Docstoc

WC_ClientBk_Dec06

Document Sample
WC_ClientBk_Dec06 Powered By Docstoc
					234 5th Avenue South • Edmonds, WA 98020 • (425) 774-4185
                www.wilcoxconstruction.com
WHO WE ARE




             In 1963, Al Wilcox founded Wilcox     Wilcox Construction employs six
             Construction, a privately owned       project managers and over twenty
             company based in Edmonds,             superintendents. To meet our clients’
             Washington. Our original goal         needs regionally and internationally,
             remains the same: to provide          we are licensed in Washington,
             performance, product and service      Oregon, California, Utah, Hawaii,
             that consistently exceed our          Alaska, British Columbia, Colorado,
             client’s expectations.                Arizona, Idaho, and Montana.

             Wilcox Construction’s guiding         Wilcox Contruction’s major clients
             principles:                           include: Starbucks Coffee Company,
             ■ Quality                             Panera Bread, Cosi, Jamba Juice,
             ■ Experience                          Krispy Kreme Doughnuts, Jack
             ■ Accountability                      in the Box, InSpa, Jimmy John’s
             ■ Value                               Gourmet Subs, and Qdoba
             ■ Customer Focus                      Mexican Grill.
             ■ Responsive
                                                   The ability to deliver high quality
             Because of our commitment to our      construction completed on-time and
             customers and the high quality        within budget has earned Wilcox
             product we deliver, over 90% of       Construction the position of a
             client referrals come from past and   first-class general contractor. As
             present clients, management com-      a result, our client list is certainly
             panies, landlords and architects.     our finest, ever-evolving project.
OUR MANY SERVICES




                    Wilcox Construction offers a wide         Services included are:
                    variety of services to help our clients   ■ Conceptual Planning
                    successfully deliver on their project     ■ Value Engineering
                    goals. Services include: design,          ■ Draft Project Schedule
                    planning, project management, project     ■ Budgeting
                    execution and ongoing service.            ■ Cost Analysis

                                                              ■ Project Contract
                    Design & Planning
                                                              ■ Building Space Site Review
                    Because of Wilcox Construction’s
                    established relationships with            Permitting & Code Compliance
                    architects, engineers and other           Wilcox Construction can expedite
                    consultants, we are able to assemble      the process of obtaining the
                    custom tailored design teams for          necessary permits to ensure your
                    our clients’ individual projects. As      project starts quickly and efficiently.
                    the design drawings develop we can        We have extensive knowledge and
                    assist with creating plans that stay      experience in working with govern-
                    within budget. In partnership with        mental agencies in this capacity;
                    our clients and architects, we will       let us navigate this process for you.
                    explore ways to save money, using
                                                              Services included are:
                    different methods or products to
                                                              ■ Determine Necessary Permits
                    achieve similar results.
                                                              ■ Permit Expediting

                                                              ■ American Disability Act
                                                                Compliance
                                                              ■ International Building Code
                                                                Compliance
                                                              ■ Health Department Permit
                                                                Submittal
OUR MANY SERVICES continued




                         Project Management                     Services included are:
                         Wilcox Construction’s project          ■ Carpentry and Labor
                         managers and superintendents           ■ Concrete Work
                         work together to ensure timely         ■ Supervision and Layout
                         completion of the project within       ■ Safety Implementation and
                         budget and to the satisfaction of        Monitoring
                         our clients. This means working        ■ Quality Control
                         closely with our clients, the design   ■ Manage Project Schedule
                         team, governing authorities, and       ■ Logistics
                         subcontractors. Wilcox Construction    ■ Job Site Security
                         uses the latest project management     ■ Owner Provided Equipment
                         software to complete a detailed          Coordination
                         schedule and budget breakdown          ■ Trade Synchronization
                         and then keeps the project within      ■ Photo/Video Documentation
                         these parameters.
OUR MANY SERVICES continued




                         Project Close-Out                       Service
                         Execution excellence within the         Once a project is complete, Wilcox
                         project close-out is critical to a      Construction’s customer service
                         successful grand opening. Wilcox        division continues to meet our
                         Construction understands how            clients’ ongoing service needs.
                         important this last phase is to our     Service technicians are available
                         clients’ long term success. We will     24/7 to assist with any emergency,
                         complete all project tasks prior to     repair or remodel projects. We take
                         the client’s operations staff arrival   every measure to complete the job
                         and then manage a full transition       with no impact to daily operations.
                         to ensure the client team is trained
                                                                 Services included are:
                         and ready for opening day.
                                                                 ■ Warranty
                         Services included are:                  ■ Repairs and Maintenance

                         ■ Certificate of Occupancy              ■ Remodels and Renovations

                         ■ Operations and Maintenance            ■ Ongoing Training
                           Manuals                               ■ Emergency Assistance

                         ■ Equipment Start Up and Training

                         ■ Complete As-Built Plans

                         ■ Punch List
OUR PROJECT CONSTRUCTION TEAM




                     The size and organizational structure   Superintendent
                     of Wilcox Construction creates          ■ Works together with the project
                     opportunities to make quick and           manager to ensure that schedules
                     easily implemented decisions              are maintained and on-target.
                     without unnecessary levels of           ■ Management of subcontractors
                     management. This hands-on style           and suppliers, quality and cost
                     delivers an effective implementation      control, coordination with contrac-
                     and efficient use of resources. The       tors, and safety implementation.
                     Wilcox Construction philosophy          ■ Responsible for checking and
                     to ensure success involves the            receiving owner furnished
                     following key personnel: Project          equipment and materials, ordering
                     Manager and Superintendent.               materials, requests for information
                                                               (RFIs), creating as-builts, and
                     Project Manager
                                                               maintaining control of the site.
                     ■ Direct control and supervision
                       of all aspects of the planning
                       process: value engineering,
                       estimating, budgeting, logistics,
                       contracting and subcontracting.
                     ■ Maintains direct line of communi-
                       cation between design team
                       and site personnel via regular
                       meetings.
                     ■ Personally administers progress
                       billings and project close out.
KEY PERSONNEL   Bob Wilcox President                   Paul Carter Project Manager
                As the president of Wilcox             Paul has experience in the public
                Construction, Bob Wilcox focuses       sector as well as the private sector.
                on solid growth for the company        Paul has served many of Wilcox
                by building repeat business in the     Construction’s clients including:
                private sector through quality work.   Gateway Country Stores, Pallino
                Bob has served many of Wilcox          Pastaria, Zao Noodle Bar, Pasta
                Construction’s clients including:      & Company, and Krispy Kreme
                Starbucks Coffee Company, Krispy       Doughnuts, to name a few. He
                Kreme Doughnuts, Pallino Pastaria,     joined Wilcox Construction in 1998
                and Gene Juarez Salons and Spas,       as a project manager. Prior to
                to name a few. Bob joined Wilcox       joining Wilcox Construction, Paul
                in 1978 as a superintendent and        worked for Engineer Contractors,
                eventually a project manager. Prior    Inc. as a project manager focusing on
                to joining Wilcox Construction,        school and university construction
                Bob worked for Atlas Construction.     projects. A graduate of Washington
                                                       State University, Paul holds a degree
                Matt Lessard Secretary Treasurer
                                                       in Construction Management.
                Matt has experience in restaurants,
                retail, tenant improvement and         Travis Falk Project Manager
                ground up new store construction.      Travis has experience in restaurants,
                He has traveled to the Philippines,    retail, commercial, industrial, tenant
                England and Switzerland to provide     improvements, and remodels both
                consulting services for Starbucks      in public and private sector markets.
                Coffee Company’s emerging              He has served many of Wilcox
                international markets. He has          Construction’s clients including:
                served many of Wilcox Construction’s   Starbucks Coffee Company, 7-Eleven,
                clients including: Central Welding     Krispy Kreme Doughnuts, Enterprise
                Supply, Jamba Juice, Qdoba Mexican     Rent-A-Car, JSH Properties, The
                Grill, Panera Bread, Starbucks         McNaughton Group, and Barber
                Coffee Company and Storables,          Development, to name a few.
                to name a few. Matt joined Wilcox      Travis joined Wilcox Construction
                Construction in 1995 as a              in 2006 as a project manager.
                superintendent and subsequently        Prior to joining Wilcox Construction,
                worked as a project manager before     Travis was a project manager
                assuming his current position. Prior   and architectural designer for
                to joining Wilcox Construction, Matt   MulvannyG2 Architecture and
                worked for Hensel Phelps as a field    Dykeman Architects. Travis has
                engineer. A graduate of Washington     worked in both the private and
                State University, Matt holds degrees   public sectors of architecture for
                in Construction Management and         over 10 years.
                Business Administration.
KEY PERSONNEL continued   Mitch Hart Project Manager                Ralph Milleson Project Manager
                          Mitch has experience in ground up         Ralph has experience in ground up
                          new store construction, medical           new store construction, tilt ups,
                          facilities, restaurants, hotels, retail   extensive remodels and tenant
                          and tenant improvement. He has            improvement. He has served many
                          served many of Wilcox Construction’s      of Wilcox Construction’s clients
                          clients including: Ivar’s, Qdoba          including: Starbucks Coffee
                          Mexican Grill, Pallino Pastaria,          Company, Gene Juarez Salon and
                          Maki of Japan and Jersey Mikes, to        Spas, Pierre Enterprises, Jamba
                          name a few. Mitch joined Wilcox           Juice, Krispy Kreme Doughnuts,
                          Construction in 2004 as a project         Pallino Pastaria, and Eddie Bauer,
                          manager. Prior to joining Wilcox          to name a few. Ralph joined
                          Construction, he held the position        Wilcox Construction in 1994 as a
                          of senior estimator for 10 years at       superintendent. Prior to joining
                          MAC Construction, Inc. located in         Wilcox Construction, Ralph worked
                          Columbus, Ohio. A graduate of             for Howard S. Wright for 9 years
                          Washington State University, Mitch        on projects including: Nordstrom
                          holds a degree in Construction            Medical Tower, Microsoft Campus,
                          Management.                               Edmonds Treatment Plant, and
                                                                    Boeing Buildings 40-87 and 40-88.
                          Trent Holobaugh Project Manager
                          Trent has experience in ground up         Andrew Ouderkirk Project Manager
                          new store construction, tenant            Andrew has experience in tenant
                          improvement, and renovations.             improvement, ground up new store
                          He has served many of Wilcox              construction and renovation. He has
                          Construction’s clients including:         served many of Wilcox Construction’s
                          Starbucks Coffee Company, Cingular        clients including: Starbucks Coffee
                          Wireless, Brien Ford, Something           Company, Cingular Wireless, Jamba
                          Silver, Krispy Kreme Doughnuts,           Juice and Krispy Kreme Doughnuts,
                          and Pallino Pastaria, to name a few.      to name a few. Andrew joined
                          Trent joined Wilcox Construction in       Wilcox Construction in 2000 as a
                          1997 as a superintendent. A graduate      superintendent.
                          of Central Washington University,
                          Trent holds a degree in Business
                          Administration.
KEY PERSONNEL continued   Erik Ekstrom                           Mark Vraney
                          Field operations manager               Service Department Manager
                          Erik has experience in site            Mark has experience in inventory,
                          development, ground up                 facilities and project management.
                          construction, tenant improvement       As a service manager, Mark has
                          and remodel projects. Erik joined      served many of Wilcox Construction’s
                          Wilcox Construction in 1995 as a       clients including: Starbucks Coffee
                          project superintendent. As a Project   Company, JSH Properties, InSpa,
                          Superintendent, Erik has served        Qdoba Mexican Grill, Cingular
                          many of Wilcox Construction’s          Wireless, Zeek’s Pizza, and Urban
                          clients including: Cascade Urology,    Outfitters, to name a few. Mark
                          Campbell Nelson Nissan, Michaels       joined Wilcox Construction in 2006
                          Toyota of Bellevue, Starbucks          as a service department manager.
                          Coffee Company, Krispy Kreme           Prior to Wilcox Construction, Mark
                          Doughnuts, and Qdoba Mexican           worked at Pierre Autogoup as an
                          Grill, to name a few. Erik is now      inventory and facilities manager for
                          a field operations manager             10 years and 18 years in the marine
                          primarily overseeing the labor         industry as a service manager and
                          force and safety program. He           project manager.
                          rounds out the team with field
                          experience, cost awareness,
                          organization, efficiency and an
                          eye for detail.



                          To learn more about Wilcox Construction, call 425-774-4185
                                   or visit us at www.wilcoxconstruction.com
ABD INSURANCE




                Location        Total Square Feet
                Seattle, WA     16,000 SF

                Type of Space   Site Development /
                Office Space    Construction Costs
                                $650,000.00

                                Completion Date
                                November 2005
AUBURN RETAIL PHASE I, II, III




                           Location                         Total Square Feet
                           Auburn, WA                       25,600 SF

                           Type of Space                    Site Development /
                           Mall Shell and Multiple Tenant   Construction Costs
                           Retail Spaces                    $2,700,000.00

                                                            Completion Date
                                                            July 2005
BRIEN FORD




             Location                Total Square Feet
             Everett, WA             5,000 SF

             Type of Space           Site Development /
             Used Car Showroom and   Construction Costs
             Service Center          $400,000.00

                                     Completion Date
                                     June 2004
CALIDORA SKIN CLINIC




                       Locations                          Total Square Feet
                       Bellevue, WA                       Average 2,600 SF
                       Redmond, WA
                                                          Site Development /
                       Seattle, WA
                                                          Construction Costs
                       University Village – Seattle, WA
                                                          Average $450,000.00
                       Type of Space
                                                          Completion Date
                       Medical Skin Clinic
                                                          July 2005 – Present
CAMPBELL NELSON NISSAN




                                  Location                       Total Square Feet
                                  Edmonds, WA                    30,500 SF

                                  Type of Space                  Site Development /
                                  Full Service Auto Dealership   Construction Costs
                                                                 $3,200,000.00

                                                                 Completion Date
                                                                 May 2005

 Wilcox Construction showed great integrity
 and a desire to see that our project was on time
 and within budget.
 Kurt Campbell
 Owner
CASCADE UROLOGY CONSULTANTS P.S., INC.




                                  Location                     Total Square Feet
                                  Bellingham, WA               7,300 SF

                                  Type of Space                Site Development /
                                  Ambulatory Surgical Center   Construction Costs
                                                               $1,400,000.00

                                                               Completion Date
 From the beginning we have been impressed with                January 2001
 the level of customer service, quality of work,
 responsiveness, professionalism and attention to
 detail from everyone at the company.
 William P. Griggs, M.D.
 John M. Pettit, M.D.
 Mansel K. Kevwitch, M.D.
 Lisa Carter, Office Manager
EVERETT GOLF AND COUNTRY CLUB




                                   Location            Total Square Feet
                                   Everett, WA         5,000 SF

                                   Type of Space       Site Development /
                                   Golf Clubhouse      Construction Costs
                                                       $500,000.00

                                                       Completion Date
                                                       1998 and 2002
 It goes without saying we were delighted to work
 with you on this project because of your commitment
 to excellence. Quality individuals definitely help
 deliver a quality product.
 Julie Nielsen
 Club Manager
FLORA AND HENRI CHILDREN’S CLOTHIER




                       Location        Total Square Feet
                       Seattle, WA     1,500 SF

                       Type of Space   Site Development /
                       Retail          Construction Costs
                                       $155,000.00

                                       Completion Date
                                       September 2001
FURLA




        Locations         Total Square Feet
        Seattle, WA       Average 1,500 SF
        Stanford, CA
                          Site Development /
        Vancouver, B.C.
                          Construction Costs
        Type of Space     Average $123,000.00
        Retail
                          Completion Date
                          August 2001 and June 2002
HARBOR SQUARE ATHLETIC CLUB




                                 Location              Total Square Feet
                                 Edmonds, WA           40,000 SF

                                 Type of Space         Site Development /
                                 Athletic Facility     Construction Costs
                                                       $2,000,000.00

                                                       Completion Date
                                                       June 1998 – Present



 We have found them to be honest, professional
 and to perform at a level of quality that is beyond
 our expectations. I can give them our highest
 recommendation without reservation.
 Jack Tawney
 President
ICON CORPORATE HEADQUARTERS




                      Location        Total Square Feet
                      Seattle, WA     12,000 SF

                      Type of Space   Site Development /
                      Office Space    Construction Costs
                                      $4,000,000.00

                                      Completion Date
                                      March 2004
IVAR’S MUKILTEO LANDING




                          Location        Total Square Feet
                          Mukilteo, WA    6,725 SF

                          Type of Space   Site Development /
                          Restaurant      Construction Costs
                                          $1,200,000.00

                                          Completion Date
                                          February 2005
JAMBA JUICE COMPANY




                      Locations                  Total Square Feet
                      30+ Stores in Washington   Average 2,000 SF
                      and California
                                                 Site Development /
                      Type of Space              Construction Costs
                      Retail and Restaurant      Average $225,000.00

                                                 Completion Date
                                                 May 1998 – Present
KRISPY KREME




                                 Locations                      Total Square Feet
                                 All Stores in Washington,      Average 4,200 SF – 11,000 SF
                                 Oregon and Hawaii
                                                                Site Development /
                                 Type of Space                  Construction Costs
                                 Doughnut Facility, Corporate   $1,300,000.00 – $4,000,000.00
                                 Office and Retail
                                                                Completion Date
                                                                July 2001 – Present

 Simply stated, we would not want to build
 a store in the Pacific Northwest with any
 other General Contractor.
 Gerard Centioli
 President & CEO
MADE IN WASHINGTON




                                   Locations                         Total Square Feet
                                   Bellevue Square – Bellevue, WA    Average 2,300 SF
                                   Westlake Center – Seattle, WA
                                                                     Site Development /
                                   Type of Space                     Construction Costs
                                   Retail                            Average $150,000.00

                                                                     Completion Date
                                                                     August 2005 – Present
 We don’t open lots of new stores, so when we do it is critical to
 have a partner we can trust, and who can lead our overall effort
 to excellence. The Wilcox Team…proved to be that kind of
 partner, and more. It was an outstanding experience with a
 great end result. I would use them again—and recommend
 them to others—in a heartbeat.
 Mike Mondello
 President
OLHAVA SHOPPING CENTER




                                Location                         Total Square Feet
                                Poulsbo, WA                      36,000 SF

                                Type of Space                    Site Development /
                                Mall Shell and Multiple Tenant   Construction Costs
                                Retail Spaces                    $3,800,000.00

                                                                 Completion Date
                                                                 July 2006

 With Wilcox Construction you are guaranteed
 diligence and honesty. They have proven to be
 cost effective and reliable.
 Andy Barber
 Barber Development
PAGLIACCI PIZZA




                  Locations                        Total Square Feet
                  Bellevue Square – Bellevue, WA   Average 4,000 SF
                  Kenmore, WA
                                                   Site Development /
                  Type of Space                    Construction Costs
                  Restaurant                       Average $600,000.00

                                                   Completion Date
                                                   July 2003 and February 2005
PALLINO PASTARIA




                   Locations                             Type of Space
                   Bank of America Tower – Seattle, WA   Retail and Restaurant
                   Bellevue Square – Bellevue, WA
                                                         Total Square Feet
                   Issaquah, WA
                                                         Average 3,000 SF
                   Sammamish, WA
                   Sea-Tac Airport – Seattle, WA         Site Development /
                   Swedish Hospital – Seattle, WA        Construction Costs
                   Two Union Square – Seattle, WA        Average $500,000.00
                   University Village – Seattle, WA
                                                         Completion Date
                   Woodinville, WA
                                                         January 1998 – Present
PANERA BREAD




                                    Locations              Type of Space
                                    Hillsboro, OR          Restaurant
                                    Issaquah, WA
                                                           Total Square Feet
                                    Kent, WA
                                                           Average 5,000 SF
                                    Lacey, WA
                                    Lakewood, WA           Site Development /
                                    Vancouver, WA          Construction Costs
                                                           $1,300,000.00

                                                           Completion Date
 Wilcox Construction’s consistent commitment to
                                                           December 2005 – Present
 quality has contributed significantly to Panera Bread’s
 successful development in the Northwest.
 Dean DeNardi
 Vice President of Construction, Western Region
PASTA & CO.




              Locations                         Total Square Feet
              Issaquah, WA                      Average 1,900 SF
              Redmond, WA
                                                Site Development /
              Type of Space                     Construction Costs
              Deli, Bakery, Pantry and Retail   Average $300,000.00

                                                Completion Date
                                                July 2001 – Present
PETERSEN OFFICE BUILDING




                       Location                          Total Square Feet
                       Everett, WA                       9,000 SF

                       Type of Space                     Site Development /
                       Class “A” Office and Historical   Construction Costs
                       Preservation                      $1,600,000.00

                                                         Completion Date
                                                         May 2002
QDOBA MEXICAN GRILL




                      Locations                       Type of Space
                      Bothell, WA                     Restaurant
                      Everett, WA
                                                      Total Square Feet
                      Federal Way, WA
                                                      Average 3,200 SF
                      Lynnwood, WA
                      Mercer Island, WA               Site Development /
                      Redmond, WA                     Construction Costs
                      Renton, WA                      Average $320,000.00
                      Sea-Tac Airport – Seattle, WA
                                                      Completion Date
                      Woodinville, WA
                                                      March 2001 – Present
     SEA-TAC CENTRAL FOOD COURT




                                Ivar’s Seafood Bar               Qdoba Mexican Grill
                                Total Square Feet: 1,110 SF      Total Square Feet: 965 SF
                                Site Development /Construction   Site Development /Construction
                                 Costs: $480,000.00               Costs: $420,000.00

                                Maki of Japan                    Dilettante Chocolates
                                Total Square Feet: 965 SF        Total Square Feet: N/A
                                Site Development /Construction   Type of Space: Retail / Kiosk
Location
                                 Costs: $380,000.00              Site Development /Construction
Sea-Tac Airport – Seattle, WA
                                                                  Costs: $140,000.00
                                Pallino Pastaria
Type of Space
                                Total Square Feet: 1,037 SF
Restaurants
                                Site Development /Construction
Completion Date                  Costs: $560,000.00
May 2005
SERVICESTAR MULTI FACILITY CONCEPT CENTER




                                  Locations                      Total Square Feet
                                  Auburn, WA                     Average 9,000 SF
                                  Puyallup, WA
                                                                 Site Development /
                                  Type of Space                  Construction Costs
                                  Automotive Service Center,     Average $1,500,000.00
                                  Fueling Island, Car Wash and
                                                                 Completion Date
                                  Convenience Store
                                                                 July 2002 and February 2005


 I would highly recommend Wilcox Construction
 to other owners interested in contracting with
 a professional and knowledgeable builder with
 a long track record and high ideals.
 Andy Poremba, CCM
 Director of Construction
SHELL GAS STATION




                                   Location                          Total Square Feet
                                   Puyallup, WA                      7,000 SF

                                   Type of Space                     Site Development /
                                   Retail Fuel Facility & Car Wash   Construction Costs
                                                                     $1,186,000.00

                                                                     Completion Date
                                                                     February 2005


 I would highly recommend Wilcox Construction to other Owners
 interested in contracting with a professional and knowledgeable
 builder with a long track record and high ideals.
 Andy Poremba, CCM
 Director of Construction
STARBUCKS COFFEE COMPANY




                                  Locations               Total Square Feet
                                  500+ Stores Worldwide   Average 2,000 SF

                                  Type of Space           Site Development /
                                  Retail and Restaurant   Construction Costs
                                                          $100,000.00 – $875,000.00

                                                          Completion Date
                                                          November 1992 – Present
 I am continually impressed with the pride of
 workmanship I see each time I stop in local
 neighborhood stores…
 Howard Schultz
 Chairman
STARBUCKS COFFEE COMPANY – 1ST AND WALKER




                       Location                Total Square Feet
                       Seattle, WA             2,200 SF

                       Type of Space           Site Development /
                       Retail and Restaurant   Construction Costs
                                               $700,000.00

                                               Completion Date
                                               May 2005
STORABLES




                                 Locations                          Total Square Feet
                                 Lynnwood, WA                       Average 16,000 SF
                                 Portland, OR
                                                                    Site Development /
                                 San Jose, CA
                                                                    Construction Costs
                                 University Village – Seattle, WA
                                                                    Average $550,000.00
                                 Type of Space
                                                                    Completion Date
                                 Retail
                                                                    February 1994 – Present


 They have always been very helpful in organizing the work,
 design, engineering, material selection, accounting and cost
 management of our projects. It has always been a pleasure
 to work with Matt and his associates; we have found them
 to be positive, enthusiastic, engaged and trustworthy.
 Dodd Fischer
 President
THAI GINGER




              Location                      Total Square Feet
              Pacific Place – Seattle, WA   2,200 SF

              Type of Space                 Site Development /
              Restaurant                    Construction Costs
                                            $600,000.00

                                            Completion Date
                                            February 2004
TWIST




        Location                      Total Square Feet
        Pacific Place – Seattle, WA   2,000 SF

        Type of Space                 Site Development /
        Retail                        Construction Costs
                                      $200,000.00

                                      Completion Date
                                      November 2003
WELDON BARBER




                Locations        Total Square Feet
                Kirkland, WA     Average 1,250 SF
                Mill Creek, WA
                                 Site Development /
                Type of Space    Construction Costs
                Retail           Average $150,000.00

                                 Completion Date
                                 July 2006 – Present
WESTWOOD VILLAGE




                   Location                         Total Square Feet
                   Seattle, WA                      27,000 SF

                   Type of Space                    Site Development /
                   Mall Shell and Multiple Tenant   Construction Costs
                   Retail Spaces                    $3,900,000.00

                                                    Completion Date
                                                    September 2004 – Present

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:0
posted:5/12/2013
language:Unknown
pages:42
yan tingting yan tingting
About