Illinois Instruction 1780 Guide 11
Front End Documents For USDA Projects
Advertisement For Bids Instructions to Bidders Bid Form Bid Bond Notice of Award Agreement Between Owner and Contractor(s) General Conditions Supplementary Conditions Performance Bond Payment Bond Application for Payment Field Order Work Change Directive Change Order Notice to Proceed Certificate of Substantial Completion Prevailing Rate of Hourly Wages (when required) Certificate of Owner’s Attorney Agency Concurrence USDA Rural Development Construction Sign Construction Contractors Affirmative Action Goals Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion – Lower Tier Covered Transactions Compliance Statement RUS Bulletin 1780-26, Exhibit D RUS Bulletin 1780-26, Exhibit E RUS Bulletin 1780-26, Exhibit F EJCDC No. C-430 (2002 Edition) EJCDC No. C-510 (2002 Edition) EJCDC No. C-521 (2002 Edition) EJCDC No. C-710 (2002 Edition) RUS Bulletin 1780-26, Exhibit G EJCDC No. C-610 (2002 Edition) EJCDC No. C-615A (March 2008) EJCDC No. C-620 (2002 Edition) Guide 11B, Illinois Instruction 1780 Guide 11C, Illinois Instruction 1780 EJCDC No. C-941 (2002 Edition) EJCDC No. C-550 (2002 Edition) EJCDC No. C-625 (2002 Edition) Supplied by Illinois Department of Labor EJCDC C-710 Exhibit GC-A (2002 Edition) Guide 11A, Illinois Instruction 1780 Guide 10, Illinois Instruction 1780 Guide 12, Illinois Instruction 1780 Form AD 1048 Form RD 400-6
* Forms and RUS Bulletins may be found at http://www.usda.gov/rus/water/ees/englib/index.htm * Illinois Engineering Documents may be found at http://www.rurdev.usda.gov/il/eng.htm
Additional Front End Documents For USDA Projects With DCEO Funding
Contractor/and Subcontractor Certifications (4) General Conditions Part II (Federal Labor Standards Provisions) Non Collusion Affidavit of Prime Bidder GMH 3-6-23 through 32 GMH 3-6-77 through 83 GMH 3-6-35
(02/25/09) PN 432