Jacobson and Olsen

Document Sample
Jacobson and Olsen Powered By Docstoc
					                                          Building Energy Strategy

Building Name                    Jacobson / Olsen Building
Year Constructed                 1975 / 1979 / 1989 / 1996
Gross Square Feet                31,639 / 4,412 / 2,843 / 45,499

#                         Exemptions                                  Summer                    Winter




    Unit        Service Area      Cool     Heat      System         Summer Hrs                 Winter Hrs
                                                      Type
AH01         Jacobson, Whole      Yes      Yes                 Run = 24/7                Run = 24/7
             Building
AH02         Olsen, South         Yes      Yes                 Run = 24/7                Run =24/7
             Meeting Room
AH03         Olsen, Ticket        Yes      Yes                 Run = 24/7                Run = 24/7
             Office / Locker
             Room
AH04         Olsen, Cyclone       Yes      Yes                 Run = 24/7                Run = 24/7
             locker room
AH05         Olsen, Strength /    Yes      Yes                 Run = 24/7                Run = 24/7
             Condition - West
AH06         Olsen, Strength /    Yes      Yes                 Run = 24/7                Run = 24/7
             Condition - East


 Unit              Service Area                                        Control Strategies
AH01        Jacobson, Whole Building       Local thermostat @ 78 degrees, 85 degrees lower limit summer, @ 68
                                           degrees, 60 degrees lower limit winter
AH02        Olsen, South Meeting Room      Local thermostat @ 78 degrees, 85 degrees lower limit summer, @ 68
                                           degrees, 60 degrees lower limit winter
AH03        Olsen, Ticket Office /         Local thermostat @ 78 degrees, 85 degrees lower limit summer, @ 68
            Locker Room                    degrees, 60 degrees lower limit winter
AH04        Olsen, Cyclone locker room     Local thermostat @ 78 degrees, 85 degrees lower limit summer, @ 68
                                           degrees, 60 degrees lower limit winter
AH05        Olsen, Strength / Condition    Local thermostat @ 78 degrees, 85 degrees lower limit summer, @ 68
            - West                         degrees, 60 degrees lower limit winter
AH06        Olsen, Strength / Condition    Local thermostat @ 78 degrees, 85 degrees lower limit summer, @ 68
            - East                         degrees, 60 degrees lower limit winter



     Date         Ex                             Energy Conservation Action(s) Taken
Jun. 12                 Adjusted local thermostats to 78 degrees
July 31, 2002           AHU1 = Changed Schedule (Don)
                        24/7
                        Run = 5am – 11pm, Thu
                        Run = 5am – 11pm, Fri
                        Run = 5am – 11pm, Sat
                        Run = 5am – 11pm, Sun
                        Run = 5am – 11pm, Holidays
July 31, 2002           AHU2 = Changed Schedule (Don)
                        24/7
                        Run = 5am – 11pm, Thu
                        Run = 5am – 11pm, Fri
                        Run = 5am – 11pm, Sat
                        Run = 5am – 11pm, Sun
                        Run = 5am – 11pm, Holidays
July 31, 2002           AHU3 = Changed Schedule (Don)
                        24/7
                        Run = 5am – 11pm, Thu
                        Run = 5am – 11pm, Fri
                        Run = 5am – 11pm, Sat
                        Run = 5am – 11pm, Sun
                        Run = 5am – 11pm, Holidays
May 27, 2004    -----   Summer schedule.
Nov. 24,        -----   Winter schedule.
2004




   Date                                      Building Energy System Notes
                Hot water, Large DX, AHU’s
                Set back domestic hot water temperature to 120 degrees
                Occupant “Last out/Lights off” process – mostly after hours ADP staff
June 12         Jacobson Building = DX cooling does not work properly. Design group is working on problem.
June 12         AH04 = Metasys does not start/stop unit, only monitor occupied status.
June 12         AH05 = Metasys does not start/stop unit.
June 12         AH06 = Metasys does not start/stop unit.
                Jacobson D/X unit Operational problems corrected by contractors
                 Potential Modifications for Future Improvements

          Date                           Jacobson / Olsen Building
Nov. 07           McQuay roof top air handling units AH04, 05, 06 = the interface
                  between McQuay air handling controller / Open Protocol Master unit and
                  Johnson Control Metasys Integrator unit is not very will understood,
                  therefore we can not schedule fans on/off.

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:0
posted:3/14/2013
language:English
pages:3