2004 Shutdown Schedule Updated 23-Feb-06 We ek #
[Date]
Sunday
Monday
Tuesday
Wednesday
Thursday
Friday Rad Survey Open muon shields and EFs Retract Be beampipe into ECN Remove N gap hardware Close ECN, EFN Install EFN platform
Saturday
21-Feb Remove SNEGs Inspect interior of EC beampipes Install collapsible beampipe sections Open EF's, CF's, EC's Warm Silicon TFW down Begin retirement of Run I L1Cal Uncable N outer H disk
Stickmic survey
1
26-Feb
Install gap hardware Rad survey
Remove Tedlar membranes Rad survey Wipe Be beampipe Drain Coolant Lines Uncable S outer H disk
Disconnect Be beampipe Cut EC beampipe ends
Drain and purge coolant lines Uncable S inner H disk Install Adapter Cards in N gap Retract Be beampipe into ECN Remove N gap hardware Close ECN, EFN Install EFN platform L1Cal sidewalk operations complete
2
5-Mar
Remove N outer H disk
Remove S outer H disk Install Adapter Cards in N gap
3
12-Mar
Remove S inner H disk Install Adapter Cards in N gap
Uncable N inner H disk
4
19-Mar
Remove Be pipe from Collision Hall Install S gap scaffold Install tables, levels, and north rails 0700-0730 Power Outage Prepare rails in south gap
5
26-Mar
6
2-Apr
Install adapter cards in S gap Install LV cables in S gap Mount stages and align north rails Install south rails Install Long Tool in South Gap Check deflections Install Be beampipe Begin installing L1Cal Upgrade crates
Setup for Run IIa beampipe extraction Complete Dry Run with Dummy Layer 0 Dry run with dummy Layer 0 Transport Layer 0 to DAB Install adapter cards in S Install adapter cards in S gap gap Install LV cables in S gap Install LV cables in S gap Remove N inner H disk Mount stages and align south rails Remove Brunson from N gap Prep stages in N gap Measure capacitance to beampipe Connect Layer 0 cooling manifold Install Layer 0 mounts L1CTT installation complete
Load Layer 0 and Run IIb beampipe into ECN Open EFN and ECN Install gap hardware
Install Layer 0 mounts
Layer 0 Installation Prep
Insert Layer 0 into SMT
7
9-Apr
Install Junction card mounts
Leak test Layer 0 cooling Weld EC beampipes
Install junction cards Connect spool pieces and leak check Verify H disk connections system checkout L1Cal Upggrade Ready for Technical Commissioning Activate SNEGs Open EFs Install BLMs L1CTT Ready for Technical Commissioning system checkout Close CF and EF Likely power outage
8 9
16-Apr 23-Apr
Install junction cards 0700-0730 Power Outage leak check Install beampipe supports make EC Be beampipe joints
Install junction cards Install inner H disks Install rad monitors Install Tedlar membrane
Verfiy Layer 0 connections Cable inner H disks Cable inner H disks Install cooling lines
10
30-Apr
Cool silicon
system checkout
11 12 13
7-May 14-May 21-May
14 15 16 17 18 19 20 21 22 23
28-May 4-Jun 11-Jun 18-Jun 25-Jun 2-Jul 9-Jul 16-Jul 23-Jul 30-Jul first store
system checkout Activate SNEGs Survey EC system checkout Remove SNEG heaters Close clamshells Survey Detector Centerbeam
System checkout Remove gap hardware Close ECs, Efs Survey EC system checkout Survey Detector CenterBeam Test Magnet Power Supplies
Install SNEGs system checkout system checkout
Leakcheck system checkout system checkout
StickMic Survey
Trigger Latency Change
Routine Operation of Upgrade Systems