Importance of Change Management

Project Management Information Improvement (PMI2) Process Team SIT Training July 25, 2005 Agenda - Monday Welcome/Meeting Objectives/Introductions Lisa Huzar 2:00 – 2:10 Project Status MdM Interface/Mitigation Plan CRP Results Tamara Fields Tamara Fields Vivian Liang 2:10 – 2:15 2:15 – 3:15 3:15 – 3:20 SIT Overview •SIT Scope & Approach •SIT Environment Vivian Liang Chris Watson 3:20 – 4:15 •SIT Participation •Center Legacy System Coordination •SIT Roles and Responsibilities •SIT Pass 1 & 2 Test Set/Plan •SIT Schedule Change Management Update Wrap/Up – Review Schedule for Week Tia Collins Lisa Huzar Vivian Liang 4:15 – 4:30 4:30 – 4:45 Page 2 Objectives • Communicate the following  SIT Overview  SIT Roles and Responsibilities  SIT Environment  SIT Rules  SIT Test Set/Plan (Execution Log)  SIT Schedule  SIT Tools (Test Director)  SIT Defect Process  SIT Business Process Documentation Update  Detailed content review of the Final Design  Demo Design  Execute transactional related design elements  Review SIT training materials  Job Aids  User Procedures  Test Plan Execution Logs Page 3 SIT Ground Rules • All SIT participants must attend SIT Training scheduled the week of July 25 • • All PMI2 R/3 testing will take place in the PMI2 facility, Room 429 Remote access will be available for BW testing; however, PMI2 Reporting Process Team members are encouraged to test in the PMI2 facility Center Legacy Systems that extract data from BW can be tested remotely BW remote testers should direct questions to their Process Team members SIT participants that are currently not Process Team members will now be considered project resources • • • • SIT participants may be requested to enter test transactions for multiple Centers Page 4 Project Status Summary of Project Activities • • • • • • • • • • • • • • • • • • December 2004 - Project Approved January 3rd - Blueprint Started March 14th – PMI2 Blueprint Pass 1 Review March 29th – Call Letter Issued to request Process Team (Core and Extended) April 5th – PMI2 Preliminary Blueprint Review (PBR) April 26th – Process Team Kick Off May 11th – PMI2 Final Blueprint Review (FBR) PMI2 Phase I completed Blueprint Phase on May 13 th May 16th - Realization Started & Conference Room Pilot (CRP) Start May 24th - Realization Kick Off June 21st & 22nd – Data Mapping Kick Off (Institutional & Mission Directorates) June 28th - Critical Design Review (CDR) July 1st – Conference Room Pilot (CRP) end July 5th – System Integration Test (SIT) start July 25th – Test Readiness Review (TRR) August 19th – PMII Draft Data Mapping Deliverable due (Institutional & Missions) Oct. 5th – Tentative ORR (including Center Readiness Review) Page 6 October – Go Live PMI2 Timeline (including CRCS & MdM Key Dates) FY05 June June 21st – 22nd: Data Mapping Kick offs Mission Directorates/Institutional June 28th: Critical Design Review (CDR) July July 1st: Conference Room Pilot End August Aug 15th: Final Submission of Change Request September Sept 2nd: Data Mapping provides final extract for CRCS Load Sept. 26th: CRCS Production Go-Live October Oct . 10th: Final Deliverable Automated Load to SAP Oct 17: Tentative SAP Go-Live July 5th: SIT Pass 1 Start Aug. 19th: SIT Pass 2 End July 21st: Tentative TRR Aug 19th: PMII Data Mapping Deliverable Due date Aug 22nd: SIT Pass 3/ Release 6.1 Pass 2 Start Aug 22nd – 31st: OCE/OCFO Final Review, Final Change Request Disposition Sept 16th: SIT Pass 3/ Release 6.1 Pass 2 End Sept 19th – Sept 29th: SIT Pass 4/ Release 6.1 Pass 3 Oct . 21st: Final Deliverable Automated Load to MdM Oct 24: Tentative MdM Go-Live July 22nd: SIT Pass 1 End July 25th: SIT Pass 2 Start Aug 31st: Agency Account Code Freeze = Key Deliverable Dates = Review by OCFO, OCE, Mission Directorates, and Institutional Agency POCs Page 7 MdM Interface Update / Mitigation Plan Background • PMI2 Team Recommended Deferring the MdM to SAP interface for October Go-Live during the CDR  Requested approval of the Mitigation Plan Approach until Interface is Released for Production  Recommended continued parallel interface development for earliest release possible • Justification/Rationale  Use Case documentation needed to be completed and approved on May 18th  Unresolved Issues  Incomplete Design  Documentation based on assumptions  Development needed to start by June 8th to meet delivery for SIT Pass 2  Lack of Schedule Integration to support System Integration Test Coordination • Per the OCFO DCFO, received approval of recommendation on July 1st Page 9 MdM Interface Scope • Central repository for NSM data elements • Web-based tool to replace the current AWCS system • All Project Structures and nomenclature will reside in the MdM and be passed to SAP R/3 for Fund Center and Project creation • Current PMI2 assumption is to design the interface to build the following data elements  Funds Center  Project WBS Hierarchy  Derivation Rules  Validation Rules Page 10 Interface Requirements • PMI2 requires the following to complete Interface Design and Implementation  Functional and Technical Design  Agreement of the design approach for PMI2 attributes  Tool Demo  Use Case documentation completed and approved  Interface Definition Agreement (IDA) completed and approved  MdM timeline to integrate with PMI2 System Integration Test  Establish schedule dependencies  Environment Connectivity  Technical confirmation of data exchange  Testing and Verification of business rules and design  Coordinated Test Execution and problem resolution Page 11 Auto Load Validation Process • MdM and SAP Content and Technical Validation  Data Mapping team will provide automated query validation of SAP and MdM extracted Master Data against Data Mapping Access database  Auto Test Load Validation Plans (content and technical) need to be developed for SAP verification Data Structures team will provide a listing of content validation rules to ensure content loaded to SAP matches the Data Mapping Access Database. – Compare number of records sent against number of records created – Compare number of derivation rules created versus anticipated Data Structures team will provide a technical validation to ensure requirements are met in SAP – Business Area ‟01‟ on Project Level 0  MdM needs to provide Auto Test Load Validation Plan (content and technical) Page 12 Post Go-Live Creation/Maintenance Process Option A Assumptions Process •SAP is not the System of Record •SR submitted to the Competency Center for creation/update („Business as Usual) MdM System Administrator (equivalent) submits SR Questions Comments •The PMI2 team will provide user procedures for managing new attributes MdM System is Ready for October Release •MdM system contains all requested/approved PMI2 attributes •Subject to the same guidelines or rules established by the interface •MdM System owns the approval process •MdM still responsible for data validation Nomenclature standards 7120.5c WBS Level 2 Standards Confirmation of Status „Executable‟ •Competency Center only receives creation/updates from the MdM System Administrator and/or equivalent Who submits the SR from the MdM System (System Administrator and/or Equivalent)? Who works creation/update issues from the Competency Center? Page 13 Post Go-Live Creation/Maintenance Process Option B Assumptions Process •SAP is not the System of Record •SR submitted to the Competency Center for creation/update Questions •Where is the System of Record Maintained for NSM Structure & Nomenclature without the MdM System? Does the Data Mapping Database stay as interim? If so, who maintains it and who owns it? •Who creates the SRs for the Comp Center? How does the Comp Center know the request approved and validated and coming from the correct owner of the data? Comment •The PMI2 team will provide user procedures for managing new attributes MdM is not Ready for October Release •MdM system does not contain all requested/approved PMI2 attributes •Subject to the same guidelines or rules established by the interface •Agency still responsible for data validation Nomenclature standards 7120.5c WBS Level 2 Standards Confirmation of Status „Executable‟ •Centers not allowed to create SRs for Agency Controlled NSM Structure  Only Receives Updates from Agency Owner Page 14 Conference Room Pilot (CRP) Results Conference Room Pilot (CRP) Overview • A Conference Room Pilot is a working SAP prototype based on a selection of several key business processes and is used to validate the functionality and the design:  It begins with setting up initial configuration components  Continues with the detailed definition of business scenarios  Scenarios are defined for the agency, using new processes and center input to ensure completeness  Detailed configuration built on the “going-in position” defined by the organizational hierarchy definitions Page 16 CRP Results • Total of 20 scenarios have been tested during CRP  56 execution logs defined and tested  Multiple execution logs utilized to separate PY05 and prior vs. PY06 and forward processes  Multiple execution logs utilized to separate complex scenarios • Status  Passed – Scenario passed with no issues  Passed with Exception – SGL pro formas not confirmed by OCFO; testing based on PMI2 assumptions  Failed – Agency process not defined by OCFO Status Passed Passed with Exception Failed Defects Data Structures 21 7 3 I02462, I02463 Cost Collection 25 None None None Page 17 System Integration Test (SIT) Overview System Integration Test (SIT) Overview • Formal set of integrated test activities incorporating all aspects of the business solution, including converted legacy data (where applicable) Business oriented, end-to-end test cases encompassing steps or functions of the business process, including exceptions and error processing Includes the following solution components:  Agency systems (SAP and any remaining legacy applications)  Agency business partners (HHS, Treasury, etc…)  Custom development components (interfaces with other agency systems or business partners, custom reports / forms, and extensions)  User Procedures and Job Aids • • • • • SIT will be planned and performed by the PMI2 Process and Integration IPT Teams (with additional participation from Agency Core & Extended Process Team ) and will include Agency-level solution components Perform more formal and comprehensive business test scenarios than previous project test activities Test according to functional requirements (tracking utilizes RequisitePro), integration with general ledger, etc., where functional requirements will be mapped to flow charts and scenarios Page 19 SIT Scope and Schedule Test Pass SIT Pass 1 Description •Integrated end-to-end business processes • Limited Custom objects (RICEF) included •Testing will occur in T01 (copy of P01) Timeline 7/5/2005 – 7/22/2005 •BW available for test verification SIT Pass 2 •Integrated end-to-end business processes •All available Custom objects (RICEF) included 7/25/2005 – 8/19/2005 •Testing will occur in T01 (copy of P01 pre yearend) •BW available for test verification SIT Pass 3 •Integration with Release 6.1 Pass 2 •All available Custom objects (RICEF) included 8/22/2005 – 9/16/2005 •Testing will occur in S02 (P01 post year-end) •BW available for test verification SIT Pass 4 •Integration with Release 6.1 Pass 3 9/19/2005 – 9/29/2005 •Testing will occur in X02 (P01 post year-end) •BW available for test verification Page 20 System Build Schedule Activity Systems R/3 BW BW5 BWT BWT TBD Execution Dates From 5/1/2005 7/5/2005 7/25/2005 9/19/2005 R/3 Source System To 7/1/2005 7/22/2005 8/19/2005 9/16/2005 9/25/2005 D01 P01 P01 S02 (P01 Post Year-End) X02 (P01 Post Year-End) PMII CRP PMII SIT Pass 1 PMII SIT Pass 2 Regression Test Pass 1 Regression Test Pass 2 D01 T01 T01 S02 X02 BWS 8/22/2005 Page 21 Process IPT Test Documentation & Deliverables • The Process IPT Team is responsible for developing several key documents and deliverables for System Integration Test • Each document has its own distinct use, and each is related to the others • Test Set • Test Plan (Execution Log) • Details the Test Steps and Transaction Codes, Expected Results, and Actual Results • In addition to these test documents, the Process IPT remains responsible for maintenance of several other key deliverables • Requirements • Process/Sub-Process/Activity definitions • White/Solution Papers • Role Definitions – coordinated with Change Management team • Inputs to Process Flows and Functional/Technical Designs • Controlled through Competency Center Change Control processes • Defect Documentation • Configuration Rationale Page 22 Documentation Change Control Process • The PMI2 project will follow the Change Control process as defined by the IFMP Project Process.  Any changes to requirements, activity definitions, and white papers must follow the project‟s change control process  A Lotus Notes Database entitled Rational Artifact Tracking (RAT) will be used to request base-lined documentation to be checked out from RequisitePro  QA Team member receives notification of “check out”  Only one check out allowed at one time for the same document  Requestor makes changes with TRACK CHANGES feature “ON” and reattaches file in MDM  When completed, select approver and send e-mail notification  Only Sub-Team leads and QA Team have approval authorization  When approved, QA Team member checks document into RAT and marks any new requirements Page 23 Coordination with Integration IPT • • • Integration IPT is responsible for the SIT tool sets, Application Development Documentation (Use Cases, Function/Technical Designs), and the Defect Process The Process IPT team will work with the Integration IPT team to blend the business, system, development, and technical aspects into a seamless, integrated whole The Integration IPT Quality Assurance (QA) is responsible for the Defect Process • Any failed step that is encountered during test execution requires a defect to be logged • Defects are created within TestDirector and associated directly to the failed step • Each defect tracks the Status, Application (Process), User information, and a description • The Test Defect is associated with a SIR in the Lotus Notes Methods Delivery Manager (MDM) to support the transport/migration process • The defect is reviewed by Process and Integration IPT Leads and NASA counterpart • The defect is assigned to the appropriate team member and worked according to the existing procedures Page 24 SIT Participation Test Pass SIT Pass 1 SIT Pass 2 & 3 Process and Integration IPT Teams •Responsible for executing all identified test scenarios (R/3 & BW) •Responsible for executing all identified test scenarios (R/3 & BW) •Provide support for SIT training scheduled week of 7/25 •Provide functional support to Core/Extended team when on-site for testing Core and Extended Process Team •No Participation •Attend SIT Training the week of 7/25 No R/3 SIT testing allowed if the user does not attend scheduled SIT Training •Responsible for executing identified test scenarios (R/3 & BW) to support Center Legacy testing May require executing the same scenarios multiple times to support test data creation for all Centers •All Testing by the Core/Extended Team must be On-Site SIT Pass 2 On-Site Testing on the Week of 8/8 & 8/15 SIT Pass 3 On-Site Testing on the Week of 9/12 Optional On-Site Testing the Week of 9/5 (holiday week) •Responsible for testing the End User Procedures for SIT Pass 2 and 3 SIT Pass 4 •Responsible for executing all identified test scenarios (R/3 & BW) •No Participation Page 25 Data Load / Set-Up Automated Load Background • Per the OCFO DCFO approval on July 1st, the MdM to SAP interface is deferred for October Go-Live and the project will utilize the Mitigation Plan Approach until Interface is Released for Production  One time initial automated loads will be utilized to create Fund Centers, Projects, and Derivation rules to support the creation of the PY06 NSM Structure in SAP  Utilize the Deliverables created by the Data Mapping team to create the necessary extract files to support the automated loads  Data Mapping Deliverable Includes  Updated M3 document (Mission, Theme, Program, Project)  Project through WBS Level 7  Attributes for all levels of the NSM Structures (Mission – WBS Level 7)  PY05 and Prior Mapping to PY06 NSM Structure • As a result of this decision, the automated load process will be tested during SIT Page 27 SIT Auto Load Strategy Test Pass SIT Pass 1 Test Automated Load •Fund Centers Only Test Data Production Data: Institutional (Mission through Project) Sample Data: Programmatic (Mission through Project) SIT Pass 2 •Pre Year-End •Fund Centers •Projects/WBS Elements •Production Copy •Derivation Rules •Cost Centers (attribute update only) •Fund Centers •Projects/WBS Elements •Derivation Rules Production Data: Institutional and Mission (Mission through Project/WBS 7) Sample data for Gaps Production Data Only SIT Pass 3 •Post Year-End •Production Copy •Cost Centers (attribute update only) •Full Load of Production Data (confirm etc auto load of each item + functional and technical validation) Page 28 Mitigation Plan Automated Tool Options Master Data Area Derivation Rules Options Custom ABAP Script (i.e., eCATT, WinRunner, LoadRunner) Funds Centers SAP-delivered t-code FMSY (loads funds center data from a flat file) Custom ABAP Script SAP-delivered LSMW project using BAPI or IDoc import techniques Custom ABAP Script SAP-delivered LSMW project using BAPI or IDoc import techniques Custom ABAP Script Page 29 Projects Cost Centers Mitigation Plan Technical Recommendation • As an implementation activity, the PMI2 team recommends Mercury WinRunner/QuickTest  One time use for Production Data Load / No reuse capability  Aggressive schedule and quick turnaround time required  Expertise within the team with this toolset  High Level logging can be implemented within the script • Technology IPT is responsible for the initial load to production  Any re-assessment of automated tool considerations after go-live would be the responsibility of the Competency Center Page 30 Data Mapping Extract File Listing for SAP Auto Load SAP Extract File # 1 Data Mapping Extract Files from Access Database SAP Extract: PY06 Projects for Creation Comments SIT Pass 2 Due Date 22-Jul SIT Pass 3 Due Date 8/17/2005 Go-Live Due Date 10-Sep 2 SAP Extract: PY06 Fund Centers for Creation 22-Jul 8/17/2005 10-Sep 3 SAP Extract: PY06 Derivation Rules for Creation 22-Jul 8/17/2005 10-Sep 4 SAP Extract: PY05 & Prior Projects (WBS Elements) for Change Attribute Update: Mission, Theme, Program, Project, plus others as identifed in the MdM Attribute listing 29-Jul 8/17/2005 10-Sep 5 SAP Extract: PY05 & Prior Fund Center for Change Attribute Update: Mission, Theme, Program, Project 29-Jul 8/17/2005 10-Sep 6 7 SAP Extract: PY05 & Prior Cost Center for Change BW ITD WBS PY05 & Prior Mapping to PY06 Attribute Update: Project 29-Jul 29-Jul 8/17/2005 8/17/2005 10-Sep 10-Sep Page 31 Center Legacy System Coordination Center Legacy System Approach • PMI2 team held a telecom on June 15th with Centers to review potential impact of PMI2 design on Center Legacy Systems  Reviewed PMI2 design  Reviewed considerations of impact  Requested Centers to provide the following  Listing of the Center Legacy Systems that require modifications  General Estimate on days required to complete the change  General Concerns of the Center  Required Functional Support from PMI2 to interpret change to Center Legacy Systems  Provided the Centers the following documents to help facilitate impact assessment action  Technical Questionnaire to aid Center Legacy System Assessment  Template provided to provide the requested information in one format  Requested assessment be returned by COB Friday, June 24th  All Centers represented on initial call except DFRC & JPL (60+ attendees)  Conducted additional call on July 8th with JPL and DFRC to collect same information by July 15th  Held follow-up calls with each of the Centers to review results and incorporate findings into the PMI2 SIT Schedule Page 33 Center Legacy System Testing • Center Implementation Point of Contact will have access to the PMI2 SIT environment  The Centers are responsible for all Center Legacy System testing  If the Center utilizes BW “pulls” or R/3 Reports for retrieving data from Core Financial to support Center Legacy Systems, they will have the same ability during SIT Pass 2 and 3  BW refreshed daily for SIT Pass 2 and 3 Clients  Centers will need to review the SIT Pass 2 and 3 detailed schedules to understand when applicable data would be available for data pulls  Dependencies on other test plans / sets have been identified and scheduled accordingly • The PMI2 Process and Integration IPTs will perform interface testing for SIT Pass 2 and 3 for Core Financial approved Agency (i.e. Travel) and Center (i.e. SSC Reimbursable Roll-Up) interfaces  Interfaces will be defined in the SIT Pass 2 and 3 schedules • The PMI2 Process IPT team has identified the necessary scenarios and schedule to be executed to support test data creation for all Centers  The Core and Extended Process Team is responsible for the execution of these scenarios Page 34 Process IPT Roles & Responsibilities Process (Test) IPT Structure Process IPT Lead - Coordinate Ov erall SIT ef f ort - Manage Resources - Rev iew & Approv e sy stem def ects - Approv e Team Deliv erable Data Structure Lead Cost Collection Lead Data Mapping Team ReportingTeam - Lead planning & execution ef f ort - Coordinate across f unctional areas - Rev iew test documentation - Coordinate assignment of Test Sets - Rev iew & monitor sy stem def ects - Lead planning & execution ef f ort - Coordinate across f unctional areas - Rev iew test documentation - Coordinate assignment of Test Sets - Rev iew & monitor sy stem def ects -Coordination with OCFO on data mapping ef f ort of PY 05 and prior structures to PY 06 structure -Lead reporting design and dv elopment f or R/3 and Business Warehouse (BW) reports based on project requirements Page 36 Process IPT Lead • Overall responsibility for the Process IPT effort – tasks, deliverables, schedule, issues, interactions with other teams, etc… Performs day-to-day leadership of the overall test effort Ensures the delivery of a high-quality product that meets requirements and is completed on schedule and within the approved budget Identifies and obtains the appropriate resources (personnel, office space, supplies, tools, etc.) Establishes, monitors, and refines team organization structures and procedures to maximize efficiency and productivity Participates in the review & approval of all Test Defects Ensures consistency and adherence to standards in Test Defect documentation & resolution Approves all team deliverables Coordinates interactions with Project Management and owns the issue resolution, status reporting and buy-in discussions with Project Management Page 37 • • • • • • • • Process IPT Lead Continued • • • Oversees all aspects of the System Integration Test effort Works directly with Competency Center QA and Release Management representatives for overall Release 6.1 coordination In conjunction with the QA team, coordinates all aspects of system defects, including assigning specific team members to complete system defect analysis, monitoring system defect resolution, retesting, and evaluating cross-team impacts Ensures participation of and coordination across functional areas and with other PMI2 and IPO teams • Page 38 Data Structures & Cost Collection (Test) Execution Lead • Leads the day-to-day test planning and execution effort • • Ensures participation of and coordination across functional areas and with other PMI2 and IPO teams (as needed) Monitors and ensures adherence to test procedures and Test Defect documentation standards • • • Reviews and validates/accepts documentation and deliverables of the Process IPT Coordinates the assignment of Test Sets/Plans with team members for planning completion Coordinates the assignment of Test Sets/Plans for execution. • • Monitors completion of the Test Sets/Plans in adherence to the SIT schedule Reviews and manages defects entered and associated with SIT Page 39 Data Structures & Cost Collection (Test) Execution Lead Continued • In conjunction with the QA team, monitors and tracks system defect and issue resolution, provides information to Process IPT Lead for status reporting, and supports communications with Project Management Serves as a “Point of Contact” for Process IPT Team Members during execution • • Ensures test set execution continues on schedule and monitors any delays or discrepancies Page 40 Role and Responsibilities: Process IPT Test Team Member • Participates in the execution and documentation of test sets and test plans, including participation in test sets/plans “owned” or coordinated by other team members • • Defines and documents test plans, including the mapping of requirements to test sets Creates or updates test plan results as part of test set execution and documentation • • Identifies and documents system defects according to team standards and processes Coordinates data definition and set-up in support of the SIT sets, ensuring that new and existing data is used appropriately • • Serves as a functional point of contact for the Application Fix Team. Coordinates updates with Change Management team for refinement of end-user role definitions and user procedures Page 41 Role and Responsibilities: Process IPT Test Team Member • Supports cross-team efforts, such as training development, application security, and mock conversion testing • Applicable NASA team members will also leverage their deep business knowledge and serve as business subject matter experts (SMEs) across the entire testing effort • Coordinates the involvement of NASA Functional Subject Matter Experts to ensure appropriate business/functional input and system considerations • Completes the execution and documentation of test plans, including participation in test sets “owned” or coordinated by other team members Page 42 Planning / Preparation Current Status SIT Planning / Preparation Status • The Process IPT team has defined the Test Sets/Plans and Schedule for SIT Pass 1 and 2 (see Back-Up)  Planning for SIT Pass 3 is in process to address testing of additional RIEF objects based upon the development schedule  SIT Pass 1 -- Complete  SIT Pass 2 – Scheduled to starts 7/25/2005, pending TRR Approval • All of the Test Plans have been loaded in Test Director for SIT Pass 1  All expected results have been updated • Loading of the Test Plans for SIT Pass 2 are In Process  All test plans scheduled for the first two weeks have been loaded Page 44 SIT Pass 1 Revised Scope • Per the approval/acceptance of the Critical Design Review (CDR), SIT Pass 1 Scope was re-aligned to accommodate the recent design changes to funds distribution  Testing was concentrated on the following  Funds Distribution Process  New Validation Rules (including negative testing)  Including newly proposed design changes per the June 22 nd meeting at HQ  New Attributes for Fund Center master data  New Attributes for Project/WBS master data  Cost Assessments  Test automated load of Fund Center Creation  All other test scenarios successfully completed in CRP and were not impacted by changes to funds distribution were deferred to SIT Pass 2  The only exception is the Working Capital Fund - NSSC Process which failed during CRP due to incorrect configuration of the SGL advance liquidation Page 45 SIT Pass 1 Schedule Example SIT Pass 1 Scenario List Sort Note: Color legend see bottom of SIT Pass 1 String list. NASA Owner Data Structures DS01.01 Master Data Creation Direct Programmatic Funding DS02.01 PY05 Direct Programmatic Funding DS02.02 PY06 DS03.01 Reimbursable Funding - PY05 DS03.02 Reimbursable Funding - PY06 DS04.01 Corporate G&A Funding - PY05 DS04.02 Corporate G&A Funding - PY06 DS04.03 Center G&A Funding - PY05 DS04.04 Center G&A Funding - PY06 Institutional Investment Funding DS04.05 PY05 Institutional Investment Funding DS04.06 PY06 Agency Fee for Services Funding DS04.07 PY05 Agency Service Pool Funding DS04.08 PY06 DS04.09 Service Pool Funding - PY05 DS04.10 Service Pool Funding - PY06 DS04.11 Labor Pool Funding - PY05 DS04.12 Labor Pool Funding - PY06 Cynthia Smith Michelle Smith Cynthia Smith John Schremp Cynthia Smith Cynthia Smith Cynthia Smith Cynthia Smith Cynthia Smith Cynthia Smith Cynthia Smith John Schremp John Schremp John Schremp John Schremp John Schremp John Schremp John Schremp SIT Pass 1 Accenture Owner M T 4 5 W T 6 7 7/4/05 [--------] [-----------------] [-----------------] [-----------------] [-----------------] [--------] [--------] [--------] [--------] [--------------------] [--------------------] [--------------------] [--------------------] [--------------------] [--------------------] [--------------------] [--------------------] [--------------------] [--------------------] [--------------------] [--------------------] [--------] [--------] [--------] [--------] [--------------------] [--------------------] [--------------------] [--------------------] F 8 M T W T F M T W T F 11 12 13 14 15 18 19 20 21 22 7/11/05 7/18/05 Status [--------] [--------] [--------] [--------] [---------------------] [---------------------] [---------------------] [---------------------] [--------] [--------] [--------] [--------] Cynthia Smith John Schremp Cynthia Smith John Schremp Cynthia Smith John Schremp Cynthia Smith Cynthia Smith Cynthia Smith Cynthia Smith Cynthia Smith John Schremp John Schremp John Schremp John Schremp John Schremp SIT Pass 1 Test Plan Listing & Status Sort String SIT Pass 1 Test Plan List Data Structures SIT Pass 1 NASA Owner SIT Pass 1 Accenture Owner Status DS01.01 DS01.02 General Master Data Creation Master Data Creation - Fund Center Extension Cynthia Smith Cynthia Smith John Schremp Chris Krug Passed Passed with Exception DS01.03 Master Data Creation - Fund Center Auto Load Cynthia Smith Robert Damian Brian Kirchhoff Passed DS01.04 Master Data Creation - Project Extension Cynthia Smith Robert Damian Passed DS01.05 DS02.01 Master Data Creation - Derivation Rules Direct Programmatic Funding - PY05 Cynthia Smith Cynthia Smith Robert Damian John Schremp Passed Passed DS02.02 DS03.01 Direct Programmatic Funding - PY06 Reimbursable Funding - PY05 Cynthia Smith Cynthia Smith John Schremp Michelle Smith Passed Passed DS03.02 DS04.01 Reimbursable Funding - PY06 Corporate G&A Funding - PY05 Cynthia Smith Cynthia Smith Michelle Smith John Schremp Passed Passed DS04.02 DS04.03 Corporate G&A Funding - PY06 Center G&A Funding - PY05 Cynthia Smith Cynthia Smith John Schremp John Schremp Passed Passed DS04.04 Center G&A Funding - PY06 Cynthia Smith John Schremp Passed Page 47 SIT Pass 1 Test Plan Listing & Status Sort String SIT Pass 1 Test Plan List Data Structures SIT Pass 1 NASA Owner SIT Pass 1 Accenture Owner Status DS04.05 Institutional Investment Funding - PY05 Cynthia Smith John Schremp Passed DS04.06 DS04.07 DS04.08 DS04.09 Institutional Investment Funding - PY06 Agency Fee for Services Funding - PY05 Agency Fee for Services Funding - PY06 Service Pool Funding - PY05 Cynthia Smith Cynthia Smith Cynthia Smith Cynthia Smith John Schremp John Schremp John Schremp John Schremp Passed Passed Passed Passed DS04.10 DS04.11 DS04.12 DS04.13 DS05.01 Service Pool Funding - PY06 Labor Pool Funding - PY05 Labor Pool Funding - PY06 Agency Service Pool Funding - PY06 Generate SGL Reports Cynthia Smith Cynthia Smith Cynthia Smith Cynthia Smith Cynthia Smith John Schremp John Schremp John Schremp John Schremp Michelle Smith Passed Passed Passed Passed Passed DS08.01 DS08.02 DS09.01 Investment Funding - PY05 Investment Funding - PY06 GAD Funding - PY05 Cynthia Smith Cynthia Smith Cynthia Smith Michelle Smith Michelle Smith Lauren Baker Passed Passed Passed DS09.02 DS10.01 DS10.02 DS10.03 DS10.04 GAD Funding - PY06 Miscellaneous Funding - CR PY05 Miscellaneous Funding - Rescission PY05 Miscellaneous Funding - CR PY06 Miscellaneous Funding - Rescission PY06 Cynthia Smith Cynthia Smith Cynthia Smith Cynthia Smith Cynthia Smith Lauren Baker Lauren Baker Lauren Baker Lauren Baker Lauren Baker Passed Passed Passed Passed Passed Page 48 SIT Pass 1 Test Plan Listing & Status Sort String SIT Pass 1 Test Plan List SIT Pass 1 NASA Owner Cost Collections SIT Pass 1 Accenture Owner Status CC06.01 Month end Processing-Cost Pool Allocations - PY05 Cynthia Smith Chris Watson Passed CC06.02 Month end Processing-Cost Pool Allocations - PY06 Cynthia Smith Chris Watson Passed Page 49 SIT Pass 1 Results Summary Data Structures Cost Collection Total # of Test Sets 10 1 11 # of Test Plans 31 2 33 Test Plan Summary Data Structures Test Plan Results Passed 29 Passed with Deferred Failed Exception 1 1 0 Defect 4 Cost Collection Test Plan Results Total 2 31 0 1 0 1 0 0 0 4 Page 50 SIT Pass 1 Results Defect Title Master Data Creation_PY06Create Fund Error Funds Center Master Extension incorrect error message Funds Center Extension - Field Length and Type change Defect ID Status Priority Technical Owner Functional Owner 2 3 Retesting Complete Retesting Complete Retesting Complete 1-Very High 2-High Art Dunn Art Dunn John Schremp John Schremp John Schremp 4 3-Medium Art Dunn Funds Center Master Extension 5 New 4-Low Art Dunn John Schremp Page 51 SIT Pass 2 Listing and Schedule (Go to Excel Document) Change Management Training Training Curriculum Update • The updated curriculum for PMI² includes the following: Course PMI² Overview Delivery Method Web-based Audience All Core Financial Roles Project Managers All WebTADs users Funds Distribution Processing Instructor Led Agency Budget Maintainers Center Budget Maintainers PMI²/ALDS Information Delivery Overview Instructor Led Reporting Super User Leads All BW users with standard BW query access Assessment Cycles Instructor Led Assessment Cycle Maintainer Procurement Process Overview Web-based Procurement Community Page 54 Training Impacts to Existing Core Financial Courses • Several existing Core Financial courses available on SOLAR will be updated to reflect impacts by PMI² Course General Overview Course Core Financial Cross-Functional Overview (FI-FMWeb-Based Delivery Method MM-CO Relationships) Purchasing Courses PR Review Process Instructor Led Requisition Approval Processing PR Review Process for Procurement Personnel Bankcard Review Process Bankcard Purchases & Desktop Receiving Requisitioning Basics Instructor Led Instructor Led Instructor Led Web-Based Web-Based Page 55 Training Material Development Timeline Training Task Owner Time Frame Training Curriculum distributed to Competency Center Training Detailed Course designs distributed to Competency Center PMI² Overview course developed Existed Core Financial Courses updated Training Materials (PMI² Overview Course and CF Courses) are reviewed Draft Training Communication Materials PMI² Training Lead PMI² Training Lead Competency Center Competency Center PMI² Training Lead PMI² Training Lead Week of July 25-29 Beginning July 29 Month of August Month of August Throughout course development August 1-5 Training Materials posted on SOLAR Conduct PMI²/ALDS Information Delivery Train the Trainer Rollout PMI² Overview Course to Centers Rollout Core Financial Courses to Centers Competency Center Lisa Huzar with support from PMI² Training Lead PMI² Training Lead PMI² Training Lead TBD August 29-September 2 September 5-9 September 19 Page 56 PMI²/ALDS Training Timeline July 7/25 August 8/19 Training Development Sandbox (TR2 in use) September 9/13-9/15 ALDS Overview Course October Nov/Dec 9/5 9/9 Distribute PMII Overview Course to Center CM POCs 9/19 8/11 Deliver Training Communications to Center Center Information Delivery CM POCs Training (BWR) 9/5-9/16 Center Development of Info Delivery Training (BWR) 10/28 8/22 8/26 10/28 Center Information Delivery Training continues (uses Production BW) Training Training Development Team build of Training Data (TR2) 8/29 9/19 Rollout Updated CF Course to Centers 9/2 PMII/ALDS Information Delivery Train the Trainer (BWR) 8/1 Begin Training Logistics Coordination (Training Rooms, trainers, # impacted end users) 8/15-8/26 Centers deliver Training Communication 8/29 TBD PMII Agency Funds Distribution Processing Course 9/12 TBD PMII Center Funds Distribution Processing Course (HSV) 10/14 Center End User Training (TR1) Available-Use for Funds Distribution Course 10/14 Training Environment Available to Centers (TR1) Page 57 Change Management Process & Organization Alignment Performance Management Tools End User Procedures - Status • Impacted End User Procedures (EUPs)  22 existing EUPs require minor updates as a result of PMI2  BE = 16  Purchasing = 5  Cost Management = 1  1 new EUP required for t-code BPACC - Create/Maintain Budget Derivation Rules • EUP Development Status  In Process = 9 (Developer is in process of updating/creating EUP)  Complete = 0 (Team Lead approved; awaiting Change Mgmt review)  In Revision = 0 (EUP failed a review; developer is revising EUP)  Revision Complete = 14 (Change Mgmt approved; awaiting Functional Lead review)  Approved = 0 (Functional Lead approved; EUP is ready for testing) Page 59 Performance Management Tools End User Procedures - Testing • End User Procedures will be tested in SIT 2 (7/25 to 8/19) by NASA‟s Core and Extended Process Teams • Any defects/changes identified through the SIT execution will be retested as part of 6.1 Release Regression Test 1 (8/22 to 9/16) • End User Procedures will be a part of the overall solution and are an important aspect of the overall test scope Page 60 Performance Management Tools End User Procedures - Key Dates Activity SIT 1: Develop EUPs and post in MDM for review Process IPT July 22, 2005 Responsible Due Date Review & Approval Interim Hand Off to Competency Center (not tested) Process Sub-Team Leads, Change Management, and Functional Lead Change Management As completed, on or before July 22 July 25 SIT 2: Validate EUPs Revise EUPs as needed and post in MDM for review/approvals Review & Approval Interim Hand Off to Competency Center (tested) NASA Extended and Core Process Teams Process IPT Same as above Change Management Week of Aug 15 – 19 As completed, on or before Aug 19 As completed, on or before Aug 22 Aug 24 SIT 3/6.1 Regression 1: Re-test defects found during SIT 2 Revise EUPs as needed and post in MDM for review/approvals NASA Extended Process Team Process IPT Sept 16 As completed, on or before Sept 16 Review & Approval Same as above As completed, on or before Sept 21 SIT 4/6.1 Regression 2: End User Procedure Deliverable TIM Change Management and COTR Week of Sept 26 Post Testing Phases: Final Hand Off to Competency Center (approved deliverable) EUPs made available to end users Change Management Competency Center Sept 30 Coinciding with Go Live Page 61 Performance Management Tools Job Aids - Status • Impacted Job Aids  8 existing Job Aids require major updates (All Cost Management)  5 New Job Aids required (All Budget Execution)  25 Expired Job Aids (All Cost Management) • Job Aid Status  Not Started = 12  In Process = 0  Complete = 1  Approved = 0 Page 62 Performance Management Tools Role Definitions - PMI2 Role Impacts • Of the approximately 74 Core Financial roles assessed to date, the following are impacted by PMI2  24 existing Core Financial SAP roles  2 existing Bankcard roles  1 new Core Financial SAP role identified (Competency Center role)  0 expired roles identified • Nature of role impacts is primarily changes to the data, not significant process changes to the actual role or role definition (e.g., description, activities, skills) • 13 roles required role definition updates  8 were impacted by PMI2  5 were outdated since Core Financial • Role security will be tested in SIT 2 and, if needed, SIT 3 Page 63 Performance Management Tools Role Definitions - PMI2 Role Impacts Budget Execution • • • • • • Budget Administrator (Competency Center) Budget Maintainer Funds Reserver Project Administrator (Competency Center) Budget Report Processor MdM Interface Processor (New) Cost Management (CM) • • • • • • • Assessment Cycle Maintainer Contractor Cost Report (CCR) Administrator Contractor Cost Report (CCR) Analyst Cost Center Maintainer (Competency Center) Consumption Data Processor NSMS Purchasing Analyst NSMS Distribution Analyst SGL • SGL Reconciliation Analyst • External Information Generator • Management Information Generator BankCard • Bankcard Holders • Bankcard Approvers Purchasing • • • • • Agency Buyer (Procurement) Center Buyer (Procurement) Outside Buyer (Procurement) Requisition Approver (Requisitioning) Requisitioner (Requisitioning) Account Payables • Vendor Invoice Processor Account Receivables • Reimbursable Manager • Agency Surcharge Processor • Sales Order Processor • Agency Contractor Cost Report Administrator - CM • Contractor Cost Report Processor - CM In addition, updated 5 existing Core Financial roles that were outdated: • Project Planner - Budget Execution • Journal Entry Processor – SGL • Assessment Cycle Administrator - CM Page 64 Performance Management Tools Posting Documents to OLQR • Submit OLQR documentation via the SR process as attachments • Submit batch requests per functional area (e.g., all BE EUPs in one SR) • Use track changes feature on all existing documents (if possible) • 2 week lead time requested for changes to OLQR • Documents will be stored on OLQR development server until go live • Freeze on all other updates to OLQR necessary (meaning all documents on development will be uploaded at once, not separately) • OLQR POC: Cathy Webster Page 65 SIT Training Agenda for the Week Agenda - Tuesday Procurement Top Concerns Data Structures: Master Data – Fund Center Break Joyce Meyer Cynthia Smith 9:00 – 10:00 10:00 – 10:55 10:55 – 11:05 John Schremp Data Structures: Master Data – Project/WBS Lunch Data Structures: Master Data – Derivation Rules Cynthia Smith Rob Damian 11:05 – 12:00 12:00 – 1:00 Cynthia Smith 1:00 – 1:45 John Schremp Chris Krug Data Structures: Fund Distribution – Agency Cynthia Smith John Schremp Chris Krug (on call) 1:45 – 2:45 Break Data Structures: Fund Distribution - Center Cynthia Smith John Schremp Chris Krug (on call) 2:45 – 3:00 3:00 – 4:00 Page 67 Agenda - Wednesday FM/SGL Overview Procurement – Requisitions & Obligations Cynthia Smith Chris Krug Cynthia Smith Joyce Meyer Vivian Liang (on call) 9:00 – 9:30 9:30 – 10:30 Break Procurement – Requisitions & Obligations Continued Cynthia Smith 10:30 – 10:45 10:45 - 11:15 Joyce Meyer Vivian Liang (on call) Cost Management – Cost (SES & GR & 533) Lunch Cynthia Smith Chris Watson 12:00 – 1:00 11:15 – 12:00 Cost Management – Cost Assessments Cost Management – Labor & Travel Overview Only Break Cynthia Smith Chris Watson 1:00 – 2:00 2:00 – 2:30 2:30 – 2:45 Cynthia Smith Chris Watson Accounts Payable – Invoicing & Payment Cynthia Smith Doug Clark Vivian Liang 2:45 – 3:15 Reimbursable Cynthia Smith 3:15 – 4:00 Page 68 Doug Clark Vivian Liang Agenda - Thursday Information Delivery – R/3 & BW (ZNASA, etc) SIT Tools & Defect Process •Test Director •Requisite Pro •RAT •ProVision Lisa Huzar Gwen Diehl 9:00 – 11:00 11:00 – 12:00 Lunch RIEF Overview (remaining objects) Marla Lenox Gwen Diehl 12:00 – 1:00 1:00 – 1:30 Center Legacy Systems Testing (Schedule) Wrap Up/Next Steps Tamara Fields Lisa Huzar 1:30 – 2:00 2:00 – 2:30 •Re-Review SIT Pass 2 Schedule •Process Core/Extended Team Travel Schedule Cynthia Smith Vivian Liang Page 69 Appendix A: Project Status PMI2 Timeline Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 FY2004 FY2005 Project Start-Up Phase I – Agency-wide Blueprint Realization FY2006 Final Prep FY2007 Project Preformulation Agency Go-Live Phase II – Agency-wide Blueprint Realization Final Prep Note: •Phase I – FY2006 Budget Structure & Technical WBS •Must be implemented on a year-end Agency Go-Live •Phase II – WBS Expansion •Does not have to be implemented on a year-end. •Assumption: Combined with SAP Version Update project Page 71 Phase I Mid-Level Timeline FY05 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Blueprint CRP Realization System Integration Test / Regression Test Data Mapping Final Prep/ Go-Live Production Support Communications & Change Mgmt Use Case Dev Test Case Development Design & Data Mapping Development & Unit Testing Training Deployment = Workshop participation by OCFO = Review by OCFO & OCE = Decision point on OCFO Systems Page 72 Data Mapping Timeline FY05 June June 6: Review Data Mapping Approach with OCE & OCFO June 21: Kickoff for Institutional Mission Directorates June 22: Kickoff for Mission Directorates June 28th: Critical Design Review (CDR) July July 4: Start Weekly POC Data Mapping Team Call August Aug. 1st: Mission Directorates Deliverable Due Date Aug 1st: Begin Center Level Unique -Programmatic September Sept 2nd: Data Mapping provides final extract for CRCS Load Sept. 26th: CRCS Production Go-Live October Oct . 10th: Final Deliverable Automated Load to SAP Oct 17: Tentative SAP Go-Live July 12-14: HQ Institutional Workshop July 15: Institutional Agency Deliverable Due Date July 18: Mission Directorates Science (2 day) Space Ops (1 day) July 18: Begin Center Level Unique -Institutional July 25: Mission Directorates Aeronautics (2 day) ESMD (1 day) Aug. 5th: Institutional Center Level Unique Deliverable Due Date Aug. 10th: Mission Directorate Center Level Deliverable Due Date Aug 15th: Final Submission of Change Request Aug 19th: PMII Data Mapping Deliverable Due date Aug 22nd – 31st: OCE/OCFO Final Review, Final Change Request Disposition Oct . 21st: Final Deliverable Automated Load to MdM Oct 24: Tentative MdM Go-Live Aug 31st: Agency Account Code Freeze = Key Deliverable Dates = Review by OCFO & OCE = Stakeholder Deliverable Due Date Page 73 Appendix B: Center Legacy System Impact Summary Legacy Center Impact Assessment Summary of Results Center AMES Impacted Yes # of Systems Impacted 11 # of Objects 14 Comment DFRC GRC Yes 17 17 Not Responded GSFC HQ JSC Yes Yes Yes 6 10 6 6 10 8 JPL KSC Yes Yes 5 1 5 2 LARC MSFC SSC Yes Yes Yes 5 3 5 5 3 7 Page 75 Legacy Center Impact Assessment Template Example Estimate of Completion (Days) 30 10 45 Potential Start Potential Completion Center Implementatin Point of Contact Center Implementatin Point of Contact Phone # Object Owner Object Owner Potential PMII Object Owner Potential PMII Contact Workshop E-mail Workshop Date Number Time 10:00am 6/29/2005 11:00am Comment 7/4/2005 08/19/05 Gigi Hackford Listing Priority Degree of Complexity High Medium Low Anticipated Development Impact High Medium Low Object Number Legacy System Name RIEF Type Object Title Object Description High Medium Low 123 124 125 Report Interface Reimbursable Roll Up CDW Interface to FAS Do the following programs contain: Anticipated Impact? Yes No Object Type Report Interface Object Number Object Title/Name 123 Reimbursable Roll Up 124 CDW Object Description Interface to FAS Impact Assessment Hard-coded Logic (1) (F) WBS Y N (G) Fund Ctr Y N (H) Cost Ctr Y N (I) (J) Reimburs Functiona ables l Area Y Y N N Service Pools (K) WBS Inception Summary to Date Logic (3) Calcs (5) (M) (N) Hier archy Logic (O) Details/Comments No custom code N N N N Page 76 Appendix C: DCFO Requirement Response Appendix D: CRP Test Scenario Listing Results CRP Execution Log Listing Sort String DS01.01 CRP Execution Log Master Data Creation NASA Owner Cynthia Smith Accenture Owner Michelle Smith Status Passed DS02.01 DS02.02 DS03.01 DS03.02 Direct Programmatic Funding - PY05 Direct Programmatic Funding - PY06 Reimbursable Funding - PY05 Reimbursable Funding - PY06 Cynthia Smith Cynthia Smith Cynthia Smith Cynthia Smith John Schremp John Schremp John Schremp John Schremp Passed Passed with exception Passed Passed with exception Passed Passed with exception Passed DS04.01 DS04.02 DS04.03 Corporate G&A Funding - PY05 Corporate G&A Funding - PY06 Center G&A Funding - PY05 Cynthia Smith Cynthia Smith Cynthia Smith John Schremp John Schremp John Schremp DS04.04 DS04.05 DS04.06 DS04.07 DS04.08 DS04.09 DS04.10 DS04.11 Center G&A Funding - PY06 Institutional Investment Funding - PY05 Institutional Investment Funding - PY06 Agency Fee for Services Funding - PY05 Agency Service Pool Funding - PY06 Service Pool Funding - PY05 Service Pool Funding - PY06 Labor Pool Funding - PY05 Cynthia Smith Cynthia Smith Cynthia Smith Cynthia Smith Cynthia Smith Cynthia Smith Cynthia Smith Cynthia Smith John Schremp John Schremp John Schremp John Schremp John Schremp John Schremp John Schremp John Schremp Passed Passed Passed with exception Passed Failed Passed Passed Passed DS04.12 Labor Pool Funding - PY06 Cynthia Smith John Schremp Passed Page 79 CRP Execution Log Listing Sort String DS05.01 CRP Execution Log Generate SGL Reports NASA Owner Cynthia Smith Accenture Owner Michelle Smith Status Passed DS06.01 DS06.02 DS06.03 DS06.04 Working Capital Fund SEWP AR - PY05 Working Capital Fund SEWP Budget - PY05 Working Capital Fund SEWP Req to Pay - PY05 Working Capital Fund SEWP AR - PY06 Cynthia Smith Cynthia Smith Cynthia Smith Cynthia Smith Chris Krug Chris Krug Chris Krug Chris Krug Passed Passed Passed Passed Passed with exception Passed Failed DS06.05 DS06.06 DS07.01 Working Capital Fund SEWP Budget - PY06 Working Capital Fund SEWP Req to Pay - PY06 Working Capital Fund NSSC Cynthia Smith Cynthia Smith Cynthia Smith Chris Krug Chris Krug Chris Krug DS08.01 Investment Funding - PY05 Cynthia Smith John Schremp Passed Passed with exception Passed DS08.02 DS09.01 Investment Funding - PY06 GAD Funding - PY05 Cynthia Smith Cynthia Smith John Schremp John Schremp DS09.02 GAD Funding - PY06 Cynthia Smith John Schremp Passed with exception Passed Failed Page 80 DS10.01 DS10.02 Miscellaneous Funding - PY05 Miscellaneous Funding - PY06 Cynthia Smith Cynthia Smith John Schremp John Schremp CRP Execution Log Listing Sort String CC01.01 CC01.02 CC01.03 CRP Execution Log Reimbursable Agreements Federal - PY05 Reimbursable Agreements Federal - PY06 Reimbursable Agreements Non-Federal - PY05 NASA Owner Cynthia Smith Cynthia Smith Cynthia Smith Accenture Owner Chris Watson Chris Watson Chris Watson Status Passed Passed Passed CC01.04 CC02.01 Reimbursable Agreements Non-Federal - PY06 Direct Accounts Receivable - PY05 Cynthia Smith Cynthia Smith Chris Watson Chris Watson Passed Passed CC02.02 CC03.01 CC03.02 CC03.03 CC03.04 CC03.05 Direct Accounts Receivable - PY06 Commercial Contract Supply - PY05 Commercial Contract Supply - PY06 Commercial Contract Service - PY05 Commercial Contract Service - PY06 Commercial Contract Supply & Service - PY05 Cynthia Smith Cynthia Smith Cynthia Smith Cynthia Smith Cynthia Smith Cynthia Smith Chris Watson Joyce Meyer Joyce Meyer Joyce Meyer Joyce Meyer Joyce Meyer Passed Passed Passed Passed Passed Passed CC03.06 Commercial Contract Supply & Service - PY06 Cynthia Smith Joyce Meyer Passed Page 81 CRP Execution Log Listing Sort String CC04.01 CC04.02 CC05.01 CRP Execution Log Grants Processing - PY05 Grants Processing - PY06 IDIQ Contract - PY05 NASA Owner Cynthia Smith Cynthia Smith Cynthia Smith Accenture Owner Joyce Meyer Joyce Meyer Joyce Meyer Status Passed Passed Passed CC05.02 IDIQ Contract - PY06 Month end Processing-Cost Pool Allocations PY05 Month end Processing-Cost Pool Allocations PY06 Cynthia Smith Joyce Meyer Passed CC06.01 Cynthia Smith Chris Watson Passed CC06.02 Cynthia Smith Chris Watson Passed CC07.01 Straight Line Accrual Processing - PY05 Cynthia Smith Chris Watson Passed CC07.02 CC08.01 Straight Line Accrual Processing - PY06 FI Invoices - PY05 Cynthia Smith Cynthia Smith Chris Watson Joyce Meyer Passed Passed CC08.02 CC09.01 CC09.02 FI Invoices - PY06 Travel Processing - PY05 Travel Processing - PY06 Cynthia Smith Cynthia Smith Cynthia Smith Joyce Meyer Joyce Meyer Joyce Meyer Passed Passed Passed CC10.01 De-obligate a COCD complete line item Cynthia Smith Joyce Meyer Passed Page 82 Appendix D: Other SIT Details SIT Terminology • Test Set  A series of Test Plans linked together to represent an end-to-end business process • Test Plan  Represents specific business functionality to be tested. All steps, expected and actual results are recorded within the Test Plan • Defect  A defect results when the actual results differ from the expected results. Defects will be tracked directly in Test Director Page 84

Related docs
The Importance of Learning Patience
Views: 8  |  Downloads: 0
The importance of Plan B
Views: 0  |  Downloads: 0
Change Management
Views: 746  |  Downloads: 81
IT-Change-Management
Views: 30  |  Downloads: 10
Change Management
Views: 446  |  Downloads: 0
THE IMPORTANCE OF STRATEGIC MANAGEMENT
Views: 3209  |  Downloads: 100
Other docs by thereader1948
Drugstorecom Inc Ammendments and By laws
Views: 292  |  Downloads: 1
CorpDocs-Board First Meeting Minutes California
Views: 460  |  Downloads: 23
Drug test consent form
Views: 385  |  Downloads: 12
Temporary help checklist
Views: 338  |  Downloads: 5
VERIFICATION
Views: 260  |  Downloads: 2
Employee Discipline Form
Views: 5953  |  Downloads: 211
Stock Subscription Package
Views: 427  |  Downloads: 30
Minutes of Special Meeting of Directors
Views: 206  |  Downloads: 5
Com21 Inc Ammendments and By laws
Views: 237  |  Downloads: 5