					W4 REGENT STREET NEWSLETTER: April 2013

Dear Neighbour,

W4 Regent Street – a development by The Crown Estate, managed by Exemplar

During April, the majority of the superstructure on W4 Regent Street was completed. The steelwork to the roof is now
well progressed and concrete slabs have been poured for all six floors, with only the roof left to be formed. This
milestone was celebrated in the traditional way with a ‘topping out’ ceremony on the 24 April. In a tradition that
dates back centuries, guests from Westminster City Council, The Crown Estate, Exemplar, the design team and the site
team were on hand to witness Cllr Robert Davis DL, Deputy Leader of Westminster City Council, place one of the final
sections of concrete.

Mechanical and electrical installations to the office areas from the first floor up have also progressed well and as a
result the first parts of the internal fit out works have begun. Cleaning of the retained façades is almost complete and
has been connected to the new steel structure; this means we can start to remove the façade retention system next
month. The blockwork on the ground floor has now fully enclosed the new retail units along Regent Street and
defined the reception area for the offices on the first to sixth floors.




 Images: Sixth floor decking (top left). Steelwork at the sixth floor and roof level continues to progress (top
 right). Steel fixing to the fifth floor (bottom left). Mechanical & electrical installations to the first floor
 office area (bottom right)
W4 REGENT STREET NEWSLETTER: April 2013

Progress on site during April 2013:

• Continuation of the façade restoration works

• Continuing the installation of steelwork and decking up to the roof level

• Blockwork for the basement, ground and first floor areas

• Installation of plant and pipework to the basement and up to the third floor

• Installation of a new hoist inside the building

• Removing the two tower cranes and repositioning one of them on top of the concrete core of the building

Over the coming month, our works will include:

• The blockwork on the ground floor areas to be completed, with the blockwork to the upper floors continuing

• Continue installing plant and pipework in the basement and up to the third floor level

• Installation of concrete at the roof level

• Removal of the façade retention system

• Re-construction of the façade to 15/16 New Burlington Street

• Construction of the new façade on 12 New Burlington Street

If you have any queries related to the works please contact either Jon Mingard (Community Liaison and Project
Manager) on 07789 956541 or email jon.mingard@macegroup.com, alternatively Laurie Furst on 07717 717154 or
laurie.furst@macegroup.com.
Kind regards,




Chris Merrin
Senior Project Manager, Mace

				