STAKEHOLDERS AND THEIR PROJECTS - Mogale City

Document Sample
STAKEHOLDERS AND THEIR PROJECTS - Mogale City Powered By Docstoc
					ANNEXURE B: STAKEHOLDERS AND THEIR PROJECTS (IMPLEMENTED)


NAME OF ENTITY                  EXISTING PROGRAMMES / PROJECTS & ACHIEVEMENTS
Department of Agriculture,      · Providing support and monitoring government programmes
Forestry & Fisheries (DAFF):        such as the Working for Water of Department of Water
Land Use & Soil Management          Affairs; and
Division                        · Monitoring and supporting government programmes to
                                    ensure sustainable use of natural resources (soil, water,
                                    vegetation & control of alien invasive plants
Department of Water Affairs     · Providing bulk water supply and sanitation pump stations;
(DWA), Gauteng Region           · Upgrading pump station in Lusaka;
                                · Extension of Percy Stuart waste water treatment works to a 10
                                    mega litre per day (251);
Water Services Sector Support   · Employing youth as part of WCDM War on Leaks Programme
                                    to repair leaks. The ten youth employed identify high water
Represented by Messrs               users and repair leaks including schools; and
Patrick Makhado & Pogiso        · Has a dedicated official to assist/support MCLM team with
Gerald Mfoloe                       water services. The support is endless.

Department of Rural             The DRLR has been assisting the population of MCLM since 1994.
Development & Land Reform       The focus of their involvement has been implementation of land
(DRDLR): (Land Reform           reform projects. In particular DRDLR has:
Branch) Gauteng Region          · Purchased two properties namely; Vlakdrift and Camel
                                    Estates for use as commonage; and
                                · Implementing the CRDP Pilot in Hekpoort.
Department of Health &          · The provision of skills development and establishment of
Social Development                  entrepreneurial/income generating/social cooperatives
                                    through the Lanseria Development Centre covering Lanseria,
                                    Zandspruit and Kromdraai.
Gauteng Department of           GDARD is the lead department in the province to coordinate
Agriculture and Rural           implementation of the CRDP by all departments. This
Development                     coordination entails amongst other activities:
                                · Agriculture, environmental, economic and infrastructure
                                    development within the CRDP sites; and
                                · CRDP strategy was launched in March and approved in July
                                    2011 after intensive consultations with all departments and
                                    local government. Though approved, it is an unfunded
                                    mandate at both the province and local government.
                                · Provincial Steering Committee has been established and is
                                    running.

                                Furthermore, department is involved in the following projects:

                                ·   Magaliesburg resurfacing of 1.9 kilometres road;
                                ·   Re-gravelling of three (3) Hekpoort roads;
                                ·   Re-gravelling of 18.25 kilometres road in Nooidgedacht;
                                ·   Re-gravelling of 6.14 km at Hartebeesfontein; and
                                ·   Re-gravelling of 4.29 km at Dam walk.




                                               56
NAME OF ENTITY                 EXISTING PROGRAMMES / PROJECTS & ACHIEVEMENTS
Gauteng Department of          · Technical advisory / extension services to farmers;
Agriculture and Rural          · Providing on-farm infrastructure through the CASP (funded
Development: Regional              infrastructure include fencing, borehole, chicken house
Office in Randfontein: Focus       irrigation and electrification); and
is agriculture.                · Coordinating key stakeholders for the national Department
                                   of Rural Development and Land Reform programmes.

                               GDARD is involved in:
                               · Pre-Settlement feasibility study to assist DRDLR to assess farms
                                 prior to purchasing; and
                               · Post-Settlement technical support tailor made to the
                                 feasibility study. Concerted effort is made to closely
                                 collaborate with municipalities.
Gauteng Department of          · Has been implementing the EPWP phase 2 of job creation
Agriculture and Rural            and skills transfer by controlling alien species and plants in
Development                      Wards 27, 29 and 32 for the past 12 years.

Gauteng Department of          The department has been involved with the MCLM for 15 years
Local Government and           and current projects include:
Housing: Sedibeng Housing
Region                         · Rietfontein village housing;
                               · Ithembalethu Infrastructure development;
                               · Nooidgedacht Planning stage;
                               · Tarlton also planning; and
                               · DMA also planning stage.
Department of Cradle of        The department has been involved in this project for 2001 and by
Humankind World Heritage       its nature is:
Site and Dinokeng Projects     · Intervention is rural development;
                               · Promotes tourism;
                               · Collaborates closely with municipalities;
                               · Train potential entrepreneurs as tourist operators; and
                               · Collaborate with SAPS on tourism safety.

                               Basically, the department has ability to leverage funding from
                               various departments and private sector to ensure that the site is
                               well developed. The department funded the development of
                               Environmental Management Framework of which stakeholders
                               included GDARD, WRDM, MCLM, Department of Environmental
                               Affairs and the North West Government (10% of Cradle falls
                               under the NW province).
Gauteng Department of          The department has been involved in implementing rural
Education                      projects for the past 16 years. Projects currently underway
                               include:
                               · The possible merger of De Poort and F J Kloppers Primary
                                   Schools with Schaumburg Combined School (only the
                                   primary) and develop Schaumburg as high school only in
                                   Hekpoort to ensure viability in terms of number of learners
                                   that should not be less that 100;
                               · F J Kloppers built by brick and has sporting facilities whereas
                                   Die Poort, though strategically located, is mud built;



                                               57
NAME OF ENTITY                  EXISTING PROGRAMMES / PROJECTS & ACHIEVEMENTS
                                · Running ABET training centre to equip parents with skills for
                                    their work in farms and lodges; and
                                · Involved in the Hekpoort CRDP initiative
Ward 23: Muldersdrift           · Housing project in the whole ward;
(Rietfontein, Van Wyksrestant   · Infrastructure such as water supply and sanitation are under
& Nooitgedacht)                     construction; and
                                · Installing street lights for all settlements to ensure illumination.
Ward 27: Sterkfontein,          · Ward 27 is 70% urban and 30 & rural. Houses are being built
Rietvlei, Oaktree & Game            in Munziville Ext 5, an urban area. There are no
Reserve                             developments in rural areas.

Ward 29: Honingklip &           ·   No, I have just started term but will be involved in the future
Pinehaven
Ward 30: Tarlton                ·   Newly appointed Ward Councillor
Ward 32: Hekpoort and           ·   Identified infrastructure need;
Kromdraai                       ·   Refurbishing schools;
                                ·   Enterprise identification & training;
                                ·   Identified 100 ha land for housing development; and
                                ·   Strategic partner also identified.

Ward 33: Lanseria               ·   Supply of water and sanitation is at 50%; and
(Lindley, Nooidgedacht &        ·   Serithi Expanded Public Works Programme for cleaning and
Rhenosterspruit (DMA)               gardening, livelihood and children s feeding scheme are
                                    underway
Ward 31: Magaliesburg            Projects implemented include:
                                · Blaauwbank; and
                                · Maloney s eye.
MCLM Water & Sanitation         · Provision of water & sanitation;
                                · Planning & provision of services; and
                                · Intermediate provision of bulk water network to Lanseria
MCLM Environmental              · Services provided and on enforcing legislation and
Management                          compliance
MCLM Electricity Distribution   · Development of design criteria for street/high mast lights;
                                    and
                                · Provision of reasonable and sustainable standards for
                                    electricity.
MCLM: Health Services           · Community environmental health services business such as
                                    restaurants etc.;
                                · Sampling water, milk parlours etc. and issuing certificates of
                                    acceptability.
Infrastructure Development      · Currently providing relief potable water to community
Enterprise Development          · SMMEs business registration, business plan development,
                                    facilitation of training and providing mentorship; and
                                · Tourism development and promotion by facilitating grading
                                    and signage.
                                · The tourism unit was involved in the development of Lesedi
                                    Cultural Village formerly under the district.
Development and Planning        The unit has been involved in the spatial development
                                framework for MCLM such as:




                                                 58
NAME OF ENTITY                 EXISTING PROGRAMMES / PROJECTS & ACHIEVEMENTS

                               ·   Precinct planning for Tarlton and Magaliesburg; and
                               ·   Rustenburg/Magalies Development Corridor.
Hekpoort Itumeleng Clinic      ·   Implementing the health care services to the community for
                                   the past nine (9) years.
NARYSEC: Hekpoort Thusong      ·   Learnership for skills development programmes to empower
Service Centre                     youth for effective participation in the development of the
                                   community.
WARD 31 Community Liaison      ·   Ensure compliance with by-laws of MCLM; and
Officer: MCLM                  ·   Facilitate public participation in development programmes
                                   for all spheres of government.
West Rand District             ·   Undertaking need assessments; and
Municipality Infrastructure:   ·   Devising plans and strategies to address the needs.
Housing
West Rand District             ·   Currently not involved with MCLM. However, developed the
Municipality Tourism               Lesedi Cultural Village in former DMA now incorporated in
                                   MCLM.
West Rand District             ·   Developing the state of environment document currently as
Municipality Environment and       a draft for LMs;
Waste Management               ·   Applied for concurrency from the GDARD MEC to do
                                   Regional Environmental Management Framework;
                               ·   Developed an Integrated Waste Management Plan that was
                                   approved by GDARD; and
                               ·   Developed quality plan.
                               ·   The unit would be involved in the implementation of rural
                                   development in assisting and supporting LMs.
Independent Development        ·   The IDT has been involved with Mogale City as an
Trust                              implementing Agency for DWA and Department of
                                   Environmental Affairs Working for Water Programme.
                               ·   In particular, the IDT has been involved in removal of alien
                                   species in the Munziville and Kagiso townships. This project
                                   employs 5 contractors and 55 beneficiaries.
National Development           ·   Identified agricultural project in Tarlton for funding; and
Agency                         ·   Engaging community of Hekpoort to establish a project of
                                   capacitating coops to manage their projects.
Mogale City-Rustenburg         ·   Identifying appropriate projects and developing outline
Development Corridor               business plans
Rand Water Wetlands            ·   Rehabilitating the Happy Acres wetland in Magaliesburg
Mogale Tourism: Section 21     ·   Development of cultural village at the gate of Rhino and Lion
Company                            Park in collaboration with the West Rand District Municipality

AGRI-SA West Rand              ·   Water quality for agriculture;
                               ·   Rural Safety in collaboration with SAPS, Local Government
                                   etc.; and
                               ·   Partnership on human upliftment with local government in
                                   terms of legislative elements.
                               ·   Commodities include: Fruit trees, flowers, grain, vegetable,
                                   Agri-tourism and game farming.
Nkunzi Development             ·   Unfair dismissals;




                                               59
NAME OF ENTITY                    EXISTING PROGRAMMES / PROJECTS & ACHIEVEMENTS
Association: Section 21           · Labour related issues;
company                           · Evictions; and Intervenes, mediate, negotiates and assist in
                                      court.
Independent Development           · IDT not yet started supporting MCLM, but has an MOU with
Trust: Municipal Support              the WRDM signed by the MM Mr David Mokoena
Programme
Aganang Community Home            ·   Holiday programme on Plot 4 for school kids;
Based Care (NGO) based in         ·   Poverty alleviation programmes such as food gardens for
Ward 23, Muldersdrift                 local unemployed people;
                                  ·   Social support for food and school uniforms for poor
                                      community members; and
                                  ·   Monthly support group forums for HIV youth headed
                                      households and child care forum.
Rural Legal Trust: A Section 21   ·   Education and awareness raising about laws and regulations
company                               affecting farm workers and dwellers to enable them to
                                      engage public service departments directly. Raise the
                                      consciousness of communities; and
                                  ·   Providing support through mediation, arbitration and
                                      litigation.
                                  ·   MCLM supported through the North West University s
                                      Potchefstroom Campus Legal Clinic.
African Farmers Association       ·   Involvement in the GDARD (agriculture) working group
of South Africa (AFASA): This         comprising of the Department and MEC s office; and
is the NAFU breakaway group       ·   Participation and involvement in MEC Mayathula-Khoza s
                                      rural development and agricultural road shows to
                                      municipalities.
LoveLife Hekpoort                 ·   LoveLife is involved in HIV/AIDS awareness targeting youth in
                                      Hekpoort. The organisation has been operating in the area
                                      for the past two (2) years.
Azania Agri Project in            ·   Skilling and promoting agricultural activities amongst the
Rhenosterspruit                       unemployed members of the community.
Tshwaranang Dropping              ·   We have been operating in the area for the past 3 years in
Centre in Hekpoort                    distributing food parcels.
Ward 31 Committee Member          ·   Involved in community projects including social responsibility
                                      and environment.
Bula Matlho Project in Ward       ·   Started to bring all small businesses together and help them
30 Tarlton                            to sustain their businesses through training.
Greenway Farm: Biggest            ·   The enterprise has been operating in MCLM for the past 23
Carrot Growing Farming                years. However, started specialising in carrot production
Enterprise in Africa                  since 1990. Specific activity is carrot production.

                                  ·   The monthly wage bill is over R1 million. It employs a
                                      minimum of 150 employees and the number goes up to 170
                                      seasonally. The top 50 farm workers own 10% shares (profit
                                      share) of the operations. These shares are hosted by Farm
                                      Worker Trust.
Datacomb (Pty) Ltd                ·   Job creation projects through the lodge;
                                  ·   Entrepreneurial training in agriculture, pottery, ceramics and
                                      tourism; and




                                                  60
NAME OF ENTITY               EXISTING PROGRAMMES / PROJECTS & ACHIEVEMENTS
                             · Hospitality training of tour operators, tour guides, chefs,
                                 managers, housekeeping (project funded by Rivers
                                 Foundation) a church in Johannesburg.
DKSK Trading Enterprise cc   · DKSK Trading Enterprise has been involved with the MCLM for
                                 3 years and his projects entail:

                             ·   Developing a corncorp of Economic Development of
                                 Magalies; and
                             ·   Running community project in Masakhane
Avianto Estate: Tourism      ·   Avianto has been in existence and operating in MCLM for
Lodge/Hotel                      the past 14 years. Other than the hotel, Avianto is planning
                                 rural development of the area and has made applications to
                                 MCLM as part of the Muldersdrift development node for the
                                 following developments:
                             ·   Develop 250 units of low cost housing in the Driefontein area
                                 close to where the hotel is located. These low cost houses
                                 are aimed at accommodating both employees of Avianto ,
                                 other businesses around the estate and the public in general;
                                 and
                             ·   Develop 1 500 high cost housing estate/luxury stands on the
                                 opposite side of the hotel. This development will also host a
                                 Maragon Private School (preparatory to high school level)
                                 that will be operational by 2013, sporting facilities, health spa
                                 and expansion of hotel (adding 80 extra rooms).
Rhino and Lion Nature        ·   R & L has been operating in the DMA area for the past thirty-
Reserve                          five (35) years and involved in:
                             ·   In partnership with government, L & R donated land at the
                                 entrance of their property to develop Katlego Cultural
                                 Centre over the past 5 years. R & L donated the land as a
                                 contribution to corporate social responsibility to Kromdraai
                                 community and WRDM for the building which eventually cost
                                 government R20 million. An MOU and several documents
                                 forming partnerships exist. To date, after 5 years, the building
                                 is not operational and lying empty. R & L would like to rent
                                 the building and operationalise it but government is not
                                 playing its part.;
                             ·   In 2000 they got an allocation of R1 8 million LED funding from
                                 the West Rand District Municipality (WRDM) to assist in
                                 development of forty (40) houses (restricted developments
                                 by UNESCO World Heritage Site) on Portion 26, the municipal
                                 land next to its property. The idea was for government to
                                 establish a village that would also house satellite police
                                 station, cash store, a clinic and government offices.
                                 However, this project is also on standstill; and
                             ·   R & L employs ninety (90) people from the local communities
                                 and accommodates them on servant s quarters in the
                                 property




                                             61
62
ANNEXURE C: STAKEHOLDERS CONSULTED AND THEIR FUTURE PLANS


Stakeholder consultation process started in earnest at the beginning of June 2011. The stakeholder consultation process commenced with their
identification by predominantly the Mogale City Rural Development personnel and the NRM Consulting team from the database of stakeholders as well
as through various stakeholders websites. The following table present individual mandates and future plans that are planned to develop the MCLM.

 Name Of Entity            Mandate                             Proposed Projects/Programmes &             Planned Projects For West Rand / Mogale
                                                               Activities                                 City
 Department of             ·   To ensure that natural          · Implement the natural resources          Short-term
 Agriculture, Forestry &       resources are used                 management education and
 Fisheries (DAFF):             sustainably; and                   awareness programme through             ·   Ensure land rehabilitation through
                           ·   Undertake rehabilitation           avenues such as farmers or                  Conservation of Agricultural Resources
 Land Use & Soil               through enforcement of the         smallholders days; and                      (CARA) enforcement on 8000-10000
 Management Division           conservation of Agricultural    · MCLM should participate in the               hectares in Gauteng; and
                               Resources Act, 43 of 1983          District Steering Committee involving   ·   Run awareness programmes on farmer
 Represented by Ms             focussing on commercial,           the DRLR. DAFF offers assessments &         and smallholder gathering days and
 Esther Mampane                smallholder, subsistence           advice on natural resources such as         schools.
                               agricultural land users and        water, land degradation
                               also on non-agricultural land      &environmental aspects.                 Medium-term

                                                                                                          ·   Increase targets on rehabilitated land
                                                                                                              and enforce CARA;
                                                                                                          ·   Strengthen working relationships with
                                                                                                              District Steering Committee and
                                                                                                              encourage MCLM to be active
                                                                                                              participants; and
                                                                                                          ·   Run awareness programmes on farmer
                                                                                                              and smallholder gathering days.

                                                                                                          Long-term

                                                                                                          ·   Continued land use rehabilitation
Name Of Entity          Mandate                              Proposed Projects/Programmes &             Planned Projects For West Rand / Mogale
                                                             Activities                                 City
                                                                                                            programme, awareness and
                                                                                                            enforcement.

Department of Water     ·   Supporting Water Services        ·   Rehabilitation & maintenance plans     Short-term
Affairs (DWA),              Authorities (WSAs) and Water         for the MCLM s water infrastructure;
Gauteng Region              Services Providers (WSPs) on                                                ·   Providing a dedicated technical official
                            contract compliance;             ·   Support municipality in developing         to assist MCLM on water services
Water Services Sector   ·   Providing support to WSAs &          the WSDP s to address water related    ·   Tankering water to those communities
Support                     WSPs with regards to drinking        issues; and                                without supply and providing
                            water quality and wastewater                                                    contingency funds to MCLM in case of
Represented by              issues (Blue Drop & Green        ·   Ensuring tankering of water to those       emergencies; and
Messrs Patrick              Drop);                               without supply in rural areas.
Makhado & Pogiso        ·   Supporting MCLM on Water             Contingency funds be made              ·   Negotiate supply of water on private
Gerald Mfoloe               Conservation & Demand                available due to the rapid                 property with the farmers.
                            Management (WCDM) on                 mushrooming of informal settlements
                            awareness & technical                as a result of evictions.              Medium-term
                            support; and
                        ·   Providing financial support to                                              ·   Rehabilitation & maintenance of plans
                            WCDM.                                                                           for their drinking and wastewater 9blue
                                                                                                            and green drop);
                                                                                                        ·   Ensure that the Water Services
                                                                                                            Development Plans are aligned to the
                                                                                                            MCLM IDPs and
                                                                                                        ·   Provide endless support

                                                                                                        Long-term

                                                                                                        ·   Implement Accelerated Community
                                                                                                            Infrastructure Project in rural areas using
                                                                                                            the MIG and DWA funding;
                                                                                                        ·   Focus on conservation, water supply
Name Of Entity         Mandate                                 Proposed Projects/Programmes &               Planned Projects For West Rand / Mogale
                                                               Activities                                   City
                                                                                                                and wastewater infrastructure; and
                                                                                                            · Provide endless support

Department of Rural    ·   To create vibrant, equitable        ·   As a starting point, MCLM need to        Short-term
Development & Land         and sustainable rural                   sign lease agreements with intended
Reform (DRDLR)             communities through                     beneficiaries of Vlakdrift & Camel       ·   To implement proposed settlement
                           implementation of Land                  Estate and facilitate sustainable            projects (Nooitgedacht and
                           Reform & Comprehensive                  institutional arrangements:                  Vlakplaats/Tarlton Agri-village); and
(Land Reform Branch)       Rural Development                                                                ·   Implement PLAS projects for aspirant
Gauteng Region             Programmes.                         ·   Operationalise the two commonages            farmers
                                                                   in order to create economic
Represented by                                                     opportunities for aspirant farmers;      Medium-term
Mr Malesela Manaka                                                 and
                                                               ·   Have more settlement projects to         ·   To acquire strategically located land
                                                                   cater for housing needs of farm              (agricultural hubs) for agricultural
                                                                   dwellers.                                    purposes

                                                               ·   DRLR would assist with acquisition of    Long-term
                                                                   land and provide support to land
                                                                   reform projects through                  ·  To facilitate tenure security and to
                                                                   recapitalisation and development            improve the livelihood of rural
                                                                   projects.                                   communities in MCLM
Department of Rural    ·   Implementation of                   ·   Establishing partnerships with land      Short-term
Development & Land         Comprehensive Rural                     owners;
Reform (DRDLR)             Development Programme               ·   Exploring the supply of water from       ·   Provision of basic needs such as water,
                           (CRDP) through execution of             Hartebeespoort Dam;                          roads, electricity, food gardens and
                           Rural Infrastructure                ·   Establishing a proper settlement area;       develop social infrastructure such as
(Rural Development         Development as follows:             ·   Undertake agricultural and tourism           schools.
Branch) Gauteng        ·   It starts with provision of basic       projects;
Region                     needs;                              ·   Implementing Land Reform & CRDP          Medium-term
                       ·   Enterprise development; and             projects; and
Name Of Entity         Mandate                              Proposed Projects/Programmes &               Planned Projects For West Rand / Mogale
                                                            Activities                                   City
                       ·   Industrialisation or             · Execute social programmes.                 · Establishment of enterprises which
Represented by             commercialisation of the                                                          captures the indigenous resources. This
Ndivhuho Ranwedzi          commodities.                                                                      will cut across all areas with potential to
                       ·   Overall objective is to create                                                    create business opportunities.
                           vibrant communities with
                           secure food security.                                                         Long-term

                                                                                                         ·  Establishment of value chain based
                                                                                                            commodities which are produced in the
                                                                                                            area, industrialise/commercialise.
Department of Health   ·   Community Development            ·   Target training on skills that are job   Short-term
& Social Development                                            oriented;
                                                            ·   Establish a Memorandum of                ·   Job placements for trained youths and
                                                                Understanding with local companies           adults.
                                                                to ensure their absorption of trained
                                                                beneficiaries; and                       Medium-term
                                                            ·   Link with other stakeholders to secure
                                                                project members stipends.                ·   Establish sustainable social cooperatives
                                                                                                             for income generating projects.
                                                            ·   Specific projects should include
                                                                plumbing, bakery, laundry services       Long-term
                                                                and brickmaking. Other than
                                                                community mobilisation & facilitation,   ·  Sustainable business entities with
                                                                the department can provide start-up         members taking home at least R1 000
                                                                funding for local entrepreneurs.            per member per month.
Gauteng Department     ·   Broad mandate of                 ·   Housing project named Chief Mogale       Short-term
of Agriculture and         department is:                       Housing Project in Mogale. This is a
Rural Development                                               flagship project; and                    ·   Create awareness and conscientise key
                       ·   Promote agriculture, food        ·   Roads re-surfacing and re-gravelling         stakeholders on rural development. This
Represented by Mr          security, rural development,         in Hekpoort.                                 process also entails establishing their
Aluoneswi                  environmental protection/                                                         rural development projects and
Name Of Entity          Mandate                               Proposed Projects/Programmes &               Planned Projects For West Rand / Mogale
                                                              Activities                                   City
Mafunzwaini                 enhancement and                   · GDARD would like to be involved in             activities;
                            conservation of natural              the:                                      · Establishing plans for stakeholders; and
                            resources; and                                                                 · Target Hekpoort, the CRDP site for
                        ·   Coordinate various                ·   Implementation of agriculture                baseline survey currently underway to
                            departments to prioritise rural       projects and has a mechanisation             establish national needs.
                            areas in terms of budgets to          plan to leverage tractors to assist
                            ensure vibrant rural                  farmers for crop planning including at   Medium-term
                            development.                          household level;
                                                              ·   Conservation, environment and            ·   Galvanise departments to support rural
                                                                  waste removal and disposal; and              development.
                                                              ·   Coordination of projects as lead
                                                                  department in implementing rural         Long-term
                                                                  development.
                                                                                                           ·   Mainstreaming rural development to
                                                              The department believes the success              ensure that all departments always have
                                                              factor for development strategies                standing programmes for rural areas.
                                                              include:

                                                              ·   Better coordination, engagement
                                                                  and communication amongst key
                                                                  stakeholders and beneficiaries;
                                                              ·   Mainstreaming, alignment and
                                                                  reporting by all those involved; and
                                                              ·   Media reporting and promotion of
                                                                  the programme.
Gauteng Department      ·   Mandate is the                    ·   Future projects should be on             Short-term
of Agriculture and          implementation of GDARD               agricultural development in the
Rural Development:          agricultural programmes and           region.                                  ·   On-farm infrastructure development.
Regional Office in          projects in the region (WRDM)     ·   GDARD will provide both technical
Randfontein: Focus is       including; Westonaria, Mogale         and advisory support to the farmers.     Medium-term
agriculture.                City, Randfontein and             ·   Success factors for development
Name Of Entity        Mandate                                  Proposed Projects/Programmes &              Planned Projects For West Rand / Mogale
                                                               Activities                                  City
                          Carletonville Local                     strategies hinges on better              · On-going support to farmers to ensure
Represented by Mr         Municipality and JHB Metro.             coordination amongst key                     improved productivity.
Thomas Tlhale                                                     stakeholders in government at all
                                                                  levels including DRDLR, MCLM and         Long-term
                                                                  availability of national budget.
                                                                                                           · Sustainable farming and markets
Gauteng Department    ·   Mandate is to implement the          ·   Alien plant removal;                    Short-term to medium term
of Agriculture and        EPWP PHASE 2 job creation            ·   Wetland rehabilitation;
Rural Development         and skills transfer to the jobless   ·   River cleaning of solid waste; and      ·   Implement the EPWP to enhance job
                          and poorest of the poor.             ·   Burning of firebreaks in game               creation. Negotiate rehabilitation of
Represented by Mr                                                  reserves.                                   wetlands with MCLM
Harmen Dendulk
                                                               ·   The department would like to be         Long-term
                                                                   involved in advising on drafting
                                                                   business plans; contracts and           ·   Implement sustainable environmental
                                                                   monitoring & evaluation of projects         conservation projects in MCLM.
                                                                   during implementation.
                                                                                                           ·   Develop an implementation strategy
                                                               ·   The success of development                  from the housing Master Plan.
                                                                   strategies hinges on proper planning,
                                                                   availability of budget, bankable
                                                                   business plan, contract in place, and
                                                                   monitoring and evaluation.
Gauteng Department    ·   Provide and facilitate               ·   Bulk services;                          Short-term to medium term
of Local Government       development of sustainable           ·   Roads & storm water; and
and Housing:              human settlements                    ·   Regeneration of inner-city to promote   ·   Develop and complete the:
Sedibeng Housing                                                   housing rental and accommodation.       ·   Rietfontein village;
Region                                                             This will improve CBD economy           ·   Ithembalethu;
                                                                   because currently it is dead at night   ·   DMA; and
Represented by Mr                                                  in Krugersdorp.                         ·   Tarlton.
Lesiba Sekele
Name Of Entity         Mandate                             Proposed Projects/Programmes &               Planned Projects For West Rand / Mogale
                                                           Activities                                   City
                                                           · The department is guided by
                                                              municipal IDPs (bulk) for to enable       ·    Long-term
                                                              them to provide internal reticulation
                                                              and top structure.                        ·   Development of strategy and
                                                                                                            Implementation Plan exploring
                                                           ·   Department would be involved in              alternative use of local materials and
                                                               implementing the strategy. However,          resources such as appropriate
                                                               ideally, the MCLM should be the              technology for on-site sanitation and
                                                               implementer. An agri-village                 borehole for water.
                                                               concept seems attractive and it
                                                               would perhaps assist department in
                                                               reviewing their housing policy that is
                                                               predominantly urban biased.
Department of Cradle   ·   Core business is:               ·   Development of Maropeng and              Short-term to medium term
of Humankind World                                             Sterkfontein that cost R180 million
Heritage Site and                                              done;                                    ·   Implement the:
Dinokeng Projects      ·   Development of the Cradle of    ·   Development of Magaliesburg Tourist      ·   Magaliesburg and Lanseria Orientation
                           Human Kind area as a Premier        Orientation Centre. This project is in       Centres;
Represented by Mr          Tourist Destination focussing       the pipeline; and                        ·   Complete the hiking trails;
Fana Jiyane                on infrastructure               ·   Development of Lanseria Tourist          ·   and
                           development; and                    Orientation Centre also in the           ·   Facilitate merger with Gauteng Tourism
                       ·   Protection and conservation         pipeline.                                    Authority.
                           of World Heritage Site
                                                           ·   All these developments are               Medium-term
                                                               implemented through the PPP
                                                               arrangements. In all these               ·   Implementation of branded distance
                                                               developments, the Cradle is                  markers, route identifiers and milestones;
                                                               predominantly developing                     and
                                                               infrastructure.                          ·   Cave tourism plan.

                                                           ·   Specific projects by MCLM should         Long-term
Name Of Entity   Mandate   Proposed Projects/Programmes &                Planned Projects For West Rand / Mogale
                           Activities                                    City
                              include:
                           · The 5 years LED strategy of MCLM            ·   Self-sustaining and financial
                              should devote a chapter on tourism;            independence of the initiatives.
                              and
                           · MCLM allocate sufficient budget
                              (IDP) and human resources to plan
                              and implement tourism projects.

                           ·   Notwithstanding budgetary
                               constraints experienced by most
                               municipalities, the CEO is confident
                               that the department can leverage
                               funds for projects through Public,
                               Private Partnership arrangements to
                               assist MCLM in this regard.

                           ·   Specific projects developed and in
                               the pipeline for implementation by
                               Cradle:
                           ·   Maropeng Hotel and Sterkfontein
                               Caves developed through PPP at the
                               cost of R180 million and operational;
                           ·   Magaliesburg Orientation Centre in
                               the pipeline and same PPP
                               arrangements will be made; and
                           ·   Lanseria Orientation Centre also
                               being implemented using the PPP.

                           ·   In all these projects, Cradle develops
                               roads infrastructure and tourist routes
                               through the Strategic Economic
Name Of Entity   Mandate   Proposed Projects/Programmes &              Planned Projects For West Rand / Mogale
                           Activities                                  City
                              Infrastructure Programme. It also
                              contributes in marketing, research
                              and protection of environment.

                           Social responsibility projects include:
                           · Close collaboration with SAPS for
                              tourist safety. Upgraded two (2)
                              police stations to the Superintendent
                              status to curb crime on tourists. As a
                              result, additional resources were
                              made to police. There is also a
                              tourism awareness programme and
                              intelligence (two-way radio) in
                              collaboration with the MCLM. This
                              also includes resources for patrolling
                              the area. The initiative has
                              contributed to a crime free area in
                              the Cradle;
                           · Established and sponsors Tourism
                              Awards for the West Rand District
                              Municipality. This occasion will be
                              held in September at Maropeng. The
                              costs of media work and promotion
                              will be borne by the Cradle; and
                           · Established a job creation and skills
                              development programme to employ
                              200 local unemployed youth and
                              train them in tourism related skills.
                              Budget for this is R10 million. It is
                              envisaged that after the two (2) years
                              of employment and training, the
Name Of Entity       Mandate                              Proposed Projects/Programmes &              Planned Projects For West Rand / Mogale
                                                          Activities                                  City
                                                             unemployed youths would be
                                                             marketable and find jobs on their
                                                             own.
Gauteng Department   ·   Departmental mandate is          · Specific programmes to be                 Short term
of Education             education and also does:            implemented include:                     · Merger of Hekpoort Schools to ensure
                                                          · Identifying property to relocate             viability (number of learners less than 100
Represented by Mr    ·   School nutrition; and               Tarlton Primary School;                     not viable); and
Sarel Streicher      ·   Parental training on their       · Identify site for relocation of Lesego    · Due to numbers, teachers including
                         responsibilities towards their      Primary School in Muldersdrift; and         school principal teach full time and
                         children education.              · Secure site within Gauteng to                have no time for administration.
                                                             relocate Schaumburg Combined
                                                             School which is in the North West        Medium term
                                                             boundary.                                · To move Lesego Primary School in
                                                                                                        Muldersdrift closer to where the majority
                                                          ·   The department would like to:             of learners come from (notwithstanding
                                                          ·   Uplift communities through                funds and availability of site). Sports &
                                                              education;                                cultural activities are suffering; and
                                                          ·   Create sporting facilities to develop   · Tarlton Primary School initially a farm
                                                              their talents and entertainment to        school has 600 learners and space very
                                                              eliminate teenage pregnancies; and        limited. Need to secure land to build
                                                          ·   Undertake ABET programme to               proper school.
                                                              encourage literacy in communities.

                                                          ·   The success in implementing
                                                              development strategies hinges on:
                                                          ·   Consistency in supporting,
                                                              developing and overseeing the
                                                              project from inception through to
                                                              operation and maintenance; and
                                                          ·   Monitoring & evaluation especially by
                                                              department of social development.
Name Of Entity           Mandate                             Proposed Projects/Programmes &               Planned Projects For West Rand / Mogale
                                                             Activities                                   City
Ward 23: Muldersdrift    ·   To serve as a link for          · The problems of land could be              Short Term
(Rietfontein, Van            community to access essential      resolved by policies that clearly state
Wyksrestant &                government services and            the nodes of development in the           ·   Purchase more land for development
Nooitgedacht)                ensure delivery thereof            MCLM area. There is also a need to            (housing and agriculture); and
                                                                finalise the Spatial Development          ·   Provide services to the area (electricity,
Represented by Cllr                                             Framework and Precinct Plans in               water and sanitation plans in the
Molefi Selibo                                                   order to reduce hostility of private          pipeline).
                                                                land owners. MCLM should also
                                                                purchase more land and consider           Medium-term
                                                                expropriation where necessary.
                                                                Specific projects and programmes          ·   Get approval for township establishment
                                                                could include:                                and develop infrastructure (IDP
                                                                                                              alignment);
                                                             ·   Hospitality industry to accommodate      ·   Build sustainable human settlements that
                                                                 the poor through Private Public              incorporate schools, employment,
                                                                 Partnership arrangements for lodges;         markets etc.; and
                                                             ·   Agricultural projects such as poultry,   ·   Establish integrated & sustainable
                                                                 vegetables and livestock be                  economic development such as the
                                                                 considered; and                              agri-village.
                                                             ·   Recycling and waste management.
                                                                                                          Long-term

                                                                                                          ·  Build on medium term plans for
                                                                                                             sustainable socio-economic livelihoods
                                                                                                             and human settlements with taxi/bus
                                                                                                             ranks, MPCs, agriculture, churches,
                                                                                                             sports facilities, markets etc.
Ward 27: Sterkfontein,   ·   Ensure services delivery to     ·   Establishment of multi-purpose           Short-term
Rietvlei, Oaktree &          community.                          centres for ease of communications;
Game Reserve                                                 ·   Stakeholder engagement; and              ·   Stabilise provision of services such as
                                                             ·   Establishment of business centres            trucking water & electricity to
Name Of Entity          Mandate                               Proposed Projects/Programmes &             Planned Projects For West Rand / Mogale
                                                              Activities                                 City
                                                                 including an office of department of        settlements; and
                                                                 home affairs.                           · Provide safety to evicted people.
Represented by Cllr
Paul Molapo                                                                                              Medium-term

                                                                                                         ·   Security of tenure ACT; and
                                                                                                         ·   Ensure acquisition of identity documents.

                                                                                                         Long-term

                                                                                                         ·  Establishment of agri-villages to ensure
                                                                                                            holistic development approach
Ward 29: Honingklip &   ·   Public representative for         ·   Projects & activities could include:   Short-term
Pinehaven                   service delivery such as          ·   Basic education ABET for skills
                            housing to community                  development; and                       ·   Street lights & electricity;
                                                              ·   Clinic/health facility                 ·   Road surfacing & maintenance; and
                                                                                                         ·   Crime reduction.
Represented by Cllr
Jacques Hoon                                                                                             Medium-term
                                                              ·   Would facilitate collaboration
                                                                  through consultation and encourage     ·   Establishing formal townships to
                                                                  openness and transparency amongst          accommodate informal settlements.
                                                                  stakeholders.
                                                                                                         Long-term

                                                                                                         ·   Establish schools & hospitals and clinics
                                                                                                             in Pinehaven.
Ward 32: Hekpoort       ·   Ensuring services delivery; and   ·   Development of sports facilities and   ·   Establishment of agri-villages to ensure
and Kromdraai           ·   Linking community with                activities;                                holistic development approach
                            government services.              ·   Skills development;
Represented by Cllr                                           ·   Involve NYDA and other agencies in
Name Of Entity          Mandate                             Proposed Projects/Programmes &              Planned Projects For West Rand / Mogale
                                                            Activities                                  City
Dennis Thabe                                                   developing specific aspects; and
                                                            · Establish youth clubs e.g. LoveLife.



                                                            ·   The council will facilitate
                                                                engagement of all stakeholders and
                                                                provide advice. He believes that will
                                                                proper planning and commitment by
                                                                all stakeholders, development
                                                                projects will be sustainable.
Ward 33: Lanseria       ·   Service delivery to community   ·   Strengthening the Health & HIV          Short-term
(Lindley,                   for all areas. We have three        awareness programmes;
Nooidgedacht &              big settlements and seven       ·   Improving safety & security. Perhaps    ·   Access to water supply and sanitation;
Rhenosterspruit (DMA)       small ones.                         have a satellite police station;        ·   Provide access roads to all places; and
                                                            ·   Need health centre, clinic; and         ·   Provide access to electricity.
Represented by Cllr                                         ·   Provide recreational facilities and
Osborn Ramadi                                                   activities for youth development.       Medium-term

                                                            ·   Cllr will coordinate and facilitate     ·   Government must purchase land for
                                                                community involvement. He believes          development of housing and agriculture
                                                                that clear communication and
                                                                commitment by all stakeholders will     Long-term
                                                                ensure sustainable development.
                                                                                                        ·  Develop an agri-village, an integrated
                                                                                                           development once land is available.
                                                                                                           Department of agriculture Gauteng
                                                                                                           approached community for agricultural
                                                                                                           projects.
Ward 31:                ·   Core business is to ensure      ·   Specific project to be implemented      Short-term
Magaliesburg                service delivery to community       should include:
                            in Magaliesburg.                ·   Camel Estate implementation of          ·   Construct roads and install street lights
Name Of Entity      Mandate                           Proposed Projects/Programmes &               Planned Projects For West Rand / Mogale
                                                      Activities                                   City
Represented by Ms                                        commonage (operationalise);                   for Ga-Mogale township.
Dipuo Mosese                                          · Boarding facility at Weskol
                                                         Agricultural School for remotely          Medium-term
                                                         located school children;
                                                      · Render Ubuntu Arts and Cultural            ·   Cleaning of roads and current dumping
                                                         Centre a tourist attractive place;;           site.
                                                         Formalisation of informal settlements;
                                                         and                                       Long-term
                                                      · Development of new landfill site and
                                                         relocation thereto appropriate place.     ·  Installing high mast lights in informal
                                                      · MCLM must take care of every                  settlements;
                                                         development initiatives from the          · Upgrade sewer networks site and
                                                         province.                                    services; and
                                                                                                   · Extend the water reticulation pipelines.
MCLM Water &        Mandate is to:                    ·   Bulk infrastructure for water, sewer     Short-term
Sanitation          · Support construction of             and electricity; and                     · Bulk water pipelines in Muldersdrift,
                      schedule 5 provision of water   ·   Backlog of 300 households on roads          Hekpoort, Magalies & Tarlton; and
                      and sanitation; and National        & housing.                               · Reticulation.
                      Water Act Water Resource        ·   The unit envisions playing an advisory
Represented by Mr     Management, treatment &             role in planning and taking lead in      Medium-term
Bongani Mtshali       discharged.                         development of Water Services
                                                          Development Plans, and financing         ·   Expand bulk infrastructure
                                                          project.
                                                                                                   Long-term
                                                      ·   On success factors for
                                                          implementation, the unit says:           ·   Bulk infrastructure mainly sewer, develop
                                                      ·   Visionary planning integrated/holistic       business plan for water and sanitation
                                                          approach to planning &                       using the Spatial Development
                                                          implementation of projects;                  Framework.
                                                      ·   Malibongwe Corridor financial model
                                                          be adopted (PPP); and
Name Of Entity      Mandate                               Proposed Projects/Programmes &             Planned Projects For West Rand / Mogale
                                                          Activities                                 City
                                                          · Blue IQ.

MCLM Electricity    ·   Electricity distribution for      ·   Develop database of all informal       Short-term
Distribution            Mogale City as a whole.               settlements;                           · Provide all informal settlements with
                        However, in some cases,           ·   Establish services provided and           streetlights or high mast; and
                        Eskom also provides electricity       backlogs e.g. housing, sanitation,     · Illuminate sports complexes in areas
                        with MCLM facilitating the            water etc.; and                           such as Munziville, Thembalethu and
Represented by Mr       process                           ·   Establish population growth in terms      Rietvlei.
Frikkie Erusmus                                               of commercial, industrial, big and
                                                              small criteria.                        Medium-term

                                                                                                     ·   Provide site and services electricity on all
                                                                                                         proclaimed land.

                                                                                                     Long-term

                                                                                                     ·  Formalisation of informal settlements
                                                                                                        ensuring EIA s timely process; and
                                                                                                     · Facilitate grant funds from Integrated
                                                                                                        National Electrification Programme
MCLM: Health        ·   Mandate is:                       ·   Embarking on baseline survey to        Short-term
Services            ·   Municipal & public                    establish status quo database e.g.
                        environmental health services;        statistics on the magnitude of         ·   Ensuring that all communities receive
Represented by Mr   ·   Collection, transportation and        backlogs and service levels in rural       refuse collection, skip bins & plastics.
Dominique Nyokana       disposal of solid waste               areas;
                                                          ·   Better integrated/holistic planning    Medium-term
                                                              within MCLM; and
                                                          ·   Possible recycling projects for job    ·   Provide refuse collection services.
                                                              creation. Currently happening
                                                              informally.                            Long-term
Name Of Entity      Mandate                               Proposed Projects/Programmes &                Planned Projects For West Rand / Mogale
                                                          Activities                                    City
                                                          · Waste removal programme should              · Ultimately, provide 240 litre bins to all
                                                             be expanded to rural areas in terms            households.
                                                             of placement of skip containers and
                                                             collection. In Tarlton, Matshelapata
                                                             municipal bags and skips are
                                                             provided.
Infrastructure      ·   Mandate:                          · Undertake a cost benefit analysis and       Short-term to long-term
Development         ·   Infrastructure development           consider appropriate technology
                        (roads, storm water, sanitation      such as boreholes instead of piped         ·   See plans in the Integrated Infrastructure
Represented by          electricity); and                    water and on-site sanitation; and              Master Plan document that also
Acting Executive    ·   Transport and fleet               · Planning and provision                          addresses rural areas of the MCLM
Manager Mr Andre        management.
Botes                                                     ·   Success factor in implementing
                                                              development strategies include good
                                                              planning, following procedure with
                                                              input from various stakeholders. For
                                                              example, lack of transport for scholars
                                                              in MCLM urban and rural areas need
                                                              integrated planning by Departments
                                                              of Education & Infrastructure &
                                                              MCLM.
Enterprise          ·   Mandate is Section 152 of the     ·   Establishment of agri-hubs;               Short-term
Development             Constitution to provide Local     ·   Development of agro-processing
                        Economic Development for              facilities;                               ·   LED Strategy is in the process of
Represented by Mr       the MCLM. In particular:          ·   Explore biogas production for LED             approval. This strategy highlighted
Vuyani Bekwa        ·   SMME development &                    with Gauteng Department of                    establishment of agricultural hub in
                        capacity building;                    Economic Development; and                     Tarlton; and
                    ·   Tourism promotion; and            ·   Promotion of tourism.                     ·   Organisation of organic farming (agro-
                    ·   Business licencing (restaurants                                                     processing) that has been approved
                        7 gambling for less than 5        The Section could contribute in:                  with budget of approximately R1 5
                        machines)                                                                           million.
Name Of Entity      Mandate                          Proposed Projects/Programmes &               Planned Projects For West Rand / Mogale
                                                     Activities                                   City
                                                     · Planning, commissioning and
                                                        implementation of LED initiatives; and    Medium-term
                                                     · Assisting SMMEs in registration of
                                                        businesses with CIPRO at cost.            ·   Organise emerging farmers and secure
                                                                                                      markets for their produce; and
                                                     Success factors include:                     ·   Link tourism to agriculture (agri-tourism
                                                                                                      concept).
                                                     ·   Involvement of key stakeholders and
                                                         beneficiaries from inception though      Long-term
                                                         implementation to ensure ownership
                                                         of projects;                             ·   Growth and sustainability of the
                                                     ·   Development of an economic data              agricultural sector.
                                                         for areas such as GDP, number of
                                                         beds and grading of lodges and B &
                                                         Bs; and
                                                     ·   Formalising institutional arrangements
                                                         with assistance of Gauteng Tourism
                                                         Authority as well as the West Rand
                                                         District Municipality.
Development and     ·   Town planning and building   ·   Rural nodal development with             Short-term
Planning                control                          amenities such as solar power;
                                                     ·   Appropriate technology; and              ·   Development of Muldersdrift area;
Represented by Ms                                    ·   Water tinkering (promote on-site         ·   Rehousing and inclusion;
Glaudi Turner                                            service delivery such as water supply    ·   Central Business District (CBD) renewal;
                                                         and sanitation.                              and
                                                                                                  ·   Development of urban renewal strategy.
                                                     ·   The success factors in implementing
                                                         the strategy include the robustness in   Medium-term
                                                         implementing projects and creation
                                                         of sufficient buy-in and involvement     ·   Urban renewal of Munziville and Kagiso
                                                         of the all stakeholders and                  townships;
Name Of Entity       Mandate                             Proposed Projects/Programmes &               Planned Projects For West Rand / Mogale
                                                         Activities                                   City
                                                            beneficiaries.                            · Development of Muldersdrift area; and
                                                                                                      · CBD renewal.

                                                                                                      Long-term

                                                                                                      ·   Development of the Lanseria/
                                                                                                          Malibongwe node;
                                                                                                      · Continue development of Munziville and
                                                                                                          Kagiso township; and
                                                                                                      · Focus on the Rustenburg / Magalies
                                                                                                          corridor.
Hekpoort Itumeleng   ·   Mandate is to provide health    ·   Specific projects should include:         Short-term
Clinic                   care services to the Hekpoort   ·   Business education;
                         community.                      ·   Skills development;                      ·   Having a clinic that operates on
                                                         ·   Social housing projects; and                 Sundays and other public holidays.
                                                         ·   Health and hygiene awareness
                                                             campaigns and events to capacitate       Medium-term
                                                             community with knowledge on health
                                                             issues.                                  ·   Reducing the rate of HIV/AIDS infections
                                                                                                          in the community.
                                                         ·   The clinic would like to implement the
                                                             strategy through:                        Long-term
                                                         ·   Taking advantage of it servicing a
                                                             large number of people on day-to-        ·   Having a fully resourced clinic in the
                                                             day basis to educate and raise               community to better service the growing
                                                             awareness given minimal resources;           number of people. This clinic should also
                                                             and                                          employ additional staff to compliment
                                                         ·   Assist in mobile clinics to                  improved facility.
                                                             accommodate remotely located
                                                             and scattered communities.
                                                         ·   The success factors hinge on well-
Name Of Entity           Mandate                              Proposed Projects/Programmes &                 Planned Projects For West Rand / Mogale
                                                              Activities                                     City
                                                                 equipped health care facilities to
                                                                 cater for the needs of community.
NARYSEC: Hekpoort        ·   Mandate of NARYSEC are:          · Specific project should include:             Short-term
Thusong Service          ·   This is a youth development      · Development of strategy for Skills
Centre                       programme aimed at assisting        development; and                            ·   Obtaining components of construction
                             the DRDLR and MCLM to            · Training and capacity building                   qualifications for involvement in building
Represented by Ms            reach out to community and          programme on business                           RDP houses planned for the area.
Baleseng                     encourage working together          management skills.
Moilwanyane                  in developing the rural area                                                    Medium-term
                             seeing that this is a CRDP       ·   At NARYSEC, we are working hand-in-
                             node.                                glove DRDLR to develop a strategy          ·   Skills development for running own
                                                                  for youth involvement. Success                 businesses.
                                                                  factor for development strategies
                                                                  include reduced unemployment and           Long-term
                                                                  acquisition of self upliftment skills.
                                                                                                             · Own a petrol station
Tarlton Clinic: Health   ·   Mandate is to provide health     ·   Projects that could be implemented         Short-term
Promotion Centre             services to the community            in MCLM could include:
                             and take part in whatever        ·   Training of self-help groups to initiate   ·   Involving youth on health awareness
                             development initiatives in the       own businesses, thus, sustainable jobs;        campaigns.
                             community                            and
Represented by Sister                                         ·   Skills development.                        Medium-term
Rita Zwane
                                                              ·   Health promotion through awareness         ·   Implementation of the campaign.
                                                                  campaigns should be implemented.
                                                                  The success factor for development         Long-term
                                                                  strategies hinges on skills
                                                                  development, participation and             ·   Youth development.
                                                                  involvement of community in
                                                                  determining their future.
Tarlton Primary School   ·   Core mandate is to teach the     ·   Specific projects to be implemented        Short-term
Name Of Entity          Mandate                         Proposed Projects/Programmes &                 Planned Projects For West Rand / Mogale
                                                        Activities                                     City
                            learners   Education.          could include:
                                                        · Computer literacy;                           ·   To get all the children of Tarlton out of
                                                        · Leadership skills; and                           the streets and in school.
Represented by Mr                                       · Life skills.
Khahlane, the school                                                                                   Medium-term
principal.                                              ·   The school could be involved
                                                            effectively because they know how          ·   To give the necessary and best
                                                            to engage and educate learners on          ·   education for all the kids in Tarlton.
                                                            various activities.
                                                                                                       Long-term
                                                        ·   Success factor for implementation of
                                                            development strategies hinges on           ·   Produce strong and learned leaders of
                                                            focussing on one project and finish            tomorrow.
                                                            before starting new one.
WARD 31 Community       ·   Community liaison or        ·   Specific projects could include:           Short-term
Liaison Officer: MCLM       facilitation for Ward 31.
                                                        ·   Implementation of the Camel Estate         ·   Skills development for youth.
                                                            Commonage project;
                                                        ·   Greening the Ga-Mogale township;           Medium-term
Represented by Mr                                       ·   Implementation of sporting code in
Daniel Mlilo                                                the area; and                              ·   To see our township grow economically
                                                        ·   Initiation of agricultural projects; and       and educationally.
                                                        ·   Social cohesion to unify different
                                                            cultures in the community                  Long-term

                                                        CLO would be involved in                       ·   Having facilities for education and sports
                                                        implementation of strategy by:                     facilities and conserving what we have
                                                                                                           for the future.
                                                        ·   Social facilitation;
                                                        ·   Monitoring; and
                                                        ·   Ensuring sustainability of projects.
Name Of Entity            Mandate                             Proposed Projects/Programmes &               Planned Projects For West Rand / Mogale
                                                              Activities                                   City
West Rand District        ·   Coordination of housing         · Future projects as per our mandate         Short-term
Municipality                  development;                       should be on housing development.
Infrastructure: Housing   ·   Capacity building and skills                                                 ·   Develop an implementation strategy
                              development; and                The three-fold involvement of housing            from the housing Master Plan.
Represented by Mr         ·   Funding (grant) on need basis   unit will be in:
Mashudu Nevhungoni                                                                                         Medium-term
                                                              ·   Planning;
                                                              ·   Development of an implementation         ·   Develop a road map to implementation.
                                                                  plan; and
                                                              ·   Housing project implementation.          Long-term

                                                              Success factor for development               ·   Implement sustainable housing projects
                                                              strategies hinge on:

                                                              ·   MOU with clear roles and
                                                                  responsibilities;
                                                              ·   Better or enhanced communication;
                                                                  and
                                                              ·   Accreditation on Vision 2016 Unicity.
West Rand District        ·   Tourism development; and        ·   Tourism route development; and           Short-term
Municipality Tourism      ·   Marketing.                      ·   Training of tour guides and operators.
                                                                                                           ·   Currently developing revised West Rand
Represented by Ms                                             ·   The unit will make inputs into Vision        Tourism Sector Strategy; and
Amanda Kruger                                                     2016 Unicity. Success factors for the    ·   Developing tourism route.
                                                                  implementation of development
                                                                  strategy depend on adequate              Medium-term
                                                                  funding.
                                                                                                           ·   Make input into the Vision 2016 Unicity
                                                                                                               strategy and plan.

                                                                                                           Long-term
Name Of Entity       Mandate                               Proposed Projects/Programmes &                Planned Projects For West Rand / Mogale
                                                           Activities                                    City

                                                                                                         ·  Implementation of the Unicity Vision
                                                                                                            2016.
West Rand District   ·   Core mandate is to                ·   Separation at source for waste;           Short-term
Municipality             coordinate and provide            ·   Basa Njengo Magogo method for fire
Environment and          support to local municipalities       making of Mbawula without smoke.          ·   Development and finalisation of
Waste Management         in Environmentally related            This programme could be rolled out            Environmental Management
                         issues such as waste and air          to all informal settlements; and              Framework; and
Represented by Ms        pollution management.             ·   Awareness raising at schools through      ·   Planting of trees targeting 10 000 per
Susan Stoffberg                                                for example establishment of Enviro           annum.
                                                               Clubs.
                                                                                                         Medium-term
                                                           ·   The unit believes the success factors
                                                               for implementing development              ·   Developing regional plans with the
                                                               strategies hinges on:                         Vision 2016 Unicity in mind.

                                                           ·   Proper understanding and                  Long-term
                                                               stakeholder commitment to strategy;
                                                           ·   Capacitated and focussed officials;       ·   Sustainable environment, acid mine, air
                                                               and                                           pollution and water pollution
                                                           ·   Financial and human resources to roll         management.
                                                               out projects identified in the strategy
Independent          ·   Implementing Agency for                                                         Short-term
Development Trust        government development
                         projects with special                                                           ·   Remove alien species and hand over
Represented by Ms        reference to poverty                                                                project to municipality for maintence.
Jane Mavhutha            alleviation programme                                                           ·   Together with DWA Working for Water
                         adopting the Expanded                                                               Directorate, the IDT is anxious to hand
                         Public Works Programme.                                                             over the project to the MCLM for
                                                                                                             maintenance as they have been
                                                                                                             implementing the project for more than
Name Of Entity         Mandate                            Proposed Projects/Programmes &                 Planned Projects For West Rand / Mogale
                                                          Activities                                     City
                                                                                                             10 years without cooperation from
                                                                                                             municipality
National               ·   Primary mandate is to          ·   Agriculture;                               Short-term
Development Agency         eradicate poverty through      ·   Manufacturing; and
                           granting to civil society      ·   Advocacy                                   ·   Establish development organisation in
Represented by Mr          organisations that implement                                                      Hekpoort; and
Solly Setlhodi             development projects of poor   ·   NDA believes that development              ·   Provide grant funding for coops to
                           communities                        agencies should be allowed to drive            Tarlton.
                                                              the process and that civil society
                                                              organisations should be capacitated        Medium-term
                                                              to run projects in community.
                                                                                                         ·   Capacitate community to manage &
                                                                                                             implement projects

                                                                                                         Long-term

                                                                                                         ·  Establish civil society organisation to
                                                                                                            drive social development in their
                                                                                                            communities
Mogale City-           ·   Economic development           ·   Training and capacity building;            Short-term
Rustenburg                 along the R24 Mogale-          ·   Establishing market facilities for small
Development Corridor       Rustenburg Corridor which is       farmers; and                               ·   Develop corridor plan;
                           92 km between Krugersdorp      ·   Establishing agricultural processing       ·   Identify anchor projects;
Represented by             and Rustenburg.                    plants.                                    ·   Identify and outline institutional
Desmond Sweke of                                                                                             arrangements and new authority; and
Dludla Development                                        ·   These could be achieved through            ·   Investigate funding options for business
                                                              correct institutional structuring,             plans.
                                                              access to funding and good
                                                              marketing to profile projects.             Medium-term

                                                                                                         ·   Develop outline business plans; and
Name Of Entity        Mandate                             Proposed Projects/Programmes &              Planned Projects For West Rand / Mogale
                                                          Activities                                  City
                                                                                                      · Develop business plans further.

                                                                                                      Long-term

                                                                                                      · Implement projects or programmes
Rand Water Wetlands   ·   Community capacity building     ·   Future projects should include:         Short-term
                          and empowerment about the       ·   Creation of parks construction;
                          use of wetlands;                ·   Greening to beautify the area;          ·   Fire fighting
                      ·   Capacity building on farming,   ·   Implementing sanitation projects; and   ·   Health & safety
Represented by Mr         greening and sanitation; and    ·   Cleaning the environment.               ·   Capacity building & training community
William Mabotha       ·   Implementing Agent for                                                          foe skills
                          government.                     ·   MCLM should prioritise sanitation and   ·   Staring own businesses; and
                                                              rehabilitation of the many wetlands     ·   Concrete mixing skills.
                                                              damaged. Cooperation of multi-
                                                              disciplinary team of stakeholders and   Medium-term
                                                              information sharing should be
                                                              adopted principles.                     ·   Capacitate community start own
                                                                                                          construction businesses.

                                                                                                      Long-term

                                                                                                      ·  Ensure environmental cleanliness on
                                                                                                         sustainable bases.
Mogale Tourism:       ·   Information office; and         ·   Street market;                          Short-term
Section 21 Company    ·   Promotion of tourism in the     ·   Contests/competitions for Mr & Mrs
                          MCLM                                Mogale;                                 ·   Establish Regional Tourism Offices in
Represented by Ms                                         ·   Mountain bike raise;                        Randfontein, MCLM and Muldersdrift
Dehlia van Staden                                         ·   Artists performances e.g. Elvis Blue;
                                                          ·   Krugersdorp vegetables; and             Medium-term
                                                          ·   West Stars performances.
                                                                                                      ·   Ensure that the Regional Tourism Office is
Name Of Entity        Mandate                             Proposed Projects/Programmes &                Planned Projects For West Rand / Mogale
                                                          Activities                                    City
                                                          · Mogale Tourism proposes that its                operational and sustainable.
                                                             business plans should be aligned with
                                                             those of for the MCLM to avoid             Long-term
                                                             duplication, share experience and
                                                             promote job creation. Even if it           ·   Establish a Unicity by 2016
                                                             means being drawn into the
                                                             municipality would make a big
                                                             difference.
AGRI-SA West Rand     ·   Agri-Gauteng chapter of Agri-   · Agriculturally related issues to derive     Short-term
                          SA s mandate is to provide a       workable solutions with government
Represented by Dirk       platform for agricultural          and community stakeholders;                ·   Transformation support for emerging
Hanekom                   community in Gauteng to         · Skills transfer to emerging farmers;            farmers through committee;
                          farm commercially and              and                                        ·   Improve food security through value
                          successfully.                   · Promote best practice and market                chain etc. ownership of the project;
                                                             products for farmers.                          and
                                                                                                        ·   Conserve natural resources and
                                                          ·   Success factors for implementation of         environment.
                                                              development strategies include:
                                                          ·   Alignment of mind-sets for                Medium-term
                                                              stakeholders;
                                                          ·   Strong leadership;                        ·   Establish big and core of successful
                                                          ·   Media and marketing campaigns;                black commercial farmers; and
                                                          ·   Re-alignment of resource and              ·   Have a safe rural agricultural community
                                                              budgets; and                                  and consolidate variety of people s
                                                          ·   Sustainability in project execution and       expertise.
                                                              capacity building throughout the
                                                              project.                                  Long-term

                                                                                                        ·   Support government in improving road
                                                                                                            and rail link for markets and
                                                                                                            communication with stakeholders.
Name Of Entity         Mandate                               Proposed Projects/Programmes &              Planned Projects For West Rand / Mogale
                                                             Activities                                  City
Nkuzi Development      Land Rights organisation focussing    · Agri-village concept that could           Short-term to medium term
Association: Section   on:                                      accommodate livestock and crop
21 company                                                      production. Holistic approach not        ·   Establish people s forums comprising of
                       ·   Land reform beneficiaries;           the RDP type of development                  workers and rum awareness and
Represented by Ms          and                                  because these communities own                educational programmes; and
Ntokozo Nzimande       ·   Farm workers.                        livestock and their source of income     ·   Facilitate access to basic services.
                                                                was for a long time dependent on
                       ·   The organisation represents          agriculture. Moreover, communities       Long-term
                           these vulnerable people to           that have been evicted in the former
                           know their rights, intervenes,       DMA due to the Cradle of Human           ·   Establishment of agri-villages suitable for
                           provide advice on labour             Kind heritage issues, need to be             farming because evicted farm workers
                           related issues of farm workers.      accommodated in a rural setting to           have skill thereof. At this stage capacity
                           Support workers through to           continue surviving;                          building and training for entrepreneurial
                           CCMA, labour court and legal      · Provide service delivery such as water        development would be facilitated.
                           clinic.                              tinkering and sanitation; and
                                                             · Provide access to Home Affairs and
                                                                schools.

                                                             The organisation feels it can make
                                                             significant contribution in assisting the
                                                             MCLM on human rights issues of farm
                                                             workers and evicted people. Success
                                                             factors include:

                                                             ·   Close collaboration amongst key
                                                                 stakeholders and communities;
                                                             ·   Consistency;
                                                             ·   Monitoring and Evaluation;
                                                             ·   Interim reporting and reviewing; and
                                                             ·   Proper joint planning.
Independent            Core business is municipal support    ·   Clinics;                                Short-term to medium term
Name Of Entity        Mandate                                Proposed Projects/Programmes &               Planned Projects For West Rand / Mogale
                                                             Activities                                   City
Development Trust:    on:                                    · Multi-Purpose Centres (halls);
Municipal Support                                            · Sports field; and                          ·   Provide institutional support on
Programme             ·     Institutional support e.g. LED   · Water & sanitation.                            implementation of their projects such as
                            and Performance                                                                   MIG. Involved at various stages from
Represented by Mr           Management Systems; and          ·  IDT would be involved in                      inception, planning, implementation
Nceba Njongwe         ·     Implementation Support e.g.         implementing the strategy as they             and exit strategy of projects.
                            Municipal Infrastructure Grant      are already an Implementing Agent
                                                                of CRDP for the Department of Rural       Long term
                                                                Development and Land Reform.
                                                                Success factors for development           ·   On a need basis of the MCLM
                                                                strategies include close collaboration
                                                                and partnerships of all sector
                                                                stakeholders.
Aganang Community     ·     Rendering Ward 23                Proposed projects for MCLM include:          Short-term
Home Based Care             community HIV/AIDS services      · Recreational facilities for children and   · Meeting daily community needs;
(NGO) based in Ward         for the infected and affected       youth;                                    · Helping immediate community to secure
23, Muldersdrift            people in the ward;              · Schools be given adequate                     identity documents; and Skilling
                      ·     Establishing support groups;        transportation for pupils;                   women s groups in sewing and business
                      ·     Running HIV/AIDS campaigns       · Enforce by-laws; and                          skills.
                            to support groups for orphans    · Prioritise women s groups for skilling
                            and vulnerable youth; and           and empowerment.                          Medium-term
                      ·     Distributing food parcels and
                            providing emotional support      ·   Furthermore, Aganang would like the      ·   Sustainable establishment of women s
                            during school holidays and           government to assist them with               cooperatives adding on to the support
                            keeping kids off the streets.        funding for broader consultation and         groups we have at the moment.
                                                                 new projects in the community as
                                                                 they are familiar with all areas and     Long-term
                                                                 people as well as struggles they are
                                                                 going through.                           ·   Securing funding for building and
                                                                                                              transportation;
                                                             The success factors for development          ·   Ensuring beneficiaries are developed to
Name Of Entity         Mandate                             Proposed Projects/Programmes &                Planned Projects For West Rand / Mogale
                                                           Activities                                    City
                                                           strategies include:                               move forward;
                                                                                                         · Establishing a drop In Centre for feeding
                                                           ·   Community stakeholder involvement             scheme of the poor;
                                                               and participation;                        · Building an orphanage or shelter
                                                           ·   Proper management (using skilled              (managing); and
                                                               people for the jobs);                     · Building an Old Age Home (managing).
                                                           ·   Minimise corruption in government;
                                                               and
                                                           ·   Committed community members to
                                                               the strategy.
Rural Legal Trust: A   Core business is the provision of   ·   Awareness raising on farm                 Short-term
Section 21 company     legal services for the rural farm       workers/dwellers right and protection.
                       based communities especially            Capacitate them with sufficient           ·   Social mobilisation to ensure that people
Represented by Mr      farm workers                            knowledge of their rights; and                are well informed about the dos and
Buti Chakache                                              ·   Engage government on need to                  don ts of legal or illegal evictions, and
                                                               create call centres using                     dismissals
                                                               technologies such as cell phones so
                                                               they could be urgently assisted.          Medium-term

                                                           ·   The Rural Legal Trust would like to be    ·   Facilitate government take over
                                                               involved in conceptualisation,                responsibility for farm workers basic
                                                               planning, implementation and review           service delivery such as water, sanitation
                                                               with biasness to primary beneficiaries.       and electricity;
                                                                                                         ·   Ensure that rural dwellers participate fully
                                                           ·   The Trust believes that success factors       in the IDP process of MCLM; and
                                                               for development strategies include:       ·   Facilitate creating of new forum for
                                                                                                             owners and workers.
                                                           ·   Public and beneficiary participation
                                                               and involvement from inception to         Long-term
                                                               end of the project to ensure
                                                               ownership and pride in the project;       ·   Sustainability of forums to run on their
Name Of Entity            Mandate                               Proposed Projects/Programmes &               Planned Projects For West Rand / Mogale
                                                                Activities                                   City
                                                                   and                                           own.
                                                                · Accountability of all stakeholders         · Rural Legal Trust has already established
                                                                   especially public officials to the            forums in seven (7) provinces except
                                                                   community or people                           KwaZulu-Natal and part of the Western
                                                                                                                 Cape.
African Farmers           ·   Organise farmers; and             ·   Access for farmers to Vlakdrift and      Short-term
Association of South      ·   Represent farmers interests to        Camel Estate Commonages;
Africa (AFASA): This is       ensure viability of their         ·   Establishment of fresh produce           ·   Capacity building of the organisation.
the NAFU breakaway            businesses through                    market; and
group                         improvement of productivity.      ·   Venue for convening training             Medium-term
                                                                    workshops of farmers.
Represented by Mr         ·   In line with the President s                                                   ·   Building capacity of farmers for
Jabulani Khumalo              priority of rural development,    AFASA would like to be involved in the           involvement in agricultural value chain.
                              AFASA would like to ensure        implementation of the strategy as follows:
                              sustainability of farming and                                                  Long-term
                              create jobs in the rural areas.   ·   Planning, inception implementation
                              They are constantly engaging          and monitoring and evaluation of all     ·  Involvement in agro-processing; and
                              government on best options            programmes; and                          ·  Establishment of fresh produce market of
                              to support its initiatives.       · Tailor making projects according to           which WRDM has completed a feasibility
                                                                    their needs and visions.                    study.
LoveLife Hekpoort         ·   HIV/AIDS Awareness and            Specific projects and activities could       Short-term
                              education of youth including      include:
Represented by Joel           teenage pregnancy and                                                          ·   Ensure that our youth is more vigilant
Motau, Ground-                substance abuse. The main         ·   Socio-economic education and                 about good sexual behaviour lack of
breaker                       target is the youth.                  awareness;                                   which could jeopardise their future.
                                                                ·   Teenage pregnancy awareness
                                                                    campaign; and                            Medium      term
                                                                ·   Career guidance and exhibition.
                                                                                                             ·   Every youth reached with the LoveLife
                                                                ·   LoveLife would like to be involved in        message.
                                                                    implementation of the strategy as far
Name Of Entity           Mandate                              Proposed Projects/Programmes &               Planned Projects For West Rand / Mogale
                                                              Activities                                   City
                                                                 as their area of specialisation is        Long-Term
                                                                 concerned. The success of strategy
                                                                 for HIV/AIDS will dependant on            ·   HIV/AIDS infection rate drastically
                                                                 career guidance for the youth and             reducing.
                                                                 having low HIV/AIDS infections.

Azania Agri Project in   ·   Involved in agricultural         ·   Projects could include establishing an   Short-term
Rhenosterspruit              projects predominantly               Agri-Village that will provide space
                             livestock (chicken and pigs).        for agricultural activities and          ·   Financial assistance
                                                                  residences.
                                                                                                           Medium       term
                                                              ·   Azania would like to be involved in
                                                                  mobilising and managing activities at    ·   Funding for production and establishing
                                                                  community level during                       community market.
                                                                  implementation of the strategy.
                                                                                                           Long-Term
                                                              ·   The success factor hinges on well
                                                                  organised community structures and       ·  Community training and capacity
                                                                  availability of funds.                      building.
Tshwaranang              ·   Core mandate of                  ·   Skills development; and                  Short-term
Dropping Centre in           Tshwaranang is distribution of   ·   Business skills training.
Hekpoort                     food parcels                                                                  ·   Catering for the needs of the
                                                              ·   Tshwaranang would be involved in             community at least to an acceptable
Represented by Ms                                                 developing the strategy to ensure            extent.
Precious Makwindila                                               that the needy and poor are being
                                                                  catered for in terms of blankets and     Medium       term
                                                                  food parcels.
                                                                                                           ·   Making sure that every household has
                                                              ·   Success factor would be access to            minimal food to eat daily.
                                                                  shopping, government offices and
                                                                  other convenient facilities for rural
Name Of Entity           Mandate                               Proposed Projects/Programmes &                  Planned Projects For West Rand / Mogale
                                                               Activities                                      City
                                                                  community
Community Works          ·   Keep the environment tidy         · Projects that could be implemented            Short-term
Programme of                 whilst creating jobs.                include development of sports
Department in Tarlton                                             facilities and activities for the youth      ·   Housing development.
Ward 30                                                           and construction of access roads.
                                                                                                               Medium       term
Represented by Mr                                              ·   Would participate in implementing
Anthony                                                            the strategy through training children      ·   Rate of abuse reduced.
                                                                   and fill up the potholes in the area.

                                                               ·   Success factors depend on
                                                                   trustworthiness of responsible officials
                                                                   and working selflessly on the project.
Tarlton Youth Desk in    ·   Developing young people of        ·   Proposed projects and activities            Short-term
Tarlton Ward 30.             Ward 30                               should include provision of skills to the
                                                                   youth through training workshops.           ·   Young people having ability to start their
                                                                   The skilling should include starting and        own businesses.
                                                                   running business enterprises.
                                                                                                               Medium       term
                                                               ·   Youth Desk could assist in
                                                                   implementing the strategy through           ·   Project sustainability.
                                                                   community mobilisation.
                                                                                                               Long-Term

                                                                                                               ·  Youth of the Ward should be vibrant and
                                                                                                                  their businesses sustainable.
Bula Matlho Project in   ·   Organising business enterprises   ·   Skills development programme                Short-term
Ward 30 Tarlton              in the ward and uniting them          required.
                             for common vision.                                                                ·   All businesses understand what they are
                                                               ·   Success factor for development                  doing.
                                                                   strategies hinges on working together
Name Of Entity         Mandate                                 Proposed Projects/Programmes &               Planned Projects For West Rand / Mogale
                                                               Activities                                   City
                                                                  and commitment to render projects         Medium term
                                                                  successful.
                                                                                                            ·   Ensure that all businesses create jobs.

                                                                                                            Long-Term

                                                                                                            ·  Growth and sustainability of businesses in
                                                                                                               community to ensure job creation and
                                                                                                               poverty alleviation..
Greenway Farm:         ·   The core business of                Specific project is:                         Short-term
Biggest Carrot             Greenway is to grow carrots
Growing Farming            and produces 150 tons per           ·   Housing for farm workers and making      ·   Declare and pay dividends for top 50
Enterprise in Africa       day.                                    property affordable to farm workers.         workers with shareholding; and
                                                                   They should be afforded free land        ·   Train and capacitate emerging farmers
Represented by Mr      ·   This is an intensive farming that       tenure.                                      as and when need arises. He views
Vito Rugani: Owner         is capital and labour intensive                                                      information sharing positively and would
                           grown on 2 500 ha of land.          ·   Greenway would be involved in                assist as much as possible.
                                                                   implementing the strategy through:
                                                                                                            Medium-term
                                                               ·   Buying back shares to empower
                                                                   workers for housing; and                 ·   Amass wealth through 25 ha of farm
                                                               ·   Is willing to capacitate emerging            which is equivalent to 10% and buy-
                                                                   farmers in sharing information and           back for housing of workers; and
                                                                   technical know-how to grow carrots;
                                                                   and labour and water technics. He is     Long-term
                                                                   open to negotiation to assist farmers
                                                                   on whatever needs they may have.         ·   Buy houses for farm workers

                                                               ·   Current Corporate Social
                                                                   Responsibility Greenway is involved in
                                                                   is:
Name Of Entity       Mandate                             Proposed Projects/Programmes &                Planned Projects For West Rand / Mogale
                                                         Activities                                    City

                                                         ·   Contracted an SMME company of a
                                                             black woman who has been a chef
                                                             in restaurants to provide catering
                                                             services to 150/170 workers on the
                                                             farm daily; and
                                                         ·   Mr Rugani is a Pastor of the Magalies
                                                             River Christian Centre in
                                                             Magaliesburg. He believes in
                                                             paradigm change that is currently
                                                             taking place with membership of the
                                                             church being 50/50 black and white.
Datacomb (Pty) Ltd   ·   Tourism Lodge in Hekpoort;      ·   Establishment of tourism information      Short-term
                     ·   Farming small agricultural          centre in Hekpoort;
Represented by Mr        enterprise growing vegetables   ·   Training on agri-tourism for              ·   Ensuring that the centre is fully
Percy Mkhosi             and rearing goats; and              unemployed matriculants;                      established and running
                     ·   Consulting services in rural    ·   Rental scheme to be established on
                         development especially              farms. i.e. Rent to Buy Scheme.           Medium-term
                         agriculture.                        Farmers need training and support;
                                                         ·   Establish agri-village to ensure people   ·   Kromdraai, municipality to ensure that
                                                             have houses. Currently, businesses            the centre is expanded; and
                                                             have to accommodate workers; and          ·   Manarandt centre is private land.
                                                         ·   Train tour guides and operators.
                                                                                                       Long-term
                                                         Datacomb believes it could work with
                                                         government in:                                ·   Growing and expanding enterprises to
                                                                                                           run and own businesses.
                                                         ·   Contributing resources and provide
                                                             opportunities for job creation;
                                                         ·   Government should provide housing
                                                             for people; and
Name Of Entity        Mandate                       Proposed Projects/Programmes &                   Planned Projects For West Rand / Mogale
                                                    Activities                                       City
                                                    · Could assist in securing bursary
                                                       opportunities for students.
DKSK Trading          ·   Property Developer        · Town Planning for Magaliesburg;                Short-term
Enterprise cc                                       · Provision of bulk services for water &
                                                       sanitation;                                   ·   Capacity building of Magaliesburg
Based in                                            · Development of sports facilities; and              leaders especially in agricultural sector.
Magaliesburg                                        · Provision of houses.
                                                                                                     Medium-term
                                                    ·   As property developers, we will
                                                        advise on housing and infrastructure         ·   Establishing fresh produce market to
                                                        development to expedite service                  cater for West Rand as a whole.
                                                        delivery. The success factor for
                                                        development strategy hinges on               Long-term
                                                        authentic stakeholder engagement
                                                        from project inception to the end.           ·  Establishing sustainable local economic
                                                                                                        development and serving in the
                                                                                                        development forum.
Avianto Estate:       ·   Hotel, conferencing and   ·   Specific projects that could be              Short-term
Tourism Lodge/Hotel       weddings                      implemented in the area include:
                                                                                                     ·   Build the Maragon Private School to
Represented by Mr                                   ·   Regular and consistent municipal                 open in 2013;
Trevor D Olivier                                        clean up to ensure there is no litter on     ·   Construct public sporting facilities; and
                                                        the road; and                                ·   Embark on Phase 1 to build 115 houses
                                                    ·   Repair potholes or provide regular               on luxury stands.
                                                        and consistent maintenance of the
                                                        road.                                        Medium-term

                                                    ·   Avianto would like to be involved in         ·   Expand the hotel by adding 80 extra
                                                        the implementation of the strategy               rooms;
                                                        because with these initiatives, it will in   ·   Build the health spa; and
                                                        a way be controlling more land.              ·   Implement low cost housing initiative.
Name Of Entity           Mandate                              Proposed Projects/Programmes &                   Planned Projects For West Rand / Mogale
                                                              Activities                                       City

                                                              ·   The success factors for development          Long-term
                                                                  strategies hinge on:
                                                              ·   Service delivery;                            ·   Participate in commercial node
                                                              ·   Facilitating developers cash flow.               development of buildings and
                                                                  The issue here is that once stands are           economic activities along the highways
                                                                  proclaimed, MCLM expect developer                in Muldersdrift.
                                                                  to start paying rates and taxes
                                                                  despite the fact that the properties
                                                                  would have not been bought. This
                                                                  contributes to financial constrain to
                                                                  developer as markets fluctuate.
                                                                  Avianto believes rates and taxes
                                                                  should only be paid upon transfer of
                                                                  property to buyers.
Oakfield Farm:           ·   Function venue and 90% of        ·   Provision of serviced land to people         Short, medium to long-term
Tourism Lodge/Hotel          the business is weddings             so they could build houses with
241 Beyers Naude                                                  assistance by government; and                ·   Preserve the property and conserve its
Drive.                                                        ·   MCLM should be diligent in providing             natural resources.
                                                                  services.
Represented by                                                                                                 Mr Tubbs believes that the success factor for
Mathew Tubbs                                                  ·   Mr Tubbs believes that provision of          development strategies hinges on:
                                                                  free houses will yield disastrous results.
                                                                  Therefore, communities should                ·   Driver with energy;
                                                                  contribute something towards their           ·   Trust amongst stakeholders; and
                                                                  houses so as to reinforce the spirit of      ·   Success breeds success
                                                                  ownership of the asset.
140 IQ 189 Rietfontein   ·   This 8 ha property was jointly   ·   Rent to buy arrangements with the            ·   In view of challenges currently
plot, a property next        bought by Mr Mathew Tubbs            owners; and                                      experienced and uncertainty on future,
to Oakfield Farm             and two other property           ·   Solar electricity and MCLM has                   the land owners have short-term plans
189 Beyers Naude             owners in the area. Mr Tubbs         undertaken to continue providing                 to resolve the current accommodation
Name Of Entity      Mandate                                Proposed Projects/Programmes &                Planned Projects For West Rand / Mogale
                                                           Activities                                    City
Drive.                  in particular purchased this          water and sanitation to the people.            problems of dwellers.
                        land motivated by business            There is also a need for skip waste bin.
                        interests to ensure control of
Represented by Mr       developments taking place
Mathew Tubbs            thereon.

                    ·   Previous landlord had
                        converted a chicken house
                        into shack dwelling housing
                        approximately seventy (70)
                        families. Over and above the
                        chicken house, there are
                        some staff quarters and a
                        farm house also
                        accommodating a number of
                        families therein. This was
                        shack farming until owners left.
Boitshoko Burial    ·   Funeral services                   ·   Development of sporting and               Short-term
Services                                                       recreational facilities;
                                                           ·   Employment of qualified people to         ·   Ensure the building of vibrant and active
Represented by Mr                                              operate the sporting facilities and           youth committee in Magalies.
Bobby Tlapi                                                    arrange various activities; and
                                                           ·   Ubuntu cultural centre need to be         Medium-term
                                                               rendered functional and needs to
                                                               separate library from other activities.   ·   SANCO would like to service stands to
                                                               Currently, it is inconvenient to be in        accommodate farm workers/dwellers.
                                                               the same venue.
                                                                                                         Long-term
                                                           ·   As a businessman and SANCO
                                                               chairman, Mr Tlapi would like to be       ·   Support all new developments coming
                                                               part of the decision making body for          to MCLM for suitable job creation and
Name Of Entity          Mandate                           Proposed Projects/Programmes &                 Planned Projects For West Rand / Mogale
                                                          Activities                                     City
                                                             activities of the library & performers.         skills development.
                                                             He believes that people should book
                                                             and pay to use the facilities.

                                                          ·   The success factor in implementing
                                                              development strategies hinges on the
                                                              employment of qualified and
                                                              experienced people who understand
                                                              project management.
Rhino and Lion Nature   ·   The core business of Rhino    ·   Development of Portion 26 village          Short-term
Reserve                     and Lion (R & L) reserve is       with facilities such as:
                            tourism.                      ·   Clinic;                                    ·   Continue to grow the business; and
Represented by                                            ·   Government offices e.g. Home               ·   Follow up with the WRDM and MCLM
Messrs Ad Herns and                                           Affairs; and                                   Executive Mayors to take decision on
Frank Wessels                                             ·   Control through traffic on Heritage            the Katlego project to ensure its
                                                              Site through booms and humps;                  operationalisation.
                                                              establish a satellite police station and
                                                              shops.                                     Medium-term to long-term

                                                          ·   The R & L is keen to partner with
                                                              government for community
                                                              development on Corporate Social
                                                              Responsibility basis.
Tarlton Central         ·   Core business is to sell      ·   Specific programmes should include         Short-term
Supermarket                 groceries and runs a bottle       building a bridge, not pedestrian
                            store                             crossing                                   ·   Sell affordable goods

                                                                                                         Medium-term

                                                                                                         ·   Ensure availability of all goods required
                                                                                                             by community
Name Of Entity          Mandate                           Proposed Projects/Programmes &              Planned Projects For West Rand / Mogale
                                                          Activities                                  City

                                                                                                      Long-term

                                                                                                      ·  Build a big super market in order to
                                                                                                         create jobs.
Dream Finders Project   ·   Implementing small projects   ·   Programmes should include building      Short-term
                            such as roads and housing;        houses, roads, sewerage and sports
                            and                               field                                   ·   Create jobs
                        ·   Installing DSTV
                                                                                                      Medium-term

                                                                                                      ·   Construction of houses

                                                                                                      Long-term

                                                                                                      · Grow the business
Tswella Picture Frame   ·   Picture framing               ·   Housing;                                Short-term
                                                          ·   Educational programmes and
Represented by Mr                                             training;                               ·   Implementation of infrastructure
Solly Mataboge                                            ·   Job creation in agriculture; and
                                                          ·   Infrastructure development.             Medium-term

                                                          Tswella would get involved in               ·   Operation of infrastructure
                                                          implementing the strategy through
                                                          establishment of consortia with other       Long-term
                                                          service providers. The success factors in
                                                          implementing development strategies         ·   Full rural development programme
                                                          are availability of both financial and          embracing all aspects.
                                                          human resources.

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:3
posted:4/12/2013
language:Unknown
pages:46