2009
VETERANS MEMORIAL ELEM SCL REVITILAZATION     $1,404,698.56 2/20/2009   2/22/2010

MOGUL BYPASS PIPELINE                         $8,096,199.76 1/15/2009
GBC COMMUNITY CENTER REMODEL                  $1,166,526.00 6/11/2009
WTR CNVYNCE IFRSTRCTR 4                        $844,353.21 2/18/2009    11/13/2009

09 PUMP STA REHAB DRISCL & FOLSM               $147,653.66 1/22/2008    12/10/2009
VIRGINIA LKE PRK PHS 2 IMPRVMNTS               $329,777.00 3/3/2009
EFLNT EXPRT SGMNT 1 SO & SGMNT 5              $1,073,550.00 2/13/2009
SAME AS ABOVE EXCEPT IN CRSN VLY               $189,450.00 2/13/0/09

RE PAVE LODER ES                               $353,436.31 2/26/2009    3/23/2010
INFRSTRCTR UPGRD BDSLY, WINN, WM               $804,285.40 2/11/2009    12/30/2009

INFRSTRCTR UPGRD WINNEMUCCA ES                              2/11/2009   12/30/2009

INFRSTRCTR UPGRD WAMER ES                                   2/11/2009   12/30/2009
GWHS GYMNASIUM ADDITION                       $1,395,576.00 5/18/2009
GRANTS LNDING TRUCKEE RVR RMP                               8/27/2009
SOUND INSULATION PHS 17.6 CNTRCTR              $655,502.00 3/26/2009    1/20/2010
RAMADAS ADA SEPTIC CONTRACT                    $243,434.60 2/12/2009    6/26/2009
NEW FLOORING-DRAKE ELEMENTARY                  $250,000.00 6/12/2009

SECURITY TV INSTALLS GRP 2-GALENA                           2/12/2009
SCRUGHAM ENGNRNG BLDG RM 117                   $250,410.96 1/29/2009    11/19/2010
SILVER LAKE RD REHAB                          $1,528,089.00 5/19/2009   12/21/2009
LAKE PKWY SIDWALK IMPRVMNTS                    $400,000.00 5/1/2009
DWNTWN CORIDOR LTNG 10TH-11TH                  $111,543.60 8/4/2009     12/9/2009
TWN OF MNDN 09 ALLEY WTRLN UPGRD               $539,292.50 1/29/2009    2/22/2010
JD RANCH BRIDGE REPLCMNT                       $286,345.60 2/20/2009
W WNDVR ELMNTRY MDLR UNT 5 ADA                              2/19/2009
FDRLY FNDED ADA IMPRVMNTS                      $124,947.55 2/18/2009    9/18/2009
FDRLY FNDED ZEPHYR WY CRB GTTR                 $159,438.30 2/18/2009    11/20/2009
REPLC FIRE ALARM SYS GRP 1                                  2/25/2009
REPLC FIRE ALARM SYS GRP 2                     $473,797.00 4/14/2009    2/22/2010
OXBOW NATR STDY BRDWALK RPLCMN                 $210,000.00 8/1/2009
BABBIT WELL DRILLING                     $387,175.00 6/3/2009
FUJI PARK URBAN FISHING POND             $271,355.00 TBA

WASHOE LKE STE PRK EQSTRIAN TOLT                        2/26/2009  8/12/2009
2008/09 CRACK SEAL                                      2/18/2009  4/7/2009
DWNTWN STSCAPE ENBARCMENT PS3           $1,431,539.00   2/20/2009
GRANTS LANDNG RVR ACESS RAMP                            TBD
OWYHEE ARPORT FENCE                      $223,147.50    6/23/2009
PNDA EXPRS UNR CMPS                      $238,508.00    11/10/2008
STEAD AFB MAIN MTR RPLCMNT PS 2         $3,600,000.00   2/26/2009
DMV CNVRSN TO EFFPD ADMIN OFFC           $644,085.00    4/1/2009   2/2/2010
DOUGLAS COUNTY JAIL EXPANSION           $3,783,600.00   8/18/2009

INSTALLATIONS FRO CITY WELL #43          $178,000.00 3/4/2009       11/12/2009
ELKO HI SCHOOL ADA UPGRADE              $1,290,908.76 5/5/2009      2/1/2010
CARSON RIVER DELTA EQSTRIAN AREA          $94,879.00 4/29/2009

FLEISCHMANN AG BLDG RMS 243/245          $255,197.71 3/5/2009       3/19/2010
EDDY STREET REHABILITATION               $155,034.45 4/23/2009
VICTORIAN AVE REHABILITATION            $2,053,289.00 4/14/2009

RENO CONSOLIDATED 08-01                 $1,413,199.47 4/21/2009     9/18/2009

MILL STREET RECONSTRUCTION              $1,599,420.68 6/15/2009     4/1/2010


09 SRVC LINE RPLCMNT-MTR RLCTN            $85,568.00 3/26/2009
RALEIGH HEIGHTS #1 TANK REMODEL          $264,000.00 3/3/2009       10/8/2009
WTR CNVUNC 3C MESA DR MN ST              $512,598.96 3/18/2009      4/19/2010

TMWA MAIN RPLCMNT PYRAMID WAY            $891,923.89 3/5/2009       11/12/2009
RATTLESNAKE HILL WATER TANK                           4/24/2009
RATTLESNAKE HILL & RIO VISTA PIPEILNE                 4/24/2009
LVLK MDWS WTR DIST WTRLN PHS 2          $3,740,348.00 6/16/2009
JACKPOT SCHOOL REMODEL                   $549,642.84 5/8/2009       11/20/2009
CARLIN SCHOOL REMODEL                    $847,014.40 5/8/2009       11/23/2009

PEAVINE TANK REPAIRS                     $111,332.46 3/5/2009       7/28/2009
09 STREET REHAB                          $542,856.00 2/26/2009
09 WINNEMUCCAEVNTS CMPLX RSTRM           $136,754.00 2/12/2009

WEST LIFT STATION IMPROVEMENTS            $46,583.00 3/19/2009
INFRSTRCTR UPGRD ECHO LODER              $355,144.00 3/26/2009      1/12/2010
CMPS GN ADA MACKAY STADM E SIDE          $414,788.00 3/26/2009      3/19/2010

LYON CO RTC SLURRY SEAL SLVR SPR         $555,920.75 4/6/2009       7/15/2009
FDRLY FND ST LIGHTING RPLC ST LIT E                     2/26/2009
HWY 50 LFT STA & FRC MAIN RPLCMNT       $2,400,000.00   5/1/2009
MAE ANNE AVE RECONSTRUCTION              $621,642.00    5/22/2009   9/23/2009
13TH STREET SEWER IMPRVMNTS              $244,937.54    5/8/2009    8/26/2009
NEW FLRING THROUT INCLINE  MDL SCH       $275,045.59    5/20/2009   3/17/2010
CRYSTAL BAY PHS 1B &11A WTR IMPRV        $653,135.75    4/23/2009   9/3/2009
WSTWTR TRTMNT PLNT HEADWORKS             $800,381.62    4/3/2009    1/27/2010
FAMILY CMPGRND IMPROVEMENTS              $178,477.75    5/8/2009    8/17/2009
FAMILY CMPGRND IMPROVEMENTS                       $205,000.00 4/15/2009
JOE CRAWLY NEW SPORTS GRILLE                      $822,000.00 3/30/2009      3/19/2010
SURVELLANCE CAMERAS NCC                                          3/26/2009
CARIOT TRK BSTR STA PRV VLT PIPLN                 $579,000.00    5/6/2009
09 PRVNTV MNTNC CITY OF RENO STS                 $4,097,967.31   5/22/2009
SOUND INSULATION IMPROVMENTS RESDNL HMS          $3,571,736.00   4/9/2009    10/27/2009
SOUND INSULATION PROGRAM PHASE 18.1 CONTRACTOR    $562,860.16    5/5/2009    9/16/2010
SOUND INSULATION PROGRAM PHASE 18.2 CONTRACTOR    $620,347.00    5/6/2009    9/16/2010
RUBY HILL SIDEWALK/SEWER IMPRVMT                  $361,379.00    4/20/2009   12/4/2009
RE-ROOF HOUSING UNTIS 4 & 5 NCC                   $359,640.00    3/18/2009   9/2/2009
VIRGINIA ST GYM RM 21 USAC REMDL                  $250,112.00    3/30/2009   11/6/2009
PINE & MILLL SEWER                                $134,273.00    3/24/2009
PEMBROKE DR RECONSTRUCTION                       $1,562,669.30   5/21/2009   10/27/2009
ADA RESTROOM UPGRADES                                            4/14/2009   10/14/2009
RE-PAVE CANNAN ELMTRY SCHOOL                      $335,182.38    4/14/2009   3/17/2010
RE-PAVE TOWIES ELMTRY SCHOOL                                     4/10/2009
RE-PAVE ALICE MAXWELL ELMT SCHL                   $161,799.77    4/14/2009
REPLACE GYM BLEACHERS WOOSTER                     $150,776.00    4/14/2009
REPLACE GYM BLEACHERS VAUGHN                      $108,000.00    4/14/2009


REPLC GYM BLCHRS TRANER MDL SCL                                  4/14/2009


REPLC GYM BLCHRS SPRKS MDL SCL                                   4/14/2009


REPLC GYM BLCHRS SWOPE MDL SCL                                   4/14/2009

METROPOLIS IRRIGATION RESTORATION                                7/28/2009

RE-ROOF ROY GOMM ELMTRY SCHL                      $107,994.66 4/22/2009      3/17/2010

RE-ROOFJUNIPER ELMTRY SCHL                        $515,731.63 4/22/2009      3/17/2010
RE-ROOF PLEASANT VALLEYY ELEMETARY SCHOOL         $233,962.49 4/22/2009      3/17/2010
RE-ROOF RENO HIGH SCHOOL                          $115,944.00 4/22/2009      9/1/2009
COTTONWOOD YARD TRUCK FILL STA                                   5/6/2009
TRUCKEE RVR BLW DERBY DAM                         $228,958.00 4/29/2009
CCTV SECURITY INSTALLS                            $114,171.15 2/10/2009      3/17/2010
RE-PAVE INCLINE MIDDLE SCHOOL                     $456,917.32 4/21/2009      3/23/2010
REPLC FIRE ALARM SYSTEMS GRP 2                                   3/13/2009
RAW SEWG PMP VFD AT TMWRF                         $120,142.00 4/8/2009       4/20/2010

SILVER LAKE 16" WATER MAIN                        $256,622.12 4/1/2009       7/29/2009
V & T RLWY IMPRVMNTS PS 3A                       $1,753,378.11 4/23/2009     3/19/2010

SECONDARY DIGESTER ROOF REPAIR                     $88,432.00 4/14/2009

AIRSIDE PVMNT REPAIRS & REHAB PS5                 $298,888.00 5/21/2009
CAPITOL PHOTOVOLTAIC INSTALLATION                  $88,432.00 4/14/2009
WA CO SHERIFFS OFC CYBR CRIMES                    $253,717.00 4/21/2009
W WNDVR N GENE L JONES WY PVMNT                   $415,926.90 4/14/2009      6/30/2009
S CURRY ST PHS 1 IMPROVEMENTS                    $3,013,714.05 4/15/2009     4/29/2010
CMAQ PEDESTRIAN PATH AT SUN VLLY                  $650,000.00 7/1/2009
RE-ROOF AT WCSD ADMIN BLDG              $153,673.60 4/30/2009     3/17/2010

09 WATERMAIN REPLACEMENT                $722,060.50 6/25/2009     10/26/2009

RE-ROOF INCLINE HI SCHOOL                             4/30/2009   5/27/2009
RE-ROOF AT CLAYTON MIDDL SCHOOL         $973,570.17 4/30/2009     3/17/2010
JOBS PEAK WELL #2 REPLACEMENT           $192,201.67 4/15/2009
WNDVR CURB & GUTTER ACCESS              $195,221.50 5/4/2009      9/22/2009
2009 PAVING PROJECT                    $1,365,661.75 5/12/2009
REHAB & REALIN RNWY 9/27 & TXIWY A     $8,910,322.60 5/19/2009
PRIMRY CLRIFIER OVRFLO PIPNG RHAB       $289,629.29 5/15/2009
APRON REHAB PHS 12                     $2,460,460.00 4/30/2009

09 ROAD SEAL                            $279,007.00 5/15/2009
INTEROPERABLE RADIO COMM 80 CRDR        $400,000.00 6/11/2009
RE-ROOF 4 BUILDINGS                    $1,360,000.00 5/1/2009
                                        $242,200.00 5/20/2009
                                        $179,068.00 5/20/2009
FY 2010 ST MAINTENANCE                  $783,521.96 5/4/2009      12/4/2009
SUMMIT RIDGE & SKY MTN DR              $1,210,552.69 7/7/2009     10/5/2010

FDRLY FNDED SPNSH SPRNGS SNTRY                        5/20/2009
KINGSBURY VILLAGE WATERLINE              $42,990.00 5/6/2009
09 WINNEMUCCA WATER MAIN                $322,273.00 4/28/2009
09 WINNEMUCCA ST RECONSTRUCTION         $240,974.50 4/29/2009     7/24/2009
09 WINNEMUCCA ST SEALING               $1,161,949.00 4/29/2009    11/16/2009
24" STUB RETIREMNT 1-80 TO MCCARAN      $120,000.00
SPRNG CRK HI SCHL HALWY FLR TILE        $129,130.00 5/20/2009     8/3/2009
SPARKS CONSOLIDATED 09-02              $1,500,000.00 8/1/2009
DRI CAVE FACILITY PLAZA                 $574,978.00 5/7/2009      11/25/2009
ROBB DR/SHARLANDS AVE INTERSEC         $1,500,000.00 6/9/2009
SEWER REHAB PROJ-PHASE 1B              $1,699,803.90 5/18/2009

2009 STREET MAINTENANCE PROJECT        $1,248,007.00 6/19/2009
VICTORIAN AVE REHABILITATION-PHS 1      $436,090.88 6/4/2009      8/24/2009
VICTORIAN AVE REHABILITATION-PHS 2     $2,485,422.00 8/20/2009
CARLIN BRANCH LIBRARY                   $300,000.00 5/8/2009
EAST 4TH ENHANCEMENT                    $440,000.00 9/1/2009
EUREKA CO 09 AIRPORT MAINTENANCE        $498,000.00 5/18/2009
CA INTRPRTV CNTR --TRAILS               $122,500.00 5/19/2009
WRF EMERGENCY STORAGE RSVOIR            $260,714.02 7/10/2009     12/23/2009
2009 OVERLAY                                          5/14/2009
09 RENO SEWER REHAB PHS 1A              $473,054.17 6/3/2009
VICTORIAN AVE WATER MAIN REPLACEMENT    $186,868.70 5/12/2009     8/13/2009
SHERIFF OFFICE CRIME LAB REMODEL        $125,000.00 5/19/2009
FERNLY H S LIFT STA REPLCMNT            $190,719.29 5/15/2009

FIRE ALARM UPGRD SPRNKLR SYSM            $99,292.00 5/21/2009
SYNTHETIC TURF SPORTS FIELDS            $446,446.00 5/12/2009
N COUNTY CC SEWER INTERTIE              $274,954.60 5/20/2009
EUREKA CO COURTHOUSE RE-ROOF            $151,502.00 5/18/2009
CITY HALL ROOF REPLACEMENT              $160,260.00 5/19/2009     11/9/2009
CMPUTR CNTR COOLING TWR RPLCMNT         $106,864.00 5/21/2009
DES BUILDING B RENOVATION                          $990,000.00 6/3/2009
FERNLEY INTERMEDIATE II                          $20,657,000.00 6/19/2009
W SEVENTH ST RECONSTRUCTION                       $1,132,000.00 7/22/2009
WELL #43 WATER MAIN EXTENTION                      $274,274.00 7/10/2009    11/10/2009
TRUCKEE RVR BKFLW MDFICTN                          $214,266.62 5/19/2009    3/10/2010
PHS II SITE IMPRVMNTS DAYTON HI                    $510,004.08 5/15/2009    12/4/2009
CONCOURSE RE-ROOF                                  $360,800.00 6/10/2009
2009 STREET MAINTENANCE PROJECT                    $199,003.00 5/19/2009
GOLDEN EAGLE REGNL PRK TFFC SGNL                   $182,620.00 5/21/2009    4/13/2010
FAIRVIEW DR LANDSCAPING                            $255,504.73 5/21/2009

PACIFIC PAWNBROKER BLDG DMLTION                     $48,744.00 5/13/2009    2/22/2010

SCL MDCN HOWARD WTR LINE RPLC                      $116,318.00 5/1/2009     10/26/2009
LILLARD DR RECONSTRUCTION                         $2,472,881.00 7/30/2009
WELLS ELMNTRY KITCHEN REMODEL                                   7/2/2009
E WSTWTR TRTMNT POND 1 RECONST                     $519,275.73 6/3/2009     4/19/2010
09 CURB GUTTER & SIDEWALKS                         $369,900.96 5/22/2009    2/15/2010
INCLINE VILLAGE HI SCHOOLL EROSION CONTROL BMP     $596,099.02 6/2/2009     3/17/2010
CARSON HI SCHOOL PRESS BOX                         $260,000.00 5/22/2009
                                                   $119,900.00 6/3/2009
                                                      $9,844.00 6/3/2009
                                                      $6,414.00 6/3/2009
                                                    $12,254.00 9/3/2009
                                                      $8,000.00 6/11/2009
                                                    $10,561.00 6/11/2009
                                                      $3,386.00 6/11/2009
AUTOMATED WEATHER OBSRVTN SYS                      $150,000.00 6/15/2009
HAWTHORNE UTLTS BABBIT WELL                        $387,175.00 6/3/2009
MAINTENANCE YARD PHS 2                             $152,450.00 5/26/2009    11/20/2009
ALF SORENSEN RE-ROOF                               $428,800.00 5/27/2009
USPFO PAVE & POWER 2009                            $261,494.40 5/27/2009
STEAD TRAINING CENTER 2009                         $196,196.00 5/27/2009
ELY STATE PRISON ADA REHAB                         $196,482.00 6/11/2009
FIRE STA 2 HVAC REMODEL                            $153,139.00 6/3/2009     2/22/2010

CONTROL VALVE ACTUATOR RPLCMNT                      $97,050.00 6/4/2009     2/26/2010

AIR QUALITY OFFICES REMODEL                         $79,900.00 7/23/2009
DEVILS GATE 1 & 2 WATER TRANS                      $575,250.00 8/6/2009
FREEPORT BLVD & STENERI WAY                       $1,856,875.00 6/30/2009   12/23/2009
HWY 93 OVERPASS BIG GAME FENCE                     $342,401.92 7/16/2009
LANDER CO 2009 PAVING PROJECT                      $433,133.50 6/23/2009
REVITALIZATION OF SCHOOL-LODER                     $803,000.00 9/23/2009
UPPAWAY WTR STORGE TNK RPLCMNT                     $597,180.00 6/30/2009

09 ADA SIDWLK IMPRVMNT PHS 1                        $84,821.70 6/3/2009

09 ADA SIDWLK IMPRVMNT PHS II                      $120,407.00 6/3/2009
340,000 GALLON STRG RESVOIR COVR                   $213,500.00 6/18/2009
ELKO HI SCHOOL DRAINAGE MITIGATION                 $246,471.61 6/16/2009    10/2/2009
RENO CONSOLIDATED 09-02 PHS 1                      $920,055.13 7/9/2009     10/2/2009
RENO CONSOLIDATED 09-02 PHS 2                      $633,633.00 8/5/2009
GERLACH SEWER IMPROVEMENT                     $500,000.00 7/1/2009
MOVA BLVD RECONSTRUCTION                     $1,889,871.51 8/4/2009      12/22/2009
HARBECKE RANCH IRRIGTN WELL                   $250,000.00 7/15/2009
REVITALIZTN 4 ELEMNTRY SCHOOLS               $7,370,400.45 5/26/2009     4/14/2010
WATER METER PLAN PROJECT 12                  $1,432,737.00 8/14/2009
09/10 ST CUT PVMNT REPAIR INCLN VLG                        6/18/2009
09/10 ST CT PVMNT REPAIR TRKE MDWS                         6/18/2009
CC FRWY PHS 2B UTLTY RELO EDMNDS              $750,158.11 6/17/2009      4/29/2010
WINNEMUCCA GATEWAY                              $97,827.00 7/1/2009
 CARSON CITY TOYOTA                          $5,535,246.00 2/25/2009

COTTONWOOD ELEM SCHL PRKNG LOT                 $63,611.12 6/15/2009      11/17/2009
SHERIFFS OFCE & JAIL ADDITN 7 REMDL               $582.18 7/6/2009
SUTRO ELMNTRY SCHOL PRKNG LOT                  $90,922.71 6/15/2009      10/29/2009
CURB & GUTTER PAVEMENT SLURRY SEAL MARKING                7/27/2009
JACKPOT AIRPORT PERIMNTR FNCNG                $252,123.72 6/23/2009

09/10 SLURRY SEAL & PATCH                     $162,007.00 6/30/2009      11/13/2009

CG MCHNCL E SIDE FSD HTHW PIPNG                $90,077.00 7/20/2009
ADA IMPRVMNTS CO FAIRGRNDS FLLON              $163,300.00 7/7/2009

LONGLEY LANE RECONSTRUCTION                   $889,575.72 7/24/2009      4/1/2010
VAN SICKLE BI-STATE PARK                     $2,460,368.64 8/25/2009
THIRD CREEK RESTORATION                       $833,182.00 7/15/2009
PERMANENT PATCH PROGRAM                       $249,825.00 6/24/2009
W WENDOVER ELMNTRY BUS LANE                   $213,176.00 7/27/2009
DERBY FIELD AIRPORT                            $47,764.40 8/12/2009
SPANISH SPRNGS SANITARY SWR PS 3             $6,699,554.50 7/8/2009
SOUTHSIDE TENNIS COURTS REHAB                 $353,742.44 7/22/2009
ECHO AVE RECONSTRUCTION                       $674,000.00 9/24/2009
EL RANCHO RECONSTRUCTION                      $989,573.00 8/11/2009
MECHANICAL JOT TRAVIS BOILR-GNRTR             $210,210.00 7/9/2009
DOUGLAS HI SCHOOL RE-ROOF PHS 2               $718,157.00 6/8/2009       10/2/2009
CAROL LANE ABANDONMENT                        $289,000.00 7/10/2009      2/5/2010
MILITARY ROAD RECONSTRUCTION                                 8/17/2009
SIERRA ST BRIDGE REPAIR                       $106,902.76 7/21/2009      1/22/2010
PUBLIC SWIMMING POOL RENOVATIONS                             7/27/2009
OLD CLEAR CREEK RD FRONTAGE                   $298,604.78    7/23/2009
LINDEN-GROVE AREA SDWLK PHS 2                 $200,000.00    9/22/2009
VICTORIAN AVE SEWER REHAB                     $131,000.00    7/15/2009   11/20/2009
VISTA BOULEVARD WIDENING                     $6,184,099.85   8/12/2009
SHRIFFS OFC NNCTC EMRGNCY GENRTR              $139,375.00    4/7/2009    1/15/2010
SCRUGHAM ENGINEERING BLDG RM 123               $66,700.00    7/16/2009
SPRKS LBRY & MCGEE CNTR PRKNG                 $210,123.00    8/12/2009   11/5/2009
RUNWAY 5-23 OBSTRUCTION REMOVAL               $150,000.00    7/22/2009
SIERRA VISTA DRAINAGE                         $104,069.40    7/9/2009    3/17/2010
LAS BRISAS BLVD RECONSTRUCTION                $684,573.00    8/19/2009   12/21/2009
4TH STREET RECONSTRUCTION                     $150,419.20    7/16/2009
GOLCONDA SHOOL PHASE III B                    $666,405.85    11/1/2008   10/15/2009
MACKAY STADUM FIELD TURF RPLCM                               7/6/2009
HAWTHORNE INDUSTRIAL AIRPORT                  $104,924.94    8/12/2009
CARLIN SCL CHESTNUT ST IMPRVMNTS              $237,102.18    8/4/2009    10/26/2009
09 SUMMER PVMENT REHAB                              $655,638.95 7/22/2009
ASBSTS ABTMNT & DMLTN PS III NGF                    $234,000.00 8/6/2009       11/23/2009
MICHAEL