									    T1173 Nett

                           Description                    Qty Unit   Rate   £p

    Bill 2 Level 1

    EXISTING SITE/BUILDINGS/SERVICES

    C90 Alterations in existing building

    the contract is the SBCC Without Quantities, the

    scope of the works is as defined on the drawings

    and specifications issued, therefor the Contractor

    is to price here for the works as indicated in the

    Drawings and specifications. Any quanities given

    are indicative only. The Contractor is to satisfy


    himself to the scope of the works required. Pricing

    Points are given below. The Contractor may add

    any additional Items he considers to be required.

    refer to clients asbestos survey

    Drawing No. L(EW)050

    install padlocked plywood security door (2 sets of

A       Double doors)                                       1 Item


    New drainage trench; Excavate (left in); earthwork

    support, working space; disposal

    provide temporary protective covers/barriers to

C       width 450 (5LM approx)                              1 Item

D       width 600 (17LM approx)                             1 Item

    extra over drainage excavation; cutting through
    reinforced concrete slab (depth to reveal

E      substrate); dispose off site                           1 Item

    Carefully take up, Remove and dispose off site;

F
       service boxing without damaging live pipework          1 Item

    Take up, Remove and dispose off site;

G      doors and frames                                       1 Item

H      drop box from door                                     1 Item

I      external doors (2 sets)                                1 Item

J
       floor finishes and skirtings throughout fit out area   1 Item

    extra over; Carpet adhesive to be mechanically

K      removed                                                1 Item


    internal blinds and noticeboards throughout fit out

L      area                                                   1 Item

    Page Total 2/1

    EXISTING SITE/BUILDINGS/SERVICES (Cont'd)

    C90 Alterations in existing building (Cont'd)

A      library turnstile                                      1 Item

B      non-loadbearing glazed screens                         1 Item

C      non-loadbearing partitions                             1 Item

D
       steel stair, supports and associated balustrades       1 Item

E      suspended ceiling throughout fit out area              1 Item

F      library reception desk                                 1 Item

    Page Total 2/2
    Bill 3 Level 2

    EXISTING SITE/BUILDINGS/SERVICES

    C90 Alterations in existing building

    the contract is the SBCC Without Quantities, the

    scope of the works is as defined on the drawings

    and specifications issued, therefor the Contractor

    is to price here for the works as indicated in the

    Drawings and specifications. Any quanities given

    are indicative only. The Contractor is to satisfy


    himself to the scope of the works required. Pricing

    Points are given below. The Contractor may add

    any additional Items he considers to be required.

    refer to clients asbestos survey

    Drawing No. L(EW)051


    install padlocked plywood security door - double (1

A       set)                                              1 Item


    install padlocked plywood security door - single (1

B       set)                                              1 Item


    provide temporary protective barrier to redundant

C       stair opening                                     1 Item

    Carefully take up, Remove and dispose off site;


    carefully remove service boxing without damaging

D       live pipework                                     1 Item
    Take up, Remove and dispose off site;

E       doors and frames                                    1 Item

F
        floor finishes and skirtings within zones 1 and 2   1 Item

G       carpet adhesive to be mechanically removed          1 Item

    glazed divider and framing from half height

H       partition                                           1 Item

I       internal blinds and noticeboards in zones 1-4       1 Item

J       redundant partitions Zone 1                         1 Item

K       suspended ceiling within zone 2                     1 Item

L       shelving within zone 3                              1 Item

    Page Total 3/1

    Bill 4 Level 4

    EXISTING SITE/BUILDINGS/SERVICES

    C90 Alterations in existing building

    the contract is the SBCC Without Quantities, the

    scope of the works is as defined on the drawings

    and specifications issued, therefor the Contractor

    is to price here for the works as indicated in the

    Drawings and specifications. Any quanities given

    are indicative only. The Contractor is to satisfy


    himself to the scope of the works required. Pricing

    Points are given below. The Contractor may add

    any additional Items he considers to be required.

    refer to clients asbestos survey
    Drawing No. L(EW)055


    install padlocked plywood security door- double (2

A      sets)                                                  1 Item

    provide secure access over openings and

B      temporary protection                                   1 Item


    secure opening to provide main route of access to

C      level 4 fit out area                                   1 Item

    Carefully take up, store;

D
       uPVC windows to provide site access via scaffold       1 Item

    extra; subsequently reinstate; to match original

E      condition, upon completion                             1 Item

    Take up, remove and dispose off site

F      doors and frames                                       1 Item

G      non-loadbearing partitions                             1 Item

H      blockwork partitions                                   1 Item

I      glazed screen within partition                         1 Item

J      suspended ceiling throughout fit out area              1 Item

K      MDF ceiling boxing                                     1 Item

L
       floor finishes and skirtings throughout fit out area   1 Item

M      carpet adhesive to be mechanically removed             1 Item

N      front desk from library                                1 Item

    Page Total 4/1

    EXISTING SITE/BUILDINGS/SERVICES (Cont'd)
    C90 Alterations in existing building (Cont'd)


    internal blinds and noticeboards throughout fit out

A      area                                               1 Item

B      library turnstile                                  1 Item

C      blinds track boxing to external wall perimeter     1 Item

D      bulkhead upstand and suspended ceiling             1 Item

E      brackets to walls in room 4.4319                   1 Item

    Page Total 4/2

								