					TIP ID                     Project Name




 2927 Citywide FA Preventative Maintenance


 5723 St. Elizabeths Campuses Access Improvements




 3210 Transportation Enhancements Program

 3213 Planning and Management Systems


 5734 Georgetown – Rosslyn Connector




 2620 Streetcar Project




 3212 Safety Improvements Citywide




 2965 Roadway Reconstruction Citywide

 3203 K Street Bridge Over Center Leg
      H Street NW Bridge Over Air Rights Tunnel-Center Leg
 5332 Bridges
3213 Planning and Management Systems

5308 Neighborhood Streetscape Improvements




2965 Roadway Reconstruction Citywide




3216 Traffic Operations Improvements Citywide




3228 Metropolitan Branch Trail

3193   11th Street Bridges SE, Replace and Reconfigure
5439   Citywide streetlight construction
3202   Bridge Design Consultant Services
3243   Citywide Consultant Bridge Inspection


2699 Asset Preservation of Tunnels-NHS/STP


5316 Impact Attenuators and Guiderails
2922 Great Streets - Minnesota Ave, NE




5345 Kennedy Center Access Improvements

3216 Traffic Operations Improvements Citywide
     Reconstruction of Benning Road, NE., Anacostia to 42nd
5572 St
     H Street NW Bridge Over Air Rights Tunnel-Center Leg
5332 Bridges




2959 Great Streets - Nannie Helen Burroughs




5308 Neighborhood Streetscape Improvements

3215 Resurfacing Streets and Freeways Citywide




3189 New York Ave. NE (#534) Over RR

3508 Anacostia Riverwalk Trail
5376 Garfield-Canal Park Connector
2780 Oxon Run Trail Restoration

3230 Rock Creek Park Trail
     Rehabilitation of Anacostia Freeway Bridges at
4917 Anacostia Park

5337 Replacement of Pedestrian Bridges over Kenilworth Ave
     Safety Improvements of Benning Road Bridges over
5334 Kenilworth Ave
     Electrical/Mechanical and Management of Tunnels
3512 Citywide
     Capitol Hill Transportation Study Infrastructure
5295 Improvements
5571 Data Warhouse
2806 Klingle Trail

5323   Citywide Roadway Pavement Condition Assessment
3213   Planning and Management Systems
5434   Program Management
5315   Takoma Study Recommendations

2965 Roadway Reconstruction Citywide
3212 Safety Improvements Citywide
         Amendment or Modification Title




Amendment - Increase and Modify Project Funding,
Change Project Description


Amendment




Administrative Modification - Description Change

Administrative Modification - Description Change


Amendment - Add New Project




Administrative Modification - Description Change




Administrative Modification - Description Change




Administrative Modification - Description Change

Administrative Modification

Administrative Modification
Administrative Modification - Description Change

Administrative Modification - Add Funding




Administrative Modification - Add Funding




Administrative Modification - Add Funding




Administrative Modification - Change Funding

Administrative Modification - Reduce Funding
Administrative Modification - Reduce Funding
Administrative Modification - Reduce Funding
Administrative Modification - Add Funding


Administrative Modification - Add Funding


Administrative Modification - Change Funding
Administrative Modification - Add Funding




Amendment - Add New Project

Administrative Modification - Add Funding

Amendment - Modify Funding
Amendment - Modify Funding




Amendment - Modify Funding




Amendment - Modify Funding

Amendment - Modify Funding




Amendment - Add New Project

Amendment - Modify Funding
Amendment - Modify Funding
Amendment - Modify Funding

Amendment - Modify Funding

Amendment - Modify Funding

Amendment - Modify Funding

Amendment - Modify Funding

Amendment - Modify Funding

Amendment - Modify Funding
Amendment - Modify Funding
Amendment - Modify Funding

Amendment - Modify Funding
Amendment - Modify Funding
Amendment - Modify Funding
Amendment - Modify Funding

Amendment - Modify Funding
Amendment - Modify Funding
                         Descrtiption of Action                           Approved      TIP

Add $7 million in Bridge Rehab (BR) funding for construction in FY 10.
Move $100,000 BR funds for PE from FY 11 to FY 12. Move $4 million
BR funds for construction from FY 11 to FY 13. Modify project
description and change Agency Project ID from CD023                        08-Jan-10 FY 10-15
This amendment adds the Malcolm X/I-295 Interchange
Reconfiguration to the project with $10 million STP funds in FY 2012
and $90 million in STP funds in FY 2013.                                  05-Feb-10 FY 10-15

Change the last sentence of the description to read: Approved
locations include: Cultural Tourism DC, Friends of Hardy, Kasky Studio,
Inc., National Museum of Women in the Arts, Tivoli North Business
Association, Mount Pleasant Main Street, NOMA BID, Bar                    01-Mar-10 FY 10-15
Add the following to the list of sub-projects in the description: aa.
Planning Manual.                                                          02-Mar-10 FY 10-15
Add the Georgetown-Rosslyn Connector project to the FY 2010-2015
TIP with $712,500 in Federal funding from FY2009 Earmark, E2009-
BUSP-890 and $1 million from local funds.                                 17-Mar-10 FY 10-15
Add the following text to the project description:

NEPA for MLK extension (Howard Road - 11th Street bridge)
NEPA for Benning Road extension (Oklahoma Ave - Benning Road
metro station)
NEPA for Union Station to Mount Vernon Square
NEPA for K Street Cente                                                   24-Mar-10 FY 10-15
- Delete sub-projects A, E, F, K and L
- Modify sub-project B title to read Hazard Elimination (HSIP)
- Modify sub-project H title to read Highway Accident Traffic Data
System (TARAS)
- Add the following six sub-projects:
1.Traffic Signal Construction                                             26-Mar-10 FY 10-15

Add the following two sub-projects to the description:

r. Retaining Wall Parapet at Canal Road – This project will include
repairs of the existing retaining wall parapet and coping along Canal
Road, NW between Whitehurst Freeway and Foxhall Road, NW Inte             26-Mar-10 FY 10-15

Move $2,075,000 in construction funding from FY 2011 to FY 2010.          16-Apr-10 FY 10-15
Move $300,000 in preliminary engineering funding and $3,500,000 in
construction funding from FY 2011 to FY10.                                16-Apr-10 FY 10-15
Add the following components to the project description:

1) Metropolitan Planning
2) Management Systems and Plans
   bb. 16th Street Corridor Study and Operations Plan
                                                                            30-Apr-10 FY 10-15
Add $2 million in STP funds for construction in FY 2010 for T. Harvard
Triangle Intersection.                                                      02-Jun-10 FY 10-15
Add $3.95 million in STP funds for construction in FY 2010 due to the
following project modifications:
d: 2nd Street, Independence to Maryland – Reduce project total by
$1,050,000 in STP construction funds in FY 2010
h: Nebraska Ave N.W., Nevada to Mili                                        02-Jun-10 FY 10-15
Add the following projects to the list of sub-projects under the
description with the associated increases in funding:
u. ITS Communication Master plan (add $750,000 of STP funds for
Design/Planning in FY2010)
v. MATOC Annual Fee (add $400,000 in STP fund                               02-Jun-10 FY 10-15
Add $3.4 million of CMAQ funds for construction in FY 2010
Reduce FY 2011 CMAQ funds for construction by $2 million
Reduce FY 2012 CMAQ funds for construction by $1.4 million
                                                                            02-Jun-10 FY 10-15

Reduce FY 2010 Bridge funds for construction by $ 12.362 million            02-Jun-10   FY 10-15
Reduce FY 2010 STP construction funds by $2.3 million.                      02-Jun-10   FY 10-15
Remove $450,000 in Bridge funds for design from FY 2010.                    02-Jun-10   FY 10-15
Add $450,000 in Bridge funds for design in FY 2010.                         02-Jun-10   FY 10-15
Add $1.234 million of NHS for construction in FY 2010.
Add $88,000 of STP funds for construction in FY 2010.
                                                                            02-Jun-10 FY 10-15
Reduce IM funds for construction by $5,000 in FY 2010.
Increase STP funds for construction by $195,000 in FY 2010.
                                                                            02-Jun-10 FY 10-15
Add $600,000 in STP funds for design in FY 2010.                            02-Jun-10 FY 10-15

This project was not obligated in FY 2009, but will begin to be obligated
in FY 2010. DDOT requests that the title be changed to Kennedy
Center Access Improvements, since the project is more focused on
pedestrian—rather than highway--access. Funding sho                         09-Jul-10 FY 10-15
Add $4.7 million in ARRA funds in FY 2010 for construction of sub-
project (p) Vehicle Detection Station.                                      17-Jun-10 FY 10-15

Add $6,000K of STP funding for the construction phase in FY 2010.           09-Jul-10 FY 10-15
Add $200K of Bridge funding and $19,000K of NHS funding for the
construction phase in FY 2010 (to the $3,800K of funding shown in the
4/16/2010 amendment). Add to the project description that the
project includes upgrades of electrical and mechanical sys              09-Jul-10 FY 10-15

Add $10,000K of ARRA funds and $3,000K of STP funding for the
construction phase in FY 2010, eliminating all the design and
construction funding currently shown in FYs 2011 and 2012. The
description in the current TIP remains correct, although we can add     09-Jul-10 FY 10-15

Add $1,600K of ARRA funds and $7,400K of STP funds for the
construction phase of Sherman Avenue NW, Park Road - Florida in FY
2010. Decrease $1,100K of ARRA construction funds in FY 2010 for FY
2010 Citywide Federal Aid Pavement Restoration/Sidewalk Cons            09-Jul-10 FY 10-15
Decrease $3,100K of ARRA construction funds for citywide paving in FY
2010 from the amendment adopted 11/24/2009.                             09-Jul-10 FY 10-15

This ARRA construction project was obligated and began construction
in FY 2009. Replace the project's force-account funding from $10.4M
of ARRA funding with regular federal-aid funding. $8,640K of Bridge
funding and $500K of STP funding for construction                       09-Jul-10 FY 10-15
Reduce the FY 2010 funding of $2,305K for construction to $1,100K for
construction.                                                           09-Jul-10 FY 10-15
Eliminate the FY 2010 funding of $200K for design.                      09-Jul-10 FY 10-15
Move FY 2010 funding of $1,000K for construction to FY 2011.            09-Jul-10 FY 10-15
Move FY 2010 funding of $3,300K for design and construction to FY
2011.                                                                   09-Jul-10 FY 10-15

Eliminate the FY 2010 funding of $500K for design.                      09-Jul-10 FY 10-15

Move FY 2010 funding of $6,800K for construction to FY 2011.            09-Jul-10 FY 10-15
Move FY 2010 funding of $3,300K for design and construction to FY
2013 and 2014 respectively.                                             09-Jul-10 FY 10-15

Eliminate the FY 2010 funding of $2,200K for construction.              09-Jul-10 FY 10-15
Move FY 2010 funding of $2,000K for design and construction to FY
2011.                                                                   09-Jul-10 FY 10-15
Move FY 2010 funding of $400K to FY 2011.                               09-Jul-10 FY 10-15
Move FY 2010 funding of $1,000K for design to FY 2011.                  09-Jul-10 FY 10-15

Reduce the FY 2010 funding by $400K.                                    09-Jul-10   FY 10-15
Reduce the SPR FY 2010 funding by $770K.                                09-Jul-10   FY 10-15
Add to FY 2010 $2,200K of STP funds for construction.                   09-Jul-10   FY 10-15
Move FY 2010 funding of $3,400K for construction to FY 2011.            09-Jul-10   FY 10-15
Reduce FY 2010 STP funding by $700K for design and reduce FY 2010
STP funding by $14,520K for construction.                               09-Jul-10 FY 10-15
Reduce the HSIP construction funding by $5,500K in FY 2010.   09-Jul-10 FY 10-15
TIP ID                     Project Name                    Amendment or Modification Title
                                                        Administrative Modification - Change
 4907 Union Station Access and Capacity Improvements    Description
                                                        Administrative Modification - Change
 3236 Farragut Station Pedestrian Tunnel                Funding Source
                                                        Administrative Modification - Change
 2597 Union Station Pedestrian Passageway/Tunnel        Description
                                                        Administrative Modification - Change
 3215 Resurfacing Streets and Freeways Citywide         Funding Source
                                                        Administrative Modification - Change
 5839 Metropolitan and Statewide Planning               Funding Source




                                                        Administrative Modification - Change
 5754 Benning Road Extension                            Name, Description, Funding Source




                                                        Administrative Modification - Change
 5753 Anacostia Phase 2                                 Name, Description, Funding Source
                                                        Administrative Modification - Remove
 2968 East Entrance Foggy Bottom                        Project




      Union Station to Washington Circle via K Street   Administrative Modification - Change
 5755 Extension                                         Name, Description, Funding Source
                                                        Administrative Modification - Change
 3216 Traffic Operations Improvements Citywide          Description
                                                        Administrative Modification - Change
 3290 Kenilworth Avenue Corridor                        Description




                                                        Administrative Modification - Change
 3423 South Capitol Street Corridor                     Description and Funding
     Roadway and Bridge Improvement on Southern Avenue Administrative Modification - Change
5353 and Winkle Doodle Branch Bridge                   Title, Description, and Funding




                                                            Administrative Modification - Change
3508 Anacostia Riverwalk Trail                              Description and Funding


                                                            Administrative Modification - Change
5790 Livability Program                                     Description
     Reconstruction of Benning Road, NE., Anacostia to 42nd Administrative Modification - Change
5572 St                                                     Description


                                                            Administrative Modification - Change
5345 Kennedy Center Access Improvements                     Description and Funding


                                                            Administrative Modification - Change
4907 Union Station Access and Capacity Improvements         Title and Funding




                                                            Administrative Modification - Change
3505 K Street Transitway                                    Title, Description, and Funding




                                                            Administrative Modification - Change
2597 Union Station Pedestrian Passageway/Tunnel             Title, Description, and Funding
                                                            Administrative Modification - Change
3213 Planning and Management Systems                        Description




                                                            Administrative Modification - Change
5802 Program Manager AWI                                    Description and Funding
                                                       Administrative Modification - Change
5723 St. Elizabeths Campuses Access Improvements       Description and Funding
                                                       Administrative Modification - Change
3215 Resurfacing Streets and Freeways Citywide         Classification
                                                       Administrative Modification - Change
2945 Traffic Congestion Mitigation                     Description




                                                       Administrative Modification - Change
3212 Safety Improvements Citywide                      Description




                                                       Administrative Modification - Change
2965 Roadway Reconstruction Citywide                   Description and Funding
                                                       Administrative Modification - Change
5308 Neighborhood Streetscape Improvements             Description
                                                       Administrative Modification - Change
3435 Great Streets - Georgia Ave                       Funding Source
                                                       Administrative Modification - Change
5764 Wisconsin Avenue Streetscape Improvements         Description




3193 11th Street Bridges SE, Replace and Reconfigure   Amendment - Add Project

5797 Mount Vernon Square District                      Amendment - Modify Funding

5764 Wisconsin Avenue Streetscape Improvements         Amendment - Add Funding

3508 Anacostia Riverwalk Trail                         Amendment - Modify Funding

3232 Bicycle and Pedestrian Management Program         Amendment - Add Funding


5298 Emergency Transportation Project                  Amendment - Add Funding


2927 Citywide FA Preventative Maintenance              Amendment - Add Funding

3246 L'Enfant Plaza Promenade/Banneker Improvements    Amendment - Add Funding
3213 Planning and Management Systems                   Amendment - Modify Funding




3212 Safety Improvements Citywide                      Amendment - Modify Funding

2945 Traffic Congestion Mitigation                     Amendment - Modify Funding

5754 Benning Road Extension                            Amendment - Add Funding


5753 Anacostia Phase 2                                 Amendment - Modify Funding

5922 DC Statewide Rail Plan                            Amendment - Add New Project




5709 Union Station Escalator Replacement               Amendment - Add New Project




3216 Traffic Operations Improvements Citywide          Amendment - Add Funding




3193 11th Street Bridges SE, Replace and Reconfigure   Amendment - Modify Funding
               Descrtiption of Action                Approved     TIP

Description modified to read as above.               18-Feb-11 FY 11-16
Change funding source of $500,000 in FY 2012 from
FA to State/DC.                                      18-Feb-11 FY 11-16

Change description to read as above.                 18-Feb-11 FY 11-16
Change funding source of $3.8 million in FY 2011
from RABA to STP.                                    18-Feb-11 FY 11-16
Change funding source of $475,000 in each fiscal
year from Section 5309 to Section 5303.              18-Feb-11 FY 11-16


- Change Project name from "H Street/Benning
Road Extension" to "Benning Road Extension."
- Change the project description to read as above.
- Remove $34.5 million in BD funding from FY 2011
(also remove $15 million in BD funding and $73.409
million i                                            18-Feb-11 FY 11-16

- Change project name from "MLK Extension" to
"Anacostia Phase 2"
- Change project description to read as above.
- Change source of funding of $29.8 million in FY
2011 from FA to CMAQ.                                18-Feb-11 FY 11-16

Remove project from the FY 2011-2016 TIP.            18-Feb-11 FY 11-16

Modified to include the K Street Extension project
(TIP ID 5756) as follows:
- The name is changed from Union Station to Mt.
Vernon Square to read as above.
- The description is modified to read as above.
- The funding is modified to include an addi         18-Feb-11 FY 11-16
Include an additional subproject: x. Managed Lanes
Feasibility Studies.                                 17-Mar-11 FY 11-16

Change project description to read as above.         14-Apr-11 FY 11-16
Change project description to read as above. In FY
11 add $4,500 in Earmark funds for PE. In FY 12
reduce Earmark funding for PE from $26,385 to
$13,800, and remove $29,500 for ROW acquisition.
In FY 13 reduce Earmark funds from $75,640 to
$20,000 and c                                        14-Apr-11 FY 11-16
Change project title, limits and description to read
as above. Move project listing from Bridge to
Primary section. Change source and
Fed/State/Local split of funds from BR 80/20/0 to
STP 83/17/0. Increase funding in FY 11 from $250
to $1,000. Move th                                     14-Apr-11 FY 11-16
Change project description to read as above. In FY
11 increase CMAQ funding from $250 to $400 and
change phase from Construction to PE. In FY 12
Increase Earmark funding for construction from
$750 to $3,250. In FY 13 add $500 in Earmark and
$600 in STP                                            14-Apr-11 FY 11-16
Add the following sentences to the project
description: Funding for is short term projects is
shown. Long term improvements will be established
as separate projects.                                  14-Apr-11 FY 11-16

Change project description to read as above.           14-Apr-11 FY 11-16
Change project description to read as above.
 Change $500 in Proffer funding in FY 11 to $300 in
NPS funds and $200 in Private funds (Kennedy
Center).                                               14-Apr-11 FY 11-16
Change project title from "Union Station ITC Air
Rights Development" to "Union Station Access and
Capacity Improvements." Change funding source
from FA to Private.                                    14-Apr-11 FY 11-16
Change Project Heading and Title to "K Street
Transitway." Change funding source from Earmark
to Section 5309 for preliminary engineering.
 Remove $46,000 in Earmark funding for
construction. Move project from Primary to Transit
section.                                               14-Apr-11 FY 11-16
Change project title and description to read as
above. Change $12,200 in FA funds in FY 11 to
$7,198 in local, $4,026 in Federal Railroad
Administration Earmark, and $976 in Section 5309
funds and move to FY 12.                               14-Apr-11 FY 11-16
Remove sub-project: h. Tri-State Oversight
Committee (TOC)                                        14-Apr-11 FY 11-16

Change Earmark and SP funding sources to NHS.
Add the the following sentence to the description:
Funding will be used for construction oversight and
consultant services.                                   14-Apr-11 FY 11-16
Change project description to read as above.
 Delete $5,500 Earmark funds for construction in FY
11. Increase Earmark funding for construction in FY
12 from $28,630 to $34,130. Change Earmark
funding source to GSA Earmark.                          14-Apr-11 FY 11-16
Move project from TERMs section to Maintenance
section.                                                14-Apr-11 FY 11-16

Change project description to read as above.            14-Apr-11 FY 11-16

Change project description to read as above,
removing sub-projects s. Mt. Pleasant
Transportation Implementation Study and item t.,
Brightwood Transportation Implementation Study.         14-Apr-11 FY 11-16

Change project description to read as above,
removing sub-project g. 'Southern Ave. Boundary
Streets' (incorporated into TIP ID 5353). Reduce
STP funds in FY 13 from $19,380 to $16,500.             14-Apr-11 FY 11-16

Change project description to read as above.            14-Apr-11 FY 11-16
Change funding source of $3,000 in FY 11 and FY 12
from FA to ARRA/TIGER.                                  14-Apr-11 FY 11-16

Change project description to read as above.            14-Apr-11 FY 11-16

Amend this project into the FY 2011-2016 TIP. This
project was originally submitted for inclusion in the
FY 2011-2016 TIP, but was inadvertently omitted at
the time of its approval.                               06-May-11 FY 11-16

Eliminate $500K of STP funding for PE in FY 2011.        08-Jul-11 FY 11-16
Add $1,920K of NHS funding for the construction
phase in FY 2011.                                        08-Jul-11 FY 11-16
Remove $350K of CMAQ funding from the PE phase
in FY 2011.                                              08-Jul-11 FY 11-16
Add $4,000K of CMAQ funding for the construction
phase in Fy 2011.                                        08-Jul-11 FY 11-16
Add $500K of STP funding for the PE phase and
$3,318K of STP funding for the construction phase
in FY 2011.                                              08-Jul-11 FY 11-16
Add $6,000K of Bridge funding for the construction
phase in FY 2011 for repairs to the Theodore
Roosevelt Memorial Bridge.                               08-Jul-11 FY 11-16
Add $5,500 of Bridge funding for the construction
phase in FY 2011.                                        08-Jul-11 FY 11-16
Reduce $2,638K of SPR funding from the studies
phase in FY 2011.                                       08-Jul-11 FY 11-16

Reduce $5,060K of HSIP funding from the PE phase,
$3,000K of HSIP funding from the construction
phase, $3,420 of NHS funding from the construction
phase, $820K of STP funding from the PE phase, and
$2,000K of STP funding from the construction phase
in FY                                                   08-Jul-11 FY 11-16
Eliminate $500K of PL funding for the study phase in
FY 2011.                                                08-Jul-11 FY 11-16
Add $918K of CMAQ funding for the study phase in
FY 2011.                                                08-Jul-11 FY 11-16
Remove $29,800K of CMAQ funding for the
construction phase and add $577K of CMAQ
funding for the study phase in FY 2011.                 08-Jul-11 FY 11-16
Amend this project to the FY 2011-2016 TIP with
$300K of STP funds in FY 20111.                         08-Jul-11 FY 11-16

Project was in a previous TIP. Amend to the FY
2011-2016 TIP with $4,271 of private funds (from
the Union Station Redevelopment Corporation) and
$4,271 of federal grant funds (from the Federal
Railroad Administration) in FY 2011.                    08-Jul-11 FY 11-16

Add $695K of STP funds for planning studies, $365K
of HSIP funding for the PE phase, $770K of NHS
funds for the construction phase, and $14,670K of
STP funding for the construction phase in FY 2011.      08-Jul-11 FY 11-16
Add $18.65 million NHS funds and $2 million IM
funds for construction in FY 2012. Eliminate $9.02
million BR funds and add $50 million in GARVEE
bond funding in FY 2013. Add $2 million IM funds,
$7 million NHS funds, and $6 million BR funds in FY
2014.                                                  02-Dec-11 FY 11-16
TIP ID                      Project Name                      Amendment or Modification Title


 5711 Long Bridge Integrity & Capacity Study               Amendment - Add Project

 3505 K Street Transitway                                  Amendment - Add funding


 5959 Virginia Avenue Tunnel Project                       Amendment - Add New Project

 5958 Boundary Stones                                      Amendment - Add New Project


                                                           Amendment - Add funding, merge 2 sub-
 5957 Middle Anacostia                                     projects
      Reconstruction of Benning Road, NE., Anacostia to 42nd
 5572 St                                                     Amendment - Reduce Funding




 2743 Great Streets - Pennsylvania Ave, SE                 Amendment - Add funding

 5313 Urban Forestry Program                               Amendment - Add funding


 5320 Howard Theater Streetscape Improvements              Amendment - Add Funding




      Civil Rights/EEO Program Implementation and          Amendment - Add funding and change
 3261 Enhancement                                          phase designation

 5433 Bridge Management Project                            Amendment - Add Funding




 3242 Citywide Culverts                                    Amendment - Add funding




                                                           Modification - Change FY 2012 funds and
 2965 Roadway Reconstruction Citywide                      add a sub-project

                                                           Modification - Change FY 2012 funding
 3508 Anacostia Riverwalk Trail                            and narrative timetable
                                                           Modification -- Change FY 2012 funding
5790 Livability Program                                    and phases, and add a narrative change




                                                           Modification - Change FY 2012 funding
3215 Resurfacing Streets and Freeways Citywide             and add narrative note

5337 Replacement of Pedestrian Bridges over Kenilworth Ave Modification -- Change FY 2012 funding
                                                           Modification - Change the FY 2012
4900 27th Street Bridge NW                                 funding




                                                           Modification - Change FY 2012 funds and
2945 Traffic Congestion Mitigation                         phases; add sub-projects




                                                           Modification - Change description and
5346 Theodore Roosevelt Bridge Rehabilitation              FY 2012 funding




                                                           Modification - Change FY 2012 funds and
5315 Takoma Study Recommendations                          phase; add a sub-project

5323 Citywide Roadway Pavement Condition Assessment        Modification - Change FY 2012 funds

5554 Garvee Bond Debt Service                              Modification - Change FY 2012 funds




5439 Citywide streetlight construction                     Modification - Change FY 2012 funds
                                                           Modification - Change the FY 2012
5792 C Street Traffic Calming                              funding
                                                           Modification - Change the FY 2012
3202 Bridge Design Consultant Services                     funding

3294 Great Streets - H St. NE                              Modification - Change FY 2012 funding
                                                        Modification -- change the FY 2012
2927 Citywide FA Preventive Maintenance                 funding level




                                                        Modification -- Change FY 2012 funding
2796 National Recreational Trails                       and phases and add a sub-project




                                                        Modification - Change FY 2012 funds and
3423 South Capitol Street Corridor                      phases
     Capitol Hill Transportation Study Infrastructure
5295 Improvements                                       Modification - Change FY 2012 funding




                                                        Modification -- Change FY 2012 funds
3232 Bicycle and Pedestrian Management Program          and phases




                                                        Modification - Change FY 2012 funds and
3216 Traffic Operations Improvements Citywide           phases

                                                        Modification -- Change dollar amount
                                                        and phase in FY 2012 and add a
2633 Size and Weight Enforcement Program                subproject




                                                        Modification -- change FY 2012 funding
3212 Safety Improvements Citywide                       and phases
     Safety Improvements of Benning Road Bridges over
5334 Kenilworth Ave                                     Modification - Change FY 2012 funding




                                                        Modification - Shift funds from FY 2011
                                                        to FY 2012; change title and add
5922 District Freight Plan                              description
5316 Impact Attenuators and Guiderails                    Modification - Change FY 2012 funds

5802 Program Manager AWI                                  Modification - Increase FY 2012 funds
                                                          Modification - shift FY 2011 funds to FY
5754 Benning Road Extension                               2012
                                                          Modification - Shift funds from FY 2011
5753 Anacostia Phase 2                                    to FY 2012
     Pennsylvania Ave. NW Bridge over Rock Creek (Br. #
5432 118)                                                 Modification - Add FY 2012 funding




                                                          Modification - Change FY 2012 funding
3213 Planning and Management Systems                      and phases; edit sub-projects list

                                                          Modification - Additional Funding for
3228 Metropolitan Branch Trail                            ROW




6078 Constitution Avenue Realignment                      Amendment - Add New Project
                Descrtiption of Action                 Approved     TIP
Amend this project into the FY 2011-2016 TIP with
$2.9 million in ARRA funding and $100,000 from
private sources (CSX).                                 03-Feb-12 FY 11-16
Add $1,000K of NHS funding in FY 2012 for phase
"a."                                                   02-Mar-12 FY 11-16
Amend this project into the FY 2011-2016 TIP with
$7 million in private funding in FY 2012. Funding is
provided by CSX.                                       02-Mar-12 FY 11-16
Amend this project into the FY 2011-2016 TIP with
$189,000 in STP funding in FY 2012.                    02-Mar-12 FY 11-16
Add $350K of STP funds in FY 2012 for phase "d."
 Combine two sub-projects to read "Reconfigure
Barney Circle/Boulevard between I-695 and
Pennsylvania Ave."                                     02-Mar-12 FY 11-16
Reduce $10,000K of STP funding from the FY 2012
column for phase "c."                                  02-Mar-12 FY 11-16
Add $1,000K of NHS funding in FY 2012 for phase
"d." This Phase II will include work on Pennsylvania
Ave. SE from the Sousa Bridge to west of 27th St.
SE.                                                    02-Mar-12 FY 11-16
Add $2,100K of STP funding and $1,500K of NHS
funding in FY 2012 for phase "c."                      02-Mar-12 FY 11-16

Change the $2,800K of STP funding in the FY 2012
column to $4,000K of NHS funding, for 'phase "c."      02-Mar-12 FY 11-16
Add $429K of SP funding (for a total of $529K) in FY
2012. Change the phase from "a" to "e" for all
years. List two subprojects: a. Civil Rights/EEO
Compliance Monitoring Program; and b. DBE
Supportive Services                                    02-Mar-12 FY 11-16
Add $220K of BR funding (for a total of $250K) in FY
2012 for phase "c."                                    02-Mar-12 FY 11-16

Add $1,900K of STP funding in FY 2012 for phase
"c." Add a subproject: a. Culvert at Kalmia Rd. NW
(construction to be funded in FY 2012).                02-Mar-12 FY 11-16

Reduce the FY 2012 STP phase "c" funds by 3,900K
(from 25,050K to 21,150K). Add 700K of FY 2012
NHS phase "a" funds. In the narrative, add a new
sub-project: "t. Canal Road NW, Chain Bridge to M
St. (design to be obligated in FY 2012)                03-Apr-12 FY 11-16
Add 400K of FY 2012 NRT phase "a" funds. In the
sub-project "e. South Cap," change the PE reference
to FY 2012 from FY 2014.                               03-Apr-12 FY 11-16
In FY 2012 shift 200K from phase "c" to phase "a,"
resulting in 300K for phase "a" and 100K for phase
"c." In the narrative description, after sub-project
"b. Far Southeast" add the words" (design to be
funded in FY 2012)"                                    03-Apr-12 FY 11-16

Reduce the FY 2012 STP funding by 4,980K (from
9,480K to 4,500K). Within the parentheses after
sub-project "h. Public Lands Highways," add: "--
construction to be obligated in FY 2012"               03-Apr-12 FY 11-16

Eliminate the 3,000K of FY 2012 funding.               03-Apr-12 FY 11-16

Eliminate the 2,300K of FY 2012 funding.               03-Apr-12 FY 11-16
Eliminate the FY 2012 PL phase "d" funds (from
500K to zero). Reduce the 1,491K of FY 2012 CMAQ
phase "d" funds by 491K (from 1,491K to 1,000K)
and change it to phase "e." Add 100K of FY 2012
STP phase "d" funds. Change the
federal/state/local split fo                           03-Apr-12 FY 11-16


Add 1,000K of FY 2012 BR phase "a" funds. Remove
the description and replace it with "Work includes
inspection, sampling and material testing; repairing
bridge superstructure and substructure; cleaning
and painting all steel members; retrofitting pin and   03-Apr-12 FY 11-16
Eliminate the FY 2012 STP phase "c" funds (from
2,050K to zero). Add 300K of FY 2012 STP phase "a"
funds. After the narrative, add a sub-project: "a.
Intersection Improvements at 4th/Cedar/Blair Sts.
NW"                                                    03-Apr-12 FY 11-16

Eliminate the FY 2012 funds (from 682K to zero)        03-Apr-12 FY 11-16
Reduce the FY 2012 BR funds by 2,183K (from
3,260K to 1,077K)                                      03-Apr-12 FY 11-16

Increase the FY 2012 STP phase "a" funds by 150K
(from 300K to 450K). Decrease the FY 2012 STP
phase "c" funds by 1,008K (from 3,558K to 2,550K).     03-Apr-12 FY 11-16
Eliminate the FY 2012 phase "a" funding (from 600K
to zero).                                              03-Apr-12 FY 11-16
Reduce the FY 2012 BR funds by 375K (from 475K to
100K).                                                 03-Apr-12 FY 11-16

Eliminate the 2,000K of FY 2012 funding.               03-Apr-12 FY 11-16
Increase the FY 2012 BR funding by 376K (from
4,000K to 4,376K)                                      03-Apr-12 FY 11-16
Increase the FY 2012 NRT funding for phase "a" by
300K (from 100K to 400K) and eliminate the 200K
shown for phase "c." List one sub-project: a.
Suitland Parkway Trail Rehabilitation (to be
obligated in FY 2012)                                  03-Apr-12 FY 11-16

Eliminate the FY 2012 Earmark phase "a" funding
(from 13,800K to zero) and add 84,927K of FY 2012
Earmark phase "b" funding and 10,000K of FY 2012
Earmark phase "c" funding.                             03-Apr-12 FY 11-16
Eliminate the 4,400K of FY 2012 funding for phase
"c."                                                   03-Apr-12 FY 11-16
Increase the FY 2012 CMAQ phase "a" funding by
200K (from 100K to 300K) and the phase "c"
funding by 3,000K (from 2,000K to 5,000K).
Eliminate the FY 2012 CMAQ phase "d" funding
(from 100K to zero) and the FY 2012 HSIP funding
(from 500K to zero).                                   03-Apr-12 FY 11-16
Add 650K of FY 2012 HSIP phase "c" funds. Increase
the FY 2012 NHS phase "c" funds by 239K (from
361K to 600K). Add 2,500K of FY 2012 NHS phase
"d" funds and 310K of FY 2012 NHS phase "e" funds.
Eliminate the FY 2012 NHS phase "a" funds (from
1,054K to                                              03-Apr-12 FY 11-16
Increase the FY 2012 STP funding by 63K (from 200K
to 263K) and change phase "a" to phase "e." At the
end of the description, list a sub-project "a. Weigh
in Motion Maintenance"                                 03-Apr-12 FY 11-16
Add 2,000K of FY 2012 HSIP phase "c" funds and
2,900K of FY 2012 HSIP phase "d" funds (each from
a current level of zero). Reduce the FY 2012 HSIP
phase "a" funds by 4,270K (from 5,170K to 900K).
Add 1,217K of FY 2012 NHS phase "c" funds (from
zero to 1                                              03-Apr-12 FY 11-16

Add 1,600K of FY 2012 BR phase "a" funds.              03-Apr-12 FY 11-16

Move the 300K of phase "d" funds from FY 2011 to
FY 2012. Change the title to "District Freight Plan"
from "DC Statewide Rail Plan." Add the description:
"The District Freight Plan will provide a current
description and evaluation of the District's fre       03-Apr-12 FY 11-16
Increase the FY 2012 IM phase "c" funds by 165K
(from 1,435K to 1,600K). Add 40K of FY 2012 STP
phase "a" funds. Increase the FY 2012 STP phase
"c" funds by 100K (from 850K to 950K).                  03-Apr-12 FY 11-16
Increase the FY 2012 NHS phase "c" funds by 500K
(from 5,000K to 5,500K).                                03-Apr-12 FY 11-16
Move the 1,500K of CMAQ phase "d" funds from FY
2011 to FY 2012.                                        03-Apr-12 FY 11-16
Move the 577K of CMAQ phase "d" funds from FY
2011 to FY 2012.                                        03-Apr-12 FY 11-16
Increase the FY 2012 BR phase "a" funding by 450K
(from 750K to 1,200K).                                  03-Apr-12 FY 11-16
Add 300K of FY 2012 CMAQ funds for phase "d."
Add 3,000K of FY 2012 NHS funds for phase "c."
Increase the FY 2012 SPR phase "d" funds by 381K
(from 5,319K to 5,700K). Add 2,700K of FY 2012
STP phase "a" funds. Increase the FY 2012 STP
phase "d" funds                                         03-Apr-12 FY 11-16
Add $250,000 of CMAQ funds to Phase 2 (ROW,
temporary construction easement acquisition) in
FY2013.                                                 20-Dec-12 FY 13-18
Amend this project to the FY 2013-2018 TIP with
$1.3 million in FY 2013 for preliminary engineering
(NEPA) and final design and $4 million in FY 2014 for
construction.                                           1-Mar-13 FY 13-18

				