					                                              Nevada Prevailing Wage Comparison By County

                                 2011 Difference
              Annual Growth       Between PW         Average Wage
             in PW rates, 2010   Survey Avg. and     Premium over                 # Cases PW Set      # Cases PW Set to
                  - 2011            PW rates         (DETR + 40%)                  to Union Rate        Survey Average

Carson                  8.32%               6.53%           65.30%                               32                    6
Churchill               3.09%               4.56%                                                27                   11
Clark                   2.35%               6.23%           45.75%                               34                    4
Douglas                 5.85%               5.99%           49.19%                               30                    8
Elko                    1.41%              -2.52%           48.98%                               29                    9
Esmeralda              -2.50%               5.90%                                                30                    8
Eureka                  0.25%               2.64%                                                27                   11
Humboldt                5.81%               3.41%                                                28                   10
Lander                  3.97%               0.59%                                                29                    9
Lincoln                 6.61%               4.76%                                                34                    4
Lyon                    8.59%               6.36%           42.16%                               29                    9
Mineral                 4.99%               4.20%                                                27                   11
Nye                    -0.42%               3.61%                                                28                   10
Pershing                2.51%               4.14%                                                27                   11
Storey                  2.57%               4.10%                                                28                   10
Washoe                 -2.02%               5.97%           15.24%                               29                    9
White Pine             -0.78%              -0.77%                                                28                   10
                                                                                                29                    9
Total                   2.98%               3.86%                                           76.78%               23.22%
                                                    North
                                                            44.18%
                                                    South
                                                            45.75%

                      Excess Labor Cost - South
    2009                                            $   539,325,277
    2010                                            $   246,656,963
Total                                               $   785,982,240



                      Excess Labor Cost - North
    2009                                                $    86,052,754
    2010                                                $    99,663,603
Total                                                   $   185,716,357


    Total
         2009                                           $   625,378,030
         2010                                           $   346,320,567
Total                                                   $   971,698,597
note: Labor Costs are 50% of Project Cost
see Public Works Projects Tab for Total Dollar Amount
  Total Job
Classifications

              38
              38
              38
              38
              38
              38
              38
              38
              38
              38
              38
              38
              38
              38
              38
              38
              38
Expenditures on Public Works Projects in Nevada, 2009, 2010
                                         South

                                          2009                     2010
Public Works                         $ 3,279,010,674          $ 1,405,458,642
NSHE & School Districts              $ 157,445,463            $ 166,181,486
Total                                $ 3,436,458,145          $ 1,571,642,138

Materials 50%                        $ 1,718,229,073          $   785,821,069
Labor 50%                            $ 1,718,229,073          $   785,821,069

                                         North

Public Works                         $     427,373,377        $   560,677,442
NSHE & School Districts              $     134,316,281        $    89,853,923
Total                                $     561,689,658        $   650,531,365

Materials 50%                        $     280,844,829        $   325,265,683
Labor 50%                            $     280,844,829        $   325,265,683
                            Prevailing Classifications Union Collective Bargining Percentage of Benefits
Craft    Classification                                           Northern Nevada Local      %         Southern Nevada Local   % Benefits
Code                                                                        Union          Benefits              Union
     1   AIR BALANCE TECHNICIAN                                   Sheet Metal 26               29%    Sheet Metal 88                   24%
     2   ALARM INSTALLER                                          IBEW 401                            IBEW Local 357                   29%
     3   BOILERMAKER                                              NV Local 549                 37%    NV Local 549                     39%
     4   BRICKLAYER                                               NV Local 13                  26%    NV Local 13                      23%
     5   CARPENTER                                                Carp Local 971               28%    Regional Council                 28%
     6   CEMENT MASON                                             NV Local 797                 24%    NV Local 797                     25%
     7   ELECTRICIAN COMMUNICATION TECHNICIAN                     IBEW Local 401               24%    IBEW Local 357                   28%
     8   ELECTRICIAN LINEMAN/GROUNDMAN/OPERATOR                   IBEW 401 & 1245              24%    IBEW 396                         29%
     9   ELECTRICIAN NEON SIGN                                    IBEW Local 401                      IBEW Local 357                   34%
    10   ELECTRICIAN WIREMAN                                      IBEW Local 401               26%    IBEW Local 357                   28%
    11   ELEVATOR CONSTRUCTOR                                     Elev Local 8                 33%    Elev Local 18                    29%
    12   FENCE ERECTOR                                            Laborers Local 169           29%    Laborers Local 872               41%
    13   FLOOR COVERER                                            Painters 567                 28%    Painters Local 159               43%
    14   GLAZIER                                                  Glaziers Local 767           19%    Glaziers Local 2001              26%
    15   HIGHWAY STRIPER                                          Laborers Local 169           25%    Laborers Local 872               40%
    16   HOD CARRIER BRICK MASON TENDER                           Laborers Local 169           28%    Laborers Local 872               39%
    17   HOD CARRIER PLASTERER TENDER                             Laborers Local 169           25%    Laborers Local 872               38%
    18   IRONWORKER                                                                                   Ironworkers Local 433            40%
    19   LABORER                                                  Laborers Local 169           28%    Laborers Local 872               41%
    20   MECHANICAL INSULATOR                                     Heat & Frost Local 69        29%    Heat & Frost Local 135           25%
    21   MILLWRIGHT                                               Millwrights Local 1827       32%    Millwrights Local 1827           32%
    22   OPERATING ENGINEER                                       OpEng Local 3                39%    OpEng Local 12                   35%
    23   PAINTER                                                  Painters 567                 24%    Painters 159                     24%
    24   PILEDRIVER (NON-EQUIPMENT)                               Piledrivers Local 34         39%    Southwest Carpenters             26%
    25   PLASTERER                                                Plasterers Local 797         24%    Plasterers Local 797             26%
    26   PLUMBER/PIPEFITTER                                       Plumbers Local 350           33%    Plumbers Local 525               30%
    27   REFRIGERATION MECHANIC                                   Plumbers Local 350           38%    Plumbers Local 525               30%
    28   ROOFER (DOES NOT INCLUDE SHEET METAL ROOFS)              Roofers Local 81             36%    Roofers Local 162                21%
    29   SHEET METAL WORKER                                       Sheet Metal Local 26         29%    Sheet Metal Local 88             24%
    30   SPRINKLER FITTER                                         Sprinkler Local 669          33%    Sprinkler Local 669              31%
    31   SURVEY TECHNICIAN                                        OpEng Local 3                35%    OpEng Local 12                   35%
    32   TAPER                                                    District Council 16          27%    Painters 159                     26%
    33   TILE/TERRAZZO WORKER/MARBLE MASON                        Bricklayers Local 13         25%    Bricklayers Local 13             21%
    34   TILE/TERRAZZO WORKER/MARBLE MASON FINISHER               Bricklayers Local 13         27%    Bricklayers Local 13             25%
    35   TRUCK DRIVER                                             Teamsters Local 533                 Teamseters Local 631             41%
    36   WELL DRILLER                                             OpEng Local 3                36%    OpEng Local 12                   35%
    37   EQUIPMENT GREASER                                        OpEng Local 3                35%    OpEng Local 12                   35%
    38   SOILS AND MATERIALS TESTER                               OpEng Local 3                35%    OpEng Local 12                   36%
                              Average Fringe Benefit Percentage                             29.70%                                  31.00%
                                                                             Difference
 CARSON CITY                                           Annual     2011 PW   Between PW
 Average Construction Wage                            Growth,      Survey Rates and Survey    Union   Union % Non-Union % DETR Mean
 $24.30                        PW 2010    PW 2011    2010 - 2011 Average         Avg.          Y/N    Difference  Difference   Wages
Average                                                     8.32%                     6.53%                 5.57%        0.32%
                              ADD
                              SHEET
                              METAL
                              ZONE
AIR BALANCE TECHNICIAN        RATE                                                              Y        47.87%
Air Balance-Journeyman            46.60      48.35        3.76%     34.80           38.94%
Air Balance-Foreman               49.62      51.46        3.71%     34.80           47.87%
Air Balance-General Foreman       52.64      54.57        3.67%     34.80           56.81%

ALARM INSTALLER                                                                                 N                    0.00%
Alarm Installer-Journeyman        23.63      26.47       12.02%     26.47            0.00%

BOILERMAKER                               Clark                                                 Y        1.87%
Boilermaker                       59.50      65.94       10.82%     64.73            1.87%

                              ADD
                              ZONE
BRICKLAYER                    RATE      Washoe                                                  Y        8.21%
Bricklayer-Journeyman             32.68    32.68          0.00%     31.51            3.71%
Bricklayer-Foreman                33.93    33.93          0.00%     31.51            7.68%
Bricklayer-General Foreman        35.68    35.68          0.00%     31.51           13.23%

                              ADD
                              ZONE
CARPENTER                     RATE                                                              Y        5.23%
Carpenter-Journeyman              38.30      38.80        1.31%     38.18            1.62%                                      23.57
Carpenter-Foreman                 41.05      41.55        1.22%     38.18            8.83%                                      23.57

CEMENT MASON                                                                                    Y        3.18%
Cement Mason-Journeyman           34.40      34.40        0.00%     34.31            0.26%
Cement Mason-Foreman              36.40      36.40        0.00%     34.31            6.09%

ELECTRICIAN
COMMUNICATION
TECHNICIAN                                                                                      Y        12.05%
Communication Technician-
Installer                         25.73      29.36       14.11%         6
                                                                    28.76            2.09%                                      21.35
                                                                                    Difference
 CARSON CITY                                                  Annual     2011 PW   Between PW
 Average Construction Wage                                   Growth,      Survey Rates and Survey    Union   Union % Non-Union % DETR Mean
 $24.30                              PW 2010    PW 2011     2010 - 2011 Average         Avg.          Y/N    Difference  Difference   Wages
Average                                                            8.32%                     6.53%                 5.57%        0.32%
Communication Technician                25.73      32.46         26.16%     28.76           12.87%                                       21.35
Communication-Senior
Technician                              25.73      34.86        35.48%     28.76           21.21%                                        21.35

ELECTRICIAN-LINE                                (22 hrs)                                               Y        -2.23%
Electrician-Groundman                   39.19       40.50        3.34%     58.40          -30.65%
Electrician-Lineman                     57.91       59.90        3.44%     58.40            2.57%
Electrician-Foreman                     63.02       65.16        3.40%     58.40           11.58%
Electrician-General Foreman             68.12       70.45        3.42%     58.40           20.63%
Heavy Equipment Operator                47.86       49.49        3.41%     58.40          -15.26%

ELECTRICIAN-NEON SIGN            -                                                                     Y         0.57%
Electrician-Neon Sign                   44.31      45.52         2.73%     45.26            0.57%

ELECTRICIAN-WIREMAN              -                                                                     Y        11.96%
Wireman                                 46.39      50.78         9.46%     48.75            4.16%                                        29.99
Cable Splicer                           46.39      54.58        17.65%     48.75           11.96%                                        29.99
Wireman-Foreman                         46.39      54.58        17.65%     48.75           11.96%                                        29.99
Wireman-General Foreman                 46.39      58.38        25.85%     48.75           19.75%                                        29.99

ELEVATOR CONSTRUCTOR             -                                                                     Y         7.08%
Elevator Constructor-
Journeyman Mechanic                     46.01      78.21        69.98%     76.43            2.33%
Elevator Constructor-Mechanic in
Charge                                  46.01      85.48        85.79%     76.43           11.84%

FENCE ERECTOR                    -                                                                     N                     0.00%
Fence Erector                           37.56      37.69         0.35%     37.69            0.00%

                                 ADD
FLAGPERSON (not surveyed         LABORER
set by Laborers Union every      ZONE
year)                            RATE
Flagperson                           27.95         27.95         0.00%

FLOOR COVERER                                                                                          Y         3.65%
Floor Coverer-Journeyman                36.26      36.34         0.22%         7
                                                                           36.31            0.08%                                        20.94
                                                                                Difference
  CARSON CITY                                             Annual     2011 PW   Between PW
  Average Construction Wage                              Growth,      Survey Rates and Survey    Union   Union % Non-Union % DETR Mean
  $24.30                          PW 2010    PW 2011    2010 - 2011 Average         Avg.          Y/N    Difference  Difference   Wages
Average                                                        8.32%                     6.53%                 5.57%        0.32%
Floor Coverer-Foreman                38.90      38.93          0.08%    36.31            7.22%                                       20.94

GLAZIER                       -                                                                    N                     1.91%
Glazier                              21.25      22.42        5.51%     22.00            1.91%

                              ADD
                              LABORER
                              ZONE
HIGHWAY STRIPER               RATE                                                                 Y         0.00%
Highway Striper                   33.57         33.57        0.00%     33.57            0.00%

                              ADD
HOD CARRIER-BRICK MASON       ZONE
TENDER                        RATE           Elko                                                  Y         0.83%
Brick Mason-Journeyman            30.10         30.10        0.00%     30.10            0.00%
Brick Maons-Foreman               30.60         30.60        0.00%     30.10            1.66%

                              ADD
HOD CARRIER-PLASTER           ZONE
TENDER                        RATE                                                                 Y         3.81%
Plasterer Tender-Journeyman       33.76         34.26        1.48%     33.76            1.48%
Plasterer-Gun Tender              34.76         35.26        1.44%     33.76            4.44%
Plasterer Tender-Foreman          35.12         35.62        1.42%     33.76            5.51%

                              SEE
                              AMENDME
IRON WORKER                   NT 1                                                                 Y         4.80%
Ironworker-Journeyman              54.38        56.74        4.34%     57.31           -0.99%
Ironworker-Foreman                 57.68        60.04        4.09%     57.31            4.76%
Ironworker-General Foreman         61.04        63.40        3.87%     57.31           10.63%


LABORER                   ADD                                                                      Y         0.42%
                          ZONE
SEE GROUP CLASSIFICATIONS RATE
Landscaper                    25.66             25.66        0.00%     30.26          -15.20%                                        20.10
Furniture Mover               27.16             27.16        0.00%         8
                                                                       30.26          -10.24%                                        20.10
                                                                                  Difference
 CARSON CITY                                             Annual     2011 PW      Between PW
 Average Construction Wage                              Growth,      Survey    Rates and Survey     Union   Union % Non-Union % DETR Mean
 $24.30                          PW 2010     PW 2011   2010 - 2011 Average            Avg.           Y/N    Difference  Difference   Wages
Average                                                       8.32%                         6.53%                 5.57%        0.32%
Group 1                             30.82      30.82          0.00%    30.26                1.85%                                       20.10
Group 1A                            27.95      27.95          0.00%    30.26               -7.63%                                       20.10
Group 2                             30.92      30.92          0.00%    30.26                2.18%                                       20.10
Group 3                             31.07      31.07          0.00%    30.26                2.68%                                       20.10
Group 4                             31.32      31.32          0.00%    30.26                3.50%                                       20.10
Group 4A                            32.57      32.57          0.00%    30.26                7.63%                                       20.10
Group 5                             31.62      31.62          0.00%    30.26                4.49%                                       20.10
Group 6
Nozzlemen, Rodmen                   31.62      31.62         0.00%     30.26               4.49%                                        20.10
Gunmen, Materialmen                 31.32      31.32         0.00%     30.26               3.50%                                        20.10
Reboundmen                          30.97      30.97         0.00%     30.26               2.35%                                        20.10
Gunite Foremen                      32.02      32.02         0.00%     30.26               5.82%                                        20.10

                                SEE
                                AMENDME
MECHANICAL INSULATOR            NT 2                                                                  Y        -0.08%
Mechanical Insulator-Mechanic        57.06     54.56        -4.38%     56.77              -3.89%
Mechanical Insulator-Foreman         59.56     57.06        -4.20%     56.77               0.51%
Mechanical Insulator-General
Foreman                             61.06      58.56        -4.09%     56.77               3.15%

MILLWRIGHT
Millwright                          49.70      25.01       -49.68%


OPERATING ENGINEER        ADD                                                                         Y         8.88%
                          ZONE
SEE GROUP CLASSIFICATIONS RATE
Group 1                       41.33            43.08         4.23%     46.84              -8.03%                                        16.45
Group 1A                      44.09            45.84         3.97%     46.84              -2.13%                                        16.45
Group 2                       44.62            46.37         3.92%     46.84              -1.00%                                        16.45
Group 3                       44.89            46.64         3.90%     46.84              -0.43%                                        16.45
Group 4                       45.63            47.38         3.84%     46.84               1.15%                                        16.45
Group 5                       45.93            47.68         3.81%     46.84               1.79%                                        16.45
Group 6                       46.10            47.85         3.80%     46.84               2.16%                                        16.45
Group 7                       46.35            48.10         3.78%     46.84               2.69%                                        16.45
Group 8                       46.94            48.69         3.73%         9
                                                                       46.84               3.95%                                        16.45
                                                                                   Difference
  CARSON CITY                                             Annual     2011 PW      Between PW
  Average Construction Wage                              Growth,      Survey    Rates and Survey    Union   Union % Non-Union % DETR Mean
  $24.30                           PW 2010    PW 2011   2010 - 2011 Average            Avg.          Y/N    Difference  Difference   Wages
Average                                                        8.32%                        6.53%                 5.57%        0.32%
Group 9                               47.26     49.01          3.70%    46.84               4.63%                                       16.45
Group 10                              47.61     49.36          3.68%    46.84               5.38%                                       16.45
Group 10A                             47.80     49.55          3.66%    46.84               5.79%                                       16.45
Group 11                              48.04     49.79          3.64%    46.84               6.30%                                       16.45
Group 11A                             49.68     51.43          3.52%    46.84               9.80%                                       16.45
Group 11B                             50.49     52.24          3.47%    46.84              11.53%                                       16.45
Foreman                               49.68     51.43          3.52%    46.84               9.80%                                       16.45
Add 7% to base rate for "Second"
Shift                            -
Add 12.5% to base rate for
"Special" shift                  -

OPERATING ENGINEER-
STEEL FABRICATOR &               ADD
                                 ZONE
SEE GROUP CLASSIFICATIONS RATE
Group 1                              56.63      58.38         3.09%     46.84             24.64%                                        17.88
Group 1 Truck Crane Oiler            50.46      52.21         3.47%     46.84             11.46%                                        17.88
Group 1 Oiler                        48.50      50.25         3.61%     46.84              7.28%                                        17.88
Group 2                              55.12      56.87         3.17%     46.84             21.41%                                        17.88
Group 2 Truck Crane Oiler            50.21      51.96         3.49%     46.84             10.93%                                        17.88
Group 2 Oiler                        48.29      50.04         3.62%     46.84              6.83%                                        17.88
Group 3                              53.88      55.63         3.25%     46.84             18.77%                                        17.88
Group 3 Truck Crane Oiler            49.99      51.74         3.50%     46.84             10.46%                                        17.88
Group 3 Oiler                        48.07      49.82         3.64%     46.84              6.36%                                        17.88
Group 3 Hydraulic                    49.66      51.41         3.52%     46.84              9.76%                                        17.88
Group 4                              52.15      53.90         3.36%     46.84             15.07%                                        17.88
Group 5                              51.05      52.80         3.43%     46.84             12.72%                                        17.88
Add 7% to base rate for "Second"
Shift                            -
Add 12.5% to base rate for
"Special" Shift

OPERATING ENGINEER -
PILEDRIVER                ADD
                          ZONE
SEE GROUP CLASSIFICATIONS RATE                                             10
                                                                                      Difference
 CARSON CITY                                                 Annual     2011 PW      Between PW
 Average Construction Wage                                  Growth,      Survey    Rates and Survey    Union   Union % Non-Union % DETR Mean
 $24.30                               PW 2010    PW 2011   2010 - 2011 Average            Avg.          Y/N    Difference  Difference   Wages
Average                                                           8.32%                        6.53%                 5.57%        0.32%
Group 1                                  56.10     57.85          3.12%    46.84              23.51%                                       17.88
Group 1 Truck Crane Oiler                50.64     52.39          3.46%    46.84              11.85%                                       17.88
Group 1 Oiler                            48.72     50.47          3.59%    46.84               7.75%                                       17.88
Group 2                                  54.56     56.31          3.21%    46.84              20.22%                                       17.88
Group 2 Truck Crane Oiler                50.43     52.18          3.47%    46.84              11.40%                                       17.88
Group 2 Oiler                            48.52     50.27          3.61%    46.84               7.32%                                       17.88
Group 3                                  53.11     54.86          3.30%    46.84              17.12%                                       17.88
Group 3 Truck Crane Oiler                50.21     51.96          3.49%    46.84              10.93%                                       17.88
Group 3 Oiler                            48.29     50.04          3.62%    46.84               6.83%                                       17.88
Group 4                                  51.60     53.35          3.39%    46.84              13.90%                                       17.88
Group 5                                  50.49     52.24          3.47%    46.84              11.53%                                       17.88
Group 6                                  49.38     51.13          3.54%    46.84               9.16%                                       17.88
Group 7                                  48.42     50.17          3.61%    46.84               7.11%                                       17.88
Group 8                                  47.46     49.21          3.69%    46.84               5.06%                                       17.88

Add 7% to base for "Second" Shift -
Add 12.5% to base for "Special"
Shift                             -

PAINTER                                                                                                  Y         4.99%
Brush/Roller Painter                     32.74     32.74         0.00%     32.03              2.22%                                        15.03
Spray Painter/Paperhanger                33.59     33.59         0.00%     32.03              4.87%                                        15.03
Sandblaster                              33.24     33.24         0.00%     32.03              3.78%                                        15.03
Structural Steel & Steeplejack           33.74     33.74         0.00%     32.03              5.34%                                        15.03
Swing Stage                              34.74     34.74         0.00%     32.03              8.46%                                        15.03

Special Coating Application-Brush        33.24     33.24         0.00%     32.03              3.78%                                        15.03

Special Coating Application-Spray        33.74     33.74         0.00%     32.03              5.34%                                        15.03
Special Coating Application-
Spray Steel                              33.99     33.99         0.00%     32.03              6.12%                                        15.03
                                    $1.00
                                    above
                                    highest
                                    Journeyma
Foreman                             n
                                                                              11
                                                                                    Difference
 CARSON CITY                                                  Annual     2011 PW   Between PW
 Average Construction Wage                                   Growth,      Survey Rates and Survey    Union   Union % Non-Union % DETR Mean
 $24.30                                PW 2010    PW 2011   2010 - 2011 Average         Avg.          Y/N    Difference  Difference   Wages
Average                                                            8.32%                     6.53%                 5.57%        0.32%
                                                Not
                                                Surveyed
                                                Laborers
PILEDRIVER                                      Union                                                  Y
Piledriver-Journeyman                     58.47     58.47        0.00%
Piledriver-Foreman                        62.05     62.05        0.00%

                                   ADD
                                   ZONE
PLASTERER                          RATE      Washoe                                                    Y        1.71%
Plasterer-Journeyman                   34.27    34.77            1.46%     35.29           -1.47%
Plasterer-Foreman                      35.59    37.02            4.02%     35.29            4.90%

PLUMBER/PIPEFITTER                 -                                                                   Y        18.18%
Plumber-Journeyman                        45.20     45.20        0.00%     40.75           10.92%                                      29.66
Plumber-Foreman                           48.16     48.16        0.00%     40.75           18.18%                                      29.66
Plumber-General Foreman                   51.12     51.12        0.00%     40.75           25.45%                                      29.66

REFRIGERATION                                                                                          Y        4.52%
Refrigeration-Journeyman                  30.92     41.58       34.48%     39.78            4.52%                                      23.51

ROOFER (Does not include
sheet metal roofs)                 -                                                                   N                    0.00%
Roofer                                    18.88     20.45        8.32%     20.45            0.00%                                      25.31

                                   ADD
                                   ZONE
SHEET METAL WORKER                 RATE                                                                Y        12.21%
Sheet Metal-Journeyman                 46.60        48.35        3.76%     45.86            5.43%                                      35.73
Sheet Metal-Foreman                    49.62        51.46        3.71%     45.86           12.21%                                      35.73
Sheet Metal-General Foreman            52.64        54.57        3.67%     45.86           18.99%                                      35.73

SPRINKLER FITTER                                                                                       Y        3.29%
Sprinkler Fitter-Journeyman               34.52     53.45       54.84%     54.25           -1.47%
Sprinkler Fitter-Foreman                  34.52     56.20       62.80%     54.25            3.59%

Sprinkler Fitter-General Foreman          34.52     58.45       69.32%         12
                                                                           54.25            7.74%
                                                                                  Difference
 CARSON CITY                                                Annual     2011 PW   Between PW
 Average Construction Wage                                 Growth,      Survey Rates and Survey    Union   Union % Non-Union % DETR Mean
 $24.30                             PW 2010    PW 2011    2010 - 2011 Average         Avg.          Y/N    Difference  Difference   Wages
Average                                                          8.32%                     6.53%                 5.57%        0.32%

                                ADD
                                OPERATIN
                                G ENG.
                                ZONE
SURVEYOR                        RATE                                                                 Y        1.70%
Surveyor                            44.89         46.64        3.90%     45.86            1.70%                                      32.69

TAPER                           -                                                                    Y        1.23%
Taper                                  35.49      36.28        2.23%     35.84            1.23%

TILE SETTER/TERRAZZO            ADD
WORKER/MARBLE MASON-            ZONE
FINISHER                        RATE           Washoe                                                Y        1.02%
Tile, Terrazzo and Marble
Finisher                               32.48      24.77       -23.74%    24.52            1.02%

TILE SETTER/TERRAZZO
WORKER/MARBLE MASON                            Washoe                                                Y        4.15%
Tile Setter-Journeyman                 25.00     32.87        31.48%     33.64           -2.29%
Tile Setter-Foreman                    25.00     34.12        36.48%     33.64            1.43%
Tile Setter-General Foreman            25.00     35.87        43.48%     33.64            6.63%
Terrazzo/Marble Mason-
Journeyman                             25.00      34.37       37.48%     33.64            2.17%

Terrazzo/Marble Mason-Foreman          25.00      35.62       42.48%     33.64            5.89%
Terrazzo/Marble Mason-General
Foreman                                25.00      37.37       49.48%     33.64           11.09%

                                ADD
                                LABORER
                                ZONE
TRAFFIC BARRIER ERECTOR         RATE
Traffic Barrier Erector             30.82         30.82        0.00%

TRUCK DRIVER                                   Washoe                                                N                    0.00%
Truck Driver                           21.61      20.80        -3.75%        13
                                                                         20.80            0.00%                                      16.27
                                                                                     Difference
 CARSON CITY                                                   Annual     2011 PW   Between PW
 Average Construction Wage                                    Growth,      Survey Rates and Survey    Union   Union % Non-Union % DETR Mean
 $24.30                             PW 2010    PW 2011       2010 - 2011 Average         Avg.          Y/N    Difference  Difference   Wages
Average                                                             8.32%                     6.53%                 5.57%        0.32%

WELL DRILLER                                   Elko                                                     N                    0.00%
Well Driller                           21.32       54.49        155.58%     54.49            0.00%

                                   ADD
                                   OPERATIN
LUBRICATION AND SERVICE            G ENG.
ENGINEER (MOBILE AND               ZONE
GREASE RACK)                       RATE                                                                 Y        2.16%

Lubrication and Service Engineer
(mobile and grease rack)               46.10         47.85        3.80%     46.84            2.16%

SOIL TESTER (CERTIFIED)                        Nye                                                      Y        -0.30%
Soil Tester (Certified)                44.64         56.62       26.84%     56.79           -0.30%

SOILS AND MATERIALS
TESTER                                         Nye                                                      Y        -0.30%
Soils and Materials Tester             44.64         56.62       26.84%     56.79           -0.30%

Union Breakdown
Union                                                                                                  32
Non-Union                                                                                               6
Total                                                                                                  38




                                                                               14
DETR Mean
Wage + 40%    Wage
 Benefits    Premium
                65.30%




     33.00     17.58%
     33.00     25.92%
       -
       -
       -
       -
       -


       -

     29.89      -1.77%   15
DETR Mean
Wage + 40%    Wage
 Benefits    Premium
                65.30%
     29.89       8.60%

     29.89     16.63%
       -
       -
       -
       -
       -
       -
       -
       -
       -
       -
       -
       -
     41.99     20.95%
     41.99     30.00%
     41.99     30.00%
     41.99     39.05%
       -
       -

       -

       -
       -
       -
       -
       -



       -
       -
       -
       -
     29.32     23.96%    16
DETR Mean
Wage + 40%    Wage
 Benefits    Premium
                65.30%
     29.32      32.79%
       -
       -
       -
       -



       -
       -
       -


       -
       -
       -
       -


       -
       -
       -
       -
       -


       -
       -
       -
       -
       -

       -

       -
     28.14      -8.81%
     28.14      -3.48%   17
DETR Mean
Wage + 40%    Wage
 Benefits    Premium
                65.30%
     28.14       9.52%
     28.14      -0.68%
     28.14       9.88%
     28.14      10.41%
     28.14      11.30%
     28.14      15.74%
     28.14      12.37%
       -
     28.14     12.37%
     28.14     11.30%
     28.14     10.06%
     28.14     13.79%
       -


       -
       -
       -

       -
       -
       -
       -
       -

       -

       -
     23.03     87.06%
     23.03     99.04%
     23.03    101.35%
     23.03    102.52%
     23.03    105.73%
     23.03    107.03%
     23.03    107.77%
     23.03    108.86%
     23.03    111.42%    18
DETR Mean
Wage + 40%    Wage
 Benefits    Premium
                65.30%
     23.03     112.81%
     23.03     114.33%
     23.03     115.15%
     23.03     116.20%
     23.03     123.32%
     23.03     126.83%
     23.03     123.32%

       -

       -
       -

       -

       -
     25.03    133.22%
     25.03    108.57%
     25.03    100.74%
     25.03    127.19%
     25.03    107.57%
     25.03     99.90%
     25.03    122.24%
     25.03    106.70%
     25.03     99.03%
     25.03    105.38%
     25.03    115.32%
     25.03    110.93%

       -

       -
       -

       -

       -                 19
DETR Mean
Wage + 40%    Wage
 Benefits    Premium
                65.30%
     25.03     131.10%
     25.03     109.29%
     25.03     101.62%
     25.03     124.95%
     25.03     108.45%
     25.03     100.82%
     25.03     119.16%
     25.03     107.57%
     25.03      99.90%
     25.03     113.13%
     25.03     108.69%
     25.03     104.26%
     25.03     100.42%
     25.03      96.59%

       -

       -
       -
       -
     21.04     55.59%
     21.04     59.63%
     21.04     57.97%
     21.04     60.35%
     21.04     65.10%

     21.04     57.97%

     21.04     60.35%

     21.04     61.53%




       -
       -                 20
DETR Mean
Wage + 40%    Wage
 Benefits    Premium
                65.30%



       -
       -
       -
       -


       -
       -
       -
       -
       -
     41.52      8.85%
     41.52     15.98%
     41.52     23.11%
       -
       -
     32.91     26.33%
       -

       -
     35.43     -42.29%
       -


       -
     50.02      -3.34%
     50.02       2.87%
     50.02       9.09%
       -
       -
       -
       -

       -                 21
DETR Mean
Wage + 40%    Wage
 Benefits    Premium
                65.30%
       -




       -
     45.77      1.91%
       -
       -
       -
       -


       -

       -
       -

       -
       -
       -
       -

       -

       -

       -
       -



       -
       -
       -
       -
     22.78      -8.68%   22
DETR Mean
Wage + 40%    Wage
 Benefits    Premium
                65.30%




                         23
                                                      Annual    2011 PW Difference Between                                      DETR
 CHURCHILL                                           Growth,     Survey    PW Rates and       Union   Union %     Non-Union     Mean
 Average Construction Wage $21.44   PW 2010 PW 2011 2010 - 2011 Average     Survey Avg.        Y/N    Difference % Difference   Wages
Average                                                   3.09%                       4.56%                 5.07%      -2.28%

                                    ADD
                                    SHEET
                                    METAL
                                    ZONE
AIR BALANCE TECHNICIAN              RATE     CC                                                 Y        47.87%
Air Balance-Journeyman                 46.60    48.35         3.76%    34.80        38.94%
Air Balance-Foreman                    49.62    51.46         3.71%    34.80        47.87%
Air Balance-General Foreman            52.64    54.57         3.67%    34.80        56.81%

ALARM INSTALLER                                                                                 N                      0.00%
Alarm Installer                        25.69         26.77    4.20%    26.77         0.00%

BOILERMAKER                                    Clark                                            Y         1.87%
Boilermaker                            59.50       65.94     10.82%    64.73         1.87%

                                    ADD
                                    ZONE
BRICKLAYER                          RATE     Washoe                                             Y         8.21%
Bricklayer-Journeyman                  32.68    32.68         0.00%    31.51         3.71%
Bricklayer-Foreman                     33.93    33.93         0.00%    31.51         7.68%
Bricklayer-General Foreman             35.68    35.68         0.00%    31.51        13.23%

                                    ADD
                                    ZONE
CARPENTER                           RATE                                                        Y         6.56%
Carpenter-Journeyman                   38.30         38.80    1.31%    37.70         2.92%                                       19.72
Carpenter-Foreman                      41.05         41.55    1.22%    37.70        10.21%                                       19.72

CEMENT MASON                                                                                    N
Cement Mason-Journeyman                34.40         26.50   -22.97%   26.50         0.00%                                       25.82
Cement Mason-Foreman                   36.40         26.50   -27.20%   26.50         0.00%                                       25.82

ELECTRICIAN-COMMUNICATION                      Nye                                              Y         1.74%
Electrician-Communication
Technician-Installer                   27.97         27.50    -1.68%   27.03         1.74%
Electrician-Communication
Technician-Technician                  30.88         27.50   -10.95%   27.03
                                                                         24          1.74%
                                                           Annual    2011 PW Difference Between                                      DETR
  CHURCHILL                                               Growth,     Survey    PW Rates and       Union   Union %     Non-Union     Mean
  Average Construction Wage $21.44       PW 2010 PW 2011 2010 - 2011 Average     Survey Avg.        Y/N    Difference % Difference   Wages
Average                                                        3.09%                       4.56%                 5.07%      -2.28%
Electrician-Communication
Technician-Senior Technician               33.13      27.50    -16.99%   27.03            1.74%

ELECTRICIAN-LINE                     -                                                               Y         -2.23%
Electrician-Groundman                      39.19      40.50     3.34%    58.40           -30.65%
Electrician-Lineman                        57.91      59.90     3.44%    58.40             2.57%
Electrician-Foreman                        63.02      65.16     3.40%    58.40            11.58%
Electrician-General Foreman                68.12      70.45     3.42%    58.40            20.63%
Heavy Equipment Operator                   47.86      49.49     3.41%    58.40           -15.26%

ELECTRICIAN-NEON SIGN                -             Clark                                             Y         0.57%
Electrician-Neon Sign                      44.31       45.52    2.73%    45.26            0.57%

ELECTRICIAN-WIREMAN                                                                                  Y         9.63%
Wireman                                    47.69      50.78     6.48%    46.32            9.63%                                       25.80

ELEVATOR CONSTRUCTOR                 -                                                               Y        13.48%
Journeyman Mechanic                        46.01      78.21    69.98%    72.12            8.44%
Mechanic In Charge                         46.01      85.48    85.79%    72.12           18.52%

                                     ADD
                                     LABORE
                                     R ZONE
FENCE ERECTOR                        RATE                                                            N                      0.00%
Fence Erector                           30.82         43.19    40.14%    43.19            0.00%


                                                   Is Not
                                ADD                Surveyed
                                LABORE             Comes
FLAGPERSON (not surveyed set by R ZONE             From
Laborers Union every year)      RATE               Laborers
Flagperson                         27.95               27.95    0.00%

FLOOR COVERER                                                                                        Y         3.65%
Floor Coverer-Journeyman                   36.26      36.34     0.22%    36.31            0.08%
Floor Coverer-Foreman                      38.90      38.93     0.08%    36.31            7.22%
                                                                          25
                                                        Annual    2011 PW Difference Between                                      DETR
 CHURCHILL                                             Growth,     Survey    PW Rates and       Union   Union %     Non-Union     Mean
 Average Construction Wage $21.44     PW 2010 PW 2011 2010 - 2011 Average     Survey Avg.        Y/N    Difference % Difference   Wages
Average                                                     3.09%                       4.56%                 5.07%      -2.28%
GLAZIER                           -                                                               N                       2.28%
Glazier                                 21.50    21.50      0.00%    21.02             2.28%

                                  ADD
                                  LABORE
                                  R ZONE
HIGHWAY STRIPER                   RATE                                                            Y         0.00%
Highway Striper                      33.57       33.57      0.00%    33.57             0.00%


                                  ADD
HOD CARRIER-BRICK MASON           ZONE
TENDER                            RATE     Washoe                                                 N                    -25.11%
Brick Mason-Journeyman               30.10    15.00        -50.17%   20.03            -25.11%
Brick Mason-Foreman                  30.60    15.00        -50.98%   20.03            -25.11%

                                  ADD
HOD CARRIER-PLASTERER             ZONE
TENDER                            RATE     CC                                                     Y         3.81%
Plasterer Tender-Journeyman          33.76    34.26         1.48%    33.76             1.48%
Plasterer-Gun Tender                 34.76    35.26         1.44%    33.76             4.44%
Plasterer Tender-Foreman             35.12    35.62         1.42%    33.76             5.51%

                                  SEE
                                  AMENDM
IRON WORKER                       ENT 1                                                           Y         4.80%
Ironworker                           54.38       56.74      4.34%    57.31            -0.99%
Ironworker-Foreman                   57.68       60.04      4.09%    57.31             4.76%
Ironworker-General Foreman           61.04       63.40      3.87%    57.31            10.63%

                                  ADD
LABORER                           ZONE                                                            Y         1.19%
SEE GROUP CLASSIFICATIONS
Landscaper                              25.66    25.66      0.00%    30.03            -14.55%                                      16.86
Furniture Mover                         27.16    27.16      0.00%    30.03             -9.56%                                      16.86
Group 1                                 30.82    30.82      0.00%    30.03              2.63%                                      16.86
Group 1A                                27.95    27.95      0.00%    30.03             -6.93%                                      16.86
Group 2                                 30.92    30.92      0.00%    30.03
                                                                       26               2.96%                                      16.86
                                                             Annual    2011 PW Difference Between                                      DETR
 CHURCHILL                                                  Growth,     Survey    PW Rates and       Union   Union %     Non-Union     Mean
 Average Construction Wage $21.44   PW 2010 PW 2011        2010 - 2011 Average     Survey Avg.        Y/N    Difference % Difference   Wages
Average                                                          3.09%                       4.56%                 5.07%      -2.28%
Group 3                                31.07     31.07           0.00%    30.03              3.46%                                      16.86
Group 4                                31.32     31.32           0.00%    30.03              4.30%                                      16.86
Group 4A                               32.57     32.57           0.00%    30.03              8.46%                                      16.86
Group 5                                31.62     31.62           0.00%    30.03              5.29%                                      16.86
Group 6
Nozzlemen, Rodmen                      31.62     31.62          0.00%    30.03              5.29%                                       16.86
Gunman, Rodmen                         31.32     31.32          0.00%    30.03              4.30%                                       16.86
Reboundmen                             30.97     30.97          0.00%    30.03              3.13%                                       16.86
Gunite Foremen                         32.02     32.02          0.00%    30.03              6.63%                                       16.86

                                    SEE
                                    AMENDM
MECHANICAL INSULATOR                ENT 2-   CC (52 hrs)                                               Y         -0.08%
Mechanical Insulator-Mechanic          57.06     54.56         -4.38%    56.77              -3.89%
Mechanical Insulator-Foreman           59.56     57.06         -4.20%    56.77               0.51%
Mechanical Insulator-General
Foreman                                61.06     58.56         -4.09%    56.77              3.15%

MILLWRIGHT                                                                                             Y         7.19%
Millwright                             49.70     49.95          0.50%    46.60              7.19%

                                    ADD
OPERATING ENGINEER                  ZONE                                                               Y        11.57%
SEE GROUP CLASSIFICATIONS
Group 1                                41.33     43.08          4.23%    45.71             -5.75%                                       23.33
Group 1A                               44.09     45.84          3.97%    45.71              0.28%                                       23.33
Group 2                                44.62     46.37          3.92%    45.71              1.44%                                       23.33
Group 3                                44.89     46.64          3.90%    45.71              2.03%                                       23.33
Group 4                                45.63     47.38          3.84%    45.71              3.65%                                       23.33
Group 5                                45.93     47.68          3.81%    45.71              4.31%                                       23.33
Group 6                                46.10     47.85          3.80%    45.71              4.68%                                       23.33
Group 7                                46.35     48.10          3.78%    45.71              5.23%                                       23.33
Group 8                                46.94     48.69          3.73%    45.71              6.52%                                       23.33
Group 9                                47.26     49.01          3.70%    45.71              7.22%                                       23.33
Group 10                               47.61     49.36          3.68%    45.71              7.99%                                       23.33
Group 10A                              47.80     49.55          3.66%    45.71              8.40%                                       23.33
Group 11                               48.04     49.79          3.64%    45.71              8.93%                                       23.33
Group 11A                              49.68     51.43          3.52%    45.71
                                                                           27              12.51%                                       23.33
                                                             Annual    2011 PW Difference Between                                      DETR
 CHURCHILL                                                  Growth,     Survey    PW Rates and       Union   Union %     Non-Union     Mean
 Average Construction Wage $21.44          PW 2010 PW 2011 2010 - 2011 Average     Survey Avg.        Y/N    Difference % Difference   Wages
Average                                                          3.09%                       4.56%                 5.07%      -2.28%
Group 11B                                    50.49   52.24       3.47%    45.71             14.29%                                      23.33
Foreman                                      49.68   51.43       3.52%    45.71             12.51%                                      23.33

Add 7% to base rate for "Second" Shift -
Add 12.5% to base rate for "Special"
shift                                  -

OPERATING ENGINEER-STEEL
FABRICATOR & ERECTOR                   ADD
SEE GROUP CLASSIFICATIONS              ZONE
                                       RATE
Group 1                                   56.63       58.38      3.09%    45.71            27.72%                                       23.33
Group 1 Truck Crane Oiler                 50.46       52.21      3.47%    45.71            14.22%                                       23.33
Group 1 Oiler                             48.50       50.25      3.61%    45.71             9.93%                                       23.33
Group 2                                   55.12       56.87      3.17%    45.71            24.41%                                       23.33
Group 2 Truck Crane Oiler                 50.21       51.96      3.49%    45.71            13.67%                                       23.33
Group 2 Oiler                             48.29       50.04      3.62%    45.71             9.47%                                       23.33
Group 3                                   53.88       55.63      3.25%    45.71            21.70%                                       23.33
Group 3 Truck Crane Oiler                 49.99       51.74      3.50%    45.71            13.19%                                       23.33
Group 3 Oiler                             48.07       49.82      3.64%    45.71             8.99%                                       23.33
Group 3 Hydraulic                         49.66       51.41      3.52%    45.71            12.47%                                       23.33
Group 4                                   52.15       53.90      3.36%    45.71            17.92%                                       23.33
Group 5                                   51.05       52.80      3.43%    45.71            15.51%                                       23.33

Add 7% to base rate for "Second" Shift -
Add 12.5% to base rate for "Special"
Shift

OPERATING ENGINEER -                   ADD
PILEDRIVER                             ZONE
SEE GROUP CLASSIFICATIONS              RATE
Group 1                                   56.10       57.85      3.12%    45.71            26.56%                                       23.33
Group 1 Truck Crane Oiler                 50.64       52.39      3.46%    45.71            14.61%                                       23.33
Group 1 Oiler                             48.72       50.47      3.59%    45.71            10.41%                                       23.33
Group 2                                   54.56       56.31      3.21%    45.71            23.19%                                       23.33
Group 2 Truck Crane Oiler                 50.43       52.18      3.47%    45.71            14.15%                                       23.33
Group 2 Oiler                             48.52       50.27      3.61%    45.71             9.98%                                       23.33
Group 3                                   53.11       54.86      3.30%    45.71
                                                                            28             20.02%                                       23.33
                                                              Annual    2011 PW Difference Between                                      DETR
 CHURCHILL                                                   Growth,     Survey    PW Rates and       Union   Union %     Non-Union     Mean
 Average Construction Wage $21.44 PW 2010 PW 2011           2010 - 2011 Average     Survey Avg.        Y/N    Difference % Difference   Wages
Average                                                           3.09%                       4.56%                 5.07%      -2.28%
Group 3 Truck Crane Oiler           50.21   51.96                 3.49%    45.71             13.67%                                      23.33
Group 3 Oiler                       48.29   50.04                 3.62%    45.71              9.47%                                      23.33
Group 4                             51.60   53.35                 3.39%    45.71             16.71%                                      23.33
Group 5                             50.49   52.24                 3.47%    45.71             14.29%                                      23.33
Group 6                             49.38   51.13                 3.54%    45.71             11.86%                                      23.33
Group 7                             48.42   50.17                 3.61%    45.71              9.76%                                      23.33
Group 8                             47.46   49.21                 3.69%    45.71              7.66%                                      23.33
Add 7% to base for "Second" Shift -

Add 12.5% to base for "Special" Shift   -

PAINTER                                                                                                 Y         -0.19%
Brush/Roller Painter                        32.74   32.74        0.00%    33.69              -2.82%
Spray Painter/Paperhanger                   33.59   33.59        0.00%    33.69              -0.30%
Sandblaster                                 33.24   33.24        0.00%    33.69              -1.34%
Structural Steel & Steeplejack              33.74   33.74        0.00%    33.69               0.15%
Swing Stage                                 34.74   34.74        0.00%    33.69               3.12%
Special Coating Application-Brush           33.24   33.24        0.00%    33.69              -1.34%
Special Coating Application-Spray           33.74   33.74        0.00%    33.69               0.15%
Special Coating Application-Spray
Steel                                       33.99   33.99        0.00%    33.69              0.89%
                                        $1.00
                                        above
                                        highest
                                        Journeym
Foreman                                 an

PILEDRIVER                                                                                              Y
Piledriver-Journeyman                       58.47   58.47        0.00%
Piledriver-Foreman                          62.05   62.05        0.00%

                                        ADD
                                        ZONE
PLASTERER                               RATE     Washoe                                                 Y         -1.47%
Plasterer                                  34.27    34.77        1.46%    35.29              -1.47%

PLUMBER/PIPEFITTER                      -                                                               N                      0.00%
Plumber                                     32.38   32.38        0.00%    32.38
                                                                            29               0.00%
                                                           Annual    2011 PW Difference Between                                      DETR
 CHURCHILL                                                Growth,     Survey    PW Rates and       Union   Union %     Non-Union     Mean
 Average Construction Wage $21.44        PW 2010 PW 2011 2010 - 2011 Average     Survey Avg.        Y/N    Difference % Difference   Wages
Average                                                        3.09%                       4.56%                 5.07%      -2.28%

REFRIGERATION                        -             Lyon                                              N                      0.00%
Refrigeration                              27.55      29.40        6.72%    29.40         0.00%

ROOFER (Does not include sheet
metal roofs)                                                                                         N                      0.00%
Roofer                                     21.28        21.28      0.00%    21.28         0.00%

                                     ADD
                                     ZONE
SHEET METAL WORKER                   RATE                                                            Y         8.82%
Sheet Metal                             46.60           48.35      3.76%    44.43         8.82%

SPRINKLER FITTER                     -             CC                                                Y         3.29%
Sprinkler Fitter-Journeyman                26.00        53.45     105.58%   54.25         -1.47%
Sprinkler Fitter-Foreman                   26.00        56.20     116.15%   54.25          3.59%
Sprinkler Fitter-General Foreman           26.00        58.45     124.81%   54.25          7.74%

SURVEYOR                                                                                             N                      0.00%
Surveyor                                   42.14        25.63     -39.18%   25.63         0.00%

TAPER                                              Lyon (4 hrs)                                      Y         1.23%
Taper                                      35.49      36.28        2.23%    35.84         1.23%

                                     -ADD
TILE SETTER/TERRAZZO                 ZONE
WORKER/MARBLE MASON                  RATE     Washoe                                                 Y         1.59%
Tile, Terrazzo and Marble Finisher      32.48    24.77            -23.74%   24.52         1.02%
Tile Setter/Terrazzo Worker/Marble
Mason                                      35.99        34.37      -4.50%   33.64         2.17%      Y         2.17%

                                     ADD
                                     LABORE
                                     R ZONE Not
TRAFFIC BARRIER ERECTOR              RATE     Surveyed
Traffic Barrier Erector                 30.82    30.82             0.00%

TRUCK DRIVER                                                                 30
                                                     Annual    2011 PW Difference Between                                      DETR
  CHURCHILL                                         Growth,     Survey    PW Rates and       Union   Union %     Non-Union     Mean
  Average Construction Wage $21.44 PW 2010 PW 2011 2010 - 2011 Average     Survey Avg.        Y/N    Difference % Difference   Wages
Average                                                  3.09%                       4.56%                 5.07%      -2.28%
Dump Trucks (Single or Multiple Units
Including Semi's & Double Transfer Units),
Dumpcretes and Bulk Cement Spreader)                                                           N                      0.00%
Under 4 yds. (water level)              20.80 19.65     -5.53%    19.65              0.00%                                      15.90
4 yds. & under 8 yds. (water level)     20.80 19.65     -5.53%    19.65              0.00%                                      15.90
8 yds. & under 18 yds. (water level)    20.80 19.65     -5.53%    19.65              0.00%                                      15.90

18 yds. & under 25 yds. ( water level)   20.80   19.65   -5.53%   19.65             0.00%                                       15.90

25 yds. & under 60 yds. (water level)    20.80   19.65   -5.53%   19.65             0.00%                                       15.90

60 yds. & under 75 yds. (water level)    20.80   19.65   -5.53%   19.65             0.00%                                       15.90

75 yds. & under 100 yds. (water level)   20.80   19.65   -5.53%   19.65             0.00%                                       15.90

100 yds. & under 150 yds.(water level)   20.80   19.65   -5.53%   19.65             0.00%                                       15.90
150 yds. & under 250 yds. ( water
level)                                   20.80   19.65   -5.53%   19.65             0.00%                                       15.90
250 yds. & under 350 yds. (water
level)                                   20.80   19.65   -5.53%   19.65             0.00%                                       15.90
350 yds. & over (water level)            20.80   19.65   -5.53%   19.65             0.00%                                       15.90
Transit Mix
Under 8 yds.                             20.80   19.65   -5.53%   19.65             0.00%                                       15.90
8 yds. & including 12 yds.               20.80   19.65   -5.53%   19.65             0.00%                                       15.90
Over 12 yds.                             20.80   19.65   -5.53%   19.65             0.00%                                       15.90
Transit Mix (Using Boom)
Transit mix with boom shall receive
16 cents per hour
above the appropriate yardage
classification rate of pay
when such boom is used
Water & Jetting Trucks
Up to 2,500 gallons                      20.80   19.65   -5.53%   19.65             0.00%                                       15.90
2,500 gallons & over                     20.80   19.65   -5.53%   19.65             0.00%                                       15.90




                                                                   31
                                                         Annual    2011 PW Difference Between                                      DETR
 CHURCHILL                                              Growth,     Survey    PW Rates and       Union   Union %     Non-Union     Mean
 Average Construction Wage $21.44      PW 2010 PW 2011 2010 - 2011 Average     Survey Avg.        Y/N    Difference % Difference   Wages
Average                                                      3.09%                       4.56%                 5.07%      -2.28%

DW 20's & 21's & other similar Cat
type, Terry Cobra LeTourneau pulls,
Tournerocker, Euclid, & similar type
equipment when pulling Aqua/Pak,
Water Tank Trailers, & Fuel, and/or
Grease Tank Trailer, or other
miscellaneous Trailers, (except as
defined under "Dump Trucks")             20.80    19.65      -5.53%   19.65             0.00%                                       15.90
Heavy Duty Transport (High Bed)          20.80    19.65      -5.53%   19.65             0.00%                                       15.90
Heavy Duty Transport(Gooseneck low
bed)                                     20.80    19.65      -5.53%   19.65             0.00%                                       15.90
Tiltbed or Flatbed Pull Trailers         20.80    19.65      -5.53%   19.65             0.00%                                       15.90
Bootman, Comb. Bootman & Road
Oiler                                    20.80    19.65      -5.53%   19.65             0.00%                                       15.90
Flat Rack (2 or 3 axle unit)             20.80    19.65      -5.53%   19.65             0.00%                                       15.90
Bus & Manhaul Drivers
Up to 18,000 lbs. (single unit)          20.80    19.65      -5.53%   19.65             0.00%                                       15.90
18,000 lbs. & over (single unit)         20.80    19.65      -5.53%   19.65             0.00%                                       15.90
Helicopter Pilot (transporting
men/materials)                           20.80    19.65      -5.53%   19.65             0.00%                                       15.90
Lift Jitneys                             20.80    19.65      -5.53%   19.65             0.00%                                       15.90
Winch Truck & "A" Frame Drivers
Up to 18,000 lbs.                        20.80    19.65      -5.53%   19.65             0.00%                                       15.90
18,000 lbs. and over                     20.80    19.65      -5.53%   19.65             0.00%                                       15.90
Warehousemen Spotter                     20.80    19.65      -5.53%   19.65             0.00%                                       15.90
Warehouse Clerk                          20.80    19.65      -5.53%   19.65             0.00%                                       15.90
Tire Repairmen                           20.80    19.65      -5.53%   19.65             0.00%                                       15.90
Truck Repairmen                          20.80    19.65      -5.53%   19.65             0.00%                                       15.90
Pick Up Truck & Pilot Cars (Jobsite)     20.80    19.65      -5.53%   19.65             0.00%                                       15.90
Pick Up Truck & Pilot Cars (Over the
road)                                    20.80    19.65      -5.53%   19.65             0.00%                                       15.90
Truck Oil Greaser                        20.80    19.65      -5.53%   19.65             0.00%                                       15.90
Fuel Truck Driver                        20.80    19.65      -5.53%   19.65             0.00%                                       15.90
Fuel Man & Fuel Island Man               20.80    19.65      -5.53%   19.65             0.00%                                       15.90
Oil Tanker                               20.80    19.65      -5.53%   19.65             0.00%                                       15.90
Oil Tanker with Pup                      20.80    19.65      -5.53%   19.65             0.00%                                       15.90
Foreman:                                 21.30    20.15      -5.40%   20.15
                                                                        32              0.00%                                       15.90
                                                      Annual    2011 PW Difference Between                                      DETR
 CHURCHILL                                           Growth,     Survey    PW Rates and       Union   Union %     Non-Union     Mean
 Average Construction Wage $21.44   PW 2010 PW 2011 2010 - 2011 Average     Survey Avg.        Y/N    Difference % Difference   Wages
Average                                                   3.09%                       4.56%                 5.07%      -2.28%

WELL DRILLER                                  Pershing                                          N                      0.00%
Well Driller                          21.55       54.49     152.85%   54.49          0.00%

                                 ADD
                                 OPERATI
LUBRICATION AND SERVICE          NG
ENGINEER (MOBILE AND GREASE ENG.ZON
RACK)                            E RATE                                                         Y         2.16%
Lubrication and Service Engineer
(mobile and grease rack)            46.10           47.85    3.80%    46.84          2.16%

SOIL TESTER (CERTIFIED)                       Nye                                               Y         -0.30%
Soil Tester (Certified)               44.65         56.62   26.81%    56.79          -0.30%

SOILS AND MATERIALS TESTER                    Nye                                                         -0.30%
Soils and Materials Tester            44.65         56.62   26.81%    56.79          -0.30%

Union Breakdown
Union                                                                                          27
Non-Union                                                                                      11
Total                                                                                          38




                                                                       33
DETR Mean
Wage + 40%     Wage
 Benefits     Premium
                 23.43%




      27.61      40.54%
      27.61      50.50%
        -
        -
      36.15     -26.69%
      36.15     -26.69%
        -
        -

        -

        -                 34
DETR Mean
Wage + 40%     Wage
 Benefits     Premium
                 23.43%

        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
      36.12      40.59%
        -
        -
        -
        -
        -



        -
        -
        -




        -
        -
        -
        -
        -
        -
        -                 35
DETR Mean
Wage + 40%     Wage
 Benefits     Premium
                 23.43%
        -
        -
        -



        -
        -
        -
        -


        -
        -
        -
        -


        -
        -
        -
        -
        -


        -
        -
        -
        -
        -

        -
        -
      23.60       8.71%
      23.60      15.07%
      23.60      30.57%
      23.60      18.41%
      23.60      30.99%   36
DETR Mean
Wage + 40%     Wage
 Benefits     Premium
                 23.43%
      23.60      31.63%
      23.60      32.69%
      23.60      37.99%
      23.60      33.96%
        -
      23.60      33.96%
      23.60      32.69%
      23.60      31.21%
      23.60      35.65%
        -


        -
        -
        -

        -
        -
        -
        -
        -

        -
        -
      32.66      31.90%
      32.66      40.35%
      32.66      41.97%
      32.66      42.80%
      32.66      45.06%
      32.66      45.98%
      32.66      46.50%
      32.66      47.27%
      32.66      49.07%
      32.66      50.05%
      32.66      51.12%
      32.66      51.71%
      32.66      52.44%
      32.66      57.46%   37
DETR Mean
Wage + 40%     Wage
 Benefits     Premium
                 23.43%
      32.66      59.94%
      32.66      57.46%

        -

        -
        -

        -
        -
        -
      32.66      78.74%
      32.66      59.85%
      32.66      53.85%
      32.66      74.12%
      32.66      59.08%
      32.66      53.21%
      32.66      70.32%
      32.66      58.41%
      32.66      52.53%
      32.66      57.40%
      32.66      65.02%
      32.66      61.66%

        -

        -
        -

        -
        -
      32.66      77.12%
      32.66      60.40%
      32.66      54.52%
      32.66      72.40%
      32.66      59.76%
      32.66      53.91%
      32.66      67.96%   38
DETR Mean
Wage + 40%     Wage
 Benefits     Premium
                 23.43%
      32.66      59.08%
      32.66      53.21%
      32.66      63.34%
      32.66      59.94%
      32.66      56.54%
      32.66      53.60%
      32.66      50.66%
        -

        -
        -
        -
        -
        -
        -
        -
        -
        -
        -

        -




        -
        -
        -
        -
        -
        -


        -
        -
        -
        -
        -                 39
DETR Mean
Wage + 40%    Wage
 Benefits    Premium
                23.43%
        -
        -
        -
        -

        -
        -
        -


        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -


        -
        -

        -
        -



        -
        -
        -
        -                40
DETR Mean
Wage + 40%     Wage
 Benefits     Premium
                 23.43%


        -
      22.26     -11.73%
      22.26     -11.73%
      22.26     -11.73%

      22.26     -11.73%

      22.26     -11.73%

      22.26     -11.73%

      22.26     -11.73%

      22.26     -11.73%

      22.26     -11.73%

      22.26     -11.73%
      22.26     -11.73%
        -
      22.26     -11.73%
      22.26     -11.73%
      22.26     -11.73%
        -

        -

        -
        -
        -
      22.26     -11.73%
      22.26     -11.73%




                          41
DETR Mean
Wage + 40%     Wage
 Benefits     Premium
                 23.43%




      22.26     -11.73%
      22.26     -11.73%

      22.26     -11.73%
      22.26     -11.73%

      22.26     -11.73%
      22.26     -11.73%
        -
      22.26     -11.73%
      22.26     -11.73%

      22.26     -11.73%
      22.26     -11.73%
        -
      22.26     -11.73%
      22.26     -11.73%
      22.26     -11.73%
      22.26     -11.73%
      22.26     -11.73%
      22.26     -11.73%
      22.26     -11.73%

      22.26     -11.73%
      22.26     -11.73%
      22.26     -11.73%
      22.26     -11.73%
      22.26     -11.73%
      22.26     -11.73%
      22.26      -9.48%   42
DETR Mean
Wage + 40%    Wage
 Benefits    Premium
                23.43%
        -
        -
        -
        -




        -

        -
        -
        -
        -
        -
        -
        -




                         43
                                                                                Difference
                                                           Annual    2011 PW   Between PW                                      DETR
 CLARK                                                    Growth,     Survey Rates and Survey Union   Union % Non-Union % Mean
 Average Construction Wage $25.12        PW 2010 PW 2011 2010 - 2011 Average        Avg.       Y/N    Difference  Difference   Wages
Average                                                       2.35%                      6.23%              7.37%        0.38%

AIR BALANCE TECHNICIAN                   ADD                                                    Y        10.62%
Air Balance Technician-Journeyman          58.52    59.52     1.71%     57.83          2.92%
Air Balance Technician-Foreman             62.95    63.97     1.62%     57.83         10.62%
Air Balance Technician-General Foreman     67.37    68.42     1.56%     57.83         18.31%

ALARM INSTALLER                                                                                 Y        12.76%
Alarm Installer-Journeyman                 54.38    55.95     2.89%     49.62         12.76%                                   24.59

BOILERMAKER                                                                                     Y         1.87%
Boilermaker                                59.50    65.94    10.82%     64.73          1.87%

BRICKLAYER                               ADD                                                    Y        -7.78%
Bricklayer-Journeyman                      45.46    44.71     -1.65%    48.48          -7.78%                                  20.07

CARPENTER                                ADD                                                    Y         7.81%
Carpenter-Journeyman                       48.70    48.95     0.51%     47.88          2.23%                                   26.57
Carpenter-Welder                           49.70    49.95     0.50%     47.88          4.32%                                   26.57
Carpenter-Foreman                          51.83    52.08     0.48%     47.88          8.77%                                   26.57
Carpenter-General Foreman                  55.24    55.49     0.45%     47.88         15.89%                                   26.57

CEMENT MASON                             ADD                                                    Y         7.82%
Cement Mason-Journeyman                    46.28    46.28     0.00%     44.70          3.53%                                   22.63
Cement Mason-Foreman                       48.28    48.28     0.00%     44.70          8.01%                                   22.63
Cement Mason-General Foreman               50.03    50.03     0.00%     44.70         11.92%                                   22.63

ELECTRICIAN- COMMUNICATION               ADD                                                    Y         8.24%
Installer/Technician                       38.72    39.83     2.87%     50.87         -21.70%                                  25.33
Senior Installer/Technician                54.38    55.95     2.89%     50.87           9.99%                                  25.33
Installer/Technician Foreman               58.78    60.53     2.98%     50.87          18.99%                                  25.33
Installer/Technician General Foreman       63.18    63.93     1.19%     50.87          25.67%                                  25.33

ELECTRICIAN-
LINEMAN/GROUNDMAN/HEAVY
EQUIPMENT OPERATOR                                                                              Y         3.93%
Groundman                                  34.82    35.33     1.46%      48.56        -27.24%                                  29.85
Lineman                                    51.95    52.82     1.67%      48.56          8.77%                                  29.85
                                                                       44
                                                                                     Difference
                                                                Annual    2011 PW   Between PW                                      DETR
 CLARK                                                         Growth,     Survey Rates and Survey Union   Union % Non-Union % Mean
 Average Construction Wage $25.12        PW 2010 PW 2011      2010 - 2011 Average        Avg.       Y/N    Difference  Difference   Wages
Average                                                            2.35%                      6.23%              7.37%        0.38%
Foreman                                      56.89    57.86        1.71%     48.56           19.15%                                  29.85
General Foreman                              61.90    62.97        1.73%     48.56           29.67%                                  29.85
Heavy Equipment Operator                     42.69    43.37        1.59%     48.56          -10.69%                                  29.85

ELECTRICIAN-NEON SIGN                                                                                Y         0.57%
Electrician-Neon Sign                        44.31    45.52       2.73%    45.26            0.57%

ELECTRICIAN-WIREMAN                      ADD                                                         Y         9.33%
Wireman-Journeyman                         54.74      56.31       2.87%    54.73            2.89%                                    30.01
Wireman-Cable Splicer                      55.25      56.83       2.86%    54.73            3.84%                                    30.01
Wireman-Foreman                            59.18      60.84       2.81%    54.73           11.16%                                    30.01
Wireman-General Foreman                    63.62      65.37       2.75%    54.73           19.44%                                    30.01

ELEVATOR CONSTRUCTOR                     -                                                           Y         1.86%
Elevator Constructor-Journeyman Mechanic     46.01    64.58      40.36%    66.35           -2.67%
Elevator Constructor-Mechanic In Charge      46.01    70.59      53.42%    66.35            6.39%

FENCE ERECTOR                            -                                                           N                   0.00%
Fence Erector                                16.97    17.46       2.89%    17.46            0.00%                                    15.37

FLAGPERSON (not surveyed set by          ADD      Not
Laborers Union every year)               LABORE Surveyed
Flagperson                                  41.44     41.44       0.00%

FLOOR COVERER                                                                                        Y         4.01%
Floor Coverer-Joureyman                      41.83    42.40       1.36%    43.13           -1.69%                                    23.63
Floor Coverer-Foreman                        46.76    47.32       1.20%    43.13            9.71%                                    23.63

GLAZIER                                  -                                                           Y        17.91%
Glazier-Journeyman                           54.72    57.51       5.10%    50.55           13.77%                                    28.10
Glazier-Foreman                              58.81    61.70       4.91%    50.55           22.06%                                    28.10

HIGHWAY STRIPER                          -                                                           N                   0.00%
Highway Striper                              24.34    30.81      26.58%    30.81            0.00%

HOD CARRIER-BRICK MASON TENDER           ADD                                                         Y         3.09%
Brick Mason                                43.31      43.31       0.00%     42.01           3.09%
                                                                          45
                                                                                 Difference
                                                            Annual    2011 PW   Between PW                                      DETR
 CLARK                                                     Growth,     Survey Rates and Survey Union   Union % Non-Union % Mean
 Average Construction Wage $25.12         PW 2010 PW 2011 2010 - 2011 Average        Avg.       Y/N    Difference  Difference   Wages
Average                                                        2.35%                      6.23%              7.37%        0.38%

HOD CARRIER-PLASTERER TENDER              ADD                                                    Y         3.76%
Plasterer Tender-Journeyman                 44.34     44.34    0.00%    44.34           0.00%
Plasterer Tender-Foreman                    46.34     46.34    0.00%    44.34           4.51%
Plasterer Tender-General Foreman            47.34     47.34    0.00%    44.34           6.77%

IRON WORKER                               SEE                                                    Y         4.96%
Ironworker-Journeyman                        54.38    56.74    4.34%    57.22          -0.84%                                   26.25
Ironworker-Foreman                           57.68    60.04    4.09%    57.22           4.93%                                   26.25
Ironworker-General Foreman                   61.04    63.40    3.87%    57.22          10.80%                                   26.25

LABORER
SEE GROUP CLASSIFICATIONS                  ADD                                                   Y         4.76%
Group 1                                       42.94   42.94    0.00%    42.47           1.11%                                   19.15
Group 2                                       43.15   43.15    0.00%    42.47           1.60%                                   19.15
Group 3                                       43.25   43.25    0.00%    42.47           1.84%                                   19.15
Group 4                                       43.34   43.34    0.00%    42.47           2.05%                                   19.15
Group 5                                       43.44   43.44    0.00%    42.47           2.28%                                   19.15
Group 6A                                      46.10   46.10    0.00%    42.47           8.55%                                   19.15
Group 6B                                      45.60   45.60    0.00%    42.47           7.37%                                   19.15
Group 6C                                      45.35   45.35    0.00%    42.47           6.78%                                   19.15
Group 6D                                      45.96   45.96    0.00%    42.47           8.22%                                   19.15
Group 6E                                      45.60   45.60    0.00%    42.47           7.37%                                   19.15
Group 7                                       44.67   44.67    0.00%    42.47           5.18%                                   19.15
Foreman $2.00 above highest paid journeyman
General Foreman $3.00 above highest paid foreman

MECHANICAL INSULATOR                                                                             Y         7.77%
Mechanical Insulator-Journeyman              55.63    56.23    1.08%    55.23           1.81%                                   21.42
Mechanical Insulator-Foreman                 58.99    59.52    0.90%    55.23           7.77%                                   21.42
Mechanical Insulator-General Foreman         62.36    62.81    0.72%    55.23          13.72%                                   21.42

MILLWRIGHT                                                                                       Y        11.55%
Millwright-Journeyman                        49.70    49.95    0.50%     47.30          5.60%                                   31.07
Millwright-Welder                            50.70    50.95    0.49%     47.30          7.72%                                   31.07
Millwright-Foreman                           53.01    53.26    0.47%     47.30         12.60%                                   31.07
Millwright-General Foreman                   56.65    56.90    0.44%     47.30         20.30%                                   31.07
                                                                       46
                                                                                 Difference
                                                            Annual    2011 PW   Between PW                                      DETR
 CLARK                                                     Growth,     Survey Rates and Survey Union   Union % Non-Union % Mean
 Average Construction Wage $25.12         PW 2010 PW 2011 2010 - 2011 Average        Avg.       Y/N    Difference  Difference   Wages
Average                                                        2.35%                      6.23%              7.37%        0.38%

OPERATING ENGINEER                                                                               Y         5.73%
SEE GROUP CLASSIFICATIONS                 ADD
Group 1                                     53.92    55.67     3.25%    56.66           -1.75%                                  29.23
Group 2                                     54.87    56.62     3.19%    56.66           -0.07%                                  29.23
Group 3                                     55.16    56.91     3.17%    56.66            0.44%                                  29.23
Group 4                                     56.65    58.40     3.09%    56.66            3.07%                                  29.23
Group 5                                     57.75    59.50     3.03%    56.66            5.01%                                  29.23
Group 6                                     56.87    58.62     3.08%    56.66            3.46%                                  29.23
Group 7                                     57.97    59.72     3.02%    56.66            5.40%                                  29.23
Group 8                                     56.98    58.73     3.07%    56.66            3.65%                                  29.23
Group 9                                     58.08    59.83     3.01%    56.66            5.59%                                  29.23
Group 10                                    57.10    58.85     3.06%    56.66            3.87%                                  29.23
Group 11                                    58.20    59.95     3.01%    56.66            5.81%                                  29.23
Group 12                                    57.27    59.02     3.06%    56.66            4.17%                                  29.23
Group 13                                    57.37    59.12     3.05%    56.66            4.34%                                  29.23
Group 14                                    57.40    59.15     3.05%    56.66            4.39%                                  29.23
Group 15                                    57.48    59.23     3.04%    56.66            4.54%                                  29.23
Group 16                                    57.60    59.35     3.04%    56.66            4.75%                                  29.23
Group 17                                    57.77    59.52     3.03%    56.66            5.05%                                  29.23
Group 18                                    57.87    59.62     3.02%    56.66            5.22%                                  29.23
Group 19                                    57.98    59.73     3.02%    56.66            5.42%                                  29.23
Group 20                                    58.10    59.85     3.01%    56.66            5.63%                                  29.23
Group 21                                    58.27    60.02     3.00%    56.66            5.93%                                  29.23
Group 22                                    58.37    60.12     3.00%    56.66            6.11%                                  29.23
Group 23                                    58.48    60.23     2.99%    56.66            6.30%                                  29.23
Group 24                                    58.60    60.35     2.99%    56.66            6.51%                                  29.23
Group 25                                    58.77    60.52     2.98%    56.66            6.81%                                  29.23
Add $.50 per hour for "Special" Shift
Add $1.00 per hour for "Multiple" Shift

OPERATING ENGINEER:
CRANES, PILEDRIVING, & HOISTING
EQUIPMENT
SEE GROUP CLASSIFICATIONS                 ADD
Group 1
Engineer Oiler                              57.60    59.35     3.04%     56.66          4.75%                                   29.23
                                                                       47
                                                                                    Difference
                                                               Annual    2011 PW   Between PW                                      DETR
  CLARK                                                       Growth,     Survey Rates and Survey Union   Union % Non-Union % Mean
  Average Construction Wage $25.12           PW 2010 PW 2011 2010 - 2011 Average        Avg.       Y/N    Difference  Difference   Wages
Average                                                           2.35%                      6.23%              7.37%        0.38%
Forklift Operator                              56.51   58.26      3.10%     56.66            2.82%                                  29.23
Group 2
Truck Crane Oiler                              57.60    59.35     3.04%    56.66           4.75%                                    29.23
Group 3
A-Frame or Winch Truck Operator                56.51    58.26     3.10%    56.66           2.82%                                    29.23
Ross Carrier Operator (Jobsite)                56.51    58.26     3.10%    56.66           2.82%                                    29.23
Group 4
Bridge-Type Unloader and Turntable             56.65    58.40     3.09%    56.66           3.07%                                    29.23
Helicopter Hoist Operator                      56.65    58.40     3.09%    56.66           3.07%                                    29.23
Group 5
Hydraulic Boom Truck (Pitman)                  56.87    58.62     3.08%    56.66           3.46%                                    29.23
Stinger Crane (Austin-Western or Similar       56.87    58.62     3.08%    56.66           3.46%                                    29.23
Tugger Hoist Operator (1 Drum)                 56.87    58.62     3.08%    56.66           3.46%                                    29.23
Group 6
Bridge Crane Operator                          56.98    58.73     3.07%    56.66           3.65%                                    29.23
Cretor Crane Operator                          56.98    58.73     3.07%    56.66           3.65%                                    29.23
Hoist Operator (Chicago Boom and Similar       56.98    58.73     3.07%    56.66           3.65%                                    29.23
Lift Mobile Operator                           56.98    58.73     3.07%    56.66           3.65%                                    29.23
Lift Slab Machine Operator (Vagtborg and
Similar Types)                                 56.98    58.73     3.07%    56.66           3.65%                                    29.23
Material Hoist/Manlift Operator                56.98    58.73     3.07%    56.66           3.65%                                    29.23
Polar Gantry Crane Operator                    56.98    58.73     3.07%    56.66           3.65%                                    29.23
Self Climbing Scaffold (or Similar Type)       56.98    58.73     3.07%    56.66           3.65%                                    29.23
Shovel, Backhoe, Dragline, Clamshell
Operator (Over 3/4 YD. and up to 5 CU.
YDS. M.R.C.)                                   56.98    58.73     3.07%    56.66           3.65%                                    29.23
Silent Piler                                   56.98    58.73     3.07%    56.66           3.65%                                    29.23
Tugger Hoist Operator (2 Drum)                 56.98    58.73     3.07%    56.66           3.65%                                    29.23
Group 7
Pedestal Crane Operator                        57.10    58.85     3.06%    56.66           3.87%                                    29.23
Shovel, Backhoe, Dragline, Clamshell
Operator (over 5 CU. YDS. M.R.C.)              57.10    58.85     3.06%    56.66           3.87%                                    29.23
Tower Crane Repairman                          57.10    58.85     3.06%    56.66           3.87%                                    29.23
Tugger Hoist Operator (3 Drum)                 57.10    58.85     3.06%    56.66           3.87%                                    29.23
Group 8
Crane Operator (up to and including 25 ton
capacity)                                      59.07    60.82     2.96%     56.66          7.34%                                    29.23
                                                                          48
                                                                                     Difference
                                                                Annual    2011 PW   Between PW                                      DETR
  CLARK                                                        Growth,     Survey Rates and Survey Union   Union % Non-Union % Mean
  Average Construction Wage $25.12            PW 2010 PW 2011 2010 - 2011 Average        Avg.       Y/N    Difference  Difference   Wages
Average                                                            2.35%                      6.23%              7.37%        0.38%
Crawler Transporter Operator                    57.27   59.02      3.06%     56.66            4.17%                                  29.23
Derrick Barge Operator (up to and including
25 ton capacity)                                57.27    59.02     3.06%    56.66           4.17%                                    29.23
Hoist Operator, Stiff Legs, Guy Derrick or
Similar Type (up to and including 25 ton
capacity)                                       57.27    59.02     3.06%    56.66           4.17%                                    29.23
Shovel, Backhoe, Dragline, Clamshell
Operator (over 7 CU. YDS. M.R.C.)               57.27    59.02     3.06%    56.66           4.17%                                    29.23
Group 9
Crane Operator (over 25 tons up to and
including 50 tons M.R.C.)                       59.07    60.82     2.96%    56.66           7.34%                                    29.23
Derrick Barge Operator (over 25 tons, up to
and including 50 tons M.R.C.)                   57.44    59.19     3.05%    56.66           4.47%                                    29.23
Highline Cableway Operator                      57.44    59.19     3.05%    56.66           4.47%                                    29.23
Hoise Operator, Stiff Legs, Guy Derrick or
Similar Type (over 25 tons, up to and
including 50 tons M.R.C.)                       57.44    59.19     3.05%    56.66           4.47%                                    29.23
K-Crane                                         57.44    59.19     3.05%    56.66           4.47%                                    29.23
Polar Crane Operator                            57.44    59.19     3.05%    56.66           4.47%                                    29.23
Self Erecting Tower Crane Operator
Maximum Lifting Capacity Ten (10) Tons.
One (1) Ton Operator).                          57.44    59.19     3.05%    56.66           4.47%                                    29.23
Group 10
Crane Operator (over 50 tons, up to and
including 100 tons M.R.C.)                      60.49    62.24     2.89%    56.66           9.85%                                    29.23
Derrick Barge Operator (over 50 tons, up to
and including 100 tons M.R.C.)                  58.44    60.19     2.99%    56.66           6.23%                                    29.23
Hoist Operator, Stiff Legs, Guy Derrick or
Similar Type (over 50 tons, up to and
including 100 tons M.R.C.)                      58.44    60.19     2.99%    56.66           6.23%                                    29.23

Mobile Tower Crane Operator (over 50
tons, up to and including 100 tons M.R.C.)      60.49    62.24     2.89%    56.66           9.85%                                    29.23
Group 11
Crane Operator (over 100 tons, up to and
including 200 tons M.R.C.)                      60.99    62.24     2.05%    56.66           9.85%                                    29.23
                                                                           49
                                                                                    Difference
                                                               Annual    2011 PW   Between PW                                      DETR
  CLARK                                                       Growth,     Survey Rates and Survey Union   Union % Non-Union % Mean
  Average Construction Wage $25.12           PW 2010 PW 2011 2010 - 2011 Average        Avg.       Y/N    Difference  Difference   Wages
Average                                                           2.35%                      6.23%              7.37%        0.38%
Derrick Barge Operator (over 100 tons, up
to and including 200 tons M.R.C.)                59.44   61.19    2.94%    56.66           8.00%                                   29.23
Hoist Operator, Stiff Legs, Guy Derrick or
Similar Type (over100 tons, up to and
including 200 tons M.R.C.)                       59.44   61.19    2.94%    56.66           8.00%                                   29.23

Mobile Tower Crane Operator (over 100
tons, up to and including 200 tons M.R.C.)       60.99   62.74    2.87%    56.66          10.73%                                   29.23
Tower Crane Operator and Tower Gantry            61.44   63.19    2.85%    56.66          11.52%                                   29.23
Group 12
Crane Operator (over 200 tons up to and
including 300 tons M.R.C.)                       63.63   65.38    2.75%    56.66          15.39%                                   29.23
Derrick Barge Operator (over 200 tons up
to and including 300 tons M.R.C.)                60.44   62.19    2.90%    56.66           9.76%                                   29.23
Hoist Operator, Stiff Legs, Guy Derrick or
Similar Type (over 200 tons up to and
including 300 tons M.R.C.)                       60.44   62.19    2.90%    56.66           9.76%                                   29.23
Mobile Tower Crane Operator (over 200
tons up to and including 300 tons M.R.C.)        63.63   65.38    2.75%    56.66          15.39%                                   29.23
Group 13
Crane Operator (over 300 tons)                   65.00   66.75    2.69%    56.66          17.81%                                   29.23
Derrick Barge Operator (over 300 tons)           61.44   63.19    2.85%    56.66          11.52%                                   29.23
Helicopter Pilot                                 61.44   63.19    2.85%    56.66          11.52%                                   29.23
Hoist Operator, Stiff Legs, Guy Derrick or
Similar Type (over 300 tons)                     61.44   63.19    2.85%    56.66          11.52%                                   29.23
Mobile Tower Crane Operator (over 300            65.00   66.75    2.69%    56.66          17.81%                                   29.23
Add $ .50 per hour for "Special" Shift       -
Add $1.00 per hour for "Multiple" Shift      -


OPERATING ENGINEER-SURVEYOR                                                                         Y        12.75%

SEE GROUP CLASSIFICATIONS                    ADD
Group 1                                        55.84     57.59    3.13%     52.34         10.03%                                   29.70
Group 2                                        56.65     58.40    3.09%     52.34         11.58%                                   29.70
Group 3                                        56.87     58.62    3.08%     52.34         12.00%                                   29.70
Group 4                                        57.15     58.90    3.06%     52.34         12.53%                                   29.70
                                                                          50
                                                                              Difference
                                                         Annual    2011 PW   Between PW                                      DETR
 CLARK                                                  Growth,     Survey Rates and Survey Union   Union % Non-Union % Mean
 Average Construction Wage $25.12    PW 2010 PW 2011   2010 - 2011 Average        Avg.       Y/N    Difference  Difference   Wages
Average                                                     2.35%                      6.23%              7.37%        0.38%
Group 5                                57.27   59.02        3.06%     52.34           12.76%                                  29.70
Group 6                                57.37   59.12        3.05%     52.34           12.95%                                  29.70
Group 7                                57.40   59.15        3.05%     52.34           13.01%                                  29.70
Group 8                                57.77   59.52        3.03%     52.34           13.72%                                  29.70
Group 9                                57.90   59.65        3.02%     52.34           13.97%                                  29.70
Group 10                               58.40   60.15        3.00%     52.34           14.92%                                  29.70


OPERATING ENGINEER -TUNNEL                                                                    Y         4.04%
SEE GROUP CLASSIFICATIONS            ADD
Group 1                                55.77   57.52       3.14%    56.66            1.52%                                    29.23
Group 2                                56.72   58.47       3.09%    56.66            3.19%                                    29.23
Group 3                                57.01   58.76       3.07%    56.66            3.71%                                    29.23
Group 4                                57.15   58.90       3.06%    56.66            3.95%                                    29.23
Group 5                                57.37   59.12       3.05%    56.66            4.34%                                    29.23
Group 6                                57.48   59.23       3.04%    56.66            4.54%                                    29.23
Group 7                                57.60   59.35       3.04%    56.66            4.75%                                    29.23
Group 8                                57.77   59.52       3.03%    56.66            5.05%                                    29.23
Group 9                                57.90   59.65       3.02%    56.66            5.28%                                    29.23

PAINTER                                                                                       Y         3.72%
Painter-Journeyman                     46.23   46.64       0.89%    46.47            0.37%                                    24.37
Painter-Foreman                        49.35   49.76       0.83%    46.47            7.08%                                    24.37

PILEDRIVER                                                                                    Y
Driverman, Rigman, Bridge and Dock     58.47   58.47       0.00%
Certified Welder                       58.47   58.47       0.00%
Piledriver-Foreman                     62.05   58.47      -5.77%
Diver-Diving (wet pay)                 58.47   58.47       0.00%
Stand-By Diver                         58.47   58.47       0.00%
Tender                                 58.47   58.47       0.00%

PLASTERER                            ADD                                                      Y         4.89%
Plasterer-Journeyman                   44.69   44.69       0.00%    44.75           -0.13%
Plasterer-Foreman                      47.19   47.19       0.00%    44.75            5.45%
Plasterer-General Foreman              48.94   48.94       0.00%    44.75            9.36%
                                                                   51
                                                                                Difference
                                                           Annual    2011 PW   Between PW                                      DETR
  CLARK                                                   Growth,     Survey Rates and Survey Union   Union % Non-Union % Mean
  Average Construction Wage $25.12       PW 2010 PW 2011 2010 - 2011 Average        Avg.       Y/N    Difference  Difference   Wages
Average                                                       2.35%                      6.23%              7.37%        0.38%
PLUMBER/PIPEFITTER                      -                                                       Y           8.42%
Plumber/Pipefitter-Journeyman              56.02   56.52      0.89%     55.69            1.49%                                  28.35
Plumber-Foreman                            59.83   60.38      0.92%     55.69            8.42%                                  28.35
Plumber-General Foreman                    63.65   64.23      0.91%     55.69           15.33%                                  28.35

REFRIGERATION                                                                                   N                       0.00%
Refrigeration-Journeyman                    36.24    35.17   -2.95%    35.17           0.00%                                    21.28
Refrigeration-Foreman                       36.24    35.17   -2.95%    35.17           0.00%                                    21.28
Refrigeration-General Foreman               36.24    35.17   -2.95%    35.17           0.00%                                    21.28

ROOFER                                  -                                                       Y         8.20%
(Does not include sheet metal roofs)
Roofer-Journeyman                           31.83    31.91    0.25%    31.78           0.41%                                    18.62
Roofer-Foreman                              36.25    36.86    1.68%    31.78          15.98%                                    18.62

SHEET METAL WORKER                      ADD                                                     Y         8.98%
Sheet Metal-Journeyman                    58.52      59.52    1.71%    58.70           1.40%                                    34.86
Sheet Metal-Foreman                       62.95      63.97    1.62%    58.70           8.98%                                    34.86
Sheet Metal-General Foreman               67.37      68.42    1.56%    58.70          16.56%                                    34.86

SPRINKLER FITTER                                                                                Y        12.65%
Sprinkler Fitter-Journeyman                 55.15    56.30    2.09%    52.27           7.71%
Sprinkler Fitter-Foreman                    57.90    59.05    1.99%    52.27          12.97%
Sprinkler Fitter-General Foreman            60.15    61.30    1.91%    52.27          17.28%


TAPER                                                                                           Y         -1.50%
Taper                                       46.23    46.64    0.89%    47.35          -1.50%                                    21.03

TILE SETTER/TERRAZZO                      ADD
WORKER/MARBLE MASON                       ZONE                                                  Y         7.96%
Tile Setter/Terrazzo Worker/Marble Mason-    32.48   34.63    6.62%    36.35          -4.73%                                    23.56
Tile Setter                                  43.61   46.66    6.99%    36.35          28.36%                                    20.42
Terrazzo Worker/Marble Mason                 46.04   49.29    7.06%    49.17           0.24%                                    23.56


TRAFFIC BARRIER ERECTOR                 ADD
                                                                      52
                                                                                  Difference
                                                             Annual    2011 PW   Between PW                                      DETR
  CLARK                                                     Growth,     Survey Rates and Survey Union   Union % Non-Union % Mean
  Average Construction Wage $25.12         PW 2010 PW 2011 2010 - 2011 Average        Avg.       Y/N    Difference  Difference   Wages
Average                                                         2.35%                      6.23%              7.37%        0.38%
Traffic Barrier Erector                       42.94  42.94      0.00%

TRUCK DRIVER                                                                                      Y        -0.68%
SEE GROUP CLASSIFICATIONS                  ADD
Group 1                                       46.13     46.13    0.00%     46.96         -1.77%                                  22.45
Group 2                                       46.23     46.23    0.00%     46.96         -1.55%                                  22.45
Group 3                                       46.44     46.44    0.00%     46.96         -1.11%                                  22.45
Group 4                                       46.62     46.62    0.00%     46.96         -0.72%                                  22.45
Group 5                                       46.82     46.82    0.00%     46.96         -0.30%                                  22.45
Group 6                                       47.12     47.12    0.00%     46.96          0.34%                                  22.45
Foreman $1.00 above highest paid
journeyman supervised.                         48.12    48.12    0.00%     47.96         0.33%                                   23.45

                                           ADD      Esmerald
WELL DRILLER                               OPERATI a                                              N                      1.52%
Well Driller                                  56.87    19.42    -65.85%    19.42         0.00%

Equipment Greaser                                                                                 Y         2.61%
                                           ADD
EQUIPMENT GREASER (RACK)                   OPERATI
Equipment Greaser (rack)                      55.16     56.91    3.17%     56.79         0.21%

EQUIPMENT GREASER (GREASE                  ADD
TRUCK)                                     OPERATI
Equipment Greaser (grease truck)              56.65     58.40    3.09%     56.79         2.84%

EQUIPMENT GREASER (GREASE                    ADD
TRUCK/MULTI-SHIFT)                           OPERATI
Equipment Greaser (grease truck/multi-shift)    57.75   59.50    3.03%     56.79         4.77%

TUNNEL, EQUIPMENT GREASER                  ADD
(GREASE TRUCK)                             OPERATI
Tunnel, Equipment Greaser (grease truck)      57.37     59.12    3.05%     56.79         4.10%

                                           ADD
FIELD SOILS AND MATERIAL TESTER            OPERATI                                                Y        28.95%
Field Soils and Material Tester               54.87     56.62    3.19%      43.91       28.95%
                                                                          53
                                                                                  Difference
                                                             Annual    2011 PW   Between PW                                      DETR
 CLARK                                                      Growth,     Survey Rates and Survey Union   Union % Non-Union % Mean
 Average Construction Wage $25.12          PW 2010 PW 2011 2010 - 2011 Average        Avg.       Y/N    Difference  Difference   Wages
Average                                                         2.35%                      6.23%              7.37%        0.38%

FIELD ASPHALTIC CONCRETE (SOILS              ADD
AND MATERIAL TESTER)                         OPERATI
Field Asphaltic Concrete (soils and material    54.87   56.62   3.19%    43.91             28.95%          28.95%

Union Breakdown
Union                                                                                 34
Non-Union                                                                              4
Total                                                                                 38




                                                                        54
DETR Mean
Wage + 40%      Wage
 Benefits      Premium
                   45.75%




       34.43      62.52%
         -
         -
         -
         -
         -
       28.10      59.12%
         -
         -
       37.20      31.59%
       37.20      34.28%
       37.20      40.01%
       37.20      49.17%
         -
         -
       31.68      46.08%
       31.68      52.39%
       31.68      57.91%
         -
         -
       35.46      12.32%
       35.46      57.77%
       35.46      70.69%
       35.46      80.28%
         -


         -
       41.79      -15.46%
       41.79       26.39%
                            55
DETR Mean
Wage + 40%      Wage
 Benefits      Premium
                   45.75%
       41.79       38.45%
       41.79       50.68%
       41.79        3.78%
         -
         -
         -
         -
         -
       42.01      -5.20%
       42.01      33.17%
       42.01      44.07%
       42.01      52.16%
         -
         -
         -
         -
         -
         -
       21.52      -18.86%
         -

         -
         -
         -
         -
       33.08      28.17%
       33.08      43.04%
         -
         -
       39.34      46.19%
       39.34      56.84%
         -
         -
         -
         -
         -
         -
                            56
DETR Mean
Wage + 40%      Wage
 Benefits      Premium
                   45.75%
         -
         -
         -
         -
         -
         -
         -
       36.75      54.39%
       36.75      63.37%
       36.75      72.52%
         -
         -
         -
       26.81      60.16%
       26.81      60.95%
       26.81      61.32%
       26.81      61.66%
       26.81      62.03%
       26.81      71.95%
       26.81      70.09%
       26.81      69.15%
       26.81      71.43%
       26.81      70.09%
       26.81      66.62%
         -
         -
         -
         -
       29.99      87.51%
       29.99      98.48%
       29.99     109.45%
         -
         -
       43.50      14.83%
       43.50      17.13%
       43.50      22.44%
       43.50      30.81%
                            57
DETR Mean
Wage + 40%      Wage
 Benefits      Premium
                   45.75%
         -
         -
         -
       40.92      36.04%
       40.92      38.36%
       40.92      39.07%
       40.92      42.71%
       40.92      45.40%
       40.92      43.25%
       40.92      45.94%
       40.92      43.52%
       40.92      46.20%
       40.92      43.81%
       40.92      46.50%
       40.92      44.23%
       40.92      44.47%
       40.92      44.54%
       40.92      44.74%
       40.92      45.03%
       40.92      45.45%
       40.92      45.69%
       40.92      45.96%
       40.92      46.25%
       40.92      46.67%
       40.92      46.91%
       40.92      47.18%
       40.92      47.48%
       40.92      47.89%
         -
         -
         -
         -

         -
         -
         -
       40.92      45.03%
                            58
DETR Mean
Wage + 40%      Wage
 Benefits      Premium
                   45.75%
       40.92       42.37%
         -
       40.92      45.03%
         -
       40.92      42.37%
       40.92      42.37%
         -
       40.92      42.71%
       40.92      42.71%
         -
       40.92      43.25%
       40.92      43.25%
       40.92      43.25%
         -
       40.92      43.52%
       40.92      43.52%
       40.92      43.52%
       40.92      43.52%

       40.92      43.52%
       40.92      43.52%
       40.92      43.52%
       40.92      43.52%


       40.92      43.52%
       40.92      43.52%
       40.92      43.52%
         -
       40.92      43.81%

       40.92      43.81%
       40.92      43.81%
       40.92      43.81%
         -

       40.92      48.62%
                            59
DETR Mean
Wage + 40%      Wage
 Benefits      Premium
                   45.75%
       40.92       44.23%

       40.92      44.23%


       40.92      44.23%

       40.92      44.23%
         -

       40.92      48.62%

       40.92      44.64%
       40.92      44.64%


       40.92      44.64%
       40.92      44.64%
       40.92      44.64%


       40.92      44.64%
         -

       40.92      52.09%

       40.92      47.08%


       40.92      47.08%


       40.92      52.09%
         -

       40.92      52.09%
                            60
DETR Mean
Wage + 40%      Wage
 Benefits      Premium
                   45.75%

       40.92      49.53%


       40.92      49.53%


       40.92      53.32%
       40.92      54.42%
         -

       40.92      59.77%

       40.92      51.97%


       40.92      51.97%

       40.92      59.77%
         -
       40.92      63.12%
       40.92      54.42%
       40.92      54.42%

       40.92      54.42%
       40.92      63.12%
         -
         -
         -
         -
         -
         -
         -
       41.58      38.50%
       41.58      40.45%
       41.58      40.98%
       41.58      41.65%
                            61
DETR Mean
Wage + 40%      Wage
 Benefits      Premium
                   45.75%
       41.58       41.94%
       41.58       42.18%
       41.58       42.26%
       41.58       43.15%
       41.58       43.46%
       41.58       44.66%
         -
         -
         -
         -
       40.92      40.56%
       40.92      42.88%
       40.92      43.59%
       40.92      43.93%
       40.92      44.47%
       40.92      44.74%
       40.92      45.03%
       40.92      45.45%
       40.92      45.77%
         -
         -
       34.12      36.70%
       34.12      45.85%
         -
         -
         -
         -
         -
         -
         -
         -
         -
         -
         -
         -
         -
         -
                            62
DETR Mean
Wage + 40%      Wage
 Benefits      Premium
                   45.75%
         -
       39.69      42.40%
       39.69      52.13%
       39.69      61.83%
         -
         -
       29.79      18.05%
       29.79      18.05%
       29.79      18.05%
         -
         -
         -
       26.07      22.41%
       26.07      41.40%
         -
         -
       48.80      21.96%
       48.80      31.08%
       48.80      40.19%
         -
         -
         -
         -
         -
         -
         -
         -
       29.44      58.41%
         -

         -
       32.98       4.99%
       28.59      63.22%
       32.98      49.44%
         -
         -
         -
                            63
DETR Mean
Wage + 40%      Wage
 Benefits      Premium
                   45.75%
         -
         -
         -
         -
       31.43      46.77%
       31.43      47.09%
       31.43      47.76%
       31.43      48.33%
       31.43      48.97%
       31.43      49.92%

       32.83      46.57%
         -

         -
         -
         -
         -

         -
         -
         -

         -
         -
         -

         -
         -
         -

         -
         -
         -

         -
         -
                            64
DETR Mean
Wage + 40%    Wage
 Benefits    Premium
                 45.75%
         -

         -




                          65
                                                                                           Difference
                                                                    Annual    2011 PW     Between PW                                         DETR
 DOUGLAS                                                           Growth,     Survey   Rates and Survey Union   Union %     Non-Union %     Mean
 Average Construction Wage $20.78     PW 2010         PW 2011     2010 - 2011 Average          Avg.       Y/N    Difference   Difference     Wages
Average                                                                 5.85%                       5.99%              4.98%         1.27%

                                       ADD
                                       SHEET
                                       METAL
                                       ZONE
AIR BALANCE TECHNICIAN                 RATE                                                                Y         45.08%
Air Balance Technician-Journeyman         46.60           48.35        3.76%    35.47            36.31%
Air Balance Technician-Foreman            49.62           51.46        3.71%    35.47            45.08%
Air Balance Technician-General Foreman    52.64           54.57        3.67%    35.47            53.85%

ALARM INSTALLER                                   CC                                                       N                        0.00%
Alarm Installer                           28.11           26.47       -5.83%    26.47             0.00%

BOILERMAKER                           -           Clark                                                    Y          1.87%
Boilermaker                               59.50           65.94       10.82%    64.73             1.87%

                                     ADD
                                     ZONE
BRICKLAYER                           RATE     Washoe                                                       N                        3.71%
Bricklayer                              32.68     32.68                0.00%    31.51             3.71%                                       26.43

                                     ADD
                                     ZONE
CARPENTER                            RATE                                                                  Y          3.54%
Carpenter-Journeyman                    38.30             38.80        1.31%    38.80             0.00%                                       22.26
Carpenter-Foreman                       41.05             41.55        1.22%    38.80             7.09%                                       22.26

CEMENT MASON                                                                                               Y          2.94%
Cement Mason-Journeyman                   34.40           34.40        0.00%    34.39             0.03%                                       23.63
Cement Mason-Foreman                      36.40           36.40        0.00%    34.39             5.84%                                       23.63

ELECTRICIAN-COMMUNICATION TECHNICIAN                                                                       N                        4.27%
Communication Installer           27.97                   31.47       12.51%    30.18             4.27%
Communication Technician          30.88                   31.47        1.91%    30.18             4.27%
Senior Technician                 33.13                   31.47       -5.01%    30.18             4.27%

ELECTRICIAN-LINE                      -           -                                                        Y         -2.23%
Electrician-Groundman                     39.19           40.50        3.34% 66 58.40            -30.65%
                                                                                                Difference
                                                                     Annual    2011 PW         Between PW                                         DETR
  DOUGLAS                                                           Growth,     Survey       Rates and Survey Union   Union %     Non-Union %     Mean
  Average Construction Wage $20.78      PW 2010         PW 2011    2010 - 2011 Average              Avg.        Y/N   Difference   Difference     Wages
Average                                                                  5.85%                            5.99%             4.98%         1.27%
Electrician-Lineman                         57.91          59.90         3.44%    58.40                   2.57%
Electrician-Foreman                         63.02          65.16         3.40%    58.40                  11.58%
Electrician-General Foreman                 68.12          70.45         3.42%    58.40                  20.63%
Heavy Equipment Operator                    47.86          49.49         3.41%    58.40                -15.26%

ELECTRICIAN-NEON SIGN                   -           -                                                           Y          0.57%
Electrician-Neon Sign                       44.31          45.52        2.73%        45.26             0.57%

ELECTRICIAN-WIREMAN                     -           -                                                           Y         16.55%
Wireman                                     47.69          50.78        6.48%        46.83             8.43%                                       22.97
Cable Splicer                               51.18          54.58        6.64%        46.83            16.55%                                       22.97
Foreman                                     51.18          54.58        6.64%        46.83            16.55%                                       22.97
General Foreman                             54.67          58.38        6.79%        46.83            24.66%                                       22.97

ELEVATOR CONSTRUCTOR                    -           -                                                           Y          7.08%
Elevator Constructor-Journeyman             46.01          78.21       69.98%        76.43             2.33%
Elevator Constructor-Mechanic in Charge     46.01          85.48       85.79%        76.43            11.84%

FENCE ERECTOR                                                                                                   Y          0.00%
Fence Erector                               37.56          37.69        0.35%        37.69             0.00%

                                        ADD
                                       LABORER
FLAGPERSON (not surveyed set by        ZONE
Laborers Union every year)             RATE
Flagperson                                 27.95           27.95        0.00%

FLOOR COVERER                                                                                                   Y          3.65%
Floor Coverer-Journeyman                    36.26          36.34        0.22%        36.31             0.08%
Floor Coverer-Foreman                       38.90          38.93        0.08%        36.31             7.22%

GLAZIER                                                                                                         Y          1.91%
Glazier                                     21.50          22.42        4.28%        22.00             1.91%

                                        ADD
                                       LABORER
                                       ZONE
HIGHWAY STRIPER                        RATE                                                                     Y          0.00%
                                                                                67
                                                                                        Difference
                                                            Annual    2011 PW          Between PW                                         DETR
  DOUGLAS                                                  Growth,     Survey        Rates and Survey Union   Union %     Non-Union %     Mean
  Average Construction Wage $20.78    PW 2010     PW 2011 2010 - 2011 Average               Avg.       Y/N    Difference   Difference     Wages
Average                                                         5.85%                            5.99%              4.98%         1.27%
Highway Striper                          33.57       33.57      0.00%    33.57                   0.00%

                                     ADD
HOD CARRIER-BRICK MASON              ZONE
TENDER                               RATE                                                               Y          0.83%
Brick Mason-Journeyman                  30.10        30.10      0.00%        30.10             0.00%
Brick Mason-Foreman                     30.60        30.60      0.00%        30.10             1.66%

                                     ADD
                                     ZONE
HOD CARRIER-PLASTERER TENDER         RATE                                                               Y          3.81%
Plasterer Tender-Journeyman             33.76        34.26      1.48%        33.76             1.48%
Plasterer Tender-Gun Tender             34.76        35.26      1.44%        33.76             4.44%
Plasterer Tender-Foreman                35.12        35.62      1.42%        33.76             5.51%


                                     SEE
                                     AMENDME
IRON WORKER                          NT 1                                                               Y          4.80%
Ironworker-Journeyman                     54.38      56.74      4.34%        57.31            -0.99%
Ironworker-Foreman                        57.68      60.04      4.09%        57.31             4.76%
Ironworker-General Foreman                61.04      63.40      3.87%        57.31            10.63%

                                     ADD
LABORER                              ZONE                                                               Y         -0.80%
SEE GROUP CLASSIFICATIONS            RATE
Landscaper                              25.66        25.66      0.00%        30.63            -16.23%                                      15.94
Furniture Mover                         27.16        27.16      0.00%        30.63            -11.33%                                      15.94
Group 1                                 30.82        30.82      0.00%        30.63              0.62%                                      15.94
Group 1A                                27.95        27.95      0.00%        30.63             -8.75%                                      15.94
Group 2                                 30.92        30.92      0.00%        30.63              0.95%                                      15.94
Group 3                                 31.07        31.07      0.00%        30.63              1.44%                                      15.94
Group 4                                 31.32        31.32      0.00%        30.63              2.25%                                      15.94
Group 4A                                32.57        32.57      0.00%        30.63              6.33%                                      15.94
Group 5                                 31.62        31.62      0.00%        30.63              3.23%                                      15.94
Group 6
Nozzlemen, Rodmen                        31.62       31.62      0.00%        30.63             3.23%                                       15.94
                                                                        68
                                                                                                   Difference
                                                                       Annual    2011 PW          Between PW                                         DETR
 DOUGLAS                                                              Growth,     Survey        Rates and Survey Union   Union %     Non-Union %     Mean
 Average Construction Wage $20.78            PW 2010         PW 2011 2010 - 2011 Average               Avg.       Y/N    Difference   Difference     Wages
Average                                                                    5.85%                            5.99%              4.98%         1.27%
Gunmen, Materialmen                             31.32           31.32      0.00%    30.63                   2.25%                                     15.94
Reboundmen                                      30.97           30.97      0.00%    30.63                   1.11%                                     15.94
Gunite Foremen                                  32.02           32.02      0.00%    30.63                   4.54%                                     15.94

                                             SEE
                                             AMENDME
MECHANICAL INSULATOR                         NT 2-                                                                 Y         -0.08%
Mechanical Insulator-Mechanic                    57.06          54.56     -4.38%        56.77             -3.89%
Mechanical Insulator-Foreman                     59.56          57.06     -4.20%        56.77              0.51%
Mechanical Insulator-General Foreman             61.06          58.56     -4.09%        56.77              3.15%

MILLWRIGHT                                                                                                         N                        0.00%
Millwright                                      49.70           25.01    -49.68%        25.01             0.00%

                                             ADD
OPERATING ENGINEER                           ZONE                                                                  Y          8.88%
SEE GROUP CLASSIFICATIONS                    RATE
Group 1                                         41.33           43.08      4.23%        46.84            -8.03%                                       22.08
Group 1A                                        44.09           45.84      3.97%        46.84            -2.13%                                       22.08
Group 2                                         44.62           46.37      3.92%        46.84            -1.00%                                       22.08
Group 3                                         44.89           46.64      3.90%        46.84            -0.43%                                       22.08
Group 4                                         45.63           47.38      3.84%        46.84             1.15%                                       22.08
Group 5                                         45.93           47.68      3.81%        46.84             1.79%                                       22.08
Group 6                                         46.10           47.85      3.80%        46.84             2.16%                                       22.08
Group 7                                         46.35           48.10      3.78%        46.84             2.69%                                       22.08
Group 8                                         46.94           48.69      3.73%        46.84             3.95%                                       22.08
Group 9                                         47.26           49.01      3.70%        46.84             4.63%                                       22.08
Group 10                                        47.61           49.36      3.68%        46.84             5.38%                                       22.08
Group 10A                                       47.80           49.55      3.66%        46.84             5.79%                                       22.08
Group 11                                        48.04           49.79      3.64%        46.84             6.30%                                       22.08
Group 11A                                       49.68           51.43      3.52%        46.84             9.80%                                       22.08
Group 11B                                       50.49           52.24      3.47%        46.84            11.53%                                       22.08
Foreman                                         49.68           51.43      3.52%        46.84             9.80%                                       22.08
Add 7% to base rate for "Second" Shift       -           -
Add 12.5% to base rate for "Special" shift   -           -

OPERATING ENGINEER-STEEL                     ADD
FABRICATOR & ERECTOR                         ZONE                                  69
                                             RATE
                                                                                                     Difference
                                                                          Annual    2011 PW         Between PW                                         DETR
 DOUGLAS                                                                 Growth,     Survey       Rates and Survey Union   Union %     Non-Union %     Mean
 Average Construction Wage $20.78            ADD 2010
                                              PW             PW 2011    2010 - 2011 Average              Avg.       Y/N    Difference   Difference     Wages
Average                                      ZONE                             5.85%                           5.99%              4.98%         1.27%
SEE GROUP CLASSIFICATIONS                    RATE
Group 1                                          56.63          58.38        3.09%        46.84            24.64%                                       22.08
Group 1 Truck Crane Oiler                        50.46          52.21        3.47%        46.84            11.46%                                       22.08
Group 1 Oiler                                    48.50          50.25        3.61%        46.84             7.28%                                       22.08
Group 2                                          55.12          56.87        3.17%        46.84            21.41%                                       22.08
Group 2 Truck Crane Oiler                        50.21          51.96        3.49%        46.84            10.93%                                       22.08
Group 2 Oiler                                    48.29          50.04        3.62%        46.84             6.83%                                       22.08
Group 3                                          53.88          55.63        3.25%        46.84            18.77%                                       22.08
Group 3 Truck Crane Oiler                        49.99          51.74        3.50%        46.84            10.46%                                       22.08
Group 3 Oiler                                    48.07          49.82        3.64%        46.84             6.36%                                       22.08
Group 3 Hydraulic                                49.66          51.41        3.52%        46.84             9.76%                                       22.08
Group 4                                          52.15          53.90        3.36%        46.84            15.07%                                       22.08
Group 5                                          51.05          52.80        3.43%        46.84            12.72%                                       22.08
Add 7% to base rate for "Second" Shift       -           -
Add 12.5% to base rate for "Special" Shift

                                      ADD
OPERATING ENGINEER -PILEDRIVER ZONE
SEE GROUP CLASSIFICATIONS             RATE
Group 1                                  56.10                  57.85        3.12%        46.84            23.51%                                       22.08
Group 1 Truck Crane Oiler                50.64                  52.39        3.46%        46.84            11.85%                                       22.08
Group 1 Oiler                            48.72                  50.47        3.59%        46.84             7.75%                                       22.08
Group 2                                  54.56                  56.31        3.21%        46.84            20.22%                                       22.08
Group 2 Truck Crane Oiler                50.43                  52.18        3.47%        46.84            11.40%                                       22.08
Group 2 Oiler                            48.52                  50.27        3.61%        46.84             7.32%                                       22.08
Group 3                                  53.11                  54.86        3.30%        46.84            17.12%                                       22.08
Group 3 Truck Crane Oiler                50.21                  51.96        3.49%        46.84            10.93%                                       22.08
Group 3 Oiler                            48.29                  50.04        3.62%        46.84             6.83%                                       22.08
Group 4                                  51.60                  53.35        3.39%        46.84            13.90%                                       22.08
Group 5                                  50.49                  52.24        3.47%        46.84            11.53%                                       22.08
Group 6                                  49.38                  51.13        3.54%        46.84             9.16%                                       22.08
Group 7                                  48.42                  50.17        3.61%        46.84             7.11%                                       22.08
Group 8                                  47.46                  49.21        3.69%        46.84             5.06%                                       22.08
Add 7% to base for "Second" Shift     -                  -
Add 12.5% to base for "Special" Shift -                  -


PAINTER                                                  CC                          70                              Y          4.59%
                                                                                                Difference
                                                                        Annual    2011 PW      Between PW                                         DETR
  DOUGLAS                                                              Growth,     Survey    Rates and Survey Union   Union %     Non-Union %     Mean
  Average Construction Wage $20.78         PW 2010         PW 2011    2010 - 2011 Average           Avg.       Y/N    Difference   Difference     Wages
Average                                                                     5.85%                        5.99%              4.98%         1.27%
Brush/Roller Painter                           32.74         32.74          0.00%    32.03               2.22%                                     18.94
Spray Painter/Paperhanger                      33.59         33.59          0.00%    32.03               4.87%                                     18.94
Sandblaster                                    33.24         33.24          0.00%    32.03               3.78%                                     18.94
Structural Steel & Steeplejack                 33.74         33.74          0.00%    32.03               5.34%                                     18.94
Swing Stage                                    34.74         34.74          0.00%    32.03               8.46%                                     18.94
Special Coating Application-Brush              33.24         33.24          0.00%    32.03               3.78%                                     18.94
Special Coating Application-Spray              33.74         33.74          0.00%    32.03               5.34%                                     18.94
Special Coating Application-Spray Steel        33.99         33.99          0.00%    33.03               2.91%                                     18.94
                                           $1.00        $1.00
                                          above        above
                                          highest      highest
                                          Journeyma    Journeyman
Foreman                                   n

PILEDRIVER                                                                                                      Y
Piledriver-Journeyman                         58.47           58.47        0.00%
Piledriver-Foreman                            62.05           62.05        0.00%

                                          ADD
                                          ZONE
PLASTERER                                 RATE                                                                  Y          1.71%
Plasterer-Journeyman                         34.27            34.77        1.46%     35.29             -1.47%
Plasterer-Foreman                            35.59            37.02        4.02%     35.29              4.90%

PLUMBER/PIPEFITTER                        -            -                                                        Y         14.11%
Plumber                                       45.20           45.20        0.00%     39.61            14.11%

REFRIGERATION                             -            -                                                        Y          4.52%
Refrigeration                                 30.92           41.58       34.48%     39.78             4.52%

ROOFER (Does not include sheet metal                                                                            N                        0.00%
Roofer                                        19.69           17.16      -12.85%     17.16             0.00%                                       17.60

                                          ADD
                                          ZONE
SHEET METAL WORKER                        RATE                                                                  Y         13.35%
Sheet Metal-Journeyman                       46.60            48.35        3.76%    45.40              6.50%
Sheet Metal-Foreman                          49.62            51.46        3.71% 71 45.40             13.35%
                                                                                           Difference
                                                               Annual    2011 PW          Between PW                                         DETR
 DOUGLAS                                                      Growth,     Survey        Rates and Survey Union   Union %     Non-Union %     Mean
 Average Construction Wage $20.78     PW 2010        PW 2011 2010 - 2011 Average               Avg.        Y/N   Difference   Difference     Wages
Average                                                            5.85%                             5.99%             4.98%         1.27%
Sheet Metal-General Foreman              52.64          54.57      3.67%    45.40                   20.20%

SPRINKLER FITTER                     -           -                                                         Y          4.72%
Sprinkler Fitter-Journeyman              52.30          53.45      2.20%        53.51             -0.11%
Sprinkler Fitter-Foreman                 55.05          56.20      2.09%        53.51              5.03%
Sprinkler Fitter-General Foreman         57.30          58.45      2.01%        53.51              9.23%

SURVEYOR                                                                                                   N                        0.00%
Surveyor                                 43.24          31.15    -27.96%        31.15             0.00%                                       31.44

TAPER                                -           -                                                         Y          1.23%
Taper                                    35.49          36.28      2.23%        35.84             1.23%

TILE SETTER/TERRAZZO                 ADD                                                                   Y          1.02%
Tile, Terrazzo and Marble Finisher      32.48           24.77    -23.74%        24.52             1.02%

TILE SETTER/TERRAZZO                 ADD                                                                   Y          4.15%
Tile Setter-Journeyman                  25.00           32.87     31.48%        33.64            -2.29%
Tile Setter-Foreman                     25.00           34.12     36.48%        33.64             1.43%
Tile Setter-General Formean             25.00           35.87     43.48%        33.64             6.63%
Terrazzo/Marble Mason-Journeyman        25.00           34.37     37.48%        33.64             2.17%
Terrazzo/Marble Mason-Foreman           25.00           35.62     42.48%        33.64             5.89%
Terrazzo/Marble Mason-General           25.00           37.37     49.48%        33.64            11.09%


                                      ADD
                                     LABORER
                                     ZONE
TRAFFIC BARRIER ERECTOR              RATE
Traffic Barrier Erector                  30.82          30.82      0.00%

TRUCK DRIVER                                     Washoe                                                    N                        2.16%
Truck Driver                             21.61       20.80        -3.75%        20.36             2.16%                                       15.43

WELL DRILLER                                     CC                                                        N                        0.00%
Well Driller                             21.32          54.49    155.58%        54.49             0.00%

                                                                           72
                                                                                        Difference
                                                             Annual    2011 PW         Between PW                                         DETR
 DOUGLAS                                                    Growth,     Survey       Rates and Survey Union   Union %     Non-Union %     Mean
 Average Construction Wage $20.78    PW 2010    PW 2011    2010 - 2011 Average              Avg.       Y/N    Difference   Difference     Wages
Average                                                          5.85%                           5.99%              4.98%         1.27%
                                     ADD
LUBRICATION AND SERVICE             LABORER
ENGINEER (MOBILE AND GREASE         ZONE
RACK)                               RATE                                                                Y          2.16%
Lubrication and Service Engineer        46.10      47.85        3.80%        46.84             2.16%

SOIL TESTER (CERTIFIED)                                                                                 Y         -0.30%
Soil Tester (Certified)                 44.64      56.62       26.84%        56.79             -0.30%

SOILS AND MATERIALS TESTER                                                                                        -0.30%
Soils and Materials Tester              44.64      56.62       26.84%        56.79             -0.30%

Union Breakdown
Union                                                                                                   30
Non-Union                                                                                                8
Total                                                                                                   38




                                                                        73
DETR Mean
Wage + 40%      Wage
 Benefits      Premium
                   49.19%




       37.00      -11.68%
         -


         -
       31.16      24.50%
       31.16      33.33%
         -
         -
       33.08       3.98%
       33.08      10.03%
         -
         -
         -
         -
         -
         -
         -
         -                  74
DETR Mean
Wage + 40%      Wage
 Benefits      Premium
                   49.19%
         -
         -
         -
         -
         -
         -
         -
         -
         -
       32.16      57.91%
       32.16      69.72%
       32.16      69.72%
       32.16      81.54%
         -
         -
         -
         -
         -
         -
         -
         -



         -
         -
         -
         -
         -
         -
         -
         -
         -
         -



         -
                            75
DETR Mean
Wage + 40%      Wage
 Benefits      Premium
                   49.19%
         -
         -


         -
         -
         -
         -


         -
         -
         -
         -
         -




         -
         -
         -
         -
         -

         -
         -
       22.32      14.98%
       22.32      21.71%
       22.32      38.11%
       22.32      25.25%
       22.32      38.56%
       22.32      39.23%
       22.32      40.35%
       22.32      45.95%
       22.32      41.69%
         -
       22.32      41.69%
                            76
DETR Mean
Wage + 40%      Wage
 Benefits      Premium
                   49.19%
       22.32       40.35%
       22.32       38.78%
       22.32       43.48%
         -


         -
         -
         -
         -
         -
         -
         -
         -

         -
         -
       30.91      39.36%
       30.91      48.29%
       30.91      50.01%
       30.91      50.88%
       30.91      53.27%
       30.91      54.24%
       30.91      54.79%
       30.91      55.60%
       30.91      57.51%
       30.91      58.55%
       30.91      59.68%
       30.91      60.29%
       30.91      61.07%
       30.91      66.38%
       30.91      69.00%
       30.91      66.38%
         -
         -
         -

         -                  77
DETR Mean
Wage + 40%      Wage
 Benefits      Premium
                   49.19%
         -
       30.91      88.86%
       30.91      68.90%
       30.91      62.56%
       30.91      83.97%
       30.91      68.09%
       30.91      61.88%
       30.91      79.96%
       30.91      67.38%
       30.91      61.17%
       30.91      66.31%
       30.91      74.37%
       30.91      70.81%
         -
         -
         -

         -
         -
       30.91      87.14%
       30.91      69.48%
       30.91      63.27%
       30.91      82.16%
       30.91      68.80%
       30.91      62.62%
       30.91      77.47%
       30.91      68.09%
       30.91      61.88%
       30.91      72.59%
       30.91      69.00%
       30.91      65.41%
       30.91      62.30%
       30.91      59.19%
         -
         -
         -
         -
         -                  78
DETR Mean
Wage + 40%      Wage
 Benefits      Premium
                   49.19%
       26.52       23.47%
       26.52       26.68%
       26.52       25.36%
       26.52       27.24%
       26.52       31.02%
       26.52       25.36%
       26.52       27.24%
       26.52       28.19%




         -
         -
         -
         -
         -
         -


         -
         -
         -
         -
         -
         -
         -
         -
         -
         -
         -
       24.64      -30.36%
         -


         -
         -
         -                  79
DETR Mean
Wage + 40%      Wage
 Benefits      Premium
                   49.19%
         -
         -
         -
         -
         -
         -
         -
         -
       44.02      -29.23%
         -
         -
         -
         -
         -
         -
         -
         -
         -
         -
         -
         -
         -
         -
         -
         -



         -
         -
         -
         -
       21.60       -3.71%
         -
         -
         -
         -
                            80
DETR Mean
Wage + 40%    Wage
 Benefits    Premium
                 49.19%



         -
         -
         -
         -
         -
         -
         -
         -




                          81
                                                              Annual    2011 PW Difference Between
 ELKO                                                        Growth,     Survey PW Rates and Survey Union   Union %     Non-Union
 Average Construction Wage $20.46   PW 2010      PW 2011    2010 - 2011 Average         Avg.         Y/N    Difference % Difference
Average                                                          1.41%                        -2.52%              0.15%      -8.93%

AIR BALANCE TECHNICIAN                                                                                Y        45.08%
Air Balance-Journeyman                  46.60       48.35       3.76%        35.47          36.31%
Air Balance-Foreman                     49.62       51.46       3.71%        35.47          45.08%
Air Balance-General Foreman             52.64       54.57       3.67%        35.47          53.85%

ALARM INSTALLER                                                                                       Y         0.00%
Alarm Installer                         30.88       31.61       2.36%        31.61           0.00%

BOILERMAKER                         -           Clark                                                 Y         1.87%
Boilermaker-Journeyman                  59.50       65.94      10.82%        64.73           1.87%
Boilermaker-Foreman                     59.50       65.94      10.82%        64.73           1.87%
Boilermaker-General Foreman             59.50       65.94      10.82%        64.73           1.87%

                                    ADD
                                    ZONE
BRICKLAYER                          RATE-    Eureka                                                   Y        -28.07%
Bricklayer                             32.68     32.68          0.00%        45.43          -28.07%

                                    ADD
                                    ZONE
CARPENTER                           RATE                                                              Y         -0.46%
Carpenter                              38.30        38.80       1.31%        38.98           -0.46%

CEMENT MASON                                                                                          Y         0.54%
Cement Mason-Journeyman                 34.40       34.40       0.00%        35.21           -2.30%
Cement Mason-Foreman                    36.40       36.40       0.00%        35.21            3.38%

ELECTRICIAN-COMMUNICATION
TECHNICIAN                                                                                            Y         1.10%
Communication Technician                27.97       29.36       4.97%        29.04           1.10%

ELECTRICIAN-                                    Humboldt                                              Y         2.20%
Electrician-Groundman                   39.19      40.50        3.34%        55.87          -27.51%
Electrician-Lineman                     57.91      59.90        3.44%        55.87            7.21%
Electrician-Foreman                     63.02      65.16        3.40%        55.87           16.63%
Electrician-General Foreman             68.12      70.45        3.42%        55.87           26.10%
Electrician-Equipment Specialist        47.86      49.49        3.41%        55.87          -11.42%
                                                                        82
                                                                     Annual    2011 PW Difference Between
 ELKO                                                               Growth,     Survey PW Rates and Survey Union   Union %     Non-Union
 Average Construction Wage $20.46          PW 2010      PW 2011    2010 - 2011 Average         Avg.         Y/N    Difference % Difference
Average                                                                 1.41%                        -2.52%              0.15%      -8.93%

ELECTRICIAN-NEON SIGN                      -           Clark                                                 Y         0.57%
Electrician-Neon Sign                          44.31       45.52       2.73%         45.26          0.57%

ELECTRICIAN-WIREMAN                        -           -                                                     Y         7.87%
Wireman                                        41.58       50.78      22.13%         50.60          0.36%
Cable Splicer                                  41.58       54.58      31.27%         50.60          7.87%
Foreman                                        41.58       54.58      31.27%         50.60          7.87%
General Foreman                                41.58       58.38      40.40%         50.60         15.38%

ELEVATOR CONSTRUCTOR                       -           Churchill                                             Y        13.48%

Elevator Constructor-Journeyman Mechanic       46.01       78.21      69.98%         72.12          8.44%
Elevator Constructor-Mechanic in Charge        46.01       85.48      85.79%         72.12         18.52%

                                            ADD
                                           LABORER
                                            ZONE
FENCE ERECTOR                              RATE                                                              Y         0.00%
Fence Erector                                 30.82        35.47      15.09%         35.47          0.00%

                                            ADD
                                           LABORER
FLAGPERSON (not surveyed set by             ZONE
Laborers Union every year)                 RATE
Flagperson                                    27.95        27.95       0.00%

FLOOR COVERER                                          Churchill                                             Y         3.65%
Floor Coverer-Journeyman                       36.26       36.34       0.22%         36.31          0.08%
Floor Coverer-Foreman                          38.90       38.93       0.08%         36.31          7.22%

GLAZIER                                    -           -                                                     N                     -0.82%
Glazier                                        21.50       20.50       -4.65%        20.67          -0.82%

                                            ADD
                                           LABORER
                                            ZONE
HIGHWAY STRIPER                            RATE                                                              Y         0.00%
                                                                                83
                                                          Annual    2011 PW Difference Between
  ELKO                                                   Growth,     Survey PW Rates and Survey Union   Union %     Non-Union
  Average Construction Wage $20.46   PW 2010    PW 2011 2010 - 2011 Average         Avg.         Y/N    Difference % Difference
Average                                                      1.41%                        -2.52%              0.15%      -8.93%
Highway Striper                         33.57     33.57      0.00%     33.57               0.00%


                                     ADD ZON
HOD CARRIER-BRICK MASON TENDER       E RATE                                                       Y         0.83%
Brick Mason-Journeyman                  30.10     30.10      0.00%        30.10          0.00%
Brick Mason-Foreman                     30.60     30.60      0.00%        30.10          1.66%


                                     ADD ZON
HOD CARRIER-PLASTERER TENDER         E RATE   Washoe                                              Y         3.90%
Plasterer Tender-Journeyman             33.76    34.26       1.48%        33.73          1.57%
Plasterer-Gun Tender                    34.76    35.26       1.44%        33.73          4.54%
Plasterer Tender-Foreman                35.12    35.62       1.42%        33.73          5.60%

                                     SEE
                                     AMENDM
IRON WORKER                          ENT 1-                                                       Y         4.80%
Ironworker-Journeyman                   54.38     56.74      4.34%        57.31         -0.99%
Ironworker-Foreman                      57.68     60.04      4.09%        57.31          4.76%
Ironworker-General Foreman              61.04     63.40      3.87%        57.31         10.63%

LABORER                              ADD                                                          Y         -6.16%
SEE GROUP CLASSIFICATIONS            ZONE
                                     RATE
Landscaper                              25.66     25.66      0.00%        32.38         -20.75%
Furniture Mover                         27.16     27.16      0.00%        32.38         -16.12%
Group 1                                 30.82     30.82      0.00%        32.38          -4.82%
Group 1A                                27.95     27.95      0.00%        32.38         -13.68%
Group 2                                 30.92     30.92      0.00%        32.38          -4.51%
Group 3                                 31.07     31.07      0.00%        32.38          -4.05%
Group 4A                                31.32     31.32      0.00%        32.38          -3.27%
Group 4                                 32.57     32.57      0.00%        32.38           0.59%
Group 5                                 31.62     31.62      0.00%        32.38          -2.35%
Group 6                                 29.72     29.72
Nozzlemen, Rodmen                       31.62     31.62      0.00%        32.38          -2.35%
Gunmen, Materialmen                     31.32     31.32      0.00%        32.38          -3.27%
Reboundmen                              30.97     30.97      0.00%        32.38          -4.35%
                                                                     84
                                                                  Annual    2011 PW Difference Between
 ELKO                                                            Growth,     Survey PW Rates and Survey Union   Union %     Non-Union
 Average Construction Wage $20.46            PW 2010    PW 2011 2010 - 2011 Average         Avg.         Y/N    Difference % Difference
Average                                                              1.41%                        -2.52%              0.15%      -8.93%
Gunite Foremen                                  32.02     32.02      0.00%     32.38              -1.11%

                                             SEE
                                             AMENDM
MECHANICAL INSULATOR                         ENT 2-   Washoe                                              Y         -0.08%
Mechanical Insulator-Journeyman                 57.06    54.56       -4.38%        56.77         -3.89%
Mechanical Insulator-Foreman                    59.56    57.06       -4.20%        56.77          0.51%
Mechanical Insulator-General Foreman            61.06    58.56       -4.09%        56.77          3.15%

MILLWRIGHT                                                                                                N                      0.00%
Millwright-Journeyman                           49.70     25.33     -49.03%        25.33         0.00%
Millwright-Welder                               50.70     25.33     -50.04%        25.33         0.00%
Millwright-Foreman                              53.01     25.33     -52.22%        25.33         0.00%
Millwright-General Foreman                      56.65     25.33     -55.29%        25.33         0.00%

                                             ADD
OPERATING ENGINEER                           ZONE                                                         Y         -8.36%
SEE GROUP CLASSIFICATIONS                    RATE
Group 1                                         41.33     43.08      4.23%         55.65        -22.59%
Group 1A                                        44.09     45.84      3.97%         55.65        -17.63%
Group 2                                         44.62     46.37      3.92%         55.65        -16.68%
Group 3                                         44.89     46.64      3.90%         55.65        -16.19%
Group 4                                         45.63     47.38      3.84%         55.65        -14.86%
Group 5                                         45.93     47.68      3.81%         55.65        -14.32%
Group 6                                         46.10     47.85      3.80%         55.65        -14.02%
Group 7                                         46.35     48.10      3.78%         55.65        -13.57%
Group 8                                         46.94     48.69      3.73%         55.65        -12.51%
Group 9                                         47.26     49.01      3.70%         55.65        -11.93%
Group 10                                        47.61     49.36      3.68%         55.65        -11.30%
Group 10A                                       47.80     49.55      3.66%         55.65        -10.96%
Group 11                                        48.04     49.79      3.64%         55.65        -10.53%
Group 11A                                       49.68     51.43      3.52%         55.65         -7.58%
Group 11B                                       50.49     52.24      3.47%         55.65         -6.13%
Foreman                                         49.68     51.43      3.52%         55.65         -7.58%
Add 7% to base rate for "Second" Shift       -        -
Add 12.5% to base rate for "Special" shift   -        -


                                                                              85
                                                                     Annual    2011 PW Difference Between
 ELKO                                                               Growth,     Survey PW Rates and Survey Union   Union %     Non-Union
 Average Construction Wage $20.46            PW 2010    PW 2011    2010 - 2011 Average         Avg.         Y/N    Difference % Difference
Average                                                                 1.41%                        -2.52%              0.15%      -8.93%
OPERATING ENGINEER-STEEL                     ADD        ADD
FABRICATOR & ERECTOR                         ZONE       ZONE
SEE GROUP CLASSIFICATIONS                    RATE       RATE
Group 1                                         56.63      58.38       3.09%        55.65            4.91%
Group 1 Truck Crane Oiler                       50.46      52.21       3.47%        55.65           -6.18%
Group 1 Oiler                                   48.50      50.25       3.61%        55.65           -9.70%
Group 2                                         55.12      56.87       3.17%        55.65            2.19%
Group 2 Truck Crane Oiler                       50.21      51.96       3.49%        55.65           -6.63%
Group 2 Oiler                                   48.29      50.04       3.62%        55.65          -10.08%
Group 3                                         53.88      55.63       3.25%        55.65           -0.04%
Group 3 Truck Crane Oiler                       49.99      51.74       3.50%        55.65           -7.03%
Group 3 Oiler                                   48.07      49.82       3.64%        55.65          -10.48%
Group 3 Hydraulic                               49.66      51.41       3.52%        55.65           -7.62%
Group 4                                         52.15      53.90       3.36%        55.65           -3.14%
Group 5                                         51.05      52.80       3.43%        55.65           -5.12%
Add 7% to base rate for "Second" Shift       -          -
Add 12.5% to base rate for "Special" Shift

                                             ADD        ADD
OPERATING ENGINEER -PILEDRIVER               ZONE       ZONE
SEE GROUP CLASSIFICATIONS                    RATE       RATE
Group 1                                         56.10      57.85       3.12%        55.65            3.95%
Group 1 Truck Crane Oiler                       50.64      52.39       3.46%        55.65           -5.86%
Group 1 Oiler                                   48.72      50.47       3.59%        55.65           -9.31%
Group 2                                         54.56      56.31       3.21%        55.65            1.19%
Group 2 Truck Crane Oiler                       50.43      52.18       3.47%        55.65           -6.24%
Group 2 Oiler                                   48.52      50.27       3.61%        55.65           -9.67%
Group 3                                         53.11      54.86       3.30%        55.65           -1.42%
Group 3 Truck Crane Oiler                       50.21      51.96       3.49%        55.65           -6.63%
Group 3 Oiler                                   48.29      50.04       3.62%        55.65          -10.08%
Group 4                                         51.60      53.35       3.39%        55.65           -4.13%
Group 5                                         50.49      52.24       3.47%        55.65           -6.13%
Group 6                                         49.38      51.13       3.54%        55.65           -8.12%
Group 7                                         48.42      50.17       3.61%        55.65           -9.85%
Group 8                                         47.46      49.21       3.69%        55.65          -11.57%
Add 7% to base for "Second" Shift            -          -
Add 12.5% to base for "Special" Shift        -          -

                                                                               86
                                                                     Annual    2011 PW Difference Between
  ELKO                                                              Growth,     Survey PW Rates and Survey Union   Union %     Non-Union
  Average Construction Wage $20.46        PW 2010      PW 2011     2010 - 2011 Average         Avg.         Y/N    Difference % Difference
Average                                                                 1.41%                        -2.52%              0.15%      -8.93%
PAINTER                                                                                                      Y           2.21%
Brush/Roller Painter                          32.74        32.74        0.00%     32.90              -0.49%
Spray Painter/Paperhanger                     33.59        33.59        0.00%     32.90               2.10%
Sandblaster                                   33.24        33.24        0.00%     32.90               1.03%
Structural Steel & Steeplejack                33.74        33.74        0.00%     32.90               2.55%
Swing Stage                                   34.74        34.74        0.00%     32.90               5.59%
Special Coating Application-Brush             33.24        33.24        0.00%     32.90               1.03%
Special Coating Application-Spray             33.74        33.74        0.00%     32.90               2.55%
Special Coating Application-Spray Steel       33.99        33.99        0.00%     32.90               3.31%
                                           $1.00       $1.00
                                          above       above
                                          highest     highest
                                          Journeym    Journeyma
Foreman                                   an          n

PILEDRIVER                                                                                                   Y
Piledriver-Journeyman                         58.47       58.47        0.00%
Piledriver-Foreman                            62.05       62.05        0.00%

                                          ADD
                                          ZONE
PLASTERER                                 RATE     Washoe                                                    Y         -1.47%
Plasterer                                    34.27    34.77            1.46%         35.29          -1.47%

PLUMBER/PIPEFITTER                        -           -                                                      N                    -16.78%
Plumber/Pipefitter                            36.24       19.00       -47.57%        22.83         -16.78%

REFRIGERATION                             -           -                                                      N                      0.00%
Refrigeration-Journeyman                      27.52       19.00       -30.96%        19.00          0.00%
Refrigeration-Foreman                         27.52       19.00       -30.96%        19.00          0.00%
Refrigeration-General Foreman                 27.52       19.00       -30.96%        19.00          0.00%

ROOFER                                                -                                                      N                      0.00%
(Does not include sheet metal roofs)      -
Roofer                                        18.64       20.11        7.89%         20.11          0.00%

SHEET METAL WORKER                                                                                           N                    -26.85%
Sheet Metal Worker                            30.00       20.00       -33.33%        27.34         -26.85%
                                                                                87
                                                                  Annual    2011 PW Difference Between
 ELKO                                                            Growth,     Survey PW Rates and Survey Union   Union %     Non-Union
 Average Construction Wage $20.46       PW 2010      PW 2011    2010 - 2011 Average         Avg.         Y/N    Difference % Difference
Average                                                              1.41%                        -2.52%              0.15%      -8.93%

SPRINKLER FITTER                        -           -                                                     N                    -42.58%
Sprinkler Fitter-Journeyman                 52.30       19.00      -63.67%        33.09         -42.58%
Sprinkler Fitter-Foreman                    55.05       19.00      -65.49%        33.09         -42.58%
Sprinkler Fitter-General Foreman            57.30       19.00      -66.84%        33.09         -42.58%

SURVEYOR                                            Churchill                                             N                      0.00%
Surveyor                                    46.85       25.63      -45.29%        25.63          0.00%

TAPER                                   -           -                                                     Y         1.23%
Taper                                       35.49       36.28       2.23%         35.84          1.23%

                                        ADD
TILE SETTER/TERRAZZO                    ZONE
WORKER/MARBLE MASON-FINISHER            RATE     Washoe                                                   Y         1.02%
Tile, Terrazzo and Marble Finisher         32.48    24.77          -23.74%        24.52          1.02%

                                        ADD
TILE SETTER/TERRAZZO                    ZONE
WORKER/MARBLE MASON                     RATE                                                              Y         4.15%
Tile Setter-Journeyman                     35.99        32.87       -8.67%        33.64         -2.29%
Tile Setter-Foreman                        35.99        34.12       -5.20%        33.64          1.43%
Tile Setter-General Formean                35.99        35.87       -0.33%        33.64          6.63%
Terrazzo/Marble Mason-Journeyman           35.99        34.37       -4.50%        33.64          2.17%
Terrazzo/Marble Mason-Foreman              35.99        35.62       -1.03%        33.64          5.89%
Terrazzo/Marble Mason-General Foreman      35.99        37.37        3.83%        33.64         11.09%


                                         ADD         ADD
                                        LABORER     LABORER
                                         ZONE       ZONE
TRAFFIC BARRIER ERECTOR                 RATE        RATE
Traffic Barrier Erector                    30.82        30.82       0.00%

                                        ADD         ADD
                                        ZONE        ZONE
TRUCK DRIVER                            RATE        RATE                                                  Y         -2.25%      -2.25%

                                                                             88
                                                                   Annual    2011 PW Difference Between
  ELKO                                                            Growth,     Survey PW Rates and Survey Union   Union %     Non-Union
  Average Construction Wage $20.46           PW 2010   PW 2011   2010 - 2011 Average         Avg.         Y/N    Difference % Difference
Average                                                               1.41%                        -2.52%              0.15%      -8.93%
Dump Trucks (Single or Multiple Units Including
Semi's & Double Transfer Units), Dumpcretes and
Under 4 yds. (water level)                     35.02     39.51       12.82%        40.42          -2.25%
4 yds. & under 8 yds. (water level)            35.24     39.51       12.12%        40.42          -2.25%
8 yds. & under 18 yds. (water level)           35.45     39.51       11.45%        40.42          -2.25%
18 yds. & under 25 yds. ( water level)         35.62     39.51       10.92%        40.42          -2.25%
25 yds. & under 60 yds. (water level)          36.04     39.51        9.63%        40.42          -2.25%
60 yds. & under 75 yds. (water level)          37.48     39.51        5.42%        40.42          -2.25%
75 yds. & under 100 yds. (water level)         38.43     39.51        2.81%        40.42          -2.25%
100 yds. & under 150 yds.(water level)         38.90     39.51        1.57%        40.42          -2.25%
150 yds. & under 250 yds. ( water level)       40.90     39.51       -3.40%        40.42          -2.25%
250 yds. & under 350 yds. (water level)        43.90     39.51      -10.00%        40.42          -2.25%
350 yds. & over (water level)                  45.40     39.51      -12.97%        40.42          -2.25%
Transit Mix
Under 8 yds.                                   35.45     39.51      11.45%         40.42          -2.25%
8 yds. & including 12 yds.                     35.56     39.51      11.11%         40.42          -2.25%
Over 12 yds.                                   35.78     39.51      10.42%         40.42          -2.25%
Transit Mix (Using Boom)
Transit mix with boom shall receive 16 cents
per hour
above the appropriate yardage classification
rate of pay
when such boom is used
Water & Jetting Trucks
Up to 2,500 gallons                            35.43     39.51      11.52%         40.42          -2.25%
2,500 gallons & over                           35.45     39.51      11.45%         40.42          -2.25%

DW 20's & 21's & other similar Cat type,
Terry Cobra LeTourneau pulls,
Tournerocker, Euclid, & similar type
equipment when pulling Aqua/Pak, Water
Tank Trailers, & Fuel, and/or Grease Tank
Trailer, or other miscellaneous Trailers,
(except as defined under "Dump Trucks")       35.73      39.51      10.58%         40.42          -2.25%
Heavy Duty Transport (High Bed)               35.62      39.51      10.92%         40.42          -2.25%

Heavy Duty Transport(Gooseneck low bed)       35.62      39.51      10.92%         40.42          -2.25%
Tiltbed or Flatbed Pull Trailers              35.62      39.51      10.92%         40.42          -2.25%
                                                                              89
                                                                     Annual    2011 PW Difference Between
  ELKO                                                              Growth,     Survey PW Rates and Survey Union   Union %     Non-Union
  Average Construction Wage $20.46              PW 2010    PW 2011 2010 - 2011 Average         Avg.         Y/N    Difference % Difference
Average                                                                 1.41%                        -2.52%              0.15%      -8.93%
Bootman, Comb. Bootman & Road Oiler               35.51      39.51     11.26%     40.42              -2.25%
Flat Rack (2 or 3 axle unit)                      33.34      39.51     18.51%     40.42              -2.25%
Bus & Manhaul Drivers
Up to 18,000 lbs. (single unit)                   35.07         39.51   12.66%         40.42        -2.25%
18,000 lbs. & over (single unit)                  35.18         39.51   12.31%         40.42        -2.25%

Helicopter Pilot (transporting men/materials)     49.66         39.51   -20.44%        40.42        -2.25%
Lift Jitneys                                      35.29         39.51    11.96%        40.42        -2.25%
Winch Truck & "A" Frame Drivers
Up to 18,000 lbs.                                 35.18         39.51   12.31%         40.42        -2.25%
18,000 lbs. and over                              35.29         39.51   11.96%         40.42        -2.25%
Warehousemen Spotter                              35.13         39.51   12.47%         40.42        -2.25%
Warehouse Clerk                                   35.24         39.51   12.12%         40.42        -2.25%
Tire Repairmen                                    35.45         39.51   11.45%         40.42        -2.25%
Truck Repairmen                                   35.78         39.51   10.42%         40.42        -2.25%
Pick Up Truck & Pilot Cars (Jobsite)              33.14         39.51   19.22%         40.42        -2.25%

Pick Up Truck & Pilot Cars (Over the road)        35.13         39.51   12.47%         40.42        -2.25%
Truck Oil Greaser                                 35.18         39.51   12.31%         40.42        -2.25%
Fuel Truck Driver                                 35.18         39.51   12.31%         40.42        -2.25%
Fuel Man & Fuel Island Man                        35.18         39.51   12.31%         40.42        -2.25%
Oil Tanker                                        35.62         39.51   10.92%         40.42        -2.25%
Oil Tanker with Pup                               36.04         39.51    9.63%         40.42        -2.25%
Foreman:                                          36.54         40.01    9.50%         40.92        -2.22%

WELL DRILLER                                              Lander                                             N                      0.00%
Well Driller                                      31.91       22.34     -29.99%        22.34        0.00%


                                         ADD              ADD
                                         OPERATI          OPERATIN
                                         NG ENG.          G ENG.
LUBRICATION AND SERVICE ENGINEER ZONE                     ZONE
(MOBILE AND GREASE RACK)                 RATE             RATE                                               Y         2.16%
Lubrication and Service Engineer (mobile
and grease rack)                            46.10               47.85    3.80%         46.84        2.16%

SOIL TESTER (CERTIFIED)                                   Nye                                                Y         -0.30%
                                                                                  90
                                                        Annual    2011 PW Difference Between
 ELKO                                                  Growth,     Survey PW Rates and Survey Union   Union %     Non-Union
 Average Construction Wage $20.46   PW 2010   PW 2011 2010 - 2011 Average         Avg.         Y/N    Difference % Difference
Average                                                    1.41%                        -2.52%              0.15%      -8.93%
Soil Tester (Certified)               45.65     56.62     24.03%     56.79              -0.30%

SOILS AND MATERIALS TESTER                                                                                -0.30%
Soils and Materials Tester            45.65     56.62     24.03%        56.79          -0.30%

Union Breakdown
Union                                                                                           29
Non-Union                                                                                        9
Total                                                                                           38




                                                                   91
DETR
Mean      DETR Mean Wage     Wage
Wages      + 40% Benefits   Premium
                               48.98%




  21.86             30.60      26.78%
                      -
                      -
  22.03             30.84      11.54%
  22.03             30.84      18.02%
                      -

                      -
                      -
                      -
                      -
  21.60             30.24      33.93%
  21.60             30.24      98.08%
  21.60             30.24     115.48%
  21.60             30.24     132.97%
  21.60             30.24      63.66%
                                        92
DETR
Mean      DETR Mean Wage     Wage
Wages      + 40% Benefits   Premium
                               48.98%
                      -
                      -
                      -
                      -
                      -
  23.64             33.10      53.43%
  23.64             33.10      64.91%
  23.64             33.10      64.91%
  23.64             33.10      76.40%
                      -
                      -

                      -
                      -
                      -



                      -
                      -
                      -



                      -
                      -
                      -
                      -
                      -
                      -
                      -
                      -
                      -
                      -



                      -
                                        93
DETR
Mean      DETR Mean Wage     Wage
Wages      + 40% Benefits   Premium
                               48.98%
                      -
                      -


                      -
                      -
                      -
                      -


                      -
                      -
                      -
                      -
                      -


                      -
                      -
                      -
                      -
                      -
                      -
                      -
                      -
  15.50             21.70      18.25%
  15.50             21.70      25.16%
  15.50             21.70      42.03%
  15.50             21.70      28.80%
  15.50             21.70      42.49%
  15.50             21.70      43.18%
  15.50             21.70      44.33%
  15.50             21.70      50.09%
  15.50             21.70      45.71%
                      -
  15.50             21.70      45.71%
  15.50             21.70      44.33%
  15.50             21.70      42.72%
                                        94
DETR
Mean      DETR Mean Wage     Wage
Wages      + 40% Benefits   Premium
                               48.98%
  15.50             21.70      47.56%
                      -


                      -
                      -
                      -
                      -
                      -
                      -
                      -
                      -
                      -
                      -
                      -

                      -
                      -
  21.78             30.49      41.28%
  21.78             30.49      50.33%
  21.78             30.49      52.07%
  21.78             30.49      52.96%
  21.78             30.49      55.39%
  21.78             30.49      56.37%
  21.78             30.49      56.93%
  21.78             30.49      57.75%
  21.78             30.49      59.68%
  21.78             30.49      60.73%
  21.78             30.49      61.88%
  21.78             30.49      62.50%
  21.78             30.49      63.29%
  21.78             30.49      68.67%
  21.78             30.49      71.32%
  21.78             30.49      68.67%
                      -
                      -
                      -

                                        95
DETR
Mean      DETR Mean Wage     Wage
Wages      + 40% Benefits   Premium
                               48.98%

                      -
                      -
  21.78             30.49      91.46%
  21.78             30.49      71.23%
  21.78             30.49      64.80%
  21.78             30.49      86.51%
  21.78             30.49      70.41%
  21.78             30.49      64.11%
  21.78             30.49      82.44%
  21.78             30.49      69.68%
  21.78             30.49      63.39%
  21.78             30.49      68.60%
  21.78             30.49      76.77%
  21.78             30.49      73.16%
                      -
                      -
                      -

                      -
                      -
  21.78             30.49      89.72%
  21.78             30.49      71.82%
  21.78             30.49      65.52%
  21.78             30.49      84.67%
  21.78             30.49      71.13%
  21.78             30.49      64.86%
  21.78             30.49      79.92%
  21.78             30.49      70.41%
  21.78             30.49      64.11%
  21.78             30.49      74.96%
  21.78             30.49      71.32%
  21.78             30.49      67.68%
  21.78             30.49      64.53%
  21.78             30.49      61.39%
                      -
                      -
                      -
                                        96
DETR
Mean      DETR Mean Wage     Wage
Wages      + 40% Benefits   Premium
                               48.98%
                      -
                      -
                      -
                      -
                      -
                      -
                      -
                      -
                      -




                      -
                      -
                      -
                      -
                      -
                      -


                      -
                      -
                      -
                      -
  25.42             35.59     -46.61%
                      -
                      -
  25.60             35.84     -46.99%
  25.60             35.84     -46.99%
  25.60             35.84     -46.99%
                      -
                      -
                      -
                      -
                      -
                      -
                      -
                                        97
DETR
Mean      DETR Mean Wage     Wage
Wages      + 40% Benefits   Premium
                               48.98%
                      -
                      -
                      -
                      -
                      -
                      -
                      -
  31.04             43.46     -41.02%
                      -
                      -
                      -
                      -


                      -
                      -
                      -


                      -
                      -
                      -
                      -
                      -
                      -
                      -
                      -
                      -



                      -
                      -
                      -


                      -
                      -
                                        98
DETR
Mean      DETR Mean Wage     Wage
Wages      + 40% Benefits   Premium
                               48.98%

                      -
  20.13             28.18      40.20%
  20.13             28.18      40.20%
  20.13             28.18      40.20%
  20.13             28.18      40.20%
  20.13             28.18      40.20%
  20.13             28.18      40.20%
  20.13             28.18      40.20%
  20.13             28.18      40.20%
  20.13             28.18      40.20%
  20.13             28.18      40.20%
  20.13             28.18      40.20%
                      -
  20.13             28.18      40.20%
  20.13             28.18      40.20%
  20.13             28.18      40.20%
                      -

                      -

                      -
                      -
                      -
  20.13             28.18      40.20%
  20.13             28.18      40.20%




  20.13             28.18      40.20%
  20.13             28.18      40.20%

  20.13             28.18      40.20%
  20.13             28.18      40.20%
                                        99
DETR
Mean      DETR Mean Wage     Wage
Wages      + 40% Benefits   Premium
                               48.98%
  20.13             28.18      40.20%
  20.13             28.18      40.20%
                      -
  20.13             28.18      40.20%
  20.13             28.18      40.20%

  20.13             28.18      40.20%
  20.13             28.18      40.20%
                      -
  20.13             28.18      40.20%
  20.13             28.18      40.20%
  20.13             28.18      40.20%
  20.13             28.18      40.20%
  20.13             28.18      40.20%
  20.13             28.18      40.20%
  20.13             28.18      40.20%

  20.13             28.18      40.20%
  20.13             28.18      40.20%
  20.13             28.18      40.20%
  20.13             28.18      40.20%
  20.13             28.18      40.20%
  20.13             28.18      40.20%
  20.13             28.18      41.97%
                      -
                      -
                      -
                      -




                      -

                      -
                      -
                      -
                                        100
DETR
Mean    DETR Mean Wage     Wage
Wages    + 40% Benefits   Premium
                             48.98%
                    -
                    -
                    -
                    -




                                      101
                                                              Annual    2011 PW       Difference Between                                  DETR
 ESMERALDA                                                   Growth,     Survey          PW Rates and     Union   Union %    Non-Union    Mean
 No Data For Construction DETR           PW 2010    PW 2011 2010 - 2011 Average           Survey Avg.      Y/N    Difference % Difference Wages
Average                                                         -2.50%                              5.90%             11.68%       -2.67%

                                         ADD
AIR BALANCE TECHNICIAN                   SHEET    Clark                                                     Y        10.62%
Air Balance Technician-Journeyman           58.52     59.52        1.71%      57.83               2.92%
Air Balance Technician-Foreman              62.95     63.97        1.62%      57.83              10.62%
Air Balance Technician-General Foreman      67.37     68.42        1.56%      57.83              18.31%

ALARM INSTALLER                                     Nye                                                     N                     0.00%
Alarm Installer                             54.38         22.00   -59.54%     22.00               0.00%

BOILERMAKER                                         Clark                                                   Y         1.87%
Boilermaker                                 59.50      65.94      10.82%      64.73               1.87%

BRICKLAYER                               ADD        Eureka                                                  Y        -1.58%
Bricklayer-Journeyman                       45.46      44.71       -1.65%     45.43               -1.58%

CARPENTER                                ADD      Nye                                                       Y        -5.31%
Carpenter-Journeyman                        48.70     48.95        0.51%      54.51              -10.20%
Carpenter-Welder                            49.70     49.95        0.50%      54.51               -8.37%
Carpenter-Foreman                           51.83     52.08        0.48%      54.51               -4.46%
Carpenter-General Foreman                   55.24     55.49        0.45%      54.51                1.80%

CEMENT MASON                             ADD        Eureka                                                  Y        40.11%
Cement Mason-Journeyman                     46.28      46.28       0.00%      34.40              34.53%
Cement Mason-Foreman                        48.28      48.28       0.00%      34.40              40.35%
Cement Mason-General Foreman                50.03      50.03       0.00%      34.40              45.44%

ELECTRICIAN-COMMUNICATION                ADD                                                                N                     0.00%
Electrician-Communication Technician        38.72         26.78   -30.84%     26.78               0.00%

ELECTRICIAN-
LINEMAN/GROUNDMAN/HEAVY
EQUIPMENT OPERATOR                                  White Pine                                              Y       -13.58%
Electrician-Groundman                       34.82      35.33       1.46%      58.40              -39.50%
Electrician-Lineman                         51.95      52.82       1.67%      58.40               -9.55%
Electrician-Foreman                         56.89      57.86       1.71%      58.40               -0.92%
Electrician-General Foreman                 61.90      62.97       1.73%      58.40                7.83%
Heavy Equipment Operator                    42.69      43.37       1.59%      58.40              -25.74%
                                                                        102
                                                                 Annual    2011 PW Difference Between                                  DETR
  ESMERALDA                                                     Growth,     Survey    PW Rates and     Union   Union %    Non-Union    Mean
  No Data For Construction DETR            PW 2010     PW 2011 2010 - 2011 Average     Survey Avg.      Y/N    Difference % Difference Wages
Average                                                            -2.50%                        5.90%             11.68%       -2.67%
ELECTRICIAN-NEON SIGN                                  Clark                                             Y          0.57%
Electrician-Neon Sign                          44.31      45.52     2.73%     45.26              0.57%

ELECTRICIAN-WIREMAN                        ADD         Nye                                               Y        20.93%
Wireman                                       54.74       56.31     2.87%      49.48           13.80%
Cable Splicer                                 55.25       56.83     2.86%      49.48           14.85%
Foreman                                       59.18       60.84     2.81%      49.48           22.96%
General Foreman                               63.62       65.37     2.75%      49.48           32.11%

ELEVATOR CONSTRUCTOR                       -           Nye                                               Y         3.09%
Elevator Constructor-Journeyman Mechanic       46.01      64.58    40.36%      65.56           -1.49%
Elevator Constructor-Mechanic In Charge        46.01      70.59    53.42%      65.56            7.67%

FENCE ERECTOR                              -           Nye                                               N                     0.00%
Fence Erector                                  13.00      18.43    41.77%      18.43            0.00%

                                            ADD
                                           LABORER Not
                                           ZONE      Surveyed
FLAGPERSON                                 RATE      Set Union                                           Y
Flagperson                                     41.44     22.16     -46.53%



FLOOR COVERER                                          Churchill                                         Y        23.55%
Floor Coverer-Journeyman                       36.26      42.40    16.93%      36.31           16.77%
Floor Coverer-Foreman                          38.90      47.32    21.65%      36.31           30.32%

GLAZIER                                    -           Nye                                               N                     0.00%
Glazier                                        21.50      21.50     0.00%      21.50            0.00%
Glazier-Foreman                                21.50      21.50     0.00%      21.50            0.00%

HIGHWAY STRIPER                            ADD         Nye                                               Y         0.00%
Highway Striper                               33.57       42.94    27.91%      42.94            0.00%

HOD CARRIER-BRICK MASON TENDER                         Eureka                                            Y         0.00%
Brick Mason                                    43.31      43.31     0.00%      43.31            0.00%


                                                                         103
                                                             Annual    2011 PW      Difference Between                                  DETR
 ESMERALDA                                                  Growth,     Survey         PW Rates and     Union   Union %    Non-Union    Mean
 No Data For Construction DETR          PW 2010    PW 2011 2010 - 2011 Average          Survey Avg.      Y/N    Difference % Difference Wages
Average                                                        -2.50%                             5.90%             11.68%       -2.67%
                                        ADD
HOD CARRIER-PLASTERER TENDER           LABORER     CC                                                     Y        36.28%
Plasterer Tender-Journeyman                44.34        44.34    0.00%      33.76              31.34%
Plasterer-Gun Tender                       46.34        46.34    0.00%      33.76              37.26%
Plasterer Tender-Foreman                   47.34        47.34    0.00%      33.76              40.23%

                                       SEE
IRON WORKER                            AMENDME Nye                                                        Y        60.63%
Ironworker-Journeyman                     54.38    56.74         4.34%      37.39              51.75%
Ironworker-Foreman                        57.68    60.04         4.09%      37.39              60.58%
Ironworker-General Foreman                61.04    63.40         3.87%      37.39              69.56%


                                        ADD
                                       LABORER
LABORER                                ZONE                                                               N                     -6.10%
SEE GROUP CLASSIFICATIONS              RATE
Landscaper                                 42.94        22.16   -48.39%     23.60               -6.10%
Furniture Mover                            42.94        22.16   -48.39%     23.60               -6.10%
Group 1                                    42.94        22.16   -48.39%     23.60               -6.10%
Group 1A                                   42.94        22.16   -48.39%     23.60               -6.10%
Group 2                                    42.94        22.16   -48.39%     23.60               -6.10%
Group 3                                    42.94        22.16   -48.39%     23.60               -6.10%
Group 4                                    42.94        22.16   -48.39%     23.60               -6.10%
Group 4A                                   42.94        22.16   -48.39%     23.60               -6.10%
Group 5                                    42.94        22.16   -48.39%     23.60               -6.10%
Group 6                                    45.60
Nozzlemen, Rodmen                          42.94        22.16   -48.39%     23.60               -6.10%
Gunmen, Materialmen                        42.94        22.16   -48.39%     23.60               -6.10%
Reboundmen                                 42.94        22.16   -48.39%     23.60               -6.10%
Gunite Foremen                             42.94        22.16   -48.39%     23.60               -6.10%


MECHANICAL INSULATOR                               Douglas                                                Y         4.84%
Mechanical Insulator-Journeyman            55.63      56.23      1.08%      56.77              -0.95%
Mechanical Insulator-Foreman               58.99      59.52      0.90%      56.77               4.84%
Mechanical Insulator-General Foreman       62.36      62.81      0.72%      56.77              10.64%

MILLWRIGHT                             ADD         Churchill          104                                 Y        13.23%
                                                                  Annual    2011 PW Difference Between                                  DETR
 ESMERALDA                                                       Growth,     Survey    PW Rates and     Union   Union %    Non-Union    Mean
 No Data For Construction DETR            PW 2010    PW 2011    2010 - 2011 Average     Survey Avg.      Y/N    Difference % Difference Wages
Average                                                             -2.50%                        5.90%             11.68%       -2.67%
Millwright-Journeyman                        49.70      49.95        0.50%     46.60              7.19%
Millwright-Welder                            50.70      50.95        0.49%     46.60              9.33%
Millwright-Foreman                           53.01      53.26        0.47%     46.60             14.29%
Millwright-General Foreman                   56.65      56.90        0.44%     46.60             22.10%

OPERATING ENGINEER
SEE GROUP CLASSIFICATIONS                 ADD        Nye                                                  Y         4.58%
Group 1                                      53.92      55.67       3.25%      57.12            -2.54%
Group 2                                      54.87      56.62       3.19%      57.12            -0.88%
Group 3                                      55.16      56.91       3.17%      57.12            -0.37%
Group 4                                      56.65      58.40       3.09%      57.12             2.24%
Group 5                                      57.75      59.50       3.03%      57.12             4.17%
Group 6                                      56.87      58.62       3.08%      57.12             2.63%
Group 7                                      57.97      59.72       3.02%      57.12             4.55%
Group 8                                      56.98      58.73       3.07%      57.12             2.82%
Group 9                                      58.08      59.83       3.01%      57.12             4.74%
Group 10                                     57.10      58.85       3.06%      57.12             3.03%
Group 11                                     58.20      59.95       3.01%      57.12             4.95%
Group 12                                     57.27      59.02       3.06%      57.12             3.33%
Group 13                                     57.37      59.12       3.05%      57.12             3.50%
Group 14                                     57.40      59.15       3.05%      57.12             3.55%
Group 15                                     57.48      59.23       3.04%      57.12             3.69%
Group 16                                     57.60      59.35       3.04%      57.12             3.90%
Group 17                                     57.77      59.52       3.03%      57.12             4.20%
Group 18                                     57.87      59.62       3.02%      57.12             4.38%
Group 19                                     57.98      59.73       3.02%      57.12             4.57%
Group 20                                     58.10      59.85       3.01%      57.12             4.78%
Group 21                                     58.27      60.02       3.00%      57.12             5.08%
Group 22                                     58.37      60.12       3.00%      57.12             5.25%
Group 23                                     58.48      60.23       2.99%      57.12             5.44%
Group 24                                     58.60      60.35       2.99%      57.12             5.65%
Group 25                                     58.77      60.52       2.98%      57.12             5.95%
Add $.50 per hour for "Special" Shift
Add $1.00 per hour for "Multiple" Shift

OPERATING ENGINEER:
CRANES, PILEDRIVING, & HOISTING
EQUIPMENT                                                                                                 Y
SEE GROUP CLASSIFICATIONS                 ADD                            105
                                                                 Annual    2011 PW   Difference Between                                  DETR
  ESMERALDA                                                     Growth,     Survey      PW Rates and     Union   Union %    Non-Union    Mean
  No Data For Construction DETR              PW 2010   PW 2011 2010 - 2011 Average       Survey Avg.      Y/N    Difference % Difference Wages
Average                                                            -2.50%                          5.90%             11.68%       -2.67%
Group 1
Engineer Oiler                                 57.60     59.35      3.04%    57.12               3.90%
Forklift Operator                              56.51     58.26      3.10%    57.12               2.00%
Group 2
Truck Crane Oiler                              57.60     59.35      3.04%    57.12               3.90%
Group 3
A-Frame or Winch Truck Operator                56.51     58.26      3.10%    57.12               2.00%
Ross Carrier Operator (Jobsite)                56.51     58.26      3.10%    57.12               2.00%
Group 4
Bridge-Type Unloader and Turntable             56.65     58.40      3.09%    57.12               2.24%
Helicopter Hoist Operator                      56.65     58.40      3.09%    57.12               2.24%
Group 5
Hydraulic Boom Truck (Pitman)                  56.87     58.62      3.08%    57.12               2.63%
Stinger Crane (Austin-Western or Similar       56.87     58.62      3.08%    57.12               2.63%
Tugger Hoist Operator (1 Drum)                 56.87     58.62      3.08%    57.12               2.63%
Group 6
Bridge Crane Operator                          56.98     58.73      3.07%    57.12               2.82%
Cretor Crane Operator                          56.98     58.73      3.07%    57.12               2.82%
Hoist Operator (Chicago Boom and Similar       56.98     58.73      3.07%    57.12               2.82%
Lift Mobile Operator                           56.98     58.73      3.07%    57.12               2.82%
Lift Slab Machine Operator (Vagtborg and       56.98     58.73      3.07%    57.12               2.82%
Material Hoist/Manlift Operator                56.98     58.73      3.07%    57.12               2.82%
Polar Gantry Crane Operator                    56.98     58.73      3.07%    57.12               2.82%
Self Climbing Scaffold (or Similar Type)       56.98     58.73      3.07%    57.12               2.82%
Shovel, Backhoe, Dragline, Clamshell
Operator (Over 3/4 YD. and up to 5 CU.
YDS. M.R.C.)                                   56.98     58.73      3.07%    57.12               2.82%
Silent Piler                                   56.98     58.73      3.07%    57.12               2.82%
Tugger Hoist Operator (2 Drum)                 56.98     58.73      3.07%    57.12               2.82%
Group 7
Pedestal Crane Operator                        57.10     58.85      3.06%    57.12               3.03%
Shovel, Backhoe, Dragline, Clamshell
Operator (over 5 CU. YDS. M.R.C.)              57.10     58.85      3.06%    57.12               3.03%
Tower Crane Repairman                          57.10     58.85      3.06%    57.12               3.03%
Tugger Hoist Operator (3 Drum)                 57.10     58.85      3.06%    57.12               3.03%
Group 8
Crane Operator (up to and including 25 ton     59.07     60.82      2.96%    57.12               6.48%
Crawler Transporter Operator                   57.27     59.02      3.06%    57.12               3.33%
                                                                         106
                                                                   Annual    2011 PW   Difference Between                                  DETR
  ESMERALDA                                                       Growth,     Survey      PW Rates and     Union   Union %    Non-Union    Mean
  No Data For Construction DETR                PW 2010   PW 2011 2010 - 2011 Average       Survey Avg.      Y/N    Difference % Difference Wages
Average                                                              -2.50%                          5.90%             11.68%       -2.67%
Derrick Barge Operator (up to and including
25 ton capacity)                                 57.27     59.02      3.06%    57.12               3.33%
Hoist Operator, Stiff Legs, Guy Derrick or
Similar Type (up to and including 25 ton
capacity)                                        57.27     59.02      3.06%    57.12               3.33%
Shovel, Backhoe, Dragline, Clamshell
Operator (over 7 CU. YDS. M.R.C.)                57.27     59.02      3.06%    57.12               3.33%
Group 9
Crane Operator (over 25 tons up to and
including 50 tons M.R.C.)                        59.07     60.82      2.96%    57.12               6.48%
Derrick Barge Operator (over 25 tons, up to
and including 50 tons M.R.C.)                    57.44     59.19      3.05%    57.12               3.62%
Highline Cableway Operator                       57.44     59.19      3.05%    57.12               3.62%
Hoise Operator, Stiff Legs, Guy Derrick or
Similar Type (over 25 tons, up to and
including 50 tons M.R.C.)                        57.44     59.19      3.05%    57.12               3.62%
K-Crane                                          57.44     59.19      3.05%    57.12               3.62%
Polar Crane Operator                             57.44     59.19      3.05%    57.12               3.62%
Self Erecting Tower Crane Operator
Maximum Lifting Capacity Ten (10) Tons.
One (1) Ton Operator).                           57.44     59.19      3.05%    57.12               3.62%
Group 10
Crane Operator (over 50 tons, up to and
including 100 tons M.R.C.)                       60.49     62.24      2.89%    57.12               8.96%
Derrick Barge Operator (over 50 tons, up to
and including 100 tons M.R.C.)                   58.44     60.19      2.99%    57.12               5.37%
Hoist Operator, Stiff Legs, Guy Derrick or
Similar Type (over 50 tons, up to and
including 100 tons M.R.C.)                       58.44     60.19      2.99%    57.12               5.37%
Mobile Tower Crane Operator (over 50 tons,
up to and including 100 tons M.R.C.)             60.49     62.24      2.89%    57.12               8.96%
Group 11
Crane Operator (over 100 tons, up to and
including 200 tons M.R.C.)                       60.99     62.74      2.87%    57.12               9.84%
Derrick Barge Operator (over 100 tons, up to
and including 200 tons M.R.C.)                   59.44     61.19      2.94%    57.12               7.13%
Hoist Operator, Stiff Legs, Guy Derrick or
Similar Type (over100 tons, up to and
including 200 tons M.R.C.)                       59.44     61.19      2.94%107 57.12               7.13%
                                                                    Annual    2011 PW     Difference Between                                  DETR
  ESMERALDA                                                        Growth,     Survey        PW Rates and     Union   Union %    Non-Union    Mean
  No Data For Construction DETR               PW 2010     PW 2011 2010 - 2011 Average         Survey Avg.      Y/N    Difference % Difference Wages
Average                                                               -2.50%                            5.90%             11.68%       -2.67%
Mobile Tower Crane Operator (over 100
tons, up to and including 200 tons M.R.C.)        60.99       62.74    2.87%      57.12               9.84%
Tower Crane Operator and Tower Gantry             61.44       63.19    2.85%      57.12              10.63%
Group 12
Crane Operator (over 200 tons up to and
including 300 tons M.R.C.)                        63.63       65.38    2.75%      57.12              14.46%
Derrick Barge Operator (over 200 tons up to
and including 300 tons M.R.C.)                    60.44       62.19    2.90%      57.12               8.88%
Hoist Operator, Stiff Legs, Guy Derrick or
Similar Type (over 200 tons up to and
including 300 tons M.R.C.)                        60.44       62.19    2.90%      57.12               8.88%
Mobile Tower Crane Operator (over 200
tons up to and including 300 tons M.R.C.)         63.63       65.38    2.75%      57.12              14.46%
Group 13
Crane Operator (over 300 tons)                    65.00       66.75    2.69%      57.12              16.86%
Derrick Barge Operator (over 300 tons)            61.44       63.19    2.85%      57.12              10.63%
Helicopter Pilot                                  61.44       63.19    2.85%      57.12              10.63%
Hoist Operator, Stiff Legs, Guy Derrick or
Similar Type (over 300 tons)                      61.44       63.19    2.85%      57.12              10.63%
Mobile Tower Crane Operator (over 300             65.00       66.75    2.69%      57.12              16.86%
Add $ .50 per hour for "Special" Shift        -           -
Add $1.00 per hour for "Multiple" Shift       -           -

OPERATING ENGINEER-SURVEYOR

SEE GROUP CLASSIFICATIONS                     ADD         ADD
Group 1                                          55.84      57.59      3.13%      57.12               0.82%
Group 2                                          56.65      58.40      3.09%      57.12               2.24%
Group 3                                          56.87      58.62      3.08%      57.12               2.63%
Group 4                                          57.15      58.90      3.06%      57.12               3.12%
Group 5                                          57.27      59.02      3.06%      57.12               3.33%
Group 6                                          57.37      59.12      3.05%      57.12               3.50%
Group 7                                          57.40      59.15      3.05%      57.12               3.55%
Group 8                                          57.77      59.52      3.03%      57.12               4.20%
Group 9                                          57.90      59.65      3.02%      57.12               4.43%
Group 10                                         58.40      60.15      3.00%      57.12               5.30%


OPERATING ENGINEER -TUNNEL                                                  108
                                                           Annual    2011 PW Difference Between                                  DETR
 ESMERALDA                                                Growth,     Survey    PW Rates and     Union   Union %    Non-Union    Mean
 No Data For Construction DETR       PW 2010     PW 2011 2010 - 2011 Average     Survey Avg.      Y/N    Difference % Difference Wages
Average                                                      -2.50%                        5.90%             11.68%       -2.67%
SEE GROUP CLASSIFICATIONS            ADD         ADD
Group 1                                 55.77      57.52      3.14%     57.12              0.70%
Group 2                                 56.72      58.47      3.09%     57.12              2.36%
Group 3                                 57.01      58.76      3.07%     57.12              2.87%
Group 4                                 57.15      58.90      3.06%     57.12              3.12%
Group 5                                 57.37      59.12      3.05%     57.12              3.50%
Group 6                                 57.48      59.23      3.04%     57.12              3.69%
Group 7                                 57.60      59.35      3.04%     57.12              3.90%
Group 8                                 57.77      59.52      3.03%     57.12              4.20%
Group 9                                 57.90      59.65      3.02%     57.12              4.43%


                                                Churchill
PAINTER                                        (8 hrs)                                             Y        43.07%
Painter-Journeyman                       46.23     46.64      0.89%     33.69            38.44%
Painter-Foreman                          49.35     49.76      0.83%     33.69            47.70%


PILEDRIVER                                                                                         Y
Driverman, Rigman, Bridge and Dock
Carpenter                                58.47      58.47     0.00%
Certified Welder                         58.47      58.47     0.00%
Piledriver-Foreman                       62.05      62.05     0.00%
Diver-Diving (wet pay)                   58.47      58.47     0.00%
Stand-By Diver                           58.47      58.47     0.00%
Tender                                   58.47      58.47     0.00%

PLASTERER                            ADD         Clark                                             Y        -0.13%
Plasterer                               44.69       44.69     0.00%     44.75            -0.13%

PLUMBER/PIPEFITTER                   -           Mineral                                           N                    -14.87%
Plumber/Pipefitter-Journeyman            34.28      26.10    -23.86%    30.66           -14.87%
Plumber-Foreman                          34.28      26.10    -23.86%    30.66           -14.87%
Plumber-General Foreman                  34.28      26.10    -23.86%    30.66           -14.87%

REFRIGERATION                                    Lander                                            Y       -11.59%
Refrigeration-Journeyman                 36.24      35.17     -2.95%    39.78           -11.59%
Refrigeration-Foreman                    36.24      35.17     -2.95%    39.78           -11.59%
Refrigeration-General Foreman            36.24      35.17     -2.95%109 39.78           -11.59%
                                                                  Annual    2011 PW     Difference Between                                  DETR
 ESMERALDA                                                       Growth,     Survey        PW Rates and     Union   Union %    Non-Union    Mean
 No Data For Construction DETR               PW 2010    PW 2011 2010 - 2011 Average         Survey Avg.      Y/N    Difference % Difference Wages
Average                                                             -2.50%                            5.90%             11.68%       -2.67%

ROOFER                                             -
(Does not include sheet metal roofs)                    Nye                                                   Y         0.25%
Roofer                                          31.83         31.91    0.25%    31.83               0.25%

SHEET METAL WORKER                          ADD      Nye                                                      Y         8.53%
Sheet Metal Worker-Journeyman                  58.52     59.52         1.71%    58.94               0.98%
Sheet Metal Worker-Foreman                     62.95     63.97         1.62%    58.94               8.53%
Sheet Metal Worker-General Foreman             67.37     68.42         1.56%    58.94              16.08%

SPRINKLER FITTER                            -           Nye                                                   N                     -0.36%
Sprinkler Fitter-Journeyman                     55.15         25.00   -54.67%   25.09               -0.36%
Sprinkler Fitter-Foreman                        57.90         25.00   -56.82%   25.09               -0.36%
Sprinkler Fitter-General Foreman                60.15         25.00   -58.44%   25.09               -0.36%


TAPER                                                   Nye                                                   Y        30.13%
Taper                                           46.23         46.64    0.89%    35.84              30.13%

TILE SETTER/TERRAZZO                        ADD
WORKER/MARBLE MASON                         ZONE        Douglas                                               Y        43.07%
Tile Setter/Terrazzo Worker/Marble Mason-      32.48       34.63       6.62%    24.52              41.23%
Tile Setter                                    43.61       46.66       6.99%    33.32              40.04%
Terrazzo Worker/Marble Mason                   46.04       49.29       7.06%    33.32              47.93%


                                             ADD
                                            LABORER
                                            ZONE
TRAFFIC BARRIER ERECTOR                     RATE
Traffic Barrier Erector                         42.94         22.16   -48.39%


                                            ADD
                                            ZONE
TRUCK DRIVER                                RATE        Clark                                                 Y        -0.38%
SEE GROUP CLASSIFICATIONS
Group 1                                         46.13         46.13    0.00%    46.96               -1.77%
Group 2                                         46.23         46.23    0.00%110 46.96               -1.55%
                                                                      Annual    2011 PW Difference Between                                   DETR
  ESMERALDA                                                          Growth,     Survey    PW Rates and      Union   Union %    Non-Union    Mean
  No Data For Construction DETR                PW 2010    PW 2011   2010 - 2011 Average     Survey Avg.       Y/N    Difference % Difference Wages
Average                                                                 -2.50%                         5.90%             11.68%       -2.67%
Group 3                                           46.44     46.44        0.00%     46.96              -1.11%
Group 4                                           46.62     46.62        0.00%     46.96              -0.72%
Group 5                                           46.82     46.82        0.00%     46.96              -0.30%
Group 6                                           47.12     47.12        0.00%     46.96               0.34%
Foreman $1.00 above highest paid
journeyman supervised.                            48.12     48.12       0.00%      46.96             2.47%

WELL DRILLER                                                                                                  N                      0.00%
Well Driller                                      31.49     19.42      -38.33%     19.42             0.00%

                                               ADD
EQUIPMENT GREASER (RACK)                       OPERATI Nye                                                     Y         2.98%
Equipment Greaser (rack)                          55.16    56.91        3.17%      56.79             0.21%

                                 ADD
EQUIPMENT GREASER (GREASE TRUCK) OPERATI Nye
Equipment Greaser (grease truck)    56.65    58.40                      3.09%      56.79             2.84%

EQUIPMENT GREASER (GREASE                    ADD
TRUCK/MULTI-SHIFT)                           OPERATI Nye
Equipment Greaser (grease truck/multi-shift)    57.75    59.50          3.03%      56.79             4.77%

TUNNEL, EQUIPMENT GREASER                      ADD
(GREASE TRUCK)                                 OPERATI Nye
Tunnel, Equipment Greaser (grease truck)          57.37    59.12        3.05%      56.79             4.10%

                                               ADD
FIELD SOILS AND MATERIAL TESTER                OPERATI Nye                                                     Y        -0.30%
Field Soils and Material Tester                   54.87    56.62        3.19%      56.79             -0.30%

FIELD ASPHALTIC CONCRETE (SOILS                ADD
AND MATERIAL TESTER)                           OPERATI Nye
Field Asphaltic Concrete (soils and material      54.87    56.62        3.19%      56.79             -0.30%

Union Breakdown
Union                                                                                                         30
Non-Union                                                                                                      8
Total                                                                                                         38
                                                                             111
DETR Mean
Wage + 40%    Wage
 Benefits    Premium




                       112
DETR Mean
Wage + 40%    Wage
 Benefits    Premium




                       113
DETR Mean
Wage + 40%    Wage
 Benefits    Premium




                       114
DETR Mean
Wage + 40%    Wage
 Benefits    Premium




                       115
DETR Mean
Wage + 40%    Wage
 Benefits    Premium




                       116
DETR Mean
Wage + 40%    Wage
 Benefits    Premium




                       117
DETR Mean
Wage + 40%    Wage
 Benefits    Premium




                       118
DETR Mean
Wage + 40%    Wage
 Benefits    Premium




                       119
DETR Mean
Wage + 40%    Wage
 Benefits    Premium




                       120
DETR Mean
Wage + 40%    Wage
 Benefits    Premium




                       121
                                                        Annual      2011 PW Difference Between                        Non-Union     DETR
 EUREKA                                              Growth, 2010 - Survey PW Rates and Survey     Union   Union %        %         Mean
 No Data for Construction DETR       PW 2010 PW 2011     2011       Average         Avg.            Y/N    Difference Difference    Wages
Average                                                      0.25%                         2.64%                2.68%      -6.34%

                                     ADD
                                     SHEET
                                     METAL
                                     ZONE
AIR BALANCE TECHNICIAN               RATE     Elko                                                   Y        45.08%
Air Balance-Journeyman                  58.52    48.35      -17.38%    35.47             36.31%
Air Balance-Foreman                     62.95    51.46      -18.25%    35.47             45.08%
Air Balance-General Foreman             67.37    54.57      -19.00%    35.47             53.85%

ALARM INSTALLER                                  Elko                                                Y         0.00%
Alarm Installer                          30.88      31.61    2.36%     31.61              0.00%

BOILERMAKER                          -           Clark                                               Y         1.87%
Boilermaker-Journeyman                   59.50      65.94   10.82%     64.73              1.87%
Boilermaker-Foreman                      59.50      65.94   10.82%     64.73              1.87%
Boilermaker-General Foreman              59.50      65.94   10.82%     64.73              1.87%

                                     ADD      ADD
                                     ZONE     ZONE
BRICKLAYER                           RATE--   RATE--                                                 Y       -28.07%
Bricklayer                              32.68    32.68       0.00%     45.43             -28.07%

                                     ADD      ADD
                                     ZONE     ZONE
CARPENTER                            RATE     RATE                                                   Y         4.90%
Carpenter-Journeyman                    38.30    38.80       1.31%     38.30              1.31%
Carpenter-Foreman                       41.05    41.55       1.22%     38.30              8.49%

CEMENT MASON                                                                                         Y         2.91%
Cement Mason-Journeyman                  34.40      34.40    0.00%     34.40              0.00%
Cement Mason-Foreman                     36.40      36.40    0.00%     34.40              5.81%

ELECTRICIAN-COMMUNICATION                      White
TECHNICIAN                                     Pine                                                  N                     0.00%
Communication-Installer/Technician       27.97     17.49    -37.47%    17.49              0.00%

                                                                      122
                                                            Annual      2011 PW Difference Between                        Non-Union     DETR
 EUREKA                                                  Growth, 2010 - Survey PW Rates and Survey     Union   Union %        %         Mean
 No Data for Construction DETR     PW 2010      PW 2011      2011       Average         Avg.            Y/N    Difference Difference    Wages
Average                                                          0.25%                         2.64%                2.68%      -6.34%
                                               White
ELECTRICIAN-LINE                   -           Pine                                                      Y        -2.23%
Groundman                              39.19       40.50         3.34%     58.40             -30.65%
Lineman                                57.91       59.90         3.44%     58.40               2.57%
Foreman                                63.02       65.16         3.40%     58.40              11.58%
General Foreman                        68.12       70.45         3.42%     58.40              20.63%
Heavy Equipment Operator               47.86       49.49         3.41%     58.40             -15.26%

ELECTRICIAN-NEON SIGN                          Clark                                                     Y         0.57%
Electrician-Neon Sign                  44.31      45.52         2.73%    45.26                0.57%

ELECTRICIAN-WIREMAN                -           -                                                         Y        10.31%
Electrician-Wireman                    29.98       50.78       69.38%    49.48                2.63%
Electrician-Cable Splicer              29.98       54.58       82.05%    49.48               10.31%
Electrician-Foreman                    29.98       54.58       82.05%    49.48               10.31%
Electrician-General Foreman            29.98       58.38       94.73%    49.48               17.99%

ELEVATOR CONSTRUCTOR               -           Nye                                                       Y         3.09%
Elevator Constructor-Journeyman
Mechanic                               46.01       64.58       40.36%    65.56               -1.49%
Elevator Constructor-Mechanic In
Charge                                 46.01       70.59       53.42%    65.56                7.67%

                                    ADD
                                   LABORE
                                   R ZONE
FENCE ERECTOR                      RATE     Elko                                                         N                     0.00%
Fence Erector                         30.82    35.47           15.09%    35.47                0.00%

                                    ADD         ADD
                                   LABORE      LABORE
                                   R ZONE      R ZONE
FLAGPERSON                         RATE        RATE
Flagperson                            27.95       27.95         0.00%


FLOOR COVERER                                  Churchill                                                 Y         3.65%
Floor Coverer-Journeyman               36.26      36.34         0.22%     36.31
                                                                        123                   0.08%
                                                     Annual      2011 PW Difference Between                        Non-Union     DETR
  EUREKA                                          Growth, 2010 - Survey PW Rates and Survey     Union   Union %        %         Mean
  No Data for Construction DETR   PW 2010 PW 2011     2011       Average         Avg.            Y/N    Difference Difference    Wages
Average                                                   0.25%                         2.64%                2.68%      -6.34%
Floor Coverer-Foreman               38.90   38.93         0.08%     36.31               7.22%

GLAZIER                           -           Elko                                                N                    -0.82%
Glazier                               21.50      20.50    -4.65%    20.67              -0.82%

                                   ADD         ADD
                                  LABORE      LABORE
                                  R ZONE      R ZONE
HIGHWAY STRIPER                   RATE        RATE                                                Y         0.00%
Highway Striper                      33.57       33.57    0.00%     33.57              0.00%

HOD CARRIER-BRICK MASON
TENDER                                                                                            Y         2.31%
Brick Mason-Journeyman                43.31      43.31    0.00%     43.31              0.00%
Brick Mason-Foreman                   45.31      45.31    0.00%     43.31              4.62%


HOD CARRIER-PLASTERER             ADD ZON
TENDER                            E RATE   Washoe                                                 Y         3.90%
Plasterer Tender-Journeyman          33.76   34.26        1.48%     33.73              1.57%
Plasterer-Gun Tender                 34.76   35.26        1.44%     33.73              4.54%
Plaster Tender-Foreman               35.12   35.62        1.42%     33.73              5.60%

                                  SEE
                                  AMENDM
IRON WORKER                       ENT 1                                                           Y         4.80%
Ironworker-Journeyman                54.38       56.74    4.34%     57.31             -0.99%
Ironworker-Foreman                   57.68       60.04    4.09%     57.31              4.76%
Ironworker-General Foreman           61.04       63.40    3.87%     57.31             10.63%

                                  ADD      ADD
LABORER                           ZONE     ZONE                                                   Y        -1.18%
SEE GROUP CLASSIFICATIONS         RATE     RATE
Landscaper                           25.66    25.66       0.00%      30.75            -16.55%
Furniture Mover                      27.16    27.16       0.00%      30.75            -11.67%
Group 1                              30.82    30.82       0.00%      30.75              0.23%
Group 1A                             27.95    27.95       0.00%      30.75             -9.11%
Group 2                              30.92    30.92       0.00%      30.75
                                                                   124                  0.55%
                                                                  Annual      2011 PW Difference Between                        Non-Union     DETR
 EUREKA                                                        Growth, 2010 - Survey PW Rates and Survey     Union   Union %        %         Mean
 No Data for Construction DETR         PW 2010 PW 2011             2011       Average         Avg.            Y/N    Difference Difference    Wages
Average                                                                0.25%                         2.64%                2.68%      -6.34%
Group 3                                    31.07       31.07           0.00%     30.75               1.04%
Group 4                                    31.32       31.32           0.00%     30.75               1.85%
Group 4A                                   32.57       32.57           0.00%     30.75               5.92%
Group 5                                    31.62       31.62           0.00%     30.75               2.83%
Group 6                                -           -
Nozzlemen, Rodmen                          31.62       31.62          0.00%     30.75               2.83%
Gunmen, Materialmen                        31.32       31.32          0.00%     30.75               1.85%
Reboundmen                                 30.97       30.97          0.00%     30.75               0.72%
Gunite Foremen                             32.02       32.02          0.00%     30.75               4.13%

                                       SEE
                                       AMENDM
MECHANICAL INSULATOR                   ENT 2-   Washoe                                                         Y        -0.08%
Mechanical Insulator-Journeyman           57.06   54.56              -4.38%     56.77               -3.89%
Mechanical Insulator-Foreman              59.56   57.06              -4.20%     56.77                0.51%

Mechanical Insulator-General Foreman       61.06       58.56         -4.09%     56.77               3.15%

MILLWRIGHT                                         Elko                                                        N                     0.00%
Millwright-Journeyman                      49.70      25.33         -49.03%     25.33               0.00%
Millwright-Welder                          50.70      25.33         -50.04%     25.33               0.00%
Millwright-Foreman                         53.01      25.33         -52.22%     25.33               0.00%
Millwright-General Foreman                 56.65      25.33         -55.29%     25.33               0.00%

                                       ADD      ADD
OPERATING ENGINEER                     ZONE     ZONE                                                           Y         8.88%
SEE GROUP CLASSIFICATIONS              RATE     RATE
Group 1                                   41.33    43.08              4.23%     46.84               -8.03%
Group 1A                                  44.09    45.84              3.97%     46.84               -2.13%
Group 2                                   44.62    46.37              3.92%     46.84               -1.00%
Group 3                                   44.89    46.64              3.90%     46.84               -0.43%
Group 4                                   45.63    47.38              3.84%     46.84                1.15%
Group 5                                   45.93    47.68              3.81%     46.84                1.79%
Group 6                                   46.10    47.85              3.80%     46.84                2.16%
Group 7                                   46.35    48.10              3.78%     46.84                2.69%
Group 8                                   46.94    48.69              3.73%     46.84                3.95%
Group 9                                   47.26    49.01              3.70%     46.84                4.63%
Group 10                                  47.61    49.36              3.68%     46.84
                                                                              125                    5.38%
                                                                    Annual      2011 PW Difference Between                        Non-Union     DETR
 EUREKA                                                          Growth, 2010 - Survey PW Rates and Survey     Union   Union %        %         Mean
 No Data for Construction DETR           PW 2010 PW 2011             2011       Average         Avg.            Y/N    Difference Difference    Wages
Average                                                                  0.25%                         2.64%                2.68%      -6.34%
Group 10A                                    47.80       49.55           3.66%     46.84               5.79%
Group 11                                     48.04       49.79           3.64%     46.84               6.30%
Group 11A                                    49.68       51.43           3.52%     46.84               9.80%
Group 11B                                    50.49       52.24           3.47%     46.84              11.53%
Foreman                                      49.68       51.43           3.52%     46.84               9.80%

Add 7% to base rate for "Second" Shift   -           -
Add 12.5% to base rate for "Special"
shift                                    -           -

OPERATING ENGINEER-STEEL                 ADD      ADD
FABRICATOR & ERECTOR                     ZONE     ZONE
SEE GROUP CLASSIFICATIONS                RATE     RATE
Group 1                                     56.63    58.38              3.09%     46.84              24.64%
Group 1 Truck Crane Oiler                   50.46    52.21              3.47%     46.84              11.46%
Group 1 Oiler                               48.50    50.25              3.61%     46.84               7.28%
Group 2                                     55.12    56.87              3.17%     46.84              21.41%
Group 2 Truck Crane Oiler                   50.21    51.96              3.49%     46.84              10.93%
Group 2 Oiler                               48.29    50.04              3.62%     46.84               6.83%
Group 3                                     53.88    55.63              3.25%     46.84              18.77%
Group 3 Truck Crane Oiler                   49.99    51.74              3.50%     46.84              10.46%
Group 3 Oiler                               48.07    49.82              3.64%     46.84               6.36%
Group 3 Hydraulic                           49.66    51.41              3.52%     46.84               9.76%
Group 4                                     52.15    53.90              3.36%     46.84              15.07%
Group 5                                     51.05    52.80              3.43%     46.84              12.72%

Add 7% to base rate for "Second" Shift   -           -
Add 12.5% to base rate for "Special"
Shift

OPERATING ENGINEER -                     ADD      ADD
PILEDRIVER                               ZONE     ZONE                                                           Y
SEE GROUP CLASSIFICATIONS                RATE     RATE
Group 1                                     56.10    57.85              3.12%     46.84              23.51%
Group 1 Truck Crane Oiler                   50.64    52.39              3.46%     46.84              11.85%
Group 1 Oiler                               48.72    50.47              3.59%     46.84               7.75%
Group 2                                     54.56    56.31              3.21%     46.84              20.22%
Group 2 Truck Crane Oiler                   50.43    52.18              3.47%     46.84
                                                                                126                  11.40%
                                                                   Annual      2011 PW Difference Between                        Non-Union     DETR
 EUREKA                                                         Growth, 2010 - Survey PW Rates and Survey     Union   Union %        %         Mean
 No Data for Construction DETR          PW 2010 PW 2011             2011       Average         Avg.            Y/N    Difference Difference    Wages
Average                                                                 0.25%                         2.64%                2.68%      -6.34%
Group 2 Oiler                               48.52       50.27           3.61%     46.84               7.32%
Group 3                                     53.11       54.86           3.30%     46.84              17.12%
Group 3 Truck Crane Oiler                   50.21       51.96           3.49%     46.84              10.93%
Group 3 Oiler                               48.29       50.04           3.62%     46.84               6.83%
Group 4                                     51.60       53.35           3.39%     46.84              13.90%
Group 5                                     50.49       52.24           3.47%     46.84              11.53%
Group 6                                     49.38       51.13           3.54%     46.84               9.16%
Group 7                                     48.42       50.17           3.61%     46.84               7.11%
Group 8                                     47.46       49.21           3.69%     46.84               5.06%
Add 7% to base for "Second" Shift              -           -
Add 12.5% to base for "Special" Shift   -           -


PAINTER                                             Elko                                                        Y         2.05%
Brush/Roller Painter                        32.74      32.74           0.00%     32.90               -0.49%
Spray Painter/Paperhanger                   33.59      33.59           0.00%     32.90                2.10%
Sandblaster                                 33.24      33.24           0.00%     32.90                1.03%
Structural Steel & Steeplejack              33.74      33.74           0.00%     32.90                2.55%
Swing Stage                                 34.74      34.74           0.00%     32.90                5.59%
Special Coating Application-Brush           33.24      33.24           0.00%     32.90                1.03%
Special Coating Application-Spray           33.74      33.74           0.00%     32.90                2.55%

Special Coating Application-Spray Steel     33.99       33.99          0.00%
Foreman $1.00 above highest Journeyman

PILEDRIVER
Piledriver-Journeyman                       58.47       58.47          0.00%
Piledriver-Foreman                          62.05       62.05          0.00%

                                        ADD
                                        ZONE
PLASTERER                               RATE     Washoe                                                         Y        -1.47%
Plasterer                                  34.27   34.77               1.46%     35.29               -1.47%

PLUMBER/PIPEFITTER                      -           Elko                                                        N                   -16.78%
Plumber/Pipefitter                          36.24      19.00         -47.57%     22.83              -16.78%

REFRIGERATION                           -           Elko                       127                              N                     0.00%
                                                                 Annual      2011 PW Difference Between                        Non-Union     DETR
 EUREKA                                                       Growth, 2010 - Survey PW Rates and Survey     Union   Union %        %         Mean
 No Data for Construction DETR         PW 2010 PW 2011            2011       Average         Avg.            Y/N    Difference Difference    Wages
Average                                                               0.25%                         2.64%                2.68%      -6.34%
Refrigeration-Journeyman                   27.55      19.00        -31.03%      19.00               0.00%
Refrigeration-Foreman                      27.55      19.00        -31.03%      19.00               0.00%
Refrigeration-General Foreman              27.55      19.00        -31.03%      19.00               0.00%

ROOFER                                                                                                        N                     0.00%
(Does not include sheet metal roofs)   -
Roofer                                     16.04      18.73         16.77%     18.73               0.00%

SHEET METAL WORKER                                 Elko                                                       N                   -26.85%
Sheet Metal                                30.00      20.00        -33.33%     27.34              -26.85%

SPRINKLER FITTER                       -           Elko                                                       N                   -42.58%
Sprinkler Fitter-Journeyman                52.30      19.00        -63.67%     33.09              -42.58%
Sprinkler Fitter-Foreman                   55.05      19.00        -65.49%     33.09              -42.58%
Sprinkler Fitter-General Foreman           57.30      19.00        -66.84%     33.09              -42.58%

SURVEYOR                                           Nye                                                        N                    17.27%
Surveyor                                   46.85      45.96         -1.90%     39.19              17.27%

TAPER                                  -           Elko                                                       Y         1.23%
Taper                                      35.49      36.28          2.23%     35.84               1.23%

TILE SETTER/TERRAZZO                   ADD
WORKER/MARBLE MASON-                   ZONE
FINISHER                               RATE     Washoe                                                        Y         1.02%
Tile, Terrazzo and Marble Finisher        32.48   24.77            -23.74%     24.52               1.02%

                                       ADD
TILE SETTER/TERRAZZO                   ZONE
WORKER/MARBLE MASON                    RATE     Washoe                                                        Y         4.15%
Tile Setter-Journeyman                    35.99   32.87             -8.67%     33.64               -2.29%
Tile Setter-Foreman                       35.99   34.12             -5.20%     33.64                1.43%
Tile Setter-General Formean               35.99   35.87             -0.33%     33.64                6.63%
Terrazzo/Marble Mason-Journeyman          35.99   34.37             -4.50%     33.64                2.17%
Terrazzo/Marble Mason-Foreman             35.99   35.62             -1.03%     33.64                5.89%
Terrazzo/Marble Mason-General
Foreman                                    35.99      37.37          3.83%     33.64              11.09%
                                                                             128
                                                              Annual      2011 PW Difference Between                        Non-Union     DETR
 EUREKA                                                    Growth, 2010 - Survey PW Rates and Survey     Union   Union %        %         Mean
 No Data for Construction DETR             PW 2010 PW 2011     2011       Average         Avg.            Y/N    Difference Difference    Wages
Average                                                            0.25%                         2.64%                2.68%      -6.34%

                                            ADD        ADD
                                           LABORE     LABORE
                                           R ZONE     R ZONE
TRAFFIC BARRIER ERECTOR                    RATE       RATE
Traffic Barrier Erector                       30.82      30.82     0.00%

                                       ADD      ADD
                                       ZONE     ZONE
TRUCK DRIVER                           RATE     RATE                                                       Y         0.03%
Dump Trucks (Single or Multiple Units
Including Semi's & Double Transfer Units),
Dumpcretes and Bulk Cement Spreader)
Under 4 yds. (water level)                35.02    36.90            5.37%    36.90              0.00%
4 yds. & under 8 yds. (water level)       35.24    36.90            4.71%    36.90              0.00%
8 yds. & under 18 yds. (water level)      35.45    36.90            4.09%    36.90              0.00%
18 yds. & under 25 yds. ( water level)    35.62    36.90            3.59%    36.90              0.00%
25 yds. & under 60 yds. (water level)     36.04    36.90            2.39%    36.90              0.00%
60 yds. & under 75 yds. (water level)     37.48    36.90           -1.55%    36.90              0.00%

75 yds. & under 100 yds. (water level)        38.43      36.90     -3.98%    36.90              0.00%

100 yds. & under 150 yds.(water level)        38.90      36.90     -5.14%    36.90              0.00%

150 yds. & under 250 yds. ( water level)      40.90      36.90     -9.78%    36.90              0.00%

250 yds. & under 350 yds. (water level)       43.90      36.90    -15.95%    36.90              0.00%
350 yds. & over (water level)                 45.40      36.90    -18.72%    36.90              0.00%
Transit Mix
Under 8 yds.                                  35.45      36.90     4.09%     36.90              0.00%
8 yds. & including 12 yds.                    35.56      36.90     3.77%     36.90              0.00%
Over 12 yds.                                  35.78      36.90     3.13%     36.90              0.00%
Transit Mix (Using Boom)
Transit mix with boom shall receive 16
cents per hour
above the appropriate yardage
classification rate of pay
when such boom is used                                                      129
                                                          Annual      2011 PW Difference Between                        Non-Union     DETR
  EUREKA                                               Growth, 2010 - Survey PW Rates and Survey     Union   Union %        %         Mean
  No Data for Construction DETR        PW 2010 PW 2011     2011       Average         Avg.            Y/N    Difference Difference    Wages
Average                                                        0.25%                         2.64%                2.68%      -6.34%
Water & Jetting Trucks
Up to 2,500 gallons                      35.43     36.90       4.15%     36.90              0.00%
2,500 gallons & over                     35.45     36.90       4.09%     36.90              0.00%
DW 20's & 21's & other similar Cat
type, Terry Cobra LeTourneau pulls,
Tournerocker, Euclid, & similar type
equipment when pulling Aqua/Pak,
Water Tank Trailers, & Fuel, and/or
Grease Tank Trailer, or other
miscellaneous Trailers, (except as
defined under "Dump Trucks")             35.73     36.90       3.27%     36.90              0.00%
Heavy Duty Transport (High Bed)          35.62     36.90       3.59%     36.90              0.00%
Heavy Duty Transport(Gooseneck low
bed)                                     35.62     36.90       3.59%     36.90              0.00%
Tiltbed or Flatbed Pull Trailers         35.62     36.90       3.59%     36.90              0.00%
Bootman, Comb. Bootman & Road
Oiler                                    35.51     36.90       3.91%     36.90              0.00%
Flat Rack (2 or 3 axle unit)             33.34     36.90      10.68%     36.90              0.00%
Bus & Manhaul Drivers
Up to 18,000 lbs. (single unit)          35.07     36.90       5.22%     36.90              0.00%
18,000 lbs. & over (single unit)         35.18     36.90       4.89%     36.90              0.00%
Helicopter Pilot (transporting
men/materials)                           49.66     36.90      -25.69%    36.90              0.00%
Lift Jitneys                             35.29     36.90        4.56%    36.90              0.00%
Winch Truck & "A" Frame Drivers
Up to 18,000 lbs.                        35.18     36.90       4.89%     36.90              0.00%
18,000 lbs. and over                     35.29     36.90       4.56%     36.90              0.00%
Warehousemen Spotter                     35.13     36.90       5.04%     36.90              0.00%
Warehouse Clerk                          35.24     36.90       4.71%     36.90              0.00%
Tire Repairmen                           35.45     36.90       4.09%     36.90              0.00%
Truck Repairmen                          35.78     36.90       3.13%     36.90              0.00%
Pick Up Truck & Pilot Cars (Jobsite)     33.14     36.90      11.35%     36.90              0.00%
Pick Up Truck & Pilot Cars (Over the
road)                                    35.13     36.90       5.04%      36.90             0.00%
Truck Oil Greaser                        35.18     36.90       4.89%      36.90             0.00%
Fuel Truck Driver                        35.18     36.90       4.89%      36.90             0.00%
Fuel Man & Fuel Island Man               35.18     36.90       4.89%      36.90             0.00%
Oil Tanker                               35.62     36.90       3.59%      36.90
                                                                        130                 0.00%
                                                      Annual      2011 PW Difference Between                        Non-Union     DETR
 EUREKA                                            Growth, 2010 - Survey PW Rates and Survey     Union   Union %        %         Mean
 No Data for Construction DETR     PW 2010 PW 2011     2011       Average         Avg.            Y/N    Difference Difference    Wages
Average                                                    0.25%                         2.64%                2.68%      -6.34%
Oil Tanker with Pup                  36.04   36.90         2.39%     36.90               0.00%
Foreman:                             36.54   37.40         2.35%     36.90               1.36%

WELL DRILLER                                  Lander                                               N                     0.00%
Well Driller                          31.91      22.34    -29.99%    22.34              0.00%


                                   ADD        ADD
                                   OPERATI    OPERATI
LUBRICATION AND SERVICE            NG ENG.    NG ENG.
ENGINEER (MOBILE AND GREASE        ZONE       ZONE
RACK)                              RATE       RATE                                                 Y         2.16%
Lubrication and Service Engineer
(mobile and grease rack)              46.10      47.85     3.80%     46.84              2.16%

SOIL TESTER (CERTIFIED)                     Nye                                                    Y        -0.30%
Soil Tester (Certified)               45.65    56.62      24.03%     56.79              -0.30%

SOILS AND MATERIALS TESTER                    Nye
Soils and Materials Tester            45.65      56.62    24.03%     56.79              -0.30%


Union Breakdown
Union                                                                                             27
Non-Union                                                                                         11
Total                                                                                             38




                                                                    131
DETR Mean Wage     Wage
 + 40% Benefits   Premium




                            132
DETR Mean Wage     Wage
 + 40% Benefits   Premium




                            133
DETR Mean Wage     Wage
 + 40% Benefits   Premium




                            134
DETR Mean Wage     Wage
 + 40% Benefits   Premium




                            135
DETR Mean Wage     Wage
 + 40% Benefits   Premium




                            136
DETR Mean Wage     Wage
 + 40% Benefits   Premium




                            137
DETR Mean Wage     Wage
 + 40% Benefits   Premium




                            138
DETR Mean Wage     Wage
 + 40% Benefits   Premium




                            139
DETR Mean Wage     Wage
 + 40% Benefits   Premium




                            140
DETR Mean Wage     Wage
 + 40% Benefits   Premium




                            141
                                                         Annual     2011 PW       Difference Between                        Non-Union    DETR
 HUMBOLDT                                              Growth, 2010 Survey           PW Rates and       Union   Union %         %        Mean
 Average Construction Wage $21.92      PW 2010 PW 2011    - 2011    Average           Survey Avg.        Y/N    Difference Difference    Wages
Average                                                       5.81%                             3.41%                 2.40%     -1.89%

                                       ADD
                                       SHEET
                                       METAL
                                       ZONE
AIR BALANCE TECHNICIAN                 RATE     Lander                                                    Y        47.11%
Air Balance-Journeyman                    46.60    48.35        3.76%     34.98               38.22%
Air Balance-Foreman                       49.62    51.46        3.71%     34.98               47.11%
Air Balance-General Foreman               52.64    54.57        3.67%     34.98               56.00%

ALARM INSTALLER                                                                                           N                    -9.74%
Alarm Installer                            25.69       25.58    -0.43%    28.34               -9.74%

BOILERMAKER                            -           Clark                                                  Y          1.87%
Boilermaker-Journeyman                     59.50      65.94    10.82%     64.73                1.87%
Boilermaker-Foreman                        59.50      65.94    10.82%     64.73                1.87%
Boilermaker-General Foreman                59.50      65.94    10.82%     64.73                1.87%

                                       ADD
                                       ZONE
BRICKLAYER                             RATE     Eureka                                                    Y        -28.07%
Bricklayer                                32.68    32.68        0.00%     45.43              -28.07%

                                       ADD      ADD
                                       ZONE     ZONE
CARPENTER                              RATE     RATE                                                      Y         -1.47%
Carpenter                                 38.30    38.80        1.31%     39.38               -1.47%

CEMENT MASON                                                                                              Y          0.00%
Cement Mason                               17.00       34.40   102.35%    34.40                0.00%

ELECTRICIAN-COMMUNICATION TECHNICIAN                                                                      N                     0.00%

Electrician-Communication Technician       27.97       25.66    -8.26%    25.66                0.00%

ELECTRICIAN-LINE                       -           -                                                      Y          2.20%
Groundman                                  39.19       40.50    3.34%     55.87              -27.51%
Lineman                                    57.91       59.90    3.44%     55.87                7.21%
                                                                         142
                                                              Annual     2011 PW    Difference Between                         Non-Union    DETR
 HUMBOLDT                                                   Growth, 2010 Survey        PW Rates and        Union   Union %         %        Mean
 Average Construction Wage $21.92   PW 2010 PW 2011            - 2011    Average        Survey Avg.         Y/N    Difference Difference    Wages
Average                                                            5.81%                           3.41%                 2.40%     -1.89%
Foreman                                 63.02       65.16          3.40%    55.87                 16.63%
General Foreman                         68.12       70.45          3.42%    55.87                 26.10%
Equipment Specialist                    47.86       49.49          3.41%    55.87                -11.42%

ELECTRICIAN-NEON SIGN               -           Clark                                                        Y          0.57%
Electrician-Neon Sign                   44.31      45.52          2.73%     45.26                 0.57%

ELECTRICIAN-WIREMAN                 -           -                                                            Y        16.05%
Wireman                                 31.22       50.78        62.65%     47.03                 7.97%
Cable Splicer                           31.22       54.58        74.82%     47.03                16.05%
Foreman                                 31.22       54.58        74.82%     47.03                16.05%
General Foreman                         31.22       58.38        87.00%     47.03                24.13%


ELEVATOR CONSTRUCTOR                -           Churchill                                                    Y        13.48%
Elevator Constructor-Journeyman
Mechanic                                46.01       78.21        69.98%     72.12                 8.44%
Elevator Constructor-Mechanic in
Charge                                  46.01       85.48        85.79%     72.12                18.52%

                                     ADD
                                    LABORE
                                    R ZONE
FENCE ERECTOR                       RATE     Elko                                                            N                     0.00%
Fence Erector                          30.82    35.47            15.09%     35.47                 0.00%

                                     ADD         ADD
                                    LABORE      LABORE
                                    R ZONE      R ZONE
FLAGPERSON                          RATE        RATE
Flagperson                             27.95       27.95          0.00%

FLOOR COVERER                                   Elko                                                         Y          3.65%
Floor Coverer-Journeyman                36.26      36.34          0.22%     36.31                 0.08%
Floor Coverer-Foreman                   38.90      38.93          0.08%     36.31                 7.22%

GLAZIER                             -           -                                                            N                     0.00%
Glazier                                 21.50       20.50         -4.65%    20.50                 0.00%
                                                                           143
                                                      Annual     2011 PW     Difference Between                        Non-Union    DETR
 HUMBOLDT                                           Growth, 2010 Survey         PW Rates and       Union   Union %         %        Mean
 Average Construction Wage $21.92   PW 2010 PW 2011    - 2011    Average         Survey Avg.        Y/N    Difference Difference    Wages
Average                                                    5.81%                           3.41%                 2.40%     -1.89%

                                     ADD        ADD
                                    LABORE     LABORE
                                    R ZONE     R ZONE
HIGHWAY STRIPER                     RATE       RATE                                                  Y          0.00%
Highway Striper                        33.57      33.57    0.00%     33.57                0.00%

                                    ADD      ADD
HOD CARRIER-BRICK MASON             ZONE     ZONE
TENDER                              RATE     RATE                                                    Y          0.83%
Brick Mason-Journeyman                 30.10    30.10      0.00%     30.10                0.00%
Brick Mason-Foreman                    30.60    30.60      0.00%     30.10                1.66%

                                    ADD
HOD CARRIER-PLASTERER               ZONE
TENDER                              RATE     Washoe                                                  Y          3.90%
Plasterer Tender-Journeyman            33.76   34.26       1.48%     33.73                1.57%
Plasterer Tender-Gun Tender            34.76   35.26       1.44%     33.73                4.54%
Plasterer Tender-Foreman               35.12   35.62       1.42%     33.73                5.60%

                                    SEE
                                    AMENDM
IRON WORKER                         ENT 1-                                                           Y          4.80%
Ironworker-Journeyman                  54.38      56.74    4.34%     57.31               -0.99%
Ironworker-Foreman                     57.68      60.04    4.09%     57.31                4.76%
Ironworker-General Foreman             61.04      63.40    3.87%     57.31               10.63%

                                     ADD        ADD
                                    LABORE     LABORE
                                    R ZONE     R ZONE
LABORER                             RATE       RATE                                                  Y        -14.41%
Laborer                                30.82      25.66   -16.74%    29.98              -14.41%                                      19.36

                                    SEE
                                    AMENDM
MECHANICAL INSULATOR                ENT 2-   Clark                                                   Y          2.71%
Mechanical Insulator-Mechanic          57.06    54.56      -4.38%    55.23               -1.21%
Mechanical Insulator-Foreman           59.56    57.06      -4.20%    55.23                3.31%
                                                                    144
                                                           Annual     2011 PW       Difference Between                        Non-Union    DETR
 HUMBOLDT                                                Growth, 2010 Survey           PW Rates and       Union   Union %         %        Mean
 Average Construction Wage $21.92        PW 2010 PW 2011    - 2011    Average           Survey Avg.        Y/N    Difference Difference    Wages
Average                                                         5.81%                             3.41%                 2.40%     -1.89%

Mechanical Insulator-General Foreman         61.06       58.56    -4.09%    55.23                6.03%


MILLWRIGHT                                           Pershing                                               N                     0.00%
Millwright-Journeyman                        49.70      31.51    -36.60%    31.51                0.00%
Millwright-Welder                            50.70      31.51    -37.85%    31.51                0.00%
Millwright-Foreman                           53.01      31.51    -40.56%    31.51                0.00%
Millwright-General Foreman                   56.65      31.51    -44.38%    31.51                0.00%

                                         ADD      ADD
OPERATING ENGINEER                       ZONE     ZONE                                                      Y          8.88%
SEE GROUP CLASSIFICATIONS                RATE     RATE
Group 1                                     41.33    43.08        4.23%     46.84               -8.03%
Group 1A                                    44.09    45.84        3.97%     46.84               -2.13%
Group 2                                     44.62    46.37        3.92%     46.84               -1.00%
Group 3                                     44.89    46.64        3.90%     46.84               -0.43%
Group 4                                     45.63    47.38        3.84%     46.84                1.15%
Group 5                                     45.93    47.68        3.81%     46.84                1.79%
Group 6                                     46.10    47.85        3.80%     46.84                2.16%
Group 7                                     46.35    48.10        3.78%     46.84                2.69%
Group 8                                     46.94    48.69        3.73%     46.84                3.95%
Group 9                                     47.26    49.01        3.70%     46.84                4.63%
Group 10                                    47.61    49.36        3.68%     46.84                5.38%
Group 10A                                   47.80    49.55        3.66%     46.84                5.79%
Group 11                                    48.04    49.79        3.64%     46.84                6.30%
Group 11A                                   49.68    51.43        3.52%     46.84                9.80%
Group 11B                                   50.49    52.24        3.47%     46.84               11.53%
Foreman                                     49.68    51.43        3.52%     46.84                9.80%

Add 7% to base rate for "Second" Shift   -           -
Add 12.5% to base rate for "Special"
shift                                    -           -

OPERATING ENGINEER-STEEL                 ADD      ADD
FABRICATOR & ERECTOR                     ZONE     ZONE
SEE GROUP CLASSIFICATIONS                RATE     RATE
Group 1                                     56.63    58.38        3.09%     46.84               24.64%
                                                                           145
                                                                   Annual     2011 PW    Difference Between                        Non-Union    DETR
 HUMBOLDT                                                        Growth, 2010 Survey        PW Rates and       Union   Union %         %        Mean
 Average Construction Wage $21.92        PW 2010 PW 2011            - 2011    Average        Survey Avg.        Y/N    Difference Difference    Wages
Average                                                                 5.81%                          3.41%                 2.40%     -1.89%
Group 1 Truck Crane Oiler                    50.46       52.21          3.47%    46.84                11.46%
Group 1 Oiler                                48.50       50.25          3.61%    46.84                 7.28%
Group 2                                      55.12       56.87          3.17%    46.84                21.41%
Group 2 Truck Crane Oiler                    50.21       51.96          3.49%    46.84                10.93%
Group 2 Oiler                                48.29       50.04          3.62%    46.84                 6.83%
Group 3                                      53.88       55.63          3.25%    46.84                18.77%
Group 3 Truck Crane Oiler                    49.99       51.74          3.50%    46.84                10.46%
Group 3 Oiler                                48.07       49.82          3.64%    46.84                 6.36%
Group 3 Hydraulic                            49.66       51.41          3.52%    46.84                 9.76%
Group 4                                      52.15       53.90          3.36%    46.84                15.07%
Group 5                                      51.05       52.80          3.43%    46.84                12.72%

Add 7% to base rate for "Second" Shift   -           -
Add 12.5% to base rate for "Special"
Shift

OPERATING ENGINEER -                     ADD         ADD
PILEDRIVER                               ZONE        ZONE                                                        Y
SEE GROUP CLASSIFICATIONS                RATE        RATE
Group 1                                     56.10       57.85          3.12%     46.84               23.51%
Group 1 Truck Crane Oiler                   50.64       52.39          3.46%     46.84               11.85%
Group 1 Oiler                               48.72       50.47          3.59%     46.84                7.75%
Group 2                                     54.56       56.31          3.21%     46.84               20.22%
Group 2 Truck Crane Oiler                   50.43       52.18          3.47%     46.84               11.40%
Group 2 Oiler                               48.52       50.27          3.61%     46.84                7.32%
Group 3                                     53.11       54.86          3.30%     46.84               17.12%
Group 3 Truck Crane Oiler                   50.21       51.96          3.49%     46.84               10.93%
Group 3 Oiler                               48.29       50.04          3.62%     46.84                6.83%
Group 4                                     51.60       53.35          3.39%     46.84               13.90%
Group 5                                     50.49       52.24          3.47%     46.84               11.53%
Group 6                                     49.38       51.13          3.54%     46.84                9.16%
Group 7                                     48.42       50.17          3.61%     46.84                7.11%
Group 8                                     47.46       49.21          3.69%     46.84                5.06%
Add 7% to base for "Second" Shift        -           -
Add 12.5% to base for "Special" Shift    -           -


PAINTER                                                                                                          Y         -0.19%
                                                                                146
                                                                    Annual     2011 PW    Difference Between                         Non-Union    DETR
  HUMBOLDT                                                        Growth, 2010 Survey        PW Rates and        Union   Union %         %        Mean
  Average Construction Wage $21.92        PW 2010 PW 2011            - 2011    Average        Survey Avg.         Y/N    Difference Difference    Wages
Average                                                                  5.81%                           3.41%                 2.40%     -1.89%
Brush/Roller Painter                          32.74       32.74          0.00%    33.69                 -2.82%
Spray Painter/Paperhanger                     33.59       33.59          0.00%    33.69                 -0.30%
Sandblaster                                   33.24       33.24          0.00%    33.69                 -1.34%
Structural Steel & Steeplejack                33.74       33.74          0.00%    33.69                  0.15%
Swing Stage                                   34.74       34.74          0.00%    33.69                  3.12%
Special Coating Application-Brush             33.24       33.24          0.00%    33.69                 -1.34%
Special Coating Application-Spray             33.74       33.74          0.00%    33.69                  0.15%

Special Coating Application-Spray Steel       33.99       33.99         0.00%     33.69                 0.89%
                                           $1.00       $1.00
                                          above       above
                                          highest     highest
                                          Journeym    Journeym
Foreman                                   an          an

PILEDRIVER
Piledriver-Journeyman                         58.47       58.47         0.00%
Piledriver-Foreman                            62.05       62.05         0.00%

                                          ADD
                                          ZONE
PLASTERER                                 RATE     Washoe                                                          Y         -1.47%
Plasterer                                    34.27   34.77              1.46%     35.29                -1.47%

PLUMBER/PIPEFITTER                        -           -                                                            Y         -0.44%
Plumber/Pipefitter                            45.20       45.20         0.00%     45.40                -0.44%

REFRIGERATION                             -           -                                                            Y          4.52%
Refrigeration                                 27.52       41.58        51.09%     39.78                 4.52%

ROOFER                                    -           -
(Does not include sheet metal roofs)                                                                               N                    -0.48%
Roofer                                        24.11       24.11         0.00%     24.11                 0.00%

                                                    ADD
                                                    ZONE
SHEET METAL WORKER                                  RATE                                                           Y         -0.96%
Sheet Metal Worker                            46.60    48.35            3.76%     48.82                -0.96%
                                                                                 147
                                                       Annual     2011 PW       Difference Between                        Non-Union    DETR
 HUMBOLDT                                            Growth, 2010 Survey           PW Rates and       Union   Union %         %        Mean
 Average Construction Wage $21.92    PW 2010 PW 2011    - 2011    Average           Survey Avg.        Y/N    Difference Difference    Wages
Average                                                     5.81%                             3.41%                 2.40%     -1.89%

SPRINKLER FITTER                     -           -                                                      N                    -8.47%
Sprinkler Fitter-Journeyman              52.30       39.35   -24.76%    42.99               -8.47%
Sprinkler Fitter-Foreman                 55.05       39.35   -28.52%    42.99               -8.47%
Sprinkler Fitter-General Foreman         57.30       39.35   -31.33%    42.99               -8.47%


SURVEYOR                                         Churchill                                              N                     0.61%
Surveyor                                 37.79      25.63    -32.18%    25.63                0.00%

TAPER                                -           Elko                                                   Y          1.23%
Taper                                    35.49      36.28     2.23%     35.84                1.23%

TILE SETTER/TERRAZZO                 ADD
WORKER/MARBLE MASON-                 ZONE
FINISHER                             RATE     Douglas                                                   Y          1.02%
Tile, Terrazzo and Marble Finisher      32.48   24.77        -23.74%    24.52                1.02%

                                     ADD
TILE SETTER/TERRAZZO                 ZONE
WORKER/MARBLE MASON                  RATE     Douglas                                                   Y          4.52%
Tile Setter-Journeyman                  35.99   32.87         -8.67%    33.52               -1.94%
Tile Setter-Foreman                     35.99   34.12         -5.20%    33.52                1.79%
Tile Setter-General Formean             35.99   35.87         -0.33%    33.52                7.01%
Terrazzo/Marble Mason-Journeyman        35.99   34.37         -4.50%    33.52                2.54%
Terrazzo/Marble Mason-Foreman           35.99   35.62         -1.03%    33.52                6.26%
Terrazzo/Marble Mason-General
Foreman                                  35.99       37.37    3.83%     33.52               11.49%

                                      ADD         ADD
                                     LABORE      LABORE
                                     R ZONE      R ZONE
TRAFFIC BARRIER ERECTOR              RATE        RATE
Traffic Barrier Erector                 30.82       30.82     0.00%

                                     ADD
                                     ZONE
TRUCK DRIVER                         RATE        Elko                                                   Y         -2.22%
                                                                       148
                                                         Annual     2011 PW    Difference Between                        Non-Union    DETR
  HUMBOLDT                                             Growth, 2010 Survey        PW Rates and       Union   Union %         %        Mean
  Average Construction Wage $21.92     PW 2010 PW 2011    - 2011    Average        Survey Avg.        Y/N    Difference Difference    Wages
Average                                                       5.81%                          3.41%                 2.40%     -1.89%
Dump Trucks (Single or Multiple Units
Including Semi's & Double Transfer Units),
Dumpcretes and Bulk Cement Spreader)
Under 4 yds. (water level)               35.02   39.51       12.82%    40.42               -2.25%
4 yds. & under 8 yds. (water level)      35.24   39.51       12.12%    40.42               -2.25%
8 yds. & under 18 yds. (water level)     35.45   39.51       11.45%    40.42               -2.25%
18 yds. & under 25 yds. ( water level)   35.62   39.51       10.92%    40.42               -2.25%
25 yds. & under 60 yds. (water level)    36.04   39.51        9.63%    40.42               -2.25%
60 yds. & under 75 yds. (water level)    37.48   39.51        5.42%    40.42               -2.25%

75 yds. & under 100 yds. (water level)     38.43   39.51     2.81%     40.42               -2.25%

100 yds. & under 150 yds.(water level)     38.90   39.51     1.57%     40.42               -2.25%

150 yds. & under 250 yds. ( water level)   40.90   39.51    -3.40%     40.42               -2.25%

250 yds. & under 350 yds. (water level)    43.90   39.51   -10.00%     40.42               -2.25%
350 yds. & over (water level)              45.40   39.51   -12.97%     40.42               -2.25%
Transit Mix
Under 8 yds.                               35.45   39.51    11.45%     40.42               -2.25%
8 yds. & including 12 yds.                 35.56   39.51    11.11%     40.42               -2.25%
Over 12 yds.                               35.78   39.51    10.42%     40.42               -2.25%
Transit Mix (Using Boom)
Transit mix with boom shall receive 16
cents per hour
above the appropriate yardage
classification rate of pay
when such boom is used
Water & Jetting Trucks
Up to 2,500 gallons                        35.43   39.51    11.52%     40.42               -2.25%
2,500 gallons & over                       35.45   39.51    11.45%     40.42               -2.25%




                                                                      149
                                                         Annual     2011 PW    Difference Between                        Non-Union    DETR
  HUMBOLDT                                             Growth, 2010 Survey        PW Rates and       Union   Union %         %        Mean
  Average Construction Wage $21.92     PW 2010 PW 2011    - 2011    Average        Survey Avg.        Y/N    Difference Difference    Wages
Average                                                       5.81%                          3.41%                 2.40%     -1.89%
DW 20's & 21's & other similar Cat
type, Terry Cobra LeTourneau pulls,
Tournerocker, Euclid, & similar type
equipment when pulling Aqua/Pak,
Water Tank Trailers, & Fuel, and/or
Grease Tank Trailer, or other
miscellaneous Trailers, (except as
defined under "Dump Trucks")             35.73    39.51      10.58%    40.42               -2.25%
Heavy Duty Transport (High Bed)          35.62    39.51      10.92%    40.42               -2.25%
Heavy Duty Transport(Gooseneck low
bed)                                     35.62    39.51      10.92%    40.42               -2.25%
Tiltbed or Flatbed Pull Trailers         35.62    39.51      10.92%    40.42               -2.25%
Bootman, Comb. Bootman & Road
Oiler                                    35.51    39.51      11.26%    40.42               -2.25%
Flat Rack (2 or 3 axle unit)             33.34    39.51      18.51%    40.42               -2.25%
Bus & Manhaul Drivers
Up to 18,000 lbs. (single unit)          35.07    39.51      12.66%    40.42               -2.25%
18,000 lbs. & over (single unit)         35.18    39.51      12.31%    40.42               -2.25%
Helicopter Pilot (transporting
men/materials)                           49.66    39.51     -20.44%    40.42               -2.25%
Lift Jitneys                             35.29    39.51      11.96%    40.42               -2.25%
Winch Truck & "A" Frame Drivers
Up to 18,000 lbs.                        35.18    39.51      12.31%    40.42               -2.25%
18,000 lbs. and over                     35.29    39.51      11.96%    40.42               -2.25%
Warehousemen Spotter                     35.13    39.51      12.47%    40.42               -2.25%
Warehouse Clerk                          35.24    39.51      12.12%    40.42               -2.25%
Tire Repairmen                           35.45    39.51      11.45%    40.42               -2.25%
Truck Repairmen                          35.78    39.51      10.42%    40.42               -2.25%
Pick Up Truck & Pilot Cars (Jobsite)     33.14    39.51      19.22%    40.42               -2.25%
Pick Up Truck & Pilot Cars (Over the
road)                                    35.13    39.51      12.47%    40.42               -2.25%
Truck Oil Greaser                        35.18    39.51      12.31%    40.42               -2.25%
Fuel Truck Driver                        35.18    39.51      12.31%    40.42               -2.25%
Fuel Man & Fuel Island Man               35.18    39.51      12.31%    40.42               -2.25%
Oil Tanker                               35.62    39.51      10.92%    40.42               -2.25%
Oil Tanker with Pup                      36.04    39.51       9.63%    40.42               -2.25%
Foreman:                                 36.54    40.01       9.50%    40.42               -1.01%

                                                                      150
                                                      Annual     2011 PW    Difference Between                        Non-Union    DETR
 HUMBOLDT                                           Growth, 2010 Survey        PW Rates and       Union   Union %         %        Mean
 Average Construction Wage $21.92   PW 2010 PW 2011    - 2011    Average        Survey Avg.        Y/N    Difference Difference    Wages
Average                                                    5.81%                          3.41%                 2.40%     -1.89%
WELL DRILLER                                                                                        N                      1.08%
Well Driller                           21.41      22.80    6.49%    22.80                0.00%


                                    ADD        ADD
                                    OPERATI    OPERATI
LUBRICATION AND SERVICE             NG ENG.    NG ENG.
ENGINEER (MOBILE AND GREASE         ZONE       ZONE
RACK)                               RATE       RATE                                                 Y          2.16%
Lubrication and Service Engineer
(mobile and grease rack)               46.10      47.85    3.80%    46.84                2.16%

SOIL TESTER (CERTIFIED)                        Nye                                                  Y         -0.30%
Soil Tester (Certified)                44.65      56.62   26.81%    56.79               -0.30%

SOILS AND MATERIALS TESTER                     Nye                                                            -0.30%
Soils and Materials Tester             44.65      56.62   26.81%    56.79               -0.30%

Union Breakdown
Union                                                                                              29
Non-Union                                                                                           9
Total                                                                                              38




                                                                   151
DETR Mean
Wage + 40%    Wage
 Benefits    Premium
                -5.33%




                         152
DETR Mean
Wage + 40%    Wage
 Benefits    Premium
                -5.33%




                         153
DETR Mean
Wage + 40%      Wage
 Benefits      Premium
                  -5.33%




       27.10      -5.33%




                           154
DETR Mean
Wage + 40%    Wage
 Benefits    Premium
                -5.33%




                         155
DETR Mean
Wage + 40%    Wage
 Benefits    Premium
                -5.33%




                         156
DETR Mean
Wage + 40%    Wage
 Benefits    Premium
                -5.33%




                         157
DETR Mean
Wage + 40%    Wage
 Benefits    Premium
                -5.33%




                         158
DETR Mean
Wage + 40%    Wage
 Benefits    Premium
                -5.33%




                         159
DETR Mean
Wage + 40%    Wage
 Benefits    Premium
                -5.33%




                         160
DETR Mean
Wage + 40%    Wage
 Benefits    Premium
                -5.33%




                         161
 LANDER                                             Annual     2011 PW   Difference Between                       Non-Union     DETR
 Average Construction Wage                        Growth, 2010 Survey       PW Rates and       Union   Union %        %         Mean
 $21.42                       PW 2010     PW 2011    - 2011    Average       Survey Avg.        Y/N    Difference Difference    Wages
Average                                                  3.97%                         0.59%                2.17%      -1.33%

                                        ADD
                                        SHEET
                                        METAL
                                        ZONE
AIR BALANCE TECHNICIAN                  RATE                                                     Y        47.11%
Air Balance-Journeyman            58.52    48.35       -17.38%   34.98               38.22%
Air Balance-Foreman               62.95    51.46       -18.25%   34.98               47.11%
Air Balance-General Foreman       67.37    54.57       -19.00%   34.98               56.00%

ALARM INSTALLER                                                                                  N                     0.00%
Alarm Installer                   30.88      25.58     -17.16%   25.58                0.00%

BOILERMAKER                   -           Clark                                                  Y         1.87%
Boilermaker-Journeyman            59.50      65.94      10.82%   64.73                1.87%
Boilermaker-Foreman               59.50      65.94      10.82%   64.73                1.87%
Boilermaker-General Foreman       59.50      65.94      10.82%   64.73                1.87%

                              ADD
                              ZONE
BRICKLAYER                    RATE     Eureka                                                    Y       -28.07%
Bricklayer                       32.68    32.68          0.00%   45.43              -28.07%

                              ADD      ADD
                              ZONE     ZONE
CARPENTER                     RATE     RATE                                                      Y         3.70%
Carpenter-Journeyman             38.30    38.80          1.31%   38.74                0.15%
Carpenter-Foreman                41.05    41.55          1.22%   38.74                7.25%

CEMENT MASON                                                                                     Y       -10.60%
Cement Mason                      34.40      34.40       0.00%   38.48              -10.60%


ELECTRICIAN-COMMUNICATION
TECHNICIAN                                Humboldt                                               N                     0.00%
Communication Technician          27.97      25.66      -8.26%   25.66                0.00%


                                                                  162
  LANDER                                                 Annual     2011 PW   Difference Between                       Non-Union     DETR
  Average Construction Wage                            Growth, 2010 Survey       PW Rates and       Union   Union %        %         Mean
  $21.42                           PW 2010     PW 2011    - 2011    Average       Survey Avg.        Y/N    Difference Difference    Wages
Average                                                       3.97%                         0.59%                2.17%      -1.33%
ELECTRICIAN-
LINEMAN/GROUNDMAN/HEAVY
EQUIPMENT OPERATOR                             Humboldt                                               Y         2.20%
Groundman                              39.19      40.50       3.34%   55.87              -27.51%
Lineman                                57.91      59.90       3.44%   55.87                7.21%
Foreman                                63.02      65.16       3.40%   55.87               16.63%
General Foreman                        68.12      70.45       3.42%   55.87               26.10%
Equipment Specialist                   47.86      49.49       3.41%   55.87              -11.42%

ELECTRICIAN-NEON SIGN              -           Clark                                                  Y         0.57%
Electrician-Neon Sign                  44.31      45.52       2.73%   45.26                0.57%

ELECTRICIAN-WIREMAN                -           -                                                      N                    -4.83%
Wireman                                31.07       42.60     37.11%   44.76               -4.83%
Cable Splicer                          31.07       42.60     37.11%   44.76               -4.83%
Foreman                                31.07       42.60     37.11%   44.76               -4.83%
General Foreman                        31.07       42.60     37.11%   44.76               -4.83%


ELEVATOR CONSTRUCTOR               -           Churchill                                              Y        13.48%
Elevator Constructor-Journeyman
Mechanic                               46.01       78.21     69.98%   72.12                8.44%
Elevator Constructor-Mechanic in
Charge                                 46.01       85.48     85.79%   72.12               18.52%

                                    ADD
                                   LABORE
                                   R ZONE
FENCE ERECTOR                      RATE     Humboldt                                                  N                     0.00%
Fence Erector                         30.82    35.47         15.09%   35.47                0.00%

                                    ADD         ADD
                                   LABORE      LABORER
                                   R ZONE       ZONE
FLAGPERSON                         RATE        RATE
Flagperson                            27.95       27.95       0.00%

FLOOR COVERER                                  Washoe                                                 Y         3.65%
                                                                       163
  LANDER                                            Annual     2011 PW    Difference Between                       Non-Union     DETR
  Average Construction Wage                       Growth, 2010 Survey        PW Rates and       Union   Union %        %         Mean
  $21.42                      PW 2010     PW 2011    - 2011    Average        Survey Avg.        Y/N    Difference Difference    Wages
Average                                                  3.97%                          0.59%                2.17%      -1.33%
Floor Coverer-Journeyman          36.26     36.34        0.22%    36.31                 0.08%
Floor Coverer-Foreman             38.90     38.93        0.08%    36.31                 7.22%

GLAZIER                       -           -                                                       N                     0.00%
Glazier                           21.50       20.50     -4.65%    20.50                0.00%

                               ADD         ADD
                              LABORE      LABORER
                              R ZONE       ZONE
HIGHWAY STRIPER               RATE        RATE                                                    Y         1.73%
Highway Striper                  33.57       33.57       0.00%    33.00                1.73%


HOD CARRIER-BRICK MASON       ADD ZON
TENDER                        E RATE Humblodt                                                     Y         0.00%
Brick Mason                      30.10  30.10            0.00%    30.10                0.00%


HOD CARRIER-PLASTERER         ADD ZON
TENDER                        E RATE   Washoe                                                     Y         3.90%
Plasterer Tender-Journeyman      33.76   34.26           1.48%    33.73                1.57%
Plasterer-Gun Tender             34.76   35.26           1.44%    33.73                4.54%
Plasterer Tender-Foreman         35.12   35.62           1.42%    33.73                5.60%

                              SEE
                              AMENDM
IRON WORKER                   ENT 1-   Humblodt                                                   Y         4.80%
Ironworker-Journeyman            54.38    56.74          4.34%    57.31               -0.99%
Ironworker-Foreman               57.68    60.04          4.09%    57.31                4.76%
Ironworker-General Foreman       61.04    63.40          3.87%    57.31               10.63%

LABORER                       ADD      ADD                                                        Y        -4.45%
SEE GROUP CLASSIFICATIONS     ZONE     ZONE
                              RATE     RATE
Landscaper                       25.66    25.66          0.00%    31.80              -19.31%
Furniture Mover                  27.16    27.16          0.00%    31.80              -14.59%
Group 1                          30.82    30.82          0.00%    31.80               -3.08%
Group 1A                         27.95    27.95          0.00%    31.80              -12.11%
                                                                  164
 LANDER                                                   Annual     2011 PW    Difference Between                        Non-Union     DETR
 Average Construction Wage                              Growth, 2010 Survey        PW Rates and        Union   Union %        %         Mean
 $21.42                           PW 2010    PW 2011       - 2011    Average        Survey Avg.         Y/N    Difference Difference    Wages
Average                                                        3.97%                           0.59%                2.17%      -1.33%
Group 2                              30.92      30.92          0.00%    31.80                 -2.77%
Group 3                              31.07      31.07          0.00%    31.80                 -2.30%
Group 4A                             31.32      31.32          0.00%    31.80                 -1.51%
Group 4                              32.57      32.57          0.00%    31.80                  2.42%
Group 5                              31.62      31.62          0.00%    31.80                 -0.57%
Group 6                              29.72      29.72
Nozzlemen, Rodmen                    31.62      31.62          0.00%    31.80                -0.57%
Gunmen, Materialmen                  31.32      31.32          0.00%    31.80                -1.51%
Reboundmen                           30.97      30.97          0.00%    31.80                -2.61%
Gunite Foremen                       32.02      32.02          0.00%    31.80                 0.69%

                                  SEE
                                  AMENDM
MECHANICAL INSULATOR              ENT 2-   Washoe                                                        Y        -0.08%
Mechanical Insulator-Journeyman      57.06   54.56            -4.38%    56.77                -3.89%
Mechanical Insulator-Foreman         59.56   57.06            -4.20%    56.77                 0.51%
Mechanical Insulator-General
Foreman                              61.06      58.56         -4.09%    56.77                 3.15%



MILLWRIGHT                                   Humboldt                                                    N                     0.00%
Millwright-Journeyman                49.70      25.33        -49.03%    25.33                 0.00%
Millwright-Welder                    50.70      25.33        -50.04%    25.33                 0.00%
Millwright-Foreman                   53.01      25.33        -52.22%    25.33                 0.00%
Millwright-General Foreman           56.65      25.33        -55.29%    25.33                 0.00%

OPERATING ENGINEER                ADD      ADD                                                           Y        -1.07%
SEE GROUP CLASSIFICATIONS         ZONE     ZONE
Group 1                              41.33    43.08            4.23%    51.55               -16.43%
Group 1A                             44.09    45.84            3.97%    51.55               -11.08%
Group 2                              44.62    46.37            3.92%    51.55               -10.05%
Group 3                              44.89    46.64            3.90%    51.55                -9.52%
Group 4                              45.63    47.38            3.84%    51.55                -8.09%
Group 5                              45.93    47.68            3.81%    51.55                -7.51%
Group 6                              46.10    47.85            3.80%    51.55                -7.18%
Group 7                              46.35    48.10            3.78%    51.55                -6.69%
Group 8                              46.94    48.69            3.73%    51.55                -5.55%
                                                                        165
  LANDER                                                         Annual     2011 PW    Difference Between                        Non-Union     DETR
  Average Construction Wage                                    Growth, 2010 Survey        PW Rates and        Union   Union %        %         Mean
  $21.42                               PW 2010     PW 2011        - 2011    Average        Survey Avg.         Y/N    Difference Difference    Wages
Average                                                               3.97%                           0.59%                2.17%      -1.33%
Group 9                                    47.26       49.01          3.70%    51.55                 -4.93%
Group 10                                   47.61       49.36          3.68%    51.55                 -4.25%
Group 10A                                  47.80       49.55          3.66%    51.55                 -3.88%
Group 11                                   48.04       49.79          3.64%    51.55                 -3.41%
Group 11A                                  49.68       51.43          3.52%    51.55                 -0.23%
Group 11B                                  50.49       52.24          3.47%    51.55                  1.34%
Foreman                                    49.68       51.43          3.52%    51.55                 -0.23%
Add 7% to base rate for "Second"
Shift                                  -           -
Add 12.5% to base rate for "Special"
shift                                  -           -

OPERATING ENGINEER-STEEL             ADD           ADD
FABRICATOR & ERECTOR                 ZONE          ZONE
SEE GROUP CLASSIFICATIONS            RATE          RATE
Group 1                                 56.63         58.38           3.09%    51.55                13.25%
Group 1 Truck Crane Oiler               50.46         52.21           3.47%    51.55                 1.28%
Group 1 Oiler                           48.50         50.25           3.61%    51.55                -2.52%
Group 2                                 55.12         56.87           3.17%    51.55                10.32%
Group 2 Truck Crane Oiler               50.21         51.96           3.49%    51.55                 0.80%
Group 2 Oiler                           48.29         50.04           3.62%    51.55                -2.93%
Group 3                                 53.88         55.63           3.25%    51.55                 7.91%
Group 3 Truck Crane Oiler               49.99         51.74           3.50%    51.55                 0.37%
Group 3 Oiler                           48.07         49.82           3.64%    51.55                -3.36%
Group 3 Hydraulic                       49.66         51.41           3.52%    51.55                -0.27%
Group 4                                 52.15         53.90           3.36%    51.55                 4.56%
Group 5                                 51.05         52.80           3.43%    51.55                 2.42%
Add 7% to base rate for "Second"
Shift                                -             -
Add 12.5% to base rate for "Special"
Shift

OPERATING ENGINEER -                   ADD      ADD
PILEDRIVER                             ZONE     ZONE                                                            Y
SEE GROUP CLASSIFICATIONS              RATE     RATE
Group 1                                   56.10    57.85              3.12%    51.55                12.22%
Group 1 Truck Crane Oiler                 50.64    52.39              3.46%    51.55                 1.63%
Group 1 Oiler                             48.72    50.47              3.59%    51.55                -2.10%
                                                                               166
 LANDER                                                         Annual     2011 PW    Difference Between                        Non-Union     DETR
 Average Construction Wage                                    Growth, 2010 Survey        PW Rates and        Union   Union %        %         Mean
 $21.42                               PW 2010     PW 2011        - 2011    Average        Survey Avg.         Y/N    Difference Difference    Wages
Average                                                              3.97%                           0.59%                2.17%      -1.33%
Group 2                                   54.56       56.31          3.21%    51.55                  9.23%
Group 2 Truck Crane Oiler                 50.43       52.18          3.47%    51.55                  1.22%
Group 2 Oiler                             48.52       50.27          3.61%    51.55                 -2.48%
Group 3                                   53.11       54.86          3.30%    51.55                  6.42%
Group 3 Truck Crane Oiler                 50.21       51.96          3.49%    51.55                  0.80%
Group 3 Oiler                             48.29       50.04          3.62%    51.55                 -2.93%
Group 4                                   51.60       53.35          3.39%    51.55                  3.49%
Group 5                                   50.49       52.24          3.47%    51.55                  1.34%
Group 6                                   49.38       51.13          3.54%    51.55                 -0.81%
Group 7                                   48.42       50.17          3.61%    51.55                 -2.68%
Group 8                                   47.46       49.21          3.69%    51.55                 -4.54%
Add 7% to base for "Second" Shift     -           -

Add 12.5% to base for "Special" Shift -           -


PAINTER                                                                                                        Y        -0.45%
Brush/Roller Painter                      32.74       32.74          0.00%    33.78                -3.08%
Spray Painter/Paperhanger                 33.59       33.59          0.00%    33.78                -0.56%
Sandblaster                               33.24       33.24          0.00%    33.78                -1.60%
Structural Steel & Steeplejack            33.74       33.74          0.00%    33.78                -0.12%
Swing Stage                               34.74       34.74          0.00%    33.78                 2.84%
Special Coating Application-Brush         33.24       33.24          0.00%    33.78                -1.60%
Special Coating Application-Spray         33.74       33.74          0.00%    33.78                -0.12%
Special Coating Application-Spray
Steel                                    33.99        33.99          0.00%    33.78                 0.62%
                                      $1.00        $1.00
                                     above        above
                                     highest      highest
                                     Journeym     Journeym
Foreman                              an           an

PILEDRIVER
Piledriver-Journeyman                     58.47       58.47          0.00%
Piledriver-Foreman                        62.05       62.05          0.00%



                                                                              167
 LANDER                                                      Annual     2011 PW   Difference Between                       Non-Union     DETR
 Average Construction Wage                                 Growth, 2010 Survey       PW Rates and       Union   Union %        %         Mean
 $21.42                                PW 2010     PW 2011    - 2011    Average       Survey Avg.        Y/N    Difference Difference    Wages
Average                                                           3.97%                         0.59%                2.17%      -1.33%
                                       ADD
                                       ZONE
PLASTERER                              RATE     Washoe                                                    Y        -1.47%
Plasterer                                 34.27   34.77           1.46%   35.29               -1.47%

PLUMBER/PIPEFITTER                     -           -                                                      Y        -0.44%
Plumber/Pipefitter                         45.20       45.20      0.00%   45.40               -0.44%

REFRIGERATION                          -           -                                                      Y        10.75%
Refrigeration-Journeyman                   27.52       41.58     51.09%   39.78                4.52%
Refrigeration-Foreman                      27.52       44.06     60.10%   39.78               10.76%
Refrigeration-General Foreman              27.52       46.53     69.08%   39.78               16.97%



ROOFER                                 -           Humboldt                                               N                     0.00%

(Does not include sheet metal roofs)
Roofer                                     17.20       24.11     40.17%   24.11                0.00%

                                                 ADD
                                                 ZONE
SHEET METAL WORKER                               RATE                                                     Y         3.27%
Sheet Metal Worker                         46.60    48.35         3.76%   46.82                3.27%



SPRINKLER FITTER                       -           Humboldt                                               N                    -8.47%
Sprinkler Fitter-Journeyman                52.30      39.35     -24.76%   42.99               -8.47%
Sprinkler Fitter-Foreman                   55.05      39.35     -28.52%   42.99               -8.47%
Sprinkler Fitter-General Foreman           57.30      39.35     -31.33%   42.99               -8.47%


SURVEYOR                                           Churchill                                              N                     0.00%
Surveyor                                   46.85      25.63     -45.29%   25.63                0.00%



                                                                           168
 LANDER                                                    Annual     2011 PW   Difference Between                       Non-Union     DETR
 Average Construction Wage                               Growth, 2010 Survey       PW Rates and       Union   Union %        %         Mean
 $21.42                              PW 2010     PW 2011    - 2011    Average       Survey Avg.        Y/N    Difference Difference    Wages
Average                                                         3.97%                         0.59%                2.17%      -1.33%


TAPER                                -           Humboldt                                               Y         1.23%
Taper                                    35.49      36.28       2.23%   35.84                1.23%

TILE SETTER/TERRAZZO                 ADD
WORKER/MARBLE MASON-                 ZONE
FINISHER                             RATE     Washoe                                                    Y         1.02%
Tile, Terrazzo and Marble Finisher      32.48   24.77         -23.74%   24.52                1.02%

                                     ADD
TILE SETTER/TERRAZZO                 ZONE
WORKER/MARBLE MASON                  RATE     Washoe                                                    Y         4.15%
Tile Setter-Journeyman                  35.99   32.87          -8.67%   33.64               -2.29%
Tile Setter-Foreman                     35.99   34.12          -5.20%   33.64                1.43%
Tile Setter-General Formean             35.99   35.87          -0.33%   33.64                6.63%

Terrazzo/Marble Mason-Journeyman         35.99      34.37      -4.50%   33.64                2.17%
Terrazzo/Marble Mason-Foreman            35.99      35.62      -1.03%   33.64                5.89%
Terrazzo/Marble Mason-General
Foreman                                  35.99      37.37       3.83%   33.64               11.09%


                                      ADD         ADD
                                     LABORE      LABORER
                                     R ZONE       ZONE
TRAFFIC BARRIER ERECTOR              RATE        RATE
Traffic Barrier Erector                 30.82       30.82       0.00%

                                     ADD         ADD
                                     ZONE        ZONE
TRUCK DRIVER                         RATE        RATE                                                   Y        -0.02%

Dump Trucks (Single or Multiple Units
Including Semi's & Double Transfer Units),
Dumpcretes and Bulk Cement Spreader)
Under 4 yds. (water level)             35.02        38.45       9.79%   38.47               -0.05%                                     $25.42
4 yds. & under 8 yds. (water level)    35.24        38.45       9.11%   38.47               -0.05%                                     $25.42
                                                                        169
 LANDER                                                      Annual     2011 PW   Difference Between                       Non-Union     DETR
 Average Construction Wage                                 Growth, 2010 Survey       PW Rates and       Union   Union %        %         Mean
 $21.42                                  PW 2010   PW 2011    - 2011    Average       Survey Avg.        Y/N    Difference Difference    Wages
Average                                                           3.97%                         0.59%                2.17%      -1.33%

8 yds. & under 18 yds. (water level)       35.45     38.45        8.46%   38.47               -0.05%                                     $25.42

18 yds. & under 25 yds. ( water level)     35.62     38.45        7.94%   38.47               -0.05%                                     $25.42

25 yds. & under 60 yds. (water level)      36.04     38.45        6.69%   38.47               -0.05%                                     $25.42

60 yds. & under 75 yds. (water level)      37.48     38.45        2.59%   38.47               -0.05%                                     $25.42
75 yds. & under 100 yds. (water
level)                                     38.43     38.45        0.05%   38.47               -0.05%                                     $25.42
100 yds. & under 150 yds.(water
level)                                     38.90     38.45       -1.16%   38.47               -0.05%                                     $25.42
150 yds. & under 250 yds. ( water
level)                                     40.90     38.45       -5.99%   38.47               -0.05%                                     $25.42
250 yds. & under 350 yds. (water
level)                                     43.90     38.45      -12.41%   38.47               -0.05%                                     $25.42
350 yds. & over (water level)              45.40     38.45      -15.31%   38.47               -0.05%                                     $25.42
Transit Mix
Under 8 yds.                               35.45     38.45        8.46%   38.47               -0.05%                                     $25.42
8 yds. & including 12 yds.                 35.56     38.45        8.13%   38.47               -0.05%                                     $25.42
Over 12 yds.                               35.78     38.45        7.46%   38.47               -0.05%                                     $25.42
Transit Mix (Using Boom)
Transit mix with boom shall receive
16 cents per hour
above the appropriate yardage
classification rate of pay                           38.45      100.00%   38.47               -0.05%                                     $25.42
when such boom is used
Water & Jetting Trucks
Up to 2,500 gallons                        35.43     38.45        8.52%   38.47               -0.05%                                     $25.42
2,500 gallons & over                       35.45     38.45        8.46%   38.47               -0.05%                                     $25.42




                                                                           170
 LANDER                                                    Annual     2011 PW   Difference Between                       Non-Union     DETR
 Average Construction Wage                               Growth, 2010 Survey       PW Rates and       Union   Union %        %         Mean
 $21.42                                PW 2010   PW 2011    - 2011    Average       Survey Avg.        Y/N    Difference Difference    Wages
Average                                                         3.97%                         0.59%                2.17%      -1.33%

DW 20's & 21's & other similar Cat
type, Terry Cobra LeTourneau pulls,
Tournerocker, Euclid, & similar type
equipment when pulling Aqua/Pak,
Water Tank Trailers, & Fuel, and/or
Grease Tank Trailer, or other
miscellaneous Trailers, (except as
defined under "Dump Trucks")             35.73     38.45        7.61%   38.47               -0.05%                                     $25.42
Heavy Duty Transport (High Bed)          35.62     38.45        7.94%   38.47               -0.05%                                     $25.42
Heavy Duty Transport(Gooseneck
low bed)                                 35.62     38.45        7.94%   38.47               -0.05%                                     $25.42
Tiltbed or Flatbed Pull Trailers         35.62     38.45        7.94%   38.47               -0.05%                                     $25.42
Bootman, Comb. Bootman & Road
Oiler                                    35.51     38.45        8.28%   38.47               -0.05%                                     $25.42
Flat Rack (2 or 3 axle unit)             33.34     38.45       15.33%   38.47               -0.05%                                     $25.42
Bus & Manhaul Drivers
Up to 18,000 lbs. (single unit)          35.07     38.45        9.64%   38.47               -0.05%                                     $25.42
18,000 lbs. & over (single unit)         35.18     38.45        9.30%   38.47               -0.05%                                     $25.42
Helicopter Pilot (transporting
men/materials)                           49.66     38.45      -22.57%   38.47               -0.05%                                     $25.42
Lift Jitneys                             35.29     38.45        8.95%   38.47               -0.05%                                     $25.42

Winch Truck & "A" Frame Drivers
Up to 18,000 lbs.                        35.18     38.45        9.30%   38.47               -0.05%                                     $25.42
18,000 lbs. and over                     35.29     38.45        8.95%   38.47               -0.05%                                     $25.42
Warehousemen Spotter                     35.13     38.45        9.45%   38.47               -0.05%                                     $25.42
Warehouse Clerk                          35.24     38.45        9.11%   38.47               -0.05%                                     $25.42
Tire Repairmen                           35.45     38.45        8.46%   38.47               -0.05%                                     $25.42
Truck Repairmen                          35.78     38.45        7.46%   38.47               -0.05%                                     $25.42

Pick Up Truck & Pilot Cars (Jobsite)     33.14     38.45       16.02%   38.47               -0.05%                                     $25.42
Pick Up Truck & Pilot Cars (Over the
road)                                    35.13     38.45        9.45%   38.47               -0.05%                                     $25.42
Truck Oil Greaser                        35.18     38.45        9.30%   38.47               -0.05%                                     $25.42
Fuel Truck Driver                        35.18     38.45        9.30%   38.47               -0.05%                                     $25.42
Fuel Man & Fuel Island Man               35.18     38.45        9.30%   38.47               -0.05%                                     $25.42
Oil Tanker                               35.62     38.45        7.94%   38.47               -0.05%                                     $25.42
                                                                        171
 LANDER                                                 Annual     2011 PW    Difference Between                        Non-Union     DETR
 Average Construction Wage                            Growth, 2010 Survey        PW Rates and        Union   Union %        %         Mean
 $21.42                            PW 2010    PW 2011    - 2011    Average        Survey Avg.         Y/N    Difference Difference    Wages
Average                                                      3.97%                           0.59%                2.17%      -1.33%
Oil Tanker with Pup                   36.04     38.45        6.69%    38.47                 -0.05%                                    $25.42
Foreman:                              36.54     38.95        6.60%    38.47                  1.25%                                    $25.42


WELL DRILLER                                                                                           N                     0.00%
Well Driller                          21.41      22.34       4.34%    22.34                 0.00%


                                   ADD        ADD
                                   OPERATI    OPERATI
LUBRICATION AND SERVICE            NG ENG.    NG ENG.
ENGINEER (MOBILE AND               ZONE       ZONE
GREASE RACK)                       RATE       RATE                                                     Y         2.16%
Lubrication and Service Engineer
(mobile and grease rack)              46.10      47.85       3.80%    46.84                 2.16%

SOIL TESTER (CERTIFIED)                       Nye                                                      Y        -0.30%
Soil Tester (Certified)               45.65      56.62      24.03%    56.79                -0.30%


SOILS AND MATERIALS TESTER                    Nye
Soils and Materials Tester            45.65      56.62      24.03%    56.79                -0.30%

Union Breakdown
Union                                                                                                 28
Non-Union                                                                                             10
Total                                                                                                 38




                                                                      172
DETR Mean Wage     Wage
 + 40% Benefits   Premium
                      8.08%




                              173
DETR Mean Wage     Wage
 + 40% Benefits   Premium
                      8.08%




                              174
DETR Mean Wage     Wage
 + 40% Benefits   Premium
                      8.08%




                              175
DETR Mean Wage     Wage
 + 40% Benefits   Premium
                      8.08%




                              176
DETR Mean Wage     Wage
 + 40% Benefits   Premium
                      8.08%




                              177
DETR Mean Wage     Wage
 + 40% Benefits   Premium
                      8.08%




                              178
DETR Mean Wage     Wage
 + 40% Benefits   Premium
                      8.08%




                              179
DETR Mean Wage     Wage
 + 40% Benefits   Premium
                      8.08%




         $35.59      8.04%
         $35.59      8.04%
                              180
DETR Mean Wage     Wage
 + 40% Benefits   Premium
                      8.08%

         $35.59      8.04%

         $35.59      8.04%

         $35.59      8.04%

         $35.59      8.04%

         $35.59      8.04%

         $35.59      8.04%

         $35.59      8.04%

         $35.59      8.04%
         $35.59      8.04%
          $0.00
         $35.59      8.04%
         $35.59      8.04%
         $35.59      8.04%
          $0.00

          $0.00

         $35.59      8.04%
          $0.00
          $0.00
         $35.59      8.04%
         $35.59      8.04%




                              181
DETR Mean Wage     Wage
 + 40% Benefits   Premium
                      8.08%




         $35.59      8.04%
         $35.59      8.04%

         $35.59      8.04%
         $35.59      8.04%

         $35.59      8.04%
         $35.59      8.04%
          $0.00
         $35.59      8.04%
         $35.59      8.04%

         $35.59      8.04%
         $35.59      8.04%

          $0.00
         $35.59      8.04%
         $35.59      8.04%
         $35.59      8.04%
         $35.59      8.04%
         $35.59      8.04%
         $35.59      8.04%

         $35.59      8.04%

         $35.59      8.04%
         $35.59      8.04%
         $35.59      8.04%
         $35.59      8.04%
         $35.59      8.04%
                              182
DETR Mean Wage     Wage
 + 40% Benefits   Premium
                      8.08%
         $35.59       8.04%
         $35.59       9.45%




                              183
                                                           Annual    2011 PW        Difference Between                        Non-Union DETR
 LINCOLN                                                  Growth,     Survey       PW Rates and Survey             Union %        %      Mean
 Average Construction Wage $25.99        PW 2010 PW 2011 2010 - 2011 Average                Avg.         Union Y/N Difference Difference Wages
Average                                                        6.61%                               4.76%                5.70%      0.00%

AIR BALANCE TECHNICIAN                   ADD       Clark                                                    Y        10.62%
Air Balance Technician-Journeyman          58.52      59.52    1.71%      57.83                  2.92%
Air Balance Technician-Foreman             62.95      63.97    1.62%      57.83                 10.62%
Air Balance Technician-General Foreman     67.37      68.42    1.56%      57.83                 18.31%

ALARM INSTALLER                                    Clark                                                    Y        12.76%
Alarm Installer-Journeyman                 54.38      55.95    2.89%      49.62                 12.76%

BOILERMAKER                                        Clark                                                    Y         1.87%
Boilermaker                                59.50      65.94   10.82%      64.73                  1.87%

                                         ADD
                                         ZONE
BRICKLAYER                               RATE-     Clark                                                    Y         -7.78%
Bricklayer-Journeyman                      32.68      44.71   36.81%      48.48                  -7.78%

                                                 White
CARPENTER                                        Pine                                                       Y         1.31%
Carpenter                                  38.30     38.80     1.31%      38.30                  1.31%

                                         ADD
                                         ZONE
CEMENT MASON                             RATE      Clark                                                    Y         7.82%
Cement Mason-Journeyman                    34.40      46.28   34.53%      44.70                  3.53%
Cement Mason-Foreman                       36.40      48.28   32.64%      44.70                  8.01%
Cement Mason-General Foreman               36.40      50.03   37.45%      44.70                 11.92%

ELECTRICIAN- COMMUNICATION               ADD       White                                                    N                    0.00%
Installer/Technician                       38.72     17.49    -54.83%     17.49                  0.00%
Senior Installer/Technician                54.38     17.49    -67.84%     17.49                  0.00%
Installer/Technician Foreman               58.78     17.49    -70.24%     17.49                  0.00%
Installer/Technician General Foreman       63.18     17.49    -72.32%     17.49                  0.00%

ELECTRICIAN-
LINEMAN/GROUNDMAN/HEAVY                            Clark                                                    Y        17.59%
Groundman                                  34.82      40.50   16.31%       48.56                -16.60%
Lineman                                    51.95      59.90   15.30%       48.56                 23.35%
                                                                        184
                                                                   Annual    2011 PW     Difference Between                        Non-Union DETR
 LINCOLN                                                          Growth,     Survey    PW Rates and Survey             Union %        %      Mean
 Average Construction Wage $25.99         PW 2010 PW 2011        2010 - 2011 Average             Avg.         Union Y/N Difference Difference Wages
Average                                                                6.61%                            4.76%                5.70%      0.00%
Foreman                                       56.89      65.16       14.54%     48.56                  34.18%
General Foreman                               61.90      70.45       13.81%     48.56                  45.08%
Heavy Equipment Operator                      42.69      49.49       15.93%     48.56                   1.92%

ELECTRICIAN-NEON SIGN                                 Clark                                                      Y         0.57%
Electrician-Neon Sign                         44.31      45.52        2.73%     45.26                 0.57%

ELECTRICIAN-WIREMAN                       ADD         Clark                                                      Y         0.00%
Electrician-Wireman                         54.74        57.09        4.29%     57.09                 0.00%

ELEVATOR CONSTRUCTOR                      -           Clark                                                      Y         1.86%
Elevator Constructor-Journeyman               46.01      64.58       40.36%     66.35                 -2.67%
Elevator Constructor-Mechanic In Charge       46.01      70.59       53.42%     66.35                  6.39%

FENCE ERECTOR                             -           Clark                                                      N                    0.00%
Fence Erector                                 16.97      17.46        2.89%     17.46                 0.00%

FLAGPERSON                                ADD         Not Surveyed
Flagperson                                  41.44        41.44        0.00%

FLOOR COVERER                                         Clark                                                      Y         4.01%
Floor Coverer-Journeyman                      41.83      42.40        1.36%     43.13                 -1.69%
Floor Coverer-Foreman                         46.76      47.32        1.20%     43.13                  9.71%

GLAZIER                                   -           Clark                                                      Y        17.91%
Glazier                                       54.72      57.51        5.10%     50.55                13.77%
Glazier-Foreman                               58.81      61.70        4.91%     50.55                22.06%

                                           ADD
                                          LABORE
                                          R ZONE
HIGHWAY STRIPER                           RATE                                                                   Y         0.00%
Highway Striper                              33.57       42.94       27.91%     42.94                 0.00%

HOD CARRIER-BRICK MASON                   ADD         Clark                                                      Y         3.09%
Brick Mason                                 43.31        43.31        0.00%     42.01                 3.09%

HOD CARRIER-PLASTERER TENDER              ADD         Clark                                                      Y         3.76%
                                                                              185
                                                              Annual    2011 PW     Difference Between                        Non-Union DETR
  LINCOLN                                                    Growth,     Survey    PW Rates and Survey             Union %        %      Mean
  Average Construction Wage $25.99     PW 2010 PW 2011      2010 - 2011 Average             Avg.         Union Y/N Difference Difference Wages
Average                                                           6.61%                            4.76%                5.70%      0.00%
Plasterer Tender-Journeyman              44.34      44.34         0.00%    44.34                   0.00%
Plasterer Tender-Foreman                 46.34      46.34         0.00%    44.34                   4.51%
Plasterer Tender-General Foreman         47.34      47.34         0.00%    44.34                   6.77%

IRON WORKER                            SEE                                                                  Y         4.80%
Ironworker-Journeyman                    54.38      56.74        4.34%     57.31                -0.99%
Ironworker-Foreman                       57.68      60.04        4.09%     57.31                 4.76%
Ironworker-General Foreman               61.04      63.40        3.87%     57.31                10.63%

LABORER
SEE GROUP CLASSIFICATIONS              ADD       ADD                                                        Y         3.61%
Group 1                                  42.94     42.94         0.00%     42.94                 0.00%
Group 2                                  43.15     43.15         0.00%     42.94                 0.49%
Group 3                                  43.25     43.25         0.00%     42.94                 0.72%
Group 4                                  43.34     43.34         0.00%     42.94                 0.93%
Group 5                                  43.44     43.44         0.00%     42.94                 1.16%
Group 6A                                 46.10     46.10         0.00%     42.94                 7.36%
Group 6B                                 45.60     45.60         0.00%     42.94                 6.19%
Group 6C                                 45.35     45.35         0.00%     42.94                 5.61%
Group 6D                                 45.96     45.96         0.00%     42.94                 7.03%
Group 6E                                 45.60     45.60         0.00%     42.94                 6.19%
Group 7                                  44.67     44.67         0.00%     42.94                 4.03%
Foreman $2.00 above highest paid
General Foreman $3.00 above highest

MECHANICAL INSULATOR                             Clark                                                      Y         7.77%
Mechanical Insulator-Journeyman          55.63      56.23        1.08%     55.23                 1.81%
Mechanical Insulator-Foreman             58.99      59.52        0.90%     55.23                 7.77%
Mechanical Insulator-General Foreman     62.36      62.81        0.72%     55.23                13.72%

MILLWRIGHT                                       Clark                                                      Y        11.55%
Millwright-Journeyman                    49.70      49.95        0.50%     47.30                 5.60%
Millwright-Welder                        50.70      50.95        0.49%     47.30                 7.72%
Millwright-Foreman                       53.01      53.26        0.47%     47.30                12.60%
Millwright-General Foreman               56.65      56.90        0.44%     47.30                20.30%

OPERATING ENGINEER
                                                                         186
                                                               Annual    2011 PW      Difference Between                        Non-Union DETR
 LINCOLN                                                      Growth,     Survey     PW Rates and Survey             Union %        %      Mean
 Average Construction Wage $25.99         PW 2010    PW 2011 2010 - 2011 Average              Avg.         Union Y/N Difference Difference Wages
Average                                                            6.61%                             4.76%                5.70%      0.00%
                                                    White
SEE GROUP CLASSIFICATIONS                           Pine                                                      Y         3.29%
Group 1                                     44.82       53.93    20.33%     52.21                  3.29%
Group 2                                     44.82       53.93    20.33%     52.21                  3.29%
Group 3                                     44.82       53.93    20.33%     52.21                  3.29%
Group 4                                     44.82       53.93    20.33%     52.21                  3.29%
Group 5                                     44.82       53.93    20.33%     52.21                  3.29%
Group 6                                     44.82       53.93    20.33%     52.21                  3.29%
Group 7                                     44.82       53.93    20.33%     52.21                  3.29%
Group 8                                     44.82       53.93    20.33%     52.21                  3.29%
Group 9                                     44.82       53.93    20.33%     52.21                  3.29%
Group 10                                    44.82       53.93    20.33%     52.21                  3.29%
Group 11                                    44.82       53.93    20.33%     52.21                  3.29%
Group 12                                    44.82       53.93    20.33%     52.21                  3.29%
Group 13                                    44.82       53.93    20.33%     52.21                  3.29%
Group 14                                    44.82       53.93    20.33%     52.21                  3.29%
Group 15                                    44.82       53.93    20.33%     52.21                  3.29%
Group 16                                    44.82       53.93    20.33%     52.21                  3.29%
Group 17                                    44.82       53.93    20.33%     52.21                  3.29%
Group 18                                    44.82       53.93    20.33%     52.21                  3.29%
Group 19                                    44.82       53.93    20.33%     52.21                  3.29%
Group 20                                    44.82       53.93    20.33%     52.21                  3.29%
Group 21                                    44.82       53.93    20.33%     52.21                  3.29%
Group 22                                    44.82       53.93    20.33%     52.21                  3.29%
Group 23                                    44.82       53.93    20.33%     52.21                  3.29%
Group 24                                    44.82       53.93    20.33%     52.21                  3.29%
Group 25                                    44.82       53.93    20.33%     52.21                  3.29%
Add $.50 per hour for "Special" Shift
Add $1.00 per hour for "Multiple" Shift

OPERATING ENGINEER:
CRANES, PILEDRIVING, & HOISTING                                                                               Y
SEE GROUP CLASSIFICATIONS
Group 1                                     44.82      53.93     20.33%      52.21                 3.29%
Group 2                                     44.82      53.93     20.33%      52.21                 3.29%
Group 3                                     44.82      53.93     20.33%      52.21                 3.29%
Group 4                                     44.82      53.93     20.33%      52.21                 3.29%
Group 5                                     44.82      53.93     20.33%      52.21                 3.29%
                                                                          187
                                                                Annual    2011 PW      Difference Between                        Non-Union DETR
 LINCOLN                                                       Growth,     Survey     PW Rates and Survey             Union %        %      Mean
 Average Construction Wage $25.99         PW 2010 PW 2011     2010 - 2011 Average              Avg.         Union Y/N Difference Difference Wages
Average                                                             6.61%                             4.76%                5.70%      0.00%
Group 6                                       44.82   53.93       20.33%     52.21                    3.29%
Group 7                                       44.82   53.93       20.33%     52.21                    3.29%
Group 8                                       44.82   53.93       20.33%     52.21                    3.29%
Group 9                                       44.82   53.93       20.33%     52.21                    3.29%
Group 10                                      44.82   53.93       20.33%     52.21                    3.29%
Group 11                                      44.82   53.93       20.33%     52.21                    3.29%
Group 12                                      44.82   53.93       20.33%     52.21                    3.29%
Group 13                                      44.82   53.93       20.33%     52.21                    3.29%
Add $ .50 per hour for "Special" Shift
Add $1.00 per hour for "Multiple" Shift   -

OPERATING ENGINEER-SURVEYOR

                                          ADD
                                          OPERATI
SEE GROUP CLASSIFICATIONS                 NG
Group 1                                       55.84   53.93       -3.42%     52.21                  3.29%
Group 2                                       56.65   53.93       -4.80%     52.21                  3.29%
Group 3                                       56.87   53.93       -5.17%     52.21                  3.29%
Group 4                                       57.15   53.93       -5.63%     52.21                  3.29%
Group 5                                       57.27   53.93       -5.83%     52.21                  3.29%
Group 6                                       57.37   53.93       -6.00%     52.21                  3.29%
Group 7                                        57.4   53.93       -6.05%     52.21                  3.29%
Group 8                                       57.77   53.93       -6.65%     52.21                  3.29%
Group 9                                        57.9   53.93       -6.86%     52.21                  3.29%
Group 10                                       58.4   53.93       -7.65%     52.21                  3.29%


OPERATING ENGINEER -TUNNEL
SEE GROUP CLASSIFICATIONS
Group 1                                       44.82   53.93       20.33%      52.21                 3.29%
Group 2                                       44.82   53.93       20.33%      52.21                 3.29%
Group 3                                       44.82   53.93       20.33%      52.21                 3.29%
Group 4                                       44.82   53.93       20.33%      52.21                 3.29%
Group 5                                       44.82   53.93       20.33%      52.21                 3.29%
Group 6                                       44.82   53.93       20.33%      52.21                 3.29%
Group 7                                       44.82   53.93       20.33%      52.21                 3.29%
Group 8                                       44.82   53.93       20.33%      52.21                 3.29%
                                                                           188
                                                         Annual    2011 PW         Difference Between                        Non-Union DETR
 LINCOLN                                                Growth,     Survey        PW Rates and Survey             Union %        %      Mean
 Average Construction Wage $25.99      PW 2010 PW 2011 2010 - 2011 Average                 Avg.         Union Y/N Difference Difference Wages
Average                                                      6.61%                                4.76%                5.70%      0.00%
Group 9                                  44.82   53.93     20.33%     52.21                       3.29%

PAINTER                                            Clark                                                   Y
Painter-Journeyman                         46.23      46.64    0.89%      46.47                 0.37%
Painter-Foreman                            49.35      49.76    0.83%      46.47                 7.08%

PILEDRIVER
Driverman, Rigman, Bridge and Dock         58.47      58.47    0.00%
Certified Welder                           58.47      58.47    0.00%
Piledriver-Foreman                         62.05      62.05    0.00%
Diver-Diving (wet pay)                     58.47      58.47    0.00%
Stand-By Diver                             58.47      58.47    0.00%
Tender                                     58.47      58.47    0.00%

PLASTERER                              ADD         Clark                                                   Y         -0.13%
Plasterer                                44.69        44.69    0.00%      44.75                 -0.13%

PLUMBER/PIPEFITTER                     -           Clark                                                   Y         8.42%
Plumber/Pipefitter-Journeyman              56.02      56.52    0.89%      55.69                 1.49%
Plumber-Foreman                            59.83      60.38    0.92%      55.69                 8.42%
Plumber-General Foreman                    63.65      64.23    0.91%      55.69                15.33%

REFRIGERATION                                      Clark                                                   N                    0.00%
Refrigeration-Journeyman                   36.24      35.17    -2.95%     35.17                 0.00%
Refrigeration-Foreman                      36.24      35.17    -2.95%     35.17                 0.00%
Refrigeration-General Foreman              36.24      35.17    -2.95%     35.17                 0.00%

ROOFER                                 -           Clark                                                   Y         8.20%
(Does not include sheet metal roofs)
Roofer-Journeyman                          16.04      31.91    98.94%     31.78                 0.41%
Roofer-Foreman                             16.04      36.86   129.80%     31.78                15.98%

SHEET METAL WORKER                     ADD         Clark                                                   Y         8.98%
Sheet Metal-Journeyman                   58.52        59.52    1.71%      58.70                 1.40%
Sheet Metal-Foreman                      62.95        63.97    1.62%      58.70                 8.98%
Sheet Metal-General Foreman              67.37        68.42    1.56%      58.70                16.56%

SPRINKLER FITTER                                   Clark                                                   Y        12.65%
                                                                        189
                                                                 Annual    2011 PW      Difference Between                        Non-Union DETR
 LINCOLN                                                        Growth,     Survey     PW Rates and Survey             Union %        %      Mean
 Average Construction Wage $25.99        PW 2010 PW 2011       2010 - 2011 Average              Avg.         Union Y/N Difference Difference Wages
Average                                                              6.61%                             4.76%                5.70%      0.00%
Sprinkler Fitter-Journeyman                55.15       56.30         2.09%    52.27                    7.71%
Sprinkler Fitter-Foreman                   57.90       59.05         1.99%    52.27                   12.97%
Sprinkler Fitter-General Foreman           60.15       61.30         1.91%    52.27                   17.28%


TAPER                                               Clark                                                       Y         -1.50%
Taper                                      46.23       46.64        0.89%     47.35                  -1.50%

TILE SETTER/TERRAZZO                      ADD       Clark                                                       Y         -3.20%
Tile Setter/Terrazzo Worker/Marble Mason-   32.48      34.63        6.62%     36.35                  -4.73%
Tile Setter                                 43.61      46.66        6.99%     49.17                  -5.10%     Y
Terrazzo Worker/Marble Mason                46.04      49.29        7.06%     49.17                   0.24%


TRAFFIC BARRIER ERECTOR                  ADD        ADD
Traffic Barrier Erector                    42.94      42.94         0.00%

TRUCK DRIVER
SEE GROUP CLASSIFICATIONS                ADD        White                                                       Y         0.00%
Group 1                                    46.13      36.90       -20.01%     36.90                  0.00%
Group 2                                    46.23      36.90       -20.18%     36.90                  0.00%
Group 3                                    46.44      36.90       -20.54%     36.90                  0.00%
Group 4                                    46.62      36.90       -20.85%     36.90                  0.00%
Group 5                                    46.82      36.90       -21.19%     36.90                  0.00%
Group 6                                    47.12      36.90       -21.69%     36.90                  0.00%
Foreman $1.00 above highest paid           48.12      36.90       -23.32%     36.90                  0.00%

                                        ADD
WELL DRILLER                            OPERATI Esmerald                                                        N                    0.00%
Well Driller                              56.87    19.42          -65.85%     19.42                  0.00%

                                        ADD     White
EQUIPMENT GREASER (RACK)                OPERATI Pine (9                                                         Y         2.16%
Equipment Greaser (rack)                  55.16     47.85         -13.25%     46.84                  2.16%

EQUIPMENT GREASER (GREASE               ADD
TRUCK)                                  OPERATI
Equipment Greaser (grease truck)          56.65        47.85      -15.53%      46.84                 2.16%
                                                                            190
                                                             Annual    2011 PW      Difference Between                        Non-Union DETR
 LINCOLN                                                    Growth,     Survey     PW Rates and Survey             Union %        %      Mean
 Average Construction Wage $25.99          PW 2010 PW 2011 2010 - 2011 Average              Avg.         Union Y/N Difference Difference Wages
Average                                                          6.61%                             4.76%                5.70%      0.00%

EQUIPMENT GREASER (GREASE                  ADD
TRUCK/MULTI-SHIFT)                         OPERATI
Equipment Greaser (grease truck/multi-       57.75    47.85    -17.14%     46.84                 2.16%

TUNNEL, EQUIPMENT GREASER                  ADD
(GREASE TRUCK)                             OPERATI
Tunnel, Equipment Greaser (grease truck)     57.37    47.85    -16.59%     46.84                 2.16%

                                           ADD
FIELD SOILS AND MATERIAL TESTER            OPERATI Clark                                                    Y        28.95%
Field Soils and Material Tester              54.87    56.62      3.19%     43.91                28.95%

FIELD ASPHALTIC CONCRETE (SOILS            ADD
AND MATERIAL TESTER)                       OPERATI Clark                                                    Y
Field Asphaltic Concrete (soils and          54.87    56.62      3.19%     43.91                28.95%


Union Breakdown
Union                                                                                                      34
Non-Union                                                                                                   4
Total                                                                                                      38




                                                                         191
DETR Mean
Wage + 40%    Wage
 Benefits    Premium




                       192
DETR Mean
Wage + 40%    Wage
 Benefits    Premium




                       193
DETR Mean
Wage + 40%    Wage
 Benefits    Premium




                       194
DETR Mean
Wage + 40%    Wage
 Benefits    Premium




                       195
DETR Mean
Wage + 40%    Wage
 Benefits    Premium




                       196
DETR Mean
Wage + 40%    Wage
 Benefits    Premium




                       197
DETR Mean
Wage + 40%    Wage
 Benefits    Premium




                       198
DETR Mean
Wage + 40%    Wage
 Benefits    Premium




                       199
                                                                  Annual    2011 PW Difference Between                      Non-Union DETR
 LYON                                                            Growth,     Survey PW Rates and Survey Union   Union %         %      Mean
 Average Construction Wage $19.91        PW 2010 PW 2011        2010 - 2011 Average         Avg.         Y/N    Difference Difference Wages
Average                                                               8.59%                        6.36%              4.98%      0.25%

                                         ADD
                                         SHEET
                                         METAL
                                         ZONE
AIR BALANCE TECHNICIAN                   RATE                                                             Y        45.61%
Air Balance Technician-Journeyman           46.60       48.35        3.76%         35.34        36.81%
Air Balance Technician-Foreman              49.62       51.46        3.71%         35.34        45.61%
Air Balance Technician-General Foreman      52.64       54.57        3.67%         35.34        54.41%

ALARM INSTALLER                                                                                           N                    0.00%
Alarm Installer                              28.38      28.01       -1.30%         28.01         0.00%

BOILERMAKER                              -           Clark                                                Y         1.87%
Boilermaker                                  59.50      65.94       10.82%         64.73         1.87%

                                         ADD
                                         ZONE
BRICKLAYER                               RATE--   Washoe                                                  Y         8.21%
Bricklayer-Journeyman                       32.68   32.68            0.00%         31.51         3.71%
Bricklayer-Foreman                          33.93   33.93            0.00%         31.51         7.68%
Bricklayer-General Foreman                  35.68   35.68            0.00%         31.51        13.23%

                                         ADD      ADD
                                         ZONE     ZONE
CARPENTER                                RATE     RATE                                                    Y         2.85%
Carpenter-Journeyman                        38.30    38.80           1.31%         39.06         -0.67%                                22.16
Carpenter-Foreman                           41.05    41.55           1.22%         39.06          6.37%

CEMENT MASON                                                                                              Y         2.94%
Cement Mason-Journeyman                      34.40      34.40        0.00%         34.39         0.03%                                 21.45
Cement Mason-Foreman                         36.40      36.40        0.00%         34.39         5.84%                                 21.45

ELECTRICIAN-COMMUNICATION TECHNICIAN                                                                      N                    1.74%
Electrician-Communication Installer  27.97              27.50       -1.68%         27.03         1.74%
Electrician-Communication Technician 30.88              27.50      -10.95%         27.03         1.74%

                                                                             200
                                                                    Annual    2011 PW Difference Between                      Non-Union DETR
  LYON                                                             Growth,     Survey PW Rates and Survey Union   Union %         %      Mean
  Average Construction Wage $19.91        PW 2010 PW 2011         2010 - 2011 Average         Avg.         Y/N    Difference Difference Wages
Average                                                                 8.59%                        6.36%              4.98%      0.25%
Electrician-Communication Senior
Technician                                    33.13       27.50      -16.99%         27.03         1.74%

ELECTRICIAN-LINE                          -           -                                                     Y        -2.23%
Electrician-Groundman                         39.19       40.50        3.34%         58.40        -30.65%
Electrician-Lineman                           57.91       59.90        3.44%         58.40          2.57%
Electrician-Foreman                           63.02       65.16        3.40%         58.40         11.58%
Electrician-General Foreman                   68.12       70.45        3.42%         58.40         20.63%
Heavy Equipment Operator                      47.86       49.49        3.41%         58.40        -15.26%

ELECTRICIAN-NEON SIGN                     -           Clark                                                 Y         0.57%
Electrician-Neon Sign                         44.31      45.52         2.73%         45.26         0.57%

ELECTRICIAN-WIREMAN                       -           -                                                     Y        17.83%
Wireman                                       35.22       50.78       44.18%         46.32         9.63%                                 22.46
Cable Splicer                                 35.22       54.58       54.97%         46.32        17.83%                                 22.46
Foreman                                       35.22       54.58       54.97%         46.32        17.83%                                 22.46
General Foreman                               35.22       58.38       65.76%         46.32        26.04%                                 22.46

ELEVATOR CONSTRUCTOR                      -           -                                                     Y        13.48%
Elevator Constructor-Journeyman
Mechanic                                      46.01       78.21       69.98%         72.12         8.44%
Elevator Constructor-Mechanic in Charge       46.01       85.48       85.79%         72.12        18.52%

FENCE ERECTOR                                                                                               N                    0.00%
Fence Erector                                 32.72       43.19       32.00%         43.19         0.00%

                                           ADD         ADD
                                          LABORER     LABORE
                                           ZONE       R ZONE
FLAGPERSON                                RATE        RATE
Flagperson                                   27.95       27.95         0.00%

FLOOR COVERER                                                                                               Y         3.65%
Floor Coverer-Journeyman                      36.26       36.34        0.22%         36.31         0.08%
Floor Coverer-Foreman                         38.90       38.93        0.08%         36.31         7.22%

                                                                               201
                                                              Annual    2011 PW Difference Between                      Non-Union DETR
 LYON                                                        Growth,     Survey PW Rates and Survey Union   Union %         %      Mean
 Average Construction Wage $19.91   PW 2010 PW 2011         2010 - 2011 Average         Avg.         Y/N    Difference Difference Wages
Average                                                           8.59%                        6.36%              4.98%      0.25%
GLAZIER                             -           -                                                     N                     -2.89%
Glazier                                 21.50       20.50        -4.65%    21.11              -2.89%

                                     ADD         ADD
                                    LABORER     LABORE
                                     ZONE       R ZONE
HIGHWAY STRIPER                     RATE        RATE                                                  Y         0.00%
Highway Striper                        33.57       33.57         0.00%         33.57         0.00%

                               ADD
                               ZONE
HOD CARRIER-BRICK MASON TENDER RATE     Storey                                                        Y         0.83%
Brick Mason-Journeyman            30.10    30.10                 0.00%         30.10         0.00%
Brick Mason-Foreman               30.60    30.60                 0.00%         30.10         1.66%

                                    ADD
                                    ZONE
HOD CARRIER-PLASTERER TENDER        RATE     Storey                                                   Y         3.81%
Plasterer Tender-Journeyman            33.76    34.26            1.48%         33.76         1.48%
Plasterer Tender-Gun Tender            34.76    35.26            1.44%         33.76         4.44%
Plasterer Tender-Foreman               35.12    35.62            1.42%         33.76         5.51%

                                    SEE
                                    AMENDM
IRON WORKER                         ENT 1                                                             Y         4.80%
Ironworker-Journeyman                  54.38        56.74        4.34%         57.31        -0.99%
Ironworker-Foreman                     57.68        60.04        4.09%         57.31         4.76%
Ironworker-General Foreman             61.04        63.40        3.87%         57.31        10.63%

                                    ADD      ADD
LABORER                             ZONE     ZONE                                                     Y        -0.18%
SEE GROUP CLASSIFICATIONS           RATE     RATE
Landscaper                             25.66    25.66            0.00%         30.44        -15.70%                               18.37
Furniture Mover                        27.16    27.16            0.00%         30.44        -10.78%                               18.37
Group 1                                30.82    30.82            0.00%         30.44          1.25%                               18.37
Group 1A                               27.95    27.95            0.00%         30.44         -8.18%                               18.37
Group 2                                30.92    30.92            0.00%         30.44          1.58%                               18.37
                                                                         202
                                                             Annual    2011 PW Difference Between                      Non-Union DETR
 LYON                                                       Growth,     Survey PW Rates and Survey Union   Union %         %      Mean
 Average Construction Wage $19.91      PW 2010 PW 2011     2010 - 2011 Average         Avg.         Y/N    Difference Difference Wages
Average                                                          8.59%                        6.36%              4.98%      0.25%
Group 3                                   31.07    31.07         0.00%    30.44               2.07%                                18.37
Group 4                                   31.32    31.32         0.00%    30.44               2.89%                                18.37
Group 4A                                  32.57    32.57         0.00%    30.44               7.00%                                18.37
Group 5                                   31.62    31.62         0.00%    30.44               3.88%                                18.37
Group 6
Nozzlemen, Rodmen                         31.62    31.62        0.00%         30.44         3.88%                                  18.37
Gunmen, Materialmen                       31.32    31.32        0.00%         30.44         2.89%                                  18.37
Reboundmen                                30.97    30.97        0.00%         30.44         1.74%                                  18.37
Gunite Foremen                            32.02    32.02        0.00%         30.44         5.19%                                  18.37

                                       SEE
                                       AMENDM
MECHANICAL INSULATOR                   ENT 2-   Douglas                                              Y        -0.08%
Mechanical Insulator-Mechanic             57.06    54.56       -4.38%         56.77         -3.89%
Mechanical Insulator-Foreman              59.56    57.06       -4.20%         56.77          0.51%
Mechanical Insulator-General Foreman      61.06    58.56       -4.09%         56.77          3.15%

MILLWRIGHT                                                                                           N                     0.00%
Millwright                                49.70    25.44      -48.81%         25.44         0.00%

                                       ADD      ADD
OPERATING ENGINEER                     ZONE     ZONE                                                 Y        10.03%
SEE GROUP CLASSIFICATIONS              RATE     RATE
Group 1                                   41.33    43.08        4.23%         46.35        -7.06%                                  24.16
Group 1A                                  44.09    45.84        3.97%         46.35        -1.10%                                  24.16
Group 2                                   44.62    46.37        3.92%         46.35         0.04%                                  24.16
Group 3                                   44.89    46.64        3.90%         46.35         0.63%                                  24.16
Group 4                                   45.63    47.38        3.84%         46.35         2.22%                                  24.16
Group 5                                   45.93    47.68        3.81%         46.35         2.87%                                  24.16
Group 6                                   46.10    47.85        3.80%         46.35         3.24%                                  24.16
Group 7                                   46.35    48.10        3.78%         46.35         3.78%                                  24.16
Group 8                                   46.94    48.69        3.73%         46.35         5.05%                                  24.16
Group 9                                   47.26    49.01        3.70%         46.35         5.74%                                  24.16
Group 10                                  47.61    49.36        3.68%         46.35         6.49%                                  24.16
Group 10A                                 47.80    49.55        3.66%         46.35         6.90%                                  24.16
Group 11                                  48.04    49.79        3.64%         46.35         7.42%                                  24.16
Group 11A                                 49.68    51.43        3.52%         46.35        10.96%                                  24.16
                                                                        203
                                                                       Annual    2011 PW Difference Between                      Non-Union DETR
 LYON                                                                 Growth,     Survey PW Rates and Survey Union   Union %         %      Mean
 Average Construction Wage $19.91            PW 2010 PW 2011         2010 - 2011 Average         Avg.         Y/N    Difference Difference Wages
Average                                                                    8.59%                        6.36%              4.98%      0.25%
Group 11B                                        50.49       52.24         3.47%    46.35              12.71%                                24.16
Foreman                                          49.68       51.43         3.52%    46.35              10.96%                                24.16
Add 7% to base rate for "Second" Shift       -           -

Add 12.5% to base rate for "Special" shift   -           -

OPERATING ENGINEER-STEEL                     ADD         ADD
FABRICATOR & ERECTOR                         ZONE        ZONE
SEE GROUP CLASSIFICATIONS                    RATE        RATE
Group 1                                         56.63       58.38         3.09%         46.35        25.95%                                  24.16
Group 1 Truck Crane Oiler                       50.46       52.21         3.47%         46.35        12.64%                                  24.16
Group 1 Oiler                                   48.50       50.25         3.61%         46.35         8.41%                                  24.16
Group 2                                         55.12       56.87         3.17%         46.35        22.70%                                  24.16
Group 2 Truck Crane Oiler                       50.21       51.96         3.49%         46.35        12.10%                                  24.16
Group 2 Oiler                                   48.29       50.04         3.62%         46.35         7.96%                                  24.16
Group 3                                         53.88       55.63         3.25%         46.35        20.02%                                  24.16
Group 3 Truck Crane Oiler                       49.99       51.74         3.50%         46.35        11.63%                                  24.16
Group 3 Oiler                                   48.07       49.82         3.64%         46.35         7.49%                                  24.16
Group 3 Hydraulic                               49.66       51.41         3.52%         46.35        10.92%                                  24.16
Group 4                                         52.15       53.90         3.36%         46.35        16.29%                                  24.16
Group 5                                         51.05       52.80         3.43%         46.35        13.92%                                  24.16
Add 7% to base rate for "Second" Shift       -           -

Add 12.5% to base rate for "Special" Shift

                                             ADD      ADD
OPERATING ENGINEER -PILEDRIVER               ZONE     ZONE                                                     Y
SEE GROUP CLASSIFICATIONS                    RATE     RATE
Group 1                                         56.10    57.85            3.12%         46.35        24.81%                                  24.16
Group 1 Truck Crane Oiler                       50.64    52.39            3.46%         46.35        13.03%                                  24.16
Group 1 Oiler                                   48.72    50.47            3.59%         46.35         8.89%                                  24.16
Group 2                                         54.56    56.31            3.21%         46.35        21.49%                                  24.16
Group 2 Truck Crane Oiler                       50.43    52.18            3.47%         46.35        12.58%                                  24.16
Group 2 Oiler                                   48.52    50.27            3.61%         46.35         8.46%                                  24.16
Group 3                                         53.11    54.86            3.30%         46.35        18.36%                                  24.16
Group 3 Truck Crane Oiler                       50.21    51.96            3.49%         46.35        12.10%                                  24.16
Group 3 Oiler                                   48.29    50.04            3.62%         46.35         7.96%                                  24.16
                                                                                  204
                                                                    Annual    2011 PW Difference Between                      Non-Union DETR
 LYON                                                              Growth,     Survey PW Rates and Survey Union   Union %         %      Mean
 Average Construction Wage $19.91         PW 2010 PW 2011         2010 - 2011 Average         Avg.         Y/N    Difference Difference Wages
Average                                                                 8.59%                        6.36%              4.98%      0.25%
Group 4                                       51.60       53.35         3.39%    46.35              15.10%                                24.16
Group 5                                       50.49       52.24         3.47%    46.35              12.71%                                24.16
Group 6                                       49.38       51.13         3.54%    46.35              10.31%                                24.16
Group 7                                       48.42       50.17         3.61%    46.35               8.24%                                24.16
Group 8                                       47.46       49.21         3.69%    46.35               6.17%                                24.16
Add 7% to base for "Second" Shift         -           -
Add 12.5% to base for "Special" Shift     -           -


PAINTER                                                                                                     Y        -0.75%
Brush/Roller Painter                          32.74       32.74        0.00%         33.88         -3.36%
Spray Painter/Paperhanger                     33.59       33.59        0.00%         33.88         -0.86%
Sandblaster                                   33.24       33.24        0.00%         33.88         -1.89%
Structural Steel & Steeplejack                33.74       33.74        0.00%         33.88         -0.41%
Swing Stage                                   34.74       34.74        0.00%         33.88          2.54%
Special Coating Application-Brush             33.24       33.24        0.00%         33.88         -1.89%
Special Coating Application-Spray             33.74       33.74        0.00%         33.88         -0.41%
Special Coating Application-Spray Steel       33.99       33.99        0.00%         33.88          0.32%
                                           $1.00       $1.00
                                          above       above
                                          highest     highest
                                          Journeym    Journeym
Foreman                                   an          an

PILEDRIVER
Piledriver-Journeyman                         45.20       45.20        0.00%
Piledriver-Foreman                            48.16       48.16        0.00%

                                          ADD
                                          ZONE
PLASTERER                                 RATE     Washoe                                                   Y        -1.47%
Plasterer                                    34.27   34.77             1.46%         35.29         -1.47%

PLUMBER/PIPEFITTER                        -           -                                                     Y        14.31%
Plumber/Pipefitter-Journeyman                 45.20       45.20        0.00%         42.13         7.29%
Plumber/Pipefitter-Foreman                    48.16       48.16        0.00%         42.13        14.31%
Plumber/Pipefitter-General Foreman            51.12       51.12        0.00%         42.13        21.34%
                                                                               205
                                                                     Annual    2011 PW Difference Between                      Non-Union DETR
 LYON                                                               Growth,     Survey PW Rates and Survey Union   Union %         %      Mean
 Average Construction Wage $19.91          PW 2010 PW 2011         2010 - 2011 Average         Avg.         Y/N    Difference Difference Wages
Average                                                                  8.59%                        6.36%              4.98%      0.25%

REFRIGERATION                              -           -                                                     N                    0.00%
Refrigeration Journeyman                       30.92       29.40       -4.92%         29.40         0.00%                                 19.70

ROOFER
(Does not include sheet metal roofs)                                                                         N                    0.00%
Roofer                                         20.48       21.95        7.18%         21.95         0.00%

                                           ADD      ADD
                                           ZONE     ZONE
SHEET METAL WORKER                         RATE     RATE                                                     Y        10.17%
Journeyman                                    46.60    48.35            3.76%         46.71         3.51%
Foreman                                       49.62    51.46            3.71%         46.71        10.17%
General Foreman                               52.64    54.57            3.67%         46.71        16.83%

SPRINKLER FITTER                           -           -                                                     Y        11.98%
Sprinkler Fitter-Journeyman                    26.00       53.45      105.58%         50.04         6.81%
Sprinkler Fitter-Foreman                       26.00       56.20      116.15%         50.04        12.31%
Sprinkler Fitter-General Foreman               26.00       58.45      124.81%         50.04        16.81%

SURVEYOR                                                                                                     N                    0.00%
Surveyor                                       42.14       27.51      -34.72%         27.51         0.00%

TAPER                                      -           -                                                     Y       -14.78%
Taper                                          35.49       36.28        2.23%         42.57        -14.78%

                                           ADD
TILE SETTER/TERRAZZO                       ZONE
WORKER/MARBLE MASON                        RATE        Douglas                                               Y         1.02%
Tile, Terrazzo and Marble Finisher            19.00      24.77         30.37%         24.52         1.02%    Y         3.15%

Tile Setter/Terrazzo Worker/Marble Mason       25.00       34.37       37.48%         33.32         3.15%

                                            ADD         ADD
                                           LABORER     LABORE
                                            ZONE       R ZONE
TRAFFIC BARRIER ERECTOR                    RATE        RATE
                                                                                206
                                                                   Annual    2011 PW Difference Between                      Non-Union DETR
  LYON                                                            Growth,     Survey PW Rates and Survey Union   Union %         %      Mean
  Average Construction Wage $19.91         PW 2010 PW 2011       2010 - 2011 Average         Avg.         Y/N    Difference Difference Wages
Average                                                                8.59%                        6.36%              4.98%      0.25%
Traffic Barrier Erector                       30.82      30.82         0.00%

TRUCK DRIVER                                                                                               N                    3.43%
Truck Driver                                  20.80      20.80        0.00%         20.11         3.43%                                 21.72

WELL DRILLER                                          Storey                                               Y         0.00%
Well Driller                                  21.32      54.49      155.58%         54.49         0.00%


                                           ADD        ADD
                                           OPERATI    OPERATI
LUBRICATION AND SERVICE                    NG ENG.    NG ENG.
ENGINEER (MOBILE AND GREASE                ZONE       ZONE
RACK)                                      RATE       RATE                                                 Y         2.16%
Lubrication and Service Engineer (mobile
and grease rack)                              46.10      47.85        3.80%         46.84         2.16%

SOIL TESTER (CERTIFIED)                               Nye                                                  Y        -0.30%
Soil Tester (Certified)                       44.14      56.62       28.27%         56.79         -0.30%

SOILS AND MATERIALS TESTER                            Nye
Soils and Materials Tester                    44.14      56.62       28.27%         56.79         -0.30%


Union Breakdown
Union                                                                                                      29
Non-Union                                                                                                   9
Total                                                                                                      38




                                                                              207
DETR Mean
Wage + 40%      Wage
 Benefits      Premium
                   42.16%




       31.02      25.06%
         -
         -
         -
       30.03      14.55%
       30.03      21.21%
         -
         -
         -
         -

                            208
DETR Mean
Wage + 40%      Wage
 Benefits      Premium
                   42.16%

         -
         -
         -
         -
         -
         -
         -
         -
         -
         -
         -
         -
         -
       31.44      61.49%
       31.44      73.58%
       31.44      73.58%
       31.44      85.66%
         -
         -

         -
         -
         -
         -
         -
         -



         -
         -
         -
         -
         -
         -
         -
                            209
DETR Mean
Wage + 40%      Wage
 Benefits      Premium
                   42.16%
         -
         -
         -



         -
         -
         -


         -
         -
         -
         -


         -
         -
         -
         -
         -


         -
         -
         -
         -
         -

         -
         -
       25.72      -0.23%
       25.72       5.61%
       25.72      19.84%
       25.72       8.68%
       25.72      20.23%
                            210
DETR Mean
Wage + 40%      Wage
 Benefits      Premium
                   42.16%
       25.72       20.81%
       25.72       21.78%
       25.72       26.64%
       25.72       22.95%
         -
       25.72      22.95%
       25.72      21.78%
       25.72      20.42%
       25.72      24.50%
         -


         -
         -
         -
         -
         -
         -
         -
         -

         -
         -
       33.82      27.37%
       33.82      35.53%
       33.82      37.09%
       33.82      37.89%
       33.82      40.08%
       33.82      40.96%
       33.82      41.47%
       33.82      42.21%
       33.82      43.95%
       33.82      44.90%
       33.82      45.93%
       33.82      46.49%
       33.82      47.20%
       33.82      52.05%
                            211
DETR Mean
Wage + 40%      Wage
 Benefits      Premium
                   42.16%
       33.82       54.45%
       33.82       52.05%
         -

         -
         -

         -
         -
       33.82      72.60%
       33.82      54.36%
       33.82      48.56%
       33.82      68.14%
       33.82      53.62%
       33.82      47.94%
       33.82      64.47%
       33.82      52.97%
       33.82      47.29%
       33.82      51.99%
       33.82      59.35%
       33.82      56.10%
         -

         -
         -

         -
         -
       33.82      71.03%
       33.82      54.89%
       33.82      49.21%
       33.82      66.48%
       33.82      54.27%
       33.82      48.62%
       33.82      62.19%
       33.82      53.62%
       33.82      47.94%
                            212
DETR Mean
Wage + 40%      Wage
 Benefits      Premium
                   42.16%
       33.82       57.73%
       33.82       54.45%
       33.82       51.16%
       33.82       48.33%
       33.82       45.49%
         -
         -
         -
         -
         -
         -
         -
         -
         -
         -
         -
         -
         -




         -
         -
         -
         -
         -
         -


         -
         -
         -
         -
         -
         -
         -
                            213
DETR Mean
Wage + 40%      Wage
 Benefits      Premium
                   42.16%
         -
         -
       27.58       6.60%
         -
         -
         -
         -
         -


         -
         -
         -
         -
         -
         -
         -
         -
         -
         -
         -
         -
         -
         -
         -
         -


         -
         -

         -
         -



         -
                            214
DETR Mean
Wage + 40%      Wage
 Benefits      Premium
                   42.16%
         -
         -
         -
       30.41      -31.60%
         -
         -
         -
         -




         -

         -
         -
         -
         -
         -
         -
         -




                            215
                                                               Annual     2011 PW   Difference Between                          Non-      DETR
 MINERAL                                                      Growth,      Survey      PW Rates and       Union   Union %    Union %      Mean
 Average Construction Wage $19.03 PW 2010 PW 2011            2010 - 2011 Average        Survey Avg.        Y/N    Difference Difference   Wages
Average                                                             4.99%                         4.20%                2.14%     -2.34%

AIR BALANCE TECHNICIAN                            Lyon                                                      Y        45.61%
Air Balance-Journeyman                    58.52      48.35       -17.38%    35.34               36.81%
Air Balance-Foreman                       62.95      51.46       -18.25%    35.34               45.61%
Air Balance-General Foreman               67.37      54.57       -19.00%    35.34               54.41%

ALARM INSTALLER                                   Lyon                                                      N                    0.00%
Alarm Installer                           28.38      28.01        -1.30%    28.01                0.00%

BOILERMAKER                           -           Clark                                                     Y         1.87%
Boilermaker                               59.50      65.94       10.82%     64.73                1.87%

                                      ADD
                                      ZONE
BRICKLAYER                            RATE     Washoe                                                       Y         8.21%
Bricklayer-Journeyman                    32.68   32.68            0.00%     31.51                3.71%
Bricklayer-Foreman                       33.93   33.93            0.00%     31.51                7.68%
Bricklayer-General Foreman               35.68   35.68            0.00%     31.51               13.23%

                                      ADD      ADD
                                      ZONE     ZONE
CARPENTER                             RATE     RATE                                                         Y         4.08%
Carpenter-Journeyman                     38.30    38.80           1.31%     38.60                0.52%
Carpenter-Foreman                        41.05    41.55           1.22%     38.60                7.64%

CEMENT MASON                                      Lyon                                                      Y         2.94%
Cement Mason-Journeyman                   34.40      34.40        0.00%     34.39                0.03%
Cement Mason-Foreman                      36.40      36.40        0.00%     34.39                5.84%

ELECTRICIAN-COMMUNICATION
TECHNICIAN                                                                                                  N                   -7.99%
Electrician-Communication Installer       27.97      23.48       -16.05%    25.52               -7.99%
Electrician-Communication
Technician                                30.88      23.48       -23.96%    25.52               -7.99%
Electrician-Communication Senior
Technician                                33.13      23.48       -29.13%    25.52               -7.99%


                                                                            216
                                                             Annual     2011 PW   Difference Between                          Non-      DETR
  MINERAL                                                   Growth,      Survey      PW Rates and       Union   Union %    Union %      Mean
  Average Construction Wage $19.03 PW 2010 PW 2011         2010 - 2011 Average        Survey Avg.        Y/N    Difference Difference   Wages
Average                                                           4.99%                         4.20%                2.14%     -2.34%
ELECTRICIAN-
LINEMAN/GROUNDMAN/HEAVY EQUIPMENT Lyon                                                                    Y        -2.23%
Electrician-Groundman                39.19   40.50              3.34%     58.40              -30.65%
Electrician-Lineman                  57.91   59.90              3.44%     58.40                2.57%
Electrician-Foreman                  63.02   65.16              3.40%     58.40               11.58%
Electrician-General Foreman          68.12   70.45              3.42%     58.40               20.63%
Heavy Equipment Operator             47.86   49.49              3.41%     58.40              -15.26%

ELECTRICIAN-NEON SIGN              -           Clark                                                      Y         0.57%
Electrician-Neon Sign                  44.31      45.52         2.73%     45.26                0.57%

ELECTRICIAN-WIREMAN                -           -                                                          Y        10.31%
Wireman                                47.69       50.78        6.48%     49.48                2.63%
Cable Splicer                          51.18       54.58        6.64%     49.48               10.31%
Wireman-Foreman                        51.18       54.58        6.64%     49.48               10.31%
Wireman-General Foreman                54.67       58.38        6.79%     49.48               17.99%

ELEVATOR CONSTRUCTOR               -           Lyon                                                       Y        13.48%
Elevator Constructor-Journeyman
Mechanic                               46.01       78.21       69.98%     72.12                8.44%
Elevator Constructor-Mechanic In
Charge                                 46.01       85.48       85.79%     72.12               18.52%

FENCE ERECTOR                                  Lyon                                                       N                    0.00%
Fence Erector                          32.72      43.19        32.00%     43.19                0.00%

                                    ADD         ADD
                                   LABORE      LABORE
                                   R ZONE      R ZONE
FLAGPERSON                         RATE        RATE
Flagperson                            27.95       27.95         0.00%

FLOOR COVERER                                  Lyon                                                       Y         3.65%
Floor Coverer-Journeyman               36.26      36.34         0.22%     36.31                0.08%
Floor Coverer-Foreman                  38.90      38.93         0.08%     36.31                7.22%

GLAZIER                            -           Lyon                                                       N                   -2.89%
Glazier                                21.50      20.50         -4.65%    21.11               -2.89%
                                                                           217
                                                        Annual     2011 PW   Difference Between                          Non-      DETR
 MINERAL                                               Growth,      Survey      PW Rates and       Union   Union %    Union %      Mean
 Average Construction Wage $19.03 PW 2010 PW 2011     2010 - 2011 Average        Survey Avg.        Y/N    Difference Difference   Wages
Average                                                      4.99%                         4.20%                2.14%     -2.34%

                                ADD         ADD
                               LABORE      LABORE
                               R ZONE      R ZONE
HIGHWAY STRIPER                RATE        RATE                                                      Y         0.00%
Highway Striper                   33.57       33.57        0.00%     33.57                0.00%

                               ADD
HOD CARRIER-BRICK MASON        ZONE
TENDER                         RATE     Storey                                                       Y        -9.59%
Brick Mason-Journeyman            30.10    30.10           0.00%     33.57              -10.34%
Brick Mason-Foreman               30.60    30.60           0.00%     33.57               -8.85%

                               ADD
HOD CARRIER-PLASTERER          ZONE
TENDER                         RATE     CC                                                           Y         3.81%
Plasterer Tender-Journeyman       33.76    34.26           1.48%     33.76                1.48%
Plasterer Tender-Gun Tender       34.76    35.26           1.44%     33.76                4.44%
Plasterer Tender-Foreman          35.12    35.62           1.42%     33.76                5.51%

                               SEE
                               AMENDM
IRON WORKER                    ENT 1                                                                 Y        -0.02%
Ironworker-Journeyman             54.38       57.29         5.35%    57.30               -0.02%
Ironworker-Foreman                57.68       57.29        -0.68%    57.30               -0.02%
Ironworker-General Foreman        61.04       57.29        -6.14%    57.30               -0.02%

                               ADD         ADD
                               ZONE        ZONE
LABORER                        RATE        RATE                                                      Y        -3.69%
SEE GROUP CLASSIFICATIONS
Landscaper                         25.66      25.66        0.00%     31.55              -18.67%
Furniture Mover                    27.16      27.16        0.00%     31.55              -13.91%
Group 1                            30.82      30.82        0.00%     31.55               -2.31%
Group 1A                           27.95      27.95        0.00%     31.55              -11.41%
Group 2                            30.92      30.92        0.00%     31.55               -2.00%
Group 3                            31.07      31.07        0.00%     31.55               -1.52%
Group 4                            31.32      31.32        0.00%     31.55               -0.73%
                                                                      218
                                                        Annual     2011 PW    Difference Between                          Non-      DETR
 MINERAL                                               Growth,      Survey       PW Rates and       Union   Union %    Union %      Mean
 Average Construction Wage $19.03 PW 2010 PW 2011     2010 - 2011 Average         Survey Avg.        Y/N    Difference Difference   Wages
Average                                                      4.99%                          4.20%                2.14%     -2.34%
Group 4A                            32.57   32.57            0.00%    31.55                 3.23%
Group 5                             31.62   31.62            0.00%    31.55                 0.22%
Group 6
Nozzlemen, Rodmen                   31.62   31.62           0.00%     31.55                0.22%
Gunmen, Materialmen                 31.32   31.32           0.00%     31.55               -0.73%
Reboundmen                          30.97   30.97           0.00%     31.55               -1.84%
Gunite Foremen                      32.02   32.02           0.00%     31.55                1.49%

                                SEE
                                AMENDM
MECHANICAL INSULATOR            ENT 2-   Douglas                                                      Y        -0.08%
Mechanical Insulator-Mechanic      57.06    54.56          -4.38%     56.77               -3.89%
Mechanical Insulator-Foreman       59.56    57.06          -4.20%     56.77                0.51%
Mechanical Insulator-General
Foreman                            61.06      58.56        -4.09%     56.77                3.15%

MILLWRIGHT                                 Lyon                                                       N                    0.00%
Millwright                         49.70      25.44       -48.81%     25.44                0.00%

                                ADD      ADD
OPERATING ENGINEER              ZONE     ZONE                                                         Y         8.88%
SEE GROUP CLASSIFICATIONS       RATE     RATE
Group 1                            41.33    43.08           4.23%     46.84               -8.03%
Group 1A                           44.09    45.84           3.97%     46.84               -2.13%
Group 2                            44.62    46.37           3.92%     46.84               -1.00%
Group 3                            44.89    46.64           3.90%     46.84               -0.43%
Group 4                            45.63    47.38           3.84%     46.84                1.15%
Group 5                            45.93    47.68           3.81%     46.84                1.79%
Group 6                            46.10    47.85           3.80%     46.84                2.16%
Group 7                            46.35    48.10           3.78%     46.84                2.69%
Group 8                            46.94    48.69           3.73%     46.84                3.95%
Group 9                            47.26    49.01           3.70%     46.84                4.63%
Group 10                           47.61    49.36           3.68%     46.84                5.38%
Group 10A                          47.80    49.55           3.66%     46.84                5.79%
Group 11                           48.04    49.79           3.64%     46.84                6.30%
Group 11A                          49.68    51.43           3.52%     46.84                9.80%
Group 11B                          50.49    52.24           3.47%     46.84               11.53%
Foreman                            49.68    51.43           3.52%     46.84                9.80%
                                                                       219
                                                             Annual     2011 PW   Difference Between                          Non-      DETR
  MINERAL                                                   Growth,      Survey      PW Rates and       Union   Union %    Union %      Mean
  Average Construction Wage $19.03 PW 2010 PW 2011         2010 - 2011 Average        Survey Avg.        Y/N    Difference Difference   Wages
Average                                                           4.99%                         4.20%                2.14%     -2.34%
Add 7% to base rate for "Second"
Shift                                -     -
Add 12.5% to base rate for "Special"
shift                                -     -

OPERATING ENGINEER-STEEL               ADD      ADD
FABRICATOR & ERECTOR                   ZONE     ZONE
SEE GROUP CLASSIFICATIONS              RATE     RATE
Group 1                                   56.63    58.38        3.09%     46.84               24.64%
Group 1 Truck Crane Oiler                 50.46    52.21        3.47%     46.84               11.46%
Group 1 Oiler                             48.50    50.25        3.61%     46.84                7.28%
Group 2                                   55.12    56.87        3.17%     46.84               21.41%
Group 2 Truck Crane Oiler                 50.21    51.96        3.49%     46.84               10.93%
Group 2 Oiler                             48.29    50.04        3.62%     46.84                6.83%
Group 3                                   53.88    55.63        3.25%     46.84               18.77%
Group 3 Truck Crane Oiler                 49.99    51.74        3.50%     46.84               10.46%
Group 3 Oiler                             48.07    49.82        3.64%     46.84                6.36%
Group 3 Hydraulic                         49.66    51.41        3.52%     46.84                9.76%
Group 4                                   52.15    53.90        3.36%     46.84               15.07%
Group 5                                   51.05    52.80        3.43%     46.84               12.72%
Add 7% to base rate for "Second"
Shift                                  -        -
Add 12.5% to base rate for "Special"
Shift

OPERATING ENGINEER -                   ADD      ADD
PILEDRIVER                             ZONE     ZONE                                                      Y
SEE GROUP CLASSIFICATIONS              RATE     RATE
Group 1                                   56.10    57.85        3.12%     46.84               23.51%
Group 1 Truck Crane Oiler                 50.64    52.39        3.46%     46.84               11.85%
Group 1 Oiler                             48.72    50.47        3.59%     46.84                7.75%
Group 2                                   54.56    56.31        3.21%     46.84               20.22%
Group 2 Truck Crane Oiler                 50.43    52.18        3.47%     46.84               11.40%
Group 2 Oiler                             48.52    50.27        3.61%     46.84                7.32%
Group 3                                   53.11    54.86        3.30%     46.84               17.12%
Group 3 Truck Crane Oiler                 50.21    51.96        3.49%     46.84               10.93%
Group 3 Oiler                             48.29    50.04        3.62%     46.84                6.83%
Group 4                                   51.60    53.35        3.39%     46.84               13.90%
                                                                           220
                                                                  Annual     2011 PW    Difference Between                          Non-      DETR
 MINERAL                                                         Growth,      Survey       PW Rates and       Union   Union %    Union %      Mean
 Average Construction Wage $19.03 PW 2010 PW 2011               2010 - 2011 Average         Survey Avg.        Y/N    Difference Difference   Wages
Average                                                                4.99%                          4.20%                2.14%     -2.34%
Group 5                             50.49   52.24                      3.47%    46.84                11.53%
Group 6                             49.38   51.13                      3.54%    46.84                 9.16%
Group 7                             48.42   50.17                      3.61%    46.84                 7.11%
Group 8                             47.46   49.21                      3.69%    46.84                 5.06%
Add 7% to base for "Second" Shift -       -

Add 12.5% to base for "Special" Shift   -           -

PAINTER                                             Lyon                                                        Y        -0.75%
Brush/Roller Painter                        32.74      32.74          0.00%     33.88               -3.36%
Spray Painter/Paperhanger                   33.59      33.59          0.00%     33.88               -0.86%
Sandblaster                                 33.24      33.24          0.00%     33.88               -1.89%
Structural Steel & Steeplejack              33.74      33.74          0.00%     33.88               -0.41%
Swing Stage                                 34.74      34.74          0.00%     33.88                2.54%
Special Coating Application-Brush           33.24      33.24          0.00%     33.88               -1.89%
Special Coating Application-Spray           33.74      33.74          0.00%     33.88               -0.41%
Special Coating Application-Spray
Steel                                       33.99       33.99         0.00%     33.88                0.32%
                                         $1.00       $1.00
                                        above       above
                                        highest     highest
                                        Journeym    Journeym
Foreman                                 an          an



PILEDRIVER
Piledriver-Journeyman                       58.47       58.47         0.00%
Piledriver-Foreman                          62.05       62.05         0.00%

                                        ADD
                                        ZONE
PLASTERER                               RATE     Washoe                                                         Y        -1.47%
Plasterer                                  34.27   34.77              1.46%     35.29               -1.47%

PLUMBER/PIPEFITTER                      -           -                                                           N                  -14.87%
Plumber/Pipefitter-Journeyman               45.20       26.10       -42.26%     30.66              -14.87%
Plumber/Pipefitter-Foreman                  48.16       26.10       -45.81%     30.66              -14.87%
                                                                                 221
                                                                Annual     2011 PW   Difference Between                          Non-      DETR
 MINERAL                                                       Growth,      Survey      PW Rates and       Union   Union %    Union %      Mean
 Average Construction Wage $19.03 PW 2010 PW 2011             2010 - 2011 Average        Survey Avg.        Y/N    Difference Difference   Wages
Average                                                              4.99%                         4.20%                2.14%     -2.34%

Plumber/Pipefitter-General Foreman         51.12      26.10       -48.94%    30.66              -14.87%

REFRIGERATION                          -           Lyon                                                      N                    0.00%
Refrigeration                              27.55      29.40        6.72%     29.40                0.00%

ROOFER                                             Lyon                                                      N                    0.00%

(Does not include sheet metal roofs)
Roofer                                     20.48      21.95        7.18%     21.95                0.00%

                                       ADD
                                       ZONE
SHEET METAL WORKER                     RATE     Lyon                                                         Y        10.17%
Sheet Metal Worker-Journeyman             46.60    48.35           3.76%     46.71                3.51%
Sheet Metal Worker-Foreman                49.62    51.46           3.71%     46.71               10.17%
Sheet Metal Worker-General
Foreman                                    52.64      54.57        3.67%     46.71               16.83%

SPRINKLER FITTER                       -           Lyon                                                      Y        11.98%
Sprinkler Fitter Journeyman                26.00      53.45      105.58%     50.04                6.81%
Sprinkler Fitter Foreman                   26.00      56.20      116.15%     50.04               12.31%
Sprinkler Fitter General Foreman           26.00      58.45      124.81%     50.04               16.81%


SURVEYOR                                                                                                     N                    0.00%
Surveyor                                   42.14      46.09        9.37%     46.09                0.00%

TAPER                                  -           Lyon                                                      Y       -14.78%
Taper                                      35.49      36.28        2.23%     42.57              -14.78%

                                       ADD
TILE SETTER/TERRAZZO                   ZONE
WORKER/MARBLE MASON                    RATE-    Douglas                                                      Y         1.02%
Tile, Terrazzo and Marble Finisher        19.00    24.77          30.37%     24.52                1.02%
Tile Setter/Terrazzo Worker/Marble
Mason                                      25.00      34.37       37.48%     33.32                3.15%      Y         3.15%
                                                                             222
                                                             Annual     2011 PW   Difference Between                          Non-      DETR
  MINERAL                                                   Growth,      Survey      PW Rates and       Union   Union %    Union %      Mean
  Average Construction Wage $19.03 PW 2010    PW 2011      2010 - 2011 Average        Survey Avg.        Y/N    Difference Difference   Wages
Average                                                           4.99%                         4.20%                2.14%     -2.34%
                                    ADD        ADD
                                   LABORE     LABORE
                                   R ZONE     R ZONE
TRAFFIC BARRIER ERECTOR            RATE       RATE
Traffic Barrier Erector               30.82      30.82          0.00%

TRUCK DRIVER                                  Lyon                                                        N                    0.00%
Truck Driver                          20.80      20.80          0.00%     20.80                0.00%

WELL DRILLER                                  CC                                                          N                    0.00%
Well Driller                          31.49        54.49       73.04%     54.49                0.00%


                                 ADD
                                 OPERATI
LUBRICATION AND SERVICE          NG ENG.
ENGINEER (MOBILE AND GREASE ZONE
RACK)                            RATE     Lyon                                                            Y         2.16%
Lubrication and Service Engineer
(mobile and grease rack)            46.10    47.85              3.80%     46.84                2.16%

SOIL TESTER (CERTIFIED)                       Nye                                                         Y        -0.30%
Soil Tester (Certified)               44.14      56.62         28.27%     56.79               -0.30%

SOILS AND MATERIALS TESTER                    Nye
Soils and Materials Tester            44.14      56.62         28.27%     56.79               -0.30%


Union Breakdown
Union                                                                                                    27
Non-Union                                                                                                11
Total                                                                                                    38




                                                                          223
DETR Mean Wage     Wage
 + 40% Benefits   Premium




                            224
DETR Mean Wage     Wage
 + 40% Benefits   Premium




                            225
DETR Mean Wage     Wage
 + 40% Benefits   Premium




                            226
DETR Mean Wage     Wage
 + 40% Benefits   Premium




                            227
DETR Mean Wage     Wage
 + 40% Benefits   Premium




                            228
DETR Mean Wage     Wage
 + 40% Benefits   Premium




                            229
DETR Mean Wage     Wage
 + 40% Benefits   Premium




                            230
DETR Mean Wage     Wage
 + 40% Benefits   Premium




                            231
                                                            Annual      2011 PW    Difference                         Non-      DETR
 NYE                                                     Growth, 2010 - Survey Between PW Rates Union   Union %    Union %      Mean
 Average Construction Wage $21.90        PW 2010 PW 2011     2011       Average and Survey Avg.   Y/N   Difference Difference   Wages
Average                                                         -0.42%                      3.61%            3.53%     -0.83%

                                         ADD
AIR BALANCE TECHNICIAN                   SHEET   Lander                                           Y        47.11%
Air Balance Technician-Journeyman          58.52    48.35       -17.38%    34.98        38.22%
Air Balance Technician-Foreman             62.95    51.46       -18.25%    34.98        47.11%
Air Balance Technician-General Foreman     67.37    54.57       -19.00%    34.98        56.00%


ALARM INSTALLER                                                                                   N                    0.00%
Alarm Installer                              28.38      22.00   -22.48%    22.00         0.00%

BOILERMAKER                              -           Clark                                        Y         1.87%
Boilermaker                                  59.50      65.94   10.82%     64.73         1.87%

BRICKLAYER                                           Eureka                                       Y       -24.95%
Bricklayer-Journeyman                        32.68      32.68    0.00%     45.43        -28.07%
Bricklayer-Foreman                           33.93      33.93    0.00%     45.43        -25.31%
Bricklayer-General Foreman                   35.68      35.68    0.00%     45.43        -21.46%

CARPENTER                                ADD     ADD                                              Y        -5.31%
Carpenter-Journeyman                       48.70   48.95         0.51%     54.51        -10.20%                                   21.15
Carpenter-Welder                           49.70   49.95         0.50%     54.51         -8.37%                                   21.15
Carpenter-Foreman                          51.83   52.08         0.48%     54.51         -4.46%                                   21.15
Carpenter-General Foreman                  55.24   55.49         0.45%     54.51          1.80%                                   21.15

CEMENT MASON                                         Eureka                                       Y         3.88%
Cement Mason-Journeyman                      46.28      34.40   -25.67%    34.40         0.00%
Cement Mason-Foreman                         48.28      36.40   -24.61%    34.40         5.81%
Cement Mason-General Foreman                 50.03      36.40   -27.24%    34.40         5.81%

ELECTRICIAN- COMMUNICATION               ADD                                                      N                    0.00%
Electrician-Communication Technician       38.72        26.78   -30.84%    26.78         0.00%

ELECTRICIAN-
LINEMAN/GROUNDMAN/HEAVY                            White
EQUIPMENT OPERATOR                                 Pine                                           Y        -2.23%
Electrician-Groundman                        34.82     40.50    16.31%     58.40        -30.65%                                   26.71
Electrician-Lineman                          51.95     59.90    15.30%     58.40          2.57%                                   26.71
                                                                     232
                                                                      Annual      2011 PW    Difference                          Non-      DETR
  NYE                                                              Growth, 2010 - Survey Between PW Rates Union    Union %    Union %      Mean
  Average Construction Wage $21.90         PW 2010 PW 2011             2011       Average  and Survey Avg.   Y/N   Difference Difference   Wages
Average                                                                   -0.42%                       3.61%            3.53%     -0.83%
Electrician-Foreman                            56.89       65.16         14.54%      58.40            11.58%                                 26.71
Electrician-General Foreman                    61.90       70.45         13.81%      58.40            20.63%                                 26.71
Heavy Equipment Operator                       42.69       49.49         15.93%      58.40           -15.26%                                 26.71

ELECTRICIAN-NEON SIGN                                  Clark                                                 Y         0.57%
Electrician-Neon Sign                          44.31      45.52           2.73%     45.26           0.57%

ELECTRICIAN-WIREMAN                        ADD                                                               N                   -4.16%
Electrician-Wireman                          54.74         23.06        -57.87%     24.06          -4.16%
Electrician-Cable Splicer                    55.25         23.06        -58.26%     24.06          -4.16%
Electrician-Foreman                          59.18         23.06        -61.03%     24.06          -4.16%
Electrician-General Foreman                  63.62         23.06        -63.75%     24.06          -4.16%

ELEVATOR CONSTRUCTOR                       -                                                                 Y         3.09%
Elevator Constructor-Journeyman Mechanic       46.01       64.58         40.36%     65.56          -1.49%
Elevator Constructor-Mechanic In Charge        46.01       70.59         53.42%     65.56           7.67%

FENCE ERECTOR                              -           -                                                     N                    0.00%
Fence Erector                                  13.00       18.43         41.77%     18.43           0.00%

                                            ADD     ADD
FLAGPERSON                                 LABORE LABORER
Flagperson                                    41.44   41.44               0.00%


FLOOR COVERER                                          Churchill                                             Y         3.65%
Floor Coverer-Journeyman                       36.26      36.34           0.22%     36.31           0.08%
Floor Coverer-Foreman                          38.90      38.93           0.08%     36.31           7.22%

GLAZIER                                    -           -                                                     N                    0.00%
Glazier                                        21.50       21.50          0.00%     21.50           0.00%

                                                      ADD
                                                     LABORER
                                                      ZONE
HIGHWAY STRIPER                                      RATE                                                    Y         0.00%
Highway Striper                                33.57    42.94            27.91%     42.94           0.00%
                                                                              233
                                                               Annual      2011 PW    Difference                         Non-      DETR
  NYE                                                       Growth, 2010 - Survey Between PW Rates Union   Union %    Union %      Mean
  Average Construction Wage $21.90         PW 2010 PW 2011      2011       Average  and Survey Avg.  Y/N   Difference Difference   Wages
Average                                                            -0.42%                      3.61%            3.53%     -0.83%
HOD CARRIER-BRICK MASON TENDER             ADD     Eureka                                             Y         2.31%
Brick Mason-Journeyman                       30.10    43.31       43.89%      43.31            0.00%
Brick Mason-Foreman                          30.60    45.31       48.07%      43.31            4.62%

                                            ADD
HOD CARRIER-PLASTERER TENDER               LABORE Clark                                              Y         3.76%
Plasterer Tender-Journeyman                   44.34  44.34         0.00%     44.34          0.00%
Plasterer Tender-Gun Tender                   46.34  46.34         0.00%     44.34          4.51%
Plasterer Tender-Foreman                      47.34  47.34         0.00%     44.34          6.77%

                                           SEE
IRON WORKER                                AMEND                                                     Y        60.63%
Ironworker-Journeyman                        54.38    56.74        4.34%     37.39         51.75%
Ironworker-Foreman                           57.68    60.04        4.09%     37.39         60.58%
Ironworker-General Foreman                   61.04    63.40        3.87%     37.39         69.56%

LABORER
SEE GROUP CLASSIFICATIONS                  ADD     ADD                                               Y         3.61%
Group 1                                      42.94   42.94         0.00%     42.94          0.00%                                    23.62
Group 2                                      43.15   43.15         0.00%     42.94          0.49%                                    23.62
Group 3                                      43.25   43.25         0.00%     42.94          0.72%                                    23.62
Group 4                                      43.34   43.34         0.00%     42.94          0.93%                                    23.62
Group 5                                      43.44   43.44         0.00%     42.94          1.16%                                    23.62
Group 6A                                     46.10   46.10         0.00%     42.94          7.36%                                    23.62
Group 6B                                     45.60   45.60         0.00%     42.94          6.19%                                    23.62
Group 6C                                     45.35   45.35         0.00%     42.94          5.61%                                    23.62
Group 6D                                     45.96   45.96         0.00%     42.94          7.03%                                    23.62
Group 6E                                     45.60   45.60         0.00%     42.94          6.19%                                    23.62
Group 7                                      44.67   44.67         0.00%     42.94          4.03%                                    23.62
Foreman $2.00 above highest paid
General Foreman $3.00 above highest paid


                                           SEE
MECHANICAL INSULATOR                       AMEND Clark                                               Y         7.77%
Mechanical Insulator-Journeyman              57.06  56.23         -1.45%     55.23          1.81%
Mechanical Insulator-Foreman                 59.56  59.52         -0.07%     55.23          7.77%
Mechanical Insulator-General Foreman         61.06  62.81          2.87%     55.23         13.72%
                                                                       234
                                                             Annual      2011 PW    Difference                         Non-      DETR
 NYE                                                      Growth, 2010 - Survey Between PW Rates Union   Union %    Union %      Mean
 Average Construction Wage $21.90         PW 2010 PW 2011     2011       Average and Survey Avg.   Y/N   Difference Difference   Wages
Average                                                          -0.42%                      3.61%            3.53%     -0.83%

MILLWRIGHT                                ADD     Churchill                                        Y       -45.41%
Millwright-Journeyman                       49.70    25.44      -48.81%    46.60         -45.41%
Millwright-Welder                           50.70    25.44      -49.82%    46.60         -45.41%
Millwright-Foreman                          53.01    25.44      -52.01%    46.60         -45.41%
Millwright-General Foreman                  56.65    25.44      -55.09%    46.60         -45.41%



OPERATING ENGINEER                                                                                 Y         4.72%
SEE GROUP CLASSIFICATIONS                 ADD     ADD
Group 1                                     53.92   55.67        3.25%     57.12          -2.54%                                   19.26
Group 2                                     54.87   56.62        3.19%     57.12          -0.88%                                   19.26
Group 3                                     55.16   56.91        3.17%     57.12          -0.37%                                   19.26
Group 4                                     56.65   58.40        3.09%     57.12           2.24%                                   19.26
Group 5                                     57.75   59.50        3.03%     57.12           4.17%                                   19.26
Group 6                                     56.87   58.62        3.08%     57.12           2.63%                                   19.26
Group 7                                     57.97   59.72        3.02%     57.12           4.55%                                   19.26
Group 8                                     56.98   58.73        3.07%     57.12           2.82%                                   19.26
Group 9                                     58.08   59.83        3.01%     57.12           4.74%                                   19.26
Group 10                                    57.10   58.85        3.06%     57.12           3.03%                                   19.26
Group 11                                    58.20   59.95        3.01%     57.12           4.95%                                   19.26
Group 12                                    57.27   59.02        3.06%     57.12           3.33%                                   19.26
Group 13                                    57.37   59.12        3.05%     57.12           3.50%                                   19.26
Group 14                                    57.40   59.15        3.05%     57.12           3.55%                                   19.26
Group 15                                    57.48   59.23        3.04%     57.12           3.69%                                   19.26
Group 16                                    57.60   59.35        3.04%     57.12           3.90%                                   19.26
Group 17                                    57.77   59.52        3.03%     57.12           4.20%                                   19.26
Group 18                                    57.87   59.62        3.02%     57.12           4.38%                                   19.26
Group 19                                    57.98   59.73        3.02%     57.12           4.57%                                   19.26
Group 20                                    58.10   59.85        3.01%     57.12           4.78%                                   19.26
Group 21                                    58.27   60.02        3.00%     57.12           5.08%                                   19.26
Group 22                                    58.37   60.12        3.00%     57.12           5.25%                                   19.26
Group 23                                    58.48   60.23        2.99%     57.12           5.44%                                   19.26
Group 24                                    58.60   60.35        2.99%     57.12           5.65%                                   19.26
Group 25                                    58.77   60.52        2.98%     57.12           5.95%                                   19.26
Add $.50 per hour for "Special" Shift
Add $1.00 per hour for "Multiple" Shift
                                                                     235
                                                              Annual      2011 PW    Difference                         Non-      DETR
 NYE                                                       Growth, 2010 - Survey Between PW Rates Union   Union %    Union %      Mean
 Average Construction Wage $21.90          PW 2010 PW 2011     2011       Average and Survey Avg.   Y/N   Difference Difference   Wages
Average                                                           -0.42%                      3.61%            3.53%     -0.83%

OPERATING ENGINEER:
CRANES, PILEDRIVING, & HOISTING
SEE GROUP CLASSIFICATIONS                  ADD       ADD
Group 1
Engineer Oiler                               57.60     59.35      3.04%     57.12          3.90%                                    19.26
Forklift Operator                            56.51     58.26      3.10%     57.12          2.00%                                    19.26
Group 2
Truck Crane Oiler                            57.60     59.35      3.04%     57.12          3.90%                                    19.26
Group 3
A-Frame or Winch Truck Operator              56.51     58.26      3.10%     57.12          2.00%                                    19.26
Ross Carrier Operator (Jobsite)              56.51     58.26      3.10%     57.12          2.00%                                    19.26
Group 4
Bridge-Type Unloader and Turntable           56.65     58.40      3.09%     57.12          2.24%                                    19.26
Helicopter Hoist Operator                    56.65     58.40      3.09%     57.12          2.24%                                    19.26
Group 5
Hydraulic Boom Truck (Pitman)                56.87     58.62      3.08%     57.12          2.63%                                    19.26
Stinger Crane (Austin-Western or Similar     56.87     58.62      3.08%     57.12          2.63%                                    19.26
Tugger Hoist Operator (1 Drum)               56.87     58.62      3.08%     57.12          2.63%                                    19.26
Group 6
Bridge Crane Operator                        56.98     58.73      3.07%     57.12          2.82%                                    19.26
Cretor Crane Operator                        56.98     58.73      3.07%     57.12          2.82%                                    19.26
Hoist Operator (Chicago Boom and Similar     56.98     58.73      3.07%     57.12          2.82%                                    19.26
Lift Mobile Operator                         56.98     58.73      3.07%     57.12          2.82%                                    19.26
Lift Slab Machine Operator (Vagtborg and     56.98     58.73      3.07%     57.12          2.82%                                    19.26
Material Hoist/Manlift Operator              56.98     58.73      3.07%     57.12          2.82%                                    19.26
Polar Gantry Crane Operator                  56.98     58.73      3.07%     57.12          2.82%                                    19.26
Self Climbing Scaffold (or Similar Type)     56.98     58.73      3.07%     57.12          2.82%                                    19.26
Shovel, Backhoe, Dragline, Clamshell
Operator (Over 3/4 YD. and up to 5 CU.
YDS. M.R.C.)                                 56.98     58.73      3.07%     57.12          2.82%                                    19.26
Silent Piler                                 56.98     58.73      3.07%     57.12          2.82%                                    19.26
Tugger Hoist Operator (2 Drum)               56.98     58.73      3.07%     57.12          2.82%                                    19.26
Group 7
Pedestal Crane Operator                      57.10     58.85      3.06%     57.12          3.03%                                    19.26
Shovel, Backhoe, Dragline, Clamshell
Operator (over 5 CU. YDS. M.R.C.)            57.10     58.85      3.06%     57.12          3.03%                                    19.26
Tower Crane Repairman                        57.10     58.85      3.06%     57.12          3.03%                                    19.26
                                                                      236
                                                               Annual      2011 PW    Difference                         Non-      DETR
  NYE                                                       Growth, 2010 - Survey Between PW Rates Union   Union %    Union %      Mean
  Average Construction Wage $21.90          PW 2010 PW 2011     2011       Average  and Survey Avg.  Y/N   Difference Difference   Wages
Average                                                            -0.42%                      3.61%            3.53%     -0.83%
Tugger Hoist Operator (3 Drum)                57.10   58.85         3.06%     57.12            3.03%                                 19.26
Group 8
Crane Operator (up to and including 25 ton    59.07   60.82         2.96%     57.12            6.48%                                 19.26
Crawler Transporter Operator                  57.27   59.02         3.06%     57.12            3.33%                                 19.26
Derrick Barge Operator (up to and including   57.27   59.02         3.06%     57.12            3.33%                                 19.26
Hoist Operator, Stiff Legs, Guy Derrick or
Similar Type (up to and including 25 ton
capacity)                                     57.27   59.02         3.06%     57.12            3.33%                                 19.26
Shovel, Backhoe, Dragline, Clamshell
Operator (over 7 CU. YDS. M.R.C.)             57.27   59.02         3.06%     57.12            3.33%                                 19.26
Group 9
Crane Operator (over 25 tons up to and
including 50 tons M.R.C.)                     59.07   60.82         2.96%     57.12            6.48%                                 19.26
Derrick Barge Operator (over 25 tons, up to
and including 50 tons M.R.C.)                 57.44   59.19         3.05%     57.12            3.62%                                 19.26
Highline Cableway Operator                    57.44   59.19         3.05%     57.12            3.62%                                 19.26
Hoise Operator, Stiff Legs, Guy Derrick or
Similar Type (over 25 tons, up to and
including 50 tons M.R.C.)                     57.44   59.19         3.05%     57.12            3.62%                                 19.26
K-Crane                                       57.44   59.19         3.05%     57.12            3.62%                                 19.26
Polar Crane Operator                          57.44   59.19         3.05%     57.12            3.62%                                 19.26
Self Erecting Tower Crane Operator
Maximum Lifting Capacity Ten (10) Tons.
One (1) Ton Operator).                        57.44   59.19         3.05%     57.12            3.62%                                 19.26
Group 10
Crane Operator (over 50 tons, up to and
including 100 tons M.R.C.)                    60.49   62.24         2.89%     57.12            8.96%                                 19.26
Derrick Barge Operator (over 50 tons, up to
and including 100 tons M.R.C.)                58.44   60.19         2.99%     57.12            5.37%                                 19.26
Hoist Operator, Stiff Legs, Guy Derrick or
Similar Type (over 50 tons, up to and
including 100 tons M.R.C.)                    58.44   60.19         2.99%     57.12            5.37%                                 19.26

Mobile Tower Crane Operator (over 50 tons,
up to and including 100 tons M.R.C.)         60.49   62.24      2.89%     57.12            8.96%                                     19.26
Group 11
Crane Operator (over 100 tons, up to and
including 200 tons M.R.C.)                   60.99   62.74      2.87%     57.12            9.84%                                     19.26
                                                                    237
                                                                 Annual      2011 PW    Difference                         Non-      DETR
  NYE                                                         Growth, 2010 - Survey Between PW Rates Union   Union %    Union %      Mean
  Average Construction Wage $21.90            PW 2010 PW 2011     2011       Average and Survey Avg.   Y/N   Difference Difference   Wages
Average                                                              -0.42%                      3.61%            3.53%     -0.83%
Derrick Barge Operator (over 100 tons, up
to and including 200 tons M.R.C.)                 59.44       61.19   2.94%     57.12         7.13%                                    19.26
Hoist Operator, Stiff Legs, Guy Derrick or
Similar Type (over100 tons, up to and
including 200 tons M.R.C.)                        59.44       61.19   2.94%     57.12         7.13%                                    19.26

Mobile Tower Crane Operator (over 100
tons, up to and including 200 tons M.R.C.)        60.99       62.74   2.87%     57.12         9.84%                                    19.26
Tower Crane Operator and Tower Gantry             61.44       63.19   2.85%     57.12        10.63%                                    19.26
Group 12
Crane Operator (over 200 tons up to and
including 300 tons M.R.C.)                        63.63       65.38   2.75%     57.12        14.46%                                    19.26
Derrick Barge Operator (over 200 tons up to
and including 300 tons M.R.C.)                    60.44       62.19   2.90%     57.12         8.88%                                    19.26
Hoist Operator, Stiff Legs, Guy Derrick or
Similar Type (over 200 tons up to and
including 300 tons M.R.C.)                        60.44       62.19   2.90%     57.12         8.88%                                    19.26
Mobile Tower Crane Operator (over 200
tons up to and including 300 tons M.R.C.)         63.63       65.38   2.75%     57.12        14.46%                                    19.26
Group 13
Crane Operator (over 300 tons)                    65.00       66.75   2.69%     57.12        16.86%                                    19.26
Derrick Barge Operator (over 300 tons)            61.44       63.19   2.85%     57.12        10.63%                                    19.26
Helicopter Pilot                                  61.44       63.19   2.85%     57.12        10.63%                                    19.26
Hoist Operator, Stiff Legs, Guy Derrick or
Similar Type (over 300 tons)                      61.44       63.19   2.85%     57.12        10.63%                                    19.26
Mobile Tower Crane Operator (over 300             65.00       66.75   2.69%     57.12        16.86%                                    19.26
Add $ .50 per hour for "Special" Shift        -           -
Add $1.00 per hour for "Multiple" Shift       -           -


OPERATING ENGINEER -TUNNEL
SEE GROUP CLASSIFICATIONS                     ADD     ADD
Group 1                                         55.77   57.52         3.14%     57.12         0.70%                                    19.26
Group 2                                         56.72   58.47         3.09%     57.12         2.36%                                    19.26
Group 3                                         57.01   58.76         3.07%     57.12         2.87%                                    19.26
Group 4                                         57.15   58.90         3.06%     57.12         3.12%                                    19.26
Group 5                                         57.37   59.12         3.05%     57.12         3.50%                                    19.26
Group 6                                         57.48   59.23         3.04%     57.12         3.69%                                    19.26
                                                                          238
                                                                  Annual      2011 PW    Difference                         Non-      DETR
 NYE                                                           Growth, 2010 - Survey Between PW Rates Union   Union %    Union %      Mean
 Average Construction Wage $21.90      PW 2010 PW 2011             2011       Average  and Survey Avg.  Y/N   Difference Difference   Wages
Average                                                               -0.42%                      3.61%            3.53%     -0.83%
Group 7                                    57.60       59.35           3.04%     57.12            3.90%                                 19.26
Group 8                                    57.77       59.52           3.03%     57.12            4.20%                                 19.26
Group 9                                    57.90       59.65           3.02%     57.12            4.43%                                 19.26

PAINTER                                            Lander                                               Y        -1.60%
Painter-Journeyman                         46.23      32.74         -29.18%     33.78          -3.08%
Painter-Foreman                            49.35      33.74         -31.63%     33.78          -0.12%

PILEDRIVER                                                                                              Y
Piledriver-Journeyman                      34.27       34.27          0.00%
Piledriver-Foreman                         35.59       35.59          0.00%

PLASTERER                              ADD     Clark                                                    Y        -0.13%
Plasterer                                44.69    44.69               0.00%     44.75          -0.13%


PLUMBER/PIPEFITTER                     -           Mineral                                              N                    0.00%
Plumber/Pipefitter-Journeyman              34.28      26.10         -23.86%     26.10          0.00%
Plumber/Pipefitter-Foreman                 34.28      26.10         -23.86%     26.10          0.00%
Plumber/Pipefitter-General Foreman         34.28      26.10         -23.86%     26.10          0.00%

REFRIGERATION                          -           Lander                                               Y       -26.09%
Refrigeration-Journeyman                   27.55      29.40           6.72%     39.78         -26.09%
Refrigeration-Foreman                      27.55      29.40           6.72%     39.78         -26.09%
Refrigeration-General Foreman              27.55      29.40           6.72%     39.78         -26.09%

ROOFER-                                -           -
(Does not include sheet metal roofs)                                                                    Y         0.25%
Roofer                                     20.48       31.91         55.81%     31.83          0.25%

SHEET METAL WORKER                     ADD     ADD                                                      Y         8.53%
Sheet Metal Worker-Journeyman            46.60   59.52               27.73%     58.94          0.98%
Sheet Metal Worker-Foreman               49.62   63.97               28.92%     58.94          8.53%
Sheet Metal Worker-General Foreman       52.64   68.42               29.98%     58.94         16.08%

SPRINKLER FITTER                       -           -                                                    N                   -0.36%
Sprinkler Fitter-Journeyman                26.00       25.00         -3.85%     25.09          -0.36%
Sprinkler Fitter-Foreman                   26.00       25.00         -3.85%     25.09          -0.36%
                                                                          239
                                                              Annual      2011 PW    Difference                         Non-      DETR
 NYE                                                       Growth, 2010 - Survey Between PW Rates Union   Union %    Union %      Mean
 Average Construction Wage $21.90          PW 2010 PW 2011     2011       Average  and Survey Avg.  Y/N   Difference Difference   Wages
Average                                                           -0.42%                      3.61%            3.53%     -0.83%
Sprinkler Fitter-General Foreman             26.00   25.00        -3.85%     25.09           -0.36%



SURVEYOR                                                                                            N                   17.27%
Surveyor                                     42.14     45.96      9.07%     39.19         17.27%                                    23.76

TAPER                                                                                               Y        30.13%
Taper                                        46.23     46.64      0.89%     35.84         30.13%

TILE SETTER/TERRAZZO                       ADD     ADD
Tile Setter/Terrazzo Worker/Marble Mason     32.48   34.63        6.62%     36.35          -4.73%   Y        -4.73%
Tile Setter/Terrazzo Worker/Marble Mason     46.04   49.29        7.06%     49.17           0.24%   Y         0.24%

                                            ADD     ADD
TRAFFIC BARRIER ERECTOR                    LABORE LABORER
Traffic Barrier Erector                       42.94   42.94       0.00%

                                           ADD
                                           ZONE
TRUCK DRIVER                               RATE      Lyon                                           N                    3.43%
SEE GROUP CLASSIFICATIONS
Group 1                                      46.13     20.80     -54.91%    20.11          3.43%                                    22.01
Group 2                                      46.23     20.80     -55.01%    20.11          3.43%                                    22.01
Group 3                                      46.44     20.80     -55.21%    20.11          3.43%                                    22.01
Group 4                                      46.62     20.80     -55.38%    20.11          3.43%                                    22.01
Group 5                                      46.82     20.80     -55.57%    20.11          3.43%                                    22.01
Group 6                                      47.12     20.80     -55.86%    20.11          3.43%                                    22.01
Foreman $1.00 above highest paid             48.12     20.80     -56.77%    20.11          3.43%                                    22.01



                                                   Esmerald
WELL DRILLER                                       a                                                N                    0.00%
Well Driller                                 31.49    19.42      -38.33%    19.42          0.00%

EQUIPMENT GREASER (RACK)                             ADD OP.                                        Y         2.98%
Equipment Greaser (rack)                     46.10     56.91     23.45%     56.79          0.21%
                                                                      240
                                                                  Annual      2011 PW    Difference                         Non-      DETR
 NYE                                                           Growth, 2010 - Survey Between PW Rates Union   Union %    Union %      Mean
 Average Construction Wage $21.90              PW 2010 PW 2011     2011       Average and Survey Avg.   Y/N   Difference Difference   Wages
Average                                                               -0.42%                      3.61%            3.53%     -0.83%

EQUIPMENT GREASER (GREASE                              ADD OP.
Equipment Greaser (grease truck)                 46.10   58.40       26.68%     56.79          2.84%

EQUIPMENT GREASER (GREASE                                ADD OP.
Equipment Greaser (grease truck/multi-shift)     46.10     59.50     29.07%     56.79          4.77%

TUNNEL, EQUIPMENT GREASER                                ADD OP.
Tunnel, Equipment Greaser (grease truck)         46.10     59.12     28.24%     56.79          4.10%

FIELD SOILS AND MATERIAL TESTER                          ADD OP.                                        Y        -0.30%
Field Soils and Material Tester                  44.14     56.62     28.27%     56.79          -0.30%

FIELD ASPHALTIC CONCRETE (SOILS                        ADD OP.
AND MATERIAL TESTER)                                   ENG.
Field Asphaltic Concrete (soils and material     44.14    56.62      28.27%     56.79          -0.30%

Union Breakdown
Union                                                                                                   28
Non-Union                                                                                               10
Total                                                                                                   38




                                                                          241
DETR Mean
Wage + 40%      Wage
 Benefits      Premium
                 108.11%




       29.61     65.32%
       29.61     68.69%
       29.61     75.89%
       29.61     87.40%
           0
           0
           0
           0
           0
           0
           0
           0
           0


           0
      37.394      8.31%
      37.394     60.19%
                           242
DETR Mean
Wage + 40%        Wage
 Benefits        Premium
                   108.11%
      37.394        74.25%
      37.394        88.40%
      37.394        32.35%
           0
           0
           0
           0
           0
           0
           0
           0
           0
           0
           0
           0
           0
           0
           0
           0
           0

             0
             0
             0

             0
             0
             0
             0
             0
             0
             0



             0
             0
             0
                             243
DETR Mean
Wage + 40%        Wage
 Benefits        Premium
                   108.11%
             0
             0
             0
             0

             0
             0
             0
             0
             0

           0
           0
           0
           0
           0
           0
           0
      33.068       29.85%
      33.068       30.49%
      33.068       30.79%
      33.068       31.06%
      33.068       31.37%
      33.068       39.41%
      33.068       37.90%
      33.068       37.14%
      33.068       38.99%
      33.068       37.90%
      33.068       35.09%
           0
           0
           0
           0

             0
             0
             0
             0
                             244
DETR Mean
Wage + 40%      Wage
 Benefits      Premium
                 108.11%
           0
           0
           0
           0
           0
           0
           0
           0
           0
           0
           0
      26.964    106.46%
      26.964    109.98%
      26.964    111.06%
      26.964    116.59%
      26.964    120.66%
      26.964    117.40%
      26.964    121.48%
      26.964    117.81%
      26.964    121.89%
      26.964    118.25%
      26.964    122.33%
      26.964    118.88%
      26.964    119.26%
      26.964    119.37%
      26.964    119.66%
      26.964    120.11%
      26.964    120.74%
      26.964    121.11%
      26.964    121.52%
      26.964    121.96%
      26.964    122.59%
      26.964    122.96%
      26.964    123.37%
      26.964    123.82%
      26.964    124.45%
           0
           0
                           245
DETR Mean
Wage + 40%      Wage
 Benefits      Premium
                 108.11%
           0
           0
           0
           0
           0
      26.964    120.11%
      26.964    116.07%
           0
      26.964    120.11%
           0
      26.964    116.07%
      26.964    116.07%
           0
      26.964    116.59%
      26.964    116.59%
           0
      26.964    117.40%
      26.964    117.40%
      26.964    117.40%
           0
      26.964    117.81%
      26.964    117.81%
      26.964    117.81%
      26.964    117.81%
      26.964    117.81%
      26.964    117.81%
      26.964    117.81%
      26.964    117.81%


      26.964    117.81%
      26.964    117.81%
      26.964    117.81%
           0
      26.964    118.25%

      26.964    118.25%
      26.964    118.25%
                           246
DETR Mean
Wage + 40%      Wage
 Benefits      Premium
                 108.11%
      26.964     118.25%
           0
      26.964    125.56%
      26.964    118.88%
      26.964    118.88%


      26.964    118.88%

      26.964    118.88%
           0

      26.964    125.56%

      26.964    119.51%
      26.964    119.51%


      26.964    119.51%
      26.964    119.51%
      26.964    119.51%


      26.964    119.51%
           0

      26.964    130.83%

      26.964    123.22%


      26.964    123.22%


      26.964    130.83%
           0

      26.964    132.68%
                           247
DETR Mean
Wage + 40%      Wage
 Benefits      Premium
                 108.11%

      26.964    126.93%


      26.964    126.93%


      26.964    132.68%
      26.964    134.35%
           0

      26.964    142.47%

      26.964    130.64%


      26.964    130.64%

      26.964    142.47%
           0
      26.964    147.55%
      26.964    134.35%
      26.964    134.35%

      26.964    134.35%
      26.964    147.55%
           0
           0
           0
           0
           0
           0
      26.964    113.32%
      26.964    116.84%
      26.964    117.92%
      26.964    118.44%
      26.964    119.26%
      26.964    119.66%
                           248
DETR Mean
Wage + 40%      Wage
 Benefits      Premium
                 108.11%
      26.964     120.11%
      26.964     120.74%
      26.964     121.22%
           0
           0
           0
           0
           0
           0
           0
           0
           0
           0
           0
           0
           0
           0
           0
           0
           0
           0
           0
           0
           0
           0
           0
           0
           0
           0
           0
           0
           0
           0
           0
           0
           0
           0
           0
                           249
DETR Mean
Wage + 40%        Wage
 Benefits        Premium
                   108.11%
           0
           0
           0
           0
           0
      33.264       38.17%
           0
           0
           0
           0
           0
           0
           0
           0

             0
             0
             0


           0
           0
      30.814       -32.50%
      30.814       -32.50%
      30.814       -32.50%
      30.814       -32.50%
      30.814       -32.50%
      30.814       -32.50%
      30.814       -32.50%
           0
           0


             0
             0
             0
             0
             0
                             250
DETR Mean
Wage + 40%        Wage
 Benefits        Premium
                   108.11%
             0
             0
             0
             0
             0
             0
             0
             0
             0
             0
             0
             0
             0

             0
             0




                             251
                                                               Annual     2011 PW Difference Between                     Non-Union    DETR
 PERSHING                                                    Growth, 2010 Survey     PW Rates and     Union   Union %        %        Mean
 Average Construction Wage $28.71        PW 2010     PW 2011    - 2011    Average     Survey Avg.      Y/N    Difference Difference   Wages
Average                                                             2.51%                       4.14%              5.29%      1.82%

                                         ADD
                                         SHEET
                                         METAL
                                         ZONE
AIR BALANCE TECHNICIAN                   RATE     Washoe                                                Y        46.57%
Air Balance Technician-Journeyman           46.60    48.35          3.76%     35.11           37.71%
Air Balance Technician-Foreman              49.62    51.46          3.71%     35.11           46.57%
Air Balance Technician-General Foreman      52.64    54.57          3.67%     35.11           55.43%

ALARM INSTALLER                                      Churchill                                          N                    0.00%
Alarm Installer                              25.69      26.77       4.20%     26.77            0.00%

BOILERMAKER                              -           Churchill                                          Y         1.87%
Boilermaker-Journeyman                       59.50      65.94      10.82%     64.73            1.87%
Boilermaker-Foreman                          59.50      65.94      10.82%     64.73            1.87%
Boilermaker-General Foreman                  59.50      65.94      10.82%     64.73            1.87%

                                         ADD
                                         ZONE
BRICKLAYER                               RATE--   Washoe                                                Y         8.21%
Bricklayer-Journeyman                       32.68    32.68          0.00%     31.51            3.71%
Bricklayer-Foreman                          33.98    33.93         -0.15%     31.51            7.68%
Bricklayer-General Foreman                  35.68    35.68          0.00%     31.51           13.23%

                                         ADD      ADD
                                         ZONE     ZONE
CARPENTER                                RATE     RATE                                                  Y         3.57%
Carpenter-Journeyman                        38.30    38.80          1.31%     38.79            0.03%
Carpenter-Foreman                           41.05    41.55          1.22%     38.79            7.12%

CEMENT MASON                                                                                            Y         2.91%
Cement Mason-Journeyman                      17.00      34.40     102.35%     34.40            0.00%
Cement Mason-Foreman                         17.00      36.40     114.12%     34.40            5.81%

ELECTRICIAN-COMMUNICATION TECHNICIAN        Humboldt                                                    N                    0.00%
Electrician-Communication Technician-
Installer                             27.97    25.66               -8.26%     25.66            0.00%
                                                                        252
                                                                 Annual     2011 PW Difference Between                     Non-Union    DETR
  PERSHING                                                     Growth, 2010 Survey     PW Rates and     Union   Union %        %        Mean
  Average Construction Wage $28.71         PW 2010     PW 2011    - 2011    Average     Survey Avg.      Y/N    Difference Difference   Wages
Average                                                               2.51%                       4.14%              5.29%      1.82%
Electrician-Communication Technician-
Technician                                     30.88       25.66    -16.90%     25.66            0.00%
Electrician-Communication Technician-
Senior Technician                              33.13       25.66    -22.55%     25.66            0.00%

ELECTRICIAN-LINE                           -           -                                                  Y        -2.23%
Electrician-Groundman                          39.19       40.50      3.34%     58.40          -30.65%
Electrician-Lineman                            57.91       59.90      3.44%     58.40            2.57%
Electrician-Foreman                            63.02       65.16      3.40%     58.40           11.58%
Electrician-General Foreman                    68.12       70.45      3.42%     58.40           20.63%
Heavy Equipment Operator                       47.86       49.49      3.41%     58.40          -15.26%

ELECTRICIAN-NEON SIGN                                  Churchill                                          Y         0.57%
Electrician-Neon Sign                          44.31      45.52       2.73%     45.26            0.57%

ELECTRICIAN-WIREMAN                                                                                       Y         4.53%
Electrician-Wireman                            47.69       50.78      6.48%     48.58            4.53%

ELEVATOR CONSTRUCTOR                       -           Churchill                                          Y        13.48%

Elevator Constructor-Journeyman Mechanic       46.01       78.21     69.98%     72.12            8.44%
Elevator Construction-Mechanic In Charge       46.01       85.48     85.79%     72.12           18.52%

                                            ADD
                                           LABORE
                                           R ZONE
FENCE ERECTOR                              RATE     Washoe                                                N                    0.00%
Fence Erector                                 30.82    48.07         55.97%     48.07            0.00%

                                            ADD         ADD
                                           LABORE      LABORER
                                           R ZONE       ZONE
FLAGPERSON                                 RATE        RATE
Flagperson                                    27.95        27.95      0.00%

FLOOR COVERER                                          Churchill                                          Y         3.65%
Floor Coverer-Journeyman                       36.26      36.34       0.22%     36.31            0.08%
Floor Coverer-Foreman                          38.90      38.93       0.08%     36.31            7.22%
                                                                          253
                                                          Annual     2011 PW Difference Between                     Non-Union    DETR
 PERSHING                                               Growth, 2010 Survey     PW Rates and     Union   Union %        %        Mean
 Average Construction Wage $28.71   PW 2010     PW 2011    - 2011    Average     Survey Avg.      Y/N    Difference Difference   Wages
Average                                                        2.51%                       4.14%              5.29%      1.82%

GLAZIER                             -           Churchill                                          N                    2.28%
Glazier                                 21.50      21.50       0.00%     21.02            2.28%

                                     ADD         ADD
                                    LABORE      LABORER
                                    R ZONE       ZONE
HIGHWAY STRIPER                     RATE        RATE                                               Y         0.00%
Highway Striper                        33.57        33.57      0.00%     33.57            0.00%

                                    ADD
                                    ZONE
HOD CARRIER-BRICK MASON TENDER      RATE     Humboldt                                              Y         0.83%
Brick Mason-Journeyman                 30.10    30.10          0.00%     30.10            0.00%
Brick Mason-Foreman                    30.60    30.60          0.00%     30.10            1.66%

                                    ADD
                                    ZONE
HOD CARRIER-PLASTERER TENDER        RATE     CC                                                    Y         3.81%
Plasterer Tender-Journeyman            33.76    34.26          1.48%     33.76            1.48%
Plasterer Tender-Gun Tender            34.76    35.26          1.44%     33.76            4.44%
Plasterer Tender-Foreman               35.12    35.62          1.42%     33.76            5.51%

                                    SEE
                                    AMENDM
IRON WORKER                         ENT 1                                                          Y         4.80%
Ironworker-Journeyman                  54.38        56.74      4.34%     57.31           -0.99%
Ironworker-Foreman                     57.68        60.04      4.09%     57.31            4.76%
Ironworker-General Foreman             61.04        63.40      3.87%     57.31           10.63%

                                    ADD      ADD
LABORER                             ZONE     ZONE                                                  Y         0.19%
SEE GROUP CLASSIFICATIONS           RATE     RATE
Landscaper                             25.66    25.66          0.00%     30.33          -15.40%
Furniture Mover                        27.16    27.16          0.00%     30.33          -10.45%
Group 1                                30.82    30.82          0.00%     30.33            1.62%
Group 1A                               27.95    27.95          0.00%     30.33           -7.85%
Group 2                                30.92    30.92          0.00%     30.33            1.95%
                                                                   254
                                                              Annual     2011 PW Difference Between                     Non-Union    DETR
 PERSHING                                                   Growth, 2010 Survey     PW Rates and     Union   Union %        %        Mean
 Average Construction Wage $28.71      PW 2010    PW 2011      - 2011    Average     Survey Avg.      Y/N    Difference Difference   Wages
Average                                                            2.51%                       4.14%              5.29%      1.82%
Group 3                                   31.07     31.07          0.00%    30.33              2.44%
Group 4                                   31.32     31.32          0.00%    30.33              3.26%
Group 4A                                  32.57     32.57          0.00%    30.33              7.39%
Group 5                                   31.62     31.62          0.00%    30.33              4.25%
Group 6
Nozzlemen, Rodmen                         31.62     31.62         0.00%     30.33             4.25%
Gunmen, Materialmen                       31.32     31.32         0.00%     30.33             3.26%
Reboundmen                                30.97     30.97         0.00%     30.33             2.11%
Gunite Foremen                            32.02     32.02         0.00%     30.33             5.57%

                                       SEE
                                       AMENDM
MECHANICAL INSULATOR                   ENT 2-   Storey                                                 Y        -0.08%
Mechanical Insulator-Mechanic             57.06     54.56         -4.38%    56.77            -3.89%
Mechanical Insulator-Foreman              59.56     57.06         -4.20%    56.77             0.51%
Mechanical Insulator-General Foreman      61.06     58.56         -4.09%    56.77             3.15%

MILLWRIGHT                                                                                             N                   19.18%
Millwright-Journeyman                     49.70     31.51        -36.60%    26.44            19.18%
Millwright-Welder                         50.70     31.51        -37.85%    26.44            19.18%
Millwright-Foreman                        53.01     31.51        -40.56%    26.44            19.18%
Millwright-General Foreman                56.65     31.51        -44.38%    26.44            19.18%

                                       ADD      ADD
OPERATING ENGINEER                     ZONE     ZONE                                                   Y         8.85%
SEE GROUP CLASSIFICATIONS              RATE     RATE
Group 1                                   41.33    43.08          4.23%     46.85            -8.05%
Group 1A                                  44.09    45.84          3.97%     46.85            -2.16%
Group 2                                   44.62    46.37          3.92%     46.85            -1.02%
Group 3                                   44.89    46.64          3.90%     46.85            -0.45%
Group 4                                   45.63    47.38          3.84%     46.85             1.13%
Group 5                                   45.93    47.68          3.81%     46.85             1.77%
Group 6                                   46.10    47.85          3.80%     46.85             2.13%
Group 7                                   46.35    48.10          3.78%     46.85             2.67%
Group 8                                   46.94    48.69          3.73%     46.85             3.93%
Group 9                                   47.26    49.01          3.70%     46.85             4.61%
Group 10                                  47.61    49.36          3.68%     46.85             5.36%
Group 10A                                 47.80    49.55          3.66%     46.85             5.76%
                                                                      255
                                                                       Annual     2011 PW Difference Between                     Non-Union    DETR
 PERSHING                                                            Growth, 2010 Survey     PW Rates and     Union   Union %        %        Mean
 Average Construction Wage $28.71            PW 2010     PW 2011        - 2011    Average     Survey Avg.      Y/N    Difference Difference   Wages
Average                                                                     2.51%                       4.14%              5.29%      1.82%
Group 11                                         48.04       49.79          3.64%    46.85              6.28%
Group 11A                                        49.68       51.43          3.52%    46.85              9.78%
Group 11B                                        50.49       52.24          3.47%    46.85             11.50%
Foreman                                          49.68       51.43          3.52%    46.85              9.78%
Add 7% to base rate for "Second" Shift       -           -
Add 12.5% to base rate for "Special" shift   -           -

OPERATING ENGINEER-STEEL                     ADD         ADD
FABRICATOR & ERECTOR                         ZONE        ZONE
SEE GROUP CLASSIFICATIONS                    RATE        RATE
Group 1                                         56.63       58.38          3.09%     46.85            24.61%
Group 1 Truck Crane Oiler                       50.46       52.21          3.47%     46.85            11.44%
Group 1 Oiler                                   48.50       50.25          3.61%     46.85             7.26%
Group 2                                         55.12       56.87          3.17%     46.85            21.39%
Group 2 Truck Crane Oiler                       50.21       51.96          3.49%     46.85            10.91%
Group 2 Oiler                                   48.29       50.04          3.62%     46.85             6.81%
Group 3                                         53.88       55.63          3.25%     46.85            18.74%
Group 3 Truck Crane Oiler                       49.99       51.74          3.50%     46.85            10.44%
Group 3 Oiler                                   48.07       49.82          3.64%     46.85             6.34%
Group 3 Hydraulic                               49.66       51.41          3.52%     46.85             9.73%
Group 4                                         52.15       53.90          3.36%     46.85            15.05%
Group 5                                         51.05       52.80          3.43%     46.85            12.70%
Add 7% to base rate for "Second" Shift       -           -
Add 12.5% to base rate for "Special" Shift

                                             ADD      ADD
OPERATING ENGINEER -PILEDRIVER               ZONE     ZONE                                                      Y
SEE GROUP CLASSIFICATIONS                    RATE     RATE
Group 1                                         56.10    57.85             3.12%     46.85            23.48%
Group 1 Truck Crane Oiler                       50.64    52.39             3.46%     46.85            11.82%
Group 1 Oiler                                   48.72    50.47             3.59%     46.85             7.73%
Group 2                                         54.56    56.31             3.21%     46.85            20.19%
Group 2 Truck Crane Oiler                       50.43    52.18             3.47%     46.85            11.38%
Group 2 Oiler                                   48.52    50.27             3.61%     46.85             7.30%
Group 3                                         53.11    54.86             3.30%     46.85            17.10%
Group 3 Truck Crane Oiler                       50.21    51.96             3.49%     46.85            10.91%
Group 3 Oiler                                   48.29    50.04             3.62%     46.85             6.81%
Group 4                                         51.60    53.35             3.39%     46.85            13.87%
                                                                               256
                                                                    Annual     2011 PW Difference Between                     Non-Union    DETR
 PERSHING                                                         Growth, 2010 Survey     PW Rates and     Union   Union %        %        Mean
 Average Construction Wage $28.71         PW 2010     PW 2011        - 2011    Average     Survey Avg.      Y/N    Difference Difference   Wages
Average                                                                  2.51%                       4.14%              5.29%      1.82%
Group 5                                       50.49       52.24          3.47%    46.85             11.50%
Group 6                                       49.38       51.13          3.54%    46.85              9.14%
Group 7                                       48.42       50.17          3.61%    46.85              7.09%
Group 8                                       47.46       49.21          3.69%    46.85              5.04%
Add 7% to base for "Second" Shift         -           -
Add 12.5% to base for "Special" Shift     -           -


PAINTER                                                                                                      Y        -3.06%
Brush/Roller Painter                          32.74       32.74         0.00%     34.69            -5.62%
Spray Painter/Paperhanger                     33.59       33.59         0.00%     34.69            -3.17%
Sandblaster                                   33.24       33.24         0.00%     34.69            -4.18%
Structural Steel & Steeplejack                33.74       33.74         0.00%     34.69            -2.74%
Swing Stage                                   34.74       34.74         0.00%     34.69             0.14%
Special Coating Application-Brush             33.24       33.24         0.00%     34.69            -4.18%
Special Coating Application-Spray             33.74       33.74         0.00%     34.69            -2.74%
Special Coating Application-Spray Steel       33.99       33.99         0.00%     34.69            -2.02%
Foreman $1.00 above highest Journeyman

PILEDRIVER
Piledriver-Journeyman                         58.47       58.47         0.00%
Piledriver-Foreman                            62.05       62.05         0.00%

                                          ADD
                                          ZONE
PLASTERER                                 RATE     Washoe                                                    Y         1.71%
Plasterer-Journeyman                         34.27    34.77             1.46%     35.29            -1.47%
Plasterer-Foreman                            35.59    37.02             4.02%     35.29             4.90%

PLUMBER/PIPEFITTER                        -           -                                                      Y        17.62%
Plumber/Pipefitter                            45.20       45.20         0.00%     38.43            17.62%


REFRIGERATION                             -           Humboldt                                               Y         4.52%
Refrigeration                                 27.55      41.58         50.93%     39.78             4.52%

ROOFER                                    -           -
(Does not include sheet metal roofs)                                                                         N                    4.80%
                                                                            257
                                                              Annual     2011 PW Difference Between                     Non-Union    DETR
 PERSHING                                                   Growth, 2010 Survey     PW Rates and     Union   Union %        %        Mean
 Average Construction Wage $28.71       PW 2010     PW 2011    - 2011    Average     Survey Avg.      Y/N    Difference Difference   Wages
Average                                                            2.51%                       4.14%              5.29%      1.82%
Roofer                                      21.28     21.60        1.50%    20.61              4.80%

                                        ADD      ADD
                                        ZONE     ZONE
SHEET METAL WORKER                      RATE     RATE                                                  Y         9.29%
Sheet Metal Worker                         46.60    48.35          3.76%    44.24             9.29%


SPRINKLER FITTER                        -           Humboldt                                           N                   -8.47%
Sprinkler Fitter-Journeyman                 52.30      39.35     -24.76%    42.99            -8.47%
Sprinkler Fitter-Foreman                    55.05      39.35     -28.52%    42.99            -8.47%
Sprinkler Fitter-General Foreman            57.30      39.35     -31.33%    42.99            -8.47%

SURVEYOR                                            Churchill                                          N                    0.00%
Surveyor                                    42.14      25.63     -39.18%    25.63             0.00%

TAPER                                   -           Washoe                                             Y         1.09%
Taper                                       35.49      36.28       2.23%    35.89             1.09%

                                        ADD
TILE SETTER/TERRAZZO                    ZONE
WORKER/MARBLE MASON-FINISHER            RATE     Washoe                                                Y         1.02%
Tile, Terrazzo and Marble Finisher         32.48    24.77        -23.74%    24.52             1.02%

                                        ADD
TILE SETTER/TERRAZZO                    ZONE
WORKER/MARBLE MASON                     RATE     Washoe                                                Y         4.15%
Tile Setter-Journeyman                     35.99    32.87         -8.67%    33.64            -2.29%
Tile Setter-Foreman                        35.99    34.12         -5.20%    33.64             1.43%
Tile Setter-General Formean                35.99    35.87         -0.33%    33.64             6.63%
Terrazzo/Marble Mason-Journeyman           35.99    34.37         -4.50%    33.64             2.17%
Terrazzo/Marble Mason-Foreman              35.99    35.62         -1.03%    33.64             5.89%
Terrazzo/Marble Mason-General Foreman      35.99    37.37          3.83%    33.64            11.09%




                                                                      258
                                                             Annual     2011 PW Difference Between                     Non-Union    DETR
 PERSHING                                                  Growth, 2010 Survey     PW Rates and     Union   Union %        %        Mean
 Average Construction Wage $28.71         PW 2010 PW 2011     - 2011    Average     Survey Avg.      Y/N    Difference Difference   Wages
Average                                                           2.51%                       4.14%              5.29%      1.82%
                                          ADD     ADD
                                         LABORE LABORER
                                         R ZONE   ZONE
TRAFFIC BARRIER ERECTOR                  RATE     RATE
Traffic Barrier Erector                     30.82    30.82        0.00%

TRUCK DRIVER                                        Churchill                                         N                    0.06%
Dump Trucks (Single or Multiple Units Including
Semi's & Double Transfer Units), Dumpcretes and
Bulk Cement Spreader)
Under 4 yds. (water level)                    20.80    19.65     -5.53%    19.65             0.00%
4 yds. & under 8 yds. (water level)           20.80    19.65     -5.53%    19.65             0.00%
8 yds. & under 18 yds. (water level)          20.80    19.65     -5.53%    19.65             0.00%
18 yds. & under 25 yds. ( water level)        20.80    19.65     -5.53%    19.65             0.00%
25 yds. & under 60 yds. (water level)         20.80    19.65     -5.53%    19.65             0.00%
60 yds. & under 75 yds. (water level)         20.80    19.65     -5.53%    19.65             0.00%
75 yds. & under 100 yds. (water level)        20.80    19.65     -5.53%    19.65             0.00%
100 yds. & under 150 yds.(water level)        20.80    19.65     -5.53%    19.65             0.00%
150 yds. & under 250 yds. ( water level)      20.80    19.65     -5.53%    19.65             0.00%
250 yds. & under 350 yds. (water level)       20.80    19.65     -5.53%    19.65             0.00%
350 yds. & over (water level)                 20.80    19.65     -5.53%    19.65             0.00%
Transit Mix
Under 8 yds.                                  20.80    19.65     -5.53%    19.65             0.00%
8 yds. & including 12 yds.                    20.80    19.65     -5.53%    19.65             0.00%
Over 12 yds.                                  20.80    19.65     -5.53%    19.65             0.00%
Transit Mix (Using Boom)
Transit mix with boom shall receive 16 cents
per hour
above the appropriate yardage classification
rate of pay                                            19.65    100.00%    19.65             0.00%
when such boom is used
Water & Jetting Trucks
Up to 2,500 gallons                           20.80    19.65     -5.53%    19.65             0.00%
2,500 gallons & over                          20.80    19.65     -5.53%    19.65             0.00%




                                                                     259
                                                                    Annual     2011 PW Difference Between                     Non-Union    DETR
 PERSHING                                                         Growth, 2010 Survey     PW Rates and     Union   Union %        %        Mean
 Average Construction Wage $28.71               PW 2010   PW 2011    - 2011    Average     Survey Avg.      Y/N    Difference Difference   Wages
Average                                                                  2.51%                       4.14%              5.29%      1.82%

DW 20's & 21's & other similar Cat type,
Terry Cobra LeTourneau pulls,
Tournerocker, Euclid, & similar type
equipment when pulling Aqua/Pak, Water
Tank Trailers, & Fuel, and/or Grease Tank
Trailer, or other miscellaneous Trailers,
(except as defined under "Dump Trucks")           20.80      19.65      -5.53%    19.65             0.00%
Heavy Duty Transport (High Bed)                   20.80      19.65      -5.53%    19.65             0.00%

Heavy Duty Transport(Gooseneck low bed)           20.80      19.65      -5.53%    19.65             0.00%
Tiltbed or Flatbed Pull Trailers                  20.80      19.65      -5.53%    19.65             0.00%
Bootman, Comb. Bootman & Road Oiler               20.80      19.65      -5.53%    19.65             0.00%
Flat Rack (2 or 3 axle unit)                      20.80      19.65      -5.53%    19.65             0.00%
Bus & Manhaul Drivers
Up to 18,000 lbs. (single unit)                   20.80      19.65      -5.53%    19.65             0.00%
18,000 lbs. & over (single unit)                  20.80      19.65      -5.53%    19.65             0.00%

Helicopter Pilot (transporting men/materials)     20.80      19.65      -5.53%    19.65             0.00%
Lift Jitneys                                      20.80      19.65      -5.53%    19.65             0.00%
Winch Truck & "A" Frame Drivers
Up to 18,000 lbs.                                 20.80      19.65      -5.53%    19.65             0.00%
18,000 lbs. and over                              20.80      19.65      -5.53%    19.65             0.00%
Warehousemen Spotter                              20.80      19.65      -5.53%    19.65             0.00%
Warehouse Clerk                                   20.80      19.65      -5.53%    19.65             0.00%
Tire Repairmen                                    20.80      19.65      -5.53%    19.65             0.00%
Truck Repairmen                                   20.80      19.65      -5.53%    19.65             0.00%
Pick Up Truck & Pilot Cars (Jobsite)              20.80      19.65      -5.53%    19.65             0.00%

Pick Up Truck & Pilot Cars (Over the road)        20.80      19.65      -5.53%    19.65             0.00%
Truck Oil Greaser                                 20.80      19.65      -5.53%    19.65             0.00%
Fuel Truck Driver                                 20.80      19.65      -5.53%    19.65             0.00%
Fuel Man & Fuel Island Man                        20.80      19.65      -5.53%    19.65             0.00%
Oil Tanker                                        20.80      19.65      -5.53%    19.65             0.00%
Oil Tanker with Pup                               20.80      19.65      -5.53%    19.65             0.00%
Foreman:                                          21.30      20.15      -5.40%    19.65             2.54%


                                                                            260
                                                              Annual     2011 PW Difference Between                     Non-Union    DETR
 PERSHING                                                   Growth, 2010 Survey     PW Rates and     Union   Union %        %        Mean
 Average Construction Wage $28.71       PW 2010     PW 2011    - 2011    Average     Survey Avg.      Y/N    Difference Difference   Wages
Average                                                            2.51%                       4.14%              5.29%      1.82%
WELL DRILLER                                                                                           N                     0.00%
Well Driller                                21.55     54.49      152.85%    54.49              0.00%


                                         ADD        ADD
                                         OPERATI    OPERATI
                                         NG ENG.    NG ENG.
LUBRICATION AND SERVICE ENGINEER ZONE               ZONE
(MOBILE AND GREASE RACK)                 RATE       RATE                                               N                    2.16%
Lubrication and Service Engineer (mobile
and grease rack)                            46.10         47.85    3.80%    46.84             2.16%

SOIL TESTER (CERTIFIED)                             Nye                                                Y        -0.30%
Soil Tester (Certified)                     44.65         56.62   26.81%    56.79            -0.30%

SOILS AND MATERIALS TESTER                          Nye
Soils and Materials Tester                  44.65         56.62   26.81%    56.79            -0.30%


Union Breakdown
Union                                                                                                 27
Non-Union                                                                                             11
Total                                                                                                 38




                                                                      261
DETR Mean
Wage + 40%    Wage
 Benefits    Premium




                       262
DETR Mean
Wage + 40%    Wage
 Benefits    Premium




                       263
DETR Mean
Wage + 40%    Wage
 Benefits    Premium




                       264
DETR Mean
Wage + 40%    Wage
 Benefits    Premium




                       265
DETR Mean
Wage + 40%    Wage
 Benefits    Premium




                       266
DETR Mean
Wage + 40%    Wage
 Benefits    Premium




                       267
DETR Mean
Wage + 40%    Wage
 Benefits    Premium




                       268
DETR Mean
Wage + 40%    Wage
 Benefits    Premium




                       269
DETR Mean
Wage + 40%    Wage
 Benefits    Premium




                       270
DETR Mean
Wage + 40%    Wage
 Benefits    Premium




                       271
                                                                    Annual     2011 PW Difference Between                          Non-      DETR
 STOREY                                                            Growth,      Survey    PW Rates and       Union   Union %    Union %      Mean
 No Data for Construction DETR           PW 2010 PW 2011          2010 - 2011 Average      Survey Avg.        Y/N    Difference Difference   Wages
Average                                                                  2.57%                       4.10%                3.95%     -1.53%

                                         ADD
                                         SHEET
                                         METAL
                                         ZONE
AIR BALANCE TECHNICIAN                   RATE     CC                                                           Y        47.87%
Air Balance Technician-Journeyman           46.60    48.35             3.76%      34.80            38.94%
Air Balance Technician-Foreman              49.62    51.46             3.71%      34.80            47.87%
Air Balance Technician-General Foreman      52.64    54.57             3.67%      34.80            56.81%

ALARM INSTALLER                                      CC                                                        N                    0.00%
Alarm Installer                              25.75        26.47        2.80%      26.47             0.00%

BOILERMAKER                              -           Clark                                                     Y         1.87%
Boilermaker                                  59.50      65.94         10.82%      64.73             1.87%

                                         ADD
                                         ZONE
BRICKLAYER                               RATE     Washoe                                                       Y         8.21%
Bricklayer-Journeyman                       32.68   32.68              0.00%      31.51             3.71%
Bricklayer-Foreman                          33.93   33.93              0.00%      31.51             7.68%
Bricklayer-General Foreman                  35.68   35.68              0.00%      31.51            13.23%

                                         ADD      ADD
                                         ZONE     ZONE
CARPENTER                                RATE     RATE                                                         Y         3.07%
Carpenter-Journeyman                        38.30    38.80             1.31%      38.98             -0.46%
Carpenter-Foreman                           41.05    41.55             1.22%      38.98              6.59%

CEMENT MASON                                                                                                   Y         3.00%
Cement Mason-Journeyman                      34.40        34.40        0.00%      34.37             0.09%
Cement Mason-Foreman                         36.40        36.40        0.00%      34.37             5.91%

ELECTRICIAN- COMMUNICATION TECHNICIAN                                                                          N                    0.00%
Electrician-Communication Technician 27.97                26.63        -4.79%     26.63             0.00%
Electrician-Foreman                  30.88                26.63       -13.76%     26.63             0.00%
Electrician-General Foreman          33.13                26.63       -19.62%     26.63             0.00%
                                                                            272
                                                                      Annual     2011 PW Difference Between                          Non-      DETR
  STOREY                                                             Growth,      Survey    PW Rates and       Union   Union %    Union %      Mean
  No Data for Construction DETR            PW 2010 PW 2011          2010 - 2011 Average      Survey Avg.        Y/N    Difference Difference   Wages
Average                                                                    2.57%                       4.10%                3.95%     -1.53%
ELECTRICIAN-LINE                           -           CC                                                        Y         -2.23%
Electrician-Groundman                          39.19        40.50        3.34%      58.40            -30.65%
Electrician-Lineman                            57.91        59.90        3.44%      58.40              2.57%
Electrician-Foreman                            63.02        65.16        3.40%      58.40             11.58%
Electrician-General Foreman                    68.12        70.45        3.42%      58.40             20.63%
Heavy Equipment Operator                       47.86        49.49        3.41%      58.40            -15.26%

ELECTRICIAN-NEON SIGN                      -           Clark                                                     Y         0.57%
Electrician-Neon Sign                          44.31      45.52          2.73%      45.26             0.57%

ELECTRICIAN-WIREMAN                        -           -                                                         N                    0.00%
Wireman                                        47.69        42.21       -11.49%     42.21             0.00%
Cable Splicer                                  51.18        42.21       -17.53%     42.21             0.00%
Wireman-Foreman                                51.18        42.21       -17.53%     42.21             0.00%
Wireman-General Foreman                        54.67        42.21       -22.79%     42.21             0.00%


ELEVATOR CONSTRUCTOR                       -           CC                                                        Y         7.08%

Elevator Constructor-Journeyman Mechanic       46.01        78.21       69.98%      76.43             2.33%
Elevator Constructor-Mechanic in Charge        46.01        85.48       85.79%      76.43            11.84%

FENCE ERECTOR                                          CC                                                        N                    0.00%
Fence Erector                                  37.56        37.69        0.35%      37.69             0.00%

                                            ADD         ADD
                                           LABORE      LABORE
                                           R ZONE      R ZONE
FLAGPERSON                                 RATE        RATE
Flagperson                                    27.95       27.95          0.00%

FLOOR COVERER                                          CC                                                        Y         3.65%
Floor Coverer-Journeyman                       36.26        36.34        0.22%      36.31             0.08%
Floor Coverer-Foreman                          38.90        38.93        0.08%      36.31             7.22%

GLAZIER                                    -           -                                                         Y        -2.23%
Glazier                                        21.50        31.51       46.56%      32.23             -2.23%
                                                                              273
                                                       Annual     2011 PW Difference Between                          Non-      DETR
 STOREY                                               Growth,      Survey    PW Rates and       Union   Union %    Union %      Mean
 No Data for Construction DETR   PW 2010 PW 2011     2010 - 2011 Average      Survey Avg.        Y/N    Difference Difference   Wages
Average                                                     2.57%                       4.10%                3.95%     -1.53%
                                  ADD
                                 LABORE
                                 R ZONE
HIGHWAY STRIPER                  RATE                                                             Y         0.00%
Highway Striper                     33.57    33.57        0.00%      33.57             0.00%

                                 ADD      ADD
                                 ZONE     ZONE
HOD CARRIER-BRICK MASON TENDER   RATE     RATE                                                    Y         0.83%
Brick Mason-Journeyman              30.10    30.10        0.00%      30.10             0.00%
Brick Mason-Foreman                 30.60    30.60        0.00%      30.10             1.66%

                                 ADD
                                 ZONE
HOD CARRIER-PLASTERER TENDER     RATE     CC                                                      Y         3.81%
Plasterer Tender-Journeyman         33.76    34.26        1.48%      33.76             1.48%
Plasterer Tender-Gun Tender         34.76    35.26        1.44%      33.76             4.44%
Plasterer Tender-Foreman            35.12    35.62        1.42%      33.76             5.51%

                                 SEE
                                 AMENDM
IRON WORKER                      ENT 1                                                            Y         0.00%
Ironworker-Journeyman               54.38    57.31         5.39%     57.31             0.00%
Ironworker-Foreman                  57.68    57.31        -0.64%     57.31             0.00%
Ironworker-General Foreman          61.04    57.31        -6.11%     57.31             0.00%

                                 ADD      ADD
LABORER -                        ZONE     ZONE                                                    Y        -1.41%
SEE GROUP CLASSIFICATIONS        RATE     RATE
Landscaper                          25.66    25.66        0.00%      30.82            -16.74%
Furniture Mover                     27.16    27.16        0.00%      30.82            -11.88%
Group 1                             30.82    30.82        0.00%      30.82              0.00%
Group 1A                            27.95    27.95        0.00%      30.82             -9.31%
Group 2                             30.92    30.92        0.00%      30.82              0.32%
Group 3                             31.07    31.07        0.00%      30.82              0.81%
Group 4                             31.32    31.32        0.00%      30.82              1.62%
Group 4A                            32.57    32.57        0.00%      30.82              5.68%
Group 5                             31.62    31.62        0.00%      30.82              2.60%
                                                               274
                                                                     Annual     2011 PW Difference Between                          Non-      DETR
 STOREY                                                             Growth,      Survey    PW Rates and       Union   Union %    Union %      Mean
 No Data for Construction DETR               PW 2010 PW 2011       2010 - 2011 Average      Survey Avg.        Y/N    Difference Difference   Wages
Average                                                                   2.57%                       4.10%                3.95%     -1.53%
Group 6
Nozzlemen, Rodmen                               31.62      31.62        0.00%      30.82             2.60%
Gunmen, Materialmen                             31.32      31.32        0.00%      30.82             1.62%
Reboundmen                                      30.97      30.97        0.00%      30.82             0.49%
Gunite Foremen                                  32.02      32.02        0.00%      30.82             3.89%

                                             SEE
                                             AMENDM
MECHANICAL INSULATOR                         ENT 2                                                              Y        -0.08%
Mechanical Insulator-Journeyman                 57.06      54.56        -4.38%     56.77             -3.89%
Mechanical Insulator-Foreman                    59.56      57.06        -4.20%     56.77              0.51%
Mechanical Insulator-General Foreman            61.06      58.56        -4.09%     56.77              3.15%

MILLWRIGHT                                                                                                      N                    0.00%
Millwright                                      49.70      25.01       -49.68%     25.01             0.00%

                                             ADD        ADD
OPERATING ENGINEER                           ZONE       ZONE                                                    Y         8.88%
SEE GROUP CLASSIFICATIONS                    RATE       RATE
Group 1                                         41.33      43.08        4.23%      46.84            -8.03%
Group 1A                                        44.09      45.84        3.97%      46.84            -2.13%
Group 2                                         44.62      46.37        3.92%      46.84            -1.00%
Group 3                                         44.89      46.64        3.90%      46.84            -0.43%
Group 4                                         45.63      47.38        3.84%      46.84             1.15%
Group 5                                         45.93      47.68        3.81%      46.84             1.79%
Group 6                                         46.10      47.85        3.80%      46.84             2.16%
Group 7                                         46.35      48.10        3.78%      46.84             2.69%
Group 8                                         46.94      48.69        3.73%      46.84             3.95%
Group 9                                         47.26      49.01        3.70%      46.84             4.63%
Group 10                                        47.61      49.36        3.68%      46.84             5.38%
Group 10A                                       47.80      49.55        3.66%      46.84             5.79%
Group 11                                        48.04      49.79        3.64%      46.84             6.30%
Group 11A                                       49.68      51.43        3.52%      46.84             9.80%
Group 11B                                       50.49      52.24        3.47%      46.84            11.53%
Foreman                                         49.68      51.43        3.52%      46.84             9.80%
Add 7% to base rate for "Second" Shift       -          -
Add 12.5% to base rate for "Special" shift   -          -
                                                                             275
                                                                     Annual     2011 PW Difference Between                          Non-      DETR
 STOREY                                                             Growth,      Survey    PW Rates and       Union   Union %    Union %      Mean
 No Data for Construction DETR               PW 2010 PW 2011       2010 - 2011 Average      Survey Avg.        Y/N    Difference Difference   Wages
Average                                                                   2.57%                       4.10%                3.95%     -1.53%
OPERATING ENGINEER-STEEL                     ADD        ADD
FABRICATOR & ERECTOR                         ZONE       ZONE
SEE GROUP CLASSIFICATIONS                    RATE       RATE
Group 1                                         56.63      58.38        3.09%      46.84            24.64%
Group 1 Truck Crane Oiler                       50.46      52.21        3.47%      46.84            11.46%
Group 1 Oiler                                   48.50      50.25        3.61%      46.84             7.28%
Group 2                                         55.12      56.87        3.17%      46.84            21.41%
Group 2 Truck Crane Oiler                       50.21      51.96        3.49%      46.84            10.93%
Group 2 Oiler                                   48.29      50.04        3.62%      46.84             6.83%
Group 3                                         53.88      55.63        3.25%      46.84            18.77%
Group 3 Truck Crane Oiler                       49.99      51.74        3.50%      46.84            10.46%
Group 3 Oiler                                   48.07      49.82        3.64%      46.84             6.36%
Group 3 Hydraulic                               49.66      51.41        3.52%      46.84             9.76%
Group 4                                         52.15      53.90        3.36%      46.84            15.07%
Group 5                                         51.05      52.80        3.43%      46.84            12.72%
Add 7% to base rate for "Second" Shift       -          -

Add 12.5% to base rate for "Special" Shift

                                             ADD        ADD
OPERATING ENGINEER -PILEDRIVER               ZONE       ZONE                                                    Y
SEE GROUP CLASSIFICATIONS                    RATE       RATE
Group 1                                         56.10      57.85        3.12%      46.84            23.51%
Group 1 Truck Crane Oiler                       50.64      52.39        3.46%      46.84            11.85%
Group 1 Oiler                                   48.72      50.47        3.59%      46.84             7.75%
Group 2                                         54.56      56.31        3.21%      46.84            20.22%
Group 2 Truck Crane Oiler                       50.43      52.18        3.47%      46.84            11.40%
Group 2 Oiler                                   48.52      50.27        3.61%      46.84             7.32%
Group 3                                         53.11      54.86        3.30%      46.84            17.12%
Group 3 Truck Crane Oiler                       50.21      51.96        3.49%      46.84            10.93%
Group 3 Oiler                                   48.29      50.04        3.62%      46.84             6.83%
Group 4                                         51.60      53.35        3.39%      46.84            13.90%
Group 5                                         50.49      52.24        3.47%      46.84            11.53%
Group 6                                         49.38      51.13        3.54%      46.84             9.16%
Group 7                                         48.42      50.17        3.61%      46.84             7.11%
Group 8                                         47.46      49.21        3.69%      46.84             5.06%
Add 7% to base for "Second" Shift            -          -
Add 12.5% to base for "Special" Shift        -          -
                                                                             276
                                                                    Annual     2011 PW Difference Between                          Non-      DETR
 STOREY                                                            Growth,      Survey    PW Rates and       Union   Union %    Union %      Mean
 No Data for Construction DETR            PW 2010 PW 2011         2010 - 2011 Average      Survey Avg.        Y/N    Difference Difference   Wages
Average                                                                  2.57%                       4.10%                3.95%     -1.53%


PAINTER                                                                                                        Y         2.40%
Brush/Roller Painter                          32.74       32.74        0.00%      32.84             -0.30%
Spray Painter/Paperhanger                     33.59       33.59        0.00%      32.84              2.28%
Sandblaster                                   33.24       33.24        0.00%      32.84              1.22%
Structural Steel & Steeplejack                33.74       33.74        0.00%      32.84              2.74%
Swing Stage                                   34.74       34.74        0.00%      32.84              5.79%
Special Coating Application-Brush             33.24       33.24        0.00%      32.84              1.22%
Special Coating Application-Spray             33.74       33.74        0.00%      32.84              2.74%
Special Coating Application-Spray Steel       33.99       33.99        0.00%      32.84              3.50%
Foreman $1.00 above highest Journeyman

PILEDRIVER
Piledriver-Journeyman                         58.47       58.47        0.00%
Piledriver-Foreman                            62.05       62.05        0.00%

                                          ADD
                                          ZONE
PLASTERER                                 RATE     Washoe                                                      Y         1.71%
Plasterer-Journeyman                         34.27   34.77             1.46%      35.29             -1.47%
Plasterer-Foreman                            35.59   37.02             4.02%      35.29              4.90%

PLUMBER/PIPEFITTER                        -           -                                                        N                    0.00%
Plumber/Pipefitter-Journeyman                 45.20       25.07       -44.54%     25.07             0.00%
Plumber/Pipefitter-Foreman                    48.16       25.07       -47.94%     25.07             0.00%
Plumber/Pipefitter-General Foreman            51.12       25.07       -50.96%     25.07             0.00%

REFRIGERATION                                                                                                  Y         0.56%
Refrigeration                                 39.58       41.58        5.05%      41.35             0.56%

ROOFER                                                                                                         N                    2.30%
(Does not include sheet metal roofs)
Roofer                                        18.57       20.88       12.44%      20.41             2.30%

                                          ADD         ADD
                                          ZONE        ZONE
SHEET METAL WORKER                        RATE        RATE                                                     Y         9.91%
                                                                            277
                                                                  Annual     2011 PW Difference Between                          Non-      DETR
 STOREY                                                          Growth,      Survey    PW Rates and       Union   Union %    Union %      Mean
 No Data for Construction DETR          PW 2010 PW 2011         2010 - 2011 Average      Survey Avg.        Y/N    Difference Difference   Wages
Average                                                                2.57%                       4.10%                3.95%     -1.53%
Sheet Metal-Journeyman                      46.60       48.35          3.76%    46.82              3.27%
Sheet Metal-Foreman                         49.62       51.46          3.71%    46.82              9.91%
Sheet Metal-General Foreman                 52.64       54.57          3.67%    46.82             16.55%

SPRINKLER FITTER                        -           -                                                        Y         0.87%
Sprinkler Fitter-Journeyman                 52.30       53.45        2.20%      55.55             -3.78%
Sprinkler Fitter-Foreman                    55.05       56.20        2.09%      55.55              1.17%
Sprinkler Fitter-General Foreman            57.30       58.45        2.01%      55.55              5.22%


                                        ADD
                                        OPERATI
                                        NG ENG.
                                        ZONE
SURVEYOR                                RATE                                                                 N                  -19.75%
Surveyor                                   44.89        20.16       -55.09%     25.12            -19.75%

TAPER                                   -           -                                                        Y         1.23%
Taper                                       35.49       36.28        2.23%      35.84             1.23%

                                        ADD
TILE SETTER/TERRAZZO                    ZONE
WORKER/MARBLE MASON-FINISHER            RATE     Washoe                                                      Y         1.02%
Tile, Terrazzo and Marble Finisher         32.48   24.77            -23.74%     24.52             1.02%

                                        ADD
TILE SETTER/TERRAZZO                    ZONE
WORKER/MARBLE MASON                     RATE     Washoe                                                      Y         4.15%
Tile Setter-Journeyman                     25.00   32.87            31.48%      33.64            -2.29%
Tile Setter-Foreman                        25.00   34.12            36.48%      33.64             1.43%
Tile Setter-General Formean                25.00   35.87            43.48%      33.64             6.63%
Terrazzo/Marble Mason-Journeyman           25.00   34.37            37.48%      33.64             2.17%
Terrazzo/Marble Mason-Foreman              25.00   35.62            42.48%      33.64             5.89%
Terrazzo/Marble Mason-General Foreman      25.00   37.37            49.48%      33.64            11.09%




                                                                          278
                                                                Annual     2011 PW Difference Between                          Non-      DETR
 STOREY                                                        Growth,      Survey    PW Rates and       Union   Union %    Union %      Mean
 No Data for Construction DETR          PW 2010 PW 2011       2010 - 2011 Average      Survey Avg.        Y/N    Difference Difference   Wages
Average                                                              2.57%                       4.10%                3.95%     -1.53%
                                         ADD        ADD
                                        LABORE     LABORE
                                        R ZONE     R ZONE
TRAFFIC BARRIER ERECTOR                 RATE       RATE
Traffic Barrier Erector                    30.82      30.82        0.00%

TRUCK DRIVER
Dump Trucks (Single or Multiple Units Including
Semi's & Double Transfer Units), Dumpcretes and     Washoe                                                 N                    2.16%
Under 4 yds. (water level)                    21.61   20.80        -3.75%     20.36             2.16%
4 yds. & under 8 yds. (water level)           21.61   20.80        -3.75%     20.36             2.16%
8 yds. & under 18 yds. (water level)          21.61   20.80        -3.75%     20.36             2.16%
18 yds. & under 25 yds. ( water level)        21.61   20.80        -3.75%     20.36             2.16%
25 yds. & under 60 yds. (water level)         21.61   20.80        -3.75%     20.36             2.16%
60 yds. & under 75 yds. (water level)         21.61   20.80        -3.75%     20.36             2.16%
75 yds. & under 100 yds. (water level)        21.61   20.80        -3.75%     20.36             2.16%
100 yds. & under 150 yds.(water level)        21.61   20.80        -3.75%     20.36             2.16%
150 yds. & under 250 yds. ( water level)      21.61   20.80        -3.75%     20.36             2.16%
250 yds. & under 350 yds. (water level)       21.61   20.80        -3.75%     20.36             2.16%
350 yds. & over (water level)                 21.61   20.80        -3.75%     20.36             2.16%
Transit Mix
Under 8 yds.                                  21.61   20.80        -3.75%     20.36             2.16%
8 yds. & including 12 yds.                    21.61   20.80        -3.75%     20.36             2.16%
Over 12 yds.                                  21.61   20.80        -3.75%     20.36             2.16%
Transit Mix (Using Boom)
Transit mix with boom shall receive 16
cents per hour
above the appropriate yardage
classification rate of pay                            20.80      100.00%      20.36             2.16%
when such boom is used
Water & Jetting Trucks
Up to 2,500 gallons                           21.61   20.80        -3.75%     20.36             2.16%
2,500 gallons & over                          21.61   20.80        -3.75%     20.36             2.16%




                                                                        279
                                                                    Annual     2011 PW Difference Between                          Non-      DETR
 STOREY                                                            Growth,      Survey    PW Rates and       Union   Union %    Union %      Mean
 No Data for Construction DETR                  PW 2010 PW 2011   2010 - 2011 Average      Survey Avg.        Y/N    Difference Difference   Wages
Average                                                                  2.57%                       4.10%                3.95%     -1.53%

DW 20's & 21's & other similar Cat type,
Terry Cobra LeTourneau pulls,
Tournerocker, Euclid, & similar type
equipment when pulling Aqua/Pak, Water
Tank Trailers, & Fuel, and/or Grease Tank
Trailer, or other miscellaneous Trailers,
(except as defined under "Dump Trucks")           21.61   20.80        -3.75%     20.36             2.16%
Heavy Duty Transport (High Bed)                   21.61   20.80        -3.75%     20.36             2.16%

Heavy Duty Transport(Gooseneck low bed)           21.61   20.80        -3.75%     20.36             2.16%
Tiltbed or Flatbed Pull Trailers                  21.61   20.80        -3.75%     20.36             2.16%
Bootman, Comb. Bootman & Road Oiler               21.61   20.80        -3.75%     20.36             2.16%
Flat Rack (2 or 3 axle unit)                      21.61   20.80        -3.75%     20.36             2.16%
Bus & Manhaul Drivers
Up to 18,000 lbs. (single unit)                   21.61   20.80        -3.75%     20.36             2.16%
18,000 lbs. & over (single unit)                  21.61   20.80        -3.75%     20.36             2.16%

Helicopter Pilot (transporting men/materials)     21.61   20.80        -3.75%     20.36             2.16%
Lift Jitneys                                      21.61   20.80        -3.75%     20.36             2.16%
Winch Truck & "A" Frame Drivers
Up to 18,000 lbs.                                 21.61   20.80        -3.75%     20.36             2.16%
18,000 lbs. and over                              21.61   20.80        -3.75%     20.36             2.16%
Warehousemen Spotter                              21.61   20.80        -3.75%     20.36             2.16%
Warehouse Clerk                                   21.61   20.80        -3.75%     20.36             2.16%
Tire Repairmen                                    21.61   20.80        -3.75%     20.36             2.16%
Truck Repairmen                                   21.61   20.80        -3.75%     20.36             2.16%
Pick Up Truck & Pilot Cars (Jobsite)              21.61   20.80        -3.75%     20.36             2.16%

Pick Up Truck & Pilot Cars (Over the road)        21.61   20.80        -3.75%     20.36             2.16%
Truck Oil Greaser                                 21.61   20.80        -3.75%     20.36             2.16%
Fuel Truck Driver                                 21.61   20.80        -3.75%     20.36             2.16%
Fuel Man & Fuel Island Man                        21.61   20.80        -3.75%     20.36             2.16%
Oil Tanker                                        21.61   20.80        -3.75%     20.36             2.16%
Oil Tanker with Pup                               21.61   20.80        -3.75%     20.36             2.16%
Foreman:                                          21.61   20.80        -3.75%     20.36             2.16%


                                                                            280
                                                                     Annual     2011 PW Difference Between                          Non-      DETR
 STOREY                                                             Growth,      Survey    PW Rates and       Union   Union %    Union %      Mean
 No Data for Construction DETR             PW 2010 PW 2011         2010 - 2011 Average      Survey Avg.        Y/N    Difference Difference   Wages
Average                                                                   2.57%                       4.10%                3.95%     -1.53%
WELL DRILLER                                          CC                                                        N                     0.00%
Well Driller                                  21.32        54.49      155.58%      54.49             0.00%


                                           ADD        ADD
                                           OPERATI    OPERATI
LUBRICATION AND SERVICE                    NG ENG.    NG ENG.
ENGINEER (MOBILE AND GREASE                ZONE       ZONE
RACK)                                      RATE       RATE                                                      Y         2.16%
Lubrication and Service Engineer (mobile
and grease rack)                              46.10        47.85        3.80%      46.84             2.16%

SOIL TESTER (CERTIFIED)                               Nye                                                       Y        -0.30%
Soil Tester (Certified)                       44.64      56.62         26.84%      56.79             -0.30%

SOILS AND MATERIALS TESTER                            Nye
Soils and Materials Tester                    44.64      56.62         26.84%      56.79             -0.30%


Union Breakdown
Union                                                                                                          28
Non-Union                                                                                                      10
Total                                                                                                          38




                                                                             281
DETR Mean
Wage + 40%    Wage
 Benefits    Premium




                       282
DETR Mean
Wage + 40%    Wage
 Benefits    Premium




                       283
DETR Mean
Wage + 40%    Wage
 Benefits    Premium




                       284
DETR Mean
Wage + 40%    Wage
 Benefits    Premium




                       285
DETR Mean
Wage + 40%    Wage
 Benefits    Premium




                       286
DETR Mean
Wage + 40%    Wage
 Benefits    Premium




                       287
DETR Mean
Wage + 40%    Wage
 Benefits    Premium




                       288
DETR Mean
Wage + 40%    Wage
 Benefits    Premium




                       289
DETR Mean
Wage + 40%    Wage
 Benefits    Premium




                       290
DETR Mean
Wage + 40%    Wage
 Benefits    Premium




                       291
                                                                   Annual     2011 PW Difference Between                     Non-Union     DETR
 WASHOE                                                           Growth,      Survey    PW Rates and     Union   Union %        %         Mean
 Average Construction Wage $22.58        PW 2010     PW 2011     2010 - 2011 Average      Survey Avg.      Y/N    Difference Difference    Wages
Average                                                                -2.02%                       5.97%              6.96%      -2.88%

                                         ADD
                                         SHEET
                                         METAL
                                         ZONE
AIR BALANCE TECHNICIAN                   RATE                                                               Y        46.57%
Air Balance Technician-Journeyman          46.60        48.35         3.76%     35.11             37.71%
Air Balance Technician-Foreman             49.62        51.46         3.71%     35.11             46.57%
Air Balance Technician-General Foreman     52.64        54.57         3.67%     35.11             55.43%

ALARM INSTALLER                                                                                             N                     0.00%
Alarm Installer                              27.41      27.95         1.97%     27.95              0.00%                                    21.48

BOILERMAKER                              -           Clark                                                  Y         1.87%
Boilermaker                                  59.50       65.94       10.82%     64.73              1.87%

                                         ADD     ADD
                                         ZONE    ZONE
BRICKLAYER                               RATE-   RATE-                                                      Y         8.21%
Bricklayer-Journeyman                      32.68    32.68             0.00%     31.51              3.71%
Bricklayer-Foreman                         33.93    33.93             0.00%     31.51              7.68%
Bricklayer-General Foreman                 35.68    35.68             0.00%     31.51             13.23%

                                         ADD     ADD
                                         ZONE    ZONE
CARPENTER                                RATE    RATE                                                       Y         4.79%
Carpenter-Journeyman                       38.30    38.80             1.31%     38.34              1.20%                                    23.60
Carpenter-Foreman                          41.05    41.55             1.22%     38.34              8.37%                                    23.60

CEMENT MASON                                                                                                Y        14.53%
Cement Mason-Journeyman                      34.40      34.40         0.00%     30.91             11.29%                                    25.45
Cement Mason-Foreman                         36.40      36.40         0.00%     30.91             17.76%                                    25.45

ELECTRICIAN-COMMUNICATION TECHNICIAN                                                                        Y         9.17%
Communication Installer             27.97               29.36         4.97%     29.52             -0.54%                                    18.01
Communication Technician            30.88               32.46         5.12%     29.52              9.96%                                    18.01
Senior Technician                   33.13               34.86         5.22%     29.52             18.09%                                    18.01
                                                                          292
                                                                     Annual     2011 PW Difference Between                     Non-Union     DETR
  WASHOE                                                            Growth,      Survey    PW Rates and     Union   Union %        %         Mean
  Average Construction Wage $22.58         PW 2010     PW 2011     2010 - 2011 Average      Survey Avg.      Y/N    Difference Difference    Wages
Average                                                                  -2.02%                       5.97%              6.96%      -2.88%
ELECTRICIAN-LINE                           -           -                                                      Y         -2.23%
Electrician-Groundman                          39.19       40.50          3.34%    58.40            -30.65%
Electrician-Lineman                            57.91       59.90          3.44%    58.40              2.57%
Electrician-Foreman                            63.02       65.16          3.40%    58.40             11.58%
Electrician-General Foreman                    68.12       70.45          3.42%    58.40             20.63%
Heavy Equipment Operator                       47.86       49.49          3.41%    58.40            -15.26%


ELECTRICIAN-NEON SIGN                      -           Douglas                                                Y         0.57%
Electrician-Neon Sign                          44.31      45.52         2.73%      45.26             0.57%

ELECTRICIAN-WIREMAN                                                                                           Y        17.96%
Wireman                                        34.39       50.78       47.66%      46.27             9.75%                                    25.21
Cable Splicer                                  34.39       54.58       58.71%      46.27            17.96%                                    25.21
Wireman-Foreman                                34.39       54.58       58.71%      46.27            17.96%                                    25.21
Wireman-General Foreman                        34.39       58.38       69.76%      46.27            26.17%                                    25.21


ELEVATOR CONSTRUCTOR                       -           -                                                      Y        13.44%

Elevator Constructor-Journeyman Mechanic       46.01       78.21       69.98%      72.15             8.40%
Elevator Constructor-Mechanic in Charge        46.01       85.48       85.79%      72.15            18.48%

FENCE ERECTOR                                                                                                 N                     0.00%
Fence Erector                                  37.89       48.07       26.87%      48.07             0.00%                                    14.99

                                            ADD     Not
                                           LABORE Surveyed
                                           R ZONE Set By
FLAGPERSON                                 RATE     Union
Flagperson                                    27.95     27.95           0.00%

FLOOR COVERER                                                                                                 Y         3.65%
Floor Coverer-Journeyman                       36.26       36.34        0.22%      36.31             0.08%
Floor Coverer-Foreman                          38.90       38.93        0.08%      36.31             7.22%

GLAZIER                                                                                                       N                    -2.98%
Glazier Journeyman                             21.25       20.50        -3.53%     21.13            -2.98%
                                                                             293
                                                          Annual     2011 PW Difference Between                     Non-Union     DETR
 WASHOE                                                  Growth,      Survey    PW Rates and     Union   Union %        %         Mean
 Average Construction Wage $22.58   PW 2010   PW 2011   2010 - 2011 Average      Survey Avg.      Y/N    Difference Difference    Wages
Average                                                       -2.02%                       5.97%              6.96%      -2.88%

                                     ADD     ADD
                                    LABORE LABORER
                                    R ZONE ZONE
HIGHWAY STRIPER                     RATE     RATE                                                  Y         0.00%
Highway Striper                        33.57    33.57        0.00%     33.57              0.00%

                                    ADD
                                    ZONE
HOD CARRIER-BRICK MASON TENDER      RATE                                                           N                   -25.11%
Brick Mason-Journeyman                30.10     15.00       -50.17%    20.03            -25.11%
Brick Mason-Foreman                   30.60     15.00       -50.98%    20.03            -25.11%

                                    ADD     ADD
                                    ZONE    ZONE
HOD CARRIER-PLASTERER TENDER        RATE    RATE                                                   Y         3.90%
Plasterer Tender-Journeyman           33.76    34.26         1.48%     33.73              1.57%
Plasterer Tender-Gun Tender           34.76    35.26         1.44%     33.73              4.54%
Plasterer Tender-Foreman              35.12    35.62         1.42%     33.73              5.60%

                                    SEE
                                    AMENDM
IRON WORKER                         ENT 1                                                          Y         4.80%
Ironworker-Journeyman                 54.38     56.74        4.34%     57.31             -0.99%                                    34.02
Ironworker-Foreman                    57.68     60.04        4.09%     57.31              4.76%                                    34.02
Ironworker-General Foreman            61.04     63.40        3.87%     57.31             10.63%                                    34.02

                                    ADD     ADD
LABORER                             ZONE    ZONE                                                   Y        -0.24%
SEE GROUP CLASSIFICATIONS           RATE    RATE
Landscaper                            25.66    25.66         0.00%     30.46            -15.76%                                    17.89
Furniture Mover                       27.16    27.16         0.00%     30.46            -10.83%                                    17.89
Group 1                               30.82    30.82         0.00%     30.46              1.18%                                    17.89
Group 1A                              27.95    27.95         0.00%     30.46             -8.24%                                    17.89
Group 2                               30.92    30.92         0.00%     30.46              1.51%                                    17.89
Group 3                               31.07    31.07         0.00%     30.46              2.00%                                    17.89
Group 4                               31.32    31.32         0.00%     30.46              2.82%                                    17.89
Group 4A                              32.57    32.57         0.00%     30.46              6.93%                                    17.89
                                                                 294
                                                              Annual     2011 PW Difference Between                     Non-Union     DETR
 WASHOE                                                      Growth,      Survey    PW Rates and     Union   Union %        %         Mean
 Average Construction Wage $22.58      PW 2010   PW 2011    2010 - 2011 Average      Survey Avg.      Y/N    Difference Difference    Wages
Average                                                           -2.02%                       5.97%              6.96%      -2.88%
Group 5                                  31.62      31.62          0.00%    30.46              3.81%                                   17.89
Group 6
Nozzlemen, Rodmen                        31.62      31.62        0.00%     30.46              3.81%                                    17.89
Gunmen, Materialmen                      31.32      31.32        0.00%     30.46              2.82%                                    17.89
Reboundmen                               30.97      30.97        0.00%     30.46              1.67%                                    17.89
Gunite Foremen                           32.02      32.02        0.00%     30.46              5.12%                                    17.89

                                       SEE
                                       AMENDM
MECHANICAL INSULATOR                   ENT 2-                                                          Y        -0.08%
Mechanical Insulator-Mechanic            57.06      54.56        -4.38%    56.77             -3.89%
Mechanical Insulator-Foreman             59.56      57.06        -4.20%    56.77              0.51%
Mechanical Insulator-General Foreman     61.06      58.56        -4.09%    56.77              3.15%


MILLWRIGHT                                                                                             N                     0.00%
Millwright                               49.70      14.80       -70.22%    14.80              0.00%

                                        ADD       ADD
                                       ZONE      ZONE
OPERATING ENGINEER                     RATE      RATE                                                  Y        11.28%
SEE GROUP CLASSIFICATIONS
Group 1                                  41.33      43.08        4.23%     45.85             -6.04%                                    25.53
Group 1A                                 44.09      45.84        3.97%     45.85             -0.02%                                    25.53
Group 2                                  44.62      46.37        3.92%     45.85              1.13%                                    25.53
Group 3                                  44.89      46.64        3.90%     45.85              1.72%                                    25.53
Group 4                                  45.63      47.38        3.84%     45.85              3.34%                                    25.53
Group 5                                  45.93      47.68        3.81%     45.85              3.99%                                    25.53
Group 6                                  46.10      47.85        3.80%     45.85              4.36%                                    25.53
Group 7                                  46.35      48.10        3.78%     45.85              4.91%                                    25.53
Group 8                                  46.94      48.69        3.73%     45.85              6.19%                                    25.53
Group 9                                  47.26      49.01        3.70%     45.85              6.89%                                    25.53
Group 10                                 47.61      49.36        3.68%     45.85              7.66%                                    25.53
Group 10A                                47.80      49.55        3.66%     45.85              8.07%                                    25.53
Group 11                                 48.04      49.79        3.64%     45.85              8.59%                                    25.53
Group 11A                                49.68      51.43        3.52%     45.85             12.17%                                    25.53
Group 11B                                50.49      52.24        3.47%     45.85             13.94%                                    25.53
Foreman                                  49.68      51.43        3.52%     45.85             12.17%                                    25.53
                                                                     295
                                                                   Annual     2011 PW Difference Between                     Non-Union     DETR
 WASHOE                                                           Growth,      Survey    PW Rates and     Union   Union %        %         Mean
 Average Construction Wage $22.58            PW 2010   PW 2011   2010 - 2011 Average      Survey Avg.      Y/N    Difference Difference    Wages
Average                                                                -2.02%                       5.97%              6.96%      -2.88%
Add 7% to base rate for "Second" Shift       -
Add 12.5% to base rate for "Special" shift   -

OPERATING ENGINEER-STEEL                     ADD     ADD
FABRICATOR & ERECTOR                         ZONE    ZONE
SEE GROUP CLASSIFICATIONS                    RATE    RATE
Group 1                                        56.63    58.38         3.09%     45.85             27.33%                                    25.53
Group 1 Truck Crane Oiler                      50.46    52.21         3.47%     45.85             13.87%                                    25.53
Group 1 Oiler                                  48.50    50.25         3.61%     45.85              9.60%                                    25.53
Group 2                                        55.12    56.87         3.17%     45.85             24.03%                                    25.53
Group 2 Truck Crane Oiler                      50.21    51.96         3.49%     45.85             13.33%                                    25.53
Group 2 Oiler                                  48.29    50.04         3.62%     45.85              9.14%                                    25.53
Group 3                                        53.88    55.63         3.25%     45.85             21.33%                                    25.53
Group 3 Truck Crane Oiler                      49.99    51.74         3.50%     45.85             12.85%                                    25.53
Group 3 Oiler                                  48.07    49.82         3.64%     45.85              8.66%                                    25.53
Group 3 Hydraulic                              49.66    51.41         3.52%     45.85             12.13%                                    25.53
Group 4                                        52.15    53.90         3.36%     45.85             17.56%                                    25.53
Group 5                                        51.05    52.80         3.43%     45.85             15.16%                                    25.53
Add 7% to base rate for "Second" Shift         52.15    52.15         0.00%     45.85             13.74%                                    25.53
Add 12.5% to base rate for "Special" Shift

                                             ADD     ADD
OPERATING ENGINEER -PILEDRIVER               ZONE    ZONE
SEE GROUP CLASSIFICATIONS                    RATE    RATE
Group 1                                        56.10    57.85         3.12%     45.85             26.17%                                    25.53
Group 1 Truck Crane Oiler                      50.64    52.39         3.46%     45.85             14.26%                                    25.53
Group 1 Oiler                                  48.72    50.47         3.59%     45.85             10.08%                                    25.53
Group 2                                        54.56    56.31         3.21%     45.85             22.81%                                    25.53
Group 2 Truck Crane Oiler                      50.43    52.18         3.47%     45.85             13.81%                                    25.53
Group 2 Oiler                                  48.52    50.27         3.61%     45.85              9.64%                                    25.53
Group 3                                        53.11    54.86         3.30%     45.85             19.65%                                    25.53
Group 3 Truck Crane Oiler                      50.21    51.96         3.49%     45.85             13.33%                                    25.53
Group 3 Oiler                                  48.29    50.04         3.62%     45.85              9.14%                                    25.53
Group 4                                        51.60    53.35         3.39%     45.85             16.36%                                    25.53
Group 5                                        50.49    52.24         3.47%     45.85             13.94%                                    25.53
Group 6                                        49.38    51.13         3.54%     45.85             11.52%                                    25.53
Group 7                                        48.42    50.17         3.61%     45.85              9.42%                                    25.53
Group 8                                        47.46    49.21         3.69%     45.85              7.33%                                    25.53
                                                                          296
                                                                     Annual     2011 PW Difference Between                     Non-Union     DETR
 WASHOE                                                             Growth,      Survey    PW Rates and     Union   Union %        %         Mean
 Average Construction Wage $22.58         PW 2010      PW 2011     2010 - 2011 Average      Survey Avg.      Y/N    Difference Difference    Wages
Average                                                                  -2.02%                       5.97%              6.96%      -2.88%
Add 7% to base for "Second" Shift         -
Add 12.5% to base for "Special" Shift     -           -


PAINTER                                                                                                       Y         1.29%
Brush/Roller Painter                          32.74        32.74        0.00%     33.20             -1.39%                                    18.74
Spray Painter/Paperhanger                     33.59        33.59        0.00%     33.20              1.17%                                    18.74
Sandblaster                                   33.24        33.24        0.00%     33.20              0.12%                                    18.74
Structural Steel & Steeplejack                33.74        33.74        0.00%     33.20              1.63%                                    18.74
Swing Stage                                   34.74        34.74        0.00%     33.20              4.64%                                    18.74
Special Coating Application-Brush             33.24        33.24        0.00%     33.20              0.12%                                    18.74
Special Coating Application-Spray             33.74        33.74        0.00%     33.20              1.63%                                    18.74
Special Coating Application-Spray Steel       33.99        33.99        0.00%     33.20              2.38%                                    18.74
                                           $1.00       $1.00
                                          above       above
                                          highest     highest
                                          Journeym    Journeyma
Foreman                                   an          n


PILEDRIVER                                                                                                    Y
Piledriver-Journeyman                         58.47       58.47         0.00%
Piledriver-Foreman                            62.05       62.05         0.00%

                                          ADD     ADD
                                          ZONE    ZONE
PLASTERER                                 RATE    RATE                                                        Y         1.71%
Plasterer - Journeyman                      34.27    34.77              1.46%     35.29             -1.47%                                    18.89
Plasterer - Foreman                         35.59    37.02              4.02%     35.29              4.90%                                    18.89

PLUMBER/PIPEFITTER                        -           -                                                       Y        25.45%
Plumber/Pipefitter-Journeyman                 45.20       45.20         0.00%     38.39             17.74%                                    33.47
Plumber/Pipefitter-Foreman                    48.16       48.16         0.00%     38.39             25.45%                                    33.47
Plumber/Pipefitter-General Foreman            51.12       51.12         0.00%     38.39             33.16%                                    33.47

REFRIGERATION                                                                                                 Y         7.72%
Refrigeration                                 39.58       41.58         5.05%     38.60              7.72%                                    27.28
                                                                            297
                                                                 Annual     2011 PW Difference Between                     Non-Union     DETR
  WASHOE                                                        Growth,      Survey    PW Rates and     Union   Union %        %         Mean
  Average Construction Wage $22.58     PW 2010     PW 2011     2010 - 2011 Average      Survey Avg.      Y/N    Difference Difference    Wages
Average                                                              -2.02%                       5.97%              6.96%      -2.88%
ROOFER (Does not include sheet metal
roofs)                                 -           -                                                      N                     0.00%
Roofer                                     20.25       20.93        3.36%      20.93             0.00%                                    18.80


                                       ADD     ADD
                                       ZONE    ZONE
SHEET METAL WORKER                     RATE    RATE                                                       Y        11.17%
Sheet Metal Worker-Journeyman            46.60    48.35             3.76%      46.29             4.45%                                    17.90
Sheet Metal Worker-Foreman               49.62    51.46             3.71%      46.29            11.17%                                    17.90
Sheet Metal Worker-General Foreman       52.64    54.57             3.67%      46.29            17.89%                                    17.90

SPRINKLER FITTER                       -           -                                                      Y         1.37%
Sprinkler Fitter                           52.30       53.45        2.20%      52.73             1.37%


                                       ADD
                                       OPERATI
                                       NG ENG.
                                       ZONE
SURVEYOR                               RATE                                                               N                     0.00%
Surveyor                                  44.89        27.88       -37.89%     27.88             0.00%                                    39.80

TAPER                                                                                                     Y         1.09%
Taper                                      35.49       36.28        2.23%      35.89             1.09%                                    19.38

                                                 ADD
TILE SETTER/TERRAZZO                             ZONE
WORKER/MARBLE MASON-FINISHER                     RATE                                                     Y         1.02%
Tile, Terrazzo and Marble Finisher         32.48    24.77          -23.74%     24.52             1.02%                                    20.86

                                                   ADD
TILE SETTER/TERRAZZO                               ZONE
WORKER/MARBLE MASON                                RATE                                                   Y         4.15%
Tile Setter-Journeyman                     35.99      32.87         -8.67%     33.64            -2.29%                                    20.86
Tile Setter-Foreman                        35.99      34.12         -5.20%     33.64             1.43%                                    20.86
Tile Setter-General Formean                35.99      35.87         -0.33%     33.64             6.63%                                    20.86
Terrazzo/Marble Mason-Journeyman           35.99      34.37         -4.50%     33.64             2.17%                                    20.86
                                                                         298
                                                                 Annual     2011 PW Difference Between                     Non-Union     DETR
 WASHOE                                                         Growth,      Survey    PW Rates and     Union   Union %        %         Mean
 Average Construction Wage $22.58        PW 2010     PW 2011   2010 - 2011 Average      Survey Avg.      Y/N    Difference Difference    Wages
Average                                                              -2.02%                       5.97%              6.96%      -2.88%
Terrazzo/Marble Mason-Foreman               35.99      35.62         -1.03%    33.64              5.89%                                   20.86
Terrazzo/Marble Mason-General Foreman       35.99      37.37          3.83%    33.64             11.09%                                   20.86


                                          ADD     ADD
                                         LABORE LABORER
                                         R ZONE ZONE
TRAFFIC BARRIER ERECTOR                  RATE     RATE
Traffic Barrier Erector                     30.82    30.82          0.00%

TRUCK DRIVER                                                                                              N                     2.16%
Dump Trucks (Single or Multiple Units Including
Semi's & Double Transfer Units), Dumpcretes and
Bulk Cement Spreader)
Under 4 yds. (water level)                   28.61     20.80       -27.30%     20.36             2.16%                                    21.29
4 yds. & under 8 yds. (water level)          28.61     20.80       -27.30%     20.36             2.16%                                    21.29
8 yds. & under 18 yds. (water level)         28.61     20.80       -27.30%     20.36             2.16%                                    21.29
18 yds. & under 25 yds. ( water level)       28.61     20.80       -27.30%     20.36             2.16%                                    21.29
25 yds. & under 60 yds. (water level)        28.61     20.80       -27.30%     20.36             2.16%                                    21.29
60 yds. & under 75 yds. (water level)        28.61     20.80       -27.30%     20.36             2.16%                                    21.29
75 yds. & under 100 yds. (water level)       28.61     20.80       -27.30%     20.36             2.16%                                    21.29
100 yds. & under 150 yds.(water level)       28.61     20.80       -27.30%     20.36             2.16%                                    21.29
150 yds. & under 250 yds. ( water level)     28.61     20.80       -27.30%     20.36             2.16%                                    21.29
250 yds. & under 350 yds. (water level)      28.61     20.80       -27.30%     20.36             2.16%                                    21.29
350 yds. & over (water level)                28.61     20.80       -27.30%     20.36             2.16%                                    21.29
Transit Mix
Under 8 yds.                                 28.61     20.80       -27.30%     20.36             2.16%                                    21.29
8 yds. & including 12 yds.                   28.61     20.80       -27.30%     20.36             2.16%                                    21.29
Over 12 yds.                                 28.61     20.80       -27.30%     20.36             2.16%                                    21.29
Transit Mix (Using Boom)
Transit mix with boom shall receive 16
cents per hour
above the appropriate yardage classification
rate of pay
when such boom is used                                 20.80      100.00%      20.36             2.16%                                    21.29
Water & Jetting Trucks
Up to 2,500 gallons                          28.61     20.80       -27.30%     20.36             2.16%                                    21.29
2,500 gallons & over                         28.61     20.80       -27.30%     20.36             2.16%                                    21.29
                                                                         299
                                                                      Annual     2011 PW Difference Between                     Non-Union     DETR
 WASHOE                                                              Growth,      Survey    PW Rates and     Union   Union %        %         Mean
 Average Construction Wage $22.58               PW 2010   PW 2011   2010 - 2011 Average      Survey Avg.      Y/N    Difference Difference    Wages
Average                                                                   -2.02%                       5.97%              6.96%      -2.88%

DW 20's & 21's & other similar Cat type,
Terry Cobra LeTourneau pulls,
Tournerocker, Euclid, & similar type
equipment when pulling Aqua/Pak, Water
Tank Trailers, & Fuel, and/or Grease Tank
Trailer, or other miscellaneous Trailers,
(except as defined under "Dump Trucks")           28.61     20.80       -27.30%     20.36             2.16%                                    21.29
Heavy Duty Transport (High Bed)                   28.61     20.80       -27.30%     20.36             2.16%                                    21.29

Heavy Duty Transport(Gooseneck low bed)           28.61     20.80       -27.30%     20.36             2.16%                                    21.29
Tiltbed or Flatbed Pull Trailers                  28.61     20.80       -27.30%     20.36             2.16%                                    21.29
Bootman, Comb. Bootman & Road Oiler               28.61     20.80       -27.30%     20.36             2.16%                                    21.29
Flat Rack (2 or 3 axle unit)                      28.61     20.80       -27.30%     20.36             2.16%                                    21.29
Bus & Manhaul Drivers
Up to 18,000 lbs. (single unit)                   28.61     20.80       -27.30%     20.36             2.16%                                    21.29
18,000 lbs. & over (single unit)                  28.61     20.80       -27.30%     20.36             2.16%                                    21.29

Helicopter Pilot (transporting men/materials)     28.61     20.80       -27.30%     20.36             2.16%                                    21.29
Lift Jitneys                                      28.61     20.80       -27.30%     20.36             2.16%                                    21.29
Winch Truck & "A" Frame Drivers
Up to 18,000 lbs.                                 28.61     20.80       -27.30%     20.36             2.16%                                    21.29
18,000 lbs. and over                              28.61     20.80       -27.30%     20.36             2.16%                                    21.29
Warehousemen Spotter                              28.61     20.80       -27.30%     20.36             2.16%                                    21.29
Warehouse Clerk                                   28.61     20.80       -27.30%     20.36             2.16%                                    21.29
Tire Repairmen                                    28.61     20.80       -27.30%     20.36             2.16%                                    21.29
Truck Repairmen                                   28.61     20.80       -27.30%     20.36             2.16%                                    21.29
Pick Up Truck & Pilot Cars (Jobsite)              28.61     20.80       -27.30%     20.36             2.16%                                    21.29

Pick Up Truck & Pilot Cars (Over the road)        28.61     20.80       -27.30%     20.36             2.16%                                    21.29
Truck Oil Greaser                                 28.61     20.80       -27.30%     20.36             2.16%                                    21.29
Fuel Truck Driver                                 28.61     20.80       -27.30%     20.36             2.16%                                    21.29
Fuel Man & Fuel Island Man                        28.61     20.80       -27.30%     20.36             2.16%                                    21.29
Oil Tanker                                        28.61     20.80       -27.30%     20.36             2.16%                                    21.29
Oil Tanker with Pup                               28.61     20.80       -27.30%     20.36             2.16%                                    21.29
Foreman:                                          28.61     20.80       -27.30%     20.36             2.16%                                    21.29


                                                                              300
                                                                    Annual     2011 PW Difference Between                     Non-Union     DETR
 WASHOE                                                            Growth,      Survey    PW Rates and     Union   Union %        %         Mean
 Average Construction Wage $22.58       PW 2010     PW 2011       2010 - 2011 Average      Survey Avg.      Y/N    Difference Difference    Wages
Average                                                                 -2.02%                       5.97%              6.96%      -2.88%
WELL DRILLER                                        CC                                                       N                      0.00%
Well Driller                               21.32          54.49       155.58%     54.49              0.00%


                                         ADD        ADD
                                         OPERATI    OPERATI
                                         NG ENG.    NG ENG.
LUBRICATION AND SERVICE ENGINEER ZONE               ZONE
(MOBILE AND GREASE RACK)                 RATE       RATE                                                     Y         2.16%
Lubrication and Service Engineer (mobile
and grease rack)                            46.10         47.85        3.80%     46.84              2.16%

SOIL TESTER (CERTIFIED)                             Nye                                                      Y        -0.30%
Soil Tester (Certified)                    42.65          56.62       32.75%     56.79             -0.30%

SOILS AND MATERIALS TESTER                          Nye
Soils and Materials Tester                 42.65          56.62       32.75%     56.79             -0.30%

Union Breakdown
Union                                                                                                       29
Non-Union                                                                                                    9
Total                                                                                                       38




                                                                           301
DETR Mean
Wage + 40%     Wage
 Benefits     Premium
                 15.24%




      30.07      -7.06%
        -
        -
        -
        -


        -
        -
        -
        -
        -


        -
      33.04     17.43%
      33.04     25.76%
        -
        -        -0.65%
      35.63      -3.45%
      35.63       2.16%
        -
        -       27.81%
      25.21     16.44%
      25.21     28.74%
      25.21     38.26%
        -
                          302
DETR Mean
Wage + 40%     Wage
 Benefits     Premium
                 15.24%
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
      35.29     43.88%
      35.29     54.64%
      35.29     54.64%
      35.29     65.41%
        -
        -
        -

        -
        -
        -
        -
      20.99    129.06%
        -



        -
        -
        -
        -
        -
        -
        -
        -
        -
                          303
DETR Mean
Wage + 40%     Wage
 Benefits     Premium
                 15.24%
        -



        -
        -
        -


        -
        -
        -
        -


        -
        -
        -
        -
        -


        -
      47.63     19.13%
      47.63     26.06%
      47.63     33.11%
        -

        -
        -
      25.05      2.45%
      25.05      8.44%
      25.05     23.05%
      25.05     11.59%
      25.05     23.45%
      25.05     24.05%
      25.05     25.05%
      25.05     30.04%
                          304
DETR Mean
Wage + 40%     Wage
 Benefits     Premium
                 15.24%
      25.05      26.25%
        -
      25.05     26.25%
      25.05     25.05%
      25.05     23.65%
      25.05     27.84%
        -


        -
        -
        -
        -
        -
        -
        -
        -
        -


        -
        -
      35.74     20.53%
      35.74     28.25%
      35.74     29.74%
      35.74     30.49%
      35.74     32.56%
      35.74     33.40%
      35.74     33.88%
      35.74     34.58%
      35.74     36.23%
      35.74     37.12%
      35.74     38.10%
      35.74     38.63%
      35.74     39.30%
      35.74     43.89%
      35.74     46.16%
      35.74     43.89%
                          305
DETR Mean
Wage + 40%     Wage
 Benefits     Premium
                 15.24%
        -
        -
        -

        -
        -
      35.74     63.34%
      35.74     46.07%
      35.74     40.59%
      35.74     59.11%
      35.74     45.38%
      35.74     40.00%
      35.74     55.64%
      35.74     44.76%
      35.74     39.39%
      35.74     43.84%
      35.74     50.80%
      35.74     47.73%
      35.74     45.91%
        -
        -

        -
        -
      35.74     61.85%
      35.74     46.58%
      35.74     41.21%
      35.74     57.55%
      35.74     45.99%
      35.74     40.65%
      35.74     53.49%
      35.74     45.38%
      35.74     40.00%
      35.74     49.26%
      35.74     46.16%
      35.74     43.05%
      35.74     40.37%
      35.74     37.68%
                          306
DETR Mean
Wage + 40%     Wage
 Benefits     Premium
                 15.24%
        -
        -
        -
        -
        -
      26.24     24.79%
      26.24     28.03%
      26.24     26.70%
      26.24     28.60%
      26.24     32.41%
      26.24     26.70%
      26.24     28.60%
      26.24     29.55%




        -
        -
        -
        -
        -
        -
        -


        -
      26.45     31.48%
      26.45     39.98%
        -
        -
      46.86      -3.54%
      46.86       2.78%
      46.86       9.10%
        -
        -
      38.19      8.87%
        -
                          307
DETR Mean
Wage + 40%     Wage
 Benefits     Premium
                 15.24%

        -
      26.32     -20.48%
        -
        -


        -
      25.06     92.94%
      25.06    105.35%
      25.06    117.76%
        -
        -
        -
        -




        -
      55.72     -49.96%
        -
        -       33.72%
      27.13     33.72%
        -


        -
      29.20     -15.18%
        -


        -
      29.20     12.55%
      29.20     16.83%
      29.20     22.83%
      29.20     17.69%
                          308
DETR Mean
Wage + 40%     Wage
 Benefits     Premium
                 15.24%
      29.20      21.97%
      29.20      27.96%
        -
        -



        -
        -
        -
        -


        -
      29.81     -30.22%
      29.81     -30.22%
      29.81     -30.22%
      29.81     -30.22%
      29.81     -30.22%
      29.81     -30.22%
      29.81     -30.22%
      29.81     -30.22%
      29.81     -30.22%
      29.81     -30.22%
      29.81     -30.22%
        -
      29.81     -30.22%
      29.81     -30.22%
      29.81     -30.22%
        -

        -

        -
      29.81     -30.22%
        -
      29.81     -30.22%
      29.81     -30.22%
                          309
DETR Mean
Wage + 40%     Wage
 Benefits     Premium
                 15.24%




      29.81     -30.22%
      29.81     -30.22%

      29.81     -30.22%
      29.81     -30.22%
      29.81     -30.22%
      29.81     -30.22%
        -
      29.81     -30.22%
      29.81     -30.22%

      29.81     -30.22%
      29.81     -30.22%
        -
      29.81     -30.22%
      29.81     -30.22%
      29.81     -30.22%
      29.81     -30.22%
      29.81     -30.22%
      29.81     -30.22%
      29.81     -30.22%

      29.81     -30.22%
      29.81     -30.22%
      29.81     -30.22%
      29.81     -30.22%
      29.81     -30.22%
      29.81     -30.22%
      29.81     -30.22%
        -
        -
                          310
DETR Mean
Wage + 40%    Wage
 Benefits    Premium
                15.24%
        -
        -
        -




        -

        -
        -
        -
        -
        -
        -
        -




                         311
                                                                      Annual    2011 PW Difference Between                                  DETR
 WHITE PINE                                                          Growth,     Survey    PW Rates and     Union   Union %     Non-Union   Mean
 Average Construction Wage $20.95        PW 2010         PW 2011    2010 - 2011 Average     Survey Avg.      Y/N    Difference % Difference Wages
Average                                                                 -0.78%                       -0.77%               1.34%       0.01%

AIR BALANCE TECHNICIAN                               Elko                                                     Y        45.08%
Air Balance Technician-Journeyman            58.52          48.35      -17.38%     35.47           36.31%
Air Balance Technician-Foreman               62.95          51.46      -18.25%     35.47           45.08%
Air Balance Technician-General Foreman       67.37          54.57      -19.00%     35.47           53.85%

ALARM INSTALLER                                      Nye                                                      N                     0.00%
Alarm Installer                              30.88          22.00      -28.76%     22.00            0.00%

BOILERMAKER                              -           Clark                                                    Y         1.87%
Boilermaker-Journeyman                       59.50       65.94         10.82%      64.73            1.87%
Boilermaker-Foreman                          59.50       65.94         10.82%      64.73            1.87%
Boilermaker-General Foreman                  59.50       65.94         10.82%      64.73            1.87%

                                         ADD
                                         ZONE
BRICKLAYER                               RATE-       Eureka                                                   Y       -28.07%
Bricklayer                                 32.68         32.68          0.00%      45.43           -28.07%

                                         ADD     ADD
                                         ZONE    ZONE
CARPENTER                                RATE    RATE                                                         Y         1.31%
Carpenter                                  38.30     38.80              1.31%      38.30            1.31%

CEMENT MASON                                         Eureka                                                   Y         3.88%
Cement Mason-Journeyman                      34.40       34.40          0.00%      34.40            0.00%
Cement Mason-Foreman                         36.40       36.40          0.00%      34.40            5.81%
Cement Mason-General Foreman                 36.40       36.40          0.00%      34.40            5.81%

ELECTRICIAN-COMMUNICATION
TECHNICIAN                                                                                                    N                     0.00%
Electrician-Communication Technician         38.72          17.49      -54.83%     17.49            0.00%

ELECTRICIAN-
LINEMAN/GROUNDMAN/HEAVY
EQUIPMENT OPERATOR                       -           -                                                        Y        -2.23%
Electrician-Groundman                        34.82          40.50      16.31%      58.40           -30.65%
                                                                             312
                                                                        Annual    2011 PW Difference Between                                  DETR
  WHITE PINE                                                           Growth,     Survey    PW Rates and     Union   Union %     Non-Union   Mean
  Average Construction Wage $20.95         PW 2010         PW 2011    2010 - 2011 Average     Survey Avg.      Y/N    Difference % Difference Wages
Average                                                                   -0.78%                       -0.77%               1.34%       0.01%
Electrician-Lineman                            51.95          59.90       15.30%     58.40              2.57%
Electrician-Foreman                            56.89          65.16       14.54%     58.40             11.58%
Electrician-General Foreman                    61.90          70.45       13.81%     58.40             20.63%
Heavy Equipment Operator                       42.69          49.49       15.93%     58.40            -15.26%


ELECTRICIAN-NEON SIGN                                  Clark                                                    Y         0.57%
Electrician-Neon Sign                          44.31       45.52          2.73%      45.26            0.57%

ELECTRICIAN-WIREMAN                        -           -                                                        Y         2.63%
Electrician Wireman                            29.98          50.78      69.38%      49.48            2.63%                                   20.34

ELEVATOR CONSTRUCTOR                       -           Nye                                                      Y         3.09%

Elevator Constructor-Journeyman Mechanic       46.01          64.58      40.36%      65.56            -1.49%
Elevator Constructor-Mechanic In Charge        46.01          70.59      53.42%      65.56             7.67%

FENCE ERECTOR                                          Nye                                                      N                     0.00%
Fence Erector                                  13.00          18.43      41.77%      18.43            0.00%

                                           ADD      Not
                                           LABORE Surveyed
                                           R ZONE Set by
FLAGPERSON                                 RATE     Union
Flagperson                                    27.95     27.95             0.00%

FLOOR COVERER                                          Clark                                                    Y         4.01%
Floor Coverer-Journeyman                       36.26       42.40         16.93%      43.13            -1.69%
Floor Coverer-Foreman                          38.90       47.32         21.65%      43.13             9.71%

GLAZIER                                    -           Nye                                                      N                     0.00%
Glazier                                        21.50          21.50       0.00%      21.50            0.00%

                                           ADD     ADD
                                           LABORE LABORER
                                           R ZONE ZONE
HIGHWAY STRIPER                            RATE   RATE                                                          Y         0.00%
                                                                               313
                                                          Annual    2011 PW Difference Between                                  DETR
  WHITE PINE                                             Growth,     Survey    PW Rates and     Union   Union %     Non-Union   Mean
  Average Construction Wage $20.95   PW 2010    PW 2011 2010 - 2011 Average     Survey Avg.      Y/N    Difference % Difference Wages
Average                                                     -0.78%                       -0.77%               1.34%       0.01%
Highway Striper                        33.57       33.57     0.00%     33.57              0.00%

HOD CARRIER-BRICK MASON TENDER                  Eureka                                            Y         2.31%
Brick Mason-Journeyman                 43.31        43.31    0.00%      43.31            0.00%
Brick Mason-Foreman                    45.31        45.31    0.00%      43.31            4.62%

                                     ADD
                                     ZONE
HOD CARRIER-PLASTERER TENDER         RATE       Clark                                             Y         3.76%
Plasterer Tender-Journeyman            33.76        44.34   31.34%      44.34            0.00%
Plasterer Tender-Gun Tender            34.76        46.34   33.31%      44.34            4.51%
Plasterer Tender-Foreman               35.12        47.34   34.79%      44.34            6.77%

                                     SEE
                                     AMENDM
IRON WORKER                          ENT 1                                                        Y         4.80%
Ironworker-Journeyman                   54.38       56.74    4.34%      57.31           -0.99%
Ironworker-Foreman                      57.68       60.04    4.09%      57.31            4.76%
Ironworker-General Foreman              61.04       63.40    3.87%      57.31           10.63%

                                     ADD     ADD
LABORER                              ZONE    ZONE                                                 Y        -1.18%
SEE GROUP CLASSIFICATIONS            RATE    RATE
Landscaper                             25.66     25.66       0.00%      30.75          -16.55%
Furniture Mover                        27.16     27.16       0.00%      30.75          -11.67%
Group 1                                30.82     30.82       0.00%      30.75            0.23%
Group 1A                               27.95     27.95       0.00%      30.75           -9.11%
Group 2                                30.92     30.92       0.00%      30.75            0.55%
Group 3                                31.07     31.07       0.00%      30.75            1.04%
Group 4                                31.32     31.32       0.00%      30.75            1.85%
Group 4A                               32.57     32.57       0.00%      30.75            5.92%
Group 5                                31.62     31.62       0.00%      30.75            2.83%
Group 6
Nozzlemen, Rodmen                      31.62        31.62    0.00%      30.75            2.83%
Gunmen, Materialmen                    31.32        31.32    0.00%      30.75            1.85%
Reboundmen                             30.97        30.97    0.00%      30.75            0.72%
Gunite Foremen                         32.02        32.02    0.00%      30.75            4.13%
                                                                  314
                                                                     Annual    2011 PW Difference Between                                  DETR
 WHITE PINE                                                         Growth,     Survey    PW Rates and     Union   Union %     Non-Union   Mean
 Average Construction Wage $20.95            PW 2010   PW 2011     2010 - 2011 Average     Survey Avg.      Y/N    Difference % Difference Wages
Average                                                                -0.78%                       -0.77%               1.34%       0.01%

                                             SEE
                                             AMENDM
MECHANICAL INSULATOR                         ENT 2-   Clark                                                  Y         7.77%
Mechanical Insulator-Journeyman                 57.06     56.23        -1.45%     55.23            1.81%
Mechanical Insulator-Foreman                    59.56     59.52        -0.07%     55.23            7.77%
Mechanical Insulator-General Foreman            61.06     62.81         2.87%     55.23           13.72%

MILLWRIGHT                                             Clark                                                 Y       -46.45%
Millwright-Journeyman                          49.60       25.33      -48.93%     47.30           -46.45%
Millwright-Welder                              50.70       25.33      -50.04%     47.30           -46.45%
Millwright-Foreman                             53.01       25.33      -52.22%     47.30           -46.45%
Millwright-General Foreman                     56.65       25.33      -55.29%     47.30           -46.45%

OPERATING ENGINEER
                                             ADD     ADD
                                             ZONE    ZONE
SEE GROUP CLASSIFICATIONS                    RATE    RATE                                                    Y        -2.32%
Group 1                                        41.33     43.08         4.23%      52.21           -17.49%
Group 1A                                       44.09     45.84         3.97%      52.21           -12.20%
Group 2                                        44.62     46.37         3.92%      52.21           -11.19%
Group 3                                        44.89     46.64         3.90%      52.21           -10.67%
Group 4                                        45.63     47.38         3.84%      52.21            -9.25%
Group 5                                        45.93     47.68         3.81%      52.21            -8.68%
Group 6                                        46.10     47.85         3.80%      52.21            -8.35%
Group 7                                        46.35     48.10         3.78%      52.21            -7.87%
Group 8                                        46.94     48.69         3.73%      52.21            -6.74%
Group 9                                        47.26     49.01         3.70%      52.21            -6.13%
Group 10                                       47.61     49.36         3.68%      52.21            -5.46%
Group 10A                                      47.80     49.55         3.66%      52.21            -5.09%
Group 11                                       48.04     49.79         3.64%      52.21            -4.64%
Group 11A                                      49.68     51.43         3.52%      52.21            -1.49%
Group 11B                                      50.49     52.24         3.47%      52.21             0.06%
Foreman                                        49.68     51.43         3.52%      52.21            -1.49%
Add 7% to base rate for "Second" Shift       -       -
Add 12.5% to base rate for "Special" shift   -       -

                                                                            315
                                                                   Annual    2011 PW Difference Between                                  DETR
 WHITE PINE                                                       Growth,     Survey    PW Rates and     Union   Union %     Non-Union   Mean
 Average Construction Wage $20.95            PW 2010   PW 2011   2010 - 2011 Average     Survey Avg.      Y/N    Difference % Difference Wages
Average                                                              -0.78%                       -0.77%               1.34%       0.01%
OPERATING ENGINEER-STEEL                     ADD     ADD
FABRICATOR & ERECTOR                         ZONE    ZONE
SEE GROUP CLASSIFICATIONS                    RATE    RATE
Group 1                                        56.63     58.38       3.09%      52.21           11.82%
Group 1 Truck Crane Oiler                      50.46     52.21       3.47%      52.21            0.00%
Group 1 Oiler                                  48.50     50.25       3.61%      52.21           -3.75%
Group 2                                        55.12     56.87       3.17%      52.21            8.93%
Group 2 Truck Crane Oiler                      50.21     51.96       3.49%      52.21           -0.48%
Group 2 Oiler                                  48.29     50.04       3.62%      52.21           -4.16%
Group 3                                        53.88     55.63       3.25%      52.21            6.55%
Group 3 Truck Crane Oiler                      49.99     51.74       3.50%      52.21           -0.90%
Group 3 Oiler                                  48.07     49.82       3.64%      52.21           -4.58%
Group 3 Hydraulic                              49.66     51.41       3.52%      52.21           -1.53%
Group 4                                        52.15     53.90       3.36%      52.21            3.24%
Group 5                                        51.05     52.80       3.43%      52.21            1.13%
Add 7% to base rate for "Second" Shift       -       -
Add 12.5% to base rate for "Special" Shift

                                             ADD     ADD
OPERATING ENGINEER -PILEDRIVER               ZONE    ZONE                                                  Y
SEE GROUP CLASSIFICATIONS                    RATE    RATE
Group 1                                        56.10     57.85       3.12%      52.21           10.80%
Group 1 Truck Crane Oiler                      50.64     52.39       3.46%      52.21            0.34%
Group 1 Oiler                                  48.72     50.47       3.59%      52.21           -3.33%
Group 2                                        54.56     56.31       3.21%      52.21            7.85%
Group 2 Truck Crane Oiler                      50.43     52.18       3.47%      52.21           -0.06%
Group 2 Oiler                                  48.52     50.27       3.61%      52.21           -3.72%
Group 3                                        53.11     54.86       3.30%      52.21            5.08%
Group 3 Truck Crane Oiler                      50.21     51.96       3.49%      52.21           -0.48%
Group 3 Oiler                                  48.29     50.04       3.62%      52.21           -4.16%
Group 4                                        51.60     53.35       3.39%      52.21            2.18%
Group 5                                        50.49     52.24       3.47%      52.21            0.06%
Group 6                                        49.38     51.13       3.54%      52.21           -2.07%
Group 7                                        48.42     50.17       3.61%      52.21           -3.91%
Group 8                                        47.46     49.21       3.69%      52.21           -5.75%
Add 7% to base for "Second" Shift            -       -
Add 12.5% to base for "Special" Shift        -       -
                                                                          316
                                                                       Annual    2011 PW Difference Between                                  DETR
 WHITE PINE                                                           Growth,     Survey    PW Rates and     Union   Union %     Non-Union   Mean
 Average Construction Wage $20.95         PW 2010     PW 2011        2010 - 2011 Average     Survey Avg.      Y/N    Difference % Difference Wages
Average                                                                  -0.78%                       -0.77%               1.34%       0.01%


PAINTER                                               Lander                                                   Y        -0.45%
Brush/Roller Painter                          46.23       32.74         -29.18%     33.78            -3.08%
Spray Painter/Paperhanger                     46.23       33.59         -27.34%     33.78            -0.56%
Sandblaster                                   46.23       33.24         -28.10%     33.78            -1.60%
Structural Steel & Steeplejack                46.23       33.74         -27.02%     33.78            -0.12%
Swing Stage                                   46.23       34.74         -24.85%     33.78             2.84%
Special Coating Application-Brush             46.23       33.24         -28.10%     33.78            -1.60%
Special Coating Application-Spray             46.23       33.74         -27.02%     33.78            -0.12%
Special Coating Application-Spray Steel       46.23       33.99         -26.48%     33.78             0.62%
Foreman $1.00 above highest Journeyman


PILEDRIVER
Driverman, Rigman, Bridge and Dock
Carpenter                                     58.47          58.47       0.00%
Certified Welder                              58.47          58.47       0.00%
Piledriver-Foreman                            62.05          62.05       0.00%
Diver-Diving (wet pay)                        58.47          58.47       0.00%
Stand-By Diver                                58.47          58.47       0.00%
Tender                                        58.47          58.47       0.00%

PLASTERER                                             Clark                                                    Y        -0.13%
Plasterer                                     44.69       44.69          0.00%      44.75            -0.13%

PLUMBER/PIPEFITTER                        -           Elko                                                     N                    -16.78%
Plumber/Pipefitter-Journeyman                 34.28          19.00      -44.57%     22.83           -16.78%
Plumber/Pipefitter-Foreman                    34.28          19.00      -44.57%     22.83           -16.78%
Plumber/Pipefitter-General Foreman            34.28          19.00      -44.57%     22.83           -16.78%

REFRIGERATION                             -           Elko                                                     N                     0.00%
Refrigeration-Journeyman                      36.24          19.00      -47.57%     19.00            0.00%
Refrigeration-Foreman                         36.24          19.00      -47.57%     19.00            0.00%
Refrigeration-General Foreman                 36.24          19.00      -47.57%     19.00            0.00%


                                                                              317
                                                                        Annual    2011 PW Difference Between                                  DETR
  WHITE PINE                                                           Growth,     Survey    PW Rates and     Union   Union %     Non-Union   Mean
  Average Construction Wage $20.95          PW 2010     PW 2011       2010 - 2011 Average     Survey Avg.      Y/N    Difference % Difference Wages
Average                                                                   -0.78%                       -0.77%               1.34%       0.01%
ROOFER (Does not include sheet metal
roofs)                                      -           Eureka                                                  N                     0.00%
Roofer                                          16.04       18.73        16.77%      18.73            0.00%

SHEET METAL WORKER                                      Nye                                                     Y         8.53%
Sheet Metal Worker-Journeyman                   30.00         59.52      98.40%      58.94            0.98%
Sheet Metal Worker-Foreman                      30.00         63.97     113.23%      58.94            8.53%
Sheet Metal Worker-General Foreman              30.00         68.42     128.07%      58.94           16.08%

SPRINKLER FITTER                            -           Nye                                                     N                     -0.36%
Sprinkler Fitter-Journeyman                     52.30         25.00      -52.20%     25.09            -0.36%
Sprinkler Fitter-Foreman                        55.05         25.00      -54.59%     25.09            -0.36%
Sprinkler Fitter-General Foreman                57.30         25.00      -56.37%     25.09            -0.36%

SURVEYOR                                                Nye                                                     N                    17.27%
Surveyor                                        46.85         45.96       -1.90%     39.19           17.27%                                    25.24

TAPER                                                   Nye                                                     Y        30.13%
Taper                                           35.49         46.64      31.42%      35.84           30.13%

TILE SETTER/TERRAZZO
WORKER/MARBLE MASON                                     Clark                                                   Y        -4.92%
Tile Setter/Terrazzo Worker/Marble Mason-
Finisher                                        32.48         34.63       6.62%      36.35            -4.73%
Tile Setter                                     43.61         46.66       6.99%      49.17            -5.10%
Terrazzo Worker/Marble Mason                    46.04         49.29       7.06%      49.17             0.24%    Y         0.24%


                                            ADD      ADD
                                            LABORE LABORER
                                            R ZONE ZONE
TRAFFIC BARRIER ERECTOR                     RATE     RATE
Traffic Barrier Erector                        30.82     30.82            0.00%

                                                        ADD
                                                        ZONE
TRUCK DRIVER                                            RATE                                                    Y         0.00%
                                                                               318
                                                                     Annual    2011 PW Difference Between                                  DETR
  WHITE PINE                                                        Growth,     Survey    PW Rates and     Union   Union %     Non-Union   Mean
  Average Construction Wage $20.95         PW 2010    PW 2011      2010 - 2011 Average     Survey Avg.      Y/N    Difference % Difference Wages
Average                                                                -0.78%                       -0.77%               1.34%       0.01%
SEE GROUP CLASSIFICATIONS
Group 1                                      46.13         36.90      -20.01%     36.90            0.00%
Group 2                                      46.23         36.90      -20.18%     36.90            0.00%
Group 3                                      46.44         36.90      -20.54%     36.90            0.00%
Group 4                                      46.62         36.90      -20.85%     36.90            0.00%
Group 5                                      46.82         36.90      -21.19%     36.90            0.00%
Group 6                                      47.12         36.90      -21.69%     36.90            0.00%
Foreman $1.00 above highest paid
journeyman supervised.                       48.12         36.90      -23.32%     36.90            0.00%



WELL DRILLER                                         Esmeralda                                               N                     0.00%
Well Driller                                 31.91      19.42         -39.14%     19.42            0.00%


                                           ADD       ADD
                                           OPERATI   OPERATIN
                                           NG ENG.   G ENG.
LUBRICATION AND SERVICE ENGINEER           ZONE      ZONE
(MOBILE AND GREASE RACK)                   RATE      RATE                                                    Y         2.16%
Lubrication and Service Engineer (mobile
and grease rack)                             46.10         47.85       3.80%      46.84            2.16%

SOIL TESTER (CERTIFIED)                              Nye                                                     Y        -0.30%
Soil Tester (Certified)                      45.65         56.62      24.03%      56.79            -0.30%

SOILS AND MATERIALS TESTER                           Nye
Soils and Materials Tester                   45.65         56.62      24.03%      56.79            -0.30%

Union Breakdown
Union                                                                                                       28
Non-Union                                                                                                   10
Total                                                                                                       38



                                                                            319
DETR Mean
Wage + 40%    Wage
 Benefits    Premium
                54.20%




                         320
DETR Mean
Wage + 40%      Wage
 Benefits      Premium
                  54.20%




       28.48     78.33%
         -
         -

         -
         -
         -
         -
         -
         -



         -
         -
         -
         -
         -
         -
         -
         -
         -
         -



         -
                           321
DETR Mean
Wage + 40%    Wage
 Benefits    Premium
                54.20%
        -
        -
        -
        -
        -
        -


        -
        -
        -
        -
        -


        -
        -
        -
        -
        -

        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
                         322
DETR Mean
Wage + 40%    Wage
 Benefits    Premium
                54.20%
        -


        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -


        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
                         323
DETR Mean
Wage + 40%    Wage
 Benefits    Premium
                54.20%

        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -

        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
                         324
DETR Mean
Wage + 40%    Wage
 Benefits    Premium
                54.20%
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -

        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -
        -

                         325
DETR Mean
Wage + 40%      Wage
 Benefits      Premium
                  54.20%

         -
         -
         -
         -
         -
         -
         -
         -
         -
         -
         -
         -
         -
         -
       35.34     30.07%
         -
         -
         -
         -

         -

         -
         -
         -
         -
         -



         -
         -
         -


         -
                           326
DETR Mean
Wage + 40%    Wage
 Benefits    Premium
                54.20%
        -
        -
        -
        -
        -
        -
        -

        -
        -


        -
        -
        -




        -

        -
        -
        -
        -
        -
        -
        -




                         327
2009 Total South Public Works Projects    $                   3,279,010,674
2010 Total South Public Works Projects    $                   1,405,458,642
2011 Total South Public Works Projects    $                     137,696,966



CL-2009-1             SNWA               Wiser Construction LLC
CL-2009-2             CWC
CL-2009-3             CWC
CL-2009-4             CWC                NEW # CL-2011-2

CL-2009-5             CWC                New # CL-2010-2

CL-2009-6             CWC
CL-2009-7             CCWRD
Apr-08
CL-2009-8             SNWA               Canceled Duplicate LI-2008-68
CL-2009-9             CCSD               Ryan Mechanical
             8-May
CL-2009-10            LVVWD              Canceled
CL-2009-11            COH                VT Construction
              8-Jun
CL-2009-12            COH                CANCELED NEW PWP 2010-99
CL-2009-13
              8-Jul
CL-2009-14            COH                Merell Bros Inc
CL-2009-15            COH                JNJ Engineering Construction, Inc.
CL-2009-16            COH                Trade West Construction
CL-2009-17            SNWA
CL-2009-18            CCMA               Commercial Roofers Inc.
CL-2009-19            CCWRD              Insituform Technologies, Inc.

CL-2009-20            CCWRD              Las Vegas Paving Corporation
CL-2009-21            CCWRD              Insituform Technologies, Inc.
CL-2009-22            SNWA               Canceled New PWP 2010-3
              8-Aug
CL-2009-23
CL-2009-24            LVVWD              Canceled
              8-Aug
CL-2009-25            CCSD               U.S. Mechanical, LLC
CL-2009-26            COH                Canceled
CL-2009-27            CWC
CL-2009-28            CWC
CL-2009-29            CWC
CL-2009-30            LVVWD              R.P. Wedell & Sons Company
CL-2009-31            LVVWD              Contri Construction Company

CL-2009-32            CLV                Diamond Construction Company, Inc.
CL-2009-33            CNLV               Southwest Iron Works LLC
CL-2009-34            UNLV               Western Single Ply
                                         American Asphalt and Grading
CL-2009-35            COH                Company
CL-2009-36            CCWRD              NEW PWP #2010-248
             Sep-08
CL-2009-37            RTC      St George Contracting Inc
CL-2009-38            CLV      1 Development Construction
CL-2009-39            COH      Harber Company, Inc.

CL-2009-40            CC       Diamond Construction Company, Inc.




CL-2009-41            CC       Jaynes Corporation
CL-2009-41            CC       Maximum Enterprises LLC

CL-2009-42            RTC      Whiting-Turner Contracting Company
CL-2009-43            CCWRD    Insituform Technologies, Inc.
CL-2009-44            UNLV     Martin Harris Construction
CL-2009-45            NC       Parsons Drilling Inc
LI-2009-46            LCPD     Pearson Brothers Construction Inc
CL-2009-47            UNLV     Lloyd's Refrigeration, Inc.
CL-2009-48            SPWB     Tand, Inc
LI-2009-49            LC       Pearson Brothers Construction Inc
LI-2009-50            LC       Mills Construction

CL-2009-51            CC       Southern Nevada Paving, Inc.
CL-2009-52            CC       Tand, Inc
CL-2009-53            CC       Mejia Contracting Co, Inc
CL-2009-54            COH      Canceled New PWP 2010-44
CL-2009-55            CCSD     Communication Electronic Systems
CL-2009-57            COH      J & J Enterprises, Inc.
NY-2009-58            NC       Mills Construction
CL-2009-59            CCMA     Martin Harris Construction
CL-2009-60            CCSD     Lloyd's Refrigeration, Inc.
CL-2009-61            CCSD     U.S. Mechanical, LLC
CL-2009-62            COH      CG&B Enterprises, Inc
CL-2009-63            COH      Eagle View Contractors
             Oct-08

CL-2009-64            CSN      Core Construction Services of Nevada
CL-2009-65            LVVWD    Canceled
CL-2009-66            CCSD     Martin Harris Construction
CL-2009-67            CNLV     Western State Contracting, Inc.
CL-2009-68            CCSD     Canceled Awarded under 100,000
CL-2009-69            CCSD     Pahor Mechanical Contractors, LLC
CL-2009-70            CCMA     JBM Construction Inc
CL-2009-71            CCSD     Trade West Construction
NY-2009-72            NC       LaHaye Electrical, Inc
CL-2009-73            CC       Williams Brother Inc
CL-2009-74            CC       Canceled New PWP 2010-78
CL-2009-75            LVVWD    K Construction Inc
CL-2009-76            LVCCLD   Palmmetto Construction Inc.
CL-2009-77            LVCCLD   Canceled Awarded under 100,000
CL-2009-78            CCSD     Canceled Awarded under 100,000
CL-2009-79            CCDA     APEC Consultants Inc
CL-2009-80     CLV      JNJ Engineering Construction, Inc.
CL-2009-81     COH      Paso Robles Tank, Inc
CL-2009-82     UMC      Canceled
CL-2009-83     CC       Canceled

CL-2009-84     UNLV     Core Construction Services of Nevada
CL-2009-85     CCSD     Big Town Mechanical
CL-2009-86     CCSD     Tand, Inc
CL-2009-87     UNLV     Subruban Elevator of Nevada
CL-2009-88     CCSD     Communication Electronic Systems
CL-2009-89     CLV      JNJ Engineering Construction, Inc.
CL-2009-90     CCSD     C.I. Contractors, Inc.

CL-2009-91     CC       Diamond Construction Company, Inc.
CL-2009-92     UNLV     U.S. Mechanical, LLC

CL-2009-93     CC       Las Vegas Paving Corporation
CL-2009-94     CCSD     Hardy Construction Inc
CL-2009-95     CCSD     Communication Electronic Systems
CL-2009-96     NC       Canceled
CL-2009-97     CLV      Tab Contractors Inc
CL-2009-98     CC       E & M Enterprises, Inc.
CL-2009-99     SNWA     Canceled
CL-2009-100    SPWB     El Camino Construction Company
CL-2009-101    CSN      McCarthy Building Companies, Inc.

CL-2009-102    CLV      Capriati Construction Corp
CL-2009-103    LVVWD    JNJ Engineering Construction, Inc.
CL-2009-104    LVVWD
CL-2009-105    CNLV     Southern Nevada Paving, Inc.
CL-2009-106    CBC      Hardy Construction Inc
CL-2009-107    CNLV     Southwest Iron Works LLC
CL-2009-108    CC       Westpoint Development Group Inc
CL-2009-109    CC       Trade West Construction
CL-2009-110    SPWB     Burke & Associates, Inc.
CL-2009-111    CC       Richardson Construction Inc
CL-2009-112    CCDA     Las Vegas Paving Corporation
NY-2009-113    NC       Welsco Corporation
CL-2009-114F   CC       Fremont Construction Company, Inc

CL-2009-115    CCMA

CL-2009-116    CCMA     Oakview Construction
CL-2009-117    SPWB     Brimont Construction Inc
                        Valleycrest Landscape Development
CL-2009-118    CBC      Inc
LI-2009-119    SNWA     Canceled NO new PWP

CL-2009-120    SNWA     Canceled NO new PWP
CL-2009-121    SNWA     Canceled
CL-2009-122    CC       Canceled
CL-2009-123    CC       B & H Construction, Inc.
CL-2009-124    LVCCLD   Brimont Construction Inc
CL-2009-125    LVCCLD   Richardson Construction Inc
CL-2009-126            COH     Canceled New PWP 2010-41
CL-2009-127            LVVWD   Rice Construction Company
CL-2009-128            CCSD    Commercial Roofers Inc.
CL-2009-129            CC      Canceled Under 100,000
CL-2009-130            CLV     APCO Construction

CL-2009-131            CC      Western States Contracting
CL-2009-132            CBC     Southern Nevada Paving, Inc.
CL-2009-133            HDPL    1 Development Construction
CL-2009-134            CBC     Las Vegas Advantage Electric
CL-2009-135            CC      M & H Enterprises Inc
CL-2009-136            COH     Crisci Builders
CL-2009-137            COH     ACME Underground, Inc.
CL-2009-138            CRCN    Harber Company Inc
CL-2009-139            COH     Crisci Builders
CL-2009-140            COH     Rice Cosntruction
LI-2009-141            COC     Bearing Point, LLC
CL-2009-142            CCSD    Mountain Vista Development Inc
ES-2009-143            ECBC    K-W Western Inc
              8-Dec
CL-2009-144            CCWRD   ACME Electric

CL-2009-145            CLV     J&J Engineering Construction, Inc.
CL-2009-146            CSN     McCarthy Building Companies, Inc.
CL-2009-147            CCSD    Mikon Construction
CL-2009-148            CC      Canceled Under 100,000
CL-2009-149            CCSD    Pahor Mechanical Contractors, LLC
CL-2009-150            CCSD    U.S. Mechanical, LLC
CL-2009-151            LVCVA   Canceled
CL-2009-152            CNLV    Canceled till further notice
CL-2009-153            CBC     SAVI Construction

CL-2009-154            CCWRD
CL-2009-155            CCWRD
CL-2009-156            CCWRD   Las Vegas Paving Corporation
CL-2009-157            CCSD    Ryan Mechcanical Inc
CL-2009-158            COH     Las Vegas Paving Corp
CL-2009-159            SNWA    Canceled
CL-2009-160            SPWB    Williams Brother Inc
CL-2009-161            COH     Harber Company Inc
CL-2009-162            CCDA    CANCELED

CL-2009-163            COH     CANCELED NEW PWP 2010-98
CL-2009-164            CLV     SAVI Construction
CL-2009-165            SNWA    CANCELED
CL-2009-166            SNWA
CL-2009-167            CLV     Canceled Federal Project

NY-2009-168            NC      Wulfenstein Construction Company Inc.
NY-2009-169            NC      CANCELED
CL-2009-170            CLV     Williams Brother Inc
CL-2009-171            CCSD    U.S. Mechanical, LLC
              Jan-09
CL-2009-172              CLV
CL-2009-173              CWC
                  CL-
2009-174                 CCSD    Awarded Under 100,000

CL-2009-175              SNWA    Capriati Construction Corporation Inc
CL-2009-176              COH     Canceled Awarded under 100,000

CL-2009-177              LVVWD   Capriati Construction Corporation Inc
CL-2009-178              CCWRD   J.F. Pacific Liners, Inc
CL-2009-179              CC      R & O Construction Company
NY-2009-180              NC      Awarded Under 100,000
CL-2009-181              MVWD    Various

CL-2009-182              CC      Las Vegas Paving Corporation
CL-2009-183              CC      Wheeler's Electric Inc
CL-2009-184              CBC     Savanic Transport Inc
CL-2009-185              CC      Frehner Construction Co., Inc.
CL-2009-186              SPWB    Canceled Under 100,000
CL-2009-187              CLV     Danoski Clutts Building Group LLC

CL-2009-188              SPWB    Core Construction Services of Nevada
CL-2009-189              CC      Tab Contractors Inc
CL-2009-190              COH     Sletten Construction of Nevada, Inc.
CL-2009-190-B            COH
CL-2009-191              NCSD    Williams Brother Inc
CL-2009-192              MCC     Las Vegas Paving
CL-2009-193              MCC     Las Vegas Paving
CL-2009-194              CCSD    The Tiberti Company
CL-2009-195              CLV     Crisci Builders
CL-2009-196              CLV     CCB Builders Enterprises, Inc

CL-2009-197              CLV     Contri Construction Company
CL-2009-198              CC      R-Coat Painting and Drywall, Inc
CL-2009-199              CNLV    richarson Construction Inc
CL-2009-200              COH     Tiger Communications LLC

CL-2009-201              CC      Diamond Construction Company, Inc.
CL-2009-202              CC      Richardson Construction Inc
CL-2009-203              COH     Mr. Jeffrey T McComb

CL-2009-204              COH     Spirit Underground, LLC
CL-2009-205              RTC     St. George Contracting, Inc.
CL-2009-206              LVVWD
CL-2009-207              CNLV    Hardy Construction Inc
CL-2009-208              CNLV    Canceled new till further notice
CL-2009-209              CRCN    PAR Electrical Contractors Inc
CL-2009-210              CC      Fast Trac Electric
CL-2009-211              CC      Williams Brother Inc
CL-2009-212-F            CC      Las Vegas Paving Corporation
CL-2009-213              CNLV    Martin Harris Construction
CL-2009-214              VVWD    Awarded Under 100,000
                Feb-09
                       Lincoln County Power District
LI-2009-215            District                        Energy Erectors Inc
CL-2009-215            COH                             Dataplus Communications
CL-2009-216            CLV                             Rafael Construction, Inc

CL-2009-217            CCSD                            U.S. Mechanical, LLC

CL-2009-218            CCSD                            Core Construction Services of Nevada
CL-2009-219            CCSD                            Roche Constructors, Inc.
CL-2009-220            CCSD                            Red Rose Inc
CL-2009-221            CCSD                            Commercial Roofers Inc.
CL-2009-222            CCSD                            Ryan Mechanical Inc

CL-2009-223            CCSD                            Core Construction Services of Nevada
CL-2009-224            CCSD                            Rafael Construction, Inc
CL-2009-225            COM                             Wheeler Electric
CL-2009-226            CCSD                            Red Rose Inc

CL-2009-227            CC                              CANCELED
CL-2009-228            CC                              Gothic Landscaping, Inc.
                                                       Longivew Construction & Development
CL-2009-229            MCC                             Inc
CL-2009-230            CNLV
CL-2009-231            CCMA                            Shaw-Lundquist Associates
CL-2009-232            CC                              Southwest Iron Works LLC
CL-2009-233            CC                              Gothic Landscaping, Inc.
CL-2009-234            CC                              Wiser Construction LLC
CL-2009-235            CC                              M & H Enterprises Inc
CL-2009-236            ES                              Parson Drilling, Inc.
CL-2009-237            UNLV                            Rafael Construction, Inc
CL-2009-238            CNLV                            Whiting-Tuner
CL-2009-239            LVVWD                           Tand, Inc.
              Mar-09
CL-2009-240            CBC                             Boulder Construction, Inc.
CL-2009-241            CC                              Hardy Construction Inc
CL-2009-242            CCSD                            McCarthy Building Companies, Inc.
CL-2009-243            LVVWD                           J&J Engineering Construction, Inc.
CL-2009-244            LVVWD
CL-2009-245            SNWA                            Corrpro Companies Inc
CL-2009-246            CSN                             Various
CL-2009-247            CSN
NY-2009-248            NY                              E&M Enterprises
CL-2009-249            CC                              Tand, Inc.

CL-2009-250            NC                              Wulfenstein Construction Company Inc.
CL-2009-251            LVVWD                           Construction Services Unlimited Inc
CL-2009-252            LVCCLD                          M & H Enterprises Inc
CL-2009-253            CCSD                            Las Vegas Paving Corporation
NY-2009-254            NC                              Awarded Under 100,000
CL-2009-255            CCSD                            Hellas Construction Inc
CL-2009-256            CCSD                            Hellas Construction Inc
CL-2009-257            CCSD                            Hellas Construction Inc
CL-2009-258            LVVWD                           WDC Exploration and Wells
CL-2009-259            LVVWD                           CANCELED
CL-2009-260            NLV     CANCELED
CL-2009-261            CLV     Canceled Under 100,000
NY-2009-262            TTB     CANCELED
CL-2009-263            COH     Ameresco Inc
CL-2009-264            CC      APEC Consultants Inc
CL-2009-265            SPWB    Trade West Construction
NY-2009-266            NC      Intermountain Slurry Seal, Inc.
CL-2009-267            CC      Flagship Construction Co, LLC

CL-2009-268            CNLV    Quality Mechanical Contractors LLC
CL-2009-269            CCSD    CANCELED
CL-2009-270            CLV     Canceled 11/13/09
CL-2009-271            CCMA    New PWP 2010-86
CL-2009-272            LVVWD   FHI Plant Services Inc
CL-2009-273            CCSD    Mikon Construction
CL-2009-274            CLV     Wiser Construction LLC
CL-2009-275            SPWB    LVI Environemental of Nevada Inc
CL-2009-276            CLV     Canceled
CL-2009-277            CC      Communication Electronic Systems
CL-2009-278            CBC     Henderson Masonry LLC
CL-2009-279            CC      Diamond Construction Co. Inc.
CL-2009-280            CC
              Apr-09
CL-2009-281            COH     Byrd Underground LLC
CL-2009-282            CCSD    Las Vegas Pavig Corporation

CL-2009-283            CBC     Eldorado Rock, Inc.

CL-2009-284            CNLV    Southern Nevada Paving, Inc.
CL-2009-285            SNWA    KW Pipeline Inc
CL-2009-286            CCMA    TAB Constractors, Inc.
CL-2009-287            CCWRD   Las Vegas Paving Corporation
CL-2009-288            CNLV    CANCELED
CL-2009-289            CLV     Richardson Construction Inc
CL-2009-290            COH     Western States Contracting Inc.
CL-2009-291            CLV     CANCELED
CL-2009-292            NCBC    Dan O Construction
CL-2009-293            COH     Awarded Under 100,000
CL-2009-294            CC      Wells Cargo Inc.
CL-2009-295            LVVWD
ES-2009-296            ECBC    Joy Engineering
                               Legancy Construction & Development
CL-2009-297            COM     Inc.
CL-2009-298            UNLV    Craft Construction Co.
CL-2009-299            CBC     Bravo Underground Inc
CL-2009-300            COH     Awarded Under 100,000
CL-2009-301            CLV     Whiting and Turner

CL-2009-302            CC      Construction Services Unlimited, Inc.
CL-2009-303            UNLV    Clark and Sullivan Constructors
                               1 Development Construction
CL-2009-304            CNLV    corporation
CL-2009-305            CC      CANCELED
CL-2009-306            RTC      CANCELED
              May-09
CL-2009-307            LVCCLD   Hi-Con, Inc
CL-2009-308            LVCCLD   Craft Construction Co.
CL-2009-309            CLV      Wells Cargo Inc.
CL-2009-310            CCMA     Access Technologies, Inc.

CL-2009-311            SPWB     VT Construction Inc.
CL-2009-312            CC       Awarded Under 100,000
CL-2009-313            CNLV     Tand, Inc
CL-2009-314            CLV      Canceled New # 2010-23
CL-2009-315            CLV      Meadow Valley Contractors, Inc
CL-2009-316            CC       Canceled
CL-2009-317            HDPL     R&O Construction
CL-2009-318            CLV      Agave Construction LLC
CL-2009-319            CCSD     Tand, Inc
LI-2009-320            COC      Anzalone Pumps, Inc.
LI-2009-321            COC      Tim Wilkin Trucking, LLC
LI-2009-322            COC      Anzalone Pumps, Inc.
CL-2009-323            CC       CG&B Enterprises, Inc.

CL-2009-324            CC       Tand, Inc

CL-2009-325            CCSD     Capriati Construction Corporation Inc
CL-2009-326            CCSD     Las Vegas Paving Corporation
CL-2009-327            CCMA     APCO Construction
CL-2009-328            COH      Canceled New # 2010-17
CL-2009-329            LVVWD    Native Resources, LLC
CL-2009-330            CC       Canceled Awarded Under 100,000
CL-2009-331            COM      Danoski Clutts Building Group LLC
CL-2009-332            CLV      Industrial Support Technologists
CL-2009-333            CC       CANCELED NEW PWP 2010-91
CL-2009-334            CLV      Crisci Builders
CL-2009-335            RTC
CL-2009-336            CCSD     Ryan Mechanical, Inc.
                                Nev Cal Investors dba Fost Tree
CL-2009-337            CNLV     Electric
CL-2009-338            COH      Conti Technologies
CL-2009-339            CCDA     Canceled
CL-2009-340            CCSD     Hellas Construction, Inc.

CL-2009-341            NDWL
NY-2009-342            NC       Awarded Under 100,000
              Jun-09
CL-2009-343            CLV      Southwest Lawn Shaping
CL-2009-344            CNLV     K.W. Pipeline
CL-2009-345            CNLV     CANCELED NEW PWP 2010-100
CL-2009-346            CNLV     Michels Corporation
CL-2009-347            MCC      Mcarthy Building Companies Inc.
CL-2009-348            UMC      Hi-Con, Inc
CL-2009-349            COH      Canceled New PWP 2010-44
CL-2009-350            UMC      Southwest Lawn Shaping
CL-2009-351            NLV      Commercial Roofers
CL-2009-352     CBC     NEW PWP 2010-110
NY-2009-353     NC      Sierra Nevada Construction
CL-2009-354     UMC     Johnson Controls Inc
CL-2009-355     CLNV
LI-2009-356     LC      Pearson Brothers Construction LLC
CL-2009-357     NC      CANCELED NEW PWP 2010-96
CL-2009-358     NC      Pearson Brothers Construction LLC
CL-2009-359     RTC     Las Vegas Paving Corporation
CL-2009-360     SPWB    Big Town Mechanical
CL-2009-361     CCSD    Tri-Signal Integration Inc
CL-2009-362     CCSD    Tri-Signal Integration Inc
LI-2009-363     NDW
CL-2009-364     LVVWD   Construction Services Unlimited
                        Prime Contracting dba Prime Grading
CL-2009-365     LVCVA   and Paving
CL-2009-366     LVVWD   WDC Exploration & Wells
CL-2009-367     CNLV    NEW PWP # 2010-120
CL-2009-368     SPWB    Ace Fire Systems Inc.
CL-2009-369     CLV     B&H Construction, Inc
CL-2009-370     CSN     Various
CL-2009-371     CC      Spirit Underground, LLC

CL-2009-372     CLV     CANCELED UNDER 100,000
CL-2009-373     SPWB    Southern Nevada Paving, Inc.
CL-2009-374     CCSD
CL-2009-375     CCSD
CL-2009-376     CCSD
CL-2009-377     CCSD
CL-2009-378     CCSD    Tri-Signal Integration Inc
CL-2009-379     CCSD    Tri-Signal Integration Inc
CL-2009-380     CCSD    Tri-Signal Integration Inc


CL-2009-381     CNLV    CANCELED NEW PWP 2010-116

CL-2009-382-F   CC      Capriati Construction Corporation, Inc
CL-2009-383     CC      Southern Nevada Paving, Inc.

CL-2009-384     CLV     Capriati Construction Corporation, Inc
LI-2009-385     NSP     Impact Construction

CL-2009-386     CLV     Construction Services Unlimited, Inc.
CL-2009-387     CC      The Tiberti Company
CL-2009-388     CC      City Plan Development, Inc.

CL-2009-389     CLV     Canceled New PWP 2010-30
CL-2009-390     COH     Harber Company Inc
CL-2009-391     CLV     Canceled New PWP 2010-31
CL-2009-392     CC      Spirit Underground, LLC
NY-2009-393     NYE     Wulfenstein Construction Co.,Inc.
CL-2009-394     COH     Canceled New PWP 2010-56
CL-2009-395     COH     Canceled New PWP 2010-57
CL-2009-396     COH     Canceled New PWP 2010-58
CL-2009-397     OPD
CL-2009-398              NANG    McKeon Door of Nevada Inc.
CL-2009-399              CC      williams Brother's, Inc.

CL-2009-400              CCSD    Trade Wset Construction
CL-2009-401              CNLV
NY-2009-402              NYE     Spirit Underground, LLC

NY-2009-403              NYE     Harris Fence & Concrete
CL-2009-404              CLV     Boulder Construction, Inc.
CL-2009-405              CC      Tand, Inc.
CL-2009-406              CC      CANCELED
CL-2009-407              CC      CG&B Enterprises, Inc.
CL-2009-408              CC      CANCELED NEW PWP 2010-316
                Aug-09
CL-2009-409              CC      New PWP 2010-89
CL-2009-410              NC      NY-2009-410
CL-2009-411              CC      New PWP 2010-88

CL-2009-412              RTC

CL-2009-413              CC      Rebel Communications LLC
CL-2009-414              CC      Pahor Mechanical Contractors, Inc.
CL-2009-415              CLV
CL-2009-416              CC      Cancele New PWP 2010-324
LI-2009-417              ASW     Boart Longue
CL-2009-418              MCC
CL-2009-419              CNLV

NY-2009-420              NC      Ben Dotson Construction
CL-2009-421              COH
CL-2009-422              CCPC    U.S. Mechanical, LLC
CL-2009-423              CCSD    Canceled Less then $100,000.00
CL-2009-424              SPWB    Core Construction Services
CL-2009-425              CCSD    Tand, Inc.
CL-2009-426              RTCSN
                Sep-09

CL-2009-427              CC      Canceled Awarded Under $100,000.00
CL-2009-428              CC      CANCELED NEW PWP 2010-92
CL-2009-429              CC      CANCELED NEW PWP 2010-93
CL-2009-430              CC      CANCELED NEW PWP 2010-94
                                 RFI Communicatios & Security
CL-2009-431              SPWB    Systems
CL-2009-432              CBC     Southern Nevada Paving, Inc.
CL-2009-433              CC
CL-2009-434              OM

CL-2009-435              CLVRA   Alpha Omega Strategies, LLC



NY-2009-436              NCBC    Pac-Van, Inc.
NY-2009-436 B            NCBC
NY-2009-436 C            NCBC    Wulfenstein Construction Co.,Inc.
Total 2009
Year 2010

CL-2010-1    CWC
CL-2010-2    CWC
CL-2010-3    SNWA    Canceled till futher notice
CL-2010-4    CCWRD   Sletten Construction
CL-2010-5    CCWRD
CL-2010-6    LVVWD
CL-2010-7    COH
CL-2010-8    CCSD    Big Town Mechanical, LLC
CL-2010-9    CCSD    Big Town Mechanical, LLC
CL-2010-10   CCSD
CL-2010-11   CCSD    Pahor Mechanical Contractors, Inc.
CL-2010-12   CCSD    Pahor Mechanical Contractors, Inc.
NY-2010-13   NYE     Contri Construction Comp.
CL-2010-14   SNWA    WDC Exploration & Wells

CL-2010-15   COH     El Camino Construction Company, Inc
CL-2010-16   UNLVR   HCI Underground, LLC
CL-2010-17   COH     Advanced Industrail Services, Inc.
CL-2010-18   CCSD    Canceled New PWP 2010-60
CL-2010-19   MCC     Las Vegas Paving Corp.
                     Wiser Construction, Limited-Liability
CL-2010-20   CLV     Company
CL-2010-21   RTC
CL-2010-22   CCSD    Canceled New # CL-2009-423
CL-2010-23   COLV    Martin Harris Construction
CL-2010-24   SNWA    Frehner Construction Company, Inc.
CL-2010-25   SNWA
CL-2010-26   LVVWD
ES-2010-27   EC
CL-2010-28   CC
CL-2010-29   CNLV
CL-2010-30   CLV     Southern Nevada Paving, Inc.
CL-2010-31   CLV
CL-2010-32   CCSD    Commercial Roofers, Inc.
CL-2010-33   UNLV    Dean Roofing Company
CL-2010-34   MVWD
CL-2010-35   CCSD    Ryan Mechanical, Inc.
NY-2010-36   NYE
CL-2010-37   CC      G and S Mechanical USA, Inc.
CL-2010-38   CCSD    Big Town Mechanical, LLC
CL-2010-39   CC      Johnson Controls, Inc.
CL-2010-40   CCWRD
CL-2010-41   COH     Southwest Ironworks, LLC
CL-2010-42   COH

CL-2010-43   COH     Canceled Awarded Under $100,000
CL-2010-44   COH
CL-2010-45   COH     CG&B Eterprises, Inc.
CL-2010-46   CLV     Tand, Inc.
ES-2010-47   EC
CL-2010-48            COH
CL-2010-49            CCPC    B&H Construction, Inc.
CL-2010-50            MCC
CL-2010-51            COH     Awarded Under 100,000.00
CL-2010-52            CCLD    Big Town Mechanical, LLC
CL-2010-53            CCLD    Communication Electronic Systems
CL-2010-54            CCPC    Preferre Contracting, Inc.

CL-2010-55            COH     Fremont Construction Company, Inc.
             Oct-09
CL-2010-56            COH
CL-2010-57            COH
CL-2010-58            COH     Las Vegas Paving Corp.
CL-2010-59            COH     Commercial Roofers, Inc.
CL-2010-60            CCSD    Martin Harris Construction
                              CANCELED AWARDED UNDER
CL-2010-61            CCPC    $100000.00
CL-2010-62            LVVWD
CL-2010-63            CCPC    Tand, Inc.
CL-2010-64            CCPC    Richardson Construction, Inc.
CL-2010-65            CCPC    Capriati Construction Corporation
CL-2010-66            CCPC    Pace Contracting Company
CL-2010-67            COH
CL-2010-68            CCPC    Hardy Construction, Inc.
CL-2010-69            CCWRD
CL-2010-70            CNLV    Southern Nevada Paving, Inc.
CL-2010-71            ASWD
CL-2010-72            LC
CL-2010-73            CCWRD
CL-2010-74            CLV     Baldwin Development LLC
CL-2010-75            SPWB    VT Construction, Inc.
LI-2010-76            ASWD    Wiser Construction
CL-2010-77            MCC     Pride Contractors, LLc
             Nov-09
CL-2010-78            CCPC    Awarded Under 100,000.00
CL-2010-79            VVWD
CL-2010-80            CNLV    Franklin Construction Services, Inc.
CL-2010-81            CCPC    Spirit Underground, LLC.
CL-2010-82            CCPC    Tand, Inc.
CL-2010-83            CCPC    Capriati Construction Corporation
CL-2010-84            CCPC    CANCELED

CL-2010-85            MCC
CL-2010-86            BCCC    Western Single Ply
NY-2010-87            NCBC
CL-2010-88            CCPC    Las Vegas Electric, Inc.
CL-2010-89            CCPC    Highway Stripping & Signs, LLC
CL-2010-90            CCPC    Contri Construction Company
CL-2010-91            CCPC    City Plan Development, Inc.
CL-2010-92            CCPC    Central Environmental, Inc.
CL-2010-93            CCPC    Awarded Under 100,000.00
CL-2010-94            CCPC    Awarded Under 100,000.00
CL-2010-95            COH     Franklin Construction Services, Inc.
NY-2010-96             NC      JNJ Eng. Const.
CL-2010-97             CRCN    M&H Enterprises, Inc dbd Martin
CL-2010-98             COH     Eldorado Rock, Inc.
CL-2010-99             COH
CL-2010-100            CNLV    Contri Construction Company
CL-2010-101            LVVWD
CL-2010-102            COH     P3 Construction Management

CL-2010-103            CCDA
CL-2010-104            NCBC
CL-2010-105            COH
CL-2010-106            COH     Las Vegas Paving Corp.
CL-2010-107            COH     Gothic Landscaping, Inc.
ES-2010-108            ECBC
              Dec-09
NY-2010-109            NCBC
CL-2010-109            SPWB    Construction Services Unlimited
CL-2010-110            CBC     Las Vegas Paving Corp.
CL-2010-111            COLV    Las Vegas Paving Corp.
CL-2010-112            UNLV    Clark and Sullivan Construction
CL-2010-113            UNLV    The Tiberti Company
CL-2010-114            UMC     Taylor International Corp.
NY-2010-115            NYBC    Hardy Construction, Inc.
CL-2010-116            CNLV
CL-2010-117            SNWA
CL-2010-118            CLV
CL-2010-119            CCPC    Commercial Roofers, Inc.
CL-2010-120            CNLV
CL-2010-121            CCPC    Hardy Construciton, Inc
LI-2010-122            NSP     Eagle View Contractors
CL-2010-123            COH     Hardy Construction, Inc.
CL-2010-124            COH     Canceled NEW PWP 2010-215
CL-2010-125            CCPC    Boyd Martin Construction, LLC
CL-2010-126            CCSD    Mikon Construction Co., Inc.

CL-2010-127            CCPC    Southern Nevada Paving

CL-2010-128            CCPC    Southern Nevada Paving

CL-2010-129            CCPC    Wells Cargo, Inc.

CL-2010-130            CCPC    APEC Consultants, Inc.
LI-2010-131            PFA     Anazalone Pumps, Inc.

CL-2010-132            CSN
CL-2010-133            CCPC    Palmetto Construction, Inc.

CL-2010-134            CCDA
CL-2010-135            CLV     Amazon masonry, Inc.
CL-2010-136            CLV     Spirit Underground, LLC
              Jan-10
NY-2010-137            BWSD    Boart Longyard
CL-2010-138            SNHD
CL-2010-139            CNLV
CL-2010-140            CNLV
CL-2010-141            CCSD    Las Vegas Paving Corp.
CL-2010-142            CNLV    APCO Construction

CL-2010-143            COH     Canceled Awarded Under 100,000.00
CL-2010-144            CLV     Ace Fire Systems, Inc.
CL-2010-145            CCPC    Las Vegas Paving Corp.
LI-2010-146            COC     Hardy Construciton, Inc

CL-2010-147            COH     Canceled Awarded Under 100,000.00
CL-2010-148            CCDA    Scheidt & Bachmann

CL-2010-149            CLV     Las Vegas Paving Corp.
CL-2010-150            CCSD    Big Town Mechanical
CL-2010-151            CNLV

CL-2010-152            CCSD    Peterson Dean Roofing & Sheet Metal
CL-2010-153            CBC     Mountain Vista Development, Inc.
CL-2010-154            CLV     QH Las Vegas
CL-2010-155            COH     Preferred Contracting, Inc.

CL-2010-156            CLV     Canceled Awarded Under 100,000.00

CL-2010-157            BOHT    Quality Mechanical Contractors, LLC
CL-2010-158            CCWRD
                               City Plan Development, Inc. dba Savi
CL-2010-159            BOHT    Const.
              Feb-10
CL-2010-160            CLV     M&H Enterprises, Inc.
CL-2010-161            CNLV
CL-2010-162            CNLV
CL-2010-163            CCSD    Lloyd's Refrigeration, Inc.
CL-2010-164            SPWB    Commercial Roofers, Inc.
NY-2010-165            NCBC
CL-2010-166            CLV
CL-2010-167            SPWB    Ryan Mechanical, Inc.
CL-2010-168            CLV     APCO Construction
CL-2010-169            LVCVA
CL-2010-170            BCCC    TAB Contractors, Inc.
CL-2010-171            COH
CL-2010-172            CCPC    Contri Construction Company
CL-2010-173            CLV     Canceled Federally Funded
CL-2010-174            CCSD    Wells Cargo, Inc.
CL-2010-175            CBC     Canceled Under 100,000.00
CL-2010-176            CBC     Pipenology, Inc.
CL-2010-177            CNLV    El Camino Contracting Co. Inc.
CL-2010-178            CCWRD
CL-2010-179            UNLV    CG&B Enterprises, Inc.
CL-2010-180            CCPC    Meado Valley Contractors, Inc.
CL-2010-181            CCPC    Tracy Hoherz
CL-2010-182            CCPC    Las Vegas Paving Corp.
CL-2010-183            CCPC
CL-2010-184            LVCVA   Turner Construction Company
CL-2010-185            SPWB    Bombard Electric
CL-2010-186            CCWRD
CL-2010-187            SPWB    Pahor Mechanical Contractors, Inc.
CL-2010-188            CNLV    Peek Construction Company

CL-2010-189            CLV
CL-2010-190            CCLD    Commercial Roofers, Inc.
CL-2010-191            CCLD    The Original Roofing Company, LLC
CL-2010-192            CCSD    Las Vegas Paving Corp.

CL-2010-193            CCPC    Trade West Construction, Inc.

CL-2010-194            CCPC    Canceled Awarded Under 100,000.00

CL-2010-195            CCPC
CL-2010-196            CCPC    Martin-Harris Construction
CL-2010-197            CLV

CL-2010-198            CLV     M&H Enterprises, Inc.
CL-2010-199            CNLV
CL-2010-200            LVCVA   Modernfold of Nevada, LLC
CL-2010-201            UNLV    Eberhard Southwest Roofing, Inc.
              Mar-10
CL-2010-202            CNLV    CANCELED
CL-2010-203            CCSD    Lloyd's Refrigeration, Inc.
CL-2010-204            CCSD    Big Town Mechanical, LLC
CL-2010-205            CCSD    Big Town Mechanical, LLC
CL-2010-206            CCWRD
CL-2010-207            CLV     Tand, Inc.
CL-2010-208            CLV     Southern Nevada Paving, Inc.
CL-2010-209            LVVWD
CL-2010-210            UNLV    Pahor Mechanical Contractors, Inc.
CL-2010-211            CNLV
CL-2010-212            CLV     Hardy Construction
CL-2010-213            COH     Transcore
CL-2010-214            COH     Williams Brother, Inc.
CL-2010-215            COH     Spirit Underground, LLC
NY-2010-216            NCC
CL-2010-217            COH
CL-2010-218            COH     Southern Nevada Paving, Inc.
CL-2010-219            COH     Southern Nevada Paving, Inc.
CL-2010-220            LVVWD
CL-2010-221            LVVWD   Capriati Construction, Inc.
CL-2010-222            SPWB    Western Single Ply
CL-2010-223            CLV     American Pavement Preservation
CL-2010-224            UNLV    Avery Atlantic



CL-2010-225            RTC
CL-2010-226            UNLV    Construction
CL-2010-227            CC
CL-2010-228            COC     JNJ Engineering Construction, Inc.
CL-2010-229            CNLV
CL-2010-230            UMC
CL-2010-231            CCSD    Big Town Mechanical, LLC
                               Interstate Plumbing and Air
CL-2010-232            CCSD    Conditioning
CL-2010-233            COH     Tand, Inc.
CL-2010-234            CCPC    Gothic Landscaping, Inc.
CL-2010-235            CCPC
CL-2010-236            CCSD    Big Town Mechanical, LLC
ES-2010-237            ESC
ES-2010-238            ESC
CL-2010-239            CCSD    Las Vegas Paving Corp.
CL-2010-240            SPWB    CG& B Enterprises, Inc.
CL-2010-241            CCPC    FastTrac Electric
CL-2010-242            SPWB    Palmetto Construction, Inc.
NY-2010-243            NCBC    Top Rank Builders
CL-2010-244            COH     Neal and Sons Enterprises
CL-2010-245            CLV     Peek Construction
CL-2010-246            CLV     Las Vegas Paving Corp.



CL-2010-247            RTC
CL-2010-248            CCWRD
              Apr-10
CL-2010-249            CCSD    Wells Cargo, Inc.
CL-2010-250            CCPC    Cobblestone Construction
CL-2010-251            CSN     Core Construction/Mojave Electric
CL-2010-252            UNLV
CL-2010-253            CCSD    Helix Electric, Inc.
CL-2010-254            CCSD    Helix Electric, Inc.
CL-2010-255            CCSD    Helix Electric, Inc.
CL-2010-256            CCSD    Helix Electric, Inc.
CL-2010-257            CCSD
CL-2010-258            COM
CL-2010-259            COH
CL-2010-260            MCC
CL-2010-261            CCSD    Big Town Mechanical, LLC
CL-2010-262            CCSD    Big Town Mechanical, LLC
CL-2010-263            CCWRD
CL-2010-264            CCPC    Western States Contracting, Inc.
CL-2010-265            CCPC    Cancel AWARDED UNDER 100,000
CL-2010-266            CCSD    Western States Contracting, Inc.
CL-2010-267            CLV     Thor Construction, Inc.
LI-2010-268            LCSD
CL-2010-269            CLV

CL-2010-270            CLV     Thor Construction, Inc.

CL-2010-271            CLV
CL-2010-272            CCWRD
CL-2010-273            CCSD    Bombard Electric, LLC
CL-2010-274            CCSD    Bombard Electric, LLC
CL-2010-275            CCSD    Bombard Electric, LLC
CL-2010-276            CCSD    Bombard Electric, LLC
CL-2010-277            CCSD    Bombard Electric, LLC
CL-2010-278            CCSD    Bombard Electric, LLC
CL-2010-279            CCSD    Bombard Electric, LLC
CL-2010-280            COH
CL-2010-281            CCSD    U.S. Mechanical, LLC
CL-2010-282            CCSD    Big Town Mechanical, LLC
CL-2010-283            CCSD    Big Town Mechanical, LLC
CL-2010-284            CCSD
CL-2010-285            CCSD    Red Rose, Inc.
CL-2010-286            CCSD    The Original Roofing Company
CL-2010-287            CCSD    The Original Roofing Company
CL-2010-288            CCSD    Dean Roofing Company

CL-2010-289            CCPC    American Pavement Preservation, LLC
CL-2010-290            COH     Hardy Construction, Inc
NY-2010-291            NYE
CL-2010-292            CCSD    Lloyd's Refrigeration, Inc.
CL-2010-293            CCSD    Lloyd's Refrigeration, Inc.
CL-2010-294            CCSD    Lloyd's Refrigeration, Inc.
CL-2010-295            LVVWD   Contri Construction Comp.
NY-2010-296            NYE
CL-2010-297            CCSD    Bombard Electric, LLC
CL-2010-298            CCSD
CL-2010-299            CCSD
CL-2010-300            CCSD
CL-2010-301            CCSD    Bombard Electric, LLC
CL-2010-302            CCSD
CL-2010-303            CCSD
CL-2010-304            CC      Williams Brother, Inc.
CL-2010-305            BC
CL-2010-306            COH     Fast Trac Electric
CL-2010-307            COH     Las Vegas Paving Corp.
CL-2010-308            CC      Turner Construction Company
CL-2010-309            CCPC
CL-2010-310            CNLV
              May-10
NY-2010-311            NYE
ES-2010-312            ESC
CL-2010-313            CCSD    Big Town Mechanical, LLC
CL-2010-314            CCSD    U.S. Mechanical, LLC
CL-2010-315            CCSD    Hasco, Inc.
CL-2010-316            CCPC    Hardy Construction, Inc
CL-2010-317            CLV     Las Vegas Electric, Inc.
CL-2010-318            LVVWD
CL-2010-319            CCPC
CL-2010-320            CCSD    Fast System
CL-2010-321            CCPA
CL-2010-322            CCPC    Meadow Valley Contractors, Inc.
CL-2010-323            SPWB    Palmetto Construction, Inc.
CL-2010-324            CCPC    Accurate Controls, Inc.
CL-2010-325            CCSD    CG&B Enterprises, Inc.
CL-2010-326            CCSD    Mikon Construction Co., Inc.
CL-2010-327            OPD
CL-2010-328            CLV     J N J Engineering Construction, Inc.
CL-2010-329            CCPC    Fremont Construction
CL-2010-330            CLV     Tand, Inc.
CL-2010-331            UNLV
CL-2010-332            NSP     Franklin Construction Services, Inc.
CL-2010-333            CCPC
CL-2010-334            CLV     Meadow Valley Contractors, Inc.
CL-2010-335            CLV
CL-2010-336            COM
CL-2010-337            CCSD    Pahor Mechanical Contractors, LLC
CL-2010-338            CLV
              Jun-10
CL-2010-339            CCPC
CL-2010-340            LVVWD   JNJ Engineering Construction, Inc.
CL-2010-341            CLV     Canceled Federally Funded
CL-2010-342            CLV     Environmental Assurance, LLC
CL-2010-343            COH     Capriati Construction, Inc.
CL-2010-344            CCPC    R-Coat Painting & Drywall, Inc.
CL-2010-345            LVVWD
CL-2010-346            LVVWD   Maile, Inc.
CL-2010-347            SPWB    Western States Contracting, Inc.
NY-2010-348            NYC     Valley Slurry Seal Co.
NY-2010-349            NYC
NY-2010-350            NYC
CL-2010-351            COH     Gothic Landscaping, Inc.
NY-2010-352            NYC
CL-2010-353            SPWB    Fremont Construction
CL-2010-354            CCSD
CL-2010-355            CLV     Wells Cargo, Inc.
CL-2010-356            COH     Vegas Valley Locking Systems, Inc.
CL-2010-357            SPWB    Clark Construction Group
CL-2010-358            CCSD

CL-2010-359            RTC
CL-2010-360            COH
CL-2010-361            COH
CL-2010-362            RTC
CL-2010-363            COH
CL-2010-364            COH     Schneider Electric
CL-2010-365            LVVWD
CL-2010-366            CCPC    Transcore Its, LLC
CL-2010-367            CC
CL-2010-368            UNLV
CL-2010-369            BCCC
CL-2010-370            CLV
CL-2010-371            CCPC    Spirit Underground
CL-2010-372            CLV
NY-2010-373            NCSD    CG&B Enterprises, Inc.
CL-2010-374            CCSD    Hufcor Nevada
CL-2010-375            CCPC
CL-2010-376            CCPC
              Jul-10
CL-2010-377              CBC
CL-2010-378              COH     CANCELED
CL-2010-379              CCSD
CL-2010-380              LVVWD
CL-2010-381              CCSD    Canceled New PWP 2011-11
CL-2010-382              CCSD    Canceled New PWP 2011-12
CL-2010-383              CCSD    Canceled New PWP 2011-13
CL-2010-384              CCSD    Canceled New PWP 2011-14
CL-2010-385              CCSD    Communication Electronic Systems
CL-2010-386              CCSD    Communication Electronic Systems
CL-2010-387              RTC     New PWP CL-2010-36
CL-2010-388              CCPC
CL-2010-389              CLV
LI-2010-390              LC
CL-2010-391              CC
CL-2010-392              CCSD
CL-2010-393              COH
CL-2010-394              CBC
CL-2010-395              LVCVA
CL-2010-396              COH
                Aug-10
CL-2010-397              CBC
CL-2010-398              COH
CL-2010-399              COH
NY-2010-400              NCSD
NY-2010-401              NCSD
ES-2010-402              ESC
CL-2010-403              CLV
CL-2010-404              SPWB
CL-2010-405              COH
CL-2010-406              COH
CL-2010-407              CCLD
CL-2010-408              CLV
NY-2010-409              NCBC
NY-2010-409-B            NCBC
CL-2010-410              BCCC
NY-2010-411              NYC
CL-2010-412              CCPC
CL-2010-413              CCPC
CL-2010-414              CCPC
CL-2010-415              COH
CL-2010-416              LVCVA

CL-2010-417              SPWB
CL-2010-418              CCDA
CL-2010-419              COH
CL-2010-420              CCPC
CL-2010-421              CCPC
CL-2010-422              CCPC
CL-2010-423              SPWB
CL-2010-424              SPWB
                Sep-10
CL-2010-425   UNLV
CL-2010-426
CL-2010-427
CL-2010-428   SPWB
CL-2010-429   CCPC
Total 2010

Year 2011
CL-2011-1     CCWRD
CL-2011-2     CWC
CL-2011-3     CCWRD
CL-2011-4     CNLV
CL-2011-5     COH
CL-2011-6     COH
CL-2011-7     CC
CL-2011-8     CNLV
CL-2011-9     CCSD
CL-2011-10    CCDA
CL-2011-11    CCSD
CL-2011-12    CCSD
CL-2011-13    CCSD
CL-2011-14    CCSD
CL-2011-15    CCSD
CL-2011-16    CCSD
CL-2011-17    CCSD
CL-2011-18    CCSD
CL-2011-19    CCSD
CL-2011-20    CCSD
CL-2011-21    CCSD
CL-2011-22    CCSD
CL-2011-23    SNWA
CL-2011-24    LVVWD
CL-2011-25    CCSD
CL-2011-26    CCSD
CL-2011-27    CNLV
CL-2011-28    CC
CL-2011-29    CCSD
CL-2011-30    CCSD
CL-2011-31    CCSD
CL-2011-32    CCSD
CL-2011-33    SPWB
CL-2011-34    CCPC
CL-2011-35    COH
CL-2011-36    RTC

CL-2011-38    CLV
CL-2011-39    CCPC
CL-2011-40    UNLV
Total 2011
note as of October 1, 2010



340A 04 C1 Coyote Spring Valley Well & Moapa Transmission System - Arsenic
CWC-300 System Conveyance & Operations Program (SCOP)-"Reach 3 Pipeline"
CWC-700 System Conveyance & Operations Program (SCOP)-Reach 4 Tunnel
CWC-900 System Conveyance & Operations Program (SCOP)-Reach 5 Pipeline

CWC-1000 System Conveyance & Operations Program (SCOP)-Boulkder Island Outfall Diffuser

CWC-600 System conveyance & Operations Program (SCOP)-City of Henderson Pumping
TS-0621 Corrosim Management Plan


340A 03 C1 Coyote Spring Valley Well and Transmission System Production Wells
0011881 School Modernization Whitney ES


C1260 Angel Park Disinfection System Addition
2008-86-0007 Galleria Drive Half Street Improvements From Moiser to Pabco


2008-86-0017 Pittman Wash Sewer Assessment Pilot Project



wwtp No 3 Decommissioning 2nd demolition Project Phase I
Flow Meter Replacement and Miscellaneas Improvements at COH Water Treatment Plant
2008-86-0019 Armillaria Sewer Lift Station Flood Protection Prject
810M 01 C1 Lower Narrows and Homestead Weirs
2262-1 MIA Roof Replacement - "C" Gates
TS-634 E Flamingo Rehabilitation Las Vegas Valley East of I-15 Freeway

Ts-0633 Sloan Interceptor Rehabilitation Sloan Lane Between E Washington Ave. and Vegas
TS-0620 Crosstown Interceptor Rehabilitation Project Phase 2
070F 04 C1 Lake Mead Intake No. 3 - Discharge Pipeline Alfred Merritt Smith Water


CWC-400 System Conveyeance & Operations Program (SCOP)-"Reach 3 Tunnel"
C1232 Centennial 2635 Zone Reservoir and 2745 Zone Pumping Station


0011350 Cooling Tower Replacement Theron Swainston Middle School
131-08-MF-042-604 Convention Center Remodel & Addition 203 Water St
CWC-100 SCOP-Reach 1 Pipeline
CWC-200 System Conveyance & Operations Program (Scop) Reach 2
CWC-500 System Conveyance & Operations Program
C1249 Miscellaneous Valts Reconstruction and Repair Phase XIV
C1217 Cactus 2538 Zone Reservoir Inlet/Outlet Pipeline and 2635 Zone Pumping Station

09.1730.11-DC Rampart Trail Phase I, II and Angel Park Trailhead
1318 ADA Accessibility & DOJ Compliance FY 08/09
5040-KC White Life Sciences Reroof

131-09-FC-054-001 Railroad Channel Maintenance Ramps
TS-0586 AWT Membrane and Ozonation Phase 1
005-09 RTC Vault Building Tenant Improvements
08.15341.10-LED Centennial Hills Added Improvements-Added Pool Shade
Wigwam/US 95 24-inch 2120 PZ Main and PRV

601264 Sunset Park Area D Well Reconstruction




Family Courts Building Remodel
601265 Building HVA/C-R Maintenance Repairs
Part 1 - RSFOQ#006-09 / Part II - RFFP - Unknown at this time Construction Management @
Risk
TS-0632 West Twain Interceptor Rehabilitation
5042-KC Concrete Replacement at HFA, CHE, & BSL-West
2008-31 Gabbs Well Drilling
LCPD0803 Headquarters Complex
5041-KC FDH Building Retrofit Air Handlers
09-A003 DETR Landscape
TOH89 Thompson Opera House
0003-40-01 Pioche Sewer Improvements

B601231-08 Street Improvements on Valley View Blvd Between Flamingo Road to Desert
B601233-08 Sunrise Avenue Storm Drain
601254 Fire Station No 18 Workout Room Expansion
2006-86-0017 RMLT 13 & 14 & Equestrian Park Trailhead Project
0012003 Fire Alarm Replacement @ Cimarron-Memorial High School
131-08-PR-183-001 Burkholder Ballfield Netting
2008-32 Calvada Building Demolition
2303 Control Center Relocation
0011347 Central Plant Modernization
0011340 Central Plant Modernization
131-08-PR-151-001 Whitney Mesa Nature Preserve
131-08-FC-042-005 Pittman MacDonald Ranch Channel



CSN Health Sciences Building Addition West Charleston
C1260 Angel Park Disinfection System Addition
0011582 Site Work Facilities / Audit
Upper Las Vegas Wash Trail Phase I
0011955 Electrical Service for Portables
0011341 Central Plant Modernization Cheyenne High School
2315-2 Henderson Executive Airport Electrical Plan - Phase 2
0000558 Underground Fire Line and Nevada Power Upgrade @ Valley HS
2008-33 Beatty Street Light Installation
601297-08 Street Light Modernization
601291-08 Hotel Rio Drive Bridge Repair
M0155 Miscellaneous Backflow Installations 2008-2009 Phase XII
09-08 Summerlin Library Efficiency Remodel
09-09 Sunrise Library Efficiency Remodel
0011612 Water Service
2359 MIA Laundry Remodel
08.53541.06-LED Water Pollution Control Facililty
2008-86-0012 Reservior Rehabilitation Improvements Project
2008-12 Operating Room Humidifier Replacement
601259 Wetlands Park Nature Center

456-PM Design Build of a New Pool to Replace Existing Pool at the McDermott Physical Edu
0000484 Plumbing Modernization Rowe ES
0011765 Fire Hydrant Installation Gragson Elementary School
4477 Furnish and Install Elevator at Shadow Lane Medical Research
0010993 Emergency Lighting/Intrusion Alarm Interface; Intercom, ALS PA Upgrades
08.53541.05-LED Durango Hills Water Resource Center
1548-04 Wallace Transportation - Bus Wash/Water Reclaim System Corrections

601096-08 Range Wash Channel Reconstruction on Nellis Air Force Base - Phase 4
Central Cooling Plant Connector to Satellite Plant for GHS, WHI and TBE Buildings

B601309-08 Northern Clark County 215 Bruce Woodbury Beltway, Tenaya Way to Decatur
0011998 Rehab Existing Building 4220 McLeod Drive
0002501 Intrusion Alarm PA ALS Exterior Lighting J D Smith Middle School
2008-35 tonopah Fitness Center Remodel
09.1730.02-LED Las Vegas Wash Middle Branch Storm Drain
601319 Clark County Museum Candlelight Wedding Chapel - Phase I
070F 02 C1 Lake Mead Intake No. 3 - Pumping Station Underground
07-M37 Erosion Remediation High Desert State Prison
09107 Fire Station / college Instructional Center

09.1730.07-LED Horse Drive / U.S. 95 Interchange Intersection of Horse Drive and U.S. 95
C1269 Kyle Canyon System Improvements - Old Town and Upper Rainbow
C1279 Hard Rock Pressure Zone Conversion
1321 Desert Horizons Park - Offsite Improvements
08-0734-PD Police Department Remodel
1305 Losee Road Improvements Phase I
601328 Clark County Fairgrounds Rodeo Arena Bleachers Modular Office and Site
601329 Clark County Fairgrounds Horse Stalls Reconfiguration
07-C07A Southern Desert Correctional Center Expansion
601207 Sunset Regional Park Phase 1 Improvements
2318 MSE Wall, Taxi and Helix Bridges Expansion Joint Rehabilitation
2008-04 Pipe Springs Well Drilling
601335 Multiple County Facility Improvements Shade Structures

2240 Landscape Renovations at McCarran International Airport and Seigfried and Roy Park

Parking Revenue Control System Infrastructure at the Gold Garage and Terminal 2 Parking Lot
Desert Regional Center, Building 1300 Accessibility Upgrades

Russell Road CMU Walls
090G 25 C3 Groundwater Development Cosntruction

320Q 01 C1 Alfred Merrit Smith Water Treatment Facility Process Drainage Improvements
320B 01 C1 AMSWTF Laboratory Space Remodel
601344 Elevator Equipment Rooms- Code Compliance Retrofit
601343 North Las Vegas Community Resource Center Fence
09-07 Spring Valley Library Efficiency Remodel
09-06 Clark County Library Efficiency Remodel
131-08-QC-001 On Call Construction Services
C1306 Miscellaneous Mian Extensions and Water Service Installations, Phase VII
MPID 0000243 Roof Replacement CVT Gilbert Elementary School
601347 Desert Breez Park Restroom Repair
08.15341.04-LED LV Museum Phase 3 Rehabilitation 300 Stewart Avenue

B601324-08 Durango Drive from Southern Beltway to Hacienda Avenue and Sunset Road
07-0696-STR 2007 Pavement Reconstruction Project
C-09-00001 Green Valley Library Addition and Remodel
08-0744-CC Boulder City Special Events Sign
601360 Emergency Power DJJS/DFS Campus
Downs 5 Morrell Park Phase 11 131-09-PR-165-001
2005-86-0072 Equestrian Tributary 1 Flood Control Project
CRCPDP-31 IPS-3 and CWC Substation 69kV Ductbank Project Phase 1
131-08-ST-034-001 Burkholder Blvd Roadway & Trail Improvements
131-09-GG-R09-001 Water Street Site A Utilities Relocation
Caliente Fire House
0011764 Renovation/Expansion at New Administration Site at Seigle 2
09-B-01 Fish Lake Valley Community Center Renovation Project


TS-0624 Switchgear #5 and Duct Banks

08.53541.03-LED Water Pollution Control Facility Nitrification Aeration Basin Improvements
RFP-182 Fire/College Instruction Center
0011865 Asphalt Playground Replacement
601372 Searchlight Justice Center Tenant Improvements
0011845 School Modernization Kirk Adams Elementary School
0011846 School Modernization James Gibson Elementary School
09-2150 Pavilion 3150 Paradise Road
In-Fill Roadway Program - FY 2007
07-0710-MC(1) LADWP Building Public Restrooms

TS-560A-P03 Moapa Valley Collection System - Lewis Force Mains Overton and Longdale
TS-560A-P02 Moapa Valley Collection System - Lift Station
TS-560A-P01 Moapa Valley Collection System - Gravity Sewer Overton and Longdale
0011844 HVAC and Plumbing Modernization
2005-86-0029 Major Avenue Rehab - Van Wagenen to Warm Springs
810G 01 C1 Duck Creek Confluence and Upper Narrows Weirs
07-M24 Door Control Panels Fire Door Replacement
PCOH 8008860047 COH Water Treatment Plant Granular Activated Carbon
2331-2 T-3 Concourse 1213 Bottleneck Power Project

2008-86-0014 Miscellaneous Sanitary Sewer Protection Improvements Various Locations
07.15341.18-DC Fire Training Center Burn Tower
8106 01 C1 Duck Creek Confluence and Upper Narrow Weirs
810V 01 C1 DU Westlands No. 1 Weir
09.1730.16-TF N Street Improvements-Jefferson Avenue to Madison Avenue

2008-42 Homestead Road Widening
2008-41 Amargosa Valley Science & Technology Park Building
09.1730.29-LED Las Vegas Wash Trail Phase 1
0010996 HVAC & Plumbing Modernization Helen Cannon Middle School
09.1762.01-TRF Annual Slurry Seal
CWC-1100 Site Prepartation

0012022 Replace State Floor & Curtains

840A 00 A1 Fire Station Weir Bank Protection Maintenance
131-08-PR-166-002 Arroyo Grande Fields #5-8 SOD Replacement

C1307 Rampart/Alta Pipeline Relocation, Phase I
Project 627 Comprehensive System Wide Inspection Program
Pinto Campus Social Service 1st and 2nd Floor - Tenant Improvements
2009-01 Smoky Valley Arena Shelters Pahrump Nevada
0027-93-01 Bowman Reservoir Discharge

B601411-09 Silverado Ranch Boulevard From Decatur Boulevard to Valley View Boulevard
B601412-08 2009 School Flasher Improvements
09-0763-MC Cemetery Paving - 2009
2291 Terminal 1 Roadway Reconfiguration
07-C89 UNLV Shadow Lane Biomedical Research Building
08.15341.12-TF Doc Romeo Park/Majestic Park Scoreboards

05-C67L(A) UNLV Student Services Bursar Office Remodel
B601415-09 Harmon Avenue Relocation Las Vegas Boulevard to Koval Lane
131-08-MF-058-002 City of Henderson Detention Center Expansion
Detention Center Expansion-Air Blown Fiber Installation
Football Field Lighting Audio System & Security System Pahrump Valley High School
PW 2009-002 Oasis Boulevard 2009 Overlay Project
PW 2009-001 Pioneer Boulevard 2009 Overlay Project
0011777 Security Gate System Chaparral High School
08.15341.15-TF Druango Riley Park Phase 2
09.1730.25.TF Rancho Park Subdivision Street Rehabilitation

09.1730.04-TF Meadows Alta Parallel Project Phase II (Lot 1) and Brush Street Storm Drain
Cambridge Community Center Social Service Second Floor - Tenant
#1324 Northeast Area Command Facility City of North Las Vegas Detention
131-09-MF-036-016 Justice Facility Expansion Data/Voice Cable Installation

B601418-09 Bruce Woodbury Beltway (North) Oso Blanca Bridge Over US 95 Ramps
Regional Justice Center Specialty and Felony DUI Court Expansion
131-09-PR-213-001 Streetscapes Turf Conversion

2008-87-0043 Landwell 2200 Sewer Interceptor Sunset-Burkholder Between Galleria Dr
09-015 Laughlin Transit Maintenance Facility
2140-09 Major & Emergency Asphalt Replacement
1325 Craig Ranch Regional Park - Phase 1
1326 Tropical Breeze Park
CRCPDP-41 CWC Temporary Substation Project-Substation Construction
B6011445-09 2009 Traffic Improvements Phase 2
B601444-09 Paradise Road - Harmon Avenue To Desert Inn Road Phase 3A
B601440-09 PM 10 Paving Project 11 Phase 1
1327 SkyView Multi-Generational Center
Access Road & Site Preparation for Well #27
LCPD0902 Gemmill Substation Construction
131-09-W-165-005 City of Henderson Utility Services Support Building
09.1730.20-DC Las Vegas Blvd Neon Signs & Median Island Improvements

0011850 Plumbing Kitchen Modernization and Door & Hardware Upgrade Fay Galloway ES

1558 Shirley and Bill Wallin Elementary School
1554 Vincent L Triggs Elementary School
0000474 Roof Replacement Bertha Ronzone ES
0004452 Roof Replacement Marion Cahlan Elementary School
0011968 Chiller Conversion Silvestri Middle School

1560 Ruby Duncan Elementary School
1559 Evelyn Stuckey Elementary School
BCP-09-01 Stop Light at Pioneer & Oasis and Pioneer & Falcon Ridge
0000471 Roof Replacement CC Ronnow ES

B601457-09 Northern CC-215 Bruce Woodbury Beltway - Decatur Boulevard to North 5th
B601455-09 Clark County Wetlands Park Pond Restoration Project

PW 2009-003 South Grapevine Camellia Circle & Sun Valley Drive 2009 Overlay
1328 Tropical Parkway Storm Drain East On Tropical Parkway from North 5th Street
2329 MRACC Office Build Out and Dumpster Facility Redesign
B601462-09 Flamingo Wash Desert Inn Road to Eastern Avenue
B601468-09 Flamingo Arroyo Trail Phase 2
B601456-09 Casino Drive - Harrah's Driveway To St - 163
Metro Communications Center
Silverpeak Production Well Drilling Construction and Test Pumping
5050-KC System Computing Services Electrical Renovations
New City Hall & Civic Plaza
C1194 Miscellaneous Site Improvements FY 2005/2006 Phase 1


06-0667-WWTP Wastewater Treatment Plant Headworks Upgrade
Jerome Mack Air Quality Monitoring
0000558 HVAC and Electrical Upgrade and Modernization Valley High School
C1308 Polyethylene Service Replacement Laughlin Phase 1 El Mirage Estates
C1281 Recycled Water Distribution System Valve Improvements
340R 01 C1 Transmission System Pipelines Cathodic Protection Repairs
Gowan Road Improvement
"A" Building HVAC Remodel West Side
Diagonal Taxiway Tonopah Airport
La Cienega Drainage Improvements 2361

2009-06 Pahrump Are Chip Seal
C1293 Trihalomethanes Treatment Project Phase 1 Alta 3205 Zone Reservoir
09-17 Southwest Library and Service Center Rainbow Boulevard/Windmill Lane
0004628 Remove & Replace Tennis and Basketball Courts
2009-07 Calvada Abatement and Demolition
MPID#0004652 Remove and Replace Running Track Surface Valley High School
MPID#0010596 Remove and Replace Running Track Surface Western High School
MPID#0004640 Remove and Replace Running Track Surface Clark High School
M0157 Drill and Develop Production Wells S-3 and S-4
M0156 Drill Piute Valley Montioring Well PVM-1
1333 Southeast Interceptor
08.53541.04-LD WPCF Security Improvements & Expansion Maintenance Charging Area
001-09 Tonopah Roof Project
131-08-MF-145-001 City Wide Performance Contract
Security Station Modification
05-M16 Sewage Disposal System Upgrades Pioche Conservation Camp
2009-08 Florence Avenue Reconstruction
601512 Self Help Center

1332 City of North Las Vegas Detention Center Dormitories A, B, and F HVAC Replacement
012019 Roof Replacement Frezier Hall at the Las Vegas Academy of Int'l Studies
09.15341.03-DC Request For Prelimary Proposals Tropical Durango Park Phase I
2262-2 Mia Roof Replacement - Centinal Terminal McCarron International Airport
M0162 Big Bend Water District On-Call Services Contract 2009-2014
MPID#0000577 Remove and Replace Asphalt and Add ADA Ramp
07.15341.17-TF Desert Nature Preserve Trail
07-C07A(A) Asbestos Flooring Abatement Southern Desert Correctional Center
09.1730.21-LED Dexter Park Playground and Dog Park Addition Dexter Park Upland Blvd
DJJS Fire Alarm System Modernization
09-0771-RE Coping Stones Replacement
B601525-09 Tropicana - Flamingo Wash Trails - Phase 1
B601527-09 Spalling Repair On 1-215


131-09-ST-164-001 Streetlight Pole Replacement Phase 1
1499 Forebuss Elementary School Located Near Grand Canyon Dr and Fore Avenue

07-0720-LT River Mountains Loop Trail Segment 3 & 4 Within the City Limits of Boulder City

Federal Stimulus 2009-A Various Locations In North Las Vegas Construction of Pavement
070F 02 C2 Intake No. 3 Connector Tunnel Alfred Merritt Smith Water Treatment Facility
Terminal 3 Apron
543-PO2 Emergency Repair Contract Services-Phase II
1334 Water Bolsering Between North 5th and
09.1730.22-DC Boulder Park Plaza
131-09-FC-038-002 Section 19 Flood Control Improvements
09.15341.07-TF RPP Teton Trails Park Phase III
2009-11 Tonopah Public Utillities Septage Drying Beds
131-09-MF-063-009 Heritage Park - Senior & Aquntie Faclities Data/Voice Cable Install
B601530-09 Duck Creek Railroad Detention Basin
C1297 Charleston Heights 2168 Zone Reservoir Rehabilitation
09-B-02 Goldfield Utilities Wastewater Pond Rehabilitation Project

BCP-09-02 Senior Center Addition
20903340 Renovate Room In MPE Emerging Diseases Laboratory
04-0608-DR Bootleg Canyon Detention Basin Phase 1- Outfall
131-09-ST-165-001 Pioneer & Army Street Dust Paving
09-25557 The Smiths Center Performing Arts Center

Spring Mountain Youth Camp (SMYC) Wastewater Treatment Facilities Repairs
90904873 Science and Engineering Building Tenant Improvements

Cheyenne Ridge Park Lighting & Shade Shelter #10277
Public Works Multi-use Service Center
09-092 South Strip Transfer Terminal Security Electronic Systems Upgrade


09-20 Whitney Library Efficiency Remodel
09-21 West Charleston Library Efficiency Remodel
Grand Teton Drive Storm Drain-Tee Pee Lane to US-95
2353 CCRF - AVI System Installation at McCarren Rent-A-Center

07-C05 Indian Springs Correctional Center Work Camp, off Site Erosion Control 20825 Cold
Lead Based Paint Stabilization and Remediation Project
1341 Water Bolstering Project Between North 5th and Donna
090200-LD Design/Build Water Pollution Control Facility
09.1730.10-DC Oakey Meadows Storm Drain Phase 1
Installation of Video Surveillance System at Bob Price Recreation Center
C-09-0000Z Gibson Library 100 W Lake Mead Pkwy, Henderson NV 89015
07.15341.03-LED Fire Station #42 Generator Enclosure
0011116 Roof Replacement Adams Elementary School
02734 Well #2 Reconditioning
Rail City Linear Park Improvements Project 02261
Well #3 Replacement 02194
Pinto Campus Parking Improvements

B601587-09 Montessouri Street Improvement From Wigwam Avenue to Shelburne Avenue

0005074 Playground and Retaining Wall Replacement William G Bennett ES
0004610 Tennis and Basketball Court Replacement and Erosion Control
2334 Terminal 1 Central Plant Reconfiguration McCarran International Airport
2009-86-0000 Reservoir Rehabilitation Improvements Project R 18 and R 20 Various
C1314 Searchlight Water System Improvements Restoration
Countywide Heater Replacement
BCP-09-3 City of Mesquite Police Headquarters
09.53541.01-LD WPCF Nitrification RAS Valve Replacement
Fire Station 22
Via Olivero Avenue and Valedez Street Special Improvement District 09.1730.34-DC
09-102 Ace Gold Line Phase III
PKGID 0011857 School Moderinization John F Mendoza Elementary School

1343 WRF Offsite Power
131-09-MF-063-013 Heritage Park Senior and Aquatic Facilities Audio
2370 Radiosonde Launch Facility
0012071 Remove and Replace Running Track Surface

91-97-48-02 A Quary and Stockpile RipRap Lincoln County Acoma Quarry (29 Miles East of )
2009-14 Re-roofing of the Rhyolite Depot


09.15341.10-TF Durango Hills Golf Course Turf Removal
1344 Southeast Interceptor Phase 1 Lake Meade/pecos to Alto/Nellis along Lake Meade
1346 Southeast Interceptor Phase 3 From Owens Ave/Pecos Rd to Lake Meade/Pecos
1345 Southeast Interceptor Phase 2 From Alto/Nellis along Alto and Betty
PW 2009-004 Mesquite Wastewater Treatment Plant Upgrade & Expansion
2009-14 Entry Canopy NE Building
131-09-W-129-001 Miscellaneous Utilities Phase 4
2009-15 Campus Landscaping and Irrigation
1340 CNLV Detention Center Dormitories A, B, and F Roof Renovation
09-0768-STR Federal Project No. AARA-0003(115), NDOT Project No. 60364
ALP NO. 3-32-0029-05 Resurface Unpaved Runways
2009-16 UMC Lied Ambulatory Center Chiller Modifications
B-1347 Parking Lot at Stanley and Bruce
EM1 Emergency Buildings Paving
Gabbs Sewer Improvement Project
AIP NO 3-32-0002-10 Vault Generator Beatty Airport
09-106 Construction Manager at Risk Boulder Highway
07-M10 & 07-C07a Templifier & Heat Pumps Replacement / Concenser Water Pipe
0012058 Fire Alarm Upgrade Durango High School
0012047 Fire Alarm Upgrade Becker Middle School
91-97-48-02B Schroeder Dam Decommissioning & Erosion
C1300 Jean 3079 Zone Reservoir Addition

#09-2171 Right Turn Stacking Lane Joe W Brown and Bel Air Drive
M0165 Drill Piute Valley Monitoring Well PVM-1
1348 Las Vegas Wash Trail Phase IV
05-S03(S) Fire Alarm Facility Upgrade Southern Desert Correctional Center
07.15431.05-DC Pavilion Pool Cover
09-0486 West Charleston Storm Drains/Flood Control
B601634 2009 Traffic Improvement Project - Phase 4B

09.15341.09-LED Centennial Hills Park Added Improvements-Amphitheater Truss Footings
07-C23(A) Off Site Improvements - Buchanan Boulevard Phase II
0012084 Fire Alarm Upgrade Las Vegas High School
0012076 Fire Alarm Upgrade Greenspun Middle School
0012082 Fire Alarm Green Valley High School
0012081 Fire Alarm Upgrade Cheyenne High School
0012083 Fire Alarm Upgrade Walter Johnson Middle School
0012085 Fire Alarm Upgrade O'Callaghan Middle School
0012080 Fire Alarm Upgrade Thurman White Middle School


1350 Fire Administration Building Emergency Generator and Enclosure

B601643-09 Las Vegas Boulevard From Silverado Ranch Boulevard to Sunset Road
B601642-09 Lower Duck Creek Detention Basin Offsite Improvements

10.1730.05-DC Symphony Park Off-Site Electrical Conduit System
Site Improvements Spring Valley State Park

WPCF Dewatering Well Project 09.53541.03-LED
Child Haven Family Services Campus Fence
B601635-09 2009 Bus Stop Concrete Pad Repairs - Federal Funded

09.1762.02-LED 2009 Asphalt Overlay Lamb Blvd from Charleston to Owens, Alexander Rd
131-09-ST-146-001 Green Valley Parkway-American Pacific ADA Ramp Improvements
Stewart Avenue Sewer & Pavement Rehabiblitation & Beautification Phase 2
2009 Traffic Improvement Project - Phase 4C
Supply Type 2 Gravel on various projects
2009 Transportation Rebab Stimulus Project Phase 3 Volunteer Blvd
2009 Transportation Rebab Stimulus Project Phase 1 Green Valley Parkway
2009 Transporation Rehab Stimulus Project American Pacific Drive
Payne Substation, Overton Power District
Energy Retrofit CSMS #2, Nevada Army National Guard
Taxiway G Reconstruction

Gym Floor Installation for Temp Structure Sandy Valley HS
North 5th Street Improvements Phase 1B Owens to Lake Mead Blvd
Landwell 2200 Sewer Interceptor Galleria Drive to Lake Mead Parkway

Gabbs Recreation Hall - Phase I Foundation
WPCF Box Culvert Modification
B601645-09 Twain/Pecos-Mccleod Storm Drain
B601646-09 Dening-Tunis Area Storm Drain At Duck Creek
B601647-09 Cleveland Avenue From Walnut Road to Gateway Street
B601648-09 Tropicana - Flamingo Wash Trails - Phase II


B601658-09 2009 Traffic Improvement Project - Phase 3
Gabbs Mater Water Treatment Facility
B601663-09 2009 Traffic Improvement Project - Phase 4A

10-042 Ace Gold Line Phase III Various Locations Along Las Vegas Boulevard and Warm

601599-09 Supply and Install a Radio Communications System at the Clark County Detention
309 South Third Street Cooling Tower and Boiler Replacement
WPCF Server Room HVAC System
RFP 601549-09 Upgraded Video Visitation System for the Clark County Detention Center
Alamo Exploratory Drilling Project Drilling Exploratory Well
Bertha Howe Aevnue & John Deere Drive
1354 Fire Station #54 Addition

2009-27 Gabbs Recreation Hall - Phase II Erection
Bird Viewing Preserve Access Driveway
RJC Air and Water Balance Modifications
Installation of Fire Hydrant at Portables
Academic & Student Services Building Electrical Revisions
Northwest Career & Technical Academy Access Road
ACE Express C-Line



Countywide Lamp & Ballast Replacement Clark Place Parking Garage
Countywide Playground ADA Safety Surfacing
Spring Mountain Youth Camp: Volleyball Pitt Turf Conversion
Stephanie Street Automotive Trailer Replacement

Campos Office & Parking Facility
Runway 9R-27L Safety Enhancements
Development Services Expansio: Security Camera Upgrades
Upgrade Truck Staging Area FETC

The Residence at Village Square, Affordable senior housing and commercial/retail development



Calvada Administration Building
Phase 2 of 2009-436
Calvada Parking Lot
CWC-800 System Conveyance & Operations Program (SCOP)-"Hydropower Facilit (PR/PGS)
CWC 1000 Reach 5 Outfall Diffusers
080F 04 C1 Lake Mead Intake No. 3 - discharge Pipeline
TS-0630 Laughlin WRF Aeration Piping Replacement and Laughlin
TS-0640 Laughlin Lift Station No.2 Rehabilitation Project
C1212 Sloan Zone Reservoir and 3205 Zone South Pumping Station
2009-86-0016 Pittman Pecos Sewer Flood Protection Project
0011861 HVAC School Modernization Charlotte Hill Elementary School
0011873 HVAC School Modernization Dorothy Eisenberg Elementary School
0011864 HVAC School Modernization Helen Herr Elementary School
011848 HVAC School Modernization Walter Jacobson Elementary School
0011847 HVAC School Modernization Helen Jydstrup Elementary School
BWSD Water Treatment Facility Treatment Facility
W0108 Las Vegas Vallely Groundwater Managmeent Program Miscellaneous Well

Pittman Wash Sewer Relocation Valle Verde Drive to Sandwedge Channel
Las Vegas Co-Op Learning Center - Landscaping #0811-P163
Resevoior Rehabilitation Improvements Project R18 & $20
Cosmetology Lab
Hillside Dr. & Hafen Ln 2009 Overby Project

LV Wash-Middle Branch Rainbow Storm Drain Elkhorn to Grand Teton
Demolition of Tompkins Maintenance Facility
Installation of Fire Hydrant at Portables
Design/Build Water Pollution Control Facility
Lower Narrows & Homestead Weirs
DU Wetlands No.1 Weir
Bermuda 2745 Zone Plumbing Station Discharge Pipeline, Phase II
Goldfield Courthouse Rehabilitation Project
Gold Garage Expansion Joint Repair
Dual Left Turn Lanes Improvements
2009 Asphalt Overlay
Stewart Avenue Sewer & Pavement Rehabiblitation & Beautification Phase 2
Roof Replacement (Gymnasium & Cafeteria)
Campus Services Building & Classroom Building Complex Reroof Project
Intermediate Booster Station Upgrade
HVAC & Day Lighting at Gymnasium
Administration Fire Suppression
Terminal 1 Ticket Counter Conveyor Replacement
HVAC School Modernization @ Elaine Wynn ES
Development Services Expansion: Security Camera Upgrades
Indiana Springs Wastewatre Treatment System Upgrades
On-Call Pavement Patching & Misc Improvements
Bird Viewing Preserve Access Driveway

Automal Interchange Ramp Signals
Miscellaneous Utilities Phase 4
RMLT 13&14 Equestrian Park Trailhead
Neon Boneyard Park
Silverpeak Water Systems Improvements
Southwest Water Reclamation Facility Offsite Improvements
Wetlands Park Nature Center and Park Expansion
East Old Mill Road 2009- Overlay Project
Olsen Street Drainage Improvements
Laughlin Library Cooling Systems Replacement
Las Vegas Library Fire Alarm System Replacement
Lower Blue Diamond Detention Basin

Marshal's Locker Room Tenant Improvement for the Justice Facility


2009 Transportation Rehabilitation Stimulus Project Phase 3 Volunteer Blvd
2009 Transportation Rehabilitation Stimulus Project Phase 1 Green Valley Pkwy
2009 Transportation Rehabilitation Stimulus Project Phase 2 Americajn Pacific Dr
Valley View Recreation Center Roof Replacement
Cosmetology Lab Expansion

Countywide Trash Enclosure Additions 601767
Big Bend Water District On-Call Services Contract 2009-2014 Phase II
CC 215 Bruce Woodbury Beltway Flamingo Rd Interchange Landscape B601762-09
Sunset Regional Park Improvements Phase 1A- Dog Park
Flamingo Road/Las Vegas Boulevard Pedestrian
Fire Station No. 20 601771
Heritage Park Campus Phase I- Dog Park 131-10-PR-135-001
Hollywood Regional Park Aquatic Center
Collection System Capacity Additions Package 1 TC-0643
Federal Stimulus- Street Rehabilitation 2009-B
Alamo Wastewater Treatment Facility Improvement Project
Pioche Upper Park Improvements
Collection System Capacity Additions Package 2 TS-0644
400 & 500 S. Main Strret Demolition
Erosion Remediation, High Desert State Prison
Alamo Wastewater Treatment Facility Improvement Project
Canyon Crest Blvd. And Horizon Blvd. Roadway Improvement Project BCP-09-04


Hotel Rio Drive Bridge Repair
2009 PRV Projects
CNLV Detention Dormitory A Flooring Renovation
Blue Diamond Wash-Wigwam Avenue B601789-09
Kell Lane Storm Nellis Boulevard To Lamont Street B601787-09
Las Vegas Boulevard/Serene Avenue Storm Drain B601786-09
Cactus Avenue and Rainbow Boulevard-Phase 1 B601785-09

Kitty Hawk Drive 2009 Overlay Project 09/10-7
MIA Roof Replacement- Central Terminal
Paving of Lola Lane
2009 Traffic Improvement Project- Phase 4A
2009 Traffic Improvement Project- Phase 3
Flamingo Arroyo Trail, Boulder Highway to Desert Inn Road
Fire Station No.22
Countywide Playground ADA Surfacing 601707
Spring Mountain Youth Camp Volleyball Pitt Turf Coversion 601711
Stephanie Street Automotive Trailer Replacement
WRF Administration and Field Office Remodel
Gabbs Sewer Improvement Project
CCWRD Electrical Facilities Project Substation Construction
Miscellaneous Sanitary Sewer Protection Improvements Phase 1 & Phase 2
Pittman Wash Sewer Assessment Pilot Project
1346 Southeast Interceptor Phase 3 From Owens Ave/Pecos Rd to Lake Meade/Pecos
Kyle Canyon System Improvements-Lower Rainbow C1270
Nevada State College-Elevator Installation 131-09-CM-026

Terminal 3 Passenger Loading Bridges
Pahrump Museum Addition
City Hall Roof Replacement
Stephanie Street Stimulus Project
Amargosa Mountain Bike Trail Plan
Goldfield Relining of Treatment Ponds Phase 2


Manhattan Water Piping
Sewer, Groundwater Monitoring, Well & Aeration
09-0768-STR Federal Project No. AARA-0003(115), NDOT Project No. 60364
2009 Asphalt Overlay, Rainbow Boulevard 09.1762.01-04LED
Imaging Suite Shielding
MPE StructureLab/Room 508
Sterile Processing Department Remodel
Tonopah Fire Station Metal Building
Fire Administration Emergency
Warm Springs Storage and Maintenance Building
Traffic Package 7A
Countywide Roof Replacement-Phase 1
Las Vegas Wash Trail Phase IV #10198
Metro Substation At Eldora/Cimarron
Park Office/Cantact Station @ Kershaw-Ryan State Park
Amargosa Trailheads
Horizon Ridge PKWY-Jeffreys Street Traffic Signal
Metro Firearms Range
Replace Tennis Basketball Courts and Correct Drainage

Stimulus Package #3. Pulverize, Pave and Slurry Seal B601822-09

Pulverize and Pave B601-824-09

Pulverize and Pave B601-825-09

County Fair Grounds: Plaza and Arena Concessions Remodel
Paneca Farmstead Association 2010 New Well

Electronic Door Access
West Flamingo Senior Center: HVAC Upgrades and Mold Mitigation

Terminal 3 Automated Transit System
WPCF Desert Inn Road Landscaping
North & South Environmental Enhancement Areas @ Floyd Lamb Park


BWSD Exploratory Drilling & Well Impr. Project
CMU Wall Repair
Central Freeway Channel Phase #2
Losee Road Improvements-Phase 2A
Site Security
Craig Ranch Maintenance Facility

Victory/Atlantic Sidewalk Ramps
Reed Whipple Center Fire Sprinkler Installation
Pulverize, Pave and Slurry Seal
Caliente Fire House Phase II Project, 2010

Racetrack Raod Trail Crossing and Misc. Median Improvements
Parking Revenue Control System

2009 Annual Asphalt Overlay Bonanza (LV to Nellis) and Maryland (Sahara to Stewart)
HVAC School Modernization @ Perkins ES
ADA Sidewalk Accessibility FY 09/10

Roof Replacement @ Valley High School
Public Works Administration- Engineering Remodel
New City Hall
Bird Viewing Preserve Onsite Improvements

Arts District Gateway

Humidifier Relocation
Corrosion Management Plan Phase 2 Bid Package 3

Cath Lab Remodel


Elkhorn Springs and Buffalo Drive Storm Drain System
Simmons Street Drainage Inpmrovements- Gowan Outfall
Water Bolstering Project Between North 5th & Donna Phase 11 Orr Ave & Barlett Ave
Kenny C. Guin Middle School
Roof Replacement for Plant/Boiler Room & Central Store/Warehouse
Amargosa Valley Science & Technology Park Pump House Electrical
Traffic Engineering Maintenance Improvements West Services Center CDL Lot
Cooling Tower Replacement Nevada State Veterans Home
Atrium Building Renovation
Sanitary Sewer Rehabilitation
Satellite C- Paradise Pad Ramp and Apron Reconstruction
Triangle Area Improvements
Duck Creek Drop Structure Near Nellis
Salvation Army Building Roof Recovering
Bus and Staff Parking and Quonset Hut Demolition
2009 Pavement Reconstruction Project- Survey
Buchanan Boulevard
Major Street Rehabilitation FY 08/09
Enterprises Water Resource Center Site Development
Design Build of the UNLV Athletics Synthetic Turf
Desesrt Inn Deck
Serene Avenue Maryland Parkway To Spencer Street
Range Wash Channel Reconstruciton VI
Streetlight Modernization
Installation of Chillers
Henderson DMV Photovoltaic Installation
Enterprise Water Resource Center Site Development Package 1
HVAC Installation Clark County Armory
Tropical Breeze Park
Solar Covered Parking Bid Lot B Stupak Comm Center& Natural History Museum& Fire Station
#10
Whitney Library Roof Replacement
West Charleston Library Roof Replace
Replace Asphalt on Playground

Glendale Peak Communication Site Replacement

Regional Justice Center Sidewalk Repairs

Sandy Valley Communications Site Improvements
Clark County Detention Center North Tower Condenser Water Piping Replacement
Traffic Package 7
Lone Mountain Trail Pedestrain Bridges Cultural Corridor Trail Pedestrain Bridge Lone Mountain
Trail Ph. 2B
Lower Detention Basin of Las Vegas Wash-Wall Repair
North Hall Air Wall Replacement
Bigelow Physics Building Re-Roofing Project


Downtown Area Command
HVAC School Modernization/Selma F Bartlett ES
HVAC School Modernization/Patricia F Bendorf ES
HVAC School Modernization/Lilly and Wing Fong ES
Corrosiion Management Plan, Phase 2 Bid Package 4
Bonneville/Clark One-Way Couplet, Phase I
Main Street and Garces Traffic Signal
Cheyenne 2975 Zone Motor Operated Valves
CBC Chiller Re-Piping
Fire Station #50
Mob Museom Exhibit Fabrication 36697
Sunridge Heights/Coronado Center Traffic Signal
Horizon Ridge Pkwy/Mission Drive Traffit Signal
Horizon Ridge Pkwy/Jeffrey's Street Traffic Signal
Great Basin Drilling
Galleria Drive Street Improvements-Burns RD to Moser Dr
Arterial Reconstruction Program FY 2010
Anthem Pkwy Rehab-Reunion to Hampton
Miscellaneous Vaults, Reconstruction and Repair, Phase XVI
Searchlight Wells S-3 and S-4 Discharge Pipeline
Roof Replacement, Clark County Armory
2010 Annual Slurry Seal
Cooperative Extension Center Expansion



Sahara Ave Bus Rapid Transit-Construction Manager @ Risk
SCS Cooling Tower Project
VGT Airfield Improvements
Well #3 Replacement- Pump House & Transmission Line
Kiel Ranch Adobe Restoration
Elevator Modernization- 2040- Building
HVAC Modernization Jim Thorpe ES

HVAC Modernization Harriet Treem ES
Hidden Falls Park
Laughlin Regional Hearitage Greenway Tail
Searchlight Trails Improvements Phase 1
HVAC School Modernization Woolley ES
Courthouse Grid Tied Solar System
Silver Peak Tied Solar System
Replace Ashpalt of Playground Walter Long ES
Parking Lot Expansion, Henderson DMV
Traffic Signal System at Cameron Street and Hacienda Avenue
Concrete Flooring Paint/Coating Removal & Re-Sealing Women's Correctional Center
Beatty Ambulance Facility {hase 1 Metal Building
2010 Pavement & Parking Lots Identified Within The City of Henderson
Sandhill Owens Park and Trailhead
Cliff Shadows Parkway, Buckskin Avenue to Lone Mountain Road



Laughlin Transit Fueling Station
AWT Membrane & Ozonation Facilities Phase 1


Construction of Additional Parking, Fire Access and Fire Hydrant
Countywide Fire Station Security Improvements
50 KW Photovoltaic Solar Power System
Honeywell Energy System Upgrade
Roof Top Photovoltaic System @ Bailey Elementary School
Roof Top Photovoltaic System @ Dickens Elementary School
Roof Top Photovoltaic System @ Glyens Elementary School
Roof Top Photovoltaic System @ Roundy Elementary School
Roof Top Photovoltaic System @ Smalley Elementary School
City of Mesquite Fime Arts Center Modifications
Site "A" Dry Utility Installation
2010 Overlay Project Phase I
Nate Mack Elementary School HVAC Modernization
Andrew Mitchell Elementary School HVAC Modernization
AWT Electrical Equipment Upgrade
Tropicana North Branch Detention Basin
Windmill Lane Durango Drive Sanitary Sewer Reconstruction
Asphalt Replacement
Covered Parking- Bid Lot East Las Vegas Community Center and All American Park
Pahranagat Valley Middle School
500 S. Main Street Parking garage
Solar Covered Parking- Bid Lot C2 Mirabelli Comm. Center, Veterans Memorial Comm. And Ed
Fountain Park

Solar Covered Parking- Bid Lot A Durango Hills Comm. Center and Cenntennial Comm. Center
AWT Electrical Equipment Upgrade
Roof Top Photovotaic System @ Eileen Conners Elementary School
Roof Top Photovotaic System @ Robert L. Forbuss Elementary School
Roof Top Photovotaic System @ Judy and John L. Goolsby Elementary School
Roof Top Photovotaic System @ John R. Hummel Elemenatry School
Roof Top Photovotaic System @ William and Mary Scherkenbach Elementary School
Roof Top Photovotaic System @ Sandra Lee Thompson Elementary School
Northwest Career & Technical Academy
St. Rose Parkway Trail Phase II
HVAC School Modernization @ Dailey ES
HVAC School Modernization @ Kahre ES
HVAC School Modernization @ Edythe Katz ES
Roof Replacement
Roof Replacement @ Long ES
Roof Replacement @ Mendoza ES
Roof Replacement Sawyer MS
Roof Replacement @ Squires ES

Bunkerville 2009-Slurry Seal
Reunion Trails Park
Ranger Residence, Storage, Photovoltaic off Grid Power and Site Improvements
HVAC School Modernization @ Mary & Zel Lowman ES
HVAC School Modernization @ Ernest May ES
HVAC School Modernization @ Ulis Newton ES
Desert Inn 3205 Zone Pumping Station Facility Improvements
Completion of Recreation Hall Phase 3
Roof Top Photovotaic System @ Kathy L. Batterman ES
Kay Carl ES
Don E. Hayden ES
Dr. Claude G. Perkins ES
Aldeane Comito Ries ES
Eva G. Simmons ES
Wendell P. Williams ES
Install Traffic Signal, Kyle Canyon Fire Station
Runway '15-33; Safety Enhancement
Burkholder Boulevard/Racetrack Road Traffic
2010 Pavement Main Fence Project Phase II
West Lobby, Restroom Renovation-CMAR
Clark Place Plate and Frame
Losee Road Sewer Line Phase 2A


Simkins Park Project
Solar PV Sytems
HVAC School Modernization @ Lunt ES
HVAC School Modernization @ Lynch ES
Gymnasium Bleacher Replacement @ Chaparral High
Tropicana-Flamingo Wash Trail-Phase II 601921-10
ITS Communication Infrastructure Corridor 1A
Las Vegas Valley Water District-2010 On-Call Services Contract
Lower Flamingo Detention Basin and Tropicana/Deactur Park
Instructional Wall Upgrade @ James Gibson ES
VGT Airfield Improvements
Northern CC-215 Bruce Woodbury Beltway-North 5th Street Interchange
Boulder City RR Museum ADA Restrooms
Contract For Upgraded Video Visitation System for the Clark County Detention Center
Expand Parking Area @ Zel Lowman ES
Expand Parking and Install CMU Wall @ Lynch ES
Overton to Payne Foundations
Tropical Durango Park Phase 1&2
DJJS Recreation Area: Shade Structures and Basketball Courts Resurfacing
First ST. Beautification-Boulder Ave to Hoover Ave
Cooling Tower Replacement William S. Boyd School of Law
Miscellanous Improvements, Valley of Sire Visitor Center
Flamingo Boulder Highway North Sahara Ave. To Flamingo Wash
Las Vegas Wash Middle Branch Storm Drain Improvements Decatur Blvd. To Elkhorn Rd
Bus Turnout Project FY2005
Town Wash Conveyance, I-15 to the Virgin River
HVAC School Moderniaztion @ Mack Lyon ES
Decatur Blvd Street Rehabilitation-Additional Bus Turnouts Sahara Ave to Alta


CC 215 Beltway Improvements (Eastern Interchange Landscape)
On-Call Major Pavement Replacement Services
Asbestos Abatement and Demolition Stupak Center
Asbestos Abatement and Demolition Bonneville and Clark Connector
Silver Springs Park
Family Court 3rd Floor-Tenant Improvements
On-Call Minor Pavement Replacement Services
On-Call Concrete Replacement and Miscellaneous Services
Advanced Clinical Training and Research Center, Parking Lot
Pahrump Chip Seal
Slurry Seal-Beatty/Amargosa
Type 2 Gravel-Pahrump
Morrell Park ADA Improvements
Nye County Detention Center-Pahrump
ADA Upgrades, DRC Building 1302
Theater Seating @ Valley High School
Bonanza Trail-Phase 2
Door Access Control Retrofits at City Facilities
UNLV Greenspun Building, Computer Room 1275 AC Units
Football Field Lighting Upgrade @ Basic High School
General market Bus Shelter Pad Construction/Assembly & Installation of Owner Provided Bus
Shelter
2010 On-Call Services for Electrical Power Distribution Equipment
site "A" Dry Utility Relocations
Integrated Bus Maintenance Facility (IBMF) Electronic Security Systems Upgrade
280 Water Street Building Remodel
Security Camera Systems Upgrades @ City Hall
Polethylene Services Replacement, Laughlin-Phase II, Laughlin Estates
Annual Taffic Signal Maintenance
C-Gates Passenger Loading Bridge Relocation
NW Substation Project
Roof Replacement- A&B Concourses, Cluster Buildings & ARFF Station
Ann Road Special Improvement District
Traffic Signal System At Hualapai Way/Tropicana Ave
Vegas Valley Drive Sewer Rehabilitation
Football Field Turf Replacement @ Pahrump Valley High School
Gymnasium Bleacher Replacement @ Clark HS
RJC 3rd Floor Court Room & 4th Floor-Tenant Improvement
12 Playground Shade Covers @ Multiple Locations
Bus Shelters 2009
WRF Roof Replacement
Metal Lockers @ Southeast Career and Technical Academy
Drill and Develop Searchlight Well No. S-4
Roof Replacement @ Halle Hewetson ES
Roof Replacement @ John Park ES
Roof Replacement @ Frank Garside MS
Roof Replacement @ Lomie Heard ES
LAN and Instructional Media Upgrade @ Bonanza HS
LAN and Instructional Media Upgrade @ Adams ES
ADA Access Bus Stop improvements
Spring Mountain Youth Camp Dormitories
Sludge Dewatering Building Rehabilitation
Well control Building & Misc. Piping
HVAC Improvements @ North Las Vegas Airport
LAN and Instrusion Alarm Systems Upgrade
Amargosa Pedestrian Bride Over St. Rose Parkway
Street Light Efficiency Improvement Project 2010
Furnish and Install Telecommunications Infrastructure
2010-2011 Streetlight Knocked and Replacement Program


Bicentennial Park Restroom
Warm Springs Between Boulder Highway and Lake Mead Parkway
Eldorado Valley Regional Public Safety Training Facility Fencing
Pahrump Valley High School Addition and Remodel
Manse Elementary School (New Construction)
Goldfield Arsenic Treatment Project
CMAR Jones & Valley View Corridor Improvements
Boiler Replacement, Southern Desert Correctional Center
2010 Arterial Reconstruction Program Phase 2
City of Henderson
Roof Replacement-West Las Vegas Library
Chuck Minker Sprinkler Installation
Buildings&Grounds Septic System-Phase 1 of Bldg Project
Building and Grounds Facility Erection and Concrete Work (Phase II)
Municipal Court Addition
Gabbs Exploratory Well
County parking Garage Structural Stabilization
11 shade Covers @ Multiple Locations
Annual Requirements Contract for Routine Electrical Services Countywide
Galleria Road Improvements Phase 3-Boulder Hwy to Burns Rd
Furnish and Install Escalator Steps

Fencing State Land, North Las Vegas Readiness Center & Las Vegas Readiness Center
C-Gates Modernization Project
City of Henderson Council Chambers A/V Upgrades
Robert E. "Bob " Price Park
Coyote Springs Communication Tower Installation
Mountain Springs Communication Tower Installation
New Readiness Center
Lighting Retrofits @ Various Location- ARRA
Central Substation Replacement



CSN Lab Revision & Main Bldg. Fire Alarm
Countywide Contractor For On-Call Construction Services 602059




Indian Springs Wastewater Treatment System Upgrades
CWC-900 System Conveyance & Operations Program (SCOP)-"Reach 5 Pipline"
Enterprise Water Resousce Center Site Development Package 2
Upper Las Vegas Wash Trail Phase #2
Starr/Executive Airport/Volunteer/Via Inspirada
River Mountain Loop Trail Segent 14
McCarran Rent-A-Car Center Tile Replacement
Major Street Rehabilitation
Theater Conversion/New Elevator @ Chaparral HS
VGT Apron Improvements
Roof Replacement @ Halle Hewetson ES
Roof Replacement @ John Park ES
Roof Replacement @ Frank Garside MS
Roof Replacement @ Lomie Heard ES
Roof Replacement @ Doriders ES
Roof Replacement @ Harris ES
Roof Replacement @ Tate ES
Roof Replacement @ Tomiyasu ES
LAN Upgrade @ Marc Kahre ES
LAN Upgrade @ Jack Dailey ES
LAN Upgrade @ Nate Mack ES
LAN Upgrade @ Ann Lynch ES
DU Wetlands No. 1 Weir
Cactus 2538 Zone Reservoir On-Site Improvements
LAN Upgrade @ Edythe & Lloyd Kats ES
LAN Upgrade @ Gwendolyn Woolley ES
North 5th Street Improvement, Phase 1C
IS Server Room Air Conditioning
Intrusion Alarm Upgrade
School Modernization @ Grant Bowler ES
Clock/Intercom System Replacement @ John Dooley ES
Clcok/Intercom System Replacment @ Clyde Cox ES
Temperature Controls Upgrade-Sahara DMV
Duck Creek Mountain Vista Street to Green Valley
WWTP No. 3 Decommission and Demolition Project-Phase 2
ADA Access Bus Stop improvements
Gowan Outfall, Lone Mountain Branch, Rancho Dr. to Decatur Blvd Lone Mtn. Rd from Rancho
to Decatur & Rancho from Lone Mtn. To Rainbow
Marion Street, vegas Valley Drive to Karen Ave
UNLV Potable Water System Improvements
                  note as of October 1, 2010



  $8,650,566.07      3/3/2009    05/21/09    5/22/2009
 $14,000,000.00     11/1/2008
$174,000,000.00     10/1/2008
 $20,000,000.00      6/1/2009                                                   Canceled

$165,000,000.00      6/1/2009                                                   Canceled

  $6,000,000.00      1/1/2009
 $30,000,000.00     10/1/2008                                                   Canceled


                   10/15/2008                                                   Canceled
  $3,519,600.00    10/16/2008    02/26/09    2/27/2009


                    12/6/2008                                                   Canceled
  $3,062,986.89     4/23/2009    06/16/09    6/17/2009


                     3/1/2009



  $3,987,821.76     10/9/2008    11/18/08   11/20/2008    9/20/2009    11/3/2009 Completed
   $426,027.00     10/23/2008    11/18/08   11/20/2008     8/4/2009   10/21/2009 Completed
   $146,346.00      3/12/2009    05/05/09     5/6/2009   12/23/2009     1/6/2010 Completed
  $2,081,000.00     10/6/2008
  $2,306,660.00    12/11/2008    02/03/09    2/11/2009    1/14/2010             Completed
  $4,679,428.00      1/6/2009                              7/8/2010    7/27/2010 Completed

  $6,116,355.00    10/14/2008    06/16/09    6/23/2009    3/11/2010    3/24/2010 Completed
 $12,875,372.00    12/18/2008    02/17/09     4/9/2009     9/8/2010     9/9/2010 Completed
                   10/27/2008                                                   Canceled


 $31,000,000.00      3/1/2009
                   11/25/2008                                                   Canceled


   $419,000.00       10/10/0/8   11/21/08    12/9/2008
                    10/1/2008                                                   Canceled
 $20,000,000.00     12/1/2008
 $43,000,000.00     11/1/2008
 $14,000,000.00      1/1/2009
  $1,199,765.00    11/13/2008    01/05/09     1/7/2009    5/27/2010     8/3/2010 Completed
 $13,116,857.00    10/16/2008    11/05/08    11/7/2008     9/7/2010     9/8/2010 Completed

  $4,044,170.90    10/16/2008    11/19/08   11/19/2008
   $768,328.00      6/18/2008    11/19/08    3/24/2009
   $327,850.00      10/1/2008    12/19/09    3/30/2009     5/7/2009    8/27/2009 Completed

   $203,422.67      10/1/2008    02/03/09    1/13/2009    9/23/2009    10/1/2009 Completed
 $59,000,000.00     2/26/2009
 $246,445.00    10/23/2008   11/13/08   12/12/2008
  $77,571.18    10/14/2008   10/28/08   10/28/2008
 $685,092.00    11/24/2009   01/05/10     1/6/2010

 $565,000.00     10/9/2008   11/05/08   11/17/2008


                                                                             CC did not
                                                                             Request Bid
                                                                             # they
                                                                             started
                                                                             using it
$5,013,559.00   11/25/2008   12/16/08   12/19/2008                           Double PWP
$5,013,559.00   12/18/2008   01/02/09     1/7/2009

 $100,000.00    11/21/2008   02/12/09     4/6/2009
$6,827,398.00    4/21/2009   06/16/09    6/23/2009   7/18/2010   8/26/2010 Completed
 $157,240.00    10/21/2008   12/02/08    12/2/2008
  $80,080.00     10/8/2008   10/21/08    11/7/2008   9/21/2009   9/25/2009 Completed
 $195,990.00     3/23/2009   04/03/09    4/14/2009   6/25/2009   6/25/2009 Completed
 $115,400.00    10/15/2008   11/14/08   12/30/2008   1/15/2009   6/15/2009 Completed
$2,460,610.60   10/14/2008   10/21/08   10/21/2008   3/29/2009    5/8/2009 Completed
 $209,500.00    10/20/2008   11/04/08    11/7/2008
 $337,446.67     4/15/2009   05/04/09     5/5/2009

$4,591,497.60   10/20/2008   11/18/08   11/26/2008   9/15/2009   1/20/2010 Completed
$1,289,124.00   10/10/2008   11/05/08    11/7/2008    8/6/2009   10/8/2009 Completed
  $89,902.00     10/2/2008   10/22/08   10/27/2008   3/31/2009   4/13/2009
                  1/1/2008
 $317,500.00     10/9/2008   11/20/08    12/9/2008
 $237,180.85     10/1/2008   11/18/08    11/3/2008   7/20/2009   7/28/2009 Completed
  $42,470.00    10/30/2008   11/10/08    12/9/2008
$8,802,727.00    1/15/2009   02/17/09     2/3/2009
$1,765,610.00   11/12/2008   04/12/09    12/9/2008
$1,739,000.00   11/12/2008   04/12/09    12/9/2008
$1,334,342.92   10/23/2008   10/30/09   10/30/2009   7/25/2009   11/5/2009 Completed
$1,824,348.06    11/1/2008   08/18/09    8/19/2009   5/19/2010   5/17/2010 Completed



$4,000,000.00    10/5/2008   11/14/08     2/5/2009
                  6/1/2009                                                   Canceled
$1,443,443.00   10/29/2008   11/06/08   11/24/2008
$3,581,660.00   12/17/2008   10/07/09   12/15/2009
                10/29/2008                                                   Canceled
$2,198,000.00    12/3/2008   01/08/09   12/12/2008
$1,596,308.00   12/22/2008   02/03/09    2/11/2009    5/8/2008   4/26/2010 Completed
 $689,000.00    11/12/2008   12/11/08   12/12/2008
  $40,400.00    10/30/2008   11/10/08    11/7/2008
 $960,103.60     4/23/2009   05/22/09    5/27/2009   7/12/2010   7/14/2010 Completed
                11/13/2008
 $416,200.00      7/2/2009   07/22/09    8/11/2009   8/30/2010    9/1/2010 Completed
 $262,777.00     11/3/2008   01/20/09 01/21/009       6/8/2009   8/21/2009 Completed
                 11/3/2008                                                   Canceled
                10/30/2008                                                   Canceled
  $97,083.00     1/21/2009   02/25/09    4/16/2009
  $5,499,090.00    1/22/2009   02/18/09    2/19/2009
  $1,815,525.00   10/16/2008   11/04/08    11/5/2008    7/29/2009    8/12/2009 Completed
                  11/25/2008                                                  Canceled
                    9/1/2008                                                  Canceled

  $4,319,454.00   10/14/2008   01/06/09    3/31/2009
   $869,700.00     2/12/2009   03/12/09    3/13/2009
   $376,000.00     6/17/2008   05/14/09    5/15/2009
     $97,300.00   10/22/2008   01/14/09    1/21/2009
   $355,000.00    11/19/2008   03/12/09    3/13/2009
   $388,722.00     12/4/2008   12/17/08   12/19/2008
   $249,500.00    11/13/2008   11/21/08   11/21/2008

  $1,055,000.00   12/15/2008   01/20/09    1/22/2009    9/25/2009   11/25/2009 Completed
   $695,576.00     11/7/2008   11/25/08    6/17/2009    4/13/2009    6/15/2009 Completed

$116,820,814.40    1/29/2009   07/21/09    7/29/2009
   $538,470.00    11/14/2008   11/20/08   11/24/2008
   $132,000.00    11/26/2008   01/08/09     1/9/2009
                   11/3/2008
  $2,734,291.00   12/10/2008   01/07/09     1/7/2009
   $194,920.76    12/15/2008   01/07/09     1/8/2009
                   2/11/2009                                                  Canceled
  $1,180,000.00    12/9/2008   12/22/08     1/9/2009    7/27/2009    9/14/2009 Completed
  $6,000,000.00    1/26/2009   01/29/09     2/5/2009

 $40,974,566.71   12/18/2008   02/18/09    2/18/2009
  $1,740,415.00     1/6/2009   02/03/09     2/5/2009   12/22/2009     8/3/2010 Completed
   $730,000.00      1/7/2009
   $332,000.00    11/20/2008   01/07/09     2/5/2009
   $573,121.00    12/18/2008   01/13/09    1/14/2009   10/27/2009    1/26/2010 Completed
  $5,444,828.15     3/5/2009   04/15/09    7/31/2009
   $216,428.00    12/10/2008   12/26/08     1/5/2009    3/25/2009     4/5/2010 Completed
   $105,500.00    12/10/2008   12/26/08     1/5/2009     4/7/2009     4/5/2010 Completed
 $14,913,728.00     1/8/2009   03/06/09    3/10/2009
 $10,050,947.55     1/8/2009   05/05/09     5/8/2009
  $1,293,285.00   11/12/2008   12/16/08     2/3/2009     1/4/2010    4/27/2010 Completed
   $194,510.00    12/29/2008   02/03/09     2/6/2009
   $210,000.00    12/30/2008   01/22/09    1/23/2009     2/2/2009    9/24/2009 Completed

 $12,000,000.00    1/14/2009

  $2,673,681.04    4/14/2009   06/02/09    6/17/2009
   $302,060.00      1/8/2009   01/21/09    1/27/2009    6/10/2009     8/5/2009 Completed

   $475,033.15     2/11/2009   05/19/09    6/17/2009
                   6/17/2009                                                  Canceled

                   6/16/2009                                                  Canceled
                   1/15/2009                                                  Canceled
                   12/1/2008
   $408,819.96    12/30/2008   01/22/09    1/23/2009     8/7/2009     1/7/2010 Completed
   $182,000.00    12/19/2008   03/09/09    3/11/2009     7/7/2009    8/28/2009 Completed
   $596,062.00    12/19/2008   03/26/09    3/23/2009    11/6/2009     3/1/2010 Completed
                   1/7/2009
  $989,980.00     3/25/2009   06/02/09     6/5/2009
  $685,000.00    12/16/2008   01/22/09    1/26/2009
                  12/1/2008                                                  Canceled
$11,512,000.00     2/5/2009   07/01/09     7/9/2009

$10,524,951.24   12/30/2008   04/07/09    4/10/2009
  $835,110.00     10/9/2008   11/12/08   11/19/2008    5/12/2009     8/5/2009 Completed
  $199,952.00    12/18/2008   12/30/08     2/3/2009     5/1/2009    5/18/2009 Completed
  $168,687.03      1/8/2009   02/10/09    2/11/2009    11/5/2009    12/3/2009 Completed
  $919,544.00     1/27/2009   02/23/09    2/25/2009    9/23/2009    1/27/2010 Completed
  $669,765.12      8/1/2008   11/03/09    11/2/2009    6/18/2010    7/22/2010 Completed
 $1,864,294.30     1/1/2009   05/05/09     6/8/2009
 $1,050,505.00    10/6/2008   01/13/09    1/21/2009   12/18/2009   12/29/2009 Completed
$10,000,000.00    12/1/2008   07/13/09
  $430,294.30     12/1/2008   01/12/09    1/13/2009     8/4/2009    9/28/2009 Completed
  $130,625.00    12/22/2008   01/02/09     1/6/2009
 $4,168,138.00    2/12/2009   04/23/09    4/24/2009
  $169,600.00      2/3/2009   02/17/09    3/24/2009


 $4,884,795.00     7/6/2009   08/04/09    8/11/2009

  $886,288.00    12/30/2008   09/28/09    9/28/2009
 $5,613,000.00    1/29/2009   06/01/09     6/2/2009
  $264,430.00    12/16/2008   01/08/09     2/5/2009
                   1/1/2009                                                  Canceled
 $3,215,000.00     2/5/2009   02/12/09    2/13/2009
 $2,959,000.00     2/5/2009   02/12/09    2/13/2009
                  1/15/2009                                                  Canceled
                   6/1/2009
  $172,565.00     1/15/2009   02/10/09    2/11/2009    8/11/2009    8/19/2009 Completed

  $100,000.00      8/1/2009
  $100,000.00      9/1/2009
$14,739,086.00     7/1/2009   08/04/09    8/11/2009
 $2,424,000.00    1/16/2009   02/12/09    2/13/2009
 $3,768,848.00    1/29/2009   04/14/09    3/30/2009    4/15/2010     8/5/2010 Completed
                  3/19/2009                                                  Canceled
  $723,462.87     1/22/2009   02/03/09     2/3/2009     3/2/2009    5/25/2010 Completed
  $447,447.00     3/18/2009   04/04/09    4/20/2009    8/18/2009   10/21/2009 Completed
                   1/8/2009                                                  Caneled

                  6/15/2009
  $426,920.00     1/20/2008   02/09/09    3/24/2009
                  3/19/2009                                                  Canceled
 $5,600,000.00    5/14/2009
                     24/08                                                   Canceled

   $80,642.84     1/23/2009   02/03/09     2/6/2009
                  1/16/2009
 $2,019,784.50    2/19/2009   04/01/09     4/2/2009
 $3,599,000.00    1/23/2009   02/12/09    2/13/2009
   $3,100,000.00      2/2/2009
   $6,000,000.00      9/1/2008

     $130,000.00      1/1/2009                                                     Canceled

     $293,119.00     4/16/2009   10/08/09   10/12/2009    4/13/2010     5/3/2010 Completed
  $10,000,000.00     12/1/2008                                                     Canceled

   $1,073,836.86     2/19/2009   04/07/09     4/8/2009
$1,341,900,000.00    1/30/2009   03/03/09     6/1/2009
     $257,938.00     2/24/2009   03/18/09    3/19/2009    8/13/2009    12/4/2009 Completed
      $58,014.00     2/13/2009
     $944,524.00     3/26/2009   04/06/09    6/22/2009

     $996,987.50     2/19/2009   03/17/09    3/19/2009   10/27/2009   11/16/2009 Completed
     $780,500.00     3/16/2009   04/21/09    4/23/2009    12/6/2009   10/29/2009 Completed
      $96,000.00      2/5/2009   02/24/09    2/25/2009
  $21,228,451.00      7/9/2009   08/04/09    8/13/2009
                      2/3/2009                                                     Canceled
     $469,962.00     2/17/2009   02/27/09     3/4/2009

     $500,000.00     2/12/2009   03/05/08     3/9/2009    8/25/2009     2/2/2010 Completed
   $3,100,152.00     2/19/2009   03/17/09    3/19/2009    4/16/2010    7/12/2010 Completed
  $29,000,000.00     2/17/2009   04/21/09     5/7/2009
      $30,000.00     11/4/2010
     $237,535.00     1/27/2009   02/05/09    2/25/2009     5/5/2009    6/30/2009 Completed
     $188,184.00      2/5/2009   02/24/09     4/7/2009    5/15/2009     6/4/2009 Completed
     $795,700.00      2/5/2009   02/24/09     4/7/2009
     $234,850.00     2/10/2009   02/26/09    2/27/2009    4/29/2010    5/14/2010 Completed
     $494,000.00     2/24/2009   03/23/09     6/2/2009
     $433,525.60     2/25/2009   03/24/09     6/2/2009

   $8,720,628.00      3/5/2009   04/15/09    4/15/2009
     $215,000.00      2/1/2009   03/17/09    5/20/2009    6/30/2009    12/4/2009 Completed
     $760,000.00     3/11/2009   04/15/09    5/15/2009                             Canceled
     $177,837.00     2/12/2009   03/03/09

     $130,295.00     2/26/2009   04/07/09    4/10/2009    9/17/2009   10/23/2009 Completed
      $87,695.22     2/27/2009   03/23/09     4/7/2009     9/6/2009   10/19/2009 Completed
     $165,860.00     2/24/2009   03/17/09    3/31/2009

   $4,500,000.00      4/1/2009   07/21/09    7/22/2009    5/23/2010     6/8/2010 Completed
     $246,445.00    10/13/2008   11/13/08     4/6/2009
   $1,000,000.00     3/31/2009
  $11,124,572.00      4/7/2009   08/13/09    10/5/2009
  $11,200,000.00     4/28/2009
     $462,654.65     2/25/2009
     $723,999.00      3/5/2009   03/16/09    3/18/2009    7/23/2009    7/28/2009
   $3,864,954.56     3/12/2009   10/06/09   10/21/2009
   $1,788,000.00     2/25/2009   09/01/09     9/3/2009     1/6/2010    1/20/2010 Completed
  $20,500,000.00     4/14/2009   05/20/09    7/31/2009
      $50,213.20      3/3/2009                                                     Canceled
 $1,640,749.10    4/6/2009   04/13/09    4/14/2009   10/27/2009    11/3/2009 Completed
  $120,500.00    2/24/2009   03/17/09    3/26/2009
 $1,045,540.00   2/25/2009   04/01/09     4/5/2009

  $639,900.00    3/10/2009   03/26/09    3/27/2009

$16,590,000.00   5/13/2009   07/02/09     7/2/2009
$14,122,700.00    5/6/2009   08/27/09    8/28/2009
  $668,197.00    3/25/2009   04/02/09     4/3/2009
  $941,000.00    3/19/2009   04/23/09    4/24/2009    5/20/2010    6/21/2010 Completed
  $368,401.00     3/6/2009   04/02/09     4/3/2009

$17,894,000.00   4/22/2009   07/02/09     7/2/2009
$14,063,000.00   4/29/2009   07/02/09     7/2/2009
  $611,573.80    3/17/2009   04/14/09    5/12/2009
  $844,194.00     4/3/2009   04/02/09     3/3/2009

                  3/1/2009                                                  Canceled
  $844,207.32     7/9/2009   08/04/09     8/5/2009   12/15/2009   12/23/2009 Completed

  $274,715.15     3/5/2009   03/24/09     4/7/2009     5/5/2009    5/11/2009 Completed
$14,000,000.00    8/4/2009
  $357,553.00    4/22/2009   06/16/09     7/9/2009    4/10/2010    4/27/2010 Completed
 $6,182,370.00    6/4/2009   07/07/09    7/22/2009
 $1,877,124.34   4/23/2009   08/04/08     8/6/2009     7/2/2010    7/12/2010 Completed
$10,434,675.53    4/9/2009   10/06/09   10/12/2009
 $3,532,752.00   5/13/2009   06/16/09    6/22/2009
  $121,300.00     4/2/2009   06/02/09   11/16/2009    9/25/2009   11/16/2009 Completed
  $573,546.00     4/7/2009   04/29/09    4/30/2009
$90,421,173.00   4/16/2009   05/20/09    9/21/2009
  $275,980.00    4/21/2009   09/10/09    9/17/2009


  $597,737.00     4/9/2009   04/28/09    4/29/2009
  $406,850.00    5/21/2009   06/08/09    6/15/2009     9/7/2010     9/8/2010 Completed
$20,175,000.00   5/14/2009   05/21/09    5/22/2009
  $540,041.00    4/22/2009   09/14/09    9/17/2009    3/16/2010    6/29/2010 Completed
  $550,000.00    4/28/2009
  $248,429.00     5/7/2009   06/16/09     7/9/2009   10/27/2009     4/7/2010 Completed
 $1,000,000.00    4/6/2009   04/01/09    6/19/2009
  $700,000.00     8/1/2009
  $978,444.72     5/1/2009   06/04/09   10/26/2009
  $143,490.00     4/7/2009   09/10/09   11/13/2009

 $1,119,191.68    5/8/2009   06/02/09     6/5/2009    8/21/2009    9/25/2009 Completed
 $1,239,445.00    5/8/2009   06/02/09     6/4/2009
$32,340,803.00    5/6/2009   06/11/09    6/16/2009
  $706,485.00     4/3/2009   04/23/09    4/24/2009
   $61,379.00    3/30/2009                                                  Canceled
  $172,480.00     3/3/2009   03/23/09    4/24/2009
  $164,600.00     3/3/2009   04/23/09    4/24/2009
  $162,051.00     3/3/2009   04/23/09    4/24/2009    6/24/2009     7/9/2009 Completed
 $2,325,460.00   4/23/2009   07/07/09     7/3/2009     9/7/2010     9/8/2010 Completed
                 3/23/2009                                                  Canceled
                   7/31/2009
                    4/2/2009                                                  Canceled
                   4/22/2009                                                  Canceled
 $17,041,930.51    3/16/2009   03/03/09    6/17/2009
   $110,294.00     4/14/2009   05/06/09     5/6/2009    8/11/2009   10/26/2009 Completed
     $95,000.00     4/7/2009   04/08/09     5/6/2009    8/10/2009    8/17/2009 Completed
   $150,051.00     4/10/2009   06/02/09     6/5/2009    9/21/2009    9/25/2009 Completed
   $142,404.00     4/29/2009   05/15/09    5/21/2009

   $122,205.00     4/14/2009   05/20/09    7/31/2009    9/22/2009   12/15/2009 Completed
                   4/14/2009
                   5/18/2009
  $4,000,000.00     6/3/2009
   $248,380.00      5/4/2009   06/02/09     6/5/2009
   $182,840.00     4/17/2009   05/14/09    5/15/2009    6/30/2009     7/9/2009 Completed
  $3,650,000.00    4/14/2009   07/15/09    7/15/2009
     $65,320.00     4/7/2009   04/07/09     4/8/2009
                   4/15/2009                                                  Canceled
     $88,000.00    4/29/2009   05/27/09    5/27/2009
   $204,878.50      4/9/2009   04/28/09    4/29/2009   11/10/2009   11/23/2009 Completed
   $846,885.00     4/29/2009   08/18/09    8/27/2009
  $1,087,643.00    4/29/2009


     $56,376.23     4/1/2009   06/16/09    6/15/2009     2/1/2010    4/29/2010 Completed
   $113,000.00     5/13/2009   05/21/09    5/22/2009

   $778,742.64     4/30/2009   05/26/09    5/28/2009    3/23/2010    4/20/2010 Completed

  $2,547,865.00     6/3/2009   12/02/09   12/15/2009
 $42,300,000.00     5/7/2009   05/21/09    5/22/2009
 $13,174,507.00    5/14/2009   07/07/09    8/31/2009
  $2,741,000.00     7/8/2009   08/04/09    8/11/2009
                   6/15/2009                                                  Canceled
   $694,952.47     5/12/2009   06/09/09     6/9/2009
   $755,559.69      6/1/2009   06/02/09     6/2/2009    12/7/2009   12/22/2009 Completed
                   5/20/2009
   $136,556.30     5/18/2009   06/16/09    6/19/2008
     $70,000.00     5/7/2009                                                  Canceled
 $12,954,811.00     5/1/2009   10/06/09   10/12/2009
   $500,000.00      6/2/2009
   $174,338.00     6/16/2009   07/07/09   11/16/2009

   $575,000.00      6/3/2009   06/09/09    8/20/2009
  $2,064,915.69    2/13/2009   03/03/09    4/22/2009     9/4/2009    4/29/2010 Completed
   $383,100.00     5/28/2009   06/09/09    6/10/2009     2/2/2010     2/2/2010 Completed
     $78,600.00     5/1/2009   06/01/09                 2/17/2010    2/26/2010 Completed
$245,980,000.00   12/27/2007   05/06/09     5/7/2009

   $219,700.00      6/1/2009   07/21/09    8/27/2009
  $1,342,273.00    3/27/2009   05/01/09     5/4/2009

   $249,948.44     6/10/2009   09/02/09   12/15/2009
                    6/1/2009
                 5/27/2009                                                  Canceled


  $119,900.00    5/29/2009   06/26/09    6/26/2009    10/9/2009    12/1/2009 Completed
  $361,012.00    5/29/2009   06/30/09     7/9/2009   11/19/2009   12/14/2009 Completed
 $1,856,277.10    6/1/2009   08/05/09    8/25/2009
   $96,245.00    6/15/2009   09/04/09   11/17/2009

  $256,953.32    5/21/2009   06/25/09     7/6/2009    9/23/2009    9/28/2009 Completed
  $120,000.00     6/1/2009                                                  Canceled
 $1,400,000.00   5/21/2009   09/02/09   11/18/2009     2/5/2010    7/27/2010 Completed
                 5/26/2009
$10,982,831.50    9/3/2009   10/21/09   10/22/2009
                 3/24/2009                                                  Canceled
 $2,598,530.00    7/8/2009   07/23/09    7/29/2009
  $141,969.00    6/23/2009   07/01/09     7/2/2009
  $908,852.00    6/18/2009   06/25/09    6/26/2009
   $85,240.00     7/6/2009   08/18/09   12/10/2009
  $426,012.65     6/8/2009   06/18/09   12/10/2009
  $201,300.00     7/6/2009   08/18/09   12/10/2009
  $296,911.00     6/1/2009   06/10/09   11/16/2009

  $219,450.00    6/11/2009   07/07/09    7/10/2009    9/15/2009   10/12/2009 Completed

  $313,200.00     6/5/2009   06/25/09    6/26/2009
  $560,000.00     6/5/2009   06/25/09    6/26/2009
 $2,633,086.78   6/16/2009   08/04/09   12/11/2009
                 7/21/2009                                                  Canceled
  $699,500.00     7/9/2009   09/09/09    9/17/2009
                  6/1/2009                             9/8/2009     9/9/2009 Canceled
 $3,351,790.00   8/13/2009   08/25/09    8/25/2009
  $297,880.00    6/30/2009   07/24/09
                  6/1/2009
  $165,167.12    6/25/2009   07/23/09   11/13/2009
 $2,250,000.00   6/25/2009
 $4,983,756.00   6/24/2009   07/09/09    7/10/2009

 $1,135,263.35   7/17/2009   10/21/09   11/18/2009
  $397,270.00    6/25/2009   09/15/09    9/29/2009
                  8/3/2009
  $192,500.00    6/18/2009   06/25/09    9/17/2009     9/4/2009    11/9/2009 Completed

  $125,000.00     7/2/2009
   $25,463.81    6/22/2009


  $182,580.00     7/8/2009   07/24/09    7/29/2009    10/6/2009    10/6/2009 Completed
$10,914,123.00   8/20/2009   11/04/09   11/18/2009
                 8/20/2009
 $6,493,970.00   8/20/2009   10/21/09   11/18/2009
$23,000,000.00   7/22/2009   08/25/09    8/25/2009
  $139,400.00    7/15/2009   08/03/09    8/10/2009   10/31/2009     2/1/2010 Completed
                  7/1/2009
  $275,000.00     7/1/2009   08/24/09    8/24/2009   10/13/2009   10/23/2009 Completed
  $180,800.00     7/7/2009   08/19/09   12/15/2009
                9/17/2009
 $113,007.00     7/1/2009    08/19/09   10/26/2009
 $150,000.00     7/1/2009    08/17/09    8/17/2009
 $280,000.00     7/1/2009
 $103,815.00    7/10/2009    08/12/09    8/13/2009
                7/31/2009
  $70,000.00     7/1/2009    08/12/09    8/14/2009
 $749,400.00     9/8/2009    10/08/09   10/15/2009
$2,526,089.00   7/27/2009    07/28/09     8/3/2009    8/5/2010   8/20/2010 Completed
 $154,400.00    7/15/2009    07/23/09    7/29/2009
 $122,900.00    7/15/2009    07/23/09    7/29/2009
 $900,000.00     8/6/2009
 $521,575.00    8/12/2009   09/09/209     1/3/1900

 $119,700.00     6/4/2009    08/11/09   10/14/2009
 $143,150.00    7/22/2009    08/18/09    9/17/2009
                8/20/2009
 $490,857.00     8/4/2009    08/26/09     9/1/2009
$3,486,000.00   7/16/2009    09/16/09    10/2/2009
$1,000,000.00   7/10/2009    07/10/08    7/24/2009                        Canceled
 $827,118.00    7/24/2009    08/18/09    8/27/2009   4/13/2010    5/6/2010 Completed

                7/16/2009                                                 Canceled
 $213,073.80    7/30/2009    08/06/09    8/12/2009
 $350,000.00     8/6/2009
 $350,000.00    8/20/2009
 $350,000.00     8/6/2009
 $350,000.00     8/6/2009
 $136,000.00    8/20/2009    08/27/09    8/28/2009
 $136,000.00    8/20/2009    08/27/09    8/28/2009
 $136,000.00    8/20/2009    08/27/09    8/28/2009


                7/29/2009

$5,629,795.00    9/1/2009    05/04/10     5/7/2010
 $261,587.25     9/1/2009    10/06/09   10/12/2009   4/23/2010   4/22/2010 Completed

$1,581,282.00   8/18/2009    09/19/09   11/16/2009
 $138,762.30     8/1/2009    08/17/09    8/17/2009   11/6/2009   11/6/2009 Completed

$1,565,300.01   7/28/2009    11/04/09    11/4/2009
 $120,000.00     7/1/2009    08/31/09     9/1/2009
 $264,244.00     9/1/2009    10/20/09   10/22/2009   3/10/2010   3/17/2010 Completed

                 8/4/2009
 $332,993.32     8/1/2009    08/18/09    8/19/2009   3/23/2010    4/7/2010 Completed
                8/24/2009
 $329,500.00     8/1/2009    10/06/09   10/16/2009   6/16/2010   6/21/2010 Completed
 $432,000.00    7/31/2009    08/18/09    9/14/2009
                 8/1/2009
                 8/1/2009
                 8/1/2009
 $250,000.00    8/27/2009
       $390,000.00      8/6/2009    10/14/09   10/22/2009
     $11,870,000.00    9/15/2009    10/06/09   10/14/2009
                                                                                 Part of 2008-
        $74,000.00     7/27/2009                                                 482
     $12,000,000.00    9/16/2009
      $2,302,849.55    6/24/2009    07/21/09    7/22/2009
                                                                                 Part of NY-
       $120,000.00     2/13/2009    03/17/09    7/22/2009                        2009-420
       $177,773.00     8/12/2009    09/28/09    9/28/2009
       $691,425.00      9/1/2009    04/04/10     4/5/2010
                        9/1/2009
       $126,912.00      9/1/2009    11/03/09   11/12/2009    3/4/2010    3/8/2010 Completed
                        9/1/2009


                        9/1/2009
       $455,777.00      9/1/2009    09/09/09   12/11/2009
                        9/1/2009

       $900,000.00     8/25/2009

       $150,000.00      8/6/2009    08/20/09    8/28/2009
       $628,554.32      9/1/2009    09/23/09    9/30/2009
       $125,000.00     8/25/2009
                        6/9/2009
       $195,750.00      8/1/2009    08/28/09   11/17/2009
      $1,250,000.00    6/22/2009
       $550,000.00     9/10/2009
                                                                                 Part of NY-
        $12,500.00     9/18/2009    10/06/09   11/13/2009                        2009-403
       $485,706.00      9/1/2009
       $256,000.00      9/1/2009
                       9/22/2009
       $181,657.11     8/19/2009    08/19/09     9/9/2009   3/16/2010   3/17/2010 Completed
       $263,252.00     9/16/2009    09/24/09    9/28/2009
       $250,000.00     9/28/2009



                        9/1/2009
                        9/1/2009
                        9/1/2009
                        9/1/2009

       $231,210.00      9/1/2009    09/09/09    9/10/2009
      $1,537,976.00     6/2/2009    06/23/09    9/17/2009
       $320,000.00      9/1/2009
       $249,962.00      5/2/2009    07/20/09    9/24/2009

     $52,382,769.00   11/13/2008    05/27/09   10/14/2009

                                                                                 Per Keith to
      $1,431,584.00     9/1/2009    08/18/09    3/17/2010                        back date
        $45,000.00      4/2/2010
        $45,900.00      6/8/2010   6/29/2010     7/6/2010
$3,279,010,673.68
 $39,000,000.00     1/1/2010
$165,000,000.00     3/1/2010
 $23,000,000.00    12/8/2009
  $6,975,000.00     7/6/2010   09/07/10    9/13/2010
  $8,000,000.00     7/6/2010
 $19,000,000.00    11/3/2009
   $360,000.00    12/15/2009
  $2,498,620.00     1/6/2010   04/22/10    4/23/2010
  $2,579,710.00     1/6/2010   04/22/10    4/23/2010
  $4,721,000.00    1/20/2010
  $2,339,900.00    1/20/2010   05/13/10    5/14/2010
  $4,395,000.00    1/20/2010   05/13/10    5/14/2010
  $1,233,658.00     1/1/2010   01/28/10     2/9/2010
   $317,350.00    10/15/2009   12/22/09   12/24/2009

  $1,535,477.00   10/29/2009   01/05/10     1/6/2010
  $1,094,573.00    10/8/2009   11/03/09    12/4/2009
   $773,176.00     12/1/2009   12/01/09    12/2/2009    6/5/2010   6/17/2010 Completed
                  11/13/2009
   $806,188.89      9/1/2009                3/1/2010   2/26/2010    3/1/2010 Completed

  $7,351,023.85    9/29/2009   11/18/09   11/19/2009
  $1,200,000.00    9/22/2009
                   9/22/2009
 $19,754,695.87    5/26/2009   07/21/10    7/28/2010
  $9,232,232.00    11/3/2009   11/19/09   11/19/2009
  $5,600,000.00    5/14/2009
  $9,000,000.00   12/22/2009
   $225,000.00     10/6/2009
   $150,000.00     10/6/2009
  $1,030,000.00    12/3/2009
  $3,374,500.00    10/1/2009   12/02/09    12/2/2009
  $3,200,000.00    10/1/2009
   $288,989.00     10/7/2009   02/11/10    2/12/2010
   $372,374.00     10/5/2009   10/10/09    2/18/2010   4/20/2010   5/10/2010 Completed
   $600,000.00    10/28/2009
   $588,000.00     10/7/2009   11/18/09   11/18/2009
   $306,671.00    10/23/2009
  $3,142,300.00     2/3/2010   04/06/10    4/22/2010
  $2,957,595.00                04/22/10    4/23/2010
   $275,000.00      9/1/2009   11/30/09   12/23/2009
  $2,534,147.60   11/19/2009   01/05/10     1/8/2010
   $433,435.00     10/1/2009   01/19/10   12/29/2009
   $485,706.00     10/1/2009

                   10/1/2009
   $120,000.00     11/1/2009
    1360257.81     12/1/2009   01/20/10    1/20/2010
  $1,884,209.60   10/26/2009   12/16/09   12/16/2009
   $105,000.00     12/8/2009
$11,600,000.00     4/1/2010
$15,236,879.00    11/1/2009   05/04/10     5/3/2010
  $145,000.00    10/22/2009
   $91,700.00     10/1/2009
  $369,135.00     10/2/2009   11/19/09    12/1/2009   3/16/2010   7/13/2010 Completed
  $138,500.00    10/28/2009   12/07/09    12/8/2009    3/9/2010   6/18/2010 Completed
 $2,534,147.60    10/1/2009   01/05/10     1/8/2010

   $99,852.00     11/5/2009   12/01/09   12/11/2009


  $845,910.00     12/1/2009
 $4,346,777.50    12/1/2009
  $696,514.00     12/1/2009   01/12/10    1/12/2010
  $118,835.00    11/24/2009   01/06/10     1/7/2010
  $441,854.00    11/16/2009   12/10/09   12/11/2009

                  11/1/2009
  $250,000.00    11/24/2009
  $902,140.37    11/19/2009   04/06/10    4/12/2010
  $389,553.00    11/18/2009   04/06/10     4/9/2010
  $140,700.00     12/1/2009   02/16/10    2/19/2010
 $3,929,809.00    12/1/2009   02/16/10    2/19/2010
 $1,630,000.00    11/1/2009
$13,199,472.00    12/1/2009   02/16/10    2/19/2010
 $6,000,000.00     2/1/2010
 $2,547,865.00    2/15/2010   12/02/09    9/16/2010
  $850,000.00     12/1/2009
  $800,000.00     12/1/2009
$10,000,000.00     3/1/2010
   $49,940.00     12/1/2009   12/01/09    12/1/2009
  $184,900.00     12/9/2009   12/10/09   12/14/2009    5/8/2010   5/18/2010 Completed
  $446,118.43     12/1/2009   01/19/10    1/27/2010
 $1,144,170.00    12/2/2009   12/08/09     1/5/2010


  $194,600.00     12/1/2009
  $200,000.00     11/9/2009
  $364,000.00     1/12/2009   02/17/10    9/16/2010
 $5,147,742.00     1/1/2010   02/16/10    2/19/2010
  $212,455.00     12/1/2009   02/16/10    2/19/2010   8/20/2010   8/30/2010 Completed
  $163,793.00     12/1/2009   05/05/10     5/6/2010
                   1/1/2010

  $350,000.00     1/15/2009
 $1,786,000.00     2/4/2010   08/03/10    8/25/2010
  $100,000.00    11/25/2009
  $605,737.00     12/1/2009   03/18/10    3/19/2010
  $461,198.00      1/1/2010   04/20/10    4/22/2010
 $2,940,344.00     1/12010    05/18/10    5/24/2010
 $3,500,555.00    12/3/2009   03/16/10    3/19/2010
 $1,243,309.00   10/29/2009   01/05/10     1/6/2010    9/7/2010    9/8/2010 Completed
   $78,596.00     12/3/2009
  $158,801.00    10/22/2009
  $394,846.00    12/10/2009   01/06/10     1/8/2010
  $162,071.00     12/1/2009   02/04/10     2/9/2010
 $4,706,975.00   12/28/2009   01/12/10    1/20/2010
  $607,400.00     2/15/2010   09/07/10    9/13/2010
  $425,000.00     7/12/2010
  $970,322.00      2/3/2010   04/07/10    4/13/2010
 $1,664,400.00    1/13/2010
  $126,200.00     1/14/2010   02/17/10    2/19/2010   7/20/2010   8/19/2010 Completed

$10,300,000.00 Sole Source
  $300,000.00      1/6/2010
  $569,393.00      2/2/2010
  $277,230.00      2/1/2010   03/08/10 38/2010
  $223,181.91      1/1/2010   02/24/10    2/24/2010
  $450,000.00     1/18/2010


  $399,000.00      1/8/2010
  $375,000.00      2/5/2010   01/05/10    2/16/2010
  $987,000.00     12/1/2009   01/26/10    2/28/2010
 $1,453,920.00     1/7/2010   03/09/10     4/7/2010
  $218,252.00     8/25/2009   12/14/09    3/17/2010
  $194,445.00     8/25/2009   12/16/09   12/21/2009
  $917,259.00      1/1/2010   04/06/10     4/7/2010
 $1,161,087.00     4/2/2010   06/29/10     7/6/2010
  $150,000.00      3/2/2010
  $401,000.00     1/19/2010
  $704,100.00     1/14/2010
  $393,000.00      1/1/2010   02/24/10    2/26/2010
 $1,350,000.00    12/7/2009
 $4,993,571.00     1/1/2010   05/18/10    5/21/2010
  $168,843.08      2/5/2010   03/15/10    4/20/2010
 $2,346,235.52     1/1/2010   03/23/10    9/14/2010
                   2/1/2010
 $2,524,482.00     1/1/2010   05/04/10    8/16/2010
  $587,112.00     1/21/2010   01/28/10    1/29/2010

 $2,642,272.93     2/1/2010   04/06/10     4/9/2010

 $1,763,600.00     2/1/2010   04/06/10     4/9/2010

 $3,254,515.52     2/1/2010   04/07/10     4/9/2010

  $164,000.00      2/1/2010   02/24/10    3/19/2010
  $190,950.00     2/23/2010   06/08/10    7/20/2010

  $159,933.63 Sole Source
  $150,008.00      1/1/2010   02/23/10    2/25/2010

$43,370,000.00 Sole Source
  $155,984.00     1/28/2009   03/30/10    3/31/2010
$22,837,880.95    1/27/2010   04/21/10    4/21/2010


  $946,662.00      2/1/2010   02/05/10     2/9/2010
  $150,000.00     2/12/2010
 $7,000,000.00     8/4/2010
  $4,600,000.00    3/25/2010
   $397,500.00      2/4/2010   02/11/10   2/12/2010
  $2,900,000.00    2/24/2010   04/08/10   7/19/2010

     $66,791.00     2/1/2010
   $203,850.00      2/4/2010   04/01/10    4/1/2010
  $5,038,050.00     3/1/2010   05/05/10    5/6/2010
   $134,417.60     2/10/2010   02/18/10   3/12/2010

                    2/1/2010
  $7,630,870.00     3/5/2010   01/20/10   1/20/2010

  $2,196,382.00    2/11/2010   04/07/10    4/7/2010
  $3,038,268.00    2/17/2010   03/11/10   3/12/2010
   $300,000.00     3/16/2010

  $3,063,827.00     3/4/2010   03/25/10   3/26/2010
   $352,141.56     2/25/2010   04/13/10   4/14/2010
$140,241,000.00    9/10/2009   11/17/09   2/27/2010
   $873,354.35      3/1/2010   03/01/10    3/2/2010

                   2/16/2010

   $590,000.00      3/1/2010   04/06/10   4/21/2010
  $2,000,000.00     5/1/2010

   $492,470.00      3/1/2010   04/06/10   4/21/2010


  $1,191,583.26    2/22/2010   03/11/10    4/7/2010
  $4,300,000.00    3/24/2010
   $650,000.00     3/12/2010
  $5,032,000.00    3/10/2010   03/25/10   3/26/2010
   $248,003.00     3/18/2010   03/18/10   3/24/2010
   $110,000.00     3/11/2010
   $350,000.00     3/26/2010
   $208,250.00     2/25/2010   03/23/10   3/26/2010
  $5,868,000.00     4/1/2010   04/21/10   4/21/2010
   $135,000.00     3/16/2010
 $29,397,810.00     6/8/2010
  $1,000,000.00     3/3/2010
   $326,305.00      3/1/2010   03/18/10   3/22/2010    9/3/2010   9/10/2010 Completed
                   3/31/2010
   $444,701.00     3/17/2010   03/25/10   3/26/2010
                   2/18/2010
   $267,730.00     3/18/2010   04/13/10   4/14/2010   8/10/2010   8/26/2010 Completed
  $1,055,691.00    4/12/2010   04/01/10    4/1/2010
  $9,200,000.00   11/15/2010
   $711,672.00     3/30/2010   04/23/10   4/26/2010    6/7/2010    6/7/2010 Completed
  $3,576,821.60     3/1/2010   06/15/10   6/21/2010
   $159,785.01      3/1/2010   04/20/10   4/22/2010   7/28/2010    8/3/2010 Completed
  $1,020,954.83     3/1/2010
  $1,020,000.00     3/1/2010
  $9,000,000.00    4/30/2010   07/13/10   7/16/2010
   $176,542.00     3/23/2010   03/29/10   3/29/2010   6/28/2010    7/7/2010 Completed
$12,600,000.00   1/13/2010
  $410,000.00    3/18/2010   06/21/10   6/30/2010
 $5,587,800.00   5/10/2010   06/16/10   9/16/2010

 $1,200,000.00   5/26/2010
   $97,800.00    3/25/2010   04/20/10   4/22/2010   6/13/2010   7/13/2010 Completed
  $128,627.00    3/25/2010   04/20/10   4/22/2010
  $138,000.00    3/17/2010   03/25/10   3/26/2010
                                                                         FEDERALLY
  $229,000.00     3/1/2010   04/21/10   4/28/2010                        FUNDED

   $89,000.00     3/1/2010
                                                                         FEDERALLY
  $420,000.00     3/1/2010                                               FUNDED
  $954,530.00     2/1/2010   02/25/10    3/1/2010
 $1,300,000.00   4/31/2010

 $4,657,593.57    5/5/2010   04/21/10   4/27/2010
  $450,000.00     5/1/2010
  $161,392.00    3/17/2010   04/13/10   4/23/2010
  $325,385.00     4/1/2010   05/18/10   5/19/2010


                  6/2/2010
 $2,200,000.00   4/23/2010   05/13/10   5/14/2010
 $2,178,000.00   4/23/2010   05/13/10   5/14/2010
 $2,270,110.00   4/23/2010   05/13/10   5/14/2010
 $1,000,000.00    7/1/2010
 $4,289,625.10    6/2/2010   08/18/10   8/20/2010
  $449,353.00     6/2/2010   05/25/10   5/26/2010
  $215,000.00     6/2/2010
  $992,718.00     4/1/2010   05/27/10    6/2/2010
 $5,523,000.00    6/3/2010
 $7,132,000.00   5/19/2010   07/07/10    7/8/2010
  $164,900.00     5/4/2010   06/15/10    5/3/2010
  $178,300.00     5/4/2010   06/15/10    5/3/2010
  $136,335.00     5/4/2010   06/15/10    5/3/2010
  $100,000.00    2/11/2010   03/02/10   3/10/2010
 $2,470,286.00    5/1/2010
  $898,850.00     5/1/2010   06/15/10    5/3/2010
  $592,000.00     5/1/2010   06/15/10    5/3/2010
  $316,950.00     6/1/2010
 $2,342,938.00    6/1/2010   06/01/10    6/3/2010
  $537,446.00    5/14/2010   04/28/10    5/6/2010
 $2,848,474.19   5/19/2010   04/21/10   4/21/2010
  $230,000.00    3/23/2010   03/22/10    8/3/2010
                                                                         TIGER
                                                                         Grant Fed
$37,700,000.00   5/20/2010                                               Fund
  $155,000.00     4/5/2010
 $5,100,000.00   6/16/2010
  $254,947.00     3/4/2010
  $200,000.00    6/15/2010
  $400,000.00     4/1/2010
 $2,301,986.00    5/5/2010   05/13/10   5/14/2010

 $2,443,730.00    5/4/2010   05/13/10   5/14/2010
 $4,158,296.02   4/15/2010   06/15/10    6/2/2010
  $695,694.06     4/1/2010   06/15/10   6/21/2010
  $787,475.00     4/1/2010
  $244,440.00     5/3/2010   05/13/10   5/14/2010
  $150,000.00    5/18/2010
  $120,000.00    5/18/2010
  $141,800.00    4/26/2010   05/13/10   5/14/2010
  $255,451.00    4/22/2010   04/29/10    5/6/2010
  $384,410.00     4/1/2010   07/06/10    7/9/2010
  $213,866.75    4/28/2010   05/11/10   5/11/2010
  $162,382.00     4/2/2010   08/17/10   8/19/2010
 $1,288,689.82    4/1/2010   07/06/10   9/14/2010
$31,471,000.00   4/30/2010   07/07/10    7/8/2010
  $964,700.00    4/26/2010   06/02/10    6/3/2010

                                                    FTA Federal
  $643,000.00     5/5/2010                          Funds
$59,000,000.00   5/27/2010


  $280,000.00    4/29/2010   05/13/10   5/14/2010
 $1,281,014.00    5/1/2010   09/07/10   9/10/2010
  $319,412.00     5/6/2010   05/26/10   5/27/2010
  $483,853.24     5/1/2010
  $256,600.00    4/27/2010   06/24/10   6/25/2010
  $260,750.00    4/27/2010   06/24/10   6/25/2010
  $258,200.00    4/27/2010   06/24/10   6/25/2010
  $265,850.00    4/27/2010   06/24/10   6/25/2010
  $400,000.00    4/27/2010
  $270,000.00    5/19/2010
  $275,000.00     4/1/2010
  $550,000.00    5/13/2010
 $2,654,804.00    6/9/2010   06/24/10   6/25/2010
 $3,194,700.00    6/8/2010   06/24/10   6/25/2010
 $4,000,000.00   12/1/2010
 $2,571,239.60    5/1/2010   07/06/10    7/9/2010
                  5/1/2010   06/15/10   6/21/2010
  $939,880.00     5/6/2010   05/13/10   5/14/2010
 $2,116,331.00   5/21/2010   05/21/10   6/25/2010
  $441,176.00    5/12/2010
$15,000,000.00   7/31/2010

 $3,511,662.00    5/3/2010   05/21/10   6/25/2010

  $900,000.00     5/7/2010
 $2,350,000.00   12/1/2010
  $247,551.00    6/16/2010   06/24/10   6/25/2010
  $247,551.00    6/16/2010   06/24/10   6/25/2010
  $247,551.00    6/16/2010   06/24/10   6/25/2010
  $247,551.00    6/16/2010   06/24/10   6/25/2010
  $247,551.00    6/16/2010   06/24/10   6/25/2010
  $247,551.00     6/16/2010   06/24/10   6/25/2010
  $248,943.00     6/16/2010   07/08/10    7/9/2010
 $4,800,000.00     5/1/2010
 $2,849,000.00     6/1/2010   06/24/10   6/25/2010
 $2,560,000.00     6/1/2010   05/13/10   6/25/2010
 $2,826,300.00     6/1/2010   05/13/10   6/25/2010
  $910,000.00     6/10/2010
  $419,995.00     6/15/2010   06/24/10   6/25/2010
  $339,468.00     6/14/2010   06/24/10   6/25/2010
  $962,000.00     6/17/2010   06/24/10   6/25/2010
 $1,095,667.00    6/16/2010   06/24/10   6/25/2010

  $222,059.17      5/1/2010   07/06/10   7/13/2010
 $5,255,323.73     5/1/2010   07/06/10   9/14/2010
  $250,000.00     5/19/2010
 $2,350,000.00    7/13/2010   08/12/10   8/13/2010
 $2,189,700.00    7/13/2010   08/12/10   8/13/2010
 $2,327,000.00    7/13/2010   08/12/10   8/13/2010
  $442,777.00      6/8/2010   07/15/10   7/22/2010
   $80,000.00     5/25/2010
  $247,551.00      7/1/2010   06/24/10   6/25/2010
  $300,000.00      7/1/2010
  $300,000.00      7/1/2010
  $300,000.00      7/1/2010
  $247,551.00      7/1/2010   07/08/10    7/9/2010
  $300,000.00      7/1/2010
  $300,000.00      7/1/2010
  $130,000.00     5/25/2010   06/07/10    6/8/2010
 $1,200,000.00     3/9/2010
  $139,145.00      6/1/2010   06/15/10    6/2/2010
  $541,700.00     5/20/2010   07/06/10   9/14/2010
  $300,000.00     4/29/2010   05/11/10   7/16/2010
  $170,000.00      5/1/2010
 $3,500,000.00     7/8/2010


  $365,000.00     6/18/2010
  $440,000.00     5/10/2010
 $2,637,000.00    6/14/2010   06/24/10   9/14/2010
 $2,649,000.00    6/14/2010   06/24/10   6/24/2010
  $159,829.00     6/17/2010   06/24/10   6/25/2010
  $812,000.00      6/1/2010   08/17/10   8/23/2010
 $1,198,124.30     6/1/2010   07/21/10   7/28/2010
  $511,280.00     6/30/2010
$17,159,295.00     6/1/2010
  $216,000.00     5/26/2010   06/24/10   6/25/2010
 $1,118,000.00    6/16/2010
$11,880,991.40     7/1/2010   08/17/10   8/19/2010
  $141,565.00     6/10/2010   06/17/10   6/21/2010
 $1,156,354.57   11/17/2009   11/23/09   5/13/2010
  $108,646.00     6/15/2010   06/24/10   6/25/2010
  $260,570.00     6/15/2010   06/24/10   6/25/2010
  $100,000.00     5/24/2010
 $1,274,500.00    6/14/2010   07/21/10   7/22/2010
  $229,031.00      6/1/2010   08/18/10   8/23/2010
 $1,495,595.00     7/5/2010   08/18/10   8/20/2010
  $100,000.00      5/4/2010
  $196,436.00     5/24/2010   08/05/10    8/9/2010
 $9,478,000.00     5/1/2010
$24,975,369.50    7/15/2010   09/15/10   9/16/2010
  $300,000.00     6/28/2010
$10,000,000.00    6/30/2010
  $663,200.00     6/17/2010   06/24/10   6/25/2010
  $220,000.00      7/1/2010


  $737,000.00      7/1/2010
  $872,275.00     6/29/2010   08/10/10   8/19/2010
  $100,000.00      7/1/2010
  $212,809.00      7/1/2010   07/15/10   7/16/2010
  $694,800.00      7/1/2010   08/18/10   8/20/2010
  $250,000.00      6/1/2010   08/03/10    8/6/2010
  $620,000.00     6/29/2010
  $381,763.45      7/1/2010   08/10/10   8/11/2010
  $344,890.00      7/6/2010   07/21/10    8/2/2010
 $1,303,277.55     7/1/2010   08/03/10    8/9/2010
  $230,000.00      7/1/2010
  $432,000.00      7/1/2010
  $211,774.45      8/1/2010   08/17/10   9/14/2010
$20,000,000.00    6/25/2010
  $264,184.00     7/15/2010   07/28/10   7/28/2010
  $420,000.00      7/1/2010
 $4,889,440.75     7/1/2010   09/15/10   9/16/2010
  $137,196.17      7/1/2010   07/08/10   7/30/2010
  $348,406.00     6/10/2010   07/27/10   7/29/2010
  $350,000.00     7/15/2010

  $450,000.00     7/14/2010
  $150,000.00     6/14/2010
  $195,000.00     7/21/2010
  $350,000.00     7/28/2010
 $1,000,000.00     7/1/2010
  $128,336.00      7/1/2010   07/08/10   8/20/2010
  $869,320.00     8/11/2010
  $801,741.00      7/1/2010   08/17/10   8/18/2010
 $1,028,059.00     7/1/2010
  $100,000.00     7/16/2010
 $4,100,000.00   10/14/2010
  $240,000.00     7/12/2010
  $430,871.26      7/1/2010   08/17/10   8/19/2010
 $3,533,492.00    7/19/2010
  $429,283.00      6/4/2010   06/04/10   6/25/2010
  $212,764.00     8/19/2010   08/26/10   8/27/2010
  $450,000.00      7/1/2010
  $500,000.00      7/1/2010
  $230,000.00    8/19/2010
                 8/10/2010
   $22,000.00     7/1/2010
  $744,240.00     9/7/2010




  $755,000.00    8/19/2010   08/26/10   8/27/2010
  $450,000.00    8/19/2010   08/26/10   8/27/2010
                  8/1/2010
  $230,000.00     8/1/2010
 $1,239,000.00    8/9/2010
  $150,000.00    8/10/2010
  $215,000.00    8/12/2010
  $225,000.00    8/19/2010
 $2,100,000.00    8/1/2010
  $100,000.00     9/2/2010
  $257,000.00    8/17/2010
  $550,000.00     8/1/2010


  $300,000.00     9/2/2010
 $3,000,000.00    9/1/2010
  $250,000.00     8/1/2010
$28,000,000.00   9/22/2010
$11,500,000.00   7/12/2010
  $450,000.00    9/10/2010
$17,500,000.00    9/1/2010
  $350,000.00     9/2/2010
 $1,800,000.00   9/22/2010
  $110,000.00     9/9/2010
  $200,000.00    9/17/2010
  $125,000.00    9/10/2010
   $42,000.00     9/2/2010
  $300,000.00    9/20/2010
  $300,000.00    9/23/2010
  $102,100.00    9/16/2010
  $310,000.00     9/1/2010
  $410,000.00     9/1/2010
  $350,000.00     9/9/2010
  $865,000.00     9/1/2010
  $206,000.00     9/2/2010

  $175,000.00    9/23/2010
 $5,400,000.00    9/1/2010
  $195,000.00    9/22/2010
  $430,000.00     9/1/2010
  $320,000.00     9/1/2010
  $320,000.00     9/1/2010
$24,000,000.00    9/1/2010
  $250,000.00    9/28/2010
      $1,200,000.00     9/8/2010



     $10,900,000.00    9/10/2010
     $25,000,000.00    10/1/2010
$1,405,458,641.92


     $11,060,000.00   10/28/2010
     $20,000,000.00    10/1/2010
      $9,200,000.00   11/15/2010
      $2,000,000.00   10/15/2010
      $7,500,000.00    10/1/2010
      $1,000,000.00    10/1/2010
       $200,000.00    10/14/2010
       $850,000.00     12/8/2010
       $476,420.00     10/5/2010
      $3,750,000.00    10/8/2010
      $1,700,000.00   10/19/2010
       $155,500.00    10/19/2010
       $219,391.00    10/19/2010
       $260,000.00    10/19/2010
       $662,560.00    10/21/2010
       $806,000.00    10/21/2010
       $709,760.00    10/21/2010
       $750,368.00    10/21/2010
        $70,000.00     10/6/2010
        $83,572.00     10/6/2010
       $103,000.00     10/7/2010
       $100,000.00    10/17/2010
      $5,400,000.00   10/14/2010
       $500,000.00    11/11/2010
       $175,000.00    10/21/2010
       $185,000.00    10/21/2010
     $30,000,000.00   11/17/2010
       $225,000.00    10/14/2010
       $128,615.00     10/5/2010
      $5,036,000.00    10/5/2010
       $100,000.00    10/20/2010
       $100,000.00    10/20/2010
       $175,000.00     10/6/2010
     $10,200,000.00    10/1/2010
      $7,250,000.00   11/15/2010
       $300,000.00    10/21/2010

     $15,700,000.00   10/18/2010
       $465,780.00     10/1/2010
       $100,000.00     10/1/2010
 $137,696,966.00
ARRA
ARRA
003(115)




ARRA
ARRA




ARRA




ARRA
ARRA




ARRA
ARRA




ARRA-
003(140)
ARRA




ARRA 0003
(125)
ARRA
0003(129)
ARRA
0003(133)
ARRA
0003(125)




ARRA
ARRA
ARRA
ARRA
ARRA
2009 Total South Public Works Projects
2010 Total South Public Works Projects
2011 Total South Public Works Projects



CL-2009-9    CCSD   Ryan Mechanical

CL-2009-25   CCSD   U.S. Mechanical, LLC
CL-2009-34   UNLV   Western Single Ply
CL-2009-44   UNLV   Martin Harris Construction
CL-2009-47   UNLV   Lloyd's Refrigeration, Inc.
CL-2009-55   CCSD   Communication Electronic Systems
CL-2009-60   CCSD   Lloyd's Refrigeration, Inc.
CL-2009-61   CCSD   U.S. Mechanical, LLC
CL-2009-64   CSN    Core Construction Services of Nevada
CL-2009-66   CCSD   Martin Harris Construction
CL-2009-68   CCSD   Canceled Awarded under 100,000
CL-2009-69   CCSD   Pahor Mechanical Contractors, LLC

CL-2009-71   CCSD   Trade West Construction
CL-2009-78   CCSD   Canceled Awarded under 100,000

CL-2009-84   UNLV   Core Construction Services of Nevada
CL-2009-85   CCSD   Big Town Mechanical
CL-2009-86   CCSD   Tand, Inc
CL-2009-87   UNLV   Subruban Elevator of Nevada

CL-2009-88   CCSD   Communication Electronic Systems

CL-2009-90   CCSD   C.I. Contractors, Inc.
CL-2009-94   CCSD   Hardy Construction Inc

CL-2009-95   CCSD   Communication Electronic Systems

CL-2009-101 CSN     McCarthy Building Companies, Inc.

CL-2009-128 CCSD    Commercial Roofers Inc.

CL-2009-142 CCSD    Mountain Vista Development Inc

CL-2009-146 CSN     McCarthy Building Companies, Inc.

CL-2009-147 CCSD    Mikon Construction

CL-2009-149 CCSD    Pahor Mechanical Contractors, LLC

CL-2009-150 CCSD    U.S. Mechanical, LLC

CL-2009-157 CCSD    Ryan Mechcanical Inc

CL-2009-171 CCSD    U.S. Mechanical, LLC

       CL-
2009-174     CCSD   Awarded Under 100,000

CL-2009-191 NCSD    Williams Brother Inc
CL-2009-194 CCSD   The Tiberti Company

CL-2009-217 CCSD   U.S. Mechanical, LLC

CL-2009-218 CCSD   Core Construction Services of Nevada

CL-2009-219 CCSD   Roche Constructors, Inc.

CL-2009-220 CCSD   Red Rose Inc

CL-2009-221 CCSD   Commercial Roofers Inc.

CL-2009-222 CCSD   Ryan Mechanical Inc

CL-2009-223 CCSD   Core Construction Services of Nevada

CL-2009-224 CCSD   Rafael Construction, Inc

CL-2009-226 CCSD   Red Rose Inc

CL-2009-237 UNLV   Rafael Construction, Inc

CL-2009-242 CCSD   McCarthy Building Companies, Inc.

CL-2009-246 CSN    Various

CL-2009-247 CSN

CL-2009-253 CCSD   Las Vegas Paving Corporation

CL-2009-255 CCSD   Hellas Construction Inc

CL-2009-256 CCSD   Hellas Construction Inc

CL-2009-257 CCSD   Hellas Construction Inc

CL-2009-273 CCSD   Mikon Construction

CL-2009-282 CCSD   Las Vegas Pavig Corporation

CL-2009-298 UNLV   Craft Construction Co.

CL-2009-303 UNLV   Clark and Sullivan Constructors

CL-2009-319 CCSD   Tand, Inc

CL-2009-325 CCSD   Capriati Construction Corporation Inc

CL-2009-326 CCSD   Las Vegas Paving Corporation

CL-2009-336 CCSD   Ryan Mechanical, Inc.

CL-2009-340 CCSD   Hellas Construction, Inc.

CL-2009-361 CCSD   Tri-Signal Integration Inc

CL-2009-362 CCSD   Tri-Signal Integration Inc
CL-2009-370 CSN      Various

CL-2009-374 CCSD

CL-2009-375 CCSD

CL-2009-376 CCSD

CL-2009-377 CCSD

CL-2009-378 CCSD     Tri-Signal Integration Inc

CL-2009-379 CCSD     Tri-Signal Integration Inc

CL-2009-380 CCSD     Tri-Signal Integration Inc

CL-2009-400 CCSD     Trade Wset Construction

CL-2009-423 CCSD     Canceled Less then $100,000.00

CL-2009-425 CCSD     Tand, Inc.
Total
2009




Year 2010
CL-2010-8    CCSD    Big Town Mechanical, LLC

CL-2010-9    CCSD    Big Town Mechanical, LLC
CL-2010-10   CCSD

CL-2010-11   CCSD    Pahor Mechanical Contractors, Inc.

CL-2010-12   CCSD    Pahor Mechanical Contractors, Inc.
CL-2010-16   UNLVR   HCI Underground, LLC
CL-2010-18   CCSD    Canceled New PWP 2010-60
CL-2010-22   CCSD    Canceled New # CL-2009-423
CL-2010-23   COLV    Martin Harris Construction
CL-2010-32   CCSD    Commercial Roofers, Inc.

CL-2010-33   UNLV    Dean Roofing Company
CL-2010-35   CCSD    Ryan Mechanical, Inc.
CL-2010-38   CCSD    Big Town Mechanical, LLC
CL-2010-60   CCSD    Martin Harris Construction

CL-2010-112 UNLV     Clark and Sullivan Construction

CL-2010-113 UNLV     The Tiberti Company

CL-2010-126 CCSD     Mikon Construction Co., Inc.

CL-2010-132 CSN

CL-2010-141 CCSD     Las Vegas Paving Corp.
CL-2010-150 CCSD   Big Town Mechanical

CL-2010-152 CCSD   Peterson Dean Roofing & Sheet Metal

CL-2010-163 CCSD   Lloyd's Refrigeration, Inc.

CL-2010-174 CCSD   Wells Cargo, Inc.

CL-2010-179 UNLV   CG&B Enterprises, Inc.

CL-2010-192 CCSD   Las Vegas Paving Corp.

CL-2010-201 UNLV   Eberhard Southwest Roofing, Inc.

CL-2010-203 CCSD   Lloyd's Refrigeration, Inc.

CL-2010-204 CCSD   Big Town Mechanical, LLC

CL-2010-205 CCSD   Big Town Mechanical, LLC

CL-2010-210 UNLV   Pahor Mechanical Contractors, Inc.

CL-2010-224 UNLV   Avery Atlantic

CL-2010-226 UNLV   Construction

CL-2010-231 CCSD   Big Town Mechanical, LLC

CL-2010-232 CCSD   Interstate Plumbing and Air Conditioning

CL-2010-236 CCSD   Big Town Mechanical, LLC

CL-2010-239 CCSD   Las Vegas Paving Corp.

CL-2010-249 CCSD   Wells Cargo, Inc.

CL-2010-251 CSN    Core Construction/Mojave Electric

CL-2010-252 UNLV

CL-2010-253 CCSD   Helix Electric, Inc.

CL-2010-254 CCSD   Helix Electric, Inc.

CL-2010-255 CCSD   Helix Electric, Inc.

CL-2010-256 CCSD   Helix Electric, Inc.

CL-2010-257 CCSD

CL-2010-261 CCSD   Big Town Mechanical, LLC

CL-2010-262 CCSD   Big Town Mechanical, LLC

CL-2010-266 CCSD   Western States Contracting, Inc.

LI-2010-268 LCSD
CL-2010-273 CCSD   Bombard Electric, LLC

CL-2010-274 CCSD   Bombard Electric, LLC

CL-2010-275 CCSD   Bombard Electric, LLC

CL-2010-276 CCSD   Bombard Electric, LLC

CL-2010-277 CCSD   Bombard Electric, LLC

CL-2010-278 CCSD   Bombard Electric, LLC

CL-2010-279 CCSD   Bombard Electric, LLC

CL-2010-281 CCSD   U.S. Mechanical, LLC

CL-2010-282 CCSD   Big Town Mechanical, LLC

CL-2010-283 CCSD   Big Town Mechanical, LLC

CL-2010-284 CCSD

CL-2010-285 CCSD   Red Rose, Inc.

CL-2010-286 CCSD   The Original Roofing Company

CL-2010-287 CCSD   The Original Roofing Company

CL-2010-288 CCSD   Dean Roofing Company

CL-2010-292 CCSD   Lloyd's Refrigeration, Inc.

CL-2010-293 CCSD   Lloyd's Refrigeration, Inc.

CL-2010-294 CCSD   Lloyd's Refrigeration, Inc.

CL-2010-297 CCSD   Bombard Electric, LLC

CL-2010-298 CCSD

CL-2010-299 CCSD

CL-2010-300 CCSD

CL-2010-301 CCSD   Bombard Electric, LLC

CL-2010-302 CCSD

CL-2010-303 CCSD

CL-2010-313 CCSD   Big Town Mechanical, LLC

CL-2010-314 CCSD   U.S. Mechanical, LLC

CL-2010-315 CCSD   Hasco, Inc.

CL-2010-320 CCSD   Fast System
CL-2010-321 CCPA

CL-2010-325 CCSD     CG&B Enterprises, Inc.

CL-2010-326 CCSD     Mikon Construction Co., Inc.

CL-2010-331 UNLV

CL-2010-337 CCSD     Pahor Mechanical Contractors, LLC

CL-2010-354 CCSD

CL-2010-357 SPWB     Clark Construction Group

CL-2010-358 CCSD

CL-2010-368 UNLV
NY-2010-
373         NCSD     CG&B Enterprises, Inc.

CL-2010-374 CCSD     Hufcor Nevada

CL-2010-379 CCSD

CL-2010-381 CCSD     Canceled New PWP 2011-11

CL-2010-382 CCSD     Canceled New PWP 2011-12

CL-2010-383 CCSD     Canceled New PWP 2011-13

CL-2010-384 CCSD     Canceled New PWP 2011-14

CL-2010-385 CCSD     Communication Electronic Systems

CL-2010-386 CCSD     Communication Electronic Systems

CL-2010-392 CCSD
NY-2010-
400         NCSD
NY-2010-
401         NCSD
     Sep-10

CL-2010-425 UNLV

CL-2010-428 SPWB
Total
2010


Year 2011
CL-2011-9     CCSD
CL-2011-11    CCSD
CL-2011-12    CCSD
CL-2011-13    CCSD
CL-2011-14    CCSD
CL-2011-15   CCSD
CL-2011-16   CCSD
CL-2011-17   CCSD
CL-2011-18   CCSD
CL-2011-19   CCSD
CL-2011-20   CCSD
CL-2011-21   CCSD
CL-2011-22   CCSD
CL-2011-25   CCSD
CL-2011-26   CCSD
CL-2011-29   CCSD
CL-2011-30   CCSD
CL-2011-31   CCSD
CL-2011-32   CCSD
CL-2011-40   UNLV
Total
2011
 $                                                         157,445,463
 $                                                         166,181,486
 $                                                          11,921,186 note as of October 1, 2010



0011881 School Modernization Whitney ES                                          $3,519,600.00   10/16/2008   02/26/09

0011350 Cooling Tower Replacement Theron Swainston Middle School                  $419,000.00     10/10/0/8   11/21/08
5040-KC White Life Sciences Reroof                                                $327,850.00     10/1/2008   12/19/09
5042-KC Concrete Replacement at HFA, CHE, & BSL-West                              $157,240.00    10/21/2008   12/02/08
5041-KC FDH Building Retrofit Air Handlers                                        $115,400.00    10/15/2008   11/14/08
0012003 Fire Alarm Replacement @ Cimarron-Memorial High School                    $317,500.00     10/9/2008   11/20/08
0011347 Central Plant Modernization                                              $1,765,610.00   11/12/2008   04/12/09
0011340 Central Plant Modernization                                              $1,739,000.00   11/12/2008   04/12/09
CSN Health Sciences Building Addition West Charleston                            $4,000,000.00    10/5/2008   11/14/08
0011582 Site Work Facilities / Audit                                             $1,443,443.00   10/29/2008   11/06/08
0011955 Electrical Service for Portables                                          $180,000.00    10/29/2008
0011341 Central Plant Modernization Cheyenne High School                         $2,198,000.00    12/3/2008   01/08/09

0000558 Underground Fire Line and Nevada Power Upgrade @ Valley HS                $689,000.00    11/12/2008   12/11/08
0011612 Water Service                                                             $100,000.00    10/30/2008
456-PM Design Build of a New Pool to Replace Existing Pool at the
McDermott Physical Edu                                                           $4,319,454.00   10/14/2008   01/06/09
0000484 Plumbing Modernization Rowe ES                                            $869,700.00     2/12/2009   03/12/09
0011765 Fire Hydrant Installation Gragson Elementary School                       $376,000.00     6/17/2008   05/14/09
4477 Furnish and Install Elevator at Shadow Lane Medical Research                  $97,300.00    10/22/2008   01/14/09
0010993 Emergency Lighting/Intrusion Alarm Interface; Intercom, ALS PA
Upgrades                                                                          $355,000.00    11/19/2008   03/12/09
1548-04 Wallace Transportation - Bus Wash/Water Reclaim System
Corrections                                                                       $249,500.00    11/13/2008   11/21/08
0011998 Rehab Existing Building 4220 McLeod Drive                                 $538,470.00    11/14/2008   11/20/08

0002501 Intrusion Alarm PA ALS Exterior Lighting J D Smith Middle School          $132,000.00    11/26/2008   01/08/09

09107 Fire Station / college Instructional Center                                $6,000,000.00    1/26/2009   01/29/09

MPID 0000243 Roof Replacement CVT Gilbert Elementary School                       $685,000.00    12/16/2008   01/22/09

0011764 Renovation/Expansion at New Administration Site at Seigle 2              $4,168,138.00    2/12/2009   04/23/09

RFP-182 Fire/College Instruction Center                                          $5,613,000.00    1/29/2009   06/01/09

0011865 Asphalt Playground Replacement                                            $264,430.00    12/16/2008   01/08/09

0011845 School Modernization Kirk Adams Elementary School                        $3,215,000.00     2/5/2009   02/12/09

0011846 School Modernization James Gibson Elementary School                      $2,959,000.00     2/5/2009   02/12/09

0011844 HVAC and Plumbing Modernization                                          $2,424,000.00    1/16/2009   02/12/09

0010996 HVAC & Plumbing Modernization Helen Cannon Middle School                 $3,599,000.00    1/23/2009   02/12/09



0012022 Replace State Floor & Curtains                                            $130,000.00      1/1/2009
Football Field Lighting Audio System & Security System Pahrump Valley
High School                                                                       $237,535.00     1/27/2009   02/05/09
0011777 Security Gate System Chaparral High School                         $234,850.00    2/10/2009   02/26/09
0011850 Plumbing Kitchen Modernization and Door & Hardware Upgrade
Fay Galloway ES                                                            $639,900.00    3/10/2009   03/26/09

1558 Shirley and Bill Wallin Elementary School                           $16,590,000.00   5/13/2009   07/02/09

1554 Vincent L Triggs Elementary School                                  $14,122,700.00    5/6/2009   08/27/09

0000474 Roof Replacement Bertha Ronzone ES                                 $668,197.00    3/25/2009   04/02/09

0004452 Roof Replacement Marion Cahlan Elementary School                   $941,000.00    3/19/2009   04/23/09

0011968 Chiller Conversion Silvestri Middle School                         $368,401.00     3/6/2009   04/02/09

1560 Ruby Duncan Elementary School                                       $17,894,000.00   4/22/2009   07/02/09

1559 Evelyn Stuckey Elementary School                                    $14,063,000.00   4/29/2009   07/02/09

0000471 Roof Replacement CC Ronnow ES                                      $844,194.00     4/3/2009   04/02/09

5050-KC System Computing Services Electrical Renovations                   $573,546.00     4/7/2009   04/29/09
0000558 HVAC and Electrical Upgrade and Modernization Valley High
School                                                                   $20,175,000.00   5/14/2009   05/21/09

Gowan Road Improvement                                                    $1,000,000.00    4/6/2009   04/01/09

"A" Building HVAC Remodel West Side                                        $700,000.00     8/1/2009

0004628 Remove & Replace Tennis and Basketball Courts                      $706,485.00     4/3/2009   04/23/09
MPID#0004652 Remove and Replace Running Track Surface Valley High
School                                                                     $172,480.00     3/3/2009   03/23/09
MPID#0010596 Remove and Replace Running Track Surface Western High
School                                                                     $164,600.00     3/3/2009   04/23/09
MPID#0004640 Remove and Replace Running Track Surface Clark High
School                                                                     $162,051.00     3/3/2009   04/23/09

MPID#0000577 Remove and Replace Asphalt and Add ADA Ramp                   $182,840.00    4/17/2009   05/14/09
1499 Forebuss Elementary School Located Near Grand Canyon Dr and Fore
Avenue                                                                     $113,000.00    5/13/2009   05/21/09

20903340 Renovate Room In MPE Emerging Diseases Laboratory                $2,064,915.69   2/13/2009   03/03/09

90904873 Science and Engineering Building Tenant Improvements             $1,342,273.00   3/27/2009   05/01/09

0011116 Roof Replacement Adams Elementary School                           $908,852.00    6/18/2009   06/25/09

0005074 Playground and Retaining Wall Replacement William G Bennett ES     $313,200.00     6/5/2009   06/25/09

0004610 Tennis and Basketball Court Replacement and Erosion Control        $560,000.00     6/5/2009   06/25/09

PKGID 0011857 School Moderinization John F Mendoza Elementary School      $4,983,756.00   6/24/2009   07/09/09

0012071 Remove and Replace Running Track Surface                           $192,500.00    6/18/2009   06/25/09

0012058 Fire Alarm Upgrade Durango High School                             $154,400.00    7/15/2009   07/23/09

0012047 Fire Alarm Upgrade Becker Middle School                            $122,900.00    7/15/2009   07/23/09
09-0486 West Charleston Storm Drains/Flood Control                          $1,000,000.00    7/10/2009   07/10/08

0012084 Fire Alarm Upgrade Las Vegas High School                              $350,000.00     8/6/2009

0012076 Fire Alarm Upgrade Greenspun Middle School                            $350,000.00    8/20/2009

0012082 Fire Alarm Green Valley High School                                   $350,000.00     8/6/2009

0012081 Fire Alarm Upgrade Cheyenne High School                               $350,000.00     8/6/2009

0012083 Fire Alarm Upgrade Walter Johnson Middle School                       $136,000.00    8/20/2009   08/27/09

0012085 Fire Alarm Upgrade O'Callaghan Middle School                          $136,000.00    8/20/2009   08/27/09

0012080 Fire Alarm Upgrade Thurman White Middle School                        $136,000.00    8/20/2009   08/27/09

Gym Floor Installation for Temp Structure Sandy Valley HS                      $74,000.00    7/27/2009

Installation of Fire Hydrant at Portables                                     $137,000.00    9/22/2009

Northwest Career & Technical Academy Access Road                              $263,252.00    9/16/2009   09/24/09


                                                                        $157,445,462.69




0011861 HVAC School Modernization Charlotte Hill Elementary School          $2,498,620.00     1/6/2010   04/22/10

0011873 HVAC School Modernization Dorothy Eisenberg Elementary School       $2,579,710.00     1/6/2010   04/22/10
0011864 HVAC School Modernization Helen Herr Elementary School              $4,721,000.00    1/20/2010

011848 HVAC School Modernization Walter Jacobson Elementary School          $2,339,900.00    1/20/2010   05/13/10

0011847 HVAC School Modernization Helen Jydstrup Elementary School          $4,395,000.00    1/20/2010   05/13/10
Las Vegas Co-Op Learning Center - Landscaping #0811-P163                    $1,094,573.00    10/8/2009   11/03/09
Cosmetology Lab                                                               $600,000.00   11/13/2009
Installation of Fire Hydrant at Portables                                     $137,000.00    9/22/2009
Design/Build Water Pollution Control Facility                              $19,754,695.87    5/26/2009   07/21/10
Roof Replacement (Gymnasium & Cafeteria)                                      $288,989.00    10/7/2009   02/11/10

Campus Services Building & Classroom Building Complex Reroof Project          $372,374.00    10/5/2009   10/10/09
HVAC & Day Lighting at Gymnasium                                              $588,000.00    10/7/2009   11/18/09
HVAC School Modernization @ Elaine Wynn ES                                  $2,957,595.00                04/22/10
Cosmetology Lab Expansion                                                     $441,854.00   11/16/2009   12/10/09

Imaging Suite Shielding                                                       $218,252.00    8/25/2009   12/14/09

MPE StructureLab/Room 508                                                     $194,445.00    8/25/2009   12/16/09

Replace Tennis Basketball Courts and Correct Drainage                         $587,112.00    1/21/2010   01/28/10

Electronic Door Access                                                        $159,933.63 Sole Source

Site Security                                                                 $397,500.00     2/4/2010   02/11/10
HVAC School Modernization @ Perkins ES                             $3,038,268.00   2/17/2010   03/11/10

Roof Replacement @ Valley High School                              $3,063,827.00    3/4/2010   03/25/10

Kenny C. Guin Middle School                                        $5,032,000.00   3/10/2010   03/25/10

Bus and Staff Parking and Quonset Hut Demolition                    $444,701.00    3/17/2010   03/25/10

Design Build of the UNLV Athletics Synthetic Turf                   $711,672.00    3/30/2010   04/23/10

Replace Asphalt on Playground                                       $138,000.00    3/17/2010   03/25/10

Bigelow Physics Building Re-Roofing Project                         $325,385.00     4/1/2010   05/18/10

HVAC School Modernization/Selma F Bartlett ES                      $2,200,000.00   4/23/2010   05/13/10

HVAC School Modernization/Patricia F Bendorf ES                    $2,178,000.00   4/23/2010   05/13/10

HVAC School Modernization/Lilly and Wing Fong ES                   $2,270,110.00   4/23/2010   05/13/10

CBC Chiller Re-Piping                                               $992,718.00     4/1/2010   05/27/10

Cooperative Extension Center Expansion                              $230,000.00    3/23/2010   03/22/10

SCS Cooling Tower Project                                           $155,000.00     4/5/2010

HVAC Modernization Jim Thorpe ES                                   $2,301,986.00    5/5/2010   05/13/10

HVAC Modernization Harriet Treem ES                                $2,443,730.00    5/4/2010   05/13/10

HVAC School Modernization Woolley ES                                $244,440.00     5/3/2010   05/13/10

Replace Ashpalt of Playground Walter Long ES                        $141,800.00    4/26/2010   05/13/10

Construction of Additional Parking, Fire Access and Fire Hydrant    $280,000.00    4/29/2010   05/13/10

50 KW Photovoltaic Solar Power System                               $319,412.00     5/6/2010   05/26/10

Honeywell Energy System Upgrade                                     $483,853.24     5/1/2010

Roof Top Photovoltaic System @ Bailey Elementary School             $256,600.00    4/27/2010   06/24/10

Roof Top Photovoltaic System @ Dickens Elementary School            $260,750.00    4/27/2010   06/24/10

Roof Top Photovoltaic System @ Glyens Elementary School             $258,200.00    4/27/2010   06/24/10

Roof Top Photovoltaic System @ Roundy Elementary School             $265,850.00    4/27/2010   06/24/10

Roof Top Photovoltaic System @ Smalley Elementary School            $400,000.00    4/27/2010

Nate Mack Elementary School HVAC Modernization                     $2,654,804.00    6/9/2010   06/24/10

Andrew Mitchell Elementary School HVAC Modernization               $3,194,700.00    6/8/2010   06/24/10

Asphalt Replacement                                                 $939,880.00     5/6/2010   05/13/10

Pahranagat Valley Middle School                                     $441,176.00    5/12/2010
Roof Top Photovotaic System @ Eileen Conners Elementary School         $247,551.00    6/16/2010   06/24/10

Roof Top Photovotaic System @ Robert L. Forbuss Elementary School      $247,551.00    6/16/2010   06/24/10
Roof Top Photovotaic System @ Judy and John L. Goolsby Elementary
School                                                                 $247,551.00    6/16/2010   06/24/10

Roof Top Photovotaic System @ John R. Hummel Elemenatry School         $247,551.00    6/16/2010   06/24/10
Roof Top Photovotaic System @ William and Mary Scherkenbach
Elementary School                                                      $247,551.00    6/16/2010   06/24/10

Roof Top Photovotaic System @ Sandra Lee Thompson Elementary School    $247,551.00    6/16/2010   06/24/10

Northwest Career & Technical Academy                                   $248,943.00    6/16/2010   07/08/10

HVAC School Modernization @ Dailey ES                                 $2,849,000.00    6/1/2010   06/24/10

HVAC School Modernization @ Kahre ES                                  $2,560,000.00    6/1/2010   05/13/10

HVAC School Modernization @ Edythe Katz ES                            $2,826,300.00    6/1/2010   05/13/10

Roof Replacement                                                       $910,000.00    6/10/2010

Roof Replacement @ Long ES                                             $419,995.00    6/15/2010   06/24/10

Roof Replacement @ Mendoza ES                                          $339,468.00    6/14/2010   06/24/10

Roof Replacement Sawyer MS                                             $962,000.00    6/17/2010   06/24/10

Roof Replacement @ Squires ES                                         $1,095,667.00   6/16/2010   06/24/10

HVAC School Modernization @ Mary & Zel Lowman ES                      $2,350,000.00   7/13/2010   08/12/10

HVAC School Modernization @ Ernest May ES                             $2,189,700.00   7/13/2010   08/12/10

HVAC School Modernization @ Ulis Newton ES                            $2,327,000.00   7/13/2010   08/12/10

Roof Top Photovotaic System @ Kathy L. Batterman ES                    $247,551.00     7/1/2010   06/24/10

Kay Carl ES                                                            $300,000.00     7/1/2010

Don E. Hayden ES                                                       $300,000.00     7/1/2010

Dr. Claude G. Perkins ES                                               $300,000.00     7/1/2010

Aldeane Comito Ries ES                                                 $247,551.00     7/1/2010   07/08/10

Eva G. Simmons ES                                                      $300,000.00     7/1/2010

Wendell P. Williams ES                                                 $300,000.00     7/1/2010

HVAC School Modernization @ Lunt ES                                   $2,637,000.00   6/14/2010   06/24/10

HVAC School Modernization @ Lynch ES                                  $2,649,000.00   6/14/2010   06/24/10

Gymnasium Bleacher Replacement @ Chaparral High                        $159,829.00    6/17/2010   06/24/10

Instructional Wall Upgrade @ James Gibson ES                           $216,000.00    5/26/2010   06/24/10
VGT Airfield Improvements                                          $1,118,000.00    6/16/2010

Expand Parking Area @ Zel Lowman ES                                  $108,646.00    6/15/2010   06/24/10

Expand Parking and Install CMU Wall @ Lynch ES                       $260,570.00    6/15/2010   06/24/10

Cooling Tower Replacement William S. Boyd School of Law              $100,000.00     5/4/2010

HVAC School Moderniaztion @ Mack Lyon ES                             $663,200.00    6/17/2010   06/24/10

Theater Seating @ Valley High School                                 $420,000.00     7/1/2010

UNLV Greenspun Building, Computer Room 1275 AC Units                 $348,406.00    6/10/2010   07/27/10

Football Field Lighting Upgrade @ Basic High School                  $350,000.00    7/15/2010

NW Substation Project                                                $100,000.00    7/16/2010

Football Field Turf Replacement @ Pahrump Valley High School         $429,283.00     6/4/2010   06/04/10

Gymnasium Bleacher Replacement @ Clark HS                            $212,764.00    8/19/2010   08/26/10

Metal Lockers @ Southeast Career and Technical Academy                $22,000.00     7/1/2010

Roof Replacement @ Halle Hewetson ES                                 $155,500.00

Roof Replacement @ John Park ES                                      $170,000.00

Roof Replacement @ Frank Garside MS                                  $219,391.00

Roof Replacement @ Lomie Heard ES                                    $260,000.00

LAN and Instructional Media Upgrade @ Bonanza HS                     $755,000.00    8/19/2010   08/26/10

LAN and Instructional Media Upgrade @ Adams ES                       $450,000.00    8/19/2010   08/26/10

LAN and Instrusion Alarm Systems Upgrade                             $225,000.00    8/19/2010

Pahrump Valley High School Addition and Remodel                   $28,000,000.00    9/22/2010

Manse Elementary School (New Construction)                        $11,500,000.00    7/12/2010



Central Substation Replacement                                     $1,200,000.00     9/8/2010

CSN Lab Revision & Main Bldg. Fire Alarm                          $10,900,000.00    9/10/2010


                                                               $166,181,485.74



Theater Conversion/New Elevator @ Chaparral HS                       $476,420.00    10/5/2010
Roof Replacement @ Halle Hewetson ES                               $1,700,000.00   10/19/2010
Roof Replacement @ John Park ES                                      $155,500.00   10/19/2010
Roof Replacement @ Frank Garside MS                                  $219,391.00   10/19/2010
Roof Replacement @ Lomie Heard ES                                    $260,000.00   10/19/2010
Roof Replacement @ Doriders ES                            $662,560.00   10/21/2010
Roof Replacement @ Harris ES                              $806,000.00   10/21/2010
Roof Replacement @ Tate ES                                $709,760.00   10/21/2010
Roof Replacement @ Tomiyasu ES                            $750,368.00   10/21/2010
LAN Upgrade @ Marc Kahre ES                                $70,000.00    10/6/2010
LAN Upgrade @ Jack Dailey ES                               $83,572.00    10/6/2010
LAN Upgrade @ Nate Mack ES                                $103,000.00    10/7/2010
LAN Upgrade @ Ann Lynch ES                                $100,000.00   10/17/2010
LAN Upgrade @ Edythe & Lloyd Kats ES                      $175,000.00   10/21/2010
LAN Upgrade @ Gwendolyn Woolley ES                        $185,000.00   10/21/2010
Intrusion Alarm Upgrade                                   $128,615.00    10/5/2010
School Modernization @ Grant Bowler ES                  $5,036,000.00    10/5/2010
Clock/Intercom System Replacement @ John Dooley ES        $100,000.00   10/20/2010
Clcok/Intercom System Replacment @ Clyde Cox ES           $100,000.00   10/20/2010
UNLV Potable Water System Improvements                    $100,000.00    10/1/2010


                                                     $11,921,186.00
 2/27/2009

 12/9/2008
 3/30/2009    5/7/2009   8/27/2009 Completed
 12/2/2008
12/30/2008   1/15/2009   6/15/2009 Completed
 12/9/2008
 12/9/2008
 12/9/2008
  2/5/2009
11/24/2008
                                  Canceled
12/12/2008

12/12/2008
                                  Canceled

 3/31/2009
 3/13/2009
 5/15/2009
 1/21/2009

 3/13/2009

11/21/2008
11/24/2008

  1/9/2009

  2/5/2009

 1/26/2009

 4/24/2009

  6/2/2009

  2/5/2009

 2/13/2009

 2/13/2009

 2/13/2009

 2/13/2009



                                  Canceled

 2/25/2009    5/5/2009   6/30/2009 Completed
2/27/2009   4/29/2010   5/14/2010 Completed

3/27/2009

 7/2/2009

8/28/2009

 4/3/2009

4/24/2009   5/20/2010   6/21/2010 Completed

 4/3/2009

 7/2/2009

 7/2/2009

 3/3/2009

4/30/2009

5/22/2009

6/19/2009




4/24/2009

4/24/2009

4/24/2009

4/24/2009   6/24/2009    7/9/2009 Completed

5/15/2009   6/30/2009    7/9/2009 Completed

5/22/2009

4/22/2009    9/4/2009   4/29/2010 Completed

 5/4/2009

6/26/2009

6/26/2009

6/26/2009

7/10/2009

9/17/2009    9/4/2009   11/9/2009 Completed

7/29/2009

7/29/2009
 7/24/2009                        Canceled




 8/28/2009

 8/28/2009

 8/28/2009
                                  Part of 2008-
                                  482




 9/28/2009




 4/23/2010

 4/23/2010



 5/14/2010

 5/14/2010
 12/4/2009



 7/28/2010
 2/12/2010

 2/18/2010   4/20/2010   5/10/2010 Completed
11/18/2009
 4/23/2010
12/11/2009

 3/17/2010

12/21/2009

 1/29/2010




 2/12/2010
3/12/2010

3/26/2010

3/26/2010

3/26/2010

4/26/2010   6/7/2010   6/7/2010 Completed

3/26/2010

5/19/2010

5/14/2010

5/14/2010

5/14/2010

 6/2/2010

 8/3/2010




5/14/2010

5/14/2010

5/14/2010

5/14/2010

5/14/2010

5/27/2010




6/25/2010

6/25/2010

6/25/2010

6/25/2010




6/25/2010

6/25/2010

5/14/2010
6/25/2010

6/25/2010

6/25/2010

6/25/2010

6/25/2010

6/25/2010

 7/9/2010

6/25/2010

6/25/2010

6/25/2010




6/25/2010

6/25/2010

6/25/2010

6/25/2010

8/13/2010

8/13/2010

8/13/2010

6/25/2010




 7/9/2010




9/14/2010

6/24/2010

6/25/2010

6/25/2010
6/25/2010

6/25/2010




6/25/2010




7/29/2010




6/25/2010

8/27/2010




8/27/2010

8/27/2010
2009 Total North Public Works Projects        $                   427,373,377
2010 Total North Public Works Projects        $                   560,677,442
2011 Total North Public Works Projects        $                    30,880,506




Year 2009
DO-2009-1     GARDNERVILLE TOWN BOARD         CANCELED 08/25/09
LY-2009-2     CITY OF FERNLEY                 MARV MCQUEARY EXCAVATING
WA-2009-3     WASHOE CO PUBIC WORKS           CAMPBELL CONSTRUCTION INC
WA-2009-4     CITY OF RENO                    CANCELED 09/26/09
WA-2009-5     WASHOE CO PUBIC WORKS           CANCELED 04/29/09

WA-2009-6     STATE PUBLIC WORKS BOARD        CLARK & SULLIVAN CONSTRUCTORS

WA-2009-7     WA CO RTC                       WEST COAST CONTRACTORS OF NV
WA-2009-8     CITY OF RENO                    GRANITE CONSTRUCTION CO
                                              SIERRA NEVADA CONSTRUCTION
WA-2009-9     CITY OF RENO                    INC
WA-2009-10    CITY OF RENO                    ATLAS CONTRACTORS INC
WA-2009-11    TMWA                            RENO-TAHOE CONSTRUCTION
WA-2009-12    WCDWR                           UNDER 100,000
WA-2009-13    WCDWR                           CANCELED 04/22/09
WA-2009-14    WASHOE CO SCHOOL DIST           RHP MECHANICAL SYSTEMS
DO-2009-15    DOUGLAS CO BORD OF COMMSNRS     PETERSEN CONSTRUCTION
WA-2009-16    RENO- TAHOE AIRPORT AUTHORITY   ALPINE ENERGY
WA-2009-17    RENO -TAHOE AIRPORT AUTHORITY   ALPINE ENERGY
WA-2009-18    RENO- TAHOE AIRPORT AUTHORITY   ALPINE ENERGY

WA-2009-19    NSHE/UNR                        TRI-SIGNAL INTEGRATION

EL-2009-20    ELKO COUNTY                     ADVANTAGE POOL PLASTERING
WP-2009-21    SO NV WATER AUTHORITY           WDC EXPLORATION & WELLS
WA-2009-22    CITY OF RENO                    PECK BROTHERS CONSTRUCTION

WA-2009-23    CITY OF RENO                    UNDER 100,000/RENO CONCRETE
HU-2009-24    STATE PUBLIC WORKS BOARD        RESOURCE DEVELOPMENT CO

EL-2009-25    CITY OF WEST WENDOVER

CH-2009-26    CHURCHILL CO COMMISSIONERS      BOMBARD RENEWABLE ENERGY
WA-2009-27    NSHE/UNR                        Q & D CONSTRUCTION INC
LY-2009-28    CITY OF FERNLEY                 A & K EARTH MOVERS
LY-2009-29    CITY OF FERNLEY                 PEAVINE CONSTRUCTION
CC-2009-30    NSHE/WNC                        RHP MECHANICAL SYSTEMS



WP-2009-31    SO NV WATER AUTHORITY           DELAYED SEE WP-2010-7

CC-2009-32    CARSON CITY COUNTY              AM-ALARM INC

WA-2009-33    WASHOE CO PUBIC WORKS           CANCELED 08/25/09
WP-2009-34    CITY OF ELY                     OFLAHERTY PLUMBING & HEATING
WA-2009-35    WASHOE COPUBLIC WORKS           WES CONSTRUCTION
ST-2009-36    CANYON GID                     CAMPBELL CONSTRUCTION INC
WA-2009-37    WASHOE CO RTC                  WEST COAST PAVING
WA-2009-38    WASHOE CO RTC                  INTERMOUNTAIN SLURRY SEAL
                                             A & K EARTHMOVERS/UNDER
CC-2009-39    CARSON CITY RTC                100,000
CC-2009-40    CC BOARD OF SUPERVISORS        KG WALTERS CONSTRUCTION CO
WA-2009-41    CITY OF SPARKS                 PETERSEN CONSTRUCTION
CC-2009-42    CC RTC                         HERBACK GENERAL ENGINEERING
HU-2009-43    HUMBOLDT CO COMMISSIONERS      H E HUNEWILL CO LTD
EL-2009-44    ELKO PARK FOUNDATION           SCHELL CREEK CONSTRUCTION
WA-2009-45    CITY OF SPARKS                 Q & D CONSTRUCTION INC
EL-2009-46    ELKO CO SCHOOL DISTRICT        MICHAEL CLAY CORP
WA-2009-47    CITY OF SPARKS                 ISBELL CONSTRUCTION INC
CC-2009-48    CC RTC                         A & K EARTHMOVERS
EL-2009-49    ELKO PARK FOUNDATION           CANYON CONST/UNDER 100,000
                                             HUMBOLDT DRILLING & PUMP CO
PE-2009-50    LOVELOCK MEADOWS WTR DIST      INC
                                             UNDER 100,000/SHELL CREEK
WP-2009-51    STATE PUBLIC WORKS BOARD       CONSTR
WA-2009-52    TMWA                           WWW CONSTRUCTION
LY-2009-53    NEVADA STATE PARKS             KFC BUILDING CONCEPTS
                                             UNDER 100,000/IMPACT
CH-2009-54    NEVADA STATE PARKS             CONSTRUCTION

LY-2009-55    DEPT CONSERVATION & NAT RES    ACTION CONST UNDER 100,000
EL-2009-56    STATE PUBLIC WORKS BOARD       KFC BUILDING CONCEPTS

LY-2009-57    STAGECOACH GID                 UNDER 100,000MARV MCQUEARY
WA-2009-58    WASHOE CO PUBIC WORKS
DO-2009-59    KINGSBURY GID                  ASPEN DEVELOPERS CORP
                                             SIERRA NEVADA CONSTRUCTION
EU-2009-60    EUREKA COUNTY                  INC
WA-2009-61    RENO SPARKS CONVENTION CNTR    CANCELED 04/01/09
WA-2009-62    NEVADA STATE PARKS             KFC BUILDING CONCEPTS
                                             SIERRA NEVADA CONSTRUCTION
LY-2009-63    CITY OF FERNLEY                INC

WA-2009-64    STATE PUBLIC WORKS BOARD       DVERSFIED CNCRTE CTTNG/ 94,168
EL-2009-65    ELKO COUNTY                    PEAVINE CONSTRUCTION
                                             SIERRA NEVADA CONSTRUCTION
WA-2009-66    WASHOE CO RTC                  INC
CC-2009-67    CC BOARD OF SUPERVISORS        LYN MARIE TRUCKING INC
EL-2009-68    ELKO PARK FOUNDATION           UNDER 100,000
EL-2009-69    ELKO PARK FOUNDATION           UNDER 100,000
WA-2009-70    CITY OF RENO                   PETERSEN CONSTRUCTION
WA-2009-71    WASHOE CO PUBIC WORKS          SIERRA WINDOW FASHIONS



WA-2009-72    RENO-TAHOE AIRPORT AUTHORITY

WA-2009-73    WASHOE CO SCHOOL DIST          WEST COAST CONTRACTORS OF NV
WA-2009-74    CITY OF RENO                   MOUNTAIN WEST CONTRACTORS
                                             SIERRA NEVADA CONSTRUCTION
WA-2009-75    NSHE/UNR                       INC
EL-2009--76   CITY OF ELKO                   MACH 4 CONSTRUCTION
WA-2009-77    WASHOE CO PUBIC WORKS          J SLASH B ENTERPRISES INC
WA-2009-78    RENO-TAHOE AIRPORT AUTHORITY   WWW CONSTRUCTION INC
WA-2009-79    WASHOE CO RTC                  ATLAS CONTRACTORS INC
WA-2009-80    STATE PUBLIC WORKS BOARD       F EVANS CONSTRUCTION INC
WA-2009-81    CITYOF RENO                    CANCELED 10/22/09
                                             TRUCKEE MEADOWS
WA-2009-82    WASHOE CO PUBIC WORKS          CONSTRUCTION
                                             SIERRA NEVADA CONSTRUCTION
WA-2009-83R   WA CO RTC                      INC
WA-2009-84    WA CO RTC                      ATLAS CONTRACTORS INC
WA-2009-85    CITY OF SPARKS                 RENO-TAHOE CONSTRUCTION

DO-2009-86    TAHOE REGIONAL PLANNING AGENCY CENTRAL SIERRA CONSTRUCTION
                                             EAST SLOPE CNS & WM TREMAINE
DO-2009-87    TAHOE REGIONAL PLANNING AGENCY CONS



DO-2009-88    STATE PUBLIC WORKS BOARD       F EVANS CONSTRUCTION INC
WA-2009-89    WASHOE CO SCHOOL DIST          SONITROL OF SOUTHERN NEVADA
WA-2009-90    WASHOE CO SCHOOL DIST          MT ROSE HEATING & AIR
WA-2009-91    WASHOE CO SCHOOL DIST          K7 CONSTRUCTION INC
                                             RENO-TAHOE CONSTRUCTION
WA-2009-92    TMWA                           /ARRA
EL-2009-93    GREAT BASIN COLLEGE            Q & D CONSTRUCTION INC
LY-2009-94    CITY OF FERNLEY                CANYON CREEK CONSTRUCTION

WA-2009-95    TMWA                           MARV MCQUEARY EXCAVATING INC
WA-2009-96    CITY OF RENO                   NORTHERN NEVADA EXCAVATING
WA-2009-97    INCLINE VILLAGE GID-PUBLIC WORKS MKD CONSTRUCTION
DO-2009-98    INCLINE VILLAGE GID-PUBLIC WORKS MKD CONSTRUCTION
                                               SIERRA NEVADA CONSTRUCTION
WA-2009-99    WASHOE CO SCHOOL DIST            INC
WA-2009-100   WASHOE CO SCHOOL DIST          POWERCOMM SOLUTIONS INC
                                             CANCELED 03/11/09 COMBINED W 9 -
WA-2009-101   WASHOE CO SCHOOL DIST          100
                                             CANCELED 03/11/09/COMBND W 9-
WA-2009-102   WASHOE CO SCHOOL DIST          100
DO-2009-103   DOUGLAS CO SCHOOL DIST         ISBELL CONSTRUCTION INC
WA-2009-104   CITY OF RENO                   CANCELED 09/30/09
WA-2009-105   RENO-TAHOE AIRPORT AUTHORITY   ADVANCE INSTALLATIONS INC
PE-2009-106   NEVADA STATE PARKS             IMPACT CONSTRUCTION
WA-2009-107   WASHOE CO SCHOOL DIST          BT MANCINI/UNDER 100,000

WA-2009-108   WASHOE CO SCHOOL DIST          CANCELED 03/010/09UNDER 100,000
WA-2009-109   NSHE/UNR                       PINECREST CONSTRUCTION
WA-2009-110   WASHOE CO RTC                  ATLAS CONTRACTORS INC
DO-2009-111   DO CO BOARD OF COMMISSIONERS
EL-2009-112   CITY OF ELKO                   QUANTUM ELECTRIC LLC
DO-2009-113   TOWN OF MINDEN                 WES CONSTRUCTION
EU-2009-114   EUREKA CO PUBLIC WORKS         HE HUNEWILL CONSTRUCTION
EL-2009-115   ELKO CO SCHOOL DISTRICT        CANCELED 3/11/09
WA-2009-116   CITY OF SPARKS                 ATLAS CONTRACTORS INC
WA-2009-117   CITY OF SPARKS                 MOUNTAIN WEST EXCAVATION
WA-2009-118   WASHOE CO SCHOOL DIST          CANCELED 03/11/09/UNDER 100,000
WA-2009-119   WASHOE CO SCHOOL DIST          NELSON ELECTRIC CO
WA-2009-120   CITY OF RENO                   DELAYED SEE 2010-24
MI-2009-121   HAWTHORNE UTILITIES            DELAYED
CC-2009-122   CC BOARD OF SUPERVISORS        DELAYED
                                             UNDER 100,000/DAN O
WA-2009-123   NEVADA STATE PARKS             CONSTRUCTION
LY-2009-124   CITY OF FERNLEY                UNDER 100,000/SIERRA NV CONST
CH-2009-125   CITY OF FALLON                 A & K EARTHMOVERS
WA-2009-126   CITY OF RENO                   CANCELD 08/26/09
EL-2009-127   ELKO COUNTY                    OLSON FENCING INC
WA-2009-128   PANDA RSTRNT GRP/UNR           HBH CONSTRUCTION INC
WA-2009-129   TMWA                           CRUZ CONSTRUCTION
DO-2009-130   E FORK FIRE & PARMEDIC DIST    BISON CONSTRUCTION
DO-2009-131   DOUGLAS COUNTY                 APCO CONSTRUCTION INC
                                             HUMBOLDT DRILLING & PUMP CO
EL-2009-132   CITY OF ELKO                   INC
EL-2009-133   ELKO CO SCHOOL DISTRICT        Q & D CONSTRUCTION INC
LY-2009-134   DPT CNSRVTN & NTURL RSRCS      HORIZON CONSTR/UNDER 100,000
                                             TRUCKEE MEADOWS
WA-2009-135   NSHE/UNR                       CONSTRUCTION
DO-2009-136   GARDNERVILLE TOWN BOARD        QUALCON CONTRACTORS INC
WA-2009-137   WASHOE CO RTC
                                             SIERRA NEVADA CONSTRUCTION
WA-2009-138   WASHOE CO RTC                  INC
                                             SIERRA NEVADA CONSTRUCTION
WA-2009-139   WASHOE CO RTC                  INC



WA-2009-140   INCLINE VILLAGE GID            MARV MCQUEARY/UNDER 100,000
WA-2009-141   TMWA                           STATE PAINTING CO INC
LY-2009-142   CITY OF FERNLEY                NORTHERN NEVADA EXCAVATING



WA-2009-143   TMWA                           RENO-TAHOE CONSTRUCTION
CH-2009-144   CITY OF FALLON                 DELAYED SEE CH-2010-28
CH-2009-145   CITY OF FALLON                 DELAYED SEE CH-2009-145
PE-2009-146   LOVELOCK MEADOWS WTR DIST      KNIFE RIVER
EL-2009-147   ELKO CO SCHOOL DISTRICT        Q & D CONSTRUCTION INC
EL-2009-148   ELKO CO SCHOOL DISTRICT        Q & D CONSTRUCTION INC

WA-2009-149   TMWA                           OLYMPUS & ASSO/UNDER 100,000
DO-2009-150   TOWN OF MINDEN                 MARV MCQUEARY EXCAVATING
HU-2009-151   HUMBOLDT CO COMMISSIONERS      BIG G CONSTRUCTION
                                             RHP MECHANICAL SYS/UNDER
LY-2009-152   CITY OF FERNLEY                100,000
WA-2009-153   WASHOE CO SCHOOL DIST          NELSON ELECTRIC CO
WA-2009-154   NSHE/UNR                       F EVANS CONSTRUCTION INC
                                             SIERRA NEVADA CONSTRUCTION
LY-2009-155   LYON CO BRD OF COMMISSIONERS   INC
WA-2009-156   CITY OF SPARKS                 CANCELED 03/02/09
LY-2009-157   CITY OF FERNLEY
WA-2009-158   WASHOE CO RTC                  GRANITE CONSTRUCTION CO
EL-2009-159   CITY OF ELKO                   PEAVINE CONSTRUCTION
WA-2009-160   WASHOE CO SCHOOL DIST          PERMIAN BUILDERS LLC
WA-2009-161   WASHOE CO SCHOOL DIST          BURDICK EXCAVATING CO INC
EL-2009-162   CITY OF ELKO                   RESOURCE DEVELOPMENT CO
WP-2009-163   NV DIV OF STATE PARKS            HCI UNDERGROUND
EL-2009-164   NV DIV OF STATE PARKS            DELAYED SEE 2010-19
WA-2009-165   NSHE/UNR                         PENTA BUILDING GROUP
CC-2009-166   STATE PUBLIC WORKS BOARD         CANCELED 03/25/09
EL-2009-167   CITY OF WELLS                    NAVCO CONSTRUCTION
WA-2009-168   CITYOF RENO                      INTERMOUNTAIN SLURRY SEAL
WA-2009-169   NSHE/UNR                         TNT CONSTRUCTION
WA-2009-170   RENO-TAHOE AIRPORT AUTHORITY     G E CHEN CONSTRUCTION
WA-2009-171   RENO-TAHOE AIRPORT AUTHORITY     G E CHEN CONSTRUCTION
EU-2009-172   EUREKA CO PUBLIC WORKS           MKD CONSTRUCTION
CC-2009-173   STATE PUBLIC WORKS BOARD         SCHOLTEN ROOFING SERVICE CO
WA-2009-174   NSHE/UNR                         NSHE/UNR
WP-2009-175   CITY OF ELY                      DIRTWORKS
WA-2009-176   WASHOE CO RTC                    Q & D CONSTRUCTION INC
WA-2009-177   WASHOE CO SCHOOL DIST            CANCELED 6/3/09
WA-2009-178   WASHOE CO SCHOOL DIST            RENO-TAHOE CONSTRUCTION
WA-2009-179   WASHOE CO SCHOOL DIST            CANCELED 06/03/09
WA-2009-180   WASHOE CO SCHOOL DIST            GRADEX CONSTRUCTION
WA-2009-181   WASHOE CO SCHOOL DIST            HASCO INC
WA-2009-182   WASHOE CO SCHOOL DIST



WA-2009-183   WASHOE CO SCHOOL DIST            03/04/09 UNDER 100,000



WA-2009-184   WASHOE CO SCHOOL DIST            03/04/09 UNDER 100,000



WA-2009-185   WASHOE CO SCHOOL DIST            03/04/09 UNDER 100,000
              METROPOLIS WATER IRRIGATION
EL-2009-186   DIST                             CANCELED 8/25/09
                                               KODIAK ROOFING &
WA-2009-187   WASHOE CO SCHOOL DIST            WATERPROOFING
                                               KODIAK ROOFING &
WA-2009-188   WASHOE CO SCHOOL DIST            WATERPROOFING
WA-2009-189   WASHOE CO SCHOOL DIST            D & D ROOFING
WA-2009-190   WASHOE CO SCHOOL DIST            WESTERN SINGLE PLY
LY-2009-191   CITY OF FERNLEY                  CANCELED 08/25/09
WA-2009-192   CITY OF RENO                     SIERRA EROSION CONTROL INC
WA-2009-193   WASHOE CO SCHOOL DIST            SONITROL OF SOUTHERN NEVADA
WA-2009-194   WASHOE CO SCHOOL DIST            GRANITE CONSTRUCTION CO
WA-2009-195   WASHOE CO SCHOOL DIST            CANCELED 06/04/09
WA-2009-196   CITY OF SPARKS                   RHP MECHANICAL SYSTEMS
                                               GERHARDT & BERRY
WA-2009-197   TMWA                             CONSTRUCTION
CC-2009-198   NV CMM FOR THE RCNSTRCTN V & T   Q & D CONSTRUCTION INC
                                               CANYON CONSTRUCTIONuUNDR
EL-2009-199   CITY OF ELKO                     100,000
                                               DIVERSIFIED CONCRETE CUTTING
WA-2009-200   RENO-TAHOE AIRPORT AUTHORITY     INC
CC-2009-201   STATE PUBLIC WORKS BOARD         BOMBARD ELECTRIC/ UNDR 100,000
WA-2009-202   WASHOE CO PUBIC WORKS            ISBELL CONSTRUCTION INC
EL-2009-203   CITY OF W WENDOVER               STAKER & PARSONS CO
CC-2009-204   CC RTC                           A & K EARTH MOVERS INC
WA-2009-205   WASHOE CO PUBIC WORKS
WA-2009-206   WASHOE CO SCHOOL DIST           D & D ROOFING
                                              GERHARDT & BERRY CONSTRUCTIN
WA-2009-207   INCLINE VILLAGE GID             INC

WA-2009-208   WASHOE CO SCHOOL DIST           CANCELED 05/27/09/UNDER 100,000
WA-2009-209   WASHOE CO SCHOOL DIST           D & D ROOFING
DO-2009-210   DOUGLAS CO BORD OF COMMSNRS     AQUA DRILLING & PUMP SRV
EL-2009-211   CITY OF W WENDOVER              RUBY DOME INC
DO-2009-212   KINGSBURY GID                   QUALCON CONTRACTORS INC
CC-2009-213   CARSON CITY AIRPORT AUTHORITY   GRANITE CONSTRUCTION CO
EL-2009-214   CITY OF ELKO                    CAMINO CONSTRUCTORS
WA-2009-215   RENO-TAHOE AIRPORT AUTHORITY    GRANITE CONSTRUCTION CO
                                              SIERRA NEVADA CONSTRUCTION
DO-2009-216   DOUGLAS CO BORD OF COMMSNRS     INC
WA-2009-217   STATE OF NEVADA PURCHASING      SAIC
WA-2009-218   RENO-TAHOE AIRPORT AUTHORITY    MULTIPLE PRIMES
WA-2009-218                                   WESTERN SINGLE PLY
WA-2009-218                                   D & D ROOFING
DO-2009-219   GARDNERVILLE RANCHOS GID        WILSON CONSTRUCTION INC
WA-2009-220   WASHOE CO RTC                   GRANITE CONSTRUCTION CO

WA-2009-221   CITY OF SPARKS                  CANCELED SEE WA-2009-315
DO-2009-222   KINGSBURY GID                   F & B INC/UNDER 100,000
HU-2009-223   CITY OF WINNEMUCCA              HE HUNEWILL CONSTRUCTION
HU-2009-224   CITY OF WINNEMUCCA              HE HUNEWILL CONSTRUCTION
HY-2009-225   CITY OF WINNEMUCCA              INTERMOUNTAIN SLURRY SEAL
WA-2009-226   TMWA                            Q & D CONSTRUCTION INC
EL-2009-227   ELKO CO SCHOOL DISTRICT         CONTINENTAL FLOORING CO
WA-2009-228   WASHOE COUNTY RTC
WA-2009-229   STATE PUBLIC WORKS BOARD        BUILDING SOLUTIONS
WA-2009-230   REG TRANSPORT COMM WASHOE CO
WE-2009-231   CITY OF RENO                    CAMPBELL CONSTRUCTION INC
                                              SIERRA NEVADA CONSTRUCTION
EU-2009-232   EUREKA CO BOARD & COMMISSIONS   INC
WA-2009-233   REG TRANSPORT COMM WASHOE CO ATLAS CONTRACTORS INC
WA-2009-234   REG TRANSPORT COMM WASHOE CO GRAINTE CONSTRUCTION CO
EL-2009-235   CITY OF CARLIN                  MACH 4 CONSTRUCTION
WA-2009-236   CITY OF RENO                    DELAYED SEE WA-2010-20
EU-2009-237   EUREKA CO BOARD & CMMSNRS       MKD CONSTRUCTION
EL-2009-238   ELKO CO PUBLIC WORKS
EL-2009-239   CITY OF ELKO                    MACH 4 CONSTRUCTION
DO-2009-240   DOUGLAS CO BORD OF COMMSNRS     CANCLED 11/17/09
WA-2009-241   CITY OF RENO                    RENO TAHOE CONSTRUCTION
WA-2009-242   TMWA                            ATLAS CONTRACTORS INC
WA-2009-243   WASHOE CO PUBIC WORKS
LY-2009-244   LYON CO SCHOOL DIST             WNW CONSTRUCTION

CC-2009-245   STATE PUBLIC WORKS BOARD        SIMPLEX GRINNELL/UNDER 100,000
LY-2009-246   LY CO SCHOOL DIST               GRANIE CONSTRUCTION
DO-2009-247   DOUGLAS CO BORD OF COMMSNRS     J SLASH B ENTERPRISES INC
EU-2009-248   EUREKA CO BRD OF CO COMISHRS    BUILDING SOLUTIONS
CC-2009-249   CC BOARD OF SUPERVISORS         D & D ROOFING
WA-2009-250   NSHE/UNR                        RHP MECHANICAL
LY-2009-251   LYON CO SCHOOL DIST             K7 CONSTRUCTION INC
LY-2009-252   LYON CO SCHOOL DIST             RAFAEL CONSTRUCTION INC
WA-2009-253   WASHOE CO RTC                   ATLAS CONTRACTORS INC
EL-2009-254   CITY OF ELKO                    PEAVINE CONSTRUCTION
WA-2009-255   CITY OF SPARKS                  MKD CONSTRUCTION
LY-2009-256   LYON CO SCHOOL DIST             ATLAS CONTRACTORS INC
WA-2009-257   RENO-SPARKS CONVENTION CNTR     D & D ROOFING & SHEET METAL
DO-2009-258   ZEPHYR HEIGHTS GID              KUSTOM KOATINGS INC
WA-2009-259   CITY OF SPARKS                  TITAN ELECTRICAL CONTRACTING
CC-2009-260   CC BOARD OF SUPERVISORS         PECORILLA HYDROSEEDING
                                              OLCESE
WA-2009-261   CITY OF SPARKS                  CONSTRUCTION/UNDER100,000

WA-2009-262   NSHE/UNR                        CLARK & SULLIVAN CONSTRUCTION
WA-2009-263   WASHOE CO RTC
EL-2009-264   ELKO CO SCHOOL DISTRICT         CANCELED 5/27/09
LY-2009-265   CITY OF FERNLEY                 PEAVINE CONSTRUCTION
WA-2009-266   CITY OF SPARKS                  MKD CONSTRUCTION
WA-2009-267   WASHOE CO SCHOOL DIST           GRADEX CONSTRUCTION
CC-2009-268   CARSON CITY SCHOOL DIST         MULTIPLE PRIMES
CC-2009-268                                   DAVIS COMPANY CONTRACTORS
C-2009-268                                    COMSTOCK DRYWALL
CC-2009-268                                   INTERMOUNTAIN ELECTRIC INC
CC-2009-268                                   NEWT CONCRETE CONSTRUCTION
CC-2009-268                                   SUNRIDGE PAINTING
CC-2009-268                                   ALCAL ARCADE CONTRACTING
CC-2009-268                                   VALLEY DOOR WORKS
CC-2009-269   CARSON CITY AIRPORT AUTHORITY
MI-2009-270   MINERAL COUNTY                  BOART LONGYEAR
WA-2009-271   CITY OF SPARKS                  Q & D CONSTRUCTION INC
WA-2009-272   CITY OF SPARKS                  BISON CONSTRUCTION
CC-2009-273   CARSON CITY COUNTY              ATLAS CONTRACTORS INC
WA-2009-274   NEVADA ARMY NATIONAL GUARD      GRANITE CONSTRUCTION CO
WP-2009-275   STATE PUBLIC WORKS BOARD        SCHELL CREEK CONSTRUCTION
WA-2009-276   CITY OF SPARKS                  ISBELL CONSTRUCTION INC

PE-2009-277   STATE PUBLIC WORKS BOARD        NELSON ELECTRIC CO INC
                                              REYMAN BROTHERS
WA-2009-278   WASHOE CO PUBIC WORKS           CONSTRUCTION
EU-2009-279   EUREKA COUNTY PUBLIC WORKS      PEAVINE CONSTRUCTION INC
WA-2009-280   REGIONAL TRANSPORTATION         GRANITE CONSTRUCTION CO
EL-2009-281   NV DEPT OF WILDLIFE             WASHBURN FENCING INC
LA-2009-282   LANDER CO BOARD OF COMMISSION   HUNEWILL CONSTRUCTION
WA-2009-283   WASHOE CO SCHOOL DIST           K7 CONSTRUCTION INC
DO-2009-284   DOUGLAS CO BORD OF COMMSNRS     SPIESS CONSTRUCTION CO INC

CC-2009-285   CC BOARD OF SUPERVISORS         DON GARCIA EXCAVATING & PAVING

CC-2009-286   CC BOARD OF SUPERVISORS         DON GARCIA EXCAVATING & PAVING
EL-2009-287   CITY OF CARLIN                  SCHELL CREEK CONSTRUCTION INC
EL-2009-288   ELKO CO SCHOOL DISTRICT         RUBY DOME INC
WA-2009-289   WASHOE CO RTC                   Q & D CONSTRUCTION INC
WA-2009-290   WASHOE CO RTC                   GRANITE CONSTRUCTION CO
WA-2009-291   GERLACH GID                     DELAYED SEE WA-2010-58
WA-2009-292   WASHOE CO RTC                   ATLAS CONTRACTORS INC
WP-2009-293   SOUTHERN NV WATR AUTHORITY      DUPLICATE SEE WP 2009-21
WA-2009-294   WASHOE CO SCHOOL DIST           SUNDT CONSTRUCTION
LY-2009-295   CITY OF FERNLEY                 Q & D CONSTRUCTION INC
WA-2009-296   WASHOE CO PUBIC WORKS           UNDER 100,000
WA-2009-297   WASHOE CO PUBIC WORKS           UNDER 100,000
CC-2009-298   CC BOARD OF SUPERVISORS         A & K EARTH MOVERS INC
HU-2009-299   CITY OF WINNEMUCCA              HUMBOLDT LAWN & LANDSCAPE
CC-2009-300   CARSON CITY                     MILES CONSTRUCTION
                                              KING CONSTRUCTION/UNDER
LY-2009-301   LYON CO SCHOOL DIST             100,000
EU-2009-302   EUREKA BOARD OF CO COMMIS       BUILDING SOLUTIONS
LY-2009-303   LYON CO SCHOOL DIST             HORIZON CONST/UNDER 100,000
WA-2009-304   WASHOE CO RTC                   DELAYED SEE WA-2010-41
EL-2009-305   ELKO COUNTY                     CHEAL CUSTOM FENCE CO
                                              SIERRA NEVADA CONSTRUCTION
LY-2009-306   CITY OF FERNLEY                 INC
                                              GARDNER ENGINEERING/UNDER
WA-2009-307   NSHE/UNR                        100,000
CH-2009-308   CHURCHILL CO COMMISSIONERS      GLACIER
                                              SIERRA NEVADA CONSTRUCTION
WA-2009-309   WASHOE CO RTC                   INC
DO-2009-310   DEPT CONSERVATION & NAT RES     BURDICK EXCAVATING CO INC
WA-2009-311   INCLINE VILLAGE GID             BURDICK EXCAVATING CO INC
WA-2009-312   CITY OF SPARKS                  PERMANENT PATCH PROGRAM
EL-2009-313   ELKO CO SCHOOL DISTRICT         CANYON CONSTRUCTION CO
PE-2009-314   PERSHING CO BRD OF COMMISNERS   UNDER 100,000/Z7 DEVELOPMENT
WA-2009-315   CITY OF SPARKS                  RENO-TAHOE CONSTRUCTION
EL-2009-316   CITY OF ELKO                    Q & D CONSTRUCTION INC
WA-2009-317   WASHOE CO RTC                   ATLAS CONTRACTORS INC
WA-2009-318   WASHOE CO RTC                   GRANITE CONSTRUCTION CO
WA-2009-319   NSHE/UNR                        RHP MECHANICAL
DO-2009-320   DOUGLAS CO SCHOOL DIST          DESIGN-BUILD SOLUTIONS
CH-2009-321   CHURCHILL CO COMMISSIONERS      A & K EARTHMOVERS
WA-2009-322   WASHOE CO RTC                   DELAYED SEE WA-2010-42
WA-2009-323   CITY OF RENO                    WWW CONSTRUCTION INC
PE-2009-324   CITY OF LOVELOCK                DELAYED SEE PE-2010-52
CC-2009-325   CARSON CITY RTC                 A & A CONSTRUCTION
WA-2009-326   CITY OF RENO                    GRADEX CONSTRUCTION
WA-2009-327   CITY OF SPARKS                  PEAVINE CONSTRUCTION INC
WA-2009-328   WASHOE COUNTY RTC               Q & D CONSTRUCTION INC
WA-2009-329   WASHOE CO PUBIC WORKS           BUILDING SOLUTIONS
WA-2009-330   NSHE/UNR                        F EVANS CONST
WA-2009-331   WASHOE CO PUBIC WORKS           MARV MCQUERY EXCAVATING
EL-2009-332   CITY OF ELKO
WA-2009-333   WASHOE CO SCHOOL DIST           F & P CONSTRUCTION INC
WA-2009-334   WASHOE CO RTC                   GRANITE CONSTRUCTION CO
EL-2009-335   CITYOF CARLIN                   RUBY DOME INC
HU-2009-336   GOLCONDA FIRE PROTECTION DIST   MICHAEL CLAYCORP
WA-2009-337   NSHE/UNR-ICA                    CANCELED 12/30/09
MI-2009-338   MINERAL CO BRD OF CMMISNRS      CHEAL CUSTOM FENCE CO
EL-2009-339   ELKO CO SCHOOL DISTRICT          CANYON CONSTRUCTION
WA-2009-340   CITY OF SPARKS                   ATLAS CONTRACTORS INC
CC-2009-341   STATE PUBLIC WORKS BOARD         GOLDIE INC
CC-2009-342   MICHAEL HOHL MNGMNT GRP          METCALF BUILDERS
CC-2009-343   MICHAEL HOHL MNGMNT GRP          METCALF BUILDERS
                                               V & C CONSTRUCTIONUNDER
LY-2009-344   CITY OF YERINGTON                100,000
CC-2009-345   NV ARMY NATIONAL GUARD           A & K EARTH MOVERS
WA-2009-346   NV ARMY NATIONAL GUARD           A & K EARTH MOVERS
WA-2009-347   NV ARMY NATIONAL GUARD           INTERMOUNTAIN SLURRY SEAL
DO-2009-348   DOUGLAS COUNTY                   Q & D CONSTRUCTION INC
WA-2009-349   CITY OF SPARKS                   RDC INC
CC-2009-350   CC BOARD OF SUPERVISORS          HORIZON CONSTRUCTION INC
WA-2009-351   WASHOE CO SCHOOL DIST            CANCELED 10/01/09
WA-2009-352   CITY OF SPARKS                   PEAVINE CONSTRUCTION INC
HU-2009-353   CITY OF WINNEMUCCA               CHEAL CUSTOM FENCE CO
DO-2009-354   DOUGLAS CO BORD OF COMMSNRS      SPIESS CONSTRUCTION CO INC
LY-2009-355   LYON CO BRD OF COMMISSIONERS     GRADEX CONSTRUCTION
WA-2009-356   WASHOE CO AIRPORT AUTHORITY      ROYAL ELECTRIC CO
WA-2009-357   WASHOE CO AIRPORT AUTHORITY      Q & D CONSTRUCTION INC
HU-2009-358   HUMBOLDT CO HOSPITAL DIST        Q & D CONSTRUCTION INC
DO-2009-359   TOWN OF MINDEN                   CANCELED 1/15/10
CH-2009-360   CITY OF FALLON                   UNDER 100,000
                                               SIERRA NEVADA CONSTRUCTION
CH-2009-361   CITY OF FALLON                   INC
WA-2009-362   RENO-TAHOE AIRPORT AUTHORITY     Q & D CONSTRUCTION INC
CC-2009-363   CC RTC                           INTERMOUNTAIN SLURRY SEAL
CC-2009-364   STATE PUBLIC WORKS BOARD         FRANK LEPORI CONSTRUCTION
                                               KODIAK ROOFING &
WA-2009-365   RENO-TAHOE AIRPORT AUTHORITY     WATERPROOFING
DO-2009-366   DOUGLAS CO SCHOOL DIST           CANCELED 08/18/2009
WA-2009-367   INCLINE VILLAGE GID              RELIANT ELECTRIC
CC-2009-368   CC BOARD OF SUPERVISORS          F & P CONSTRUCTION INC
WA-2009-369   WASHOE CO SCHOOL DIST            LIGH TAC INC
                                               BUILDING SOLUTIONS/UNDER
LY-2009-370   CITY OF YERINGTON                100,000
                                               BISON CONSTRUCTION/UNDER
CC-2009-371   STATE PUBLIC WORKS BOARD         100,000
WA-2009-372   WASHOE CO PUBIC WORKS            MT ROSE HEATING & AIR
WA-2009-373   S TRUCKEE MEADOWS GID            CANCLED 12-23-09
CC-2009-374   CC SCHOOL DIST                   MULTIPLE PRIMES
CC-2009-374                                    MARV MCQUEARY EXCAVATING
CC-2009-374                                    CRUZ CONSTRUCTION CO INC
CC-2009-374                                    NEWT CONCRETE CONSTRUCTION
WA-2009-375   WASHOE CO SCHOOL DIST            JW MCCLENAHAN CO
EL-2009-376   ELKO CO SCHOOL DISTRICT          CANCELED 10/28/09
HU-2009-377   MCDERMITT SEWER DIST             CANCELED SEE HU-2010-36
LA-2009-378   LANDER CO SEWER & WATER DIST 2   CANCELED SEE LA-2010-7
MI-2009-379   HAWTHORNE UTILITIES              DELAYED SEE 2010-94
ST-2009-380   CANYON GID                       DELAYED SEE 2010-84
WA-2009-381   WASHOE CO RTC                    DELAYED SEE WA-2010-203
EL-2009-382   STATE PUBLIC WORKS BOARD         PEAVINE CONSTRUCTION INC
WA-2009-383   CITY OF SPARKS                   SYSTEM 3 INC.
WA-2009-384   TRUCKEE MEADOWS WATER           PEAVINE CONSTRUCTION INC
EL-2009-385   ELKO CO SCHOOL DISTRICT         RUBY DOME INC
WA-2009-386   WASHOE CO DPT WTR RESORCS       DELAYED SEE WA-2010-51
LA-2009-387   LANDER CO BOARD OF COMMISSION   HUNEWILL CONSTRUCTION INC
LY-2009-388   LYON COUNTY                     L A PERKS PLUMBING & HEATING

LA-2009-389   GVENORS BRD BATTLE MT GEN HOSP SHAHEEN-BEAUCHAMP BUILDERS
CC-2009-390   CC RTC                          Z7 DEVELOPMENT/ARRA
WA-2009-391   WASHOE CO SCHOOL DIST           CANCELED 10/27/09
WA-2009-392   TMWA                            MKD CONSTRUCTION
WA-2009-393   TMWA                            MKD CONSTRUCTION
                                              DON M LAZARKO CONST/UNDER
WA-2009-394   NEVADA STATE PARKS              100,000
LY-2009-395   LYON CO BRD OF COMMISSIONERS    DELAYED SEE LY-2010-67
WA-2009-396   TMWA                            WWW CONSTRUCTION INC
WA-2009-397   WASHOE CO                       DEVCON CONSTRUCTION INC
                                              HUMBOLDT DRILLING & PUMP CO
CC-2009-398   CC BOARD OF SUPERVISORS         INC
HU-2009-399   HUMBOLDT CO SCHOOL DIST         MULTIPLE PRIMES
HU-2009-399                                   DESERT FIRE PROTECTION
HU-2009-399                                   FAST GLASS
HU-2009-399                                   MARCOR ENVIRONMENTAL
HU-2009-399                                   RICKS FLOORING
HU-2009-399                                   CR DRAKE & SONS ELECTRICAL
HU-2009-399                                   RHP MECHANICAL
HU-2009-399                                   BIG G CONSTRUCTION
HU-2009-399                                   H E HUNEWILL CO LTD
HU-2009-399                                   INSULPRO PROJECTS
HU-2009-399                                   RAY KELLER CONSTRUCTION
HU-2009-399                                   TALLMAN LUMBER CO
HU-2009-399                                   WN SALES
HU-2009-399                                   CB BROWN CO
                                              INNOVATIVE COMMUNICATION
HU-2009-399                                   SYSTEMS
PE-2009-400   HUMBOLDT CO SCHOOL DIST         MULTIPLE PRIMES
PE-2009-400                                   MARCOR ENVIRONMENTAL
PE-2009-400                                   RICKS FLOORING
PE-2009-400                                   RICKS FLOORING
PE-2009-400                                   ALPINE ROOFING
PE-2009-400                                   HSP PAINTING
PE-2009-400                                   RENO CONCRETE
                                              SIERRA NEVADA CONSTRUCTION
PE-2009-400                                   INC
PE-2009-400                                   FRANK EVANS CONSTRUCTION
PE-2009-400                                   CB BROWN CO
CC-2009-401   NV DEPT OF CORRECTIONS          NORESCO PHASE 1
CC-2009-402   NV DEPT OF CORRECTIONS          NORESCO PHASE 2
WA-2009-403   CITY OF RENO                    APS ENERGY SERVICES
Total 2009
Year 2010
LY-2010-1    CITY OF YERINGTON                CAMPBELL CONSTRUCTION
LY-2010-2    LYON COUNTY                      Q & D CONSTRUCTION
DO-2010-3    DOUGLAS COUNTY BOARD
WA-2010-4    CITY OF RENO                     GRANITE CONSTRUCTION
WA-2010-5    CITY OF RENO                     GRANITE CONSTRUCTION
WA-2010-6    CITY OF RENO                     SPANISH SPRINGS CONSTRUCTION
ST-2010-7    SOUTHERN NV WATER AUTHORITY
ST-2010-8    STOREY COUNTY                    MULTIPLE PRIMES

                                              MARV MCQUEARY EXCAVATING INC
WA-2010-9    WASHOE CO RTC                    ATLAS CONTRACTORS INC
WA-2010-10   WASHOE CO RTC                    GRANITE CONSTRUCTION
WA-2010-11   WASHOE CO RTC
PE-2010-12   PERSHING CO WATER CONSERVATN
CH-2010-13   STATE PUBLIC WORKS BOARD         D & D ROOFING/UNDER 100,000
HU-2010-14   STATE PUBLIC WORKS BOARD         KODIAK ROOFING/UNDER 100,000
WA-2010-15   STATE PUBLIC WORKS BOARD         SUNDT CONSTRUCTION INC
WA-2010-16   CARSON CITY RTC                  A & K EARTHMOVERS
WA-2010-17   BOARD OF REGENTS UNR             J F DUNCAN INDUSTRIES
EL-2010-18   ELKO COUNTY                      MGM CONSTRUCTION
EL-2010-19   NV DIV OF STATE PARKS            IMPACT CONSTRUCTION
WA-2010-20   CITY OF RENO
EL-2010-21   NSHE BOARD OF REGEANTS           HIGH MARK CONSTRUCTION
                                              D & D ROOFING/UNDER /UNDER
CH-2010-22   CHURCHILL CO SCHOOL DIST         100,000
                                              BRIGGS ELECTRIC INC/UNDER
WA-2010-23   INCLINE VILLAGE GID              100,000
WA-2010-24   CITY OF RENO                     DELAYED SEE WA-2011-10
WA-2010-25   WASHOE CO PUBLIC WORKS           ATLAS CONTRACTORS INC
EL-2010-26   CITY OF WEST WENDOVER            GERBER CONSTRUCTION
LY-2010-27   CITY OF FERNLEY                  A&K EARTHMOVERS
CH-2010-28   CITY OF FALLON                   SIERRA NEVADA CONSTRUCTION
EL-2010-29   CITY OF WELLS                    STEEL SYSTEMS INC
WP-2010-30   STATE PUBLIC WORKS BOARD         NELSON ELECTRIC/UNDER 100,000
CH-2010-31   CITY OF FALLON                   SIERRA NEVADA CONSTRUCTION
WP-2010-32   WHITE PINE CO COMMISSION         CG&B ENTERPRISES INC
WA-2010-33   STATE PUBLIC WORKS BOARD         NELSON ELECTRIC CO
                                              CANCELED SEE CH-2010.-53
CH-2010-34   CHURCHILL CO COMMISSIONERS       DUPLICATE
                                              EMPIRE CONTRACTORS/UNDER
WA-2010-35   CITY OF SPARKS                   100,000
HU-2010-36   MCDERMITT SEWER DIST             HIGH MARK CONSTRUCTION
LA-2010-37   LANDER CO SEWER & WATR DIST 2    VALLEY UNDERGROUND INC
DO-2010-38   GARDNERVILLE RANCHOS GID         PEEK CONSTRUCTION CO
                                              PRESENTATION PRODUCTS DBA
WA-2010-39   NSHE/UNR                         SPINITAR
WA-2010-40   NSHE/UNR
WA-2010-41   WASHOE CO RTC
WA-2010-42   WASHOE CO RTC                    GRANITE CONSTRUCTION
LY-2010-43   SILVER SPRINGS MUTUAL WATER CO
HU-2010-44   MCDERMITT SEWER DIST             UNDER 100,000
WA-2010-45   CITY OF SPARKS                   STEVE C HAMILTON INC
WA-2010-45                                    STEVE C HAMILTON INC
WA-2010-45                                    STEVE C HAMILTON INC
MI-2010-46    MINERAL CO SCHOOL DIST          HERBACK GENERAL ENGINEERING
WA-2010-47    WASHOE CO RTC

WA-2010-48    WASHOE CO SCHOOL DIST           Q & D CONSTRUCTION/ARRA
WA-2010-49    RENO-TAHOE AIRPORT AUTHORITY    ALPINE ENERGY
LA-2010-50    LANDER CO BRD OF COMMISSONERS
                                              LAYFIELD ENVIRONMENTAL SYS
WA-2010-51    WASHOE DEPT WATER RESOURCES     CORP
PE-2010-52    CITY OF LOVELOCK                BEN F DOTSON CONSTRUCTION
CH-2010-53    CHURCHILL CO COMMISSIONERS      BOMBARD ELECTRIC
WA-2010-54    TMWA                            Q & D CONSTRUCTION
MI-2010-55    HAWTHORNE UTILITIES             CAMPBELL CONSTRUCTION CO INC
MI-2010-56    MINERAL CO SCHOOL DIST          HERBACK GENERAL ENGINEERING
HU-2010-57    MCDERMITT WATER SUPPLY          ARRA/UNDER 100,000
WA-2010-58    GERLACH GID                     KING CONSTRUCTION
WA-2010-59    CITY OF RENO                    CANCELED 4/30/10
WA-2010-60    CITY OF RENO                    PAR ELECTRICAL CONSTRACTORS

LY-2010-61    SILVER SPRINGS MUTUAL WATER CO NORTHERN NEVADA EXCAVATIONG
WA-2010-62    WASHOE CO RTC                   MT ROSE HEATING & AIR
                                              UNDER 100,000/HI STANDARD
WA-2010-63    NEVADA STATE PARKS              SECURITY
WA-2010-64    WASHOE CO SCHOOL DIST           SIMPLEX GRINNELL LP

WA-2010-65    WASHOE CO SCHOOL DIST           FCC COMMUNICATION
WA-2010-66    WASHOE CO SCHOOL DIST           CANCELED 6/16/10
LY-2010-67    LYON CO SCHOOL DIST             FARR CONSTRUCTION CORP
                                              BRUCE MCKAY PUMP & WELL UNDR
WA-2010-68    STAGECOACH GID                  100
WA-2010-69    STMGID BOARD OF TRUSTEES        CANCELED 06/21/10
                                              BRIGGS ELECTRIC INC/UNDER
CC-2010-70    STATE PUBLIC WORKS BOARD        100,000
                                              DANOSKI CLUTTS BUILDING GROUP
WP-2010-71    WP CO HOSPITAL DISTRICT         LLC
LY-2010-72    CITY OF YERINGTON
WP-2010-73    STATE PUBLIC WORKS BOARD        RESOURCE DEVELOPMENT CO
HU-2010-74    MC DERMITT WATER SYSTEM         UNDER 100,000/CARSON PUMP LLC




LY-2010-76A   CITY OF YERINGTON               BOART LONGYEAR
EL-2010-76    CITY OF ELKO                    STAKER PARSON COMPANIES
LY-2010-77    CITY OF YERINGTON               CANCELED 5/5/10
WA-2010-78    TMWA                            MKD CONSTRUCTION INC
ST-2010-79    CANYON GID                                                5/5/2010
WA-2010-80    CITY OF SPARKS                  RESOURCE DEVELOPMENT CO
WA-2010-80A   RENO-TAHOE AIRPORT AUTHORITY    G & G SPECIALTY CONTRACTORS
CH-2010-81    CHURCHILL BRD OF COMMISSIONERS K7 CONSTRUCTION
WA-2010-81    RENO-TAHOE AIRPORT AUTHORITY    ADVANCE INSTALLATIONS INC
WA-2010-82    CITY OF SPARKS                  GRANITE CONSTRUCTION
LY-2010-83    CITY OF YERINGTON               CANCELED 5/5/10
ST-2010-84    CANYON GID                      PEAVINE CONSTRUCTION
EL-2010-85     CITY OF WEST WENDOVER            GERBER CONSTRUCTION
WP-2010-86     CITY OF ELY                      HYDRO TECH INC
LY-2010-87     CITY OF FERNLEY
EU-2010-88     EUREKA CO COMMISSIONERS          SIERRA NEVADA CONSTRUCTION
WA-2010-89     WASHOE CO PUBLIC WORKS           LEPORI CONSTRUCTION
                                                HUMBOLDT DRILLING & PUMP CO
EL-2010-90     ELKO COUNTY/JACKPOT              INC
EL-2010-91     ELKO COUNTY/JACKPOT              RECORD STEEL & CONSTRUCTION
EL-2010-92     STATE PUBLIC WORKS BOARD         BUILDING SOLLUTIONS
                                                GARDEN SHOP NURSERY
CH-2010-93     CITY OF FALLON                   LANDSCAPE
MI-2010-94     HAWTHORNE UTILITIES              KFC BUILDING CONCEPTS INC
WA-2010-95     WASHOE CO BOARD OF COMMISS       FARR CONSTRUCTION
WA-2010-96     WASHOE CO SCHOOL DIST            DIAMOND G CONSTRUCTION
WA-2010-97     WASHOE CO SCHOOL DIST
                                                HE HUNNEWILL CONST/UNDER
LA-2010-98     LANDER CO BOARD OF COMMISS       100,000
LY-2010-99     LYON CO BOARD OF COMMISSIONER
CC-2010-100    CC BOARD OF SUPERVISORS          EL CAMINO CONSTRUCTION
CC-2010-101    CC BOARD OF SUPERVISORS          CANCELED & COMBINED W 10-100
WA-2010-102    TMWA                             SIERRA NEVADA CONSTRUCTION

CH-2010-103    CHURCHILL CO BOARD OF COMMISNR A & K EARTHMOVERS

CC-2010-104    CARSON CITY                      RESOURCE DEVELOPMENT CO
DO-2010-105    MINDEN GARDNERVILLE SANITATION   KG WALTERS CONSTRUCTION
WA-2010-106    DO CO COMMUNITY SERVICES         Q&D CONSTRUCTION
DO-2010-107    TMWA                             CAMPBELL CONSTRUCTION CO INC
WA-2010-108    WA CO BOARD OF COMMISSIONERS     A & K EARTHMOVERS
WA-2010-109    TMWA                             GERHARDT & BERRY
                                                UNDER 100,000/BISON
DO-2010-110    DO DEPT CONSERVATION             CONSTRUTION
                                                CANCELED 9/14/10 PER SUE/see ch-
CH-2010-111    CHURCHILL CO SCHOOL DIST         407
EL-2010-112    ELKO CO SCHOOL DIST              CANCELED 5/25/10
CH-2010-113    TOLAS WATERWORKS CO-OP           A&K EARTHMOVERS
EL-2010-114    ELKO CO SCHOOL DIST              MGM CONSTRUCTION
WA-2010-115    TMWA                             RENO TAHOE CONSTRUCTION
WP-2010-116    CITY OF ELY                      RECK BROTHERS LLC
CC-2010-117    CARSON CITY RTC                  VALLEY SLURRY SEAL CO
CC-2010-118    CARSON CITY RTC                  PEAVINE CONSTRUCTION
WA-2010-119    NSHE/UNR                         K7 CONSTRUCTION
WA-2010-120    NSHE/UNR                         RELIANT ELECTRIC LLC
WA-2010-121    WASHOE CO RTC                    KFC BUILDING CONCEPTS INC
WA-2010-122    WASHOE CO RTC                    BISON CONSRUCTION

HU-2010-123    STAR CITY PROPERTY OWNERS ASSO HE HUNEWILL CONSTRUCTION
EL-2010-124    ELKO CO SCHOOL DIST
EL-2010--125   NV DIV OF WATER RESOURCES        ASSOCIATED UNDERWATER SRVS
HU-2010-126    MCDERMITT WATER SYSTEMS          BOART LONGYEAR
MI-2010-127    WALKER LAKE GID                  BOART LONGYEAR
WA-2010-128    WASHOE CO RTC                    NELSON ELECTRIC
                                                RHP MECHANICAL SYS/UNDER
WA-2010-129    WASHOE CO RTC                    100,000
CC-2010-130   CARSON CITY RTC                  V & C CONSTRUCTION INC
WA-2010-131   CITY OF RENO                     KFC BUILDING CONCEPTS INC
WA-2010-132   INCLINE VILLAGE GID              ASPEN DEVELOPERS
WA-2010-133   RED DEVELOPMENT/CITY OF SPARKS Q & D CONSTRUCTION
WA-2010-134   RENO-TAHOE AIRPORT AUTHORITY     BISON CONSTRUTION
WA-2010-135   RENO-TAHOE AIRPORT AUTHORITY     ALPINE ENERGY INC
WA-2010-136   RENO-TAHOE AIRPORT AUTHORITY     ALPINE ENERGY
WA-2010-137   RENO TAHOE AIRPORT AUTHORITY     BISON CONSTRUTION
CH-2010-138   SAGE VALLEY MOBILE HOME PARK     UNDER $100,000
WA-2010-139   RENO-TAHOE AIRPORT AUTHORITY     G&S SPECIALTY CONTRACTORS
WA-2010-140   WASHOE CO RTC                    SYSTEM 3 INC
                                               FARR CONSTRUCTION/UNDER
EL-2010-141   CITY OF ELKO                     100,000
WA-2010-142   CITY OF SPARKS                   GRANITE CONSTRUCTION
EU-2010-143   EUREKA CO PUBLIC WORKS           SIERRA NEVADA CONSTRUCTION
              CARSON CITY BOARD OF             HUMBOLDT DRILLING & PUMP CO
CC-2010-144   SUPERVISORS                      INC
WA-2010-145   CITY OF SPARKS                   HORIZON CONSTRUCTION INC
WA-2010-146   CITY OF RENO                     INTERMOUNTAIN SLURRY SEAL
WA-2010-147   WASHOE CO PUBLIC WORKS
WA-2010-148   INCLINE VILLAGE GID              UNITED CONSTRUCTION
EL-2010-149   NEVADA STATE PARKS               UNDER 100,000

WA-2010-150   WASHOE CO SCHOOL DIST            CANCEL 6/15/10 DUPLICATE OF 10-48
CH-2010-151   CITY OF FALLON                   A & K EARTHMOVERS
EL-2010-152   STATE PUBLIC WORKS BOARD         PEAVINE CONSTRUCTION
WA-2010-153   TMWA                             Q & D CONSTRUCTION
HU-2010-154   STATE PUBLIC WORKS BOARD         BISON CONSTRUCTION
WA-2010-155   CITY OF RENO                     DEVCON CONSTRUCTION
                                               OASIS AIR CONDITIONING &
CH-2010-156   CHURCHILL FACILITIES & GROUNDS   HEATING
WA-2010-157   RENO-TAHOE AIRPORT AUTHORITY     GRANITE CONSTRUCTION

HU-2010-158   HUMBOLDT COUNTY COMMISSIONERS SWEENEY CONSTRUCTION
WA-2010-159   WASHOE CO SCHOOL DIST            CANCELED 4/2/10
WA-2010-160   WASHOE CO SCHOOL DIST            CANCELED 4/2/10
WA-2010-161   WASHOE OC SCHOOL DIST            CANCELED 4/2/10
WA-2010-162   WASHOE CO SCHOOL DIST            CANCELED 4/2/10
EL-2010-163   BOARD OF REGENTS UNR             QUANTUM ELECTRIC LLC
WA-2010-164   WASHOE CO RTC                    GRANITE CONSTRUCTION
WA-2010-165   WA CO BOARD OF COMMISSIONERS     INTERSTATE PLUMBING
WA-2010-166   INCLINE VILLAGE GID
WA-2010-167   CITY OF SPARKS                   RENO-TAHOE CONSTRUCTION INC
                                               HORIZON CONSTRUCTION UNDR
WA-2010-168   WASHOE CO PUBLIC WORKS           1000,000
WA-2010-169   RENO TAHOE AIRPORT AUTHORITY
WA-2010-170   WASHOE CO SCHOOL DIST            COMMERCIAL SOLAR SERVICES
WA-2010-171   WASHOE CO SCHOOL DIST            FRANK LEPORI CONSTRUCTION
EL-2010-172   CITY OF ELKO                     DUPLICATE SEE EL-2010-178
WA-2010-173   WASHOE CO RTC                    VALLEY SLURRY SEAL INC
WA-2010-174   WASHOE CO RTC                    WEST COAST PAVING
WA-2010-175   WASHOE CO RTC                    SIERRA NEVADA CONSTRUCTION
WA-2010-176   WASHOE CO RTC                    GRANITE CONSTRUCTION
WA-2010-177   WASHOE CO RTC                    SPANISH SPRINGS CONSTRUCTION
EL-2010-178   CITY OF ELKO                     CAMINO CONSTRUCTERS
WA-2010-179   CITY OF SPARKS                   CANCELED 5/26/10




WA-2010-180   TMWA                             Q & D CONSTRUCTION
WA-2010-181   STATE PUBLIC WORKS BOARD         GARDNER ENGINEERING INC
WA-2010-182   STATE PUBLIC WORKS BOARD         SAVAGE & SON INC/UNDER 100,000
WA-2010-183   STATE PUBLIC WORKS BOARD         RELIANT ELECTRIC LLC
                                               GERHARDT & BERRY
WA-2010-184   CITY OF SPARKS                   CONSTRUCTION
WA-2010-185   TMWA                             GRADEX CONSTRUCTION CO
                                               DON M LAZORKO CONSTRUCTION
HU-2010-186   HUMBOLDT CO HOSPITAL DIST        INC
              DEPT OF CONSERVATION & NATURAL
WA-2010-187   RESOURCES
LY-2010-188   LYON CO COMMISSIONERS            FARR CONSTRUCTION/UNDER
LY-2010-189   LYON CO SCHOOL DIST              A & K EARTHMOVERS
WA-2010-190   WASHOE CO SCHOOL DIST            RHP MECHANICAL SYS
WA-2010-191   INCLINE VILLAGE GID              DELAYED SEE WA-2011-12
WA-2010-192   CITY OF SPARKS                   GRANITE CONSTRUCTION
WA-2010-193   CITY OF RENO
WA-2010-194   WASHOE CO RTC                    SIERRA NEVADA CONSTRUCTION
WA-2010-195   WASHOE CO RTC                    SIERRA NEVADA CONSTRUCTION
WA-2010-196   WASHOE OC RTC                    Q & D CONSTRUCTION
WA-2010-197   WASHOE CO RTC
WA-2010-198   WASHOE CO RTC
WA-2010-199   WASHOE CO RTC

WA-2010-200   WASHOE CO SCHOOL DIST            POWERCOM SOLUTIONS

WA-2010-201   WASHOE CO SCHOOL DIST            CANCELED 4-7 COMBINING INTO 200

WA-2010-202   WASHOE CO SCHOOL DIST            CANCELED 4-7 COMBINING INTO 200
WA-2010-203   WASHOE CO RTC                    SIERRA NEVADA CONSTRUCTION




HU-2010-204   STATE PUBLIC WORKS BOARD         HE HUNNEWILL CONST Per Debbie all

EL-2010-205   STATE PUBLIC WORKS BOARD         HE HUNNEWILL CONST one project
EL-2010-206   ELKO CO SCHOOL DIST              QUANTUM ELECTRIC LLC
EL-2010-207   ELKO CO SCHOOL DIST
WA-2010-208   UNR                              FIELDTRUF USA
HU-2010-209   STATE PUBLIC WORKS BOARD         HE HUNNEWILL
DO-2010-210   GARDNERVILLE RANCHOS GID         GRANITE CONSTRUCTION
WA-2010-211   CITY OF SPARKS                   Q & D CONSTRUCTION
WA-2010-212   TMWA                             STEVE C HAMILTON INC
CC-2010-213   STATE OF NEVADA PURCHASING       CANCELED 8/17/10
                                               CANCELED PER DORA DUPLICATE
PE-2010-214   CITY OF LOVELOCK                 8/9/10
WA-2010-215   WASHOE CO SCHOOL DIST            D&D ROOFING & SHEET METAL
WA-2010-216   WASHOE CO SCHOOL DIST            D&D ROOFING & SHEET METAL
WA-2010-217   WASHOE CO SCHOOL DIST            D&D ROOFING & SHEET METAL
LY-2010-218   SO LYON CO HOSPITAL DISTRICT    DESERT ENGINEETING
DO-2010-219   GARDNERVILLE TOWN BOARD
WA-2010-220   WASHOE CO SCHOOL DIST           D&D ROOFING & SHEET METAL
LY-2010-221   STATE PUBLIC WORKS BOARD        UNDER 100,000/ R & R ROOFING INC
WA-2010-222   NSHE/UNR                        K7 CONSTRUCTION
WA-2010-223   NSHE/UNR                        SPINITAR
                                              GERHARDT & BERRY
WA-2010-224   CITY OF SPARKS                  CONSTRUCTION
EU-2010-225   EUREKA CO PUBLIC WORKS
WA-2010-226   WASHOE CO SCHOOL DIST           NELSON ELECTRIC
WA-2010-227   WASHOE CO SCHOOL DIST           CANCEL 5/13/10
WA-2010-228   WASHOE CO SCHOOL DIST           CANCEL 5/13/10
WA-2010-229   WASHOE CO SCHOOL DIST           CANCEL 5/13/10
WA-2010-230   WASHOE CO SCHOOL DIST           NELSON ELECTRIC CO
WA-2010-231   WASHOE CO SCHOOL DIST           UNITED CONSTRUCTION
WA-2010-232   WASHOE CO SCHOOL DIST           NELSON ELECTRIC CO
WA-2010-233   WASHOE CO SCHOOL DIST           RANGER CONSTRUCTION
WA-2010-234   WASHOE CO RTC                   UNDER 100,000
LY-2010-235   CITY OF YERINGTON               CARSON PUMP/ UNDER 100,000
              CARSON CITY BOARD OF
CC-2010-236   SUPERVISORS
WA-2010-237   WASHOE CO RTC                   GRANITE CONSTRUCTION
WA-2010-238   WASHOE CO SCHOOL DIST           UNITED CONSTRUCTION
WA-2010-239   CITY OF RENO                    Q & D CONSTRUCTION
WA-2010-240   TMWA                            Q&D CONSTRUCTION
                                              CANCELED 7/27/10/DUPLICATED
EU-2010-241   EUREKA CO SCHOOL DIST           SEE 416
LY-2010-242   LYON CO BOARD OF COMMISSIONER
WA-2010-243   WASHOE CO RTC
WA-2010-244   WASHOE CO RTC                   SPANISH SPRINGS CONSTRUCTION
WA-2010-245   WASHOE CO RTC                   GRANITE CONSTRUCTION
WA-2010-246   WASHOE CO SCHOOL DIST           CANCELED UNDER 100,000
WA-2010-247   WASHOE CO SCHOOL DIST           CANCELED UNDER 100,000
LY-2010-248   CENTRAL LYON CO FIRE DIST       MULTIPLE PRIMES
LY-2010-248                                   RAPID CONSTRUCTION
LY-2010-248                                   MILES CONSTRUCTION
LY-2010-248                                   BUILDERS WHOLESALE
LY-2010-248                                   CAPITAL GLASS
LY-2010-248                                   EXCAL CONSTRUCTION
LY-2010-248                                   KEYSTONE MASONRY
LY-2010-248                                   LA THOMAS CO
LY-2010-248                                   OVERHEAD DOOR CO
LY-2010-248                                   AD CONSTRUCTION
LY-2010-248                                   BUILDERS WHOLESALE
LY-2010-248                                   STATE FIRE PROTECTION
LY-2010-248                                   ALCAL ARCADE CONTRACTING
LY-2010-248                                   BLUE MOUNTAIN STEEL
LY-2010-248                                   DESERT ENGINEERING
LY-2010-248                                   JW MCCLENAHAN CO
LY-2010-249   LYON CO SCHOOL DIST             UNDER 100,000
                                              UNDER 100,000/Far West Erosion
WA-2010-250   WASHOE CO DEPT OF RESOURCES     Control Co
WA-2010-251   WASHOE CO SCHOOL DIST           COMMERCIAL SOLAR SERVICES
WA-2010-252   WASHOE CO SCHOOL DIST             UNITED CONSTRUCTION
EU-2010-253   EUREKA BOARD OF COMMISSIONERS BISON CONSTRUTION
DO-2010-254   KINGSBURY GID                     SIERRA NEVADA CONSTRUCTION
              DOUGLAS CO BOARD OF
DO-2010-255   COMMISSIONERS                     KG CONSTRUCTION
WA-2010-256   ELKO CO SCHOOOL DISTRICT          CANCELED 5/26/10
WA-2010-257   BOARD OF REGENTS UNR
DO-2010-258   TOWN OF MINDEN
DO-2010-259   TOWN OF MINDEN
WA-2010-260   WASHOE CO RTC
WA-2010-261   WASHOE CO RTC
              DOUGLAS CO BOARD OF
DO-2010-262   COMMISSIONERS
DO-2010-263   ROUND HILL GID
DO-2010-264   KINGSBURY GID                     SPIESS CONSTRUCTION
DO-2010-265   KINGSBURY GID                     UNDER 100,000/SPIESS CONST
DO-2010-266   KINGSBURY GID                     V & C CONSTRUCTION INC
DO-2010-267   KINGSBURY GID                     V & C CONSTRUCTION INC
DO-2010-268   KINGSBURY GID                     UNDER 100,000/SPIESS CONST
WA-2010-269   BJ'S RESTAURANTS INC              TERRA NOVA INDUSTRIES


ST-2010-270   STOREY COUNTY SCHOOL DIST         COMMERCIAL SOLAR SERVICES

WA-2010-271   WASHOE CO SCHOOL DIST             WEST COAST CONTRACTORS OF NV
WP-2010-272   SOUTHERN Nevada Water Authority

WA-2010-273   WASHOE CO SCHOOL DIST             WEST COAST CONTRACTORS OF NV
EL-2010-274   ELKO CO SCHOOL DIST               CARSON UNLIMITED
WA-2010-275   RENO-TAHOE AIRPORT AUTHORITY
                                                RFI COMMUNICATIONS & SECURITY
WA-2010-276   BOARD OF REGENTS NSHE             SYS
EL-2010-277   CITY OF ELKO
WA-2010-278   CITY OF RENO
DO-2010-279   DOUGLAS CO SCHOOL DIST            CANCELED 09/08/2010

WA-2010-280   NSHE/UNR                          RENO BUSINESS INTERIORS INC
EL-2010-281   CITY OF ELKO
WA-2010-282   NSHE/UNR                          SIERRA NEVADA CONSTRUCTION
WA-2010-283   WASHOE CO SCHOOL DIST             SMITH MECHANICAL INC
WA-2010-284   WASHOE CO SCHOOL DIST
WA-2010-285   WASHOE CO SCHOOL DIST
WA-2010-286   WASHOE CO SCHOOL DIST
              DOUGLAS CO BOARD
DO-2010-287   OFCOMMISSIONERS
WA-2010-288   WASHOE CO SCHOOL DIST             BOMBARD ELECTRIC
WA-2010-289   WASHOE CO SCHOOL DIST             NELSO ELECTRIC CO
WA-2010-290   WASHOE CO SCHOOL DIST             CANCELED/COMBINED W 10-231
LA-2010-291   LANDER CO BOARD OF COMMISS        HE HUNEWILL CONSTRUCTION
                                                PRO-TECH FIRE PROTECTION SYS
CC-2010-292   STATE PUBLIC WORKS BOARD          CORP
ST-2010-293   STOREY CO COMMUNITY CHEST INC     MULTIPLE PRIMES
ST-2010-293                                     HAUS PLUMBING & MECHANICAL
ST-2010-293                                     COMSTOCK DRYWALL
ST-2010-293                                     ALCAL ARCADE CONTRACTING
ST-2010-293                                   TEDESCO PACIFIC CONSTRUCTION
ST-2010-293                                   F & P CONSTRUCTION
ST-2010-293                                   NORT EAST MASONRY
ST-2010-293                                   RICKS FLOOR COMERING
ST-2010-293                                   BUILDERS WHOLESALE
ST-2010-293                                   SIERRA NEVADA CONSTRUCTION
ST-2010-293                                   UNITED ELECTRICAL SRVS
ST-2010-293                                   SOUTHAM & ASSOC
ST-2010-293                                   CUSTOM GLASS
ST-2010-293                                   BLUE MOUNTAIN STEEL
ST-2010-293                                   WOOD PAINTING
ST-2010-293                                   FLEET HEATING & AIR INC
ST-2010-293                                   EXCAL CONSTRUCTION
WA-2010-294   WASHOE CO SCHOOL DIST           KING CONSTRUCTION
WA-2010-295   WASHOE CO SCHOOL DIST           ADVANCE INSTALLATIONS INC
PE-2010-296   CITY OF LOVELOCK
PE-2010-297   CITY OF LOVELOCK
LY-2010-298   STATE PUBLIC WORKS BOARD

CC-2010-299   BOARD OF REGENTS OF NSHE/UNR    WESTERN SINGLE PLY
CC-2010-300   CITY OF ELY
PE-2010-301   PERSHING CO SCHOOL DIST         UNDER 100,000/MARCOR
WA-2010-302   WASHOE CO SCHOOL DIST           SIERRA NEVADA CONSTRUCTION
LY-2010-303   LYON CO BOARD OF COMMISSIONER   SIERRA NEVADA CONSTRUCTION
WA-2010-304   WASHOE CO RTC                   SPANISH SPRINGS CONSTRUCTION
HU-2010-305   HUMBOLDT CO SCHOOL DIST         RHP MECHANICAL


HU-2010-305                                   D & D ROOFING CO
HU-2010-306   HUMBOLDT CO SCHOOL DIST         MARCOR ABATEMENT
HU-2010-306                                   ALPINE ROOFING CO
HU-2010-306                                   CR DRAKE & SONS
HU-2010-306                                   D & D ROOFING CO
HU-2010-306                                   RHP MECHANICAL SYS
HU-2010-306                                   DESERT DESIGN ICN
HU-2010-306                                   JIM WARNER INSULATION
CC-2010-307   CARSON CITY SCHOOL DIST         UNITED ELECTRICAL SERVICES
LA-2010-308   LANDER CO SCHOOL DIST           STEVE C HAMILTON INC
PE-2010-309   PERSHING CO SCHOOL DIST
PE-2010-310   PERSHING CO SCHOOL DIST         MULTIPLE PRIMES
PE-2010-310                                   GOIDENBY CONSTRUCTION
PE-2010-310                                   UNITED ELECTRICAL SERVICES
PE-2010-310                                   MT ROSE HEATING & AIR
PE-2010-310                                   STEVE C HAMILTON INC
PE-2010-310                                   RASMOSSEN CONSTRUCTIN
WA-2010-311   CITY OF RENO
LY-2010-312   LYON CO UTILITIES DEPT          COONS CONSSTRUCTION LLC
WA-2010-313   CITY OF SPARKS                  GRANITE CONSTRUCTION
WA-2010-314   WASHOE CO RTC                   SIERRA NEVADA CONSTRUCTION
WA-2010-315   RENO TAHOE AIRPORT AUTHORITY    UNDER 100,000
WA-2010-316   WASHOE CO RTC
EL-2010-317   ELKO CO SCHOOL DIST             CANCELED 5-26/10
WA-2010-318   WASHOE CO PUBLIC WORKS
LY-2010-319   LYON CO BOARD OF COMMISSIONER
HU-2010-320   HUMBOLDT CO HOSPITAL DIST       R&O CONSTRUCTION CO
WA-2010-321   NSHE/UNR                        KODIAK ROOFING
WA-2010-322   BOARD OF REGENTS NSHE           FRANK EVAN CONSTRUCTION
EL-2010-323   STATE PUBLIC WORKS BOARD        KODIAK ROOFING
DO-2010-324   DOUGLAS CO SCHOOL DIST          NELSON ELECTRIC/TOTAL AWARD
EL-2010-325   CARSON CITY RTC                 A & K EARTHMOVERS
WA-2010-326   WASHOE CO SCHOOL DIST           GRADEX CONSTRUCTION CO
HU-2010-327   CITY OF WINNEMUCCA              VALLEY SLURRY SEAL CO
WA-2010-328   WASHOE CO RTC                   SIERRA NEVADA CONSTRUCTION
WA-2010-329   CITY OF RENO
WA-2010-330   WASHOE CO RTC                   GRANITE CONSTRUCTION
WA-2010-331   RENO-TAHOE AIRPORT AUTHORITY
WA-2010-332   STATE PUBLIC WORKS BOARD        K7 CONSTRUCTION
WA-2010-333   WASHOE CO SCHOOL DIST           SIERRA NEVADA CONSTRUCTION
WA-2010-334   CITY OF SPARKS                  SPANISH SPRINGS CONSTRUCTION
WA-2010-335   WASHOE CO RTC                   SIERRA NEVADA CONSTRUCTION

WA-2010-336   WASHOE CO SCHOOL DIST           GARDNER ENGINEERING INC
WA-2010-337   CITY OF RENO

EL-2010-338   STATE PUBLIC WORKS BOARD        R & R ROOFING/UNDER 100,000
WP-2010-339   CITY OF ELY                     CLEARY BUILDING CORP
EL-2010-340   CITY OF ELKO                    PEAVINE CONSTRUCTION
WA-2010-341   WASHOE CO RTC                   SIERRA NEVADA CONSTRUCTION
WA-2010-342   NSHE/UNR                        K7 CONSTRUCTION/UNDER 100,000
EL-2010-343   ELKO CO SCHOOL DIST             BISON CONSTRUCTION
WA-2010-344   STATE PUBLIC WORKS BOARD        FRANK LEPORI CONST
CC-2010-345   CARSON CITY SCHOOL DIST
WA-2010-346   WASHOE CO PUBLIC WORKS          K7 CONSTRUCTION
WA-2010-347   WASHOE CO RTC
WA-2010-348   CARSON CITY AIRPORT AUTHORITY
LA-2010-349   LANDER CO BOARD OF COMMISS
              CARSON CITY BOARD OF
CC-2010-350   SUPERVISORS                     F & P CONSTRUCTION
LY-2010-351   LYON CO BOARD OF COMMISSIONER
CC-2010-352   CARSON CITY RTC                 SIERRA NEVADA CONSTRUCTION
WA-2010-353   WASHOE COUNTY RTC               SIERRA NEVADA CONSTRUCTION
                                              GERHARDT & BERRY
WA-2010-354   CITY OF RENO                    CONSTRUCTION
WA-2010-355   SODEXO-UNR CONCESSIONAIRE       Q & D CONSTRUCTION
WA-2010-356   WASHOE CO SCHOOL DIST           UNDER 100,000
WA-2010-357   CITY OF WINNEMUCCA
DO-2010-358   DOUGLAS CO BOARD OF COMMISS     Q & D CONSTRUCTION
CC-2010-359   STATE PUBLIC WORKS BOARD        MURPHY BUILT CONSTRUCTION INC

LA-2010-360   LANDER CO BOARD OF COMMISS      LEGACY CONSTRUCTION
LA-2010-361   LANDER CO BOARD OF COMMISS
WA-2010-362   WASHOE CO RTC                   GRANITE CONSTRUCTION

CC-2010-363   STATE PUBLIC WORKS BOARD        RELIANT ELECTRIC
DO-2010-364   DOUGLAS CO SCHOOL DIST
DO-2010-365   DOUGLAS CO SCHOOL DIST
CH-2010-366   CHURCHILL CO SCHOOL DIST
WA-2010-367   WASHOE CO SCHOOL DIST          UNITED CONSTRUCTION
WA-2010-368   NSHE/UNR                       F EVANS CONSTRUCTION
WA-2010-369   WASHOE CO RTC                  CANCELED 6/22/10 DUPLICATE
EL-2010-370   CITY OF WEST WENDOVER          MODERN CONCRETE
WA-2010-371   STMGID BOARD OF TRUSTEES
WA-2010-372   LYON CO UTILITIES DEPT         DELAYED SEE LY-2011-15
WA-2010-373   TMWA
DO-2010-374   TOWN OF MINDEN
                                             UNDER 100,000/BUILDING
WA-2010-375   STATE PUBLIC WORKS BOARD       SOLUTIONS
EU-2010-376   EUREKA CO COUNTY COMMISSIONER SIERRA NEVADA CONSTRUCTION
LY-2010-377   CITY OF YERINGTON              DELAYED SEE LY-2011-15
CC-2010-378   CC BOARD OF SUPERVISORS        SIERRA NEVADA CONSTRUCTION
CC-2010-379   CARSON CITY SCHOOL DIST        SOUTLAND INDUSTRIES


HU-2010-380   HUMBOLDT CO HOSPITAL DIST
EL-2010-381   SHOSHONE-PAIUTE TRIBE
PE-2010-382   CITY OF LOVELOCK
PE-2010-383   CITY OF LOVELOCK
EL-2010-384   STATE PUBLIC WORKS BOARD
EL-2010-385   CITY OF WEST WENDOVER
PE-2010-386   CITY OF LOVELOCK
WA-2010-387   CITY OF RENO
                                             MICHAEL R CLARK CONSTRUCTION
WA-2010-388   CITY OF SPARKS                 INC
WA-2010-389   NSHE/UNR
WA-2010-390   INCLINE VILLAGE GID            SPINIELLO COMPANIES
HU-2010-391   CITY OF WINNEMUCCA             BISON CONSTRUCTION
WA-2010-392   INCLINE VILLAGE GID

WA-2010-393   INCLINE VILLAGE GID            BURDICK EXCAVATING
EU-2010-394   EUREKA CO SCHOOL DIST
EU-2010-395   EUREKA CO SCHOOL DIST
CC-2010-396   CC BOARD OF SUPERVISORS
WA-2010-397   WASHOE CO SCHOOL DIST          RANGER CONSTRUCTION

WA-2010-398   WASHOE CO SCHOOL DIST          COMBINED WITH WA-2010-398
WA-2010-399   WASHOE CO SCHOOL DIST          COMBINED WITH WA-2010-398
WA-2010-400   WASHOE CO SCHOOL DIST          COMBINED WITH WA-2010-398

WA-2010-401   WASHOE CO PUBLIC WORKS

WA-2010-402   WASHOE CO PUBLIC WORKS
CC-2010-403   STATE PUBLIC WORKS BOARD       SIMPLEX GRINNELL LP
                                             UNDER 100,000/CENTRAL SIERRA
WA-2010-404   STATE PUBLIC WORKS BOARD       CONST
WA-2010-405   RENO-TAHOE AIRPORT AUTHORITY
CH-2010-406   CHURCHILL CO SCHOOL DIST
CH-2010-407   CHURCHILL CO SCHOOL DIST
CH-2010-408   CHURCHILL CO SCHOOL DIST


CH-2010-409   CHURCHILL CO SCHOOL DIST
HU-2010-410   CITY OF WINNEMUCCA
CC-2010-411   STATE PUBLIC WORKS BOARD

WA-2010-412   CITY OF SPARKS
DO-2010-413   DOUGLAS CO BOARD OF COMMISS   KG WALTERS CONSTRUCTION
              STOREY CO COMMUNITY
ST-2010-414   DEVELOPMENT DEPT              K7 CONSTRUCTION

WA-2010-415   WASHOE CO SCHOOL DIST         UNDER 100,000 CANCELED 8/26/10
EU-2010-416   EUREKA CO SCHOOL DIST         JB ENTERPRISES INC
WP-2010-417   CITY OF ELY
EL-2010-418   NEVADA DIV OF STATE PARKS
WA-2010-419   TMWA                          F & P CONSTRUCTION
WA-2010-420   CITY OF RENO
wl-2010-421   STATE PUBLIC WORKS BOARD
              PERSHING CO WATER
PE-2010-422   CONSERVATION DISTRICT

WA-2010-423   NSHE/UNR
EL-2010-424   CITY OF ELKO                  UNDER 100,000

CC-2010-425   STATE PUBLIC WORKS BOARD      PALMETTO CONSTRUCTIN INC
EL-2010-426   STATE PUBLIC WORKS BOARD      DELTA FIRE SYSTEM
WA-2010-427   NSHE/UNR
CH-2010-428   STATE PUBLIC WORKS BOARD
WA-2010-429   TMWA                          CAMPBELL CONSTRUCTION CO INC
EU-2010-430   EUREKA COUNTY SCHOOL DIST     STEVE C HAMILTON INC
                                            CASSINELLI LANDSCAPING/UNDER
WA-2010-431   STATE PUBLIC WORKS BOARD      100,000

EL-2010-432   STATE PUBLIC WORKS BOARD      GARDNER ENGINEERING INC
EL-2010-433   CITY OF ELKO
WA-2010-434   WASHOE CO SCHOOL DIST         NELSON ELECTRIC
WA-2010-435   WASHOE CO SCHOOL DIST         NELSON ELECTRIC
WA-2010-436   WASHOE CO SCHOOL DIST         NELSON ELECTRIC
WA-2010-437   NSHE/UNR
LA-2010-438   LANDER CO BOARD OF COMMISS
LA-2010-439   LANDER CO BOARD OF COMMISS
              STATE OF NEVADA PURCHASING
CC-2010-440   DIVISION

CC-2010-441   STATE PUBLIC WORKS BOARD      RAY HEATING PRODUCTS
CC-2010-442   CC BOARD OF SUPERVISORS       CRUZ CONSTRUCTION
WA-2010-443   WASHOE CO SCHOOL DIST         NELSON ELECTRIC
WA-2010-444   WASHOE CO SCHOOL DIST         NELSON ELECTRIC
CH-2010-445   CITY OF FALLON
WA-2010-446   CITY OF SPARKS
                                            WEST COAST CONTRACTORS OF
WA-2010-447   STATE PUBLIC WORKS BOARD      NEVADA
EL-2010-448   CITY OF ELKO
              WASHOE CO BOARD OF COUNTY
WA-2010-449   COMMISSIONERS
              WASHOE CO BOARD OF COUNTY
WA-2010-450   COMMISSIONERS
              WASHOE CO BOARD OF COUNTY
WA-2010-451   COMMISSIONERS
WA-2010-452   BOARD OF REGENTS/ NSHE
WA-2010-453   WASHOE CO SCHOOL DIST
WA-2010-454   WASHOE CO SCHOOL DIST
WA-2010-455   WASHOE CO SCHOOL DIST
EL-2010-456   STATE PUBLIC WORKS BOARD
WA-2010-457   WASHOE CO PUBLIC WORKS
LY-2010-458   LYON CO BOARD OF COMMISSIONER

WA-2010-459   WASHOE COUNTY RTC
LY-2010-460   MASON VALLEY SWIMMING POOL
WP-2010-461   STATE PUBLIC WORKS BOARD        UNDER 100,000
              CARSON CITY PURCHASING &
CC-2010-462   CONTRACTS                       UNDER 100,000
WA-2010-463   WASHOE CO SCHOOL DIST
Total 2010


YEAR 2011
WA-2011-01    WASHOE CO PUBLIC WORKS
              WASHOE CO DPT OF WATER
WA-2011-02    RESOURCES
WA-2011-03    NSHE/UNR
WA-2011-04    RENO-TAHOE AIRPORT AUTHORITY

EU-2011-05    EUREKA CO COMMISSIONERS
DO-2011-06    TOWN OF MINDEN
WA-2011-07    CITY OF RENO
WA-2011-08    CITY OF RENO
WA-2011-09    CITY OF RENO
WA-2011-10    CITY OF RENO
WA-2010-11    WASHOE CO WATER RESOURCES       UNDER 100,000
WA-2011-12    INCLINE VILLAGE GID
EL-2011-13    ELKO COUNTY
DO-2011-14    DOUGLAS CO BOARD OF COMMISS


LY-2011-15    CITY OF YERINGTON
EL-2011-16    ELKO COUNTY SCHOOL DIST
LY-2011-17    LYON CO UTILITIES
WA-2011-18    TMWA
WA-2011-19    WASHOE CO SCHOOL DIST
WA-2011-20    WASHOE CO SCHOOL DIST
WA-2011-21    WASHOE CO SCHOOL DIST
DO-2011-22    DOUGLAS CO BOARD OF COMMISS
Total 2011
note as of 10.21.2010




MARTIN SLOUGH LINEAR PKWY PS 4                                            11/0/08
WATER CONVEYANCE INFRASTRUCTUR 3B TRUCKEE CANAL              $920,398.00 11/17/2008    7/23/2009
TRUCKEE RIIVER LEVEE FLOODWALL 395 TO E 2ND/GLENDALE        $2,715,101.80 11/20/2008
RENO STEAD EFFLUENT TRUCK FILL STATION                                    12/15/2008
ALTERNATIVE SENTENCING DIV T I                                            3/9/2009
UNR CENTER FOR MOLECULAR MEDCINE, NEW LABORATORY/
MEDICAL OFFICE BUILDING                                    $54,935,000.00 10/21/2008

RTC 4TH STREET STATION                                     $12,872,000.00 2/5/2009
09 NEIGHBORHOOD ST REHABILITATION UNIT 1                    $3,672,506.00 1/27/2009

09 NEIGHBORHOOD ST REHABILITATION UNIT 2                    $1,548,007.00 1/28/2009
09 NEIGHBORHOOD ST REHABILITATION UNIT 3                    $1,501,104.85 1/29/2009
HIGHLAND CANAL RCB -FORMAL                                  $3,425,132.80 10/22/2008   9/10/2009
DESERT SPRINGS WATER BLENDING                                 $40,000.00 10/1/2008
PLEASANT VALLEY SEWER INTERCEPTOR REACH 3                                 1/1/2009
MDF COOLING RETROFIT AT 6 SCHOOLS                            $155,527.00 10/7/2008     5/4/2009
N VALLEY WASTEWATER TREATMENT FACILITY PHASE II A            $888,000.00 10/16/2008
SOUND INSULATION PHS 17.3 CONTRACTOR                         $455,837.00 12/10/2009    1/20/2010
SOUND INSULATION PHS 17.4 CONTRACTOR                         $697,788.00 12/11/2009    1/20/2010
SOUND INSULATION PHS 17.5 CONTRACTOR                         $461,134.00 12/11/2008    1/20/2010
CG ADA TRANSITION CHEMISTRY BUILDING-BUILDING FIRE ALARM
UPGRADE                                                      $112,000.00 10/9/2008

JACKPOT POOL RE-PLASTER                                       $93,100.00 10/27/2008    12/16/2008
HARBECKE RANCH IRRIGAION WELL CONSTRUCTION                   $906,662.00 10/29/2008    4/8/2009
TERRACE SPORTS COMPLEX WARM-UP AREA                          $162,945.28 9/8/2009

08 CDBG PEDSTRIAN RAMP                                        $55,968.50 10/1/2008     1/9/2009
HUMBOLT CONSERVATION CAMP WATER TANK REPLACEMENT             $222,176.44 10/16/2008    7/31/2009
WATER RECLAMATION FACILITY EXPANSION & UPGRADE:PHS 1
HEADWORKS                                                    $600,000.00 11/21/2008
DESIGN BUILD FOR SOLAR PHOTO VOLTAIC NET METERED SYSTEM-
FALLON                                                       $399,076.20 10/31/2008
APPLIED RESEARCH FACILITY RM 315 LAB REMODEL                 $146,173.32 10/9/2008     4/20/2009
WATER CONVEYANCE INFRASTRUCTURE 1B                           $456,960.00 1/23/2009
WATER CONVEYANCE INFRASTRUCTURE 2B                           $720,240.00 10/22/2008    9/8/2009
WNCBRISTLECONE PINE BLUILDING CHILLER REPLACEMENT            $948,362.00 2/19/2009



SPRING & HAMLIN INTERBASIN MONITOR WELL CONSTRUCTION        $2,462,300.00 3/23/2009

WARM SPRINGS CORRECTIONAL DOOR PANEL CONTROL UPGRDS          $435,000.00 11/5/2008     5/11/2009

SPARKS JUSTICE COURT                                                      6/1/2009
UPPER MURRY WATER                                            $535,278.00 11/19/2009
MICHAEL D THOMPSON TRAILHEAD-HUNTER CREEK                    $332,356.65 11/12/2008
CANYON GID SEWER IMPROVEMENT                       $2,357,644.00 3/3/2009
09 PREVENTIVE MAINTENANCE PATCHING                  $690,381.15 10/14/2008    1/27/2010
09 PREVENTIVE MAINTENANCE SLURRY                   $4,148,575.53 3/6/2009

CORPORATE YARD PAVING-PS 1                           $93,588.00 10/6/2008
CC ARSENIC WATER TREATMENT PLANT & PIPE LINE       $2,713,316.64 10/9/2008    10/9/2008
ROCK PARK WHITE WATER PARK PHS 2                    $551,257.25 10/17/2008    45/19/09
APPION WAY EXTENSION                                $400,117.35 10/22/2008
09 WINNEMUCCA EVENTS COMPLEX PARKING LOT PAVING     $134,774.00 10/1/2008
ELKO PEACE PARK RESTROOM FACILITY                   $330,000.00 10/10/2008
HULDA WAY IMPROVEMENTS PHS II                       $188,654.27 10/22/2008    6/18/2009
SPRING CREEK HIGH SCHOOL VALLEY ROOF REPAIR         $149,576.00 10/23/2008    10/2/2009
MUNI COURT HVAC UPGRADE                             $173,872.63 11/29/2008    4/8/2009
STEWART ST EXTENSION                               $3,236,570.00 11/20/2008
ELKO PEACE PARK ENTRY PORTAL                         $77,000.00 10/24/2008

IMPROVEMENT PLANS OREANO WELL                       $438,650.00 3/23/2009

ADA CIVIL UPGRDS ELY STATE PRSN                      $81,765.00 10/21/2008
ORR DITCY PUMP STA-08 PUMP INSTAL                   $120,822.38 11/6/2008     6/4/2009
BUCKLAND STA FIRE SUPPRESN SYS                      $220,070.40 11/20/2008    9/22/2009

NO. SHORE BOAT RAMP EXTNSION                         $82,429.15 11/21/2008    2/10/2009

BEACH 7 ELECTRIC LINE REPLACEMENT                    $23,240.25 11/21/2008    1/15/2009
ELKO INTRAGNCY DSPTCH CNTR REPR                     $298,082.00 11/25/2008    11/23/2009

CONTROL VALVE RETROFIT                               $25,452.00 12/9/2008     2/12/2009
6TH FLR HVAC IMPROVMNTS                             $135,075.00 11/18/2008
WATER TANK 10B                                     $2,175,975.00 3/9/2009

EUREKA 08 WTR SYSTM IMPRVMNTS                      $2,114,007.00 4/20/2009
GRAPHIC WALL LIGHTING                                           1/8/2009
VEHICLE MAINTENANCE & STORG BLDG                    $413,385.51 3/18/2009     8/5/2009

WTR CNVYNC IFRSTRCTR PS9                           $1,414,862.04 12/19/2008

NNAMHS BUILDING 23 DEMOLITION                        $94,168.00 11/25/2008
NE NV REGNL RAILPORT PHS 1 CONST                  $20,000,000.00 10/23/2008

LEMMON DR AT US 395 CAPACITY IMPR                   $187,007.00 9/16/2009
CC WTRFL FIR WTRSHD IMPRV PS 1                      $214,636.92 11/25/2008    11/9/2009
ELKO PEACE PARK BRIDGE I                                        12/3/2008
ELKO PEACE PARK BRIDGE II                                       12/3/2008
09-10 PERMANENT PATCH PROGRAM                       $748,748.00 12/2/2008     5/24/2010
CRT HOUSE SFTY GLZNG FLM INSATLL                    $135,000.00 12/3/2008



SECURITY SYSTMS UPGRD ACAMS PS1                    $2,500,000.00 1/8/2009

ACADEMY OF ARTS & CAREER TECHNOLOGY ADDITION      $11,823,694.00 12/23/2008   2/3/2010
TERRACE SPRTS CMPLX ACCSS RAMP                      $115,429.42 1/13/2009     7/20/2009

CMPS GEN PAVING REPAVE W STDM                       $366,142.00 12/12/2008    10/26/2009
WELL #43 WATER WELL HOUSE                           $529,479.06 1/20/2009     11/12/2009
JAN EVANS DETNTN CNTR SOD RPLCMT              $190,500.00 11/18/2008
CONDUCTOR HEIGHTS DEMOLITION                  $108,076.00 4/21/2009
EAST LINCOLN WAY                              $253,453.67 3/27/2009    9/10/2009
BLDG 8 RMDL NO NV ADLT MNTL HLTH              $527,894.00 1/13/2008    9/18/2009
TRUCKEE RIVER BANK STABILIZATION OXBW PARK                6/1/2009

VOCATIONAL ARTS TRAINING BLDG                 $319,332.11 11/12/2008

VASSAR ST RECONSTRCTN                        $1,549,007.00 8/4/2009
LOS ALTOS PKWY RECONSTRUCTION                 $319,296.54 6/23/2009    10/1/2009
PEOPLES DRAIN DITCH IMPROVEMENT               $319,296.54 2/11/2009    8/18/2009

GSA TENANT IMPRVMNTS STE 2A                   $457,000.00 11/13/2008

TENANTS IMPRVMNT STE 3F TRNSPRTN              $141,256.80 11/12/2008   1/16/2009



SRA FRNT INTRGNCY DSPTCH CNTR &               $601,781.00 1/9/2009     4/8/2010
CCTB SECURITY INSTALLS-REED HI SCL            $101,599.41 2/10/2009    3/17/2010
MCQUEEN HI SCHL HVAC REPLCMNT                 $713,000.00 2/19/2009    10/15/2009
VETERANS MEMORIAL ELEM SCL REVITILAZATION    $1,404,698.56 2/20/2009   2/22/2010

MOGUL BYPASS PIPELINE                        $8,096,199.76 1/15/2009
GBC COMMUNITY CENTER REMODEL                 $1,166,526.00 6/11/2009
WTR CNVYNCE IFRSTRCTR 4                       $844,353.21 2/18/2009    11/13/2009

09 PUMP STA REHAB DRISCL & FOLSM              $147,653.66 1/22/2008    12/10/2009
VIRGINIA LKE PRK PHS 2 IMPRVMNTS              $329,777.00 3/3/2009
EFLNT EXPRT SGMNT 1 SO & SGMNT 5             $1,073,550.00 2/13/2009
SAME AS ABOVE EXCEPT IN CRSN VLY              $189,450.00 2/13/0/09

RE PAVE LODER ES                              $353,436.31 2/26/2009    3/23/2010
INFRSTRCTR UPGRD BDSLY, WINN, WM              $804,285.40 2/11/2009    12/30/2009

INFRSTRCTR UPGRD WINNEMUCCA ES                            2/11/2009    12/30/2009

INFRSTRCTR UPGRD WAMER ES                                 2/11/2009    12/30/2009
GWHS GYMNASIUM ADDITION                      $1,395,576.00 5/18/2009
GRANTS LNDING TRUCKEE RVR RMP                             8/27/2009
SOUND INSULATION PHS 17.6 CNTRCTR             $655,502.00 3/26/2009    1/20/2010
RAMADAS ADA SEPTIC CONTRACT                   $243,434.60 2/12/2009    6/26/2009
NEW FLOORING-DRAKE ELEMENTARY                 $250,000.00 6/12/2009

SECURITY TV INSTALLS GRP 2-GALENA                         2/12/2009
SCRUGHAM ENGNRNG BLDG RM 117                  $250,410.96 1/29/2009    11/19/2010
SILVER LAKE RD REHAB                         $1,528,089.00 5/19/2009   12/21/2009
LAKE PKWY SIDWALK IMPRVMNTS                   $400,000.00 5/1/2009
DWNTWN CORIDOR LTNG 10TH-11TH                 $111,543.60 8/4/2009     12/9/2009
TWN OF MNDN 09 ALLEY WTRLN UPGRD              $539,292.50 1/29/2009    2/22/2010
JD RANCH BRIDGE REPLCMNT                      $286,345.60 2/20/2009
W WNDVR ELMNTRY MDLR UNT 5 ADA                            2/19/2009
FDRLY FNDED ADA IMPRVMNTS                     $124,947.55 2/18/2009    9/18/2009
FDRLY FNDED ZEPHYR WY CRB GTTR                $159,438.30 2/18/2009    11/20/2009
REPLC FIRE ALARM SYS GRP 1                                2/25/2009
REPLC FIRE ALARM SYS GRP 2                    $473,797.00 4/14/2009    2/22/2010
OXBOW NATR STDY BRDWALK RPLCMN           $210,000.00 8/1/2009
BABBIT WELL DRILLING                     $387,175.00 6/3/2009
FUJI PARK URBAN FISHING POND             $271,355.00 TBA

WASHOE LKE STE PRK EQSTRIAN TOLT                     2/26/2009    8/12/2009
2008/09 CRACK SEAL                                   2/18/2009    4/7/2009
DWNTWN STSCAPE ENBARCMENT PS3           $1,431,539.00 2/20/2009
GRANTS LANDNG RVR ACESS RAMP                         TBD
OWYHEE ARPORT FENCE                      $223,147.50 6/23/2009
PNDA EXPRS UNR CMPS                      $238,508.00 11/10/2008
STEAD AFB MAIN MTR RPLCMNT PS 2         $3,600,000.00 2/26/2009
DMV CNVRSN TO EFFPD ADMIN OFFC           $644,085.00 4/1/2009     2/2/2010
DOUGLAS COUNTY JAIL EXPANSION           $3,783,600.00 8/18/2009

INSTALLATIONS FRO CITY WELL #43          $178,000.00 3/4/2009     11/12/2009
ELKO HI SCHOOL ADA UPGRADE              $1,290,908.76 5/5/2009    2/1/2010
CARSON RIVER DELTA EQSTRIAN AREA          $94,879.00 4/29/2009

FLEISCHMANN AG BLDG RMS 243/245          $255,197.71 3/5/2009     3/19/2010
EDDY STREET REHABILITATION               $155,034.45 4/23/2009
VICTORIAN AVE REHABILITATION            $2,053,289.00 4/14/2009

RENO CONSOLIDATED 08-01                 $1,413,199.47 4/21/2009   9/18/2009

MILL STREET RECONSTRUCTION              $1,599,420.68 6/15/2009   4/1/2010



09 SRVC LINE RPLCMNT-MTR RLCTN            $85,568.00 3/26/2009
RALEIGH HEIGHTS #1 TANK REMODEL          $264,000.00 3/3/2009     10/8/2009
WTR CNVUNC 3C MESA DR MN ST              $512,598.96 3/18/2009    4/19/2010



TMWA MAIN RPLCMNT PYRAMID WAY            $891,923.89 3/5/2009     11/12/2009
RATTLESNAKE HILL WATER TANK                          4/24/2009
RATTLESNAKE HILL & RIO VISTA PIPEILNE                4/24/2009
LVLK MDWS WTR DIST WTRLN PHS 2          $3,740,348.00 6/16/2009
JACKPOT SCHOOL REMODEL                   $549,642.84 5/8/2009     11/20/2009
CARLIN SCHOOL REMODEL                    $847,014.40 5/8/2009     11/23/2009

PEAVINE TANK REPAIRS                     $111,332.46 3/5/2009     7/28/2009
09 STREET REHAB                          $542,856.00 2/26/2009
09 WINNEMUCCAEVNTS CMPLX RSTRM           $136,754.00 2/12/2009

WEST LIFT STATION IMPROVEMENTS            $46,583.00 3/19/2009
INFRSTRCTR UPGRD ECHO LODER              $355,144.00 3/26/2009    1/12/2010
CMPS GN ADA MACKAY STADM E SIDE          $414,788.00 3/26/2009    3/19/2010

LYON CO RTC SLURRY SEAL SLVR SPR         $555,920.75 4/6/2009     7/15/2009
FDRLY FND ST LIGHTING RPLC ST LIT E                  2/26/2009
HWY 50 LFT STA & FRC MAIN RPLCMNT       $2,400,000.00 5/1/2009
MAE ANNE AVE RECONSTRUCTION              $621,642.00 5/22/2009    9/23/2009
13TH STREET SEWER IMPRVMNTS              $244,937.54 5/8/2009     8/26/2009
NEW FLRING THROUT INCLINE MDL SCH        $275,045.59 5/20/2009    3/17/2010
CRYSTAL BAY PHS 1B &11A WTR IMPRV        $653,135.75 4/23/2009    9/3/2009
WSTWTR TRTMNT PLNT HEADWORKS             $800,381.62 4/3/2009     1/27/2010
FAMILY CMPGRND IMPROVEMENTS                       $178,477.75 5/8/2009     8/17/2009
FAMILY CMPGRND IMPROVEMENTS                       $205,000.00 4/15/2009
JOE CRAWLY NEW SPORTS GRILLE                      $822,000.00 3/30/2009    3/19/2010
SURVELLANCE CAMERAS NCC                                       3/26/2009
CARIOT TRK BSTR STA PRV VLT PIPLN                 $579,000.00 5/6/2009
09 PRVNTV MNTNC CITY OF RENO STS                 $4,097,967.31 5/22/2009
SOUND INSULATION IMPROVMENTS RESDNL HMS          $3,571,736.00 4/9/2009    10/27/2009
SOUND INSULATION PROGRAM PHASE 18.1 CONTRACTOR    $562,860.16 5/5/2009     9/16/2010
SOUND INSULATION PROGRAM PHASE 18.2 CONTRACTOR    $620,347.00 5/6/2009     9/16/2010
RUBY HILL SIDEWALK/SEWER IMPRVMT                  $361,379.00 4/20/2009    12/4/2009
RE-ROOF HOUSING UNTIS 4 & 5 NCC                   $359,640.00 3/18/2009    9/2/2009
VIRGINIA ST GYM RM 21 USAC REMDL                  $250,112.00 3/30/2009    11/6/2009
PINE & MILLL SEWER                                $134,273.00 3/24/2009
PEMBROKE DR RECONSTRUCTION                       $1,562,669.30 5/21/2009   10/27/2009
ADA RESTROOM UPGRADES                                         4/14/2009    10/14/2009
RE-PAVE CANNAN ELMTRY SCHOOL                      $335,182.38 4/14/2009    3/17/2010
RE-PAVE TOWIES ELMTRY SCHOOL                                  4/10/2009
RE-PAVE ALICE MAXWELL ELMT SCHL                   $161,799.77 4/14/2009
REPLACE GYM BLEACHERS WOOSTER                     $150,776.00 4/14/2009
REPLACE GYM BLEACHERS VAUGHN                      $108,000.00 4/14/2009



REPLC GYM BLCHRS TRANER MDL SCL                               4/14/2009



REPLC GYM BLCHRS SPRKS MDL SCL                                4/14/2009



REPLC GYM BLCHRS SWOPE MDL SCL                                4/14/2009

METROPOLIS IRRIGATION RESTORATION                             7/28/2009

RE-ROOF ROY GOMM ELMTRY SCHL                      $107,994.66 4/22/2009    3/17/2010

RE-ROOFJUNIPER ELMTRY SCHL                        $515,731.63 4/22/2009    3/17/2010
RE-ROOF PLEASANT VALLEYY ELEMETARY SCHOOL         $233,962.49 4/22/2009    3/17/2010
RE-ROOF RENO HIGH SCHOOL                          $115,944.00 4/22/2009    9/1/2009
COTTONWOOD YARD TRUCK FILL STA                                5/6/2009
TRUCKEE RVR BLW DERBY DAM                         $228,958.00 4/29/2009
CCTV SECURITY INSTALLS                            $114,171.15 2/10/2009    3/17/2010
RE-PAVE INCLINE MIDDLE SCHOOL                     $456,917.32 4/21/2009    3/23/2010
REPLC FIRE ALARM SYSTEMS GRP 2                                3/13/2009
RAW SEWG PMP VFD AT TMWRF                         $120,142.00 4/8/2009     4/20/2010

SILVER LAKE 16" WATER MAIN                        $256,622.12 4/1/2009     7/29/2009
V & T RLWY IMPRVMNTS PS 3A                       $1,753,378.11 4/23/2009   3/19/2010

SECONDARY DIGESTER ROOF REPAIR                     $88,432.00 4/14/2009

AIRSIDE PVMNT REPAIRS & REHAB PS5                 $298,888.00 5/21/2009
CAPITOL PHOTOVOLTAIC INSTALLATION                  $88,432.00 4/14/2009
WA CO SHERIFFS OFC CYBR CRIMES                    $253,717.00 4/21/2009
W WNDVR N GENE L JONES WY PVMNT                   $415,926.90 4/14/2009    6/30/2009
S CURRY ST PHS 1 IMPROVEMENTS                    $3,013,714.05 4/15/2009   4/29/2010
CMAQ PEDESTRIAN PATH AT SUN VLLY        $650,000.00 7/1/2009
RE-ROOF AT WCSD ADMIN BLDG              $153,673.60 4/30/2009     3/17/2010

09 WATERMAIN REPLACEMENT                $722,060.50 6/25/2009     10/26/2009

RE-ROOF INCLINE HI SCHOOL                             4/30/2009   5/27/2009
RE-ROOF AT CLAYTON MIDDL SCHOOL         $973,570.17 4/30/2009     3/17/2010
JOBS PEAK WELL #2 REPLACEMENT           $192,201.67 4/15/2009
WNDVR CURB & GUTTER ACCESS              $195,221.50 5/4/2009      9/22/2009
2009 PAVING PROJECT                    $1,365,661.75 5/12/2009
REHAB & REALIN RNWY 9/27 & TXIWY A     $8,910,322.60 5/19/2009
PRIMRY CLRIFIER OVRFLO PIPNG RHAB       $289,629.29 5/15/2009
APRON REHAB PHS 12                     $2,460,460.00 4/30/2009

09 ROAD SEAL                            $279,007.00 5/15/2009
INTEROPERABLE RADIO COMM 80 CRDR        $400,000.00 6/11/2009
RE-ROOF 4 BUILDINGS                    $1,360,000.00 5/1/2009
                                        $242,200.00 5/20/2009
                                        $179,068.00 5/20/2009
FY 2010 ST MAINTENANCE                  $783,521.96 5/4/2009      12/4/2009
SUMMIT RIDGE & SKY MTN DR              $1,210,552.69 7/7/2009     10/5/2010

FDRLY FNDED SPNSH SPRNGS SNTRY                        5/20/2009
KINGSBURY VILLAGE WATERLINE              $42,990.00 5/6/2009
09 WINNEMUCCA WATER MAIN                $322,273.00 4/28/2009
09 WINNEMUCCA ST RECONSTRUCTION         $240,974.50 4/29/2009     7/24/2009
09 WINNEMUCCA ST SEALING               $1,161,949.00 4/29/2009    11/16/2009
24" STUB RETIREMNT 1-80 TO MCCARAN      $120,000.00
SPRNG CRK HI SCHL HALWY FLR TILE        $129,130.00 5/20/2009     8/3/2009
SPARKS CONSOLIDATED 09-02              $1,500,000.00 8/1/2009
DRI CAVE FACILITY PLAZA                 $574,978.00 5/7/2009      11/25/2009
ROBB DR/SHARLANDS AVE INTERSEC         $1,500,000.00 6/9/2009
SEWER REHAB PROJ-PHASE 1B              $1,699,803.90 5/18/2009

2009 STREET MAINTENANCE PROJECT        $1,248,007.00 6/19/2009
VICTORIAN AVE REHABILITATION-PHS 1      $436,090.88 6/4/2009      8/24/2009
VICTORIAN AVE REHABILITATION-PHS 2     $2,485,422.00 8/20/2009
CARLIN BRANCH LIBRARY                   $300,000.00 5/8/2009
EAST 4TH ENHANCEMENT                    $440,000.00 9/1/2009
EUREKA CO 09 AIRPORT MAINTENANCE        $498,000.00 5/18/2009
CA INTRPRTV CNTR --TRAILS               $122,500.00 5/19/2009
WRF EMERGENCY STORAGE RSVOIR            $260,714.02 7/10/2009     12/23/2009
2009 OVERLAY                                          5/14/2009
09 RENO SEWER REHAB PHS 1A              $473,054.17 6/3/2009
VICTORIAN AVE WATER MAIN REPLACEMENT    $186,868.70 5/12/2009     8/13/2009
SHERIFF OFFICE CRIME LAB REMODEL        $125,000.00 5/19/2009
FERNLY H S LIFT STA REPLCMNT            $190,719.29 5/15/2009

FIRE ALARM UPGRD SPRNKLR SYSM            $99,292.00 5/21/2009
SYNTHETIC TURF SPORTS FIELDS            $446,446.00 5/12/2009
N COUNTY CC SEWER INTERTIE              $274,954.60 5/20/2009
EUREKA CO COURTHOUSE RE-ROOF            $151,502.00 5/18/2009
CITY HALL ROOF REPLACEMENT              $160,260.00 5/19/2009     11/9/2009
CMPUTR CNTR COOLING TWR RPLCMNT                    $106,864.00 5/21/2009
DES BUILDING B RENOVATION                          $990,000.00 6/3/2009
FERNLEY INTERMEDIATE II                          $20,657,000.00 6/19/2009
W SEVENTH ST RECONSTRUCTION                       $1,132,000.00 7/22/2009
WELL #43 WATER MAIN EXTENTION                      $274,274.00 7/10/2009    11/10/2009
TRUCKEE RVR BKFLW MDFICTN                          $214,266.62 5/19/2009    3/10/2010
PHS II SITE IMPRVMNTS DAYTON HI                    $510,004.08 5/15/2009    12/4/2009
CONCOURSE RE-ROOF                                  $360,800.00 6/10/2009
2009 STREET MAINTENANCE PROJECT                    $199,003.00 5/19/2009
GOLDEN EAGLE REGNL PRK TFFC SGNL                   $182,620.00 5/21/2009    4/13/2010
FAIRVIEW DR LANDSCAPING                            $255,504.73 5/21/2009

PACIFIC PAWNBROKER BLDG DMLTION                     $48,744.00 5/13/2009    2/22/2010

SCL MDCN HOWARD WTR LINE RPLC                      $116,318.00 5/1/2009     10/26/2009
LILLARD DR RECONSTRUCTION                         $2,472,881.00 7/30/2009
WELLS ELMNTRY KITCHEN REMODEL                                  7/2/2009
E WSTWTR TRTMNT POND 1 RECONST                     $519,275.73 6/3/2009     4/19/2010
09 CURB GUTTER & SIDEWALKS                         $369,900.96 5/22/2009    2/15/2010
INCLINE VILLAGE HI SCHOOLL EROSION CONTROL BMP     $596,099.02 6/2/2009     3/17/2010
CARSON HI SCHOOL PRESS BOX                         $260,000.00 5/22/2009
                                                   $119,900.00 6/3/2009
                                                      $9,844.00 6/3/2009
                                                      $6,414.00 6/3/2009
                                                    $12,254.00 9/3/2009
                                                      $8,000.00 6/11/2009
                                                    $10,561.00 6/11/2009
                                                      $3,386.00 6/11/2009
AUTOMATED WEATHER OBSRVTN SYS                      $150,000.00 6/15/2009
HAWTHORNE UTLTS BABBIT WELL                        $387,175.00 6/3/2009
MAINTENANCE YARD PHS 2                             $152,450.00 5/26/2009    11/20/2009
ALF SORENSEN RE-ROOF                               $428,800.00 5/27/2009
USPFO PAVE & POWER 2009                            $261,494.40 5/27/2009
STEAD TRAINING CENTER 2009                         $196,196.00 5/27/2009
ELY STATE PRISON ADA REHAB                         $196,482.00 6/11/2009
FIRE STA 2 HVAC REMODEL                            $153,139.00 6/3/2009     2/22/2010

CONTROL VALVE ACTUATOR RPLCMNT                      $97,050.00 6/4/2009     2/26/2010

AIR QUALITY OFFICES REMODEL                         $79,900.00 7/23/2009
DEVILS GATE 1 & 2 WATER TRANS                      $575,250.00 8/6/2009
FREEPORT BLVD & STENERI WAY                       $1,856,875.00 6/30/2009   12/23/2009
HWY 93 OVERPASS BIG GAME FENCE                     $342,401.92 7/16/2009
LANDER CO 2009 PAVING PROJECT                      $433,133.50 6/23/2009
REVITALIZATION OF SCHOOL-LODER                     $803,000.00 9/23/2009
UPPAWAY WTR STORGE TNK RPLCMNT                     $597,180.00 6/30/2009

09 ADA SIDWLK IMPRVMNT PHS 1                        $84,821.70 6/3/2009

09 ADA SIDWLK IMPRVMNT PHS II                      $120,407.00 6/3/2009
340,000 GALLON STRG RESVOIR COVR                   $213,500.00 6/18/2009
ELKO HI SCHOOL DRAINAGE MITIGATION                 $246,471.61 6/16/2009    10/2/2009
RENO CONSOLIDATED 09-02 PHS 1                      $920,055.13 7/9/2009     10/2/2009
RENO CONSOLIDATED 09-02 PHS 2                 $633,633.00 8/5/2009
GERLACH SEWER IMPROVEMENT                     $500,000.00 7/1/2009
MOVA BLVD RECONSTRUCTION                     $1,889,871.51 8/4/2009    12/22/2009
HARBECKE RANCH IRRIGTN WELL                   $250,000.00 7/15/2009
REVITALIZTN 4 ELEMNTRY SCHOOLS               $7,370,400.45 5/26/2009   4/14/2010
WATER METER PLAN PROJECT 12                  $1,432,737.00 8/14/2009
09/10 ST CUT PVMNT REPAIR INCLN VLG                       6/18/2009
09/10 ST CT PVMNT REPAIR TRKE MDWS                        6/18/2009
CC FRWY PHS 2B UTLTY RELO EDMNDS              $750,158.11 6/17/2009    4/29/2010
WINNEMUCCA GATEWAY                             $97,827.00 7/1/2009
CARSON CITY TOYOTA                           $5,535,246.00 2/25/2009

COTTONWOOD ELEM SCHL PRKNG LOT                 $63,611.12 6/15/2009    11/17/2009
SHERIFFS OFCE & JAIL ADDITN 7 REMDL               $582.18 7/6/2009
SUTRO ELMNTRY SCHOL PRKNG LOT                  $90,922.71 6/15/2009    10/29/2009
CURB & GUTTER PAVEMENT SLURRY SEAL MARKING                7/27/2009
JACKPOT AIRPORT PERIMNTR FNCNG                $252,123.72 6/23/2009

09/10 SLURRY SEAL & PATCH                     $162,007.00 6/30/2009    11/13/2009

CG MCHNCL E SIDE FSD HTHW PIPNG                $90,077.00 7/20/2009
ADA IMPRVMNTS CO FAIRGRNDS FLLON              $163,300.00 7/7/2009

LONGLEY LANE RECONSTRUCTION                   $889,575.72 7/24/2009    4/1/2010
VAN SICKLE BI-STATE PARK                     $2,460,368.64 8/25/2009
THIRD CREEK RESTORATION                       $833,182.00 7/15/2009
PERMANENT PATCH PROGRAM                       $249,825.00 6/24/2009
W WENDOVER ELMNTRY BUS LANE                   $213,176.00 7/27/2009
DERBY FIELD AIRPORT                            $47,764.40 8/12/2009
SPANISH SPRNGS SANITARY SWR PS 3             $6,699,554.50 7/8/2009
SOUTHSIDE TENNIS COURTS REHAB                 $353,742.44 7/22/2009
ECHO AVE RECONSTRUCTION                       $674,000.00 9/24/2009
EL RANCHO RECONSTRUCTION                      $989,573.00 8/11/2009
MECHANICAL JOT TRAVIS BOILR-GNRTR             $210,210.00 7/9/2009
DOUGLAS HI SCHOOL RE-ROOF PHS 2               $718,157.00 6/8/2009     10/2/2009
CAROL LANE ABANDONMENT                        $289,000.00 7/10/2009    2/5/2010
MILITARY ROAD RECONSTRUCTION                              8/17/2009
SIERRA ST BRIDGE REPAIR                       $106,902.76 7/21/2009    1/22/2010
PUBLIC SWIMMING POOL RENOVATIONS                          7/27/2009
OLD CLEAR CREEK RD FRONTAGE                   $298,604.78 7/23/2009
LINDEN-GROVE AREA SDWLK PHS 2                 $200,000.00 9/22/2009
VICTORIAN AVE SEWER REHAB                     $131,000.00 7/15/2009    11/20/2009
VISTA BOULEVARD WIDENING                     $6,184,099.85 8/12/2009
SHRIFFS OFC NNCTC EMRGNCY GENRTR              $139,375.00 4/7/2009     1/15/2010
SCRUGHAM ENGINEERING BLDG RM 123               $66,700.00 7/16/2009
SPRKS LBRY & MCGEE CNTR PRKNG                 $210,123.00 8/12/2009    11/5/2009
RUNWAY 5-23 OBSTRUCTION REMOVAL               $150,000.00 7/22/2009
SIERRA VISTA DRAINAGE                         $104,069.40 7/9/2009     3/17/2010
LAS BRISAS BLVD RECONSTRUCTION                $684,573.00 8/19/2009    12/21/2009
4TH STREET RECONSTRUCTION                     $150,419.20 7/16/2009
GOLCONDA SHOOL PHASE III B                    $666,405.85 11/1/2008    10/15/2009
MACKAY STADUM FIELD TURF RPLCM                            7/6/2009
HAWTHORNE INDUSTRIAL AIRPORT                  $104,924.94 8/12/2009
CARLIN SCL CHESTNUT ST IMPRVMNTS                    $237,102.18 8/4/2009     10/26/2009
09 SUMMER PVMENT REHAB                              $655,638.95 7/22/2009
ASBSTS ABTMNT & DMLTN PS III NGF                    $234,000.00 8/6/2009     11/23/2009
MICHAEL HOHL HONDA                                 $4,515,251.00 6/15/2009
MICHAEL HOHL SUBARU                                $3,938,632.00 6/15/2009

BRIDGE ST CIVIL IMPROVEMNTS/UNDER 100,000            $84,374.00 8/1/2009     1/15/2010
CSMS FRONT LOT ASPHALT RPLCMNT                      $197,000.00 7/8/2009
PLA REAR LOT ASPHALT REPLCMNT                       $118,800.00 7/8/2009
AASF AIRFIELD APRON REHAB                           $528,000.00 7/8/2009
MINDEN/TAHOE AIRPORT IMPROVEMENT #19 & 20           $467,755.60 7/16/2009    2/2/2010
TMWRF EFFLUENT PMP STA MODS PH2                     $175,000.00 8/4/2009
MORGN MILL RD RIVER ACCESS                          $219,939.61 8/5/2009     3/3/2010
BACKFLOW RETROFIT AT 8 SITES                                    9/15/2009
PIONEER DAM RECONSTRUCTION                          $970,850.00 7/30/2009
CITY OF W MUNICIPAL AIRPORT                         $314,022.47 8/12/2009    6/23/2010
CAVE ROCK WTR SYS IMPVMNTS PS 1                     $651,750.00 8/18/2009
RIVER PARK II                                       $297,944.62 4/14/2009    11/2/2009
AIRFIELD LIGHTING UPGRADES & MODIFICATIONS         $2,935,043.00 8/27/2009
ARFLD LTNG RPLC W ARFLD LTNG VLT                    $717,769.00 8/27/2009
GEN HOSPITAL AMBULANCE BARN                         $344,803.00 8/18/2009    5/6/2010
RANCH@GARD & BUCK RD TEST WELLS                                 8/4/2009
WHITAKER WATER MAIN EXTENTION                                   7/31/2009

SURFACE TRTMNT VARIOUS STS                          $220,000.00 8/7/2010     1/19/2010
APRON RECNSTRCTN PHS 13                            $2,662,819.00 8/27/2009
09 MICRO SURFACE PROJECT                            $243,040.50 8/5/2009
COMBINED SUPORT MNTNCE SHOP                         $956,695.00 8/19/2009

ROOF RPLCMNT-MAIN TERMINL 2,4,12                    $334,597.00 8/6/2009
PINION HILLS MDULR CLSRM ADDITION                               8/10/2009
SOLAR ARRAY RETROFIT                                $222,205.00 8/12/2009    6/11/2010
CC FAIRGROUNDS URBAN FISHING POND                   $654,525.30 8/24/2009    9/16/2010
LIGHTING UPGRADES AT 5 SITES                        $148,490.86 8/25/2009    3/23/2010

YERINGTON AIRPORT HELIPAD/UNDER 100,000              $97,811.00 8/21/2009

SITE ENTRY IMPRVMNTS NV NTNL GRD                                8/21/2009    2/26/2010
SHERIFFS OFFICE HU-7 HVAC RTROFIT                   $493,000.00 9/15/2009
STMGID WELL 12 CONSTRUCTION                                     8/27/2009
CC HI SCHL MULTI PURPOSE FACILITY PAVING            $250,000.00 8/14/2009
                                                     $65,308.00 8/17/2009
                                                    $216,712.00 8/7/2009
                                                   $1,202,556.00 9/10/2009
MITCHELL BOILER REPLACEMENT                         $244,364.89 9/23/2009    11/13/2009
850 ELM ST REMODEL-ELKO                                         9/22/2009
LINING OF WASTWATR TREATMENT POND                               9/9/2009
RELOCATION OF WASTEWATR TREATMENT PONDS                         9/22/2009
BABBIT WELL HOUSE                                               9/17/2009
RECHIM WATER SYSTME IMPROVEMENT                                 9/1/2009
HOLCOMB AVE RECONSTRUCTION                                      9/9/2009
GROUND WATER PROTECTION CARLIN CONSERVATION CORP    $950,000.00 8/27/2009
LDJ COMMUNITY CNTR PHOYVOLAIC SYS RETROFIT          $192,562.26 9/15/2009    6/2/2010
VALLEY ROAD MAIN REPLACEMENT                              $1,149,939.06 9/24/2009     8/19/2010
ELKO HIGH SCHOOL COLLEGE AVE IMPROVEMENTS                   $129,782.00 9/15/2009     7/15/2010
FIELDCREEK RECLAIMED RESERVOIR COVER REPLACEMENT                          9/1/2009
LANDER CO 2009 PHASE 2 PAVING                               $379,598.50 10/1/2009
AVIATION FUEL STORAGE & DISPENSING SYS                      $168,283.00 9/4/2009

BATTLE MT GEN HOSPITAL EMERGENCY DEPT- DAY ROOM ADD         $130,000.00 9/24/2009
PEDESTRIAN IMPROVENMNT-E 5TH ST & GONI RD.                  $581,016.00 9/29/2009
SPARKS & GALENA WELDING SHOP VENTILATION IMPRVMNTS                        9/29/2009
FLUME 18 RECONSTRUCTION                                     $424,500.00 9/29/2009
FLUME 1 RECONSTRUCTION                                      $779,500.00 9/29/2009

CALIFORNIA TRAIL SIGN PROJECT                               $163,000.00 9/23/2009
DAYTON COMMUNITY CENTER STRUCTURAL REHAB                                  9/15/2009
2009 FLUME REHABILITATION                                   $147,389.38 9/9/2009      2/11/2010
RENO AAA BASEBALL RETAIL PROJECT                          $3,000,000.00 6/15/2009

WELL # 50 DRILLING                                          $186,964.00 5/12/2009     3/3/2010
GENERAL REHAB & REFURBISHING VARIOUS SCHOOL SITES           $391,996.00 5/21/2009
                                                             $82,600.00 6/18/2009
                                                            $168,057.00 7/9/2009
                                                             $72,669.00 6/4/2009
                                                            $178,000.00 6/4/2009
                                                            $260,000.00 5/12/2009
                                                            $210,121.00 7/9/2009
                                                             $27,992.00 7/9/2009
                                                            $207,788.00 6/11/2009
                                                             $95,412.00 7/9/2009
                                                             $86,070.00 5/11/2009
                                                             $36,783.00 7/27/2009
                                                            $136,003.00 7/7/2009
                                                          $2,000,000.00 6/15/2009

                                                             $25,140.00 7/10/2009
GENERAL REHAB & REFURBISHING VARIOUS SCHOOL SITES            $68,900.00 7/20/2009
                                                             $55,552.00 7/30/2009
                                                            $278,000.00 7/30/2009
                                                             $84,747.00 7/30/2009
                                                            $127,000.00 7/30/2009
                                                            $529,007.00 8/20/2009
                                                            $128,249.00 8/17/2009

                                                             $31,387.00 9/8/2009
                                                            $128,249.00 8/19/2009
                                                             $36,783.00 7/29/2009
                                                         $13,832,631.00
                                                          $4,146,405.00
ENERGY EFFICIENCY & RENEWABEL ENERGY INITIATIVE          $20,739,414.00 10/10/2009
                                                      $427,373,376.99
YERINGTON WATER & SEWER IMPROVEMTNS PHS 3/ARRA                    $2,223,207.00 1/13/2010
SSWC WATER TREATMANT PLANT/ARRA                                   $2,089,000.00 1/6/2010
CITY WATER & SEWER IMPRVMNTS                                     $10,400,000.00 10/1/2009
2010 NEIGHBORHOOD ST REHABILITATION UNIT 1                        $1,696,696.00 12/15/2009
2010 NEIGHBORHOOD ST REHABILITATION UNIT 2                        $1,589,589.00 12/16/2009
2010 NEIGHBORHOOD ST REHABILITATION UNIT 3                        $1,363,333.00 12/17/2010
INTERBASIN STIPULATION WELLS Spring, Hamlin, Dry Lake Delamare    $2,462,300.00 10/1/2009
STOREY COUNTY JAIL FACILITY/EARTHWORKS $500,000/ARRA              $4,000,000.00 6/1/2010

                                                                    $77,256.00 12/4/2009
VISTA BLVD AT BARING BLVD INTERSECTION                              $81,587.94 11/10/2009
VETERANS PKWY AT GEIGER GRADE INTERSECTION                        $3,686,686.00 8/24/2010
PLUMB LANE AT HARVARD WAY INTERSECTION                            $5,000,000.00 4/6/2010
THACKER DAM RECONSTRUCTION                                        $1,285,000.00 11/1/2009
FALLON ARMORY RE-ROOF                                            $29,825,424.00 12/1/2010
WINNEMUCCA ARMORY RE-ROOF                                           $88,490.00 10/1/2009
MEDICAL EDUCATION LEARNING LAB BUILDING                          $27,000,000.00 10/29/2009
SO CARSON ST/EAGLE STATION LANE TRAFFIC SIGNAL INSTALL             $518,146.50 10/5/2009
FOOD SERVICE EQUIPMENT                                             $106,690.72 10/29/2009
TUSCARORA COMMUNITY CENTER REHAB-PHASE IV                          $156,000.00 10/19/2009
FAMILY CAMPGOUND IMPROVEMENTS                                      $162,505.00 7/13/2010
EAST 4TH STREET ENHANCEMENT                                        $440,000.00 9/1/2010
PROP PAD REPAIR FIRE SCIENCE ACADEMY, ELKO                         $191,465.00 10/15/2009

DESIGN-BUILD BOILER SYSTEM UPGRADE                                 $167,131.00 10/6/2009

STANDBY GENERATOR INSTALLATION                                      $98,680.00 4/29/2010
OXBOW NATURE STUDY BOARDWALK RESTORATION                                       11/3/2009
5TH AVE PEDESTRIAN PATH CMAQ PROJECT                               $519,006.00 12/3/2009
WATER RECLAMATION FACILITY EXPANSION & PS I HEADWORKS              $248,500.00 1/6/2010
HIGHWAY 50 LIFT STATION & FORCE MAIN REPLACEMENT                  $1,781,710.00 10/7/2009    8/13/2010
RATTLESNAKE HILL WATER TANK                                        $818,007.00 3/26/2010
CITY OF WELLS, PUBLIC WORKS BUILDING                               $347,555.00 10/6/2009     8/25/2010
FIRE & SECURITY ALARM SYSTEM RETROFIT                               $75,409.00 11/3/2009     5/26/2010
RATTLESNAKE HILL & RIO VISTA PIPELINE                              $648,007.00 3/26/2010
WHITE PINE CO EMERGENCY OPERATIONS CENTER                         $2,178,199.00 10/6/2009
NEW AV PACKAGE MULTI PURPOSE RM #104 DEPT OF AGRICULTR             $148,192.93 11/2/2010     5/7/2010

30 KW A/C MOODY EXPANSION                                                      N/A

1212 VICTORIAN AVE (SIMONS BUILDING) DEMOLITION                                11/4/2009     3/10/2010
LINING OF TREATMENT POND A & INSTALL OF BAFFLE CURTAIN             $164,585.00 10/23/2009
AUSTIN WASTWATER TREATMENT FACILITY (AARA)                         $797,831.28 3/3/2010
BOWLES LANE WATERLINE REPLACEMENT                                  $278,115.00 4/1/2010

DAVIDSON MATH & SCIENCE CNTR AUDIO/VISUAL PACKAGE                  $932,949.57 12/15/2009
DAVIDSON MATH & SCIENCE CNTR FURNITURE & SEATING                   $900,000.00 12/15/2009
VIRGINIA ST TRANSIT QUEUE JUMP                                    $1,100,000.00 2/3/2010
MILITARY RD RECONSTRUCTION                                        $2,220,220.00 10/9/2009
WATER SYSTEM IMPROVEMENTS FOR SSMWC (AARA)                        $2,220,220.00 1/1/2010
WELL EVALUATION & REHABLITATION/ARRA                                           10/3/2009
PROJECT 3 POLICE DEPT PHOTOVOITAIC PHASE                           $649,000.00 12/2/2010
PROJECT 1 FIRE STATION #4 PROJECT #1 LOCALLY FUNDED                      $170,855.79 12/2/2009     9/7/2010
PROJECT 2 FIRE STATION #5 PROJECT #2 LOCALLY FUNDED                      $174,576.00 12/2/2009
SCHURZ ELEMENTRY SCHOOL WATER SYS ARSENIC TREATMENT                      $145,343.00 12/29/2009
ROBB DR/SHARLANDS AVE INTERSECTION IMPROVEMENTS                         $1,500,000.00 10/3/2009
REVITALIZATION OF Sun Valley, Duncan,Corbett, & Booth Schools PHASE 1
&2                                                                      $5,383,591.00 11/10/2009
SOUND INSULATION PROGRAM PHASE 17.7 CONTRACTOR                           $406,669.00 7/8/2010      8/19/2010
LANDER CO 2009 PHASE 2 PAVING PROJECT                                    $450,000.00 5/1/2010

FIELDCREEK RECALIMED RESERVOIR COVER REPLACEMENT                         $315,587.00 10/18/2009
PUBLIC SWIMMING POOL RENOVATIONS                                          $91,455.00 1/7/2010
30 KW A/C MOODY EXPANSION                                                $238,729.00 NONE          6/28/2010
MOGUL SIPHONING DECOMMISSIONING                                          $245,800.00 11/19/2009
WAST WATER TREATMENT FACILITY                                            $896,663.40 1/11/2010
SCHURZ SCHOOL WATER SYS ARSENIC TREATMENT PLANT                          $145,343.00 12/2*/09
WELL EVALUATION & REHABILITATION                                          $25,000.00 10/3/2009
GERLACH SEWER IMPROVEMENT                                                $600,636.50 12/18/2009
09/10 CONCRETE REPLACEMENT CITY WIDE ON CALL AS NEEDED                               12/1/2009
2010 TRAFFIC SIGNAL ON CALL CONTRACT CITYWIDE                            $385,550.00 11/24/2009

WATER SYSTEM IMPROVEMENTS FOR SSMWC (AARA)                               $645,777.00 12/16/2009
TERMINAL & VILLANOVA HVAC                                                $555,000.00 12/3/2009

WASHOE LAKE SECURITY SYSTEM                                                $2,995.00 11/24/2009    12/21/2009
SECURITY CCTV SYSTEM INSTALL/AACT HIGH SCHOOL                            $307,015.00 5/21/2010
SECURITY CCTV SYSTEM INSTALL/DAMONTE RANCH HI, GERLACH &
WOOSTER                                                                  $145,000.00 5/20/2010
SECURTIY CCTB SYSTEM INSTALL/SPANISH SPRINGS HI SCHOOL                               N/A
DAYTON COMMUNITY CENTER STRUCTURAL REHABILITATION                         $98,000.00 11/24/2009

EXPLORATORY WELL                                                          $39,600.00 12/17/2009    2/16/2010
STMGID EXPLORATORY DRILLING                                                          12/17/2009

LIGHTING RETROFIT RICHARD BRYAN OFFICE BUILDING                           $86,015.00 11/24/2009

OPERATING ROOM ADDITION & REMODEL                                       $1,015,000.00 12/3/2009
YERINGTON WATER & SEWER WELL IMPROVEMENTS                                $250,000.00 11/19/2009
REPLACE ATTACHED GROWTH MEDIA SEWAGE TREATMNT UPGRDES                    $151,750.00 11/10/2009    5/24/2010
MCDERMITT PRODUCTION WELL                                                 $20,347.00 11/12/2009    5/25/2010




WATER & SEWER WELL IMPROVEMENTS                                          $265,020.00 3/16/2010     5/7/2010
SILVER ST PAVEMENT RESURFACING 5th TO IDAHO                              $863,134.50 3/5/2010
WATER & SEWER EXPLORATORY DRILLING                                                   11/12/2009
HIGHLAND CANAL LINING-MESA PARKE                                         $309,674.05 12/17/2009    8/25/2010
CANYON GID RECHIM WATER SYS IMPROVEMENT LOCKWOOD                         $750,000.00 2/5/2010
TMWRF EFFLUENT PUMP STATION MODS PHASE 3                                 $296,900.00 12/3/2010
SOUND INSULATION PROGRAM PHASE 19.1                                      $635,097.00 2/26/2010
CHURCHILL CO JUVENILE DETENTION FACILITY                                $3,200,000.00 12/17/2009
SOUND INSULATION PROGRAM PHASE 17.8                                      $470,585.00 2/25/2010
FEDERALLY FUNDED STIULUS ZEPHYR WY CURB GUTTER SIDWLK                    $171,171.00 12/16/2010
WATER & SEWER EXPLORATORY DRILLIJNG                                                  12/4/2009
RECHIM WATER SYS IMPROVEMENT LOCKWOOD                                    $835,274.00 1/14/2010
WATER RECLAMATION FACILITY EXPANSION & UPGRADE PHS 1              $248,500.00 12/17/2010
SEWER CLEAN & TV                                                  $106,100.00 1/8/2010
WINNIE LN CAPE SEAL IMPROVEMENT                                   $330,000.00 12/1/2009
ARRA STREET MAINTENANCE                                   341207-00.          4/20/2010
WA CO ARRA FUNDED PHOTVOLTAIC/E 9TH & NW LIBRARY                  $722,460.00 12/22/2010

JACKPOT WATER SYSTEM IMPROVEMENTS                                 $446,900.00 12/22/2009   9/1/2010
WASTEWATER TREATMENT FACILITY MODIFICATIONS                     $1,565,000.00 1/29/2010
GREAT BASIN COLLEGE CENTRAL RECEIVING REMODEL                     $284,248.00 1/5/2010     8/30/2010

OATS PARK PLAYGROUND EQUIPMENT                                     $95,777.00 1/29/2010    6/14/2010
BABBIT WELL HOUSE-INSTALL NEW HOUSE & PLUMBING                    $370,073.00 12/22/2009
PUBLIC DEFENDERS OFFICE REMODEL                                   $348,259.00 3/2/2010
GYM BLEACHER REPLACEMENT                                          $239,000.00 1/29/2010    8/25/2010
SECURITY CCTV SYSTEM INSTALL-PHASE 2                              $125,000.00 10/20/2009

LANDER CO WWTF POND ABONDONMENT                                    $71,775.00 1/7/2010
LYON CO DETENTION FACILITY                                     $16,000,000.00 2/17/2010
NORTH-SOUTH WATER TRANMISSION MAIN PHASE 1                      $1,991,106.00 1/8/2010
PRODUCTI0N WELL 4 DRILLING, CONSTRUCTION & TESTING                            1/6/2010
WEST 7TH ST WATER TANK                                            $892,007.00 1/7/2010

CHURCHILL CO OASIS SERWER INTERCEPTOR                           $1,164,000.00 1/14/2010
A-PRODUCTION WELL 4 REMODEL & PIPING MODIFICATIONS & B-
PRODUCTI0N WELL 24 PHASE 2 UPGRADES                               $927,900.00 1/14/2010
GREASE DIGESTION & COGENERATION DESIGN PROJECT                $154,487,000.00 1/15/2010
TOPSY LN INTERMIN IMPROVEMENT155,000.                             $129,798.00 4/20/2010
CITY OF RENO 2010 UNIT 2 MAIN REPLACEMENTS 285,000.               $211,800.00 1/13/2010
LEMMON VALLEY WATER SYS IMPROVEMENTS HEPNER PHS 7                 $994,000.00 5/6/2010
2010 PUMB STATION REHABILITATION                                  $397,857.00 1/26/2010

MORMON STATION WAGON SHED REPAIR                                              1/27/2010    5/18/2010

HI SCHOOL ADMIN BUILDING RE-ROOF                                              01/19/.09
CARLIN HI SCHOOL DRAINAGE IMPROVEMENTS                                        4/5/2010
TOLAS WATERWORKS ARSENIC TREATMENT-FALLON                         $455,520.00 7/20/2010    1/27/2010
WELLS ELEMENTARY KITCHE REMODEL & PARKING LOT                     $545,215.00 4/12/2010
CHALK BLUFF PARALLEL SIPHON                                       $202,117.92 1/14/2010
WWTP POND LINING ELY                                              $789,790.00 1/20/2010
2010 ARRA MICRO-PAVING                                            $793,215.25 2/28/2010
ROOP ST WIDENING PHS 2                                          $3,685,752.45 2/3/2010
ANSARIE BUSINESS BLDG 4TH FLOOR REMODEL                           $189,100.00 5/4/2010
FA VALLEY RD GREENHOUSES SOLOR PHOTVOLTAIC PR SYS                 $168,790.00 1/29/2010
RTC FIRE SUPPRESSION SYSTEM IN SELECT ROOMS                       $111,007.00 3/3/2010
RTC ACCESS BUS WASH SYSTEM                                        $146,300.00 3/4/2010

STAR CITY WATER SYSTEM IMPROVEMENTS                             $1,768,574.00 4/21/2010
ELKO HIGH SCHOOL BLEACHER REPLACEMENT                             $202,571.00 4/9/2010
HYDRAULIC VALVE OPERATOR MAINTENANCE AT SOUTH FORK                $104,340.00 3/8/2010     6/29/2010
EXPLORATORY DRILLLING & WELL IMPROVEMENTS                         $302,937.00 2/4/2010
EXPLORATORY DRILLING & WELL IMPROVEMENTS                          $434,671.00 2/4/2010
RTC FACILITY LIGHTING                                             $305,000.00 2/18/2010

SUTRO HVAC                                                         $69,347.00 2/4/2010
E WASHINGTON ST CDBG PEDESTRIAN IMPROVEMENTS                   $248,483.50 2/23/2010    8/25/2010
09/10 CONCRETE REPLACEMENT ON CALL CONTRACT                    $119,598.80 10/27/2009
2010 WATER PUMP STATION IMPROVEMENT                           $1,195,000.00 2/24/2010
LEGENDS AT SPARKS MARINA 14 SCREEN MOVIE THEATER              $5,283,715.00 PRIVATE
SOUND INSULATION PROGRAM PHASE 18.3                           $1,425,200.00 5/5/2010
SOUND INSULATION PROGRAM PHASE 19.3                            $524,161.00 5/26/2010
SOUND INSULATION PROGRAM PHASE 19.2                           $1,479,000.00 3/30/2010
SOUND INSULATION PROGRAM PHASE 18.4                            $679,000.00 5/25/2010
SAGE VALLEY MHP WATER TREATMENT FACILITY/UNDER 100,000                     2/12/2010
SOUND INSULATION PROGRAM PHASE 20.1                            $787,597.00 5/27/2010
ROOF MOUNTED PHOTOVOLTIAIC SYS                                $1,644,000.00 2/25/2010
RUBY VISTA DR WATER STORAGE TANKS EXTERIOR SURFACES
COATING                                                                    3/1/2010
09/10 PLYMOUTH DOTSON & GUALT WAY FEDERALLY FUNDED             $475,475.00 2/10/2010
MAIN ST WATER & SEWER RECONSTRUCTION                          $3,936,007.00 3/19/2010

PRODUCTION WELL 4 DRILLING, CONSTRUCTION & TESTING             $446,590.00 1/3/2010
BITTER BRUSH PARK                                              $317,171.35 2/17/2010    7/1/2010
2010 SURFACE TREATMENT OR CITY OF RENO STREETS                $4,341,500.00 3/10/2010
LEON DRIVE PEDESTRIAN PATH                                     $408,214.00 8/1/2010
DIAMOND PEAK SKIER SERVICES BUILDING                          $3,743,000.00 3/9/2010
FISH CLEANING STATION/UNDER 100,000                                        NONE         5/18/2010

REVITALIZATION OF THREE SCHOOLS                                            3/1/2010
RECONSTRUCT RUNWAY 3/21                                       $1,543,000.00 5/21/2010
GROUND WATER PROTECTION-WELLS CONSERVATION CAMP                $588,250.00 3/9/2010
GLENDALE WATER SUPPLY IMPROVEMENTS                            $3,766,000.00 4/13/2010
HUMBOLDT CONSERVATION CAMP ARSENIC TREATMENT PLANT             $317,900.00 3/25/2010
RENO BASEBALL STADIUM RETAIL & TENANT IMPROVEMENT              $104,900.00 N/A

ARRA DOE GRANT HVAC REPLACEMENT                                $117,882.00 N/A          6/24/2010
APRON RECONSTRUCTION PHASE 14                                 $3,124,124.00 3/4/2010
ROCK CRUSHING AT EDEN VALLEY SOUTH PIT BURMA PIT & REINHARD
PIT IN PARADISE VALLEY                                         $100,000.00 2/25/2010
REPLACE FIRE ALARM SYSTEMS GROUP 3 WHITEHEAD ES                            1/20/2010
REPLACE FIRE ALARM SYSTEMS GROUP 3 VERDI ES                                1/20/2010
REPLACE FIRE ALARM SYSTEMS GROUP 3 BECK ES                                 1/20/2010
REPLACE FIRE ALARM SYSTEMS GROUP 3 DUN ES                                  1/20/2010
GREAT BASIN COLLEGE PHOTOVOLTAIC                               $282,882.32 3/18/2010
EAST LINCOLN WAY REHABILITATION-STANFORD TO HOWARD             $795,795.00 4/21/2010
SUN VALLEY POOL HEATER                                         $215,500.00 3/30/2010
2010 FIRE FLOW ENHANCEMENT                                     $494,000.00 4/14/2010
HYMER AVE STORM DRAIN RECONSTRUCTION PHASE II                  $254,291.25 3/3/2010     7/1/2010

WHITES CREEK PARKING LOT IMPROVEMENTS                                      3/2/2010
FEDERAL INSPECTION SERVICES BAGGAGE RENOVATION                 $160,000.00 3/30/2010
PHOTOVOLTAIC POWER @ BENNETT ELEMENTARY SCHOOL                 $263,046.00 3/11/2010    9/3/2010
PHOTOVOLTAIC POWER @ WOOSTER HIGH SCHOOL                       $458,431.78 3/11/2010    8/25/2010
WRF EQUALIZATION IMPROVEMENTS PROJECT 2010                                 3/16/2010
2010 PREVENTIVE MAINTENANCE SLURRY                            $4,919,471.69 4/20/2010
2010 PREVENTIVE MAINTENANCE PATCHING                          $1,297,000.00 3/16/2010
RENO CONSOLIDATED 10-02                                       $1,653,382.00 6/23/2010
PARR BLVD REHAB                                               $2,054,952.00 7/7/2010
INTERNATIONAL PLACE & ICEHOUSE RD                        $349,569.72 5/12/2010    8/26/2010
WRF EQUALIZATION IMPROVEMENTS PROJECT 2010               $443,956.00 7/2/2010
I-80 PYRAMID WAY NE & NW QUADRANT MATCH LANDSCAPE                    6/2/2010




SPARKS FEEDER MAIN PHASE IV                             $1,276,945.00 3/11/2010
BUILDING #8 TEMPERATURE CONTROLS UPGRADE NNAMHS          $218,318.00 3/18/2010
CULINARY WATER HEATING RENOVATION NO NV CORRECTIONAL      $69,239.00 3/16/2010    7/23/2010
LIGHTING UPGRADE NV HISTORICAL SOCIETY                   $107,770.00 3/25/2010

E GLENDALE AVE SANITARY SEWER REHABILATATION             $374,646.30 3/23/2010
PECKHAM & WHITE FIR TRUCK FILL STATION                   $356,283.00 3/16/2010

HUMBOLDT GENERAL HOSPITAL MRI REMODEL                    $526,105.00 3/18/2010

BYCICLE PATH AT WASHOE LAKE STATE PARK                   $490,000.00 3/24/2010
WATER RESERVOIR INTERIOR & EXTERIOR RECOATING            $120,753.40 3/30/2010    8/9/2010
FERNELY HI SECONDARY ACCESS & NDOT IMPROVEMENTS          $704,000.00 4/21/2010
MDF COOLING RETROFIT AT 12 SCHOOLS                       $243,355.00 3/23/2010
SPOONER PUMPING STATION IMPROVEMENT                                  2/25/2010
BID FOR 2010 STREET REHAB VARIOUS SITES                 $1,286,286.00 3/26/2010
MCKINLEY PERVIOUS CONCRETE DEMONSTRATION PARKIN G LOT    $175,000.00 5/1/2010
SILVE LAKE RD REHAB STEAD TO SKY VISTA                   $675,007.00 5/11/2010
S VIRGINIA ST/KEITZKE LANE IMPROVEMENTS                  $716,007.00 4/14/2010
SPARKS CONSOLIDATED 10-01 RECONSTRUCTION                $4,092,920.00 5/4/2010
RENO CONSOLIDATED 11-01 RECONSTRUCTION PHASE 1           $400,000.00 5/20/2010
RENO CONSOLIDATED 11-02 RECONSTRUCTION PHASE 1          $1,200,000.00 6/23/2010
RENO CONSOLIDATED 10-01 RECONSTRUCTION                  $1,200,000.00 7/27/2010
INFRASTRUCTURE UPGRADE HUNSBERGER, MATHEWS & SPANISH
SPRINGS ELEMENTARY SCHOOL                                $748,595.00 3/30/2010

IFRASTRUCTURE UPGRADE MATTHEWS ES                                    3/30/2010

INFRASTRUCTURE UPGRADE SPANISH SPRINGS                               3/30/2010
HOLCOMB AVE RECONSTRUCTION                              $1,277,007.00 8/5/2010



PAVEMENT REHABILITATION & NEW PAVEMENT HUMBOLDT
CONSERVATION CAMP 09-S05 E                               $236,236.00 4/1/2010
PAVEMENT REHABILITATION & ADA SIDEWALKS CARLIN
CONSERVATION CAMP 09-S05 E                                           3/31/2010
NORTHSIDE ELEMENTARY CAMPUS LIGHTING RETROFIT            $137,400.00 4/1/2010     9/10/2010
ELKO HIGH SCHOOL CAMPUS LIGHTING RETROFIT                $300,000.00 4/1/2010
ICA MACKAY STADIUM ARTIFICIAL TURF REPLACEMENT           $461,061.92 4/15/2010
DMV COMMERCIAL DRIVERS LICENSE-PAVEMENT REPLACEMENT      $253,422.04 4/1/2010     8/6/2010
GARDNERVILLE RANCHOS 2010 STREET MAINTENANCE PROJECT     $641,465.43 4/29/2010
VICTORIAN SQUARE PH 2A PUBLIC INFRASTRUCTURE IMP PROJ   $1,224,144.00 4/7/2010
SOLAR PANEL INSTALLATION AT CORPORATE                    $175,253.00 3/5/2010
DETR/NSHE ENERGY SERVICES PERFORMANCE CONTRACT                       5/1/2010

LOVELOCK WWTP SCREENTING FACILITY                                    6/14/2010
ROOFING AT VETERANS ELEM SCHOOL-SECTIONS B & C           $120,320.00 4/8/2010
ROOFING AT CANNAN ELEM SCHOOL-SECTIONS A & D             $195,815.00 4/8/2010
ROOFING AT ECHO LODAR ELEM SCHOOL SECTIONS A B C & D     $324,245.00 4/8/2010
SO LYON MEDICAL CENTER PARKING LOT REHABILITATION      $227,356.00 4/22/2010
2010 ANNUAL STREET REHABILITATION                         $3,000.00 4/26/2010
ROOFING AT GERLACH HIGH SCHOOL SECTIONS A, B1 & B2     $286,965.00 4/8/2010
ROOF REPLACEMENT YERINGTON ARMORY                                  3/30/2010    4/1/2010
REDFIELD CAMPUS TELESCOPE INSTALLATION                 $149,100.00 4/10/2010
SOM CENTER FOR MOLECULAR MEDICINE AUDIO VIDEO SYS      $566,006.00 4/16/2010

S LARKIN CIRCLE STORM DRAIN REPLACEMENT                $192,214.75 4/8/2010
CRESCENT VALLEY WATER TREATMENT PLANT PRE-PURCHASE    $1,000,000.00 5/20/2010
CBI LAB AT SPARKS HS                                   $445,000.00 5/13/2010
CBI LAB AT HUG HS                                                  4/23/2010
CBI LAB AT WOOSTER HS                                              4/23/2010
CBI LAB AT RENO HS                                                 4/23/2010
PHOTOVOLTAIC POWER PRODUCTION                          $293,995.00 6/18/2010
PHOTOVOLTAIC POWER PRODUCTION                          $606,400.00 6/11/2010
PHOTOVOLTAIC POWER PRODUCTION                          $292,500.00 6/18/2010
PHOTOVOLTAIC POWER PRODUCTION                          $266,800.00 6/18/2010
RTC-RIDE HYDRAULIC LIFT REPLACEMENT                                8/1/2010
WATER & SEWER PUMP DEVELOPMENT-TESTING OF WELL                     4/9/2010
CARSON CITY PRODUCTION WELL 50 & 24 INCH WATER LINE
CONSTRUCTION                                           $900,000.00 4/19/2010
RENO CONSOLIDATED 10-05 PROJECT                        $706,706.00 6/8/2010
REVITALIZATION OF ELMCREST                            $2,247,331.00 4/8/2010
2010 PERMANENT PATCH PROGRAM                           $454,000.00 4/9/2010
2010 SPARKS/ RTC CONSOLIDATED PROJECT                  $268,981.31 4/15/2010    8/31/2010

EUREKA HIGHSCHOOL TRACK & FIELD PROJECT                            4/13/2010
ALFONSO DRIVE RECONSTRUCTION                          $1,435,000.00 4/26/2010
TANBURG DRIVE                                          $274,000.00 5/26/2010
YORK WAY                                              $1,512,444.00 7/8/2010
EAST GLENDALE AVE                                     $1,076,160.37 6/30/2010
ASBESTOS ABATEMENT AT ANDERSON ELEMENTARY SCHOOL                   4/29/2010
ASBESTOS ABATEMENT AT WOOSTER HIGH SCHOOL                          4/29/2010
CENTRAL LYON CO FIRE DIST STATION #37                 $2,200,000.00 N/A
                                                       $331,331.00 7/16/2010
                                                       $180,199.00 8/6/2010
                                                        $40,216.75 8/6/2010
                                                        $68,635.00 8/6/2010
                                                          $7,176.00 8/6/2010
                                                        $99,500.00 8/6/2010
                                                        $46,661.00 8/6/2010
                                                        $39,771.00 8/6/2010




SILVERBUD PHASE 2 SS LATERALS FERNLEY NV                           3/29/2010

SEWER LIFT STATION CATHODIC PROTECTION RETROFIT                    4/29/2010
PHOTOVOLTAIC POWER PRODUCTION ALLEN ELEMENTARY         $287,400.00 5/13/2010
PHOTOVOLTAIC POWER PRODUCTION HUG HIGH                   $434,000.00 5/13/2010
EUREKA CO COURTHOUSE PAINTING                            $130,000.00 5/6/2010
2010 SEALING PROJECT                                     $149,709.16 5/20/2010

JOBS PEAK RANCH DIFFUSED AIR WATER TREATMENT FACILITY   $1,135,792.00 6/29/2010
OFFICE REMODEL PHASE 1 860 ELM ST                                    5/18/2010
TMCC MEADOWOOD HVAC                                      $500,000.00 4/29/2010
MINDEN 2010 STREET REHABILITATION                        $400,000.00 4/28/2010
MINDEN 2010 BUCKEYE & EAST VALLEY WATERLINE             $1,600,000.00 5/26/2010
SPICE ISLAND & UNITED CIRCLE REHABILITATION             $3,605,745.00 4/6/2010
PARR CIRCLE & CATRON DRIVE REHABILITATION               $1,474,380.00 7/14/2010

LAKE VILLAGE PHS II WATER QUALITY IMPROVEMENT           $1,500,000.00 4/20/2010
RHGID 2010 PAVEMENT REHAB                                $400,208.00 5/14/2010
SHERWOOD DR WATERLINE REPLACEMENT                        $183,840.00 5/14/2010
HUBBARD WATERLINE REPLACEMENT                                        5/14/2010
LOWER KINGSBURY WATER METERING                           $357,100.00 5/14/2010
KINGSBURY VILLAGE WATER METERING                         $313,950.00 5/14/2010
SKI CT WATERLINE REPLACEMENT                                         5/14/2010
BJ'S RESTAURANT AT THE LEGENDS                           $100,000.00 4/12/2010


ENERGY CONSERVATION                                      $290,000.00 4/12/2010

REVITALIZATION OF HUNTER LAKE ELEMENTARY SCHOOL         $1,734,046.00 3/25/2010
SHOSHONE & Cleveland Ranch Monitor Well Construction    $4,500,000.00 7/1/2010

REVITALIZATION OF MT ROSE ELEMENTARY SCHOOL             $1,307,204.00 4/7/2010
SPRING CREEK HI ENTRY ROAD PAVEMENT REPLACEMENT          $261,413.00 5/18/2010    9/2/2010
MAN TERMINAL BLDG EXTERIOR UPGRADE STONE & STUCCO        $220,000.00 5/1/2010

PERIMETER ACCESS SYSTEM                                  $250,000.00 5/13/2010
RUNWAY 5-23 OBSTRUCTION REMOVAL PHASE 2                  $400,000.00 5/21/2010
PARKING GALLERY                                          $150,000.00 TBA
DISTRICT WIDE RE-KEYING                                              6/3/2010
SOM CENTER FOR MOLECULAR MEDICINE PROVIDE & INSTALL
FURNITURE IN LAB WING                                    $226,257.35 5/13/2010
REMOVAL OF OBSTRUCTIONS FROM RUNWAY 5-23                 $400,000.00 5/21/2010
PAVINE EMERGENCY VEHICLE ACCESS ROADWAY                  $149,007.00 5/26/2010
BOILER REPLACEMENT DODSON ES                             $179,614.98 6/1/2010
BOILER REPLACEMENT DIEDRICHSEN ES                        $200,000.00 5/28/2010
BOILER REPLACEMENT LENZ ES                               $200,000.00 5/28/2010
BOILER REPLACEMENT PALMER ES                             $200,000.00 5/28/2010

SLURRY SEAL                                              $170,000.00 6/15/2010
PHOTOVOLTAIC POWER PRODUCTION BEASLEY ES                 $313,925.00 6/8/2010
PHOTOVOLTAIC POWER PRODUCTION CAUGHLIN RANCH ES          $280,000.00 6/18/2010
PHOTOVOLTAIC POWER PRODUCTION WINNEMUCCA ES                          5/12/2010
LANDER CO STREET REHABILITATIONS 2010                    $253,578.00 5/25/2010

NO NV CORRECTIONAL CENTER FIRE ALARM UPGRADE             $708,325.00 6/24/2010
VIRGINIA CITY YOUTH & COMMUNITY CENTER                   $379,759.76 7/14/2010
                                                          $17,800.00 9/14/2010
                                                            $9,925.00 9/14/2010
                                                            $8,000.00 9/14/2010
                                                             $78,200.00 9/14/2010
                                                             $65,006.00 9/14/2010
                                                               $5,463.00 9/14/2010
                                                               $4,586.00 9/14/2010
                                                               $5,800.00 9/14/2010
                                                               $2,396.76 9/14/2010
                                                             $63,840.00 9/14/2010
                                                             $85,597.00 9/14/2010
                                                             $24,853.00 9/14/2010
                                                               $5,893.00 9/14/2010
                                                               $2,400.00 9/14/2010
                                                             $14,500.00 7/2/2010
                                                             $92,379.15 7/2/2010
GERLACH HI SCHOOL PAVING & DRAINAGE IMPROVEMENTS            $153,304.00 5/20/2010
FLOORING AT WOOSTER HIGH SCHOOL                             $410,594.00 5/18/2010
LOVELOCK WWTP SCREENING FACILITY                            $704,000.00 6/14/2010
MEADOW LANE LIFT STATION REHABILITATION                     $703,780.00 6/14/2010
NO NV VETERANS MEMORIAL CEMETERY PHS 2-A                    $500,000.00 5/27/2010
WESTERN NEVADA COLLEGE ROOF REPLACEMENT OF BRISTLECONE ,
ASPEN, PINION, SAGE & GETTO BUILDINGS                       $461,500.00 5/27/2010
AVE B 13TH TO 14TH SEWER                                    $104,000.00 5/24/2010
ABATEMENT OF SOFFITS AT MIDDLE SCHOOL                        $11,730.00 3/24/2010
WOOSTER HI PAVING & DRAINAGE IMPROVEMENTS                   $629,007.00 5/27/2010
INDUSTRIAL DRIVE RECONSTRUCTION                             $729,007.00 5/26/2010
RENO CONSOLIDATED 10-04 PROJECT                            $4,122,444.00 7/13/2010
HCSD ARRA PROJECTS LOWRY HI SCHOOL                          $154,900.00 6/15/2010


                                                            $253,155.00 6/15/2010
HCSD BONO PROJECTS VARIOUS SCHOOLS                          $118,200.00 6/8/2010
                                                             $16,732.00 6/9/2010
                                                               $4,720.00




                                                             $24,874.00
CCSD LIGHTING RETROFIT 3 SCHOOLS                            $201,464.00 6/16/2010
PV SOLAR SYSTEMS HI SCHOOL & ELEMENTARY                     $274,171.00 6/21/2010
HIGH SCHOOL SOLAR SYSTEMS 8O KW                              $39,614.00 6/22/2010
SUMMER PROJECTS HVAC, ELEC, ROOF STRUCTURE                 $3,000,000.00 MAY/JUNE
                                                            $465,250.00 5/4/2010
                                                            $266,100.00 5/4/2010
                                                           $1,093,923.00 5/4/2010
                                                           $1,309,394.00 JOINDER
                                                             $39,615.00 6/22/2010
ECHO LODER SCHOOL FIELD RENOVATION                          $200,000.00 6/24/2010
ROLLING A WWTP SLUDGE POND MODIFICATIONS                    $279,931.88 6/15/2010
2010 SPARKS ST REHABILITATION UNIT 1                        $676,676.00 5/26/2010
2010 INTERSECTION CORRECTIVE MAINTENANCE                   $1,066,438.47 8/20/2010
EXTERIOR BUILDING PAINTING                                                 6/1/2010
LARKIN CIRCLE & MADISON AVE RECONSTRUCTION                 $1,744,897.00 7/13/2010
OFFICE REMODEL PHASE 850 ELM ST                                            6/15/2010
PEDESTRIAN PATH/BIKE LAND ENHANCEMENT                       $800,000.00 9/1/2010
SANTA MARIA AQUATIC PARK                                     $100,000.00 6/24/2010
GENERAL HOSPITAL REMODEL & MEDICAL OFFICE BLDG ADD          $9,407,000.00 6/17/2010
COOPERATIVE EXTENTION BLDG REROOF                            $163,100.00 5/27/2010
TMCC NURSING-RED MOUNTAIN & REDFIELD                         $267,000.00 5/27/2010
RE-ROOF NEVADA YOUTH CENTER, 9 COTTAGES                      $770,000.00 7/20/2010
NETWORK REWIRING 2:PHASE ONES                                $163,532.00 7/9/2010
SNYDER AVE RE-ALIGNMENT (MEDIAN MOD)                         $173,000.00 5/25/2010
PARKING LOT IMPROVEMENTS AT PICOLLO SCHOOL                   $582,454.00 6/16/2010
2010 WINNEMUCCA CHIP SEAL                                    $379,699.49 6/3/2010
RIDGEVIEW DRIVE RECONSTRUCTION                               $298,007.00 8/3/2010
OXBOW PARK STREAMBANK & INFRASTRUCTURE PROTECTION            $200,000.00 N/A
LOOP RD & SALOMON CIR REHABILITATION                        $4,344,343.00 6/29/2010
VEHICLE MAINTENANCE FACILITY YARD PAVING                     $150,000.00 7/1/2010
WASHOE LAKE STATE PARK ADA IMPROVEMENTS                      $255,022.00 6/17/2010
WOOSTER HI CEILING/SOFFIT REPLACEMENT                        $158,600.00 6/10/2010
2011 STREET REHABILITATION-UNIT 1                            $604,444.00 6/10/2010
LINDA WAY & SOUTHERN WAY RECONSTRUCTION                     $1,073,007.00 8/31/2010
WELDING SHOP VENTILATION & EXHAUST IMPROVEMENTS AT GALENA
& SPARKS HIGH SCHOOLS                                        $173,943.00 6/9/2010     9/7/2010
EAST 4TH ST CELLAR VAULT REPLACEMENTS                        $100,000.00 6/1/2010

RE-ROOF ELKO MAIN ARMORY BUILDING                             $87,256.50 6/10/2010
LANDFILL & ANIMAL CONTROL BUILDING                           $400,000.00 OCTOBER
WRF EFFLUENT REUSE SITE N PIVOT RIB EXPANSION                $995,209.80 6/25/2010
COLISEUM WAY/YORI AVE REHABILITATION                         $595,007.00 7/8/2010
JOE CROWLEY STUDENT UNION 1ST FLOOR OPS WELCOME CNTR          $91,479.00 6/16/2010
OFFICE REMODEL-REMODEL AT 8580 ELM ST ELKO                   $772,200.00 7/6/2010
PURCHASING WAREHOUSE SEISMIC RETROFIT                        $250,300.00 6/22/2010
FRISTCH ELEMENTARY SCHOOL ROOF/ENTRY REMODEL                 $175,000.00 6/24/2010
2ND JUDICIAL DISTRICT COURT DEPT 15 TENANT IMPROVEMENT       $850,000.00 7/7/2010
SECURITY CIRCLE RECONSTRUCTION                              $1,100,000.00 8/1/2010
RUNWAY 9 CONNECTOR NORTH APRON & TAXIWAY C                  $1,000,000.00 8/1/2010
BATTLE MOUNTAIN/LANDER CO 2010 PHASE 2 PAVING                $328,825.00 6/29/2010

CARSON CITY WATERFALL FIRE WATERSHED IMPROVEMENTS PHASE 2    $188,642.00 6/30/2010
FERNLEY SHERIFF SUB STA CHN ADDITON & REMODEL                $180,000.00 11/24/2010
SILVER OAK DRIVE & N CARSON ST INTERSECTION IMPROVEMENTS     $316,007.00 6/28/2010
MAE ANNE AVE PHASE 3/AVENIDA DE LANDA                       $1,529,007.00 8/6/2010

LAKESIDE DR SANITARY SEWER TRUNK REPLACEMENT                $1,673,802.80 7/21/2010
MACKAY STADIUM SO END ZONE FOODSERVICE IMPROVEMENTS          $518,388.00 6/2/2010
RENO HIGH SCHOOL BOILER UPGRADES                                         6/24/2010
WINNEMUCCA ENERGY EFFICIENCY RETRO-RIT                       $800,000.00 7/29/2010
N DOUGLAS CARSON CITY WATER LINE INTER-TIE PHS 1 SEC-1      $2,823,417.00 7/20/2010
SANITARY SEWER SYSTEM UPGRADES, NNCC                         $249,970.24 7/13/2010
BATTLE MUNTAIN WATER & SEWER TRANSMISSION MAINS &
DOMESTIC WELLS                                              $3,261,462.85 7/20/2010
BATTLE MOUNTAIN WATER TANK                                  $1,251,500.00 8/17/2010
BRAVO AVENUE                                                 $814,814.00 7/12/2010
LCB PARKING GARAGE PHOTVOLTAIC RETROFIT & PARKING GARAGE
LIGHTING RETROFIT                                            $301,310.00 7/8/2010
FAN COIL UNIT & BOILER REPLACEMENTS                         $2,407,804.00 NONE
JVES BOILER REPLACEMENT & CCHES FAN COIL REPLACEMENT         $440,955.00 NONE
HIGH SCHOOL ATHLETIC TRACK                                   $700,000.00 7/6/2010
REVITALIZATION OF LEMMON VALLEY ELEMENTRY SCHOOL            $1,927,805.00 4/8/2010
LOMBARDI RECREATION CENTER WELLNESS CENTER EXPANSION         $134,000.00 7/1/2010
TANBERG DRIVE                                                            7/28/2010
NORTH GENE L JONES WAY SIDEWALK                              $129,329.12 7/27/2010
STMGID WELL 12 CONSTRUCTION                                  $420,000.00 7/20/2010
LYON CO UTILITIES MAINTENANCE BUILDING                       $492,006.00 9/14/2010
RENO SEWER REHAB IN LAKESIDE DR MANZANITA LN & PLUMAS        $235,100.00 7/20/2010
2010 AMBER WAY WATER TANK                                   $2,000,000.00 7/27/2010

UNR EARLY HEAD START IMPROVEMENTS AT NNEIS                    $70,947.00 6/22/2010
EUREKA CO 2010 STRETT MAINTENANCE                           $1,110,007.00 7/20/2010
YERINGTON WATER TREATMENT PLANT                             $4,000,000.00 7/7/2010
PRISON HILL WATER TANK #2 CONSTRUCTION PLANS                $1,237,007.00 7/16/2010
HVAC SEELIGER ELEMENTARY SCHOOL                              $499,891.00 6/16/2010


HUMBOLDT GENERAL HOSPITAL BOILER REPLACEMENT                 $451,000.00 7/22/2010
CONSTRUCT AIRPORT                                           $4,000,000.00 8/2/2010
MEADOW LANE LIFT STATION REHAB                               $407,305.00 9/1/2010
LOVELOCK WWTP SCREENING FACILITY                             $704,000.00 9/1/2010
INSTALL NEW EQUIPMENT & PARKING AREA                         $250,000.00 7/20/2010
CITY GOVERNMENT COMPLEX SOLAR VOLTAIC                        $350,000.00 7/27/2010
LOVELOCK PUBLIC WORKS FACILITY                              $1,275,954.00 7/29/2010
SKY TAVERN BUILDING REHABLITATION-PERMANENT RETROFIT         $450,000.00 7/29/2010

POPEYES LOUISIANA KITCHEN                                    $986,632.29 3/16/2010
COOPERATIVE EXTENSION 4955 ENERGTY WAY BUILDING REMDL        $739,000.00 8/13/2010
2010 WATER MAIN LINING                                       $293,670.00 7/29/2010
WINNEMUCCA POLICE STATION                                    $675,000.00 8/26/2010
ODOR CONTROL MODIFICATIONS                                   $400,000.00 8/26/2010
INCLINE & THIRD CREEK RESTORATION-INCLINE WY CULVERT
REPLACEMENT                                                 $1,546,860.00 7/29/2010
CONCESSION/STORAGE VACILITY & BLEACHERS & PRESS BOX          $650,000.00 7/13/2010
BUS BARN & ASSOCIATES SITE WORK                              $350,000.00 7/13/2010
CC PUBLIC WORKS SOLAR PHOTOVOLTAIC SYSTEM                    $500,000.00 7/30/2010
PHOTOVOLTAIC POWER PRODUCTION MOSS ELEMENTARY               $1,051,034.00 8/17/2010

PHOTOVOLTAIC POWER PRODUCTION SPANISH SPRINGS ELEMENTARY     $280,000.00 8/4/2010
PHOTOVOLTAIC POWER PRODUCTION TAYLOR ELEMENTARY              $280,000.00 8/4/2010
VAN GORDER ELEMENTARY PHOTOVOLTAIC                           $280,000.00 8/4/2010
WASHOE CO REGIONAL PARKS OPEN SPACE HAWKINS FIRE
ECOSYTEM RESTORATION                                         $530,000.00 7/29/2010
WASHOE CO REGIONAL PARKS OPEN SPACE PEAVINE FIRE ECOSYTEM
RESTORATION                                                  $430,000.00 7/29/2010
PUBLIC SAFETY TRAINING BUILDING FIRE ALARM & SPRINKLER       $137,380.00 8/5/2010
AGRICULTURE HEADQUARTERS SITE FENCING & INFRASTRUCTURE
Installation                                                  $77,500.00 7/27/2010
RENO-STEAD AIRPRT RUNWAY 8/26 SAFETY AREA IMPROVEMNTS       $4,000,000.00 7/30/2010
CCHS GYMNASIUM REROOF                                        $140,000.00 7/6/2010
MINNE BLAIR/NEW SCIENCE WING                                 $700,000.00 6/22/2010
OHS ROOF/CCJHS SCIENCE WING                                  $480,000.00 6/22/2010


CCJHS GYMNASIUM REROOF                                       $225,000.00 7/6/2010
WINNEMUCCA SCAOA SYSTEM REPLACEMENT                          $250,000.00 8/18/2010
UPGRADE ELECTRICAL POWER STEWART COMPLEX                     $1,500,000.00 8/17/2010

I-80/PYRAMID WY NE & NW QUADRANT COMMUNITY MATCH LANDSCAPE    $365,000.00 9/15/2010
ZEPHY WATER UTILITY DIST-WATER TREATMENT                      $308,799.00 8/25/2010


STOREY CO ENERGY EFFICIENT COMMUNITY BLOCK GRANT              $403,690.00 8/5/2010
BACKFLOW PREVENTION AT KATE SMITH JUNIPER DUNCAN & WARNER
ELEMENTARY SCHOOLS                                                        8/19/2010
FOOTBALL FIELD SYNTHETIC TRUF & TRACK EUREKA HS               $648,900.00 5/19/2010
AVENUE C WATER                                                $175,000.00 8/3/2010
WEST SHORE BOAT RAMP & IMPROVEMENTS                           $350,000.00 8/26/2010
MOGUL FLUME JUNCTIONS 1,2 & 3 REMOVAL DRAINAGE                $132,775.00 8/17/2010
DIGESTER #4 FLOATING COVER RENOVATION                        $1,000,000.00 9/13/2010
QUASI-MUNICIPAL WELL #2 REPLACEMENT                           $270,000.00 8/10/2010

THACKER DAM & PITT-TAYLOR CANA IMPROVEMENTS                  $1,557,505.00 9/2/2010
CAMPUS GENERAL ELECTRICAL PARKING COMPLEXES LIGHTING
RETROFIT                                                      $300,000.00 8/13/2010
COLLEGE PARKWAY WATER MAIN EXTENSION                                      9/3/2010
REPLACE FLOORING NORTHERN NEVADA CORREDCTION CENTER
REGIONAL MEDICAL MEDICAL FACILITY                             $351,484.00 8/18/2010
NEVADA YOUTH TRAINING CENTER DORM FIRE SPRINKLER INSTAL       $395,995.00 8/26/2010
HARRY REID ENGINEERING LAB EARTHQUAKE LAB EXPANSION PHS 1    $2,600,000.00 9/23/2010
NEW EQUIPMENT PARKING AREA ARMORY                             $175,000.00 8/17/2010
CITY OF RENO 2011 UNIT 1 MAIN REPLACEMENT                     $721,597.50 8/17/2010
SOLAR PROJECT NOT ARRA OR STIMULUS                            $258,530.00 JOINDER
AGRICULTURE HEADQUARTERS & LAB BUILDING INTERIOR
REMODELING                                                                8/6/2010
REPLACE HOT WATER STORAGE TANKS NV STATE YOUTH TRAINING
CENTER                                                        $262,826.00 8/26/2010
WRF BIOSOLIDS DRYING BED                                      $450,000.00 7/3/2010
PHOTOVOLTAIC POWER INSTALL                                    $273,700.00 8/31/2010
PHOTOVOLTAIC POWER INSTALL                                    $276,550.00 8/31/2010
PHOTOVOLTAIC POWER INSTALL                                    $278,450.00 8/31/2010
BRIAN WHALEN PARKING COMPLES RE COAT UPPER DECK               $180,000.00 8/16/2010
WILSON ST WATER & SEWER REPLACEMENT                           $225,000.00 9/17/2010
CASHMAN LIFT STATION RECONSTRUCTION                           $500,000.00 9/17/2010

PROVIDE & INSTALL BAY DOOORS FOR NATIONAL GUARD               $120,000.00 9/17/2010
MECHANICAL SYSTEM RETROFIT FOR NV ARMY NATIONAL GUARD-
OTAG BUILDING                                                $1,811,246.00 9/16/2010
FULSTONE WETLANDS ENHANCEMENT-SO ACCESS NORTHRIDGE            $228,952.30 8/31/2010
PHOTOVOLTAIC POWER INSTALL HALL ELEMENTARY SCHOOL             $296,650.00 9/2/2010
PHOTOVOLTAIC POWER INSTALL SEPULVEDA ELEM SCHOOL              $298,650.00 9/2/2010
SURFACE TREATMENT OF VARIOUS STREETS 2010                     $175,000.00 9/3/2010
MALDONADO PARK VISTA SWALES-PHASE 2                           $354,100.00 9/22/2010

DRI CAVE FACILITY SITE PACKAGE                                $288,239.00 9/10/2010
COLLEGE PARKWAY WATER MAIN EXTENSION                          $130,000.00 9/3/2010

ARROW CREEK FIRE REHABILITATION                               $785,501.00 9/16/2010

BELLI FIRE REHABILITATION                                     $398,102.00 9/16/2010

MARTIS FIRE RAHABILITATION                                    $197,200.00 9/16/2010
RENEWABLE ENERGY EXPERIMENTAL FACILITY (Reef)                       $270,000.00 9/30/2010
PHOTOVOLTAIC POWER INSTALL SHAW MIDDLE SCHOOL                       $220,000.00 9/14/2010
PHOTOVOLTAIC POWER INSTALL COLD SPRINGS MIDDLE SCHOOL               $220,000.00 9/14/2010
PHOTOVOLTAIC POWER INSTALL/MENDIVE MIDDLE SCHOOL                    $220,000.00 9/14/2010
NV YOUTH TRAINING CENTER ELECTRICAL SERVICE UPGRADE                 $400,000.00 9/29/2010
2010 SLURRY SEAL THRU JOINDER WITH CITY OF RENO                     $500,000.00 8/10/2010
SANTA MARIA RIVER PARK                                              $100,000.00 9/28/2010
RTC RAPID MEADOWOOD MALL BUS TRANSIT STATION
IMPROVEMENTS                                                        $528,000.00 9/24/2010
POOL REHABILITATION- MASON VALLEY POOL                              $320,000.00 10/30/2010
ELY ARMORY RE-ROOF                                                              9/20/2010

CARSON CITY COMMUNITY CENTER ASBESTOS ABATEMENT                                 9/28/2010
REVITALIZATION OF ANDERSON ELEEMNTARY PHS 1 & PHS 2               $1,500,000.00 9/16/2010
                                                              $560,677,441.88



LEMMON DR PEDESTRIAN PATH CMAQ PHASE 2                              $700,000.00 1/1/2011

DESERT SPRING BLENDING-PHASE 2 SPANISH SPRINGS                       $92,500.00 11/1/2010
JOT TRAVIS BLDG OVERLOOK INTERIOR REMODEL                           $100,000.00 10/7/2010
SOUND INSULATION PROGRAM PHASES 18.5                              $1,500,000.00 1/16/2011
DEVILS GATE DISTRICTS 1 & 2 WATER TRANSMISSION MAIN & WATER
STORAGE TANK                                                      $2,200,000.00 10/12/2010
2010 BUCKEYE RD HEYBOURNE RD TO VIRGINIA DITCH                    $1,600,000.00 10/20/2010
2011 NEIGHBORHOOD STREET REHAB PROGRAM UNIT 1                     $4,800,000.00 1/1/2011
2011 NEIGHBORHOOD STREET REHAB PROGRAM UNIT 2                     $4,000,000.00 1/1/2011
2011 NEIGHBORHOOD STREET REHAB PROGARM UNIT 3                     $5,000,000.00 1/1/2011
OXBOW PARK BOARDWALK RESTORATION
DOJACK WAY WATER MAIN REPLACEMENT                                               11/1/2010
SPOONER PUMPING STATION IMPROVEMENT                                             4/7/2010
JACKPOT WATER SYSTEM IMPROVEMENTS PHASE II                        $2,300,000.00 10/7/2010
NORTH DOUGLAS COUNTY CARSON CITY WATER LINE INTER-TIE             $2,900,000.00 10/19/2010


YERINGTON WATER TREATMENT PLANT                                   $4,000,000.00 10/20/2010
ADOBE MIDDLE SCHOOL 13K W PHOTOVOLTAIC                              $115,000.00 10/5/2010
LYON COUNTY UTILITIES MAINTENANCE BUILDING                          $492,006.00 10/8/2010
2010-2011 FLEISCH FLUME REHABILITATION                              $234,000.00 10/5/2010
MCQUEEN HIGH FOOTBALL BLEACHER MODIFICATIONS                        $137,000.00 11/10/2010
GALENA HIGH FOOTBALL BLEACHER MODIFICATIONS                         $131,000.00 11/10/2010
REED HIGH FOOTBALL BEACHER MODIFICATIONS                            $129,000.00 11/10/2010
CARSON VALLEY GOLF COURSE STEAM BANK                                $450,000.00 10/12/2010
                                                               $30,880,506.00
11/0/08
12/3/2008    12/5/2008
12/16/2008   1/26/2009
1/15/2009
4/9/2009

10/22/2008

3/17/2009    4/6/2009                  ARRA
3/25/2009    3/26/2009

3/25/2009    3/31/2009
3/25/2009    4/2/2009
10/30/2008   11/4/2008
11/1/2008
3/1/2009
10/28/2008
11/6/2008    11/20/2008
1/22/2009    4/10/2009
1/22/2009    4/10/2009
1/22/2009    4/10/2009

11/7/2008    11/13/2008
                          UNDER
11/5/2008    11/7/2008    100,000
11/7/2008    12/4/2008
9/9/2009     9/10/2009
                          UNDER
10/22/2008   NEVER        100,000
10/29/2008   10/30/2008

12/2/2008

11/6/2008    4/13/2009
10/22/2008   4/20/2009                 ARRA
2/4/20009    2/25/2009
11/26/2009   2/25/2009
3/30/2009    4/29/2009
                          DELAYED
                          SEE WP-
4/23/2009                 2008-152
                          450,000 TO
11/18/2008   11/19/2008   650,000
                          CANCELED
7/1/2009                  08/25/09
2/1/2009     6/5/2009
12/9/2008    1/6/2009
11/30/2008   4/3/2009
10/1/1955    7/13/2009
3/13/2009    4/3/2009
                          UNDER
10/13/2008   10/14/2008   100,000
10/16/2008   11/6/2008
11/10/2008   10/30/2008
10/30/2008   10/30/2008
10/23/2008   11/21/2008
7/1/2009     7/21/2010
11/10/2008   11/14/2008
10/28/2008   11/5/2008
11/24/2008   12/2/2008
12/10/2008   12/22/2008
10/24/2008   7/21/2010

4/20/2009    5/27/2009
                          UNDER
11/21/2008   10/29/2008   100,000
12/10/2008   12/15/2008
12/5/2008    12/5/2008

12/15/2008   12/3/2009
                          UNDER
12/2/2008    12/2/2008    100,000
12/2/2008    12/2/2008
                          UNDER
12/19/2008   1/7/2009     100,000
12/9/2008
5/1/2009     5/8/2009

5/6/2009     5/6/2009
2/27/2009
4/6/2009     3/31/2009

1/7/2009     1/9/2009
                          UNDER
11/25/2008   11/26/2008   100,000
11/5/2008    11/5/2008

9/22/2009    9/25/2009
12/18/2008   1/16/2009
12/10/2008
12/10/2008
12/17/2008   1/12/2009
1/16/2009    9/22/2009
                          2,500,000
                          TO
5/1/2009                  3,500,000.

1/1/2009     1/2/2009
1/28/2009    1/30/2009

1/16/2009    1/30/2009
2/10/2009    2/11/2009
12/9/2008
5/21/2009    5/22/2009
4/6/2009     4/10/2009
1/14/2009    1/15/2009
6/24/2009

11/24/2008   12/8/2008

8/5/2009     8/5/2009
6/24/2009    6/24/2009
3/9/2009     3/11/2009

11/21/2008   12/11/2008

11/13/2008   12/11/2008

                          950,000 TO
2/12/2009    2/11/2009    1,050,000
3/6/2009     5/27/2009
2/10/2009    10/15/2009
3/6/2009     3/9/2009

2818/09      2/18/2009                 ARRA
6/25/2009    6/24/2009
3/4/2009     3/12/2009

2/5/2008     2/18/2009
3/25/2009
2/25/2009    2/26/2009                 ARRA
2/25/2009    2/6/2009

3/12/2009    3/12/2009
3/6/2009     3717/09

2/19/2009

2/19/2009
5/22/2009    6/12/2009
8/29/2009
4/9/2009     4/10/2009
2/23/2009    3/2/2009
6/22/2009
                          UNDER
3/9/2009                  100,000
2/23/2009    2/27/2009
5/20/2009    5/21/2009
5/21/2009
8/11/2009    8/12/2009
2/4/2009     2/5/2009
3/6/2009     3/11/2009
3/10/2009
3/9/2009     3/11/2009
3/9/2008     3/11/2009
3/10/2009
5/7/2009     5/7/2009
9/1/2009
6/17/2009    8/26/2009                ARRA
TBA

3/12/2009    4/14/2009
3/4/2009     3/12/2009
3/17/2009    9/25/2009
TBA
8/28/2009    9/18/2009
12/10/2008   1/23/2009
3/12/2009
4/16/2009    4/22/2009
10/1/2009    10/5/2009

3/10/2009    6/2/2009
5/12/2009    5/13/2009
4/30/2009    4/30/2009

5/12/2009    5/19/2009
4/27/2009    4/27/2009
5/15/2009

4/24/2009    5/6/2009

6/17/2009    6/19/2009
                         04/09/09
                         UNDER
4/8/2009     4/9/2009    100,000
3/24/2009    3/24/2009
4/1/2009     5/5/019

                         950,000 TO
3/12/2009    3/12/2009   1,250,000
5/5/2009
5/5/2009
8/1/2009     9/21/2009
5/12/2009    5/27/2009
5/12/2009    5/27/2009
                         UNDER
3/12/2009    3/12/2009   100,000
3/4/2009     3/9/2009
3/24/2009    5/13/2009

4/1/2009     6/4/2009
4/8/2009     4/10/2009
4/21/2009    4/27/2009

5/7/2009     5/13/2009
3/9/2009
6/1/2009
5/27/2009    5/28/2009
5/12/2009    5/13/2009
6/2/2009     6/2/2009
5/12/2009    5/18/2009
4/14/2009    4/15/2009
5/18/2009   6/1/2009
4/29/2009
3/30/2009   5/6/2009
4/27/2009
5/12/2009   9/18/2009
6/24/2009   9/18/2009
4/23/2009   5/6/2009
5/21/2009   5/21/2009
5/21/2009   5/21/2009
5/6/2009    9/22/2009
3/24/2009   3/24/2009
3/30/2009
5/1/2009    6/5/2009
5/26/2009   6/1/2009
5/12/2009   5/13/2009
4/30/2009   5/4/2009
4/20/2009
5/5/2009    5/5/2009
5/12/2009   5/13/2009
4/22/2009
                        03/04/09
                        UNDER
4/22/2009               100,000
                        03/04/09
                        UNDER
4/22/2009               100,000
                        03/04/09
                        UNDER
4/22/2009               100,000

9/10/2009

5/6/2009    5/7/2009

5/6/2009    5/7/2009
5/6/2009    5/7/2009
5/7/2009    5/7/2009
5/20/2009
6/10/2009   6/10/2009
3/6/2009    3/6/2009
5/12/2009   5/13/2009
2/26/2009
4/27/2009   4/30/2009

4/8/2009    4/8/2009
7/15/2009   7/31/2009

4/15/2009   4/16/2009

5/21/2009   7/7/2009
4/15/2009   4/16/2009
5/12/2009   6/8/2009
4/21/2009   5/6/2009
4/24/2009   4/27/2009
9/1/2009
5/19/2009   5/27/2009

7/9/2009    7/10/2009
                        CANCELED
5/8/2009                05/27/09
5/19/2009   5/27/2009
5/7/2009    5/14/2009
5/4/2009    5/19/2009
5/21/2009   6/5/2009
6/16/2009   9/24/2009
5/26/2009   5/27/2009
5/21/2009   7/7/2009

8/6/2009    9/21/2009
9/8/2009    9/21/2009
6/1/2009
6/11/2009   6/23/2009
6/11/2009   6/23/2009
5/6/2009    5/8/2009
7/8/2009    8/10/2009
                        CANCELED
6/8/2009                06/09/09
5/21/2009   6/5/2009
5/5/2009    5/5/2009
5/19/2009   5/19/2009
5/19/2009   5/19/2009
3/31/2009   4/8/2009
5/26/2009   5/27/2009
9/1/2009
6/8/2009    6/11/2009
7/9/2009
6/24/2009   7/14/2009

7/6/2009    9/16/2009
6/5/2009    6/8/2009
8/21/2009   9/8/2009
5/31/2009   8/28/2009
9/30/2009
7/6/2009    7/6/2009
5/20/2009
7/14/2009   7/15/2009
6/4/2009
6/24/2009   7/14/2009
5/19/2009   5/27/2009
6/9/2009
6/11/2009   6/19/2009
                        110,000 TO
5/27/2009   5/28/2009   150,000
5/20/2009   6/4/2009
6/4/2009    6/12/2009
5/18/2009   6/5/2009
6/4/2009    6/8/2009
6/15/2009   6/16/2009
6/9/2009    6/16/2009
6/23/2009   9/20/2009
7/23/2009   7/23/2009
7/14/2009   7/15/2009
6/8/2009    6/11/2009
6/11/2009   6/19/2009
7/23/2009   8/13/2009
6/15/2009   6/16/2009
6/22/2009   6/24/2009
6/10/2009   6/11/2009

5/26/2009

5/11/2009   5/19/2009
7/31/2009
7/14/2009
7/1/2009    7/16/2009
6/22/2009   6/24/2009
6/9/2009
5/29/2009
6/5/2009    6/5/2009
6/5/2009    6/5/2009
6/15/2009   6/15/2009
6/15/2009   6/15/2009
6/15/2009   6/15/2009
6/15/2009   6/15/2009
6/15/2009   6/15/2009
7/15/2009
6/17/2009   8/26/2009             ARRA
6/22/2009   6/24/2009
6/22/2009   6/24/2009
6/10/2009   9/23/2009
6/10/2009   9/23/2009
6/15/2009   6/16/2009
6/22/2009   6/24/2009
                        UNDER
6/15/2009   6/15/2009   100,000
                        UNDER
8/12/2009   8/18/2009   100,000
8/20/2009   9/21/2009
7/2/2009    7/10/2009
8/3/2009    9/23/2009
6/30/2009   7/8/2009
10/2/2009   10/2/2009
7/16/2009   7/17/2009
                        UNDER
6/10/2009   6/11/2009   100,000

6/10/2009   6/11/2009
6/24/2009   10/5/2009
6/23/2009   7/2/2009
7/10/2009   7/20/2009
8/6/2009    8/18/2009
7/15/2009
8/4/2009    8/10/2009
8/18/2009
6/3/2009    6/4/2009
9/2/2009    9/10/2009
7/14/2009
7/14/2009
7/2/2009    7/7/2009
7/8/2009    10/26/2009
4/29/2009

6/24/2009   7/8/2009
7/20/2009   1/15/2010
6/24/2009   7/8/2009
8/3/2009
8/6/2009    9/18/2009

8/5/2009    10/26/2009

6/26/2009   7/8/2009
7/15/2009   10/26/2009

7/27/2009   7/30/2009
8/26/2009   9/17/2009
7/30/2009   7/30/2009
7/13/2009   7/15/2009
7/28/2009   8/3/2009
9/3/2009    9/16/2009
7/27/2009   7/29/2009
7/28/2009   7/29/2009
9/25/2009   10/15/2009
8/12/2009   10/15/2009
9/28/2009   10/7/2009
6/10/2009   6/16/2009
7/16/2009   10/26/2009
8/18/2009
7/15/2009   7/20/2009
9/18/2009
8/12/2009   8/25/2009
10/7/2009   10/26/2009   ARRA
8/10/2009   8/12/2009
8/17/2009   9/1/2009
4/28/2009   1/15/2010
8/6/2009    8/12/2009
9/8/2009    10/23/2009
7/28/2009
7/17/2009   7/17/2009
8/21/2009   8/27/2009
7/22/2009   8/20/2009
7/7/2009    3/9/2009
7/7/2009
8/20/2009   9/18/2009
8/18/2009    10/26/2009
8/12/2009    8/12/2009
8/12/2009    8/12/2009
7/1/2009     9/16/2009
7/1/2009     9/16/2009
                          UNDER
9/1/2009     1/15/100     100,000
8//11/09     9/23/2009
8/11/2009    9/23/2009
8/11/2009    9/23/2009
8/20/2009    8/26/2009
8/24/2009    8/26/2009
8/20/2009    8/25/2009
9/23/2009
8/24/2009    8/26/2009
9/8/2009     9/18/2009
9/3/2009     1/15/2010
7/14/2009    4/14/2009
11/12/2009   2/10/2010
9/10/2009    9/10/2009
9/1/2009     12/14/2009
8/5/2009
8/5/2009

9/18/2009    1/19/2010
9/10/2009    9/10/2009
8/12/2009    2/11/2010
8/25/2009    8/25/2009

8/13/2009    8/14/2009
8/12/2009
9/10/2009    9/10/2009
9/3/2009     9/18/2009
9/9/2009     9/10/2009

9/28/2009    12*/23/09

8/26/2009    8/27/2009
10/13/2009   12/23/2009
9/30/2009
8/21/2009
8/19/2009    8/19/2009
8/10/2009    8/12/2009
9/22/2009
9/23/2009    8/12/2009
9/22/2009
10/12/2009   10/13/2009
9/30/2009
9/18/2009
10/1/2009
9/28/2009
9/9/2009     9/10/2009
9/22/2009    10/13/2010
10/13/2009   9/9/2009
10/13/2009   10/22/2009
10/1/2009
10/5/2009    4/27/2010
10/2/2009    10/26/2009

9/30/2009
10/14/2009   10/21/2009   ARRA
10/19/2009
10/15/2009   10/15/2009
10/15/2009   10/15/2009

9/30/2009
N/A          10/2/2009
9/30/2009    12/22/2009
6/20/2009

5/18/2009    NEVER
5/25/2009
6/22/2009
7/20/2009
6/8/2009
6/23/2009
5/19/2009
7/14/2009
7/14/2009
6/4/2009
7/20/2009
5/13/2009
7/29/2009
7/13/2009
6/20/2009

7/15/2009
7/21/2009
8/4/2009
8/5/2009
8/5/2009
8/5/2009
8/25/2009
8/19/2009

9/9/2009


12/0/2008
6/ 0/2009


8/10/2009                 ARRA
1/25/2010    2/3/2010               ARRA
1/30/2010    2/3/2010               ARRA
10/1/2009
1/27/2010    2/26/2010
1/27/2010    2/26/2010
1/27/2010    2/26/2010
10/30/2009
2/1/2010                            ARRA

12/18/2009   12/18/2009
11/12/2009   11/18/2009
8/31/2010    8/27/2010
4/26/2010
11/30/2009
12/14/2009   1/21/2010
11/2/2009    10/12/2009
11/30/2009
11/14/2009
1/26/2010    4/13/2010
10/22/2009   10/22/2009
8/16/2010    8/27/2010
10/1/2010
11/23/2010   4/13/2010

10/15/2009

5/13/2010    6/21/2010
00/18/09
1/13/2010    2/1/2010
1/8/2010     4/29/2010              ARRA
11/4/2010    5/26/2010
4/7/2010     4/13/2010
8/25/2010    8/25/2010
11/9/2009    11/10/2009
4/7/2010     4/13/2010
11/18/2009   11/20/2009
12/4/2010    11/2/2009

N/A
                          UNDER
11/23/2009   11/25/2009   100,000
10/23/2009   11/10/2009             ARRA
3/20/2010    3/30/2010              ARRA
4/15/2010    4/28/2010

2/25/2009    9/14/2010
12/152009
2/12/2010
10/12/2009
2/29/10                             ARRA
10/23/2009
4/12/2010    7/30/2010              ARRA
2/22/2010    2/23/2010
2/22/2010    2/23/2010
1/7/2010     5/7/2010                  ARRA
10/23/2009                             ARRA

11/23/2009                             ARRA
1/21/2010    8/20/2010                 ARRA
5/30/2010

12/8/2009    12/15/2009                ARRA
1/21/2010
2/10/2010    10/26/2009
12/8/2009                              ARRA
1/20/2010    1/27/2010                 ARRA
1/7/2010     4/26/2010                 ARRA
10/23/2009                             ARRA
1/7/2010     1/27/2010                 ARRA
1/1/2010                               ARRA
12/16/2009   1/7/2010                  ARRA

12/29/2009   4/26/2010                 ARRA
11/18/2009   12/23/2009

12/16/2009
6/11/2010    6/16/2010                 ARRA

6/7/2010     6/9/2010                  ARRA
11/5/2009                              ARRA
1/5/2010     5/4/2010

1/5/2009     1/6/2010
1/5/2010

12/17/2009                             ARRA

12/10/2009
12/8/2009
11/23/2009   12/3/2009                 ARRA
11/12/2009   5/25/2010
                          SHOULD
                          HAVE
                          USED 2010-
3/23/2010    3/23/2010    75           ARRA
3/9/2010     3/10/2010
11/12/2009                             ARRA
12/30/2009   12/30/2009                ARRA
3/9/2010                               ARRA
1/11/2010    1/20/2010                 ARRA
3/11/2010    3/11/2010
1/4/2010
3/11/2010    3/11/2010
1/11/2010    1/20/2010                 ARRA
12/28/2009
2/2/2010     2/10/2010                 ARRA
1/6/2010     2/4/2010              ARRA
4/30/2010    5/7/2010              ARRA
1/1/2010                           ARRA
5/6/2010     5/7/2010              ARRA
1/12/2010    5/6/2010              ARRA

1/6/2010     1/11/2010             ARRA
2/1/2010     2/2/2010              ARRA
01/07/10.    1/7/2010              ARRA
                         UNDER
2/2/2010     5/5/2010    100,000   ARRA
1/6/2010                           ARRA
3/23/2010    5/6/2010
2/12/2010    4/21/2010
11/20/2009   12/2/2009             ARRA

1/14/2010    2/5/2010
2/25/2010                          ARRA
1/21/2010    2/11/2010             ARRA
1/7/2010
10/13/2010

1/14/2010    2/5/2010              ARRA

2/16/2010    2*/16/10              ARRA
2/2/2010     2/4/2010              ARRA
5/6/2010     8/27/2010             ARRA
1/21/2010                          ARRA
5/25/2010    6/4/2010              ARRA
2/2/2010     2/2/2010

2/1/2010     2/5/2010

1/21/2010
5/27/2010
7/20/2010    9/16/2010             ARRA
5/11/2010    5/11/2010
1/21/2010    1/25/2010
2/17/2010    4/27/2010             ARRA
3/10/2010    3/17/2010             ARRA
2/10/2010    2/11/2010
7/13/2010    7/19/2010
5/6/2010     6/7/2010
3/19/2010    3/19/2010             ARRA
3/19/2010    3/19/2010             ARRA

4/29/2010    6/1/2010              ARRA
4/13/2010
5/11/2010    5/11/2010             ARRA
2/4/2010     2/10/2010             ARRA
2/5/2010     2/10/2010             ARRA
3/3/2010     5/5/2010              ARRA

3/3/2010     3/5/2010              ARRA
3/10/2010   3/17/2010             CDBG
12/2/2009   4/26/2010
3/10/2010   3/15/2010             ARRA
1/00/2010   3/30/2010
5/20/2010   6/10/2010
6/10/2010   6/10/2010
4/8/2010    4/9/2010
6/10/2010   66/10/10
2/12/2010
6/10/2010   6/10/2010
4/5/2010    5/5/2010              ARRA
                        UNDER
3/1/2010    3/9/2010    100,000
2/22/2010   2/23/2010             ARRA
4/6/2010    4/7/2010

2/16/2010   2/16/2010
3/8/2010    3/10/2010
4/14/2010   4/16/2010
9/1/2010
3/31/2010   4/7/2010
3/5/2010

3/9/2010
6/1/2010    8/10/2010
3/16/2010   3/17/2010
5/7/2010    5/7/2010
5/18/2010   5/24/2010
2/3/2010    2/10/2010

2/3/2010    2/10/2010             ARRA
4/8/2010    4/12/2010

3/1/2010    6/1/2010
1/28/2010
1/28/2010
1/28/2010
1/28/2010
7/20/2010   9/8/2010
4/22/2010   6/1/2010
4/23/2010   6/1/2010
4/28/2010
4/28/2010   3/24/2010
                        UNDER
3/3/2010    4/20/2010   100,000
4/15/2010
4/16/2010   4/13/2010             ARRA
4/2/2010    4/8/2010              ARRA
3/23/2010
4/27/2010   8/30/2010
3/31/2010   4/8/2010
6/28/2010   7/22/2010
7/9/2010    7/13/2010
5/25/2010   6/1/2010
7/13/2010   7/14/2010
6/10/2010
                        DROPPED
                        RENO-
                        TAHOE
5/27/2010   5/27/2010   CONST
3/18/2010
3/18/2010   3/18/2010
4/26/2010   3/29/2010

4/12//10    4/14/2010
3/24/2010   3/24/2010

3/23/2010   4/22/2010

3/29/2010
4/15/2010   4/19/2010
4/27/2010   5/13/2010
3/31/2010   4/1/2010
4/28/2010
4/26/2010   4/28/2010
6/1/2010
5/17/2010   8/27/2010
4/15/2010   4/30/2010
5/10/2010   5/12/2010
5/21/2010   5/12/2010
6/24/2010
7/28/2010

4/7/2010    4/7/2010

4/7/2010

4/7/2010
8/5/2010    8/16/2010
                        COMBINDE
                        D
                        PROJECT
4/5/2010    4/7/2010    204 & 205

4/31/2010
4/13/2010   5/18/2010               ARRA
4/13/2010                           ARRA
6/15/2010   6/16/2010
4/5/2010    4/7/2010
5/5/2010    5/13/2010
4/26/2010   4/27/2010
4/2/2010    4/2/2010
8/1/2010



4/23/2010   4/27/2010
4/23/2010   4/27/2010
4/23/2010   4/27/2010
5/6/2010    5/28/2010
5/4/2010
4/23/2010   4/27/2010   $80,705.50
4/1/2010
5/14/2010   5/21/2010
6/10/2010   6/10/2010

4/26/2010   4/28/2010
5/20/2010
5/13/2010   5/13/2010
4/30/2010
4/30/2010
4/30/2010
6/28/2010   6/29/2010
6/21/2010   6/18/2010
6/28/2010   6/29/2010
6/28/2010   6/29/2010
9/1/2010
4/12/2010   5/7/2010

5/6/2010
6/9/2010    6/17/2010
6/10/2010   6/16/2010                ARRA
4/30/2010   4/28/2010
4/27/2010   4/27/2010

4/30/2010
5/6/2010
5/27/2010
7/20/2010   7/28/2010
7/1/2010    7/28/2010
5/7/2010
5/7/2010
5/17/2010
7/26/2010   7/26/2010
8/10/2010   8/10/2010
8/11/2010   8/11/2010
8/11/2010   8/11/2010
8/11/2010   8/11/2010
8/11/2010   8/11/2010
8/11/2010   8/11/2010
8/11/2010   8/11/2010




3/30/2010

7/30/2010   8/4/2010
5/21/2010   5/20/2010                ARRA
5/21/2010   5/20/2010   ARRA
5/6/2010
5/20/2010   5/21/2010

8/5/2010    8/30/2010
2/25/2010
5/6/2010
5/5/2010
6/2/2010
7/15/2010
7/15/2010

5/6/2010
5/18/2010
5/20/2010   5/21/2010
5/20/2010   5/21/2010
5/20/2010   5/21/2010
5/20/2010   5/21/2010
5/20/2010   5/21/2010
3/20/2010   4/12/2010
                        STIMULU
4/14/2010   4/15/2010   S

5/10/2010   6/16/2010
8/1/2010

5/25/2010   6/16/2010
5/25/2010   9/3/2010
5/30/2010

5/20/2010
5/26/2010
TBA
6/9/2010

6/15/2010   6/22/2010
5/26/2010
6/29/2010   7/1/2010
6/14/2010   6/16/2010
6/7/2010
6/7/2010
6/7/2010

7/1/2010
5/20/2010   6/18/2010
6/28/2010   6/29/2010
5/20/2010
5/27/2010   6/3/2010

7/1/2010    7/1/2010
7/22/2010
9/14/2010   9/17/2010
9/14/2010   9/20/2010
5/28/2010   5/28/2010
6/4/2010    6/4/2010
NONE
NONE
6/28/2010

6/1/2010    6/1/2010
6/10/2010               CDBG
3/26/2010   6/11/2010
6/7/2010    6/8/2010
6/17/2010   6/22/2010
7/15/2010   7/27/2010
6/19/2010   6/25/2010   ARRA

6/19/2010   6/25/2010
5/12/2010
6/25/2010   6/25/2010




6/21/2010   6/28/2010   ARRA
7/29/2010   7/30/2010   ARRA
7/19/2010   7/30/2010   ARRA
MAY/JUNE
5/5/2010    6/11/2010
5/5/2010    6/11/2010
5/5/2010    6/11/2010
6/11/2010   6/11/2010
7/19/2010   7/30/2010
7/14/2010
7/1/2010    7/6/2010
6/26/2010   6/30/2010
8/30/2010   9/3/2010
7/1/2010
7/14/2010
6/22/2010
9/30/2010
7/19/2010
7/6/2010     7/13/2010
6/17/2010    6/22/2010
6/3/2010     7/26/2010
7/27/2010    7/28/2010
7/14/2010    7/20/2010
6/9/2010     6/30/2010
6/24/2010    6/24/2010
6/8/2010     6/16/2010
8/5/2010     8/17/2010
8/1/2010
7/1/2010     7/2/2010
7/15/2010
6/24/2010    6/24/2010
6/18/2010    6/18/2010
7/12/2010    7/16/2010
9/9/2010

6/22/2010    6/24/2010             ARRA
7/1/2010
                         UNDER
6/23/2010    6/23/2010   100,000
5/14/2010    5/24/2010
7/13/2010    7/14/2010
7/9/2010     7/13/2010
6/23/2010    6/29/2010
7/13/2010    7/15/2010
6/29/2010    6/29/2010
7/1/2010
7/28/2010
8/2/2010
9/1/2010
7/8/2010

7/15/2010    7/15/2010
12/17/2010
7/14/2010    7/15/2010
8/16/2010    9/9/2010

8/18/2010    8/26/2010
6/2/2010     6/11/2010
6/25/2010
8/10/2010
8/5/2010     8/16/2010
7/28/2010

7/28/2010    7/28/2010
                                   AB198
7/19/2010    7/28/2010

7/13/2010    7/13/2010
4/30/2010
6/30/2010
7/8/2010                ARRA
6/10/2010   6/16/2010   ARRA
7/16/2010   7/26/2010   ARRA
7/29/2010
8/3/2010    9/16/2010   ARRA
9/17/2010
9/20/2010
7/23/2010               CDBG
8/4/2010

6/24/2010   6/24/2010   ARRA
7/20/2010   7/22/2010
9/13/2010
8/5/2010    8/5/2010    ARRA
6/25/2010   6/28/2010
                        ARMY
7/27/2010               CORE
8/?/10                  ARRA


8/20/2010
8/3/2010


8/18/2010

3/16/2010


8/12/2010   8/18/2010
9/7/2010    9/8/2010
8/11/2010

8/12/2010   8/18/2010
9/8/2010
8/11/2010
7/25/2010
8/25/2010

8/19/2010
8/12/2010
8/12/2010

8/12/2010

8/12/2010
8/24/2010

8/24/2010
8/9/2010    8/9/2010
7/28/2010
9/9/2010
7/8/2010
                        ARRA/CD
6/24/2010               BG
6/24/2010
7/8/2010

8/24/2010
9/16/2010    9/16/2010
                         BLOK
8/30/2010    9/2/2010    GRNT

9/16/2010
8/12/2010
8/27/2010
6/9/2010
9/9/2010     9/10/2010
9/30/2010
9/16/2010

10/14/2010

8/30/2010
9/10/2010

8/26/2010    8/30/2010
8/30/2010
9/13/2010                ARRA
9/20/2010
8/24/2010    8/24/2010
9/17/2010

8/23/2010    8/23/2010

8/27/2010    8/31/2010


9/9/2010     9/9/2010
9/9/2010     9/9/2010
9/9/2010     9/9/2010
9/3/2010
9/3/2010
9/16/2010

10/17/2010

9/21/2010    9/22/2010
9/16/2010    9/16/2010
9/13/2010    9/13/2010
9/13/2010    9/13/2010
9/7/2010
10/25/2010

9/14/2010    9/14/2010
9/14/2010

10/12/2010               ARRA

10/12/2010

10/12/2010
10/6/2010
10/22/2010
10/22/2010
10/22/2010
10/29/2010
8/10/2010
11/8/2010

9/29/2010


10/20/2010

9/28/2010    CDBG




             ARRA



11/1/2011

11/3/2010
12/3/2010
2/1/2011
2/1/2011
2/1/2011
11/27/2010
12/1/2010
4/27/2010
10/20/2010   USDA
11/4/2010
             ARMY
11/20/2011   CORE
10/12/2010
10/15/2010
10/12/2010
11/19/2010
11/19/2010
11/19/2010
10/21/2010
2009 Total North Public Works Projects                        $134,316,280.79
2010 Total North Public Works Projects                         $89,853,923.32
2011 Total North Public Works Projects                            $612,000.00



Year 2009

WA-2009-6     STATE PUBLIC WORKS BOARD   CLARK & SULLIVAN CONSTRUCTORS
WA-2009-14    WASHOE CO SCHOOL DIST      RHP MECHANICAL SYSTEMS
WA-2009-27    NSHE/UNR                   Q & D CONSTRUCTION INC
CC-2009-30    NSHE/WNC                   RHP MECHANICAL SYSTEMS
EL-2009-46    ELKO CO SCHOOL DISTRICT    MICHAEL CLAY CORP
WA-2009-73    WASHOE CO SCHOOL DIST      WEST COAST CONTRACTORS OF NV
WA-2009-75    NSHE/UNR                   SIERRA NEVADA CONSTRUCTION INC
WA-2009-82    WASHOE CO PUBIC WORKS      TRUCKEE MEADOWS CONSTRUCTION
WA-2009-89    WASHOE CO SCHOOL DIST      SONITROL OF SOUTHERN NEVADA
WA-2009-90    WASHOE CO SCHOOL DIST      MT ROSE HEATING & AIR
WA-2009-91    WASHOE CO SCHOOL DIST      K7 CONSTRUCTION INC
EL-2009-93    GREAT BASIN COLLEGE        Q & D CONSTRUCTION INC
WA-2009-99    WASHOE CO SCHOOL DIST      SIERRA NEVADA CONSTRUCTION INC
WA-2009-100   WASHOE CO SCHOOL DIST      POWERCOMM SOLUTIONS INC
WA-2009-101   WASHOE CO SCHOOL DIST      CANCELED 03/11/09 COMBINED W 9 -100
WA-2009-102   WASHOE CO SCHOOL DIST      CANCELED 03/11/09/COMBND W 9-100
DO-2009-103   DOUGLAS CO SCHOOL DIST     ISBELL CONSTRUCTION INC
WA-2009-107   WASHOE CO SCHOOL DIST      BT MANCINI/UNDER 100,000
WA-2009-108   WASHOE CO SCHOOL DIST      CANCELED 03/010/09UNDER 100,000
WA-2009-109   NSHE/UNR                   PINECREST CONSTRUCTION
EL-2009-115   ELKO CO SCHOOL DISTRICT    CANCELED 3/11/09
WA-2009-118   WASHOE CO SCHOOL DIST      CANCELED 03/11/09/UNDER 100,000
WA-2009-119   WASHOE CO SCHOOL DIST      NELSON ELECTRIC CO
EL-2009-133   ELKO CO SCHOOL DISTRICT    Q & D CONSTRUCTION INC
WA-2009-135   NSHE/UNR                   TRUCKEE MEADOWS CONSTRUCTION
EL-2009-147   ELKO CO SCHOOL DISTRICT    Q & D CONSTRUCTION INC
EL-2009-148   ELKO CO SCHOOL DISTRICT    Q & D CONSTRUCTION INC
WA-2009-153   WASHOE CO SCHOOL DIST      NELSON ELECTRIC CO
WA-2009-154   NSHE/UNR                   F EVANS CONSTRUCTION INC
WA-2009-160   WASHOE CO SCHOOL DIST      PERMIAN BUILDERS LLC
WA-2009-161   WASHOE CO SCHOOL DIST      BURDICK EXCAVATING CO INC
WA-2009-165   NSHE/UNR                   PENTA BUILDING GROUP
WA-2009-169   NSHE/UNR                   TNT CONSTRUCTION
WA-2009-174   NSHE/UNR                   NSHE/UNR
WA-2009-177   WASHOE CO SCHOOL DIST      CANCELED 6/3/09
WA-2009-178   WASHOE CO SCHOOL DIST      RENO-TAHOE CONSTRUCTION
WA-2009-179   WASHOE CO SCHOOL DIST      CANCELED 06/03/09
WA-2009-180   WASHOE CO SCHOOL DIST      GRADEX CONSTRUCTION
WA-2009-181   WASHOE CO SCHOOL DIST      HASCO INC
WA-2009-182   WASHOE CO SCHOOL DIST
WA-2009-183   WASHOE CO SCHOOL DIST      03/04/09 UNDER 100,000
WA-2009-184   WASHOE CO SCHOOL DIST      03/04/09 UNDER 100,000
WA-2009-185   WASHOE CO SCHOOL DIST      03/04/09 UNDER 100,000
WA-2009-187   WASHOE CO SCHOOL DIST      KODIAK ROOFING & WATERPROOFING
WA-2009-188   WASHOE CO SCHOOL DIST      KODIAK ROOFING & WATERPROOFING
WA-2009-189   WASHOE CO SCHOOL DIST     D & D ROOFING
WA-2009-190   WASHOE CO SCHOOL DIST     WESTERN SINGLE PLY
WA-2009-193   WASHOE CO SCHOOL DIST     SONITROL OF SOUTHERN NEVADA
WA-2009-194   WASHOE CO SCHOOL DIST     GRANITE CONSTRUCTION CO
WA-2009-195   WASHOE CO SCHOOL DIST     CANCELED 06/04/09
WA-2009-206   WASHOE CO SCHOOL DIST     D & D ROOFING
WA-2009-208   WASHOE CO SCHOOL DIST     CANCELED 05/27/09/UNDER 100,000
WA-2009-209   WASHOE CO SCHOOL DIST     D & D ROOFING
EL-2009-227   ELKO CO SCHOOL DISTRICT   CONTINENTAL FLOORING CO
LY-2009-244   LYON CO SCHOOL DIST       WNW CONSTRUCTION
LY-2009-246   LY CO SCHOOL DIST         GRANIE CONSTRUCTION
WA-2009-250   NSHE/UNR                  RHP MECHANICAL
LY-2009-251   LYON CO SCHOOL DIST       K7 CONSTRUCTION INC
LY-2009-252   LYON CO SCHOOL DIST       RAFAEL CONSTRUCTION INC
LY-2009-256   LYON CO SCHOOL DIST       ATLAS CONTRACTORS INC
WA-2009-262   NSHE/UNR                  CLARK & SULLIVAN CONSTRUCTION
EL-2009-264   ELKO CO SCHOOL DISTRICT   CANCELED 5/27/09
WA-2009-267   WASHOE CO SCHOOL DIST     GRADEX CONSTRUCTION
CC-2009-268   CARSON CITY SCHOOL DIST   MULTIPLE PRIMES
CC-2009-268                             DAVIS COMPANY CONTRACTORS
C-2009-268                              COMSTOCK DRYWALL
CC-2009-268                             INTERMOUNTAIN ELECTRIC INC
CC-2009-268                             NEWT CONCRETE CONSTRUCTION
CC-2009-268                             SUNRIDGE PAINTING
CC-2009-268                             ALCAL ARCADE CONTRACTING
CC-2009-268                             VALLEY DOOR WORKS
WA-2009-283   WASHOE CO SCHOOL DIST     K7 CONSTRUCTION INC
EL-2009-288   ELKO CO SCHOOL DISTRICT   RUBY DOME INC
WA-2009-294   WASHOE CO SCHOOL DIST     SUNDT CONSTRUCTION
LY-2009-301   LYON CO SCHOOL DIST       KING CONSTRUCTION/UNDER 100,000
LY-2009-303   LYON CO SCHOOL DIST       HORIZON CONST/UNDER 100,000
WA-2009-307   NSHE/UNR                  GARDNER ENGINEERING/UNDER 100,000
EL-2009-313   ELKO CO SCHOOL DISTRICT   CANYON CONSTRUCTION CO
WA-2009-319   NSHE/UNR                  RHP MECHANICAL
DO-2009-320   DOUGLAS CO SCHOOL DIST    DESIGN-BUILD SOLUTIONS
WA-2009-330   NSHE/UNR                  F EVANS CONST
WA-2009-333   WASHOE CO SCHOOL DIST     F & P CONSTRUCTION INC
WA-2009-337   NSHE/UNR-ICA              CANCELED 12/30/09
EL-2009-339   ELKO CO SCHOOL DISTRICT   CANYON CONSTRUCTION
WA-2009-351   WASHOE CO SCHOOL DIST     CANCELED 10/01/09
DO-2009-366   DOUGLAS CO SCHOOL DIST    CANCELED 08/18/2009
WA-2009-369   WASHOE CO SCHOOL DIST     LIGH TAC INC
CC-2009-374   CC SCHOOL DIST            MULTIPLE PRIMES
CC-2009-374                             MARV MCQUEARY EXCAVATING
CC-2009-374                             CRUZ CONSTRUCTION CO INC
CC-2009-374                             NEWT CONCRETE CONSTRUCTION
WA-2009-375   WASHOE CO SCHOOL DIST     JW MCCLENAHAN CO
EL-2009-376   ELKO CO SCHOOL DISTRICT   CANCELED 10/28/09
EL-2009-385   ELKO CO SCHOOL DISTRICT   RUBY DOME INC
WA-2009-391   WASHOE CO SCHOOL DIST     CANCELED 10/27/09
HU-2009-399   HUMBOLDT CO SCHOOL DIST   MULTIPLE PRIMES
HU-2009-399                             DESERT FIRE PROTECTION
HU-2009-399                                FAST GLASS
HU-2009-399                                MARCOR ENVIRONMENTAL
HU-2009-399                                RICKS FLOORING
HU-2009-399                                CR DRAKE & SONS ELECTRICAL
HU-2009-399                                RHP MECHANICAL
HU-2009-399                                BIG G CONSTRUCTION
HU-2009-399                                H E HUNEWILL CO LTD
HU-2009-399                                INSULPRO PROJECTS
HU-2009-399                                RAY KELLER CONSTRUCTION
HU-2009-399                                TALLMAN LUMBER CO
HU-2009-399                                WN SALES
HU-2009-399                                CB BROWN CO
HU-2009-399                                INNOVATIVE COMMUNICATION SYSTEMS
PE-2009-400   HUMBOLDT CO SCHOOL DIST      MULTIPLE PRIMES
PE-2009-400                                MARCOR ENVIRONMENTAL
PE-2009-400                                RICKS FLOORING
PE-2009-400                                RICKS FLOORING
PE-2009-400                                ALPINE ROOFING
PE-2009-400                                HSP PAINTING
PE-2009-400                                RENO CONCRETE
PE-2009-400                                SIERRA NEVADA CONSTRUCTION INC
PE-2009-400                                FRANK EVANS CONSTRUCTION
PE-2009-400                                CB BROWN CO
Total 2009


Year 2010
WA-2010-15    STATE PUBLIC WORKS BOARD     SUNDT CONSTRUCTION INC
EL-2010-21    NSHE BOARD OF REGEANTS       HIGH MARK CONSTRUCTION
CH-2010-22    CHURCHILL CO SCHOOL DIST     D & D ROOFING/UNDER /UNDER 100,000
                                           PRESENTATION PRODUCTS DBA
WA-2010-39    NSHE/UNR                     SPINITAR
WA-2010-40    NSHE/UNR
MI-2010-46    MINERAL CO SCHOOL DIST       HERBACK GENERAL ENGINEERING
WA-2010-48    WASHOE CO SCHOOL DIST        Q & D CONSTRUCTION/ARRA
MI-2010-56    MINERAL CO SCHOOL DIST       HERBACK GENERAL ENGINEERING
WA-2010-64    WASHOE CO SCHOOL DIST        SIMPLEX GRINNELL LP
WA-2010-65    WASHOE CO SCHOOL DIST        FCC COMMUNICATION
WA-2010-66    WASHOE CO SCHOOL DIST        CANCELED 6/16/10
LY-2010-67    LYON CO SCHOOL DIST          FARR CONSTRUCTION CORP
EL-2010-92    STATE PUBLIC WORKS BOARD     BUILDING SOLLUTIONS
WA-2010-95    WASHOE CO BOARD OF COMMISS   FARR CONSTRUCTION
WA-2010-96    WASHOE CO SCHOOL DIST        DIAMOND G CONSTRUCTION
WA-2010-97    WASHOE CO SCHOOL DIST
CH-2010-111   CHURCHILL CO SCHOOL DIST     CANCELED 9/14/10 PER SUE/see ch-407
EL-2010-112   ELKO CO SCHOOL DIST          CANCELED 5/25/10
EL-2010-114   ELKO CO SCHOOL DIST          MGM CONSTRUCTION
WA-2010-119   NSHE/UNR                     K7 CONSTRUCTION
WA-2010-120   NSHE/UNR                     RELIANT ELECTRIC LLC
EL-2010-124   ELKO CO SCHOOL DIST
WA-2010-150   WASHOE CO SCHOOL DIST        CANCEL 6/15/10 DUPLICATE OF 10-48
WA-2010-159   WASHOE CO SCHOOL DIST        CANCELED 4/2/10
WA-2010-160   WASHOE CO SCHOOL DIST       CANCELED 4/2/10
WA-2010-161   WASHOE OC SCHOOL DIST       CANCELED 4/2/10
WA-2010-162   WASHOE CO SCHOOL DIST       CANCELED 4/2/10
EL-2010-163   BOARD OF REGENTS UNR        QUANTUM ELECTRIC LLC
WA-2010-170   WASHOE CO SCHOOL DIST       COMMERCIAL SOLAR SERVICES
WA-2010-171   WASHOE CO SCHOOL DIST       FRANK LEPORI CONSTRUCTION
LY-2010-189   LYON CO SCHOOL DIST         A & K EARTHMOVERS
WA-2010-190   WASHOE CO SCHOOL DIST       RHP MECHANICAL SYS

WA-2010-200   WASHOE CO SCHOOL DIST       POWERCOM SOLUTIONS
WA-2010-201   WASHOE CO SCHOOL DIST       CANCELED 4-7 COMBINING INTO 200
WA-2010-202   WASHOE CO SCHOOL DIST       CANCELED 4-7 COMBINING INTO 200
EL-2010-206   ELKO CO SCHOOL DIST         QUANTUM ELECTRIC LLC
EL-2010-207   ELKO CO SCHOOL DIST
WA-2010-208   UNR                         FIELDTRUF USA
WA-2010-215   WASHOE CO SCHOOL DIST       D&D ROOFING & SHEET METAL
WA-2010-216   WASHOE CO SCHOOL DIST       D&D ROOFING & SHEET METAL
WA-2010-217   WASHOE CO SCHOOL DIST       D&D ROOFING & SHEET METAL
WA-2010-220   WASHOE CO SCHOOL DIST       D&D ROOFING & SHEET METAL
WA-2010-222   NSHE/UNR                    K7 CONSTRUCTION
WA-2010-223   NSHE/UNR                    SPINITAR
WA-2010-226   WASHOE CO SCHOOL DIST       NELSON ELECTRIC
WA-2010-227   WASHOE CO SCHOOL DIST       CANCEL 5/13/10
WA-2010-228   WASHOE CO SCHOOL DIST       CANCEL 5/13/10
WA-2010-229   WASHOE CO SCHOOL DIST       CANCEL 5/13/10
WA-2010-230   WASHOE CO SCHOOL DIST       NELSON ELECTRIC CO
WA-2010-231   WASHOE CO SCHOOL DIST       UNITED CONSTRUCTION
WA-2010-232   WASHOE CO SCHOOL DIST       NELSON ELECTRIC CO
WA-2010-233   WASHOE CO SCHOOL DIST       RANGER CONSTRUCTION
WA-2010-238   WASHOE CO SCHOOL DIST       UNITED CONSTRUCTION
EU-2010-241   EUREKA CO SCHOOL DIST       CANCELED 7/27/10/DUPLICATED SEE 416
WA-2010-246   WASHOE CO SCHOOL DIST       CANCELED UNDER 100,000
WA-2010-247   WASHOE CO SCHOOL DIST       CANCELED UNDER 100,000
LY-2010-249   LYON CO SCHOOL DIST         UNDER 100,000
WA-2010-251   WASHOE CO SCHOOL DIST       COMMERCIAL SOLAR SERVICES
WA-2010-252   WASHOE CO SCHOOL DIST       UNITED CONSTRUCTION
WA-2010-256   ELKO CO SCHOOOL DISTRICT    CANCELED 5/26/10
ST-2010-270   STOREY COUNTY SCHOOL DIST   COMMERCIAL SOLAR SERVICES
WA-2010-271   WASHOE CO SCHOOL DIST       WEST COAST CONTRACTORS OF NV
WA-2010-273   WASHOE CO SCHOOL DIST       WEST COAST CONTRACTORS OF NV
EL-2010-274   ELKO CO SCHOOL DIST         CARSON UNLIMITED
WA-2010-276   BOARD OF REGENTS NSHE       RFI COMMUNICATIONS & SECURITY SYS
DO-2010-279   DOUGLAS CO SCHOOL DIST      CANCELED 09/08/2010
WA-2010-280   NSHE/UNR                    RENO BUSINESS INTERIORS INC
WA-2010-282   NSHE/UNR                    SIERRA NEVADA CONSTRUCTION
WA-2010-283   WASHOE CO SCHOOL DIST       SMITH MECHANICAL INC
WA-2010-284   WASHOE CO SCHOOL DIST
WA-2010-285   WASHOE CO SCHOOL DIST
WA-2010-286   WASHOE CO SCHOOL DIST
WA-2010-288   WASHOE CO SCHOOL DIST       BOMBARD ELECTRIC
WA-2010-289   WASHOE CO SCHOOL DIST       NELSO ELECTRIC CO
WA-2010-290   WASHOE CO SCHOOL DIST       CANCELED/COMBINED W 10-231
WA-2010-294   WASHOE CO SCHOOL DIST       KING CONSTRUCTION
WA-2010-295   WASHOE CO SCHOOL DIST          ADVANCE INSTALLATIONS INC

CC-2010-299   BOARD OF REGENTS OF NSHE/UNR   WESTERN SINGLE PLY
PE-2010-301   PERSHING CO SCHOOL DIST        UNDER 100,000/MARCOR
WA-2010-302   WASHOE CO SCHOOL DIST          SIERRA NEVADA CONSTRUCTION
HU-2010-305   HUMBOLDT CO SCHOOL DIST        RHP MECHANICAL


HU-2010-305                                  D & D ROOFING CO
HU-2010-306   HUMBOLDT CO SCHOOL DIST        MARCOR ABATEMENT
HU-2010-306                                  ALPINE ROOFING CO
HU-2010-306                                  CR DRAKE & SONS
HU-2010-306                                  D & D ROOFING CO
HU-2010-306                                  RHP MECHANICAL SYS
HU-2010-306                                  DESERT DESIGN ICN
HU-2010-306                                  JIM WARNER INSULATION
CC-2010-307   CARSON CITY SCHOOL DIST        UNITED ELECTRICAL SERVICES
LA-2010-308   LANDER CO SCHOOL DIST          STEVE C HAMILTON INC
PE-2010-309   PERSHING CO SCHOOL DIST
PE-2010-310   PERSHING CO SCHOOL DIST        MULTIPLE PRIMES
PE-2010-310                                  GOIDENBY CONSTRUCTION
PE-2010-310                                  UNITED ELECTRICAL SERVICES
PE-2010-310                                  MT ROSE HEATING & AIR
PE-2010-310                                  STEVE C HAMILTON INC
PE-2010-310                                  RASMOSSEN CONSTRUCTIN
EL-2010-317   ELKO CO SCHOOL DIST            CANCELED 5-26/10
WA-2010-321   NSHE/UNR                       KODIAK ROOFING
WA-2010-322   BOARD OF REGENTS NSHE          FRANK EVAN CONSTRUCTION
DO-2010-324   DOUGLAS CO SCHOOL DIST         NELSON ELECTRIC/TOTAL AWARD
WA-2010-326   WASHOE CO SCHOOL DIST          GRADEX CONSTRUCTION CO
WA-2010-333   WASHOE CO SCHOOL DIST          SIERRA NEVADA CONSTRUCTION
WA-2010-336   WASHOE CO SCHOOL DIST          GARDNER ENGINEERING INC
WA-2010-342   NSHE/UNR                       K7 CONSTRUCTION/UNDER 100,000
EL-2010-343   ELKO CO SCHOOL DIST            BISON CONSTRUCTION
CC-2010-345   CARSON CITY SCHOOL DIST
WA-2010-356   WASHOE CO SCHOOL DIST          UNDER 100,000
DO-2010-364   DOUGLAS CO SCHOOL DIST
DO-2010-365   DOUGLAS CO SCHOOL DIST
CH-2010-366   CHURCHILL CO SCHOOL DIST
WA-2010-367   WASHOE CO SCHOOL DIST          UNITED CONSTRUCTION
WA-2010-368   NSHE/UNR                       F EVANS CONSTRUCTION
WA-2010-375   STATE PUBLIC WORKS BOARD       UNDER 100,000/BUILDING SOLUTIONS
CC-2010-379   CARSON CITY SCHOOL DIST        SOUTLAND INDUSTRIES

WA-2010-389   NSHE/UNR
EU-2010-394   EUREKA CO SCHOOL DIST
EU-2010-395   EUREKA CO SCHOOL DIST
WA-2010-397   WASHOE CO SCHOOL DIST          RANGER CONSTRUCTION
WA-2010-398   WASHOE CO SCHOOL DIST          COMBINED WITH WA-2010-398
WA-2010-399   WASHOE CO SCHOOL DIST          COMBINED WITH WA-2010-398
WA-2010-400   WASHOE CO SCHOOL DIST          COMBINED WITH WA-2010-398
CH-2010-406   CHURCHILL CO SCHOOL DIST
CH-2010-407   CHURCHILL CO SCHOOL DIST
CH-2010-408   CHURCHILL CO SCHOOL DIST
CH-2010-409   CHURCHILL CO SCHOOL DIST
WA-2010-415   WASHOE CO SCHOOL DIST       UNDER 100,000 CANCELED 8/26/10
EU-2010-416   EUREKA CO SCHOOL DIST       JB ENTERPRISES INC

WA-2010-423   NSHE/UNR
WA-2010-427   NSHE/UNR
EU-2010-430   EUREKA COUNTY SCHOOL DIST   STEVE C HAMILTON INC
WA-2010-434   WASHOE CO SCHOOL DIST       NELSON ELECTRIC
WA-2010-435   WASHOE CO SCHOOL DIST       NELSON ELECTRIC
WA-2010-436   WASHOE CO SCHOOL DIST       NELSON ELECTRIC
WA-2010-437   NSHE/UNR
WA-2010-443   WASHOE CO SCHOOL DIST       NELSON ELECTRIC
WA-2010-444   WASHOE CO SCHOOL DIST       NELSON ELECTRIC
WA-2010-452   BOARD OF REGENTS/ NSHE
WA-2010-453   WASHOE CO SCHOOL DIST

WA-2010-454   WASHOE CO SCHOOL DIST
WA-2010-455   WASHOE CO SCHOOL DIST
WA-2010-463   WASHOE CO SCHOOL DIST
Total 2010


YEAR 2011
WA-2011-03    NSHE/UNR
EL-2011-16    ELKO COUNTY SCHOOL DIST
WA-2011-19    WASHOE CO SCHOOL DIST
WA-2011-20    WASHOE CO SCHOOL DIST
WA-2011-21    WASHOE CO SCHOOL DIST
Total 2011
note as of 10.21.2010




UNR CENTER FOR MOLECULAR MEDCINE, NEW LABORATORY/
MEDICAL OFFICE BUILDING                             $54,935,000.00 10/21/2008                10/22/2008
MDF COOLING RETROFIT AT 6 SCHOOLS                     $155,527.00 10/7/2008     5/4/2009     10/28/2008
APPLIED RESEARCH FACILITY RM 315 LAB REMODEL          $146,173.32 10/9/2008     4/20/2009    10/22/2008
WNCBRISTLECONE PINE BLUILDING CHILLER REPLACEMENT     $948,362.00 2/19/2009                  3/30/2009
SPRING CREEK HIGH SCHOOL VALLEY ROOF REPAIR           $149,576.00 10/23/2008    10/2/2009    10/28/2008
ACADEMY OF ARTS & CAREER TECHNOLOGY ADDITION        $11,823,694.00 12/23/2008   2/3/2010     1/1/2009
CMPS GEN PAVING REPAVE W STDM                         $366,142.00 12/12/2008    10/26/2009   1/16/2009
VOCATIONAL ARTS TRAINING BLDG                         $319,332.11 11/12/2008                 11/24/2008
CCTB SECURITY INSTALLS-REED HI SCL                    $101,599.41 2/10/2009     3/17/2010    3/6/2009
MCQUEEN HI SCHL HVAC REPLCMNT                         $713,000.00 2/19/2009     10/15/2009   2/10/2009
VETERANS MEMORIAL ELEM SCL REVITILAZATION            $1,404,698.56 2/20/2009    2/22/2010    3/6/2009
GBC COMMUNITY CENTER REMODEL                         $1,166,526.00 6/11/2009                 6/25/2009
RE PAVE LODER ES                                      $353,436.31 2/26/2009     3/23/2010    3/12/2009
INFRSTRCTR UPGRD BDSLY, WINN, WM                      $804,285.40 2/11/2009     12/30/2009   3/6/2009
INFRSTRCTR UPGRD WINNEMUCCA ES                                    2/11/2009     12/30/2009   2/19/2009
INFRSTRCTR UPGRD WAMER ES                                         2/11/2009     12/30/2009   2/19/2009
GWHS GYMNASIUM ADDITION                              $1,395,576.00 5/18/2009                 5/22/2009
NEW FLOORING-DRAKE ELEMENTARY                         $250,000.00 6/12/2009                  6/22/2009
SECURITY TV INSTALLS GRP 2-GALENA                                 2/12/2009                  3/9/2009
SCRUGHAM ENGNRNG BLDG RM 117                          $250,410.96 1/29/2009     11/19/2010   2/23/2009
W WNDVR ELMNTRY MDLR UNT 5 ADA                        $102,000.00 2/19/2009                  3/10/2009
REPLC FIRE ALARM SYS GRP 1                            $190,000.00 2/25/2009                  3/10/2009
REPLC FIRE ALARM SYS GRP 2                            $473,797.00 4/14/2009     2/22/2010    5/7/2009
ELKO HI SCHOOL ADA UPGRADE                           $1,290,908.76 5/5/2009     2/1/2010     5/12/2009
FLEISCHMANN AG BLDG RMS 243/245                       $255,197.71 3/5/2009      3/19/2010    5/12/2009
JACKPOT SCHOOL REMODEL                                $549,642.84 5/8/2009      11/20/2009   5/12/2009
CARLIN SCHOOL REMODEL                                 $847,014.40 5/8/2009      11/23/2009   5/12/2009
INFRSTRCTR UPGRD ECHO LODER                           $355,144.00 3/26/2009     1/12/2010    4/8/2009
CMPS GN ADA MACKAY STADM E SIDE                       $414,788.00 3/26/2009     3/19/2010    4/21/2009
NEW FLRING THROUT INCLINE MDL SCH                     $275,045.59 5/20/2009     3/17/2010    6/2/2009
CRYSTAL BAY PHS 1B &11A WTR IMPRV                     $653,135.75 4/23/2009     9/3/2009     5/12/2009
JOE CRAWLY NEW SPORTS GRILLE                          $822,000.00 3/30/2009     3/19/2010    3/30/2009
SOUND INSULATION IMPROVMENTS RESDNL HMS              $3,571,736.00 4/9/2009     10/27/2009   4/23/2009
VIRGINIA ST GYM RM 21 USAC REMDL                      $250,112.00 3/30/2009     11/6/2009    3/30/2009
ADA RESTROOM UPGRADES                                 $150,776.00 4/14/2009     10/14/2009   5/12/2009
RE-PAVE CANNAN ELMTRY SCHOOL                          $335,182.38 4/14/2009     3/17/2010    4/30/2009
RE-PAVE TOWIES ELMTRY SCHOOL                          $113,000.00 4/10/2009                  4/20/2009
RE-PAVE ALICE MAXWELL ELMT SCHL                       $161,799.77 4/14/2009                  5/5/2009
REPLACE GYM BLEACHERS WOOSTER                         $150,776.00 4/14/2009                  5/12/2009
REPLACE GYM BLEACHERS VAUGHN                          $108,000.00 4/14/2009                  4/22/2009
REPLC GYM BLCHRS TRANER MDL SCL                        $84,000.00 4/14/2009                  4/22/2009
REPLC GYM BLCHRS SPRKS MDL SCL                         $88,000.00 4/14/2009                  4/22/2009
REPLC GYM BLCHRS SWOPE MDL SCL                         $91,000.00 4/14/2009                  4/22/2009
RE-ROOF ROY GOMM ELMTRY SCHL                          $107,994.66 4/22/2009     3/17/2010    5/6/2009
RE-ROOFJUNIPER ELMTRY SCHL                            $515,731.63 4/22/2009     3/17/2010    5/6/2009
RE-ROOF PLEASANT VALLEYY ELEMETARY SCHOOL              $233,962.49 4/22/2009    3/17/2010    5/6/2009
RE-ROOF RENO HIGH SCHOOL                               $115,944.00 4/22/2009    9/1/2009     5/7/2009
CCTV SECURITY INSTALLS                                 $114,171.15 2/10/2009    3/17/2010    3/6/2009
RE-PAVE INCLINE MIDDLE SCHOOL                          $456,917.32 4/21/2009    3/23/2010    5/12/2009
REPLC FIRE ALARM SYSTEMS GRP 2                         $150,000.00 3/13/2009                 2/26/2009
RE-ROOF AT WCSD ADMIN BLDG                             $153,673.60 4/30/2009    3/17/2010    5/19/2009
RE-ROOF INCLINE HI SCHOOL                              $196,000.00 4/30/2009    5/27/2009    5/8/2009
RE-ROOF AT CLAYTON MIDDL SCHOOL                        $973,570.17 4/30/2009    3/17/2010    5/19/2009
SPRNG CRK HI SCHL HALWY FLR TILE                       $129,130.00 5/20/2009    8/3/2009     5/26/2009
FERNLY H S LIFT STA REPLCMNT                           $190,719.29 5/15/2009                 6/11/2009
SYNTHETIC TURF SPORTS FIELDS                           $446,446.00 5/12/2009                 5/20/2009
CMPUTR CNTR COOLING TWR RPLCMNT                        $106,864.00 5/21/2009                 6/15/2009
DES BUILDING B RENOVATION                              $990,000.00 6/3/2009                  6/9/2009
FERNLEY INTERMEDIATE II                              $20,657,000.00 6/19/2009                6/23/2009
PHS II SITE IMPRVMNTS DAYTON HI                        $510,004.08 5/15/2009    12/4/2009    6/11/2009
SCL MDCN HOWARD WTR LINE RPLC                          $116,318.00 5/1/2009     10/26/2009   5/11/2009
WELLS ELMNTRY KITCHEN REMODEL                          $142,000.00 7/2/2009                  7/14/2009
INCLINE VILLAGE HI SCHOOLL EROSION CONTROL BMP         $596,099.02 6/2/2009     3/17/2010    6/9/2009
CARSON HI SCHOOL PRESS BOX                             $260,000.00 5/22/2009                 5/29/2009
                                                       $119,900.00 6/3/2009                  6/5/2009
                                                          $9,844.00 6/3/2009                 6/5/2009
                                                          $6,414.00 6/3/2009                 6/15/2009
                                                        $12,254.00 9/3/2009                  6/15/2009
                                                          $8,000.00 6/11/2009                6/15/2009
                                                        $10,561.00 6/11/2009                 6/15/2009
                                                          $3,386.00 6/11/2009                6/15/2009
REVITALIZATION OF SCHOOL-LODER                         $803,000.00 9/23/2009                 10/2/2009
ELKO HI SCHOOL DRAINAGE MITIGATION                     $246,471.61 6/16/2009    10/2/2009    6/23/2009
REVITALIZTN 4 ELEMNTRY SCHOOLS                        $7,370,400.45 5/26/2009   4/14/2010    6/3/2009
COTTONWOOD ELEM SCHL PRKNG LOT                          $63,611.12 6/15/2009    11/17/2009   6/24/2009
SUTRO ELMNTRY SCHOL PRKNG LOT                           $90,922.71 6/15/2009    10/29/2009   6/24/2009
CG MCHNCL E SIDE FSD HTHW PIPNG                         $90,077.00 7/20/2009                 6/26/2009
W WENDOVER ELMNTRY BUS LANE                            $213,176.00 7/27/2009                 7/28/2009
MECHANICAL JOT TRAVIS BOILR-GNRTR                      $210,210.00 7/9/2009                  9/28/2009
DOUGLAS HI SCHOOL RE-ROOF PHS 2                        $718,157.00 6/8/2009     10/2/2009    6/10/2009
SCRUGHAM ENGINEERING BLDG RM 123                        $66,700.00 7/16/2009                 8/6/2009
SIERRA VISTA DRAINAGE                                  $104,069.40 7/9/2009     3/17/2010    7/17/2009
MACKAY STADUM FIELD TURF RPLCM                         $600,000.00 7/6/2009                  7/7/2009
CARLIN SCL CHESTNUT ST IMPRVMNTS                       $237,102.18 8/4/2009     10/26/2009   8/18/2009
BACKFLOW RETROFIT AT 8 SITES                           $550,000.00 9/15/2009                 9/23/2009
PINION HILLS MDULR CLSRM ADDITION                      $105,000.00 8/10/2009                 8/12/2009
LIGHTING UPGRADES AT 5 SITES                           $148,490.86 8/25/2009    3/23/2010    9/9/2009
CC HI SCHL MULTI PURPOSE FACILITY PAVING               $250,000.00 8/14/2009                 8/21/2009
                                                        $65,308.00 8/17/2009                 8/19/2009
                                                       $216,712.00 8/7/2009                  8/10/2009
                                                      $1,202,556.00 9/10/2009                9/22/2009
MITCHELL BOILER REPLACEMENT                            $244,364.89 9/23/2009    11/13/2009   9/23/2009
850 ELM ST REMODEL-ELKO                                $244,364.89 9/22/2009                 9/22/2009
ELKO HIGH SCHOOL COLLEGE AVE IMPROVEMENTS              $129,782.00 9/15/2009    7/15/2010    10/13/2009
SPARKS & GALENA WELDING SHOP VENTILATION IMPRVMNTS     $950,000.00 9/29/2009                 10/19/2009
GENERAL REHAB & REFURBISHING VARIOUS SCHOOL SITES      $391,996.00 5/21/2009                 5/25/2009
                                                        $82,600.00 6/18/2009                 6/22/2009
                                                                      $168,057.00 7/9/2009                 7/20/2009
                                                                       $72,669.00 6/4/2009                 6/8/2009
                                                                      $178,000.00 6/4/2009                 6/23/2009
                                                                      $260,000.00 5/12/2009                5/19/2009
                                                                      $210,121.00 7/9/2009                 7/14/2009
                                                                       $27,992.00 7/9/2009                 7/14/2009
                                                                      $207,788.00 6/11/2009                6/4/2009
                                                                       $95,412.00 7/9/2009                 7/20/2009
                                                                       $86,070.00 5/11/2009                5/13/2009
                                                                       $36,783.00 7/27/2009                7/29/2009
                                                                      $136,003.00 7/7/2009                 7/13/2009
                                                                    $2,000,000.00 6/15/2009                6/20/2009
                                                                       $25,140.00 7/10/2009                7/15/2009
GENERAL REHAB & REFURBISHING VARIOUS SCHOOL SITES                      $68,900.00 7/20/2009                7/21/2009
                                                                       $55,552.00 7/30/2009                8/4/2009
                                                                      $278,000.00 7/30/2009                8/5/2009
                                                                       $84,747.00 7/30/2009                8/5/2009
                                                                      $127,000.00 7/30/2009                8/5/2009
                                                                      $529,007.00 8/20/2009                8/25/2009
                                                                      $128,249.00 8/17/2009                8/19/2009
                                                                       $31,387.00 9/8/2009                 9/9/2009
                                                                      $128,249.00 8/19/2009
                                                                       $36,783.00 7/29/2009                12/0/2008
                                                                $134,316,280.79



MEDICAL EDUCATION LEARNING LAB BUILDING                            $27,000,000.00 10/29/2009               11/30/2009
PROP PAD REPAIR FIRE SCIENCE ACADEMY, ELKO                            $191,465.00 10/15/2009               11/23/2010
DESIGN-BUILD BOILER SYSTEM UPGRADE                                    $167,131.00 10/6/2009                10/15/2009
DAVIDSON MATH & SCIENCE CNTR AUDIO/VISUAL PACKAGE                     $932,949.57 12/15/2009               2/25/2009
DAVIDSON MATH & SCIENCE CNTR FURNITURE & SEATING
SCHURZ ELEMENTRY SCHOOL WATER SYS ARSENIC                             $900,000.00 12/15/2009               12/152009
TREATMENT
REVITALIZATION OF Sun Valley, Duncan,Corbett, & Booth Schools         $145,343.00 12/29/2009               1/7/2010
PHASE 1 & 2                                                         $5,383,591.00 11/10/2009               11/23/2009
SCHURZ SCHOOL WATER SYS ARSENIC TREATMENT PLANT                       $145,343.00 12/2*/09                 1/7/2010
SECURITY CCTV SYSTEM INSTALL/AACT HIGH SCHOOL                         $307,015.00 5/21/2010                6/11/2010
SECURITY CCTV SYSTEM INSTALL/DAMONTE RANCH HI,
GERLACH & WOOSTER                                                     $145,000.00 5/20/2010                6/7/2010
SECURTIY CCTB SYSTEM INSTALL/SPANISH SPRINGS HI SCHOOL                $100,000.00 N/A                      11/5/2009
DAYTON COMMUNITY CENTER STRUCTURAL REHABILITATION                      $98,000.00 11/24/2009               1/5/2010
GREAT BASIN COLLEGE CENTRAL RECEIVING REMODEL                         $284,248.00 1/5/2010     8/30/2010   01/07/10.
PUBLIC DEFENDERS OFFICE REMODEL                                       $348,259.00 3/2/2010                 3/23/2010
GYM BLEACHER REPLACEMENT                                              $239,000.00 1/29/2010    8/25/2010   2/12/2010
SECURITY CCTV SYSTEM INSTALL-PHASE 2                                  $125,000.00 10/20/2009               11/20/2009
HI SCHOOL ADMIN BUILDING RE-ROOF                                      $500,000.00 01/19/.09                1/21/2010
CARLIN HI SCHOOL DRAINAGE IMPROVEMENTS                                $151,090.00 4/5/2010                 5/27/2010
WELLS ELEMENTARY KITCHE REMODEL & PARKING LOT                         $545,215.00 4/12/2010                5/11/2010
ANSARIE BUSINESS BLDG 4TH FLOOR REMODEL                               $189,100.00 5/4/2010                 7/13/2010
FA VALLEY RD GREENHOUSES SOLOR PHOTVOLTAIC PR SYS                     $168,790.00 1/29/2010                5/6/2010
ELKO HIGH SCHOOL BLEACHER REPLACEMENT                                 $202,571.00 4/9/2010                 4/13/2010
REVITALIZATION OF THREE SCHOOLS                                     $1,075,045.00 3/1/2010                 3/9/2010
REPLACE FIRE ALARM SYSTEMS GROUP 3 WHITEHEAD ES                       $146,500.00 1/20/2010                1/28/2010
REPLACE FIRE ALARM SYSTEMS GROUP 3 VERDI ES             $116,500.00 1/20/2010                1/28/2010
REPLACE FIRE ALARM SYSTEMS GROUP 3 BECK ES              $116,500.00 1/20/2010                1/28/2010
REPLACE FIRE ALARM SYSTEMS GROUP 3 DUN ES               $146,500.00 1/20/2010                1/28/2010
GREAT BASIN COLLEGE PHOTOVOLTAIC                        $282,882.32 3/18/2010                7/20/2010
PHOTOVOLTAIC POWER @ BENNETT ELEMENTARY SCHOOL          $263,046.00 3/11/2010    9/3/2010    4/16/2010
PHOTOVOLTAIC POWER @ WOOSTER HIGH SCHOOL                $458,431.78 3/11/2010    8/25/2010   4/2/2010
FERNELY HI SECONDARY ACCESS & NDOT IMPROVEMENTS         $704,000.00 4/21/2010                4/27/2010
MDF COOLING RETROFIT AT 12 SCHOOLS                      $243,355.00 3/23/2010                3/31/2010
INFRASTRUCTURE UPGRADE HUNSBERGER, MATHEWS &