BID FORM
**General Construction Contract**
SUBMITTED BY:
____________________________________ ____________________________________ ____________________________________ ____________________________________
TO:
REMINGTON GROUP, INC. 351 East Conestoga Road Wayne, PA 19807 ATTENTION: Adrienne Maiocco
We, Contractor, shall furnish all labor, materials, equipment, tools, facilities, supplies, and services not furnished by Owner and do all things necessary to complete all work for the Project in accordance with Request for Proposal dated June 29, 2009 and as further described herein.
Pricing Breakdown
1. General Conditions ................................................... $ ______________ 2. Demolition................................................................. $ ______________ 3. Thermal & Moisture Protection ............................... $ ______________ 4. Doors & Windows .................................................... $ ______________ 5. Finishes a. Drywall........................................................ $ ______________ b. Flooring....................................................... $ ______________ c. Ceiling......................................................... $ ______________ d. Painting ....................................................... $ ______________
Stratford Friends School – Request For Proposal June 29, 2009 6. Specialties.................................................................. $ ______________ 7. Equipment ................................................................. $ ______________ 8. Furnishings ................................................................ $ ______________ 9. Conveying Systems................................................... $ ______________ 10. Mechanical a. Plumbing ..................................................... $ ______________ b. Fire Protection............................................. $ ______________ c. HVAC ......................................................... $ ______________ 11. Electric ..................................................................... $ ______________ 12. Total ..................................................................... $ ______________
OUR LUMP SUM PRICE FOR THE FOREGOING IS:
_____________________________________________________________and 00/100 dollars
($____________.00).
Our mark-up on change orders is ________________
Stratford Friends School – Request For Proposal June 29, 2009
SITE SUPERVISOR
We propose to use _______________________________ as our site supervisor.
We understand that Owner reserves the right to interview him/her prior to contract award/prior to start of work and to reject him/her if not considered acceptable. If rejected, we will propose alternate personnel for the position who will be subject to the same review and acceptance procedure, at no increase in our lump sum proposal.
We also understand that Owner reserves the right to reject our bid if we are unable to provide a site supervisor acceptable to Owner within five calendar days after submission of this proposal.
REMARKS
1. We have received the following Addenda:
2. Our proposal is firm based on contract award within 10 calendar days of the date of this proposal. a. We are familiar with federal, state, and local safety regulations (including the Occupational Safety and Health Act). We hereby affirm our commitment to perform the work safely and in compliance with all contractual safety regulations and requirements.
Stratford Friends School – Request For Proposal June 29, 2009 b. Our proposal is based on the bid documents, including any Addenda, and the written information contained therein, and any “Remarks” or “Clarifications” noted herein or attached hereto. We understand that we will not be compensated at a later date for claimed additional costs based on oral information received during the bid period, but which is not identified in our proposal and subsequently accepted in writing by Owner. c. Our time required to complete the project is _____________ calendar days from Notice to Proceed.
Stratford Friends School – Request For Proposal June 29, 2009
Alternates Alternate 1
Remove and relocate the existing emergency generator from the Basement to the outdoors (on the side of the original school building.)
$ ____________
Stratford Friends School – Request For Proposal June 29, 2009
Addendum #2
Labor Billing Rates
1. Carpentry a. Foreman ...................................................... $ ______________ b. Mechanic..................................................... $ ______________ c. Laborer ........................................................ $ ______________ 2. Painting a. Foreman ...................................................... $ ______________ b. Mechanic..................................................... $ ______________ c. Laborer ........................................................ $ ______________
3. Laborer…………………………………………$ ______________
4. Electrical a. Foreman ...................................................... $ ______________ b. Mechanic..................................................... $ ______________ c. Laborer ........................................................ $ ______________
Stratford Friends School – Request For Proposal June 29, 2009
Partnerships or Individual Principals sign here:
Signed, sealed and delivered in the presence of: _______________________________________ (Name of Partnership, Firm or Individual Trading as…etc.) __________________________ __________________________ __________________________ __________________________ __________________________ __________________________
Corporate Principal sign here: (Corporate Seal)
______________________________________________ (President or Vice President)