GE Energy
Gasification Business Overview
Edward Lowe General Manager, Gasification
GTC 2006
October 2006
Growing Gasification In Multiple Segments
IGCC/Coal to Power
• Low cost fuels/feedstock • Reduced emissions • Fuel diversity
Coal to Chemicals
Refinery Polygeneration
Coal to Liquids (CTL)
2/
Recent Successes: North America
North America
• Executed License Agreements: –DKRW, Medicine Bow, Wyoming CTL Project –Erora/Tenaska, Christian County, IL IGCC –Synenco Energy, Northern Lights Upgrader, Alberta, Canada –Pet coke to ammonia, Mosaic off take agreement • Executed Heads of Agreement with BP for Global Hydrogen to Power Projects. First gasification project proposed in Carson, CA.
3 /
Recent Successes: China
• Signed 4 coal-to-chemical licenses in China -Coal Mine Company: Coal to Methanol -Dalian: Coal to Ammonia -Private Company: Coal to Methanol -Shenmu II: Coal to Methanol • Successful startup of 3 coal-to-chemical plants in China -Sinopec Jinling: Coal/pet coke to ammonia -Shenmu: Coal to methanol -Sinopec Nanjing: Coal/pet coke to ammonia
China
4 /
GE Gasification & IGCC Experience Leadership
• Gasification leader since 1948 with 62 facilities operating worldwide • First coal gasification plant in 1978 • 21 gas turbines operating on synthesis gas, 900,000 operating hours • IGCC leader: >3 GW with GE technologies • >6 centuries team gasification experience 24 74 GE’s Gasification Experience ~120 Vessels In Operation
Plants Operating Plants in Design or Under Construction
Total Plants on All Fuels
Total Plants On Solid Fuels
5 /
Utilizing a Diverse Global Team …
300 Technologists
Irvine China Niskayuna Houston Houston India India Poland Poland
Houston, TX – process & product design & IGCC experience Niskayuna, NY – materials, design, system analysis Shanghai, China – materials, chemistry, instrumentation Schenectady, NY/ Salem, VA – controls, simulation Bangalore, India – computational, experimental Greenville, SC – design, adv materials & manufacturing Irvine, CA – gasification modeling & experimental experts Warsaw, Poland – reliability and maintenance analysis
… to lower CAPEX, plus increase efficiency & RAM
6/
Investing for Success
Step Increases in Product Development
10*$Y $Y 30*$Y (est.) 20*$Y
Headcount
300 250 200 150 100 50
g fin taf s
Avg/yr ‘01–‘04
0
‘05
‘06
‘07
0
Jun04
Dec05
Dec06
Gasification Technology
Power Generation Technology
Advanced Technologies
7/
IGCC Launch Plants Status
Gary Cleveland Fort Wayne
OHIO
Columbus Cincinnati
INDIANA WEST VIRGINIA
Indianapolis
Meigs County, Ohio
AEP IGCC Project
• 9/05 announced FEED study • 4Q06 FEED to be complete • 2012 expected commercial start up
Mason County, West Virginia
AEP IGCC Project
• 08/06 announced project • 12/06 FEED to be completed • 2011 expected commercial start up
Edwardsport, Indiana
Duke IGCC Project
• 03/06 announced FEED study • 1Q07 FEED to be complete • 2011 expected commercial start up*
*pending project approval
8 /
GE & Bechtel Alliance IGCC Reference Plant
Reference plant design
cycle system
Reference plant status
• ASU integration & plant performance models complete • Layout being optimized, MTOs underway • Cost estimates being finalized • Reference plant design 90% complete
• Nominal 630MW net plant output • RSC and GT preliminary designs complete Dec ‘06 • 7FB gas turbine combined • Fuel flexibility – Wide range of bituminous coals – Coal/coke blends
9 /
Reference Plant … Enhanced Coal Envelope Program Initiated
Leveraging from initial Reference Plant product – Gasification & heat recovery technology – Process & power island designs – Integrated plant models & cycle optimization – RAM modeling Economically optimizing for PRB Working with potential launch customer
From Energy Information Administration, Quarterly Coal Report, October 2006
1 / 0
GE and BP Signed HOA To Accelerate Use of Low Carbon Power Generation
Hydrogen Power Projects • Utilize advantaged fossil fuels (coal, petcoke) • Produce high H2 fuel gas to burn in gas turbines • Capture CO2 (~90%) • Utilize CO2 for Enhanced Oil Recovery (EOR) • Future storage in Saline Aquifers Value Through Collaboration • Combine technology company with an operations company • Leaders in gasification, power and CCS • 10 – 15 projects over next decade • Carson, CA is first gasification project
Carson Hydrogen Power Project
1 1/
GE Growing Across the Gasification Segments
Power Chemicals CTL Refining
Accelerating technology development Partnering with industry leaders Delivering commercial solutions