CAP Advocacy Items 2011-2012 - Moreland City Council

Document Sample
CAP Advocacy Items 2011-2012 - Moreland City Council Powered By Docstoc
					                                                                                                                   180847d5-0043-4e9a-9655-7389008b0002.xls




                                                                                                                                                                                                                         The Moreland Council Action Plan 2011-2012 is the
                                                                                                                                                                                                                        plan for the implementation of the Council Plan in the
                                                                                                                                                                                                                        2011-2012 financial year. The focus, therefore, is on
                                                                                                                                                                                                                          the actions that will be undertaken in that period to
                                                                                                                                                                                                                         implement the initiatives aimed at achieving the key

                                                                      COUNCIL ACTION PLAN 2011-2012                                                                                                                          strategic objectives of Council, as stated in the
                                                                                                                                                                                                                          Council Plan. Progress with implementation will be
                                                                                                                                                                                                                         reported on a quarterly basis against the nominated
                                                                                                                                                                                                                          measures and targets. Note: shaded rows indicate
                                                                                                                                                                                                                           items in common with the Key Strategic Activities
                                                                                                                                                                                                                                       budget document 2011-12.
Item #




         Key Strategic Objective                Initiative                 Action                                            Measure                                          Target                                    Lead Service Unit           Department




                                                                           Implement the Carbon Management Strategy,
         KSO 1: Collaborate with the community Carbon Management                                                             Implementation of strategy milestones &          In accordance with strategy or progress
1                                                                          including: building efficiency works and                                                                                                      ESD Unit                   City Development
         and respond actively to climate change Strategy                                                                     deliverables provided                            report to Council not later than June 2012
                                                                           development of carbon off-set policy.



                                                                           Convert Moreland’s street lights to energy
         KSO 1: Collaborate with the community                                                                                  Proportion of 80W MV Lights changed to T5     At least 80% of lightings changed by June
2                                               Climate Action Plan        efficient globes (retrofit Council controlled public                                                                                         Transport Development       City Infrastructure
         and respond actively to climate change                                                                                 luminaries                                    2012
                                                                           lighting in Jemena area)


         KSO 1: Collaborate with the community                             Implement Climate Action Plan, including review Implementation of plan milestones &                In accordance with plan or progress report
3                                               Climate Action Plan                                                                                                                                                      Transport Development      City Infrastructure
         and respond actively to climate change                            vehicle policy                                  deliverables provided                              to Council not later than June 2012




         KSO 1: Collaborate with the community Integrated Water            Continue to convert sports fields (where
4                                                                                                                            No. of conversions per year                      Minimum of two (2)                        Open Space Maintenance City Infrastructure
         and respond actively to climate change Management Plan            appropriate) to warm season grasses



                                                                           Implement the Integrated Water Management
         KSO 1: Collaborate with the community Integrated Water                                                              Implementation of plan milestones &              In accordance with plan or progress report
5                                                                          Plan, including building water efficiency works                                                                                               ESD Unit                   City Development
         and respond actively to climate change Management Plan                                                              deliverables provided                            to Council not later than June 2012
                                                                           and stormwater harvesting projects


         KSO 1: Collaborate with the community Integrated Water                                                              Proportion of Council water (Open Space
6                                                                          Increase Council water recycling                                                                5%                                           Open Space Maintenance City Infrastructure
         and respond actively to climate change Management Plan                                                              Maintenance activity only) re-used in 2011/12



                                                                                                                             Continue Capital Works Program for a range
         KSO 1: Collaborate with the community Integrated Water            Support the use of water saving techniques at                                                      Complete FY 11/12 Capital Works
7                                                                                                                            of drought-responsive initiatives (irrigation,                                             Open Space Maintenance City Infrastructure
         and respond actively to climate change Management Plan            our parks and gardens                                                                              Program for the relevant items
                                                                                                                             rainwater harvesting, turf conversion)


                                                                                                                             Completion of Phase 2 of Place Framework
                                                                           Ongoing preparation of Brunswick Place
         KSO 2: Facilitate the development of                                                                                Strategy and deliverables provided, and                                                    Place Manager -
8                                               Brunswick Structure Plan   Framework Strategy to attract investment to                                                        June 2012.                                                            Economic Development
         the local economy and jobs                                                                                          implementation of structure plans, including                                               Brunswick
                                                                           optimise economic and social benefits
                                                                                                                             approved capital works


         KSO 2: Facilitate the development of   Economic Development       Establish an on-line business support service,    Fully operational on-line business support
9                                                                                                                                                                             Dec 2011.                                 Economic Development        Economic Development
         the local economy and jobs             Strategy                   incorporating a business directory                service and directory




                                                                                                                                     Page 1
                                                                                                                         180847d5-0043-4e9a-9655-7389008b0002.xls


Item #


         Key Strategic Objective                 Initiative                      Action                                             Measure                                      Target                             Lead Service Unit        Department




                                                                                 Explore the feasibility of expanding the
         KSO 2: Facilitate the development of    Economic Development            Business Incubation program to campuses in
10                                                                                                                                  Feasibility Study reported to Council        June 2012.                         Economic Development     Economic Development
         the local economy and jobs              Strategy                        the northern and central areas of the
                                                                                 municipality


                                                                                                                                    Deliver 3 business plans and designs for 2
                                                                                                                                    small and one medium shopping centre and
         KSO 2: Facilitate the development of    Economic Development
11                                                                               Implement Shopping Strip Renewal Program           implement 2 small centre streetscape         June 2012.                         Economic Development     Economic Development
         the local economy and jobs              Strategy
                                                                                                                                    improvement plans.



                                                                                                                                    Completion of Phase 1 of Place Framework
                                                                                 Prepare Glenroy Place Framework Strategy to        and implementation of stage 1 of the
         KSO 2: Facilitate the development of
12                                               Glenroy Structure Plan          attract investment to optimise economic and        Streetscape Master Plan                      June 2012.                         Place Manager - Glenroy Economic Development
         the local economy and jobs
                                                                                 social benefits




         KSO 2: Facilitate the development of                                    Prepare and submit Development Management                                                       Development Management Agreement
13                                               The Coburg Initiative                                                     Timely achievement of project milestones                                                 Place Manager - Coburg   Economic Development
         the local economy and jobs                                              Agreement                                                                                       signed and adopted December 2011



                                                                                 Implement bicycle plan, including further
                                                                                 improvements to East-West linkages, signage        As per adopted FY 11/12 Capital Works
14       KSO 3: Improve transport and mobility   Bicycle Plan                                                                                                                    June 2012.                         Transport Development    City Infrastructure
                                                                                 and availability of bike parking within retail     Program
                                                                                 centres



                                                                                 Improve integration of bike network with           As per adopted FY 11/12 Capital Works
15       KSO 3: Improve transport and mobility   Bicycle Plan                                                                                                                    June 2012.                         Transport Development    City Infrastructure
                                                                                 neighbouring municipalities                        Program




                                                                                 Complete DDA Audits for all shopping centres
                                                                                                                                    DDA Audits completed for all Shopping
16       KSO 3: Improve transport and mobility   Disability Action Plan          (including any work not already completed for                                                   Oct 2011.                          Transport Development    City Infrastructure
                                                                                                                                    Centres and Activity Centres
                                                                                 the Activity Centres)



                                                                               Continue to support the installation of traffic
                                                                               management devices where they are
                                                                                                                                    Works implemented as per adopted FY 11/12
17       KSO 3: Improve transport and mobility   Integrated Transport Strategy appropriate, including the use of the tool kit                                                 June 2012.                            Transport Development    City Infrastructure
                                                                                                                                    Capital Works Program
                                                                               developed by Bicycle Victoria to make
                                                                               intersections safer for cyclists and pedestrians


                                                                                 Investigate community bus link to transit points
18       KSO 3: Improve transport and mobility   Integrated Transport Strategy                                                      Report to Council                            June 2012.                         Transport Development    City Infrastructure
                                                                                 and major roads



                                                                                 Implement parking management project,
19       KSO 3: Improve transport and mobility   Parking Strategy                                                                   PODS installed                               By Jan 2012                        Transport Development    City Infrastructure
                                                                                 including implementation of PODS




                                                                                                                                            Page 2
                                                                                                                       180847d5-0043-4e9a-9655-7389008b0002.xls


Item #


         Key Strategic Objective                 Initiative                   Action                                              Measure                                         Target                                   Lead Service Unit         Department




                                                                                                                                                                                  1. Public consultation by July 2011;
                                                                              Develop and implement Peak Oil Strategy             Implementation of strategy milestones &         2. Adoption by October 2011; and,
20       KSO 3: Improve transport and mobility   Peak Oil Strategy                                                                                                                                                         DCS                       Corporate Services
                                                                              action plan                                         deliverables provided                           3. Implementation in accordance with
                                                                                                                                                                                  strategy action plan


                                                                                                                                  1. Program developed and reported to
                                                                              Develop and commence implementation of a
                                                                                                                                  Council                                   1. Dec 2011: and,
21       KSO 3: Improve transport and mobility   Pedestrian Strategy          program to ensure adequate seating, shelter                                                                                                  Transport Development     City Infrastructure
                                                                                                                                  2. Commence implementation as per adopted 2. July 2012.
                                                                              and lighting at a number of bus stops
                                                                                                                                  YR 11/12 Capital Works Program



                                                                              Develop and Implement Capital Works priority        Report to council and inclusion in FY 11/12
22       KSO 3: Improve transport and mobility   Pedestrian Strategy                                                                                                              Aug 2011.                                Transport Development     City Infrastructure
                                                                              Program for pedestrian strategy                     Capital Works Program



                                                                              Invest in better amenity and streetscape of
                                                                              pedestrian paths (especially on pedestrian          As per adopted FY 11/12 Capital Works
23       KSO 3: Improve transport and mobility   Pedestrian Strategy                                                                                                              June 2012.                               Transport Development     City Infrastructure
                                                                              routes to activity centres), including more trees   Program
                                                                              or shade, seating and appropriate lighting



         KSO 4: Maintain and enhance
                                                                              Introduce Asset Bond Scheme based on level          1. Report to Council; and,                      1. Dec 2011; and,                        Road Construction &
24       appropriate infrastructure and open     Asset Bond Scheme                                                                                                                                                                                   City Infrastructure
                                                                              of compliance with Asset Protection Permit          2. Implement scheme                             2. June 2012                             Maintenance
         space



                                                 Brunswick Structure Plan;    Prepare a feasibility study on the use of the
         KSO 4: Maintain and enhance
                                                 Brunswick Place Framework;   Brunswick Civic and Arts Precinct including         Completion of feasibility study and report to                                            Place Manager -
25       appropriate infrastructure and open                                                                                                                                      June 2012.                                                         Economic Development
                                                 Library Strategy; Building   resolution of a community hub and the Saxon         Council                                                                                  Brunswick
         space
                                                 Operations Plan              Street property.



         KSO 4: Maintain and enhance
                                                 Community Infrastructure                                                                                                                                                  Community Development
26       appropriate infrastructure and open                                  Implement Community Infrastructure Framework Application to agreed relevant projects                90% of agreed relevant projects                                Social Development
                                                 Framework                                                                                                                                                                 & Social Policy
         space



         KSO 4: Maintain and enhance                                          Complete Fleming Park Building Masterplan           Production of 5 year Action Plan for Buildings. 1) Consultation completed by Dec 2011
27       appropriate infrastructure and open     Fleming Park Masterplan      and commence scoping up Open Space                  Complete consultation and scoping up of         2) Building Action Plan and scoping of   Property Services         City Infrastructure
         space                                                                Masterplan                                          timetable for Open Space Works                  Open Space timetable by June 2012



         KSO 4: Maintain and enhance
                                                                                                                                  Adopted by Council and implementation
28       appropriate infrastructure and open     Laneways Policy              Implement Laneways Policy                                                                           July 2011 (and ongoing)                  Strategic Property Unit   City Infrastructure
                                                                                                                                  commenced
         space



         KSO 4: Maintain and enhance
                                                                                                                                                                                                                           Local Laws & Civic
29       appropriate infrastructure and open     Municipal Local Laws         Amend local law to protect significant trees        Adoption of Local Law/Amended Local Law         Dec 2011.                                                          City Development
                                                                                                                                                                                                                           Compliance
         space




                                                                                                                                          Page 3
                                                                                                                 180847d5-0043-4e9a-9655-7389008b0002.xls


Item #


         Key Strategic Objective               Initiative                Action                                           Measure                                       Target                                      Lead Service Unit          Department




                                                                                                                          Complete detailed design, contract
         KSO 4: Maintain and enhance
                                               Neighbourhood House       Re-locate Sussex Neighbourhood House to          documentation and planning permit.
30       appropriate infrastructure and open                                                                                                                          June 2012.                                    Building Maintenance Unit City Infrastructure
                                               Strategy                  Rogers Reserve Pascoe Vale                       Construction to commence as per 5yr Capital
         space
                                                                                                                          Works Program.




         KSO 4: Maintain and enhance                                     Conduct review of land used as open space in
                                                                                                                                                                                                                    Open Space Design &
31       appropriate infrastructure and open   Open Space Strategy       Moreland to identify ownership and               Commence Stage 1 and overview                 March 2012.                                                            City Infrastructure
                                                                                                                                                                                                                    Development
         space                                                           inappropriately zoned land




         KSO 4: Maintain and enhance
                                                                         Continue to implement exercise equipment in      As per adopted FY 11/12 Capital Works                                                     Open Space Design &
32       appropriate infrastructure and open   Open Space Strategy                                                                                                      June 2012.                                                             City Infrastructure
                                                                         parks in accordance with strategy                Program                                                                                   Development
         space




         KSO 4: Maintain and enhance
                                                                                                                          Implementation according to agreed project    Progress report to Council not later than   Open Space Design &
33       appropriate infrastructure and open   Open Space Strategy       Implement Open Space Strategy action plan                                                                                                                             City Infrastructure
                                                                                                                          plan milestones & deliverables                June 2012                                   Development
         space




         KSO 4: Maintain and enhance
                                                                                                                                                                        Project milestones achieved in
34       appropriate infrastructure and open   Open Space Strategy       Redevelop CB Smith Reserve                       Commence construction of pavilion                                                         Property Services          City Infrastructure
                                                                                                                                                                        accordance with plan by June 2012.
         space




         KSO 4: Maintain and enhance
                                                                         Undertake improvements to Gowanbrae open         Implementation of strategy milestones &       In accordance with strategy or progress    Open Space Design &
35       appropriate infrastructure and open   Open Space Strategy                                                                                                                                                                             City Infrastructure
                                                                         space                                            deliverables provided                         report to Council not later than June 2012 Development
         space



                                                                                                                          1. Construct new public toilet at West St
         KSO 4: Maintain and enhance
                                                                                                                          Hadfield
36       appropriate infrastructure and open   Public Toilets Strategy   Continue with public toilet upgrades                                                           July 2011.                                  Property Services          City Infrastructure
                                                                                                                          2. Complete design and study for new public
         space
                                                                                                                          toilet at Cumberland Rd/ Gaffney St



         KSO 4: Maintain and enhance
                                                                         Review & adopt Public Toilet strategy with
37       appropriate infrastructure and open   Public Toilets Strategy                                                    Strategy adopted and implemented              Nov 2011.                                   Property Services          City Infrastructure
                                                                         funding targets (operating & capital)
         space




         KSO 4: Maintain and enhance
                                               Road Asset Management     Actively manage the impact of utility services on                                                                                          Road Construction &
38       appropriate infrastructure and open                                                                               Monitor and report to Council                Report to Council by Dec 2011                                          City Infrastructure
                                               Plan                      council assets                                                                                                                             Maintenance
         space




                                                                                                                                   Page 4
                                                                                                                          180847d5-0043-4e9a-9655-7389008b0002.xls


Item #


         Key Strategic Objective                 Initiative                      Action                                            Measure                                        Target                                     Lead Service Unit         Department




         KSO 4: Maintain and enhance
                                                                                 Complete the review and implement the             Implementation of strategy milestones &        In accordance with strategy or progress    Open Space Design &
39       appropriate infrastructure and open     Street Landscape Strategy                                                                                                                                                                             City Infrastructure
                                                                                 Moreland Street Landscape Strategy (MSLS)         deliverables provided                          report to Council not later than June 2012 Development
         space



         KSO 5: Effective use of our land use                                    Implement the Coburg 2020 Structure Plan and
                                               Coburg 2020 Structure Plan;
         and development policies for outcomes                                   Coburg Place Framework, including proposed
40                                             Colours of Coburg Place                                                         Year 1 of implementation plan                      June 2012.                                 Place Manager - Coburg    Economic Development
         appropriate to the long term needs of                                   Healthscope development, utilising the place-
                                               Framework
         communities                                                             making approach

         KSO 5: Effective use of our land use                                    Prepare a report to Council seeking
         and development policies for outcomes   North of Bell Street Heritage   authorisation to implement the North of Bell
41                                                                                                                               Presentation of report to Council                Sept 2011.                                 Strategic Planning Unit   City Development
         appropriate to the long term needs of   Study                           Street Heritage Study via the preparation of an
         communities                                                             amendment to the Moreland Planning Scheme.
         KSO 5: Effective use of our land use
                                                 Planning Scheme -
         and development policies for outcomes                                   Implement a municipal wide Development
42                                               Development Contributions                                                         Prepare planning scheme amendment              Nov 2011.                                  Strategic Planning Unit   City Development
         appropriate to the long term needs of                                   Contribution Plan for Moreland
                                                 Plan
         communities
         KSO 5: Effective use of our land use                                 Implement the MILUS via progressing planning
         and development policies for outcomes   Planning Scheme - Industrial scheme amendments, which rezone redundant Prepare permanent planning controls for
43                                                                                                                                                                                June 2012.                                 Strategic Planning Unit   City Development
         appropriate to the long term needs of   Land Use Strategy            industrial land/precincts to facilitate urban Nicholson and Lygon Street corridors
         communities                                                          regeneration consistent with MILUS and Local

                                                                                                                                   1. Adoption of Parking Management Strategy
         KSO 5: Effective use of our land use
                                                                                                                                   (public spaces)
         and development policies for outcomes Planning Scheme - Parking         Prepare a parking local policy for inclusion in                                                1. August 2011
44                                                                                                                                 2. Prepare a local parking policy for Coburg                                              Transport Development     City Infrastructure
         appropriate to the long term needs of Local Policy                      planning scheme                                                                                2. June 2012
                                                                                                                                   and Brunswick informed by the respective ED
         communities
                                                                                                                                   Strategies and Place Framework programs

                                                                                 Implement the recommendations of the
         KSO 5: Effective use of our land use                                    Moreland Planning Scheme Review (2010)
                                                                                                                                   Implement the actions arising from the Local
         and development policies for outcomes Planning Scheme - Planning        including key priorities: Local Planning Policy
45                                                                                                                                 Planning Policy Framework Review/ MSS          Not later than April 2012.                 Strategic Planning Unit   City Development
         appropriate to the long term needs of Scheme Review                     Framework Review/ MSS Review, including
                                                                                                                                   Review and report progress to Council
         communities                                                             review private open space requirement and
                                                                                 review of urban villages policy and of reverse
         KSO 5: Effective use of our land use
                                                                            Develop protocol for officers to refer all public
         and development policies for outcomes                                                                                     Corporate policy and procedure approved by
46                                             Redevelopment of public land land issues (not council owned land) to CEO                                                           Dec 2011.                                  CEO Office                CEO Office
         appropriate to the long term needs of                                                                                     Councillors
                                                                            and brief Council if appropriate
         communities

                                               Sustainable Tools for
         KSO 5: Effective use of our land use
                                               Environmental Performance
         and development policies for outcomes                                   Continue to promote the STEPS and SDS built
47                                             Strategy (STEPS) and                                                                Annual progress report to Council              June 2012.                                 ESD Unit                  City Development
         appropriate to the long term needs of                                   environment assessment tools
                                               Sustainable Design
         communities
                                               Scorecard (SDS)

         KSO 5: Effective use of our land use                                                                                      1. Prepare a report to Council on possible     1. Dec 2011;
         and development policies for outcomes                                   Implement a proactive planning enforcement        costs and benefits;                            2. Increased number of enforcement          Building & Planning
48                                             TBD                                                                                 2. Implement findings of the report                                                                                 City Development
         appropriate to the long term needs of                                   program, including appropriate staffing                                                          actions (preferably at least double current Compliance
         communities                                                                                                                                                              rate)


         KSO 5: Effective use of our land use
                                                                                 Prepare a planning scheme amendment
         and development policies for outcomes
49                                             The Coburg Initiative             package to facilitate Coburg activity centre      Prepare Planning Scheme Amendment              June 2012.                                 Strategic Planning Unit   City Development
         appropriate to the long term needs of
                                                                                 redevelopment
         communities




                                                                                                                                           Page 5
                                                                                                                        180847d5-0043-4e9a-9655-7389008b0002.xls


Item #


         Key Strategic Objective                 Initiative                  Action                                             Measure                                        Target                                      Lead Service Unit      Department




         KSO 7: Engage the organisation and                                  Full implementation of the AIM program,            Level of community satisfaction with Council
50       community to make Moreland a prouder AIM Program                    including a review of street cleaning schedule     performance, as measured by program            Improvement in community satisfaction       Street Cleansing       City Infrastructure
         and cleaner city                                                    and practices                                      survey


                                                                                                                                Completion and implementation of Policy for
         KSO 7: Engage the organisation and                                  Work with local schools, communities and                                                          Council adoption by first Council meeting
                                                                                                                                Waste and Litter at Sporting Clubs and
51       community to make Moreland a prouder City Improvement program       sporting clubs on waste education and litter                                                      of 2011 and commencement of                 Waste Services         City Infrastructure
                                                                                                                                implementation of waste and litter strategy
         and cleaner city                                                    reduction                                                                                         implementation thereafter
                                                                                                                                actions




         KSO 7: Engage the organisation and
                                                                             Continue to work with the Department of Justice Proportion of square metres given to
52       community to make Moreland a prouder Graffiti Strategy                                                                                                                90%                                         Street Cleansing       City Infrastructure
                                                                             for the timely removal of inappropriate graffiti Department of Justice to paint completed
         and cleaner city




                                                                                                                              1. Number of Notices to Comply and fines
         KSO 7: Engage the organisation and
                                                                             Continue to improve the enforcement of littering issued; and,                                                                                 Local Laws & Civic
53       community to make Moreland a prouder Waste & Litter Strategy                                                                                                          Improvement in both measures                                       City Development
                                                                             laws                                             2. Proportion satisfied with enforcement of                                                  Compliance
         and cleaner city
                                                                                                                              local laws, as measured by DPCD survey



         KSO 7: Engage the organisation and
                                                                             Implement Moreland Waste & Litter Strategy
54       community to make Moreland a prouder Waste & Litter Strategy                                                           Strategy and contracts implemented             As per Council resolution                   Street Cleansing       City Infrastructure
                                                                             and associated contracts
         and cleaner city



         KSO 8: Foster greater community                                                                                        Implementation according to agreed action      Progress report to Council not later than   Community Development
55                                               Multicultural Policy        Implement Multicultural Policy action plan                                                                                                                          Social Development
         resilience                                                                                                             plan milestones & deliverables                 June 2012                                   & Social Policy



         KSO 9: Celebrate what makes
56                                               Arts and Culture Strategy   Provide a Festivals and Events Program             Total number of attendees                      70,000+                                     Arts & Culture         Social Development
         Moreland great




57       KSO 10: Foster community creativity     Arts and Culture Strategy   Create work spaces for creative activity           Number of creative work spaces created         One creative work space by June 2012        Arts & Culture         Social Development




                                                                             Implementation of new Arts and Culture
58       KSO 10: Foster community creativity     Arts and Culture Strategy                                                      First year Strategy actions completed          June 2012.                                  Arts & Culture         Social Development
                                                                             Strategy for 2011-2016


         KSO 11: Appropriately respond to the
                                                                             Implement Annual Moreland Municipal Public         Implementation of plan milestones &            In accordance with plan or progress report Community Development
59       population health needs of people at all Health & Well-Being Plan                                                                                                                                                                      Social Development
                                                                             Health Action Plan                                 deliverables provided                          to Council not later than June 2012        & Social Policy
         ages and stages

                                                                             For each playground (new or upgrade) in the
         KSO 11: Appropriately respond to the                                capital works program, include both an                                                      Report to Councillor I & D on the
                                                                                                                             Consideration of shade and fencing needs in                                                   Open Space Design &
60       population health needs of people at all Playground Strategy        assessment of shade and the provision of                                                    assessment of shade and fencing needs                                    City Infrastructure
                                                                                                                             playground projects.                                                                          Development
         ages and stages                                                     solutions (such as shade sails and trees) where                                             for each playground project in 11/12.
                                                                             needed, and also an assessment of the need



                                                                                                                                        Page 6
                                                                                                                     180847d5-0043-4e9a-9655-7389008b0002.xls


Item #


         Key Strategic Objective                 Initiative                  Action                                            Measure                                       Target                                    Lead Service Unit         Department




         KSO 11: Appropriately respond to the
                                                                                                                               Implementation of strategy milestones &       In accordance with plan or progress report Open Space Design &
61       population health needs of people at all Playground Strategy        Implement Moreland Playground Strategy                                                                                                                              City Infrastructure
                                                                                                                               deliverables provided                         to Council by Jan 2012                     Development
         ages and stages



                                                                                                                               1. Number of meals purchased pa from RFK;
         KSO 12: Ensure provision of                                         Continue to participate in the Regional Kitchen                                             1. 500 meals pa.
62                                               Aged Services Review                                                          and,                                                                                    Social Support            Social Development
         appropriate aged services                                           project.                                                                                    2. June 2012.
                                                                                                                               2. Evaluation report to Council.


                                                                                                                               1. Implementation of the Seniors Panel;
                                                                             Implement community participation and             2. Continue to assist promotion of the Wesley 1. >10 people on the database;
         KSO 12: Ensure provision of                                                                                                                                                                                   Policy, Planning &
63                                               Later Years Strategy        development elements of the Later Years           PetPals program; and,                         2. 3 articles in the media; and,                                    Social Development
         appropriate aged services                                                                                                                                                                                     Projects
                                                                             Strategy                                          3. Report on other projects, partnerships &   3. Report to Council by June 2012.
                                                                                                                               collaborations



         KSO 13: Ensure that the community                                   Develop an implementation plan for the Active
                                                                                                                               Completion of Aquatics and Leisure tender
64       has access to a range of sporting and   Active Moreland Framework   Moreland Framework (stage 1 - single service                                                    Dec 2011.                                 Leisure Facilities        Social Development
                                                                                                                               process as reported to Council.
         recreational facilities                                             specification and tender)




         KSO 13: Ensure that the community
                                                                             Ensure outdoor pools are promoted and             Attendance levels (subject to variations in
65       has access to a range of sporting and   Active Moreland Framework                                                                                                   Increase on 10/11 levels of patronage     Leisure Facilities        Social Development
                                                                             patronised                                        weather and capital works interruptions)
         recreational facilities




                                                                                                                                                                             1. Council report and an allocation for
                                                                                                                               1. Development of the netball courts plan for
         KSO 13: Ensure that the community                                                                                                                                   netball courts within the Capital Works   1. Youth & Leisure; and   1. Social Development;
                                                 Active Women in Moreland                                                      future years reported to Council; and,
66       has access to a range of sporting and                               Construct additional netball courts                                                             Program by June 2012; and,                2. Engineering &          and,
                                                 Strategy                                                                      2. Construction of 2 netball courts in
         recreational facilities                                                                                                                                             2. Completed construction of 2 netball    Transport                 2. City Infrastructure
                                                                                                                               Brunswick.
                                                                                                                                                                             courts in Brunswick by June 2012



         KSO 13: Ensure that the community
67       has access to a range of sporting and   Aquatic Strategy            Redevelop the Brunswick Baths                     Completion of construction                    Sept 2012.                                Strategic Property Unit   City Infrastructure
         recreational facilities

                                                                                                                               Complete Stage 1 concept planning, detailed
         KSO 13: Ensure that the community                                   Upgrade Oak Park Aquatic Centre (includes
                                                                                                                               design, contract documentation, and planning
68       has access to a range of sporting and   Aquatic Strategy            redevelopment of Oak Park Reserve and the                                                      June 2012.                                 Property Services         City Infrastructure
                                                                                                                               permit. Construction to commence as per 5yr
         recreational facilities                                             pavilion located between the two ovals.
                                                                                                                               Capital Works Program.


         KSO 13: Ensure that the community
                                                                             Undertake an analysis of cycling velodrome site
69       has access to a range of sporting and   Bicycle Plan                                                                Report to Council                               June 2012.                                Recreation Services       Social Development
                                                                             options.
         recreational facilities


                                                                             Explore costs and benefits of a restoration
         KSO 13: Ensure that the community
                                                 Grandstand Restoration      program for all grandstands in Moreland,                                                                                                  Open Space Design &
70       has access to a range of sporting and                                                                                 Report to Council                             Dec 2011.                                                           City Infrastructure
                                                 Program - New               including: Gillon Oval and Fleming Park                                                                                                   Development
         recreational facilities
                                                                             Brunswick; and Coburg City Oval




                                                                                                                                       Page 7
                                                                                                                            180847d5-0043-4e9a-9655-7389008b0002.xls


Item #


         Key Strategic Objective                  Initiative                    Action                                              Measure                                      Target                                      Lead Service Unit         Department




         KSO 13: Ensure that the community
                                                                                Prepare masterplan for the redevelopment of
71       has access to a range of sporting and    The Coburg Initiative                                                             Completion of masterplan                     Dec 2011.                                   Place Design & Strategy   Economic Development
                                                                                the Coburg City Oval and grandstand
         recreational facilities


         KSO 14: Ensure that the community                                      Ensure that the funds for the purchase of new
                                                                                                                                    Library book budget for 2011/2012 increased
72       has access to a range of educational      Library Strategy             books are increased at a minimum of the CPI                                                     CPI on 2010/2011 $828,000 book budget Library Services                 Social Development
                                                                                                                                    by minimum of CPI from 2010/2011
         opportunities to maximise their potential                              rate each year




         KSO 14: Ensure that the community
                                                   Universal Access to 15 Hours
73       has access to a range of educational                                   Upgrade and expand early years facilities           Increased capacity for more places           As per action plan                          Children's Services       Social Development
                                                   Kindergarten
         opportunities to maximise their potential




                                                                            Engage and communicate with the community,              1. Develop CALD story-boards
                                                                                                                                                                                 1. Four new story-boards per annum.
         KSO 15: Facilitate community             Communications & Research and ensure that culturally and linguistically           2 Continued placement of CALD story-                                                     Communications &          Organisational
74                                                                                                                                                                               2. Four (4) major Media Releases are
         connection and engagement                Action Plan               diverse (CALD) Community outputs are a                  boards and media releases with general and                                               Research                  Development
                                                                                                                                                                                 provided to ethnic press
                                                                            Council priority                                        ethnic media.



         KSO 15: Facilitate community             Economic Development          Investigate proposal for a café at the Coburg
75                                                                                                                                  Report to Council                            Dec 2011.                                   Economic Development      Economic Development
         connection and engagement                Strategy (?)                  lake




         KSO 16: Facilitate people's access to                                  Undertake structural repairs and improvements Temporary re-location of existing Brunswick
                                                  Building Operating Plan                                                                                                  June 2012 (& completion of structural
76       an appropriate range of services that                                  to the Brunswick library (NB. Glenroy         library, detailed planning, and commencement                                                   Property Services         City Infrastructure
                                                  (BOP)                                                                                                                    repairs in 12/13)
         meet their needs                                                       scheduled for 12/13)                          of structural repairs


         KSO 16: Facilitate people's access to
                                                                                                                                    Implementation according to agreed action    Progress report to Council not later than   Community Development
77       an appropriate range of services that    Disability Action Plan        Implement Disability Action Plan                                                                                                                                   Social Development
                                                                                                                                    plan milestones & deliverables               June 2012                                   & Social Policy
         meet their needs



         KSO 16: Facilitate people's access to                                                                                      1. System fully operational
                                                                                Implement an Integrated Library Management                                                      1. Dec 2011
78       an appropriate range of services that    Library Strategy                                                                  2. Community satisfaction with ILMS OPAC at                                              Library Services          Social Development
                                                                                System (ILMS)                                                                                   2. June 2012
         meet their needs                                                                                                           least 80%



         KSO 16: Facilitate people's access to                                  Review the layout and presentation of all
                                                                                                                                    Report on priority actions for key
79       an appropriate range of services that    Library Strategy              libraries to ensure libraries are attractive and                                                 Oct 2011.                                   Library Services          Social Development
                                                                                                                                    improvements.
         meet their needs                                                       user-friendly



                                                  Youth Services Strategy &     Investigate possible sites for additional           Site identified
80       KSO 17: Invest in our young people                                                                                                                                      June 2012.                                  Youth Services            Social Development
                                                  Open Space Strategy           skateboard and BMX parks



                                                                                Complete construction of skate park and             Implementation according to agreed project   Progress report to Council not later than
81       KSO 17: Invest in our young people       Youth Strategy                                                                                                                                                             Youth Services            Social Development
                                                                                surrounding areas at CB Smith Reserve               plan milestones & deliverables               June 2012




                                                                                                                                             Page 8
                                                                                                                        180847d5-0043-4e9a-9655-7389008b0002.xls


Item #


         Key Strategic Objective               Initiative                     Action                                               Measure                                         Target                                    Lead Service Unit      Department




                                                                              Continue implementing the OxYgen Project,            Site selected. Further development of the
                                                                              through clarifying and defining preferred models     venue option/s for youth space and models       Dec 2011.
82       KSO 17: Invest in our young people    Youth Strategy                                                                                                                                                                Youth Services         Social Development
                                                                              for delivering youth spaces and activities, with a   for delivery of services and activities
                                                                              view to both long and short term solutions           (preliminary design and partners identified).

                                                                              Develop an Advocacy Plan, including prioritising
83       KSO 18: Improve service to citizens   Code of Good Governance        which items to advocate for, and how, in 2011- Implementation of a Advocacy Plan                     As per agreed plan                        Governance             Corporate Services
                                                                              2011.


                                                                              Reduce backlog of planning permit applications and
                                               Continuous Improvement         improve customer service by implementing actions Number of planning and subdivision applications     A 10% reduction in the number of outstanding
84       KSO 18: Improve service to citizens                                                                                                                                                                                    Urban Development   City Development
                                               Policy                         identified in the Urban Development Branch Service that are outstanding                              planning and subdivision applications
                                                                              Plan 2011/2012.


                                                                              Reduce statutory timelines for planning permit                                                       Demonstrate improvement from 40% towards
                                                                                                                                   Percentage of planning and subdivision
                                               Continuous Improvement         applications and improve customer service by                                                         60% of planning and subdivision planning
85       KSO 18: Improve service to citizens                                                                                       applications determined within statutory                                                 Urban Development       City Development
                                               Policy                         implementing actions identified in the Urban                                                         permit applications determined within 60
                                                                                                                                   timeframe
                                                                              Development Branch Service Plan 2011/2012.                                                           statutory days


                                                                              1. Develop a process to measure and report on
                                                                                                                            1. Reporting process established;
                                                                              quality of CRS item resolution;                                                                      June 2012
86       KSO 18: Improve service to citizens   Customer Service Strategy                                                    2. Improvement actions implemented as                                                            Citizen Services       Corporate Services
                                                                              2. Implement improvement actions from report
                                                                                                                            needed.
                                                                              results.



                                                                              Ensure that all inquiries and complaints are
87       KSO 18: Improve service to citizens   Customer Service Strategy                                                           Proportion of requests completed on time        >80%                                      Citizen Services       Corporate Services
                                                                              dealt with promptly and thoroughly



                                                                              Improve citizen focus across the organisation        1. Community satisfaction with customer
                                                                              through change management tools, Knowledge           contact as measured by DPCD survey; and,        1. >85%; and,
88       KSO 18: Improve service to citizens   Customer Service Strategy                                                                                                                                                     Citizen Services       Corporate Services
                                                                              Management System, training and                      2. Performance as measured by                   2. As per Organisational KPI targets
                                                                              Organisational KPIs                                  Organisational KPIs



                                               Domestic Animal                                                                                                                                                               Local Laws & Civic
89       KSO 18: Improve service to citizens                                  Review the Domestic Animal Management Plan Report to Council                                         June 2012.                                                       City Development
                                               Management Plan                                                                                                                                                               Compliance




                                                                              Ensure that services to the community are
                                               MoreValue Service                                                                   Implementation of revised MoreValue             Reviews undertaken in accordance with     Council Planning &     Organisational
90       KSO 18: Improve service to citizens                                  delivered in accordance with best value
                                               Excellence Program                                                                  Program                                         agreed schedule                           Performance            Development
                                                                              principles and practices



         KSO 19: Align the financial resources of
                                                                                                                                   Budgeted expenditure on asset renewal           Renewal expenditure either equals or
91       Council to meet the needs of the         Asset Management Strategy   Manage expenditure on asset renewal                                                                                                            Asset Management       City Infrastructure
                                                                                                                                   relative to depreciation                        exceeds depreciation of assets
         community now and into the future




                                                                                                                                            Page 9
                                                                                                                         180847d5-0043-4e9a-9655-7389008b0002.xls


Item #


         Key Strategic Objective                 Initiative                     Action                                            Measure                                        Target                                       Lead Service Unit         Department




                                                                                                                                  1. Annual Budget reviewed by the public and
         KSO 19: Align the financial resources of                                                                                                                                1. Budget approved by August 2011;
                                                                                Ensure budget outcomes are in accordance          council;                                                                                    Finance & Business
92       Council to meet the needs of the         Financial Strategy                                                                                                             2. Keep within sustainability limits; and,                             Corporate Services
                                                                                with Five Year Financial Plan                     2. VAGO sustainability measures; and,                                                       Systems
         community now and into the future                                                                                                                                       3. Unqualified approval
                                                                                                                                  3. Audit report


         KSO 19: Align the financial resources of                               Ensure revenue collection remains equitable       Budgets prepared for Council consideration
                                                                                                                                                                                                                              Finance & Business
93       Council to meet the needs of the         Financial Strategy            and in accordance to the community's capacity     are in line with the Five Year Strategic       Budget approved by August 2011                                         Corporate Services
                                                                                                                                                                                                                              Systems
         community now and into the future                                      to pay                                            Resource Plan


         KSO 19: Align the financial resources of
                                                  Five Year Financial Plan      Complete Airspace use feasibility study of
94       Council to meet the needs of the                                                                                         Feasibility study completed                    By Oct 2011                                  Place Design & Strategy   Economic Development
                                                  (alternative revenue sources) Council car parks
         community now and into the future


                                                                                                                                  Proportion of online versus non-online
         KSO 20: Leverage technology to
95                                               eGovernment Strategy           Improve community access to Council services      transactions for common processes available 30% (measured in June 2012)                     Information Technology    Corporate Services
         improve service delivery
                                                                                                                                  online via the Council web site



         KSO 20: Leverage technology to
96                                               IT Strategy                    Link GIS with Council assets database             Linkage of GIS with Council assets database In place by June 2012                           Information Technology    Corporate Services
         improve service delivery



                                                                                                                                  Implement the outcomes of the review of
                                                                                Improve policy development practices to
         KSO 21: Align and implement             Continuous Improvement                                                           policy development with a view to maximising                                                Council Planning &        Organisational
97                                                                              maximise the use of policy development skills                                                  As per agreed schedule
         organisational plans                    Policy                                                                           the use of policy development skills across                                                 Performance               Development
                                                                                across the organisation
                                                                                                                                  the organisation


                                                                                Continue to develop new corporate planning        Ongoing development of PowerPlanner to
         KSO 21: Align and implement                                                                                                                                             In accordance with agreed project            Council Planning &        Organisational
98                                               Corporate planning software    software to facilitate better alignment with a    incorporate all corporate planning functions
         organisational plans                                                                                                                                                    schedule                                     Performance               Development
                                                                                corporate planning and reporting process          (i.e. service unit plans and KPIs)



         KSO 21: Align and implement                                            Commence planning for the development of the                                                                                                  Council Planning &        Organisational
99                                               Council Planning Process                                                    Implementation according to agreed schedule June 2012.
         organisational plans                                                   2013 - 2017 Council Plan                                                                                                                      Performance               Development




         KSO 21: Align and implement                                                                                              1. Completion of projects;                     1. At least 90%
100                                              Council Planning Process       Deliver capital works program                                                                                                                 Asset Management          City Infrastructure
         organisational plans                                                                                                     2. Expenditure of budget                       2. At least 90%




                                                                                Ensure that Council policies and decisions are
         KSO 21: Align and implement                                            put in place in a planned, timely and efficient   Proportion of Council resolutions closed
101                                              Council Planning Process                                                                                                        95%                                          Governance                Corporate Services
         organisational plans                                                   manner, and in accordance with meeting            within agreed time
                                                                                schedules and resolutions




                                                                                                                                          Page 10
                                                                                                                    180847d5-0043-4e9a-9655-7389008b0002.xls


Item #


         Key Strategic Objective                 Initiative                 Action                                           Measure                                        Target                                      Lead Service Unit       Department




         KSO 21: Align and implement                                        Oversight, monitoring and reporting of the       1. Completion of projects;                                                                 Project Management      Organisational
102                                              Council Planning Process                                                                                                   1. At least 90% 2. At least 90%
         organisational plans                                               delivery of operating projects across Council    2. Expenditure of budget                                                                   Office                  Development




                                                                           Align individual performance of all staff with
         KSO 21: Align and implement             Performance & Development                                                Proportion of PDRs completed as per agreed                                                                            Organisational
103                                                                        Council’s objectives and review annually along                                            100%                                               Human Resources
         organisational plans                    Review (PDR) Program                                                     Organisational KPI on PDRs.                                                                                           Development
                                                                           with individual development needs



                                                                            Align & embed RBA methodology across the
         KSO 21: Align and implement             Strategic Planning                                                                                                                                                     Council Planning &      Organisational
104                                                                         organisation and with Council Plan and other     To the satisfaction of the CEO                 As per agreed implementation schedules
         organisational plans                    Framework                                                                                                                                                              Performance             Development
                                                                            Corporate planning processes

                                                                            Develop appropriate Organisational
         KSO 22: Foster a motivated,                                        Development (OD) and Human Resources (HR) Implementation of OCI strategies & action             % Proportion of actions delivered in line   Council Planning &      Organisational
105      responsive, innovative, performance-    Cultural Change Program    strategies and action plans to implement the    plans                                           with agreed schedule                        Performance             Development
         oriented workplace culture                                         results of the Organisational Culture Inventory
                                                                            (OCI)

         KSO 22: Foster a motivated,                                        Review and update corporate training and                                                        Developed by 1st August 2011 and
                                                 Learning & Development                                                                                                                                                                         Organisational
106      responsive, innovative, performance-                               leadership development programs in line with     Delivery of program                            delivered according to program schedule     Human Resources
                                                 Program                                                                                                                                                                                        Development
         oriented workplace culture                                         Council needs                                                                                   and within budget



                                                                            Implement Occupational Health & Safety                                                          1. Decrease in LTI;
         KSO 22: Foster a motivated,                                                                                      1. Number of Lost Time Injuries (LTIs);
                                                                            systems which meet statutory requirements and                                                   2. SafetyMAP rolled out in accordance                               Organisational
107      responsive, innovative, performance-    OH&S Policy                                                              2. SafetyMAP rollout; and,                                                                    OHS & Risk Management
                                                                            which maximise the health and safety of the                                                     with approved schedule; and,                                        Development
         oriented workplace culture                                                                                       3. OH&S Strategy renewal
                                                                            Council work environment                                                                        3. June 2012.



                                                                                                                             1. Data development actions from RBA
                                                                                                                                                                            1. All data development actions
         KSO 22: Foster a motivated,                                        Assist in the implementation of Service Unit     workshops in service unit plans implemented;
                                                                                                                                                                            implemented by June 2012; and,              Council Planning &      Organisational
108      responsive, innovative, performance-    Service Unit Planning      Plans based on Results Based Accountability      and,
                                                                                                                                                                            2. Relevant performance measurement         Performance             Development
         oriented workplace culture                                         (RBA) model to drive improved performance        2. Baseline measurement data obtained
                                                                                                                                                                            baseline reported at 30 June 2012
                                                                                                                             where feasible.

                                                                            1) maximise opportunities for community
                                                                            observation of and input into decision-making,
         KSO 23: Maintain a clear, transparent                                                                               Advertising and consultation opportunities
                                                                            including open and interactive Council and                                                      Consistency on a monthly basis at both
109      and ethical decision-making and         Code of Good Governance                                                     available for public interaction including                                                 Governance              Corporate Services
                                                                            Committee Meetings;                                                                             Committee and Council meetings.
         performance management process                                                                                      ongoing question time opportunity
                                                                            2) maintain a half hour question time at the
                                                                            commencement of each Council Meeting.


         KSO 23: Maintain a clear, transparent
                                                                            Encourage all residents who are eligible to vote Development of program to encourage non-
110      and ethical decision-making and         Code of Good Governance                                                                                                    June 2012 for roll-out in 12/13             Governance              Corporate Services
                                                                            in Council elections to be enrolled to vote      citizens to enrol to vote
         performance management process




                                                                                                                                     Page 11
                                                                                                                   180847d5-0043-4e9a-9655-7389008b0002.xls


Item #


         Key Strategic Objective                 Initiative                Action                                          Measure                                       Target                                   Lead Service Unit    Department




                                                                           Mandate all council committees – internal,
         KSO 23: Maintain a clear, transparent                             external and community – to present minutes of                                                Committee minutes presented to Council
                                                                                                                          Provision of Committee to Council section in
111      and ethical decision-making and         Code of Good Governance   the committee and a covering report to the                                                    upon adoption of the minutes, according to Governance         Corporate Services
                                                                                                                          Council agenda
         performance management process                                    Council and hence the public record, annually                                                 frequency of meetings
                                                                           or more frequently


         KSO 23: Maintain a clear, transparent
                                                                           Minimise number of reports to Council deemed    Proportion of reports to Council deemed to be
112      and ethical decision-making and         Code of Good Governance                                                                                                 No more than 10%                         Governance           Corporate Services
                                                                           to be "confidential"                            “confidential”
         performance management process


         KSO 23: Maintain a clear, transparent                             Monitor the adherence of contractors to the
                                                                                                                           Number of high risk contracts sampled for                                              Finance & Business
113      and ethical decision-making and         Procurement Policy        terms in their contracts, including footpath                                                  Five (5) high risk contracts                                  Corporate Services
                                                                                                                           compliance (with manual system).                                                       Systems
         performance management process                                    contractors




                                                                                                                                   Page 12
                                                                                                                                        180847d5-0043-4e9a-9655-7389008b0002.xls




                                                                                                                                                                                                                   The Moreland Council Action Plan Advocacy Items 2011-2012 focuses
                                                                                                                                                                                                                   on advocacy actions that will be undertaken in the 2011-2012 period to

                                                             Council Action Plan Advocacy Items 2011-2012                                                                                                              implement the initiatives aimed at achieving the key strategic
                                                                                                                                                                                                                     objectives of Council, as stated in the Council Plan. Progress with
                                                                                                                                                                                                                      implementation will be reported on a quarterly basis against the
                                                                                                                                                                                                                                     nominated measures and targets.
Item #




         Key Strategic Objective                Initiative                      Action                                                          Measure                                              Target        Lead Service Unit               Department




                                                                                                                                                Opportunities identified for possible sites and needs
         KSO 2: Facilitate the development of                                   Advocate for the relocation of State and/or Federal
114                                             Economic Development Strategy                                                                   analysis completed with State for departments seeking June 2011.   Economic Development            Economic Development
         the local economy and jobs                                             departments to activity centres
                                                                                                                                                relocation.




                                                                                                                                                Advocate to relevant government department(s) in
115      KSO 3: Improve transport and mobility Bicycle Plan                     Advocate for bike racks on buses                                                                                     March 2012.   Transport Development           City Infrastructure
                                                                                                                                                accordance with the advocacy program



                                                                                Advocate for more bike parking and storage at railway           Advocate to relevant government department(s) in
116      KSO 3: Improve transport and mobility Bicycle Plan                                                                                                                                          March 2012.   Transport Development           City Infrastructure
                                                                                stations                                                        accordance with the advocacy program



                                                                                                                                                Advocate to relevant government department(s) in
117      KSO 3: Improve transport and mobility Bicycle Plan                     Advocate for no car parking in bike lanes                                                                            March 2012.   Transport Development           City Infrastructure
                                                                                                                                                accordance with the advocacy program




                                                                                Progress the expansion of active transport networks -
118      KSO 3: Improve transport and mobility Bicycle Plan                                                                                     Approvals in place                                                 Transport Development           City Infrastructure
                                                                                Craigieburn bike path




                                                                                Progress the expansion of active transport networks - Upfield
119      KSO 3: Improve transport and mobility Bicycle Plan                                                                                   Completion to Ring Road (subject to funding)           June 2012.    Transport Development           City Infrastructure
                                                                                bike path



                                                                                Continue to advocate to Department of Transport to finish
                                                                                                                                                Participation in relevant meetings and forums to
120      KSO 3: Improve transport and mobility Disability Action Plan           revised design for a DDA compliant underpass in Glenroy                                                              Oct 2011.     Transport Development           City Infrastructure
                                                                                                                                                progress this issue.
                                                                                and build the underpass.



                                                                                Advocate for better co-ordination between public transport      Advocate to relevant government department(s) in
121      KSO 3: Improve transport and mobility Integrated Transport Strategy                                                                                                                         March 2012.   Transport Development           City Infrastructure
                                                                                modes                                                           accordance with the advocacy program



                                                                                Advocate for federal government funding for public transport    Advocate to relevant government department(s) in
122      KSO 3: Improve transport and mobility Integrated Transport Strategy                                                                                                                         March 2012.   Transport Development           City Infrastructure
                                                                                infrastructure                                                  accordance with the advocacy program




                                                                                Advocate for free or discounted Public Transport travel, out of Advocate to relevant government department(s) in
123      KSO 3: Improve transport and mobility Integrated Transport Strategy                                                                                                                         March 2012.   Transport Development           City Infrastructure
                                                                                peak hours, (to to increase patronage and safety)               accordance with the advocacy program




                                                                                                                                                        Page 13
                                                                                                                                      180847d5-0043-4e9a-9655-7389008b0002.xls



Item #


         Key Strategic Objective               Initiative                       Action                                                         Measure                                                Target        Lead Service Unit         Department




                                                                                Advocate for larger and bigger trams on Routes 55, 8, 19 and Advocate to relevant government department(s) in
124      KSO 3: Improve transport and mobility Integrated Transport Strategy                                                                                                                          March 2012.   Transport Development     City Infrastructure
                                                                                97                                                           accordance with the advocacy program



                                                                                                                                               Advocate to relevant government department(s) in
125      KSO 3: Improve transport and mobility Integrated Transport Strategy    Advocate for more low floor buses                                                                                     March 2012.   Transport Development     City Infrastructure
                                                                                                                                               accordance with the advocacy program



                                                                                                                                               Advocate to relevant government department(s) in
126      KSO 3: Improve transport and mobility Integrated Transport Strategy    Advocate for shuttle bus for Fawkner cemetery                                                                         June 2012.    Transport Development     City Infrastructure
                                                                                                                                               accordance with the advocacy program



                                                                                Advocate for the immediate implementation of a Smart Bus       Advocate to relevant government department(s) in
127      KSO 3: Improve transport and mobility Integrated Transport Strategy                                                                                                                          March 2012.   Transport Development     City Infrastructure
                                                                                Route on Dawson Street/Glenlyon Road (blue orbital)            accordance with the advocacy program



                                                                                                                                               Advocate to local MPs and relevant government
                                                                                Advocate for upgrade of the Upfield line (to provide more
128      KSO 3: Improve transport and mobility Integrated Transport Strategy                                                                   department(s) in accordance with the advocacy          March 2012.   Transport Development     City Infrastructure
                                                                                peak services and only 6 carriage trains)
                                                                                                                                               program


                                                                                Continue to advocate for changes to Zone One and Zone
                                                                                                                                               Advocate to relevant government department(s) in
129      KSO 3: Improve transport and mobility Integrated Transport Strategy    Two boundaries, particularly on the bus routes in the north of                                                        March 2012.   Transport Development     City Infrastructure
                                                                                                                                               accordance with the advocacy program
                                                                                the municipality



                                                                                                                                               Advocate to relevant government department(s) in
130      KSO 3: Improve transport and mobility Pedestrian Strategy              Advocate for more funding for crossing supervisors                                                                    March 2012.   Transport Development     City Infrastructure
                                                                                                                                               accordance with the advocacy program


                                                                                Advocate for more pedestrian crossings on busy (arterial and
                                                                                                                                             Research and advocate to relevant government
                                                                                major) roads (particularly Cumberland Road, Glenroy Road,
131      KSO 3: Improve transport and mobility Pedestrian Strategy                                                                           department(s) in accordance with the advocacy            Dec 2011.     Transport Development     City Infrastructure
                                                                                Widford Street and Hilton Street), and changes to VicRoads
                                                                                                                                             program also consider part funding to improve ratios
                                                                                warrants for pedestrian crossings




                                                                                Advocate to Department of Transport to ensure adequate
                                                                                                                                                   Advocate to relevant government department(s) in
132      KSO 3: Improve transport and mobility Pedestrian Strategy              seating, signs, shelter, real time information and lighting at all                                                    March 2012.   Transport Development     City Infrastructure
                                                                                                                                                   accordance with the advocacy program
                                                                                tram stops




                                                                                                                                               Advocate to Department of Transport and M Trains,
         KSO 4: Maintain and enhance
                                               Glenroy Structure Plan; MITS;    Advocate for amenity improvements adjacent to Pascoe           and incorporate improvements in any works
133      appropriate infrastructure and open                                                                                                                                                          June 2012.    Place Design & Strategy   Economic Development
                                               Shopping Strip Renewal Program   Vale, Oak Park and Glenroy train stations                      undertaken as part of Shopping Strip Renewal
         space
                                                                                                                                               Program.



         KSO 4: Maintain and enhance                                            Continue to investigate opportunities for shared use           Opportunities considered and draft principles
                                                                                                                                                                                                                    Open Space Design &
134      appropriate infrastructure and open   Open Space Strategy              agreements for use of open space with local primary and        developed as part of the review of the Open Space      Dec 2011.                               City Infrastructure
                                                                                                                                                                                                                    Development
         space                                                                  secondary schools                                              Strategy




         KSO 4: Maintain and enhance                                            Advocate against inner city Councils being required to comply
                                                                                                                                              Advocate to relevant government departments in                        Open Space Design &
135      appropriate infrastructure and open   TBD                              with the Electrical Safety (Line Clearance) Regulations 2010                                                          March 2012.                             City Infrastructure
                                                                                                                                              accordance with the advocacy program                                  Development
         space                                                                  to the same extent that rural Councils should.




                                                                                                                                                        Page 14
                                                                                                                                        180847d5-0043-4e9a-9655-7389008b0002.xls



Item #


         Key Strategic Objective                Initiative                       Action                                                         Measure                                                  Target                             Lead Service Unit             Department




         KSO 5: Effective use of our land use
         and development policies for                                            Advocate for grade separation of the Glenroy Road railway      Preparation of submission on Council's preferred option Council to adopt a preferred
136                                            Glenroy Structure Plan                                                                                                                                                                       Place Manager - Glenroy       Economic Development
         outcomes appropriate to the long term                                   crossing                                                       for grade separation or alternatives                    position by Dec 2011
         needs of communities


         KSO 5: Effective use of our land use
                                                                                 Undertake negotiations to achieve a long-term lease for
         and development policies for
137                                            Glenroy Structure Plan            Glenroy Primary School to address the long term needs of       Leased signed for 50+ years                              Dec 2011.                          Place Manager - Glenroy       Economic Development
         outcomes appropriate to the long term
                                                                                 the community
         needs of communities


         KSO 5: Effective use of our land use
         and development policies for
138                                            Redevelopment of public land      Advocate for better use of (existing) Vic Track land           Report to Council regarding options.                     TBD                                Property Services             City Infrastructure
         outcomes appropriate to the long term
         needs of communities

         KSO 5: Effective use of our land use
         and development policies for                                            Progress issues relating to Hilton Street site ('Kode') with aim
139                                            Redevelopment of public land                                                                       Progress report to Ward councillors                    Oct 2011.                          Property Services             City Infrastructure
         outcomes appropriate to the long term                                   of keeping public access to open space
         needs of communities



         KSO 5: Effective use of our land use                                    Where Government land is considered redundant advocate                                                                  Assess potential community
         and development policies for                                            for public use, including affordable housing, employment       Effective monitoring of the release of government land   benefits for all government land   Community Development &
140                                            Redevelopment of public land                                                                                                                                                                                               Social Development
         outcomes appropriate to the long term                                   generating uses, aged care, child care, disability access,     for redevelopment                                        that is released for               Social Policy
         needs of communities                                                    open space and sustainable transport                                                                                    redevelopment


         KSO 5: Effective use of our land use
         and development policies for                                            Advocate for noise attenuation improvements along the Ring Advocate to relevant government department(s) in
141                                            TBD                                                                                                                                                       July 2011 (& ongoing).             Engineering & Transport       City Infrastructure
         outcomes appropriate to the long term                                   Road                                                       accordance with the advocacy program
         needs of communities

                                                                                 Advocate for greater investment from State & Federal
         KSO 6: Facilitate housing that meets                                                                                                                                                                                               Community Development &
142                                             Affordable Housing Strategy      Governments in social and public housing to address            Involvement in community housing sector campaigns        2 per year                                                       Social Development
         the needs of the community                                                                                                                                                                                                         Social Policy
                                                                                 homelessness and housing affordability



         KSO 6: Facilitate housing that meets                                    Identify opportunities for expansion & redevelopment of                                                                                                    Community Development &
143                                             Affordable Housing Strategy                                                                     Identify appropriate sites to office of housing          1 per year                                                       Social Development
         the needs of the community                                              existing public housing stock                                                                                                                              Social Policy



                                                                                                                                                                                                        Attend relevant pre-application
         KSO 6: Facilitate housing that meets                                    Promote the inclusion of affordable accommodation in new       Participation of Council Housing Development Officer in                                     Community Development &
144                                             Affordable Housing Strategy                                                                                                                             meetings as determined by                                         Social Development
         the needs of the community                                              (larger-scale) development                                     pre-application meetings                                                                    Social Policy
                                                                                                                                                                                                        Manager of Urban Planning


         KSO 7: Engage the organisation and
                                                                                 Continue to campaign for the constitutional recognition of     Participation in sectoral campaign for the constitutional
145      community to make Moreland a           Code of Good Governance                                                                                                                                   As required by ALGA campaign      Governance                    Corporate Services
                                                                                 Local Government by the Commonwealth.                          recognition of Local Government
         prouder and cleaner city



         KSO 11: Appropriately respond to the                                                                                                   Support the Moreland Food Access Group to promote Dialogue initiated between
                                                                                 Support the establishment of Fresh Food markets every                                                                                                   Community Development &
146      population health needs of people at Health & Well-Being Plan                                                                          the development of fresh food markets in local schools relevant partners/stakeholders in                                  Social Development
                                                                                 Friday at schools                                                                                                                                       Social Policy
         all ages and stages                                                                                                                    and other healthy eating options                       at least three cases



                                                                                 Participate in forums and discussions regarding possible       1. Number of forums attended;                            1. 3 forums;
         KSO 12: Ensure provision of            Aged Services Financial Review
147                                                                              changes and opportunities for funding and partnerships in      2. Number of funding submissions; and,                   2. 3 submissions; and,             Policy, Planning & Projects   Social Development
         appropriate aged services              2008
                                                                                 Aged Services                                                  3. Partnerships developed.                               3. 2 partnerships.




                                                                                                                                                         Page 15
                                                                                                                                      180847d5-0043-4e9a-9655-7389008b0002.xls



Item #


         Key Strategic Objective                Initiative                     Action                                                         Measure                                                     Target                              Lead Service Unit            Department




         KSO 13: Ensure that the community
                                                                                                                                              Advocate to relevant government departments in
148      has access to a range of sporting and Aquatic Strategy                Advocate for funding to upgrade Oak Park Aquatic Centre                                                                    June 2012.                          Property Services            City Infrastructure
                                                                                                                                              accordance with the advocacy program
         recreational facilities


         KSO 14: Ensure that the community
                                                                               Advocate for education improvements, including year 12
         has access to a range of educational   Investment for education                                                                                                                                                                      Community Development &
149                                                                            retention rates, increase the rate of secondary education, and Participation in Moreland schools regeneration project      Attend relevant meetings                                         Social Development
         opportunities to maximise their        improvements                                                                                                                                                                                  Social Policy
                                                                               provision of education appropriate to local job opportunities.
         potential


         KSO 14: Ensure that the community
         has access to a range of educational   Investment for education       Continue to advocate for a year's 7-12 secondary school in                                                                                                     Community Development &
150                                                                                                                                           Participation in forums &/or task groups                    Attend relevant meetings                                         Social Development
         opportunities to maximise their        improvements                   Coburg                                                                                                                                                         Social Policy
         potential


         KSO 16: Facilitate people's access to
                                                                               Advocate for changes to the National Building Code to          Advocate to relevant government department(s) in                                                Community Development &
151      an appropriate range of services that Disability Action Plan                                                                                                                                     March 2012.                                                      Social Development
                                                                               specify standards for disability access                        accordance with the advocacy program                                                            Social Policy
         meet their needs



         KSO 16: Facilitate people's access to                                 Advocate for more funding from other levels of Government
                                                                                                                                              Number of successful submissions, as recorded in
152      an appropriate range of services that Financial Strategy              to keep up with increasing demand for services and asset                                                                   Report on grants by June 2012       Finance & Business Systems   Corporate Services
                                                                                                                                              Grants Register maintained by Finance
         meet their needs                                                      renewal




                                                Financial Strategy/ Moreland   Continue to advocate to the State Government for an            Submission on the DPCD report on alternative fee            Submission within prescribed
153      KSO 18: Improve service to citizens                                                                                                                                                                                                  Urban Development            City Development
                                                Planning Scheme                increase to scheduled planning permit and amendment fees       models.                                                     timeframes



         KSO 19: Align the financial resources
                                               Five Year Financial Plan        Prioritise and clarify the submission process for grants and
154      of Council to meet the needs of the                                                                                                  Implementation of a grants submission program               As per agreed program               Governance                   Corporate Services
                                               (alternative revenue sources)   funding from state/federal government
         community now and into the future

         KSO 23: Maintain a clear, transparent
                                                                               Maintain effective relations with Government on key policy     Councillor satisfaction with ability to influence State and
155      and ethical decision-making and       Code of Good Governance                                                                                                                                    Majority of Councillors satisfied   Governance                   Corporate Services
                                                                               issues affecting the municipality                              Federal Governments.
         performance management process




                                                                                                                                                      Page 16

				