					APS/SRP Stakeholder Meeting
 For Transmission Planning
      FERC Order 890
    OATT Attachment K
        (APS Attachment E)

SRP Transmission Planning
APS Transmission Planning
Phoenix, Arizona
December 18, 2009
Agenda
1.      Welcome, Introductions, and Stakeholder Meeting Overview
2.      Status of Action Items-6/05/09 Joint APS/SRP 2nd Quarter Public Planning Meeting
3.      SRP Planning
     a.      SRP Planning Calendar & Methodology
     b.      SRP Proposed Ten-Year Plan Review
     c.      Interconnection Requests and Transmission Service Requests
     d.      Requests Received for Economic Planning Studies
     e.      Stakeholders invited to submit requests for additional transmission studies
     f.      Comments/Questions
4.      APS Planning
     a.      APS Planning Calendar & Methodology
     b.      Draft 2010-2019 Ten-Year Year Plan
     c.      APS Transmission Projects for Renewable Generation
     d.      APS 2009/2010 Study Assumptions and NERC/WECC Reliability Studies
     e.      Interconnection Requests, Transmission Service Requests, and Requests
             Received for Economic Planning Studies
     f.      Stakeholders invited to submit requests for additional transmission studies
     g.      Comments/Questions
5.      TEPPC Economic Studies Activity
6.      Stakeholder Questions/Comments
7.      Action Items
December 18, 2009            APS & SRP 4th Quarter Stakeholder Meeting                     2
Welcome

Introductions

Meeting Overview


December 18, 2009   APS & SRP 4th Quarter Stakeholder Meeting   3
2. Status of Action Items
 No Action Items




December 18, 2009   APS & SRP 4th Quarter Stakeholder Meeting   4
3.a SRP Planning - Calendar &
Methodology
WECC/TEPPC/SWAT Planning Calendar
SRP Planning Calendar
Assumptions and Methodology
Types of Studies Performed
Proposed 2010–2019 Ten Year Plan



December 18, 2009   APS & SRP 4th Quarter Stakeholder Meeting   5
December 18, 2009   APS & SRP 4th Quarter Stakeholder Meeting   6
                                                                7
December 18, 2009   APS & SRP 4th Quarter Stakeholder Meeting
December 18, 2009   APS & SRP 4th Quarter Stakeholder Meeting   8
3.a 2010-2019 Study
Assumptions/Methodology
 Coordinated Base Cases (Seed Cases)
      2009 Summer Operating case
      2013 - WestConnect 2013 coordinated case
      2019 - CATS-EHV 2018 coordinated case
 69kV transmission models incorporated
 Most up-to-date forecasts for peak
  summer loads

December 18, 2009   APS & SRP 4th Quarter Stakeholder Meeting   9
3.a 2010-2019 Study
Assumptions/Methodology
 NERC Compliance Studies Cases
    2010 & 2015 Summer Peak & Offpeak Cases
    2010 & 2015 Simultaneous Import Limit (SIL) &
     Maximum Load Serving Capability (MLSC)
     Cases
 Summer Peak & Offpeak cases
    Thermal analysis
    Post-Transient
    Transient Stability
December 18, 2009   APS & SRP 4th Quarter Stakeholder Meeting   10
3.a 2010-2019 Study
Assumptions/Methodology
 SIL & MLSC Cases (Phx)
    Thermal and Post-Transient




December 18, 2009   APS & SRP 4th Quarter Stakeholder Meeting   11
Planning Methodology
NERC STANDARD                                 Type of Studies Completed
TPL-001 (N-0)                                 Thermal         Transient Stability   Post-transient
2010            Peak                          X
2010            Offpeak                       X
2015            Peak                          X
2015            Offpeak                       X
2015            All-in                        X
TPL-002 (N-1)                                 Thermal         Transient Stability   Post-transient
2010            Peak                          X               X                     X
2010            SIL                           X                                     X
2010            MLSC                          X                                     X
2015            Peak                          X               X                     X
2015            SIL                           X                                     X
2015            MLSC                          X                                     X
TPL-003 (N-2)                                 Thermal         Transient Stability   Post-transient
2010            Contingency of towers         X               X                     X
2010            Stuck breaker                 X               X                     X
2010            Common Corridor               X               X                     X

December 18, 2009                 APS & SRP 4th Quarter Stakeholder Meeting                          12
Planning Methodology
NERC STANDARD                                     Type of Studies Completed
TPL-003 (N-2)                                     Thermal    Transient Stability   Post-transient
2010            Contingency of towers - Offpeak   X          X                     X
2010            Stuck breaker - Offpeak           X          X                     X
2010            Common Corridor - Offpeak         X          X                     X
2015            Contingency of towers             X          X                     X
2015            Stuck breaker                     X          X                     X
2015            Common Corridor                   X          X                     X
2015            Contingency of towers - Offpeak   X          X                     X
2015            Stuck breaker - Offpeak           X          X                     X
2015            Common Corridor - Offpeak         X          X                     X
TPL-004 (N-X)                                     Thermal    Transient Stability   Post-transient
2010            Substations with generation       X          X
2010            Common Corridor/Substation        X          X
                without generation




December 18, 2009                 APS & SRP 4th Quarter Stakeholder Meeting                         13
                3.b
      SRP Ten Year Plan Projects
             2010-2019

                         Proposed




December 18, 2009   APS & SRP 4th Quarter Stakeholder Meeting   14
                                                                    NAVAJO GS



                                                                     MOENKOPI




                                                        YAVAPAI                                                          CHOLLA
           MARKETPLACE                                                                                                    (APS)
                                                                                DUGAS
                                                                                 (APS)
                           MEAD                     MORGAN(APS)
                                                       2010                                        SUGARLOAF (APS)
                                    Sun Valley
           McCULLOUGH                 (APS)
                                       2014
               NEVADA                                      2016                     2011


                                        2014                             WESTWING             PINNACLE PEAK (APS)
                                                                                                     2010
                                                                                                                                                 CORONADO
                      PALO VERDE                                  RUDD
                     HASSAYAMPA                      TBD                                                                                     TBD
                                                              JOJOBA
                                                                                                                      RS20
                                                                                                                      TBD
                                                                           KYRENE
                                           TBD                TBD
                   2014                                                                                        2011
                                                                              BROWNING
                                                                                                                                  SILVER
                                                                              SANTA ROSA ABEL                                      KING
                                          PINAL WEST                             2014    2020                             TBD
                                                                    2014
                                                                                                 2011
                                                                                                                  2020
                                             (TBD,
                                  place holder for CATS only,                                                  PINAL CENTRAL
                                     no current SRP plans)                             2014                         2014
NORTH GILA (APS)                                                                                                                   SUNZIA (SPG)
                                                                           SAGUARO                      2014                                              Central
                                                                                                                                                        New Mexico
                                                                                                                                           2013/2014


                                                                                              TORTOLITA
      EXISTING 500kV SUBSTATION                  EXISTING LINES                                 (TEP)                           SALT RIVER PROJECT
      FUTURE 500kV SUBSTATION                    FUTURE LINES                                                                      500kV SYSTEM

 December 18, 2009                               APS & SRP 4th Quarter Stakeholder Meeting                                                                  15
2011:
 Browning-Pinal Central 500kV (it will be
  energized as Randolph-Browning 230kV
  until 2014)
2014:
 Delany-Sun Valley 500kV
 Hassayampa-N.Gila 500kV line
 Pinal West-Pinal Central 500kV
 Pinal Central 500/230kV substation
2016:
 Sun Valley-Morgan 500kV
2020:
 Pinal Central-Abel #2 500kV
                                                                SALT RIVER PROJECT
                                                                   500kV SYSTEM

December 18, 2009   APS & SRP 4th Quarter Stakeholder Meeting                        16
                     PINNACLE PEAK           THUNDERSTONE                      GOLDFIELD
                                                                                                                           SALT RIVER PROJECT
                                                                                                                          EASTERN 230kV SYSTEM
                           ROGERS          TBD

                                                                 TBD


                                                                  BROWNING
                                           SANTAN
                    To CORBELL

                                                                                        TBD
                                  RS17
                                  TBD
                                                     2018


                                                           DINOSAUR
                                            2017                                        RS21
                                                                                TBD
                    To SCHRADER                                                          TBD
                                                                                                              TO SILVER
                                                   RS24                                                         KING
                                                                                              TBD
                                                   2018                 2018     2011
                                                                                          RS20                TO SILVER
                                                                                              TBD               KING
                                                                                                    LOOP IN
                                                          2017
                                                                                          TBD         TBD


                                                                                  TBD


                                                      ABEL/RS22
                                                             2011
                                                                                          RS23
                                                                                              TBD
                                                                                                                            DOUBLE CIRCUIT, PHASE TIED LINE


                                                                  2011                                                      EXISTING 230kV CIRCUIT

                                                                                 RANDOLPH SWITCHYARD                        FUTURE 230kV CIRCUIT
                        DESERT BASIN
                                                                                        2011
                                                                                                                            EXISTING 230kV SUBSTATIONS

                           2014                                        PINAL CENTRAL                                        FUTURE 230kV SUBSTATIONS
                                    2014                                    2014
                                                                                                                            GENERATING STATION
                        CATSHV03
                          TBD


December 18, 2009                       APS & SRP 4th Quarter Stakeholder Meeting                                                                  17
2011:
 Dinosaur-Abel-Randolph 230kV
2014:
 Desert Basin-Pinal Central 230kV line
 Pinal Central - Randolph 230kV line
 RS26 230/69kV substation
2017:
 Abel-Schrader 230kV
2018:
 Abel-Santan 230kV
 RS24 230/69kV substation
                                                                 SALT RIVER PROJECT
                                                                EASTERN 230kV SYSTEM




December 18, 2009   APS & SRP 4th Quarter Stakeholder Meeting                  18
                                                                                                                           SALT RIVER PROJECT
                                                                                                                          WESTERN 230kV SYSTEM



                                                              TO W.A.P.A.
                                                            PINNACLE PEAK            TO APS
                                                                                 PINNACLE PEAK


                                   W.A.P.A.
                                                           SRP
                                                      PINNACLE PEAK
    WESTWING                                                                       TBD
                                                    DEER                                     RS26
                                                   VALLEY
                                                    (APS)                                    2014



                                                                                            W.A.P.A.
                                                                   PAPAGO
           W.A.P.A.                           ALEXANDER
                                       AGUA
                                       FRIA
                                                                   BRANDOW                             THUNDERSTONE
                                     WHITE                                                                                To GOLDFIELD
                                     TANKS                                          TBD
                                                                                          ROGERS          TBD
                                 RUDD
                                                                                WARD        TBD
                                                                      TO APS
                                            ORME                     OCOTILLO
         LIBERTY
        (W.A.P.A.)                                                                                        SANTAN
                                                                        CORBELL
                                                                                                                          To BROWNING

                                        ANDERSON             KYRENE

          DOUBLE CIRCUIT, PHASE TIED LINE             KNOX

                                                                                  SCHRADER        RS17
          EXISTING 230kV CIRCUIT                                                                    TBD

          FUTURE 230kV CIRCUIT
                                                                                                                To RS24
          EXISTING 230kV SUBSTATIONS

          FUTURE 230kV SUBSTATIONS

          GENERATING STATION

December 18, 2009                             APS & SRP 4th Quarter Stakeholder Meeting                                                  19
                                                                                                              ROOSEVELT
                                              MORMON                 HORSE
                                               FLAT                  MESA

                            STEWART                                                                                          FRAZIER
                            MOUNTAIN



                                                                                          TO
                                                                 SILVER               SILVER KING
                                                                  KING                   500kV
                                                                   230


                                                        TBD
                                                      (230kV)                        PINTO
                                                                                    VALLEY
         GOLDFIELD                              TBD                                                  MIAMI                        MOONSHINE
               230kV       115kV
                                                                                                              PINAL
     TO
THUNDERSTONE
                          CARREL                                                 CARLOTTA
                                      SPURLOCK                                                                                    ELLISON
           TBD
         (230kV)
                                                                                TRASK        OAK
                                                                                             FLAT
                   RS20              TBD         SEE DETAIL
                230kV              (230kV)
                                                  SUPERIOR                                     KNOLL
                 TBD
                                                                              RAY
               DETAIL                                                                               MORRIS

                                                                                                               KEARNY
                                                                                TBD
                                                                                                                             HAYDEN
                                                                  BONNEYBROOK
                        SUPERIOR                                      (APS)
                          115KV                                                         NEW HAYDEN      TBD
                                                                                                               ASARC0
   SUPERIOR
      230KV
                                         COOLIDGE                                                                     TO APACHE
                                                                                                                       (AEPCO)
                                         (W.A.P.A.)
       FUTURE SUBSTATION
                                                                FUTURE LINE                                                           SALT RIVER PROJECT
       EXISTING SUBSTATION                                                                                                              EASTERN MINING
                                                                EXISTING LINE                                                            AREA SYSTEM
       GENERATING STATION

 December 18, 2009                                APS & SRP 4th Quarter Stakeholder Meeting                                                           20
Electric System Additions/Upgrades

Equipment                                                                     Year
Mead-Phoenix 500kV series capacitors                                          Completed
Coronado-Silver King 500kV series capacitors                                  Completed
4-150MVAr Shunt capacitor banks @ P. Buttes, P. Peak, Rogers and Ward 230kV   Completed
Silver King-Goldfield 230kV line upgrade                                      Completed
Coronado #2 500/345kV transformer                                             2010
Kyrene 3rd 500/230kV transformer                                              2011
Abel 1st 230/69kV transformer                                                 2011
Rudd 1st 230/69kV transformer                                                 2013
Schrader 3rd 230/69kV transformer                                             2013
Pinal Central 1st & 2nd 500/230kV transformers                                2014
RS-24 1st 230/69kV transformer                                                2018




December 18, 2009               APS & SRP 4th Quarter Stakeholder Meeting                 21
Summary Status

Project                                  I/S          Status Study         Forum
Hassayampa – Pinal West 500kV            2008         Complete     Yes     CATS/ CATS HV/WATS/SEV E&O/
                                                                           WECC SRWG, TSS
Pinal West – Browning 500kV              2011, 2014   Des/ ROW     Yes     CATS/CATS HV/WATS/SEV E&O/
                                                                           WECC SRWG, TSS

Desert Basin – Pinal Central 230kV       2014         Des          Yes     CATS HV/WECC SRWG, TSS
Pinal Central – Southeast Valley 230kV   2011         Des          Yes     CATS HV
RS24 230kV Transmission Project          2018         Siting       Yes
RS26 Transmission Project                2014         Pre Siting   Yes




December 18, 2009                   APS & SRP 4th Quarter Stakeholder Meeting                        22
SRP Changes from 2009 to 2010
   500kV Projects
         2010 Morgan – Pinnacle Peak
                     Formerly Raceway – Pinnacle Peak
         2013/2014 SunZia Project
                     Delayed from 2013
         2014 Pinal West – Pinal Central
                     Delayed from 2013
         2014 Tortolita – Pinal Central
                     Delayed from 2013

   230kV Projects
         2014 Desert Basin – Pinal Central 230kV
                    Delayed from 2013
         2017/2018 RS24 230kV Transmission Project
                    Delayed from 2013

 December 18, 2009      APS & SRP 4th Quarter Stakeholder Meeting   23
3. SRP Planning – Transmission Projects
    for Renewable Generation

  Pinal West – Pinal Central 500kV line
  Pinal Central – Tortolita 500kV line
  Palo Verde – Delany 500kV line




 December 18, 2009   APS & SRP 4th Quarter Stakeholder Meeting   24
December 18, 2009   APS & SRP 4th Quarter Stakeholder Meeting   25
3. SRP Planning - Study Requests
   Generation Interconnection Requests
   Transmission Interconnection Requests
   Transmission Service Requests
   Economic Study Requests




December 18, 2009   APS & SRP 4th Quarter Stakeholder Meeting   26
3.c. SRP Planning – Study Requests
 Generation Interconnection Requests listed below are for SRP solely owned transmission:




      4 Natural Gas projects - 2516 MW
      2 Wind projects -         900 MW
   The joint interconnection requests are listed on SRP OASIS website @ http://www.oatioasis.com/SRP/index.html
 December 18, 2009                         APS & SRP 4th Quarter Stakeholder Meeting                              27
3.c. SRP Planning - Study Requests

  Currently there are no Transmission
   Interconnection Requests under study




 December 18, 2009   APS & SRP 4th Quarter Stakeholder Meeting   28
3.c. SRP Planning - Study Requests

  Currently there are no Transmission
   Service Requests under study




 December 18, 2009   APS & SRP 4th Quarter Stakeholder Meeting   29
3.d. SRP Planning - Study Requests

 Currently there are no Economic Study
  Requests
 TEPPC Economic Studies Activity are
  covered at the end of the presentation.




 December 18, 2009   APS & SRP 4th Quarter Stakeholder Meeting   30
3.e. Stakeholders Requests

 SRP invites Stakeholders to submit
  request for additional transmission studies




 December 18, 2009   APS & SRP 4th Quarter Stakeholder Meeting   31
3.f. SRP Planning – Comments &
            Questions
Stakeholder comments/questions on 2009
 Study Results or 2010 Study Requests

Requests can be made at any time to:
     SRP.TransmissionPlanning@srpnet.com




December 18, 2009   APS & SRP 4th Quarter Stakeholder Meeting   32
4.a. APS Planning Calendar &
         Methodology

WECC/TEPPC/WestConnect Planning
 Calendar
APS Planning Calendar
Planning Process/Methodology




December 18, 2009   APS & SRP 4th Quarter Stakeholder Meeting   33
December 18, 2009   APS & SRP 4th Quarter Stakeholder Meeting   34
                                                                35
December 18, 2009   APS & SRP 4th Quarter Stakeholder Meeting
December 18, 2009   APS & SRP 4th Quarter Stakeholder Meeting   36
4.b. APS Ten Year Plan Projects
2010-2019

              Draft Transmission
                     Plan
               (Filing due no later than Jan. 29, 2010)




December 18, 2009      APS & SRP 4th Quarter Stakeholder Meeting   37
                                                  2009 (In-Service):
                                                   Dugas & Sugarloaf 500/69kV
                                                     substations
                                                   Milligan 230/69kV substation
                                                  2010:
                                                   Morgan 500/230kV substation
                                                  2011:
                                                   Morgan-Pinnacle Peak 500kV line
                                                  2012:
                                                   Palo Verde-Delany 500kV line
                                                  2013:
                                                   Flagstaff 345/69kV substation
                                                   TS12 230/69kV substation
                                                   Mazatzal 345/69kV substation
                                                  2014:
                                                   Delany-Sun Valley 500kV line
                                                   Hassayampa-N.Gila 500kV line
                                                   D. Basin-Pinal Central 230kV line
                                                   Sundance-Pinal Central 230kV line
                                                   Bagdad 115kV relocation
                                                  2016:
                                                   Sun Valley-TS9 500kV line


December 18, 2009   APS & SRP 4th Quarter Stakeholder Meeting                   38
December 18, 2009   APS & SRP 4th Quarter Stakeholder Meeting   39
                                                                2010:
                                                                 Morgan-Raceway
                                                                   230kV
                                                                2011:
                                                                 Raceway-Pinnacle
                                                                   Peak 230kV
                                                                2014:
                                                                 TS6 230/69kV
                                                                   substation
                                                                 Sun Valley-Trilby
                                                                   Wash 230kV
                                                                2015:
                                                                 Trilby Wash-Palm
                                                                   Valley 230kV


December 18, 2009   APS & SRP 4th Quarter Stakeholder Meeting                  40
                                  Arizona Ave.


                                                 Inte
                                                     rsta
                                                         te 8
California




                                  Arizona Ave.




             December 18, 2009   APS & SRP 4th Quarter Stakeholder Meeting   41
                                  Arizona Ave.


                                                 Inte
                                                     rsta
                                                         te 8
California




                                                                2014:
                                  Arizona Ave.




                                                                 Palo Verde Hub-North Gila
                                                                   500kV #2 line
                                                                 North Gila-TS8 230kV line




             December 18, 2009   APS & SRP 4th Quarter Stakeholder Meeting                    42
Project Timing Changes
Project Name                                           Previous in-service       New in-service
                                                       date                      date
Bagdad 115kV line relocation                           2011                      2014
Flagstaff 345/69kV substation                          2012                      2013
TS6 230/69kV substation                                2012                      2014
TS12 230/69kV substation                               2012                      2013
Desert Basin-Pinal Central 230kV line                  2013                      2014
Sundance-Pinal Central 230kV line                      2013                      2014
* It should be noted that in-service dates shown in this table are based on load projects, not
potential interconnections. New generation interconnections may accelerate the in-service date.




December 18, 2009              APS & SRP 4th Quarter Stakeholder Meeting                         43
4.c. APS Planning – Transmission
Projects for Renewable Generation

 1) Palo Verde to Delany 500kV
 2) Palo Verde to North Gila 500kV
 3A) Palo Verde to Valley Load (Liberty)
 3B) Gila Bend to Valley Load (Liberty)
 4) Delany to Blythe 500kV



 December 18, 2009   APS & SRP 4th Quarter Stakeholder Meeting   44
December 18, 2009   APS & SRP 4th Quarter Stakeholder Meeting   45
4.d. 2009/2010 Study Assumptions
Coordinated Base Cases (Seed Cases)
     2010 - 2009 Summer Operating case
     2013 - WestConnect 2013 coordinated case
     2019 - CATS-EHV 2018 coordinated case
69kV transmission models incorporated
Most up-to-date forecasts for peak
 summer loads


December 18, 2009   APS & SRP 4th Quarter Stakeholder Meeting   46
4.d. 2009 NERC/WECC Reliability
Studies
 Summer Peak cases
    TPL-001 & TPL-002
           Thermal analysis (All 10 years)
           Post-Transient (All 10 years)
           Transient Stability (2013 & 2018)
    TPL-003 & TPL-004 (2013 & 2018)
 Maximum Load Serving Capability for Phx & Yuma
  (All 10 years)
    TPL-001 & TPL-002 Thermal and Post Transient
 Winter Load cases (2013 & 2019 WECC cases)
    Thermal, Transient Stability, & Post Transient
    TPL-001 thru TPL-004
 December 18, 2009        APS & SRP 4th Quarter Stakeholder Meeting   47
                  2009 NERC/WECC Studies
                                    A P S T P L P l a n n in g M e th o d o lo g y : S u m m e r
                    N E R C S TAN D AR D                                                  S T UD IE S C O M P L E T E D
       T P L - 0 0 1 (n - 0 )                                           T h e rm a l   T r a n s i e n t S ta b i l i ty   P o s t T ra n s i e n t
          20 13      S IL                                                     X
          20 13      P E AK                                                   X
          20 18      S IL                                                     X
          20 18      P E AK                                                   X
       T P L -0 0 2 (n - 1 )
          20 13      S IL ( L in e s , x f m rs , g e n s )                   X                                                        X
          20 13      P E A K (L in e s , x f m rs , g e n s )                 X                         X                              X
          20 13      M L S C ( L in e s , x f m r s , g e n s )               X                                                        X
          20 18      S IL ( L in e s , x f m rs , g e n s )                   X                                                        X
          20 18      P E A K (L in e s , x f m rs , g e n s )                 X                         X                              X
          20 18      M L S C ( L in e s , x f m r s , g e n s )               X                                                        X
       T P L -0 0 3 (n - 2 )

          20 13      S t u c k B re a k e r/B r e a k e r F a ilu r e        X                          X                              X
          20 13      N -1-1                                                  X                          X                              X
          20 13      B u s S e c t io n                                      X                          X                              X

          20 18      S t u c k B re a k e r/B r e a k e r F a ilu r e        X                          X                              X
          20 18      N -1-1                                                  X                          X                              X
          20 18      B u s S e c t io n                                      X                          X                              X
       T P L -0 0 4 (n - x x )
                     M a jo r S u b s t a t io n s
          20 13      W it h /W it h o u t G e n e ra t io n                   X                         X                              X

          20 13      S t u c k B re a k e r/B r e a k e r F a ilu r e         X                         X                              X
          20 13      C o m m o n C o rrid o r                                 X                         X                              X
                     M a jo r S u b s t a t io n s
          20 18      W it h /W it h o u t G e n e ra t io n                   X                         X                              X

          20 18      S t u c k B re a k e r/B r e a k e r F a ilu r e         X                         X                              X
          20 18      C o m m o n C o rrid o r                                 X                         X                              X

December 18, 2009                                  APS & SRP 4th Quarter Stakeholder Meeting                                                          48
                 2009 NERC/WECC Studies
            APS TPL Planning M ethodology: WIN TER SEASO N - Low load
                    NERC STANDARD                                      STUDIES COMPLETED
       TPL -001(n-0)                                        Thermal Transient Stability   Post Transient
         20 13      WIN TER-Low load                           X
         20 19      WIN TER-Low load                           X
       TPL-002 (n-1)
         20 13      TRANSM ISS IO N LINE                       X                X                X
         20 19      TRANSM ISS IO N LINE                       X                X                X
         20 13      XFM R                                      X                                 X
         20 19      XFM R                                      X                                 X
         20 13      GE NER ATIO N                              X                                 X
         20 19      GE NER ATIO N                              X                                 X
         20 13      REACTO RS                                  X                                 X
         20 19      REACTO RS                                  X                                 X
       TPL-003 (n-2)
         20 13      Stuck B reak er                            X                X                X
         20 13      N-1-1                                      X                X                X
         20 19      Stuck B reak er                            X                X                X
         20 19      N-1-1                                      X                X                X
       TPL-004 (n-xx)
                    Los s of All G enera ti on U ni ts at
         20 13      a Station                                  X                X                X
         20 13      Com m on Corridor                          X                X                X
                    Los s of All G enera ti on U ni ts at
         20 19      a Station                                  X                X                X
         20 19      Com m on Corridor                          X                X                X

December 18, 2009                        APS & SRP 4th Quarter Stakeholder Meeting                    49
4.d. 2010 NERC/WECC Reliability
Studies
 Summer Peak cases
     TPL-001 & TPL-002
            Thermal analysis (All 10 years)
            Post-Transient (All 10 years)
            Transient Stability (2013 & 2019)
     TPL-003 & TPL-004 (2013 & 2019)
 Maximum Load Serving Capability for Phx & Yuma
  (All 10 years)
     TPL-001 & TPL-002 Thermal and Post Transient
 Winter Load cases (cases unknown at this time)
     Thermal, Transient Stability, & Post Transient
     TPL-001 thru TPL-004
December 18, 2009          APS & SRP 4th Quarter Stakeholder Meeting   50
4.e. Interconnection & Study Requests
 Generation Interconnection requests
     APS OASIS contains Generation
      Interconnection Queue
           http://www.oatioasis.com/azps/index.html
           30 Solar projects - 8336 MW
           7 Wind projects - 2835 MW
           1 Others (Coal, NG, Biomass, etc.) - 1400 MW
 4 Transmission Interconnection Requests
 Currently no Transmission Service
  Requests under Study
 Currently no Economic Study Requests
 December 18, 2009    APS & SRP 4th Quarter Stakeholder Meeting   51
4.f. Stakeholder Study Requests

Study requests can be taken at today’s
 meeting

Study requests can be made at any time
 to:
     apstransmission@aps.com



December 18, 2009   APS & SRP 4th Quarter Stakeholder Meeting   52
4.g. Comments & Question
Comments??????

Questions!!!!!!!!!!




December 18, 2009   APS & SRP 4th Quarter Stakeholder Meeting   53
5. TEPPC Economic Studies Activity
 Funding Opportunity Announcement

Regional Transmission Planning
 Up to $60 million in DOE funding for:
      (A) Interconnection-level analysis and planning
      (B) State cooperation on electric resource
           planning and priorities
 Responses were due September 14, 2009
      WECC submission - August 13, 2009
 DOE announcement was expected November 2, 2009
 Funds available under DE-FOA0000068
      www.doe.gov/recovery



December 18, 2009        APS & SRP 4th Quarter Stakeholder Meeting   54
5. TEPPC Economic Studies Activity
Funding Opportunity Announcement

Key Provisions
 Create interconnection-wide, long-term, scenario-based
  transmission plans
      Identify alternative transmission system configurations
      Quantify reliability and cost implications
      Address technology and policy uncertainties
 Deliverables due in June 2011 and June 2013
 Establish a multi-constituency steering group to guide
  scenario development
      1/3 State representatives
      Non-traditional stakeholders
 Fund non-profit and non-governmental organization (NGO)
  participation in planning processes

December 18, 2009        APS & SRP 4th Quarter Stakeholder Meeting   55
5. TEPPC Economic Studies Activity
Overview of WECC response

What the proposal is:
 Extraordinary opportunity to expand the capability of planning
  processes in the West
 An extension of existing TEPPC planning process
      Ability for broader input from other stakeholders into planning processes
      Ability to study a broader range of scenarios
         Determine impact of policy and technology drivers




December 18, 2009        APS & SRP 4th Quarter Stakeholder Meeting            56
5. TEPPC Economic Studies Activity
Overview of WECC response

What the proposal is (continued):
 Improved coordination of subregional groups and WECC
  planning processes
 Ability to provide input to other critical processes
      Siting – Rating – Cost Allocation
 Process in which decision authority remains with TEPPC and
  the WECC Board




December 18, 2009        APS & SRP 4th Quarter Stakeholder Meeting   57
5. TEPPC Economic Studies Activity
Overview of WECC response

What the proposal is NOT:
 Radical shift in WECC processes
 Change in planning governance
 Significant long-term funding commitment by WECC and
  membership
 WECC involvement in siting or cost allocation processes
 No commitment to fund non-WECC activities beyond the DOE
  funding period




December 18, 2009   APS & SRP 4th Quarter Stakeholder Meeting   58
5. TEPPC Economic Studies Activity
Overview of WECC response
Funding Diagram




December 18, 2009   APS & SRP 4th Quarter Stakeholder Meeting   59
5. TEPPC Economic Studies Activity
WECC Funding Proposal
Planning Activities (new activities in Red)




December 18, 2009   APS & SRP 4th Quarter Stakeholder Meeting   60
5. TEPPC Economic Studies Activity
Overview of WECC Response
Expanded TEPPC Regional Planning Process                        Consensus
                                                                TEPPC has
                                                                final decision
                                                                Section
                                                                4.1.4




December 18, 2009   APS & SRP 4th Quarter Stakeholder Meeting           61
5. TEPPC Economic Studies Activity
Organizational Structure

   WECC
   Subregional Planning Groups (SPG)
   Scenario Planning Steering Group (SPSG)
   Western universities
   Non-Governmental Organizations (NGO)




December 18, 2009   APS & SRP 4th Quarter Stakeholder Meeting   62
5. TEPPC Economic Studies Activity
Planning Activities

Subregional Planning Groups (SPG)
 10-yr Coordinated Reliability Plan
      Combine SPG plans
      Analyze and rectify seams issues
      Ensure reliability (planning) standards are met
      Identify needed transmission projects
 Form “baseline” for WECC regional plans
      Transmission models
      Load & Resource models
      Coordinated with PCC activities
         Base cases, loads and resources



December 18, 2009      APS & SRP 4th Quarter Stakeholder Meeting   63
5. TEPPC Economic Studies Activity
Organizational Structure
Scenario Planning Steering Group (SPSG) Representation
Total          SPSG       Representing
Number         members on
               TEPPC
5              0          Technology Advocates
                          (wind/solar/geothermal/nuclear/coal/EE/DSM)
1              0          Transmission Owner/Operator
1              0          Lands protection advocate
1              0          Wildlife advocate
8              2          State Officials (PUC, Energy Office)
1              0          Provincial Official
1              0          Canadian Utility Representative
2              1          Consumer Advocates – One from TEPPC
1              1          Environmental Representative from TEPPC
1              1          WECC Board member from TEPPC
1              1          SPG representative from TEPPC
1              1          LSE representative from TEPPC
24             7          TOTAL
December 18, 2009          APS & SRP 4th Quarter Stakeholder Meeting    64
5. TEPPC Economic Studies Activity
Organizational Structure
Western University Activities
 Education and training
      Create programs for existing and new planning professionals
      Identify future industry needs
 Technology assessment
      Comprehensive look at reliability implications and
       integration needs
            Coordinated with WECC VGS and National Labs
            Identify operational feasibility issues




December 18, 2009      APS & SRP 4th Quarter Stakeholder Meeting     65
5. TEPPC Economic Studies Activity
Desired Outcomes


What to expect
 Improved regional and subregional planning process
  coordination
 Increased quantity and improved quality of information
  available to the industry
 Comprehensive understanding of the reliability impacts of
  energy policy
 Facilitated the development of needed transmission capacity




December 18, 2009   APS & SRP 4th Quarter Stakeholder Meeting   66
6. Stakeholder Questions and
Comments

 Open discussion

Reference Material
 WestConnect –
  http://www.westconnect.com/documents_results.php?categoryid=85
 APS OASIS –
  http://www.oatioasis.com/azps/index.html
 SRP OASIS –
  http://www.oatioasis.com/srp/index.html


December 18, 2009     APS & SRP 4th Quarter Stakeholder Meeting    67
7. Action Items

 Review any action items identified for follow up
 Information addressing action items to be posted
  on APS and/or SRP OASIS and WestConnect
  website




December 18, 2009   APS & SRP 4th Quarter Stakeholder Meeting   68

				