                                 Projects Under Construction

County Road 210 Providing an overpass for traffic to go over the FEC Railroad and US 1. J.B.
Coxwell Contracting Inc., of Jacksonville began in March 2013 with the construction and should
finish in 550 days (Summer of 2014) at a cost of $9,881,230. This is a design/build project. Tom
Woods of HNTB is CEI (904-596-7964). Donnie DeVenny/FDOT project manager. (2104209)

State Road A1A Resurfacing from Mickler Road (County Road 203) to beginning of the four-
lane (2.4 miles) in Ponte Vedra. Duval Asphalt Products Inc., of Jacksonville began January 3,
2013 and should finish in 90 days (Spring 2013) at a cost of $1,441,186.78. Steve Spittle/project
manager. (4234251)

State Road 16 Resurfacing from Green Acres Road to San Marco Avenue (5 miles) and adding
sidewalk from Toms Road to Kenton Morrison Road (3.5 miles). Hubbard Construction
Company of Winter Park began January 7, 2013 and should finish in 210 days (Fall 2013) at a
cost of $6,198,490.65. Donnie DeVenny/project manager. (424481, 4308961)

State Road 206 (Crescent Beach Bridge) Replacing the motors that operate the bridge raising
mechanism and replacing the control console inside the bridgetender’s house. Quinn
Construction, Inc., began January 3, 2013 and should finish in 235 days (Fall of 2013) at a cost
of $3,295,000. Matthew Kuhn of Parsons Transportation Groups is CEI project manager (904-
596-1413). Steve Spittle/FDOT project manager. (2104582)

                                   Construction is Imminent

Interstate 95 Landscape and provide irrigation for the interchanges at US 1, State Road 206,
State Road 207, State Road 16 and County Road 210. Sun State Nursery & Landscaping, Inc.,
should begin April 22, 2013 and should finish in 540 days at a cost of $3,250,000. The time
frame includes a 5-year establishment and maintenance period (1,825 days). Austin
Woodington/project manager. (4287581)

State Road 312 Repairs to the eastbound Matanzas River Bridge. Bids to open in July 2013 at
estimated cost of $3.5 million. Jeff Bailey/project designer. (4282291)

                            Projects in Five-Year Work Program
                            (Adopted Work Program 2012-2017)

Interstate 95 Improvements at County Road 210 interchange in 2012/13 at estimated cost of $3
million. (4243072)

Interstate 95 Add high mast lighting at the US 1 interchange. Bids to open in August 2013 at
estimated cost of $757,085. Travis Humphries/project designer.
King Street (State Road 5A) Traffic signal update from US 1 to State Road A1A (.2 mile) in
2012/13 at estimated cost of $250,000. (4300691)

May Street (State Road A1A) Drainage improvements from San Marco to Magnolia Avenue
(.3 mile) in 2015/16 at estimated cost of $1.1 million. (2104524)

State Road A1A Update traffic signals from Dondaville Road to State Road 312 (3.5 miles) in
2012/13 at estimated cost of $440,000. (4300661)

State Road 13 Replace and widen the bridge culvert over Wards Creek and add a southbound
left turn lane onto State Road 16 and a right turn lane on State Road 16 to northbound State Road
13. Bids to open in May 2014 at estimated cost of $2.8 million. Public information meeting held
August 11, 2011. Eric Shimer/project designer. (4244541)

State Road 16 Resurface from Green Acres Road to San Marco Avenue (State Road 5A) (3
miles). Bids to open in July 2012 at estimated cost of $5 million. John Thrasher/project designer.
(4244811)

State Road 206 (Crescent Beach Bridge) Improvements to the Matanzas River Bridge in
2013/14 at estimated cost of $1.4 million. (4304491)

                                 Recently Completed Projects
                                    (within the past year)

Interstate 95 Replaced 10 high mast light poles at State Road 16 interchange. American
Lighting and Signalization Inc., of Jacksonville started November 14, 2011 and finished March
23, 2012 at a cost of $607,551.35. (2135052)

State Road A1A Replaced two low level bridges over the Matanzas River in Summer Haven
just north of the Flagler County line. Misener Marine Construction, Inc., of Tampa began
September 9, 2009 and finished April 12, 2012 at a cost of $11,756,527.75. (2104273, 4)

State Road A1A Replaced the ornamental gates at the Bridge of Lions that had been damaged
in a vehicle crash. Walsh Group finished November 9, 2012. (432747)

State Road A1A Built sidewalk from Corona Road to Solana Road (.8 mile) in Ponte Vedra.
CDM Contracting, Inc., began January 3, 2013 and finished March 11, 2013 at a cost of
$241,989.08. (4273311)

State Road 13 Resurfaced, added new curbs and sidewalks and reset the guardrail at the
Cunningham Creek Bridge near Fruit Cove. Duval Asphalt Products Inc., of Jacksonville began
December 28, 2012 and finished in March 2013 at a cost of $640,856.87. (2102133)

State Road 16 Landscaped from County Road 16A to International Golf Parkway (1.5 miles).
Gainesville Landscape Contractors Inc., of Gainesville began September 2012 and finished
November 29, 2012 at a cost of $755,250 (combined with projects on State Road 20 in Alachua
County and on State Roads 19 and 20 and US 17 in Putnam County). (4287591)

State Road 16 Created off-site salt marsh wetland as mitigation for the San Sebastian River
Bridge. Maer Construction of Orange Park began February 10, 2013 and finished April 1, 2013
at a cost of $75,903.03. (4303781)

State Road 207 Built a multi-use trail from Armstrong Road to end of the existing trail.
Superior Construction Company of Jacksonville began September 6, 2011 and finished May 15,
2012 at a cost of $1,274,040.17. (2102865)

State Road 207 Built a multi-use trail from Spuds to Armstrong Road (2.3 miles). Superior
Construction Company of Jacksonville began April 4, 2012 and finished August 3, 2012 at a cost
of $544,169.17. (2102867)

State Road 312 Modified intersection by offsetting left turn lanes with Sgt. Tutten Drive
(formerly Whetstone Drive) and installed new traffic signals at Harbour Drive/Plantation Island
Drive including a flashing yellow signal. Petticoat-Schmitt Civil Contractors, Inc., of
Jacksonville began November 29, 2011 and finished March 14, 2012 at a cost of $738,097.56.
(4247281, 2103946)

State Road 312 Repainted the eastbound bridge over the Matanzas River. Astron General
Contracting Company Inc. began March 8, 2012 and finished March 21, 2013 at a cost of
$1,483,681.72. (2102524)

U.S. 1 Replaced bridge over the San Sebastian River. Archer Western Contractors of
Jacksonville and GAI began July 2011 and finished in February 2013 at a cost of $13,520,000.
(2104482)

                               Projects Under Consideration
                            (Adopted Work Program 2012-2017)

Interstate 95 Design to add lanes from International Golf Parkway to the Duval County line
(8.6 miles) is underway. Construction is not funded. (4240264)

King Street (State Road 5A) Design to make drainage improvements from Cordova Street to
Avenida Menendez begins in 2014/15. (4308971)

River Crossing Project development and environmental study to connect Branan Field -
Chaffee Road (State Road 23) to the proposed I-95/State Road 9B interchange that will cross the
St. Johns River at the Shands Bridge is underway. See web page: www.sjrbridge.com. Public
information meetings held November 1, 2005 in St. Johns County and November 3, 2005 in Clay
County. Public hearings held February 22, 2010 in St. Augustine, February 25, 2010 in Orange
Park, March 2, 2010 in Green Cove Springs and March 4, 2010 in Jacksonville. Brandi
Vittur/project manager. (2082253)
State Road A1A Right of way to add lanes from Mickler Road to beginning of the four-lane
(1.9 miles) is needed. Construction is unfunded. Leigh Ann Bennett/project designer. (2104082)

State Road A1A Design to make improvements from Palmetto Avenue to Sand Castle Lane
begins in 2012/13. (4299311)

State Road A1A Design to replace the timber and navigational lights at the Vilano Bridge over
the Tolomato River begins in 2012/13. (4319421)

State Road 5A, State Road A1A and US 1 Study to determine improvements from the Bridge
of Lions to Charlotte Street begins in 2011/12. (4282712)

State Road 313 (formerly State Road 312 Extension) Purchase right of way beginning in
2012/13 to build new roadway from State Road 207 to US 1. Construction estimated at $82
million is not funded. Public meeting held January 12, 2012. Leigh Ann Bennett/project
designer. (2102302)

				