Docstoc

MARCH_doc07_Dissemin.. - Celtic

Document Sample
MARCH_doc07_Dissemin.. - Celtic Powered By Docstoc
					                                                                           MARCH Doc. 7
                                                                               Coordinator
                                          Created/Updated 26 May 2009/14 November 2009
                                                                  terje.tjelta@telenor.com
                                                                                        All


                           MARCH Dissemination list

Public deliverables
1.   D1.1 Project presentation. September 2008
2.   D2.1 Scenarios enabled by multilink systems (version 1). 8 December 2008
3.   D7.2 Project Web Site. February 2008
4.   D2.2 Scenarios enabled by multilink systems (final version). 27 May 2009
5.   D7.1 Dissemination and Exploitation Plan. 25 August 2008
6.   D4.1 Architectural framework for multilink techniques. 26 November 2009
7.   D2.3 Requirements from operators and users of multilink networks. 8 December 2009
Papers in journals
1. K. Stordahl, “Long-term broadband evolution, forecasts and impact of new technologies”,
   Telektronikk (104) no 3/4, 2008
2. N. K. Elnegaard and K. Stordahl, “Modelling uncertainties and risk in telecommunication
   investment projects”, Telektronikk (104) no 3/4, 2008
3. N. K. Elnegaard, K. Stordahl, J. Lydersen, and T. G. Eskedal. “Mobile Broadband
   evolution and the possibilities”, Telektronikk (104) no 3/4, 2008
4. E. Puschita and T. Palade. QoS Path Selection Mechanism in a Hybrid Access Wireless
   Scenario: A Distributed Approach using Mobile Agents. International Journal of
   Communications, Issue 1, Volume 2, 2008
5. T. Tjelta, G. K. Klungsøyr, I. Tardy, H. Lønsethagen, and L. Henden Groth. Multilink
   wireless access network architecture and functions, submitted to Telektronikk, December
   2009 (See http://www.telenor.com/en/innovation/research/publications/telektronikk/)

Papers in conference proceedings
1. K. Stordahl, “Long-term access broadband forecasting and the influence of new
   technology”. 28th International Symposium on Forecasting. Nice, France, June 22-25,
   2008
2. T. Palade, E. Puschita, and I. Bogdan. Performance Evaluation of Wireless Systems
   implementing IEEE 802.16 Standard. In proc. of 12th WSEAS International Conference
   on COMMUNICATIONS, Heraklion, Greece, July 23-25, 2008
3. K. Stordahl, “Broadband demand and the role of new technologies”. In proc Networks
   2008, the 13th International Telecommunications Strategy and Planning Symposium,
   Budapest Hungary, September 28 – October 02, 2008
4. B. Héder and J. Bitó, “Adaption of Terminal to Base Station Assignment to Terminal
   Activities and Rain Event in Broadband Fixed Wireless Access Systems”, in Proc. 3rd
   European Conference on Antennas and Propagation (EuCAP'09), Berlin, Germany, 23-27
   March 2009, pp. 1405-1409
5. P. Kántor and J. Bitó, “Capacity investigation of BFWA networks applying adaptive site
   diversity techniques”, ICT Mobile Summit, Santander, Spain, 10-12 June 2009


                                             1
                                                                             MARCH Doc. 7
6. B. T. Olsen, L. Henden, A. Fosselie Hansen, M. Lähteenoja “The Core of Techno-
   Economics historical review and new business modeling with examples from the CELTIC
   MARCH project”, CTTE2009, Stockholm, 16-17 June 2009
7. K. Stordahl, “Long-term mobile broadband forecasts. Forecasts when number of
   observations are limited”. 29th International Symposium on Forecasting. Hong Kong,
   China, 22-25 June 2009
8. K. Stordahl, "Forecasting the long-term evolution of broadband accesses and the role of
   new technologies", International Institute of Research Telecoms Market Forecasting
   conference, London, 28 September – 1 October 2009
9. J. Orozco, L. Collantes Abril,“Arquitectura multienlace para servicios multiplay
   (MARCH)”. (in Spanish) XIX edition of TELECOM I+D, Madrid, Spain, 24-26
   November 24-26 2009

Presentations at workshop and conferences
1. T Tjelta and H Lønsethagen, “Service convergence over adaptive multilink networks”,
   Panlab and FIRE 2nd Workshop on IMS enabled Converged Networks New paradigms
   for services delivery, Paris, France, 12 September 2008
2. T. Tjelta, "Multilink technology for improved broadband services at lower cost with a
   minimum of new investments", MARCH Workshop Multilink broadband access for better
   service at lower cost, Telenor expo, Fornebu, Norway, 27 October 2007
3. G. K. Klungsøyr, "Realistic scenarios where multilink solutions enable new business
   opportunities", MARCH Workshop Multilink broadband access for better service at lower
   cost, Telenor expo, Fornebu, Norway, 27 October 2007
4. H. Lønsethagen, "Technical building blocks for taking advantage of multiple access
   networks simultaneously", MARCH Workshop Multilink broadband access for better
   service at lower cost, Telenor expo, Fornebu, Norway, 27 October 2007
5. V. S. Wold Eide and H. O. Rafaelsen, "Demonstration of robust scalable broadband
   access over multiple links at the same time", MARCH Workshop Multilink broadband
   access for better service at lower cost, Telenor expo, Fornebu, Norway, 27 October 2007,
   MARCH Workshop Multilink broadband access for better service at lower cost, Telenor
   expo, Fornebu, Norway, 27 October 2007
6. A. Fosselie Hansen, "An early business assessment showing profitable multilink
   networks", MARCH Workshop Multilink broadband access for better service at lower
   cost, Telenor expo, Fornebu, Norway, 27 October 2007
7. I. Tardy, "International standardisation activities in support for multilink technology",
   MARCH Workshop Multilink broadband access for better service at lower cost, Telenor
   expo, Fornebu, Norway, 27 October 2007
8. N. K. Elnegaard N. K and K. Stordahl, "Building A Transparent Business Case:
   Measuring The Costs And Benefits Associated With Upgrading Your Current HSPA
   Network To HSPA+", Mobile Broadband World Conference. London, September 22-25,
   2009

Posters
1. MARCH poster. FIRE launch 10 September 2008, Paris




                                             2
                                                                            MARCH Doc. 7
Submitted/planned publication for journals, conference proceedings, etc
1. B. Héder, L. Csurgai-Horváth and J. Bitó, “Adaptive Terminal to Base Station
   Assignment in BFWA Systems”, IEEE Communication Letters, 2009, submitted
2. B. Héder and A. Bertók, “Detection of sleet attenuation in data series measured on
   microwave links", Infocommunications Journal, 2009, submittet
3. P. Kántor, G. Tóth and J. Bitó, “Investigation of multi-satellite backbone network for
   BFWA systems”, International Workshop on Satellite and Space Communications 2009
   (IWSSC’09), Siena-Tuscany, Italy, 10-11 September 2009, submitted
4. G. Tóth, P. Kántor and J. Bitó, “Scalable video transmission over multilink networks”,
   International Workshop on Satellite and Space Communications 2009 (IWSSC’09),
   Siena-Tuscany, Italy, 10-11 September 2009, submitted
5. E. Puşchiţă, T. Palade. Performance Analysis of Contention-Based Channel Access
   Mechanisms of 802.11 DCF and 802.11e EDCA. 9th International Conference on
   Telecommunications in Modern Satellite, Cable and Broadcasting Services TELSIKS
   2009 which will be held from 7 to 9 October 2009, at the Faculty of Electronic
   Engineering, University of Niš, Serbia.
6. L Csurgai-Horvath and J Bitó, “Fog attenuation on V band terrestrial radio and a low-cost
   measurement setup”, ICT Mobile Summit, 16-18 June 2010




                                             3

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:2
posted:4/18/2013
language:Latin
pages:3