					                                                                                 Schedule Item Report - Gas

Trade   Sched Item Code   Short Title                   Specification                                         Unit of Measure Minimum Quantity Increment       Current Cost   Sch Item Eff   Sch Item Exp
                                                                                                                                                                              Dte            Dte
Gas     G2                RENEW TOP BURNER HEAD         SUPPLY AND INSTALL NEW CHEF TOP BURNER HEAD AND       EA                             1             1            51.05 01/07/2012
                          MUSHROOM STYLE (CHEF).        LEAVE IN WORKING ORDER.




Gas     G2A               RENEW TOP BURNER HEAD RING    SUPPLY AND INSTALL NEW TYPE CHEF BURNER HEAD SUITABLE EA                             1             1           163.60 01/07/2012
                          TYPE (CHEF)                   ON PREMIER MODELS AND LEAVE IN WORKING ORDER.




Gas     G4C               RENEW BURNER CAP (CHEF)       SUPPLY AND INSTALL NEW BURNER CAP TO CHEF STOVE.      EA                             1             1            46.05 01/07/2012




Gas     G7                GREASE AND OVERHAUL           STRIP DOWN, GREASE, OVERHAUL AND ADJUST MANIFOLD      ST                             1             1            36.80 01/07/2012
                          MANIFOLD COCKS.               COCKS AND LEAVE IN WORKINGORDER. USE APPROVED
                                                        LUBRICANT.




Gas     G11               RENEW GRILLER BURNER,(CHEF)   SUPPLY AND INSTALL NEW GRILL BURNER AND LEAVE IN      EA                             1             1            97.75 01/07/2012
                                                        WORKING ORDER.(CHEF).




                                                                                             Page 1 of 23
                                                                                Schedule Item Report - Gas

Trade   Sched Item Code   Short Title                  Specification                                         Unit of Measure Minimum Quantity Increment       Current Cost   Sch Item Eff   Sch Item Exp
                                                                                                                                                                             Dte            Dte
Gas     G12P              ADJUST AND CLEAN STOVE       ADJUST AND CLEAN STOVE BURNERS, PER SET, I.E. TOP     ST                             1             1            34.50 01/07/2012
                          BURNERS.                     BURNERS, GRILLER BURNER ANDIGNITION OR OVEN BURNER
                                                       AND IGNITION.




Gas     G17               RENEW GRILLER DOOR HINGE L/H SUPPLY AND INSTALL NEW GRILLER DOOR HINGE, LEFT OR    EA                             1             1            65.15 01/07/2012
                          OR R/H PLUS SPRING (CHEF).   RIGHT HAND. INCLUDES SPRING (CHEF)




Gas     G18               RENEW OVEN THERMOSTAT        SUPPLY AND INSTALL NEW OVEN THERMOSTAT AND LEAVE IN   EA                             1             1           191.60 01/07/2012
                          (CHEF).                      WORKING ORDER. (CHEF).




Gas     G20               ADJUST OVEN THERMOSTAT       ADJUST OVEN THERMOSTAT ONLY AND LEAVE IN WORKING      EA                             1             1            51.70 01/07/2012
                          ONLY.                        ORDER.




Gas     G21               RENEW PIEZO IGNITOR AND LEAD SUPPLY AND INSTALL NEW PIEZO IGNITOR TO STOVE AND     EA                             1             1           108.05 01/07/2012
                                                       LEAVE INWORKNG ORDER.




                                                                                             Page 2 of 23
                                                                                 Schedule Item Report - Gas

Trade   Sched Item Code   Short Title                   Specification                                          Unit of Measure Minimum Quantity Increment       Current Cost   Sch Item Eff   Sch Item Exp
                                                                                                                                                                               Dte            Dte
Gas     G25               RENEW OVEN DOOR HINGE AND     SUPPLY AND INSTALL NEW OVEN DOOR HINGE AND SPRING.     EA                             1             1            73.25 01/07/2012
                          SPRING (CHEF).                (CHEF).




Gas     G26A              RENEW OVEN DOOR SEAL          SUPPLY AND INSTALL NEW OVEN DOOR SEAL AND ADJUST FOR EA                               1             1            52.70 01/07/2012
                          (WESTINGHOUSE OR CHEF).       GOOD FIT. (WESTINGHOUSE OR CHEF).




Gas     G30               S.A.I. FLARED GAS ISOLATION   SUPPLY AND INSTALL NEW FLARED GAS ISOLATION COCK TO    EA                             1             1            42.95 01/07/2012
                          COCK (20MM).                  COMPLYWITH SUPPLY AUTHORITY REQUIREMENTS. (20MM)




Gas     G31               S.A.I. STOVE RESTRAINING CHAIN. SUPPLY AND INSTALL NEW APPROVED CLOSED LINK          EA                             1             1            29.45 01/07/2012
                                                          RESTRAINING CHAIN TO STOVE WHEN DIRECTED.




Gas     G32               S.A.I. ANTI TILTING BRACKET   SUPPLY AND INSTALL NEW APPROVED ANTI TILTING BRACKET   EA                             1             1            66.40 01/07/2012
                          (BRICK).                      TO STOVE AND BRICK WALL.




                                                                                              Page 3 of 23
                                                                                  Schedule Item Report - Gas

Trade   Sched Item Code   Short Title                   Specification                                           Unit of Measure Minimum Quantity Increment       Current Cost   Sch Item Eff   Sch Item Exp
                                                                                                                                                                                Dte            Dte
Gas     G33               S.A.I. ANTI TILTING BRACKET   SUPPLY AND INSTALL NEW APPROVED ANTI TILTING BRACKET    EA                             1             1           115.25 01/07/2012
                          (TIMBER)                      TO STOVE AND TIMBERFRAMED WALL COMPLETE WITH 38 X
                                                        6MM FLAT BAR FIXED TO TWO STUDS TO SECURECATCHING
                                                        BODY.




Gas     G33C              S.A.I. ANTI-TILTING BRACKET   SUPPLY AND INSTALL ANTI-TILTING BRACKET (FLOOR TYPE).   EA                             1             1            59.50 01/07/2012
                          (FLOOR TYPE)                  SECURLEY FIXED TO FLOOR ASPER MANUFACTURERS
                                                        INSTRUCTIONS.




Gas     G34               RENEW NATURAL GAS STOVE       REMOVE EXISTING STOVE AND REPLACE WITH STOVE T.B.S.    EA                              1             1           103.90 01/07/2012
                          T.B.S.                        CONNECT TO EXISTING SUPPLYPOINT. RATE DOES NOT INCLUDE
                                                        GAS TEST. RATE INCLUDES REFIXING BRACKET AND CHAIN.
                                                        CONTRACTOR TO AFFIX STICKER TO NEW STOVE SHOWING
                                                        DATE OF INSTALLATION AND SIGNATURE OF INSTALLER.




Gas     G34B              CARRY STOVE ABOVE GROUND      CARRY STOVE ABOVE GROUND FLOOR                          EA                             1             1            17.25 01/07/2012
                          FLOOR




Gas     G34C              RENEW GAS UPRIGHT STOVE       REMOVE EXISTING STOVE AND REPLACE WITH STOVE T.B.S.    EA                              1             1           103.90 01/07/2012
                          (L.P.G.) T.B.S.               CONNECT TO EXISTING SUPPLYPOINT. RATE DOES NOT INCLUDE
                                                        GAS TEST. RATE INCLUDES REFIXING BRACKETAND CHAIN.
                                                        CONTRACTOR TO AFFIX STICKER TO NEW STOVE SHOWING
                                                        DATE OF INSTALLATION AND SIGNATURE OF INSTALLER.




                                                                                               Page 4 of 23
                                                                                Schedule Item Report - Gas

Trade   Sched Item Code   Short Title                  Specification                                          Unit of Measure Minimum Quantity Increment       Current Cost   Sch Item Eff   Sch Item Exp
                                                                                                                                                                              Dte            Dte
Gas     G34E              RENEW GAS ELEVATED STOVE     REMOVE EXISTING STOVE AND REPLACE WITH STOVE T.B.S.    EA                             1             1            74.00 01/07/2012
                          (NATURAL GAS) T.B.S.         CONNECT TO EXISTING SUPPLYPOINT. RATE DOES NOT INCLUDE
                                                       GAS TEST. RATE INCLUDES REFIXING ANTI-TILT BRACKETAND
                                                       CHAIN. CONTRACTOR TO AFFIX STICKER TO NEW STOVE
                                                       SHOWING DATE OF INSTALLATION AND SIGNATURE OF
                                                       INSTALLER.




Gas     G34F              RENEW GAS ELEVATED STOVE     REMOVE EXISTING STOVE AND REPLACE WITH STOVE T.B.S.    EA                             1             1            74.00 01/07/2012
                          (L.P.G.) T.B.S.              CONNECT TO EXISTING SUPPLYPOINT. RATE DOES NOT INCLUDE
                                                       GAS TEST. RATE INCLUDES REFIXING ANTI-TILT BRACKET AND
                                                       CHAIN. CONTRACTORTO AFFIX STICKER TO NEW STOVE
                                                       SHOWING DATE OF INSTALLATION AND SIGNATURE OF
                                                       INSTALLER.




Gas     G34G              RENEW GAS COOKTOP (S.A.I.)   REMOVE EXISTING THEN SUPPLY AND INSTALL NEW APPROVED EA                               1             1           536.00 01/07/2012
                                                       GAS COOK TOP. DISPOSE OF EXISTING. INCLUDES TIME TO
                                                       ALTER BENCHTOP CUT OUT WHEN REQUIRED.CONTRACTOR TO
                                                       AFFIX STICKER TO THE UNDERNEATH OF THE
                                                       COOKTOPSHOWING DAYE OF INSTALLATION AND SIGNATURE
                                                       OF INSTALLER.




Gas     G35               RENEW GAS STOVE. S.A.I.      REMOVE EXISTING STOVE & SUPPLY AND INSTALL NEW        EA                              1             1          1433.30 01/07/2012
                                                       APPROVED UPRIGHT GAS STOVE. CONNECT TO EXISTING
                                                       SUPPLYPOINT. GAS TEST NOT INCLUDED. INCLUDES REFIXING
                                                       BRACKET AND CHAIN ANDPICK-UP FEE. CONTRACTOR TO AFFIX
                                                       STICKER TO NEW STOVE SHOWING DATE OFINSTALLATION AND
                                                       SIGNATURE OF INSTALLER.




Gas     G35A              RENEW GAS STOVE S.A.I.       REMOVE EXISTING ELEVATED STOVE & SUPPLY AND INSTALL     EA                            1             1          2217.70 01/07/2012
                          (ELEVATED)                   NEW APPROVED ELEVATED GAS STOVE. CONNECT TO TO
                                                       EXISTING POINT.ITEM DOES NOT INCLUDE GAS TEST. INCLUDES
                                                       REFIXING ANTI-TILT BRACKET AND PICKUPFEE. CONTRACTOR
                                                       TO AFFIXSTICKER TO NEW STOVE SHOWING DATE OF
                                                       INSTALLATION ANDSIGNATURE OF INSTALLER.




                                                                                             Page 5 of 23
                                                                                Schedule Item Report - Gas

Trade   Sched Item Code   Short Title                  Specification                                           Unit of Measure Minimum Quantity Increment       Current Cost   Sch Item Eff   Sch Item Exp
                                                                                                                                                                               Dte            Dte
Gas     G39A              S.A.I. FLEXIBLE LEAD.        SUPPLY AND INSTALL 900 MM FLEXIBLE GAS LEAD TO STOVE    EA                             1             1            63.50 01/07/2012
                                                       INCLUDING FITTINGS.




Gas     G43P              TEST GAS SERVICE.            CARRY OUT PRESSURE TEST ON GAS SERVICE AS REQUIRED BY   EA                             1             1            34.50 01/07/2012
                                                       GAS AUTHORITY REGULATIONS.




Gas     G51               ADJUST HOT WATER UNIT.       MAKE ALL NECESSARY ADJUSTMENTS TO HOT WATER UNIT       EA                              1             1            41.70 01/07/2012
                                                       AND LEAVE IN WORKING ORDER.THIS ITEM NOT TO BE USED AS
                                                       RELIGHT ONLY.




Gas     G52               CLEAN HOT WATER UNIT         DISMANTLE UNIT, SCRUB COMBUSTION CHAMBERCLEAN JETS, EA                                 1             1            69.30 01/07/2012
                          CHAMBER AND BURNERS FULL     REASSEMBLE, MAKE ALLADJUSTMENTS AND LEAVE IN
                          SERVICE INCLUDES G50 & G51   WORKING ORDER. ITEMS REPLACED TO BE CHARGED TO
                                                       THEAPPROPRIATE SCHEDULED ITEM. AFFIXSERVICE LABEL
                                                       SHOWING APPROPRIATE DATEAND SIGNATURE. * NOTE: NO
                                                       MAJOR SERVICE TO BE CARRIED OUT WITHIN ONE YEAR OF
                                                       DATE SHOWN ONSERVICE STICKER WITHOUT AUTHORITY. FULL
                                                       SERVICE INCLUDES G50 & G51.


Gas     G54A              RENEW HOT WATER UNIT         RENEW WATER DIAPHRAGM INCLUDING WASHERS (EVERDURE). EA                                 1             1            85.55 01/07/2012
                          DIAPHRAGM (EVERDURE)




                                                                                             Page 6 of 23
                                                                                  Schedule Item Report - Gas

Trade   Sched Item Code   Short Title                   Specification                                            Unit of Measure Minimum Quantity Increment       Current Cost   Sch Item Eff   Sch Item Exp
                                                                                                                                                                                 Dte            Dte
Gas     G54B              RENEW HOT WATER UNIT          RENEW WATER DIAPHRAGM, INCLUDING WASHERS (BOSCH).        EA                             1             1            33.65 01/07/2012
                          DIAPHRAGM -BOSCH (YELLOW
                          KIT)




Gas     G56A              RENEW HOT WATER UNIT WATER SUPPLY AND INSTALL NEW WATER QUANTITY REGULATOR TO          EA                             1             1            75.50 01/07/2012
                          QUANTITY REGULATOR         WATER VALVE INCLUDINGWASHERS.




Gas     G57               RENEW SLOW IGNITION DEVICE    SUPPLY AND INSTALL NEW SLOW IGNITION DEVICE AND LEAVE EA                                1             1            72.90 01/07/2012
                          (EVERDURE)                    IN WORKING ORDER (EVERDURE)




Gas     G60               INSTALL "O" RING TO BOSCH HOT S.A.I NEW "O" RING TO BOSCH HOT WATER UNIT AS REQUIRED   EA                             1             0            22.35 01/07/2012
                          WATER UNIT




Gas     G61A              RENEW HOT WATER UNIT          SUPPLY AND INSTALL NEW THERMOCOUPLE TO PILOT BURNER. EA                                 1             1            81.60 01/07/2012
                          THERMOCOUPLE




                                                                                               Page 7 of 23
                                                                                 Schedule Item Report - Gas

Trade   Sched Item Code   Short Title                   Specification                                            Unit of Measure Minimum Quantity Increment       Current Cost   Sch Item Eff   Sch Item Exp
                                                                                                                                                                                 Dte            Dte
Gas     G61C              RENEW HYDROPOWER              SUPPLY AND INSTALL NEW HYDROPOWER GENERATOR TO           EA                             1             1           312.80 01/07/2012
                          GENERATOR (BOSCH)             BOSCH HOT WATER UNIT AND LEAVE IN WORKING ORDER.




Gas     G61D              RENEW IGNITION PACK (BOSCH)   SUPPLY AND INSTALL NEW BOSCH HOT WATER UNIT BATTERY      EA                             1             1           296.35 01/07/2012
                                                        IGNITIONPACK AND LEAVE IN WORKING ORDER.




Gas     G62A              RENEW HOT WATER UNIT PIEZO    SUPPLY AND INSTALL NEW PIEZO IGNITION TO GAS VALVE       EA                             1             1            44.00 01/07/2012
                          IGNITION (EVERDURE)           SECTION (EVERDURE).




Gas     G62B              RENEW HOT WATER UNIT PIEZO    RENEW PIEZO IGNITION TO GAS VALVE SECTION AND LEAVE IN   EA                             1             1            95.40 01/07/2012
                          IGNITION (BOSCH)              WORKING ORDER.(BOSCH).




Gas     G63A              INSTALL OVER TEMPERATURE      S.A.I NEW OVER TEMPERATURE SWITCH AND LEAVE IN           EA                             1             0            77.90 01/07/2012
                          SWITCH                        WORKINGORDER




                                                                                              Page 8 of 23
                                                                                 Schedule Item Report - Gas

Trade   Sched Item Code   Short Title                  Specification                                             Unit of Measure Minimum Quantity Increment       Current Cost   Sch Item Eff   Sch Item Exp
                                                                                                                                                                                 Dte            Dte
Gas     G66               RENEW GAS E.B.F. HOT WATER   INSTALL NEW GAS HOT WATER UNIT AND CONNECT TO             EA                             1             1            63.65 01/07/2012
                          UNIT (NATURAL GAS) T.B.S.    EXISTING SERVICE. INACCORDANCE WITH GAS AND WATER
                                                       AUTHORITY REGULATIONS. UNIT T.B.S. PARTS USED INPIPING
                                                       ALTERATIONS TO BE CHARGED AT TRADE COST. CONTRACTOR
                                                       TO AFFIX STICKERTO NEW APPLIANCE SHOWING DATE OF
                                                       INSTALLATION AND SIGNATURE OF INSTALLER.




Gas     G66B              RENEW GAS E.B.F. HOT WATER   INSATLL NEW GAS HOT WATER UNIT AND CONNECT TO             EA                             1             1            63.65 01/07/2012
                          UNIT (L.P.G.) T.B.S.         EXISTING SERVICE IN ACCORDANCE WITH GAS AND WATER
                                                       AUTHORITY REGULATIONS. UNIT T.B.S. PARTS USED IN PIPING
                                                       ALTERATIONS TO BE CHARGED AT TRADE COST. CONTRACTOR
                                                       TO AFFIX STICKER TO NEW APPLIANCE SHOWING DATE OF
                                                       INSTALLATION AND SIGNATURE OF INSTALLER.




Gas     G66D              RENEW GAS INTERNAL HOT       INSTALL NEW GAS HOT WATER UNIT AND CONNECT TO             EA                             1             1            91.20 01/07/2012
                          WATER UNIT (NATURAL GAS)     EXISTING SERVICE. INACCORDANCE WITH GAS AND WATER
                          T.B.S.                       AUTHORITY REGULATIONS. UNIT T.B.S. PARTS USED INPIPING
                                                       ALTERATIONS TO BE CHARGED AT TRADE COST. CONTRACTOR
                                                       TO AFFIX STICKERTO NEW APPLIANCE SHOWING DATE OF
                                                       INSTALLATION AND SIGNATURE OF INSTALLER.




Gas     G66E              RENEW GAS INTERNAL HOT       INSTALL NEW GAS HOT WATER UNIT AND CONNECT TO             EA                             1             1            91.20 01/07/2012
                          WATER UNIT (L.P.G.) T.B.S.   EXISTING SERVICE. INACCORDANCE WITH GAS AND WATER
                                                       AUTHORITY REGULATIONS. UNIT T.B.S. PARTS USED INPIPING
                                                       ALTERATIONS TO BE CHARGED AT TRADE COST. CONTRACTOR
                                                       TO AFFIX STICKERTO NEW APPLIANCE SHOWING DATE OF
                                                       INSTALLATION AND SIGNATURE OF INSTALLER.




Gas     G66F              RENEW 90 LITRE GAS STORAGE   REMOVE EXISTING & INSTALL NEW GAS HOT WATER UNIT AND EA                                  1             1           160.30 01/07/2012
                          HOT WATER UNIT (NATURAL GAS) CONNECT TO EXISTING SERVICE. INACCORDANCE WITH GAS
                          T.B.S.                       AND WATER AUTHORITY REGULATIONS. UNIT T.B.S. PARTS
                                                       USED INPIPING ALTERATIONS TO BE CHARGED AT TRADE COST.
                                                       CONTRACTOR TO AFFIX STICKERTO NEW APPLIANCE SHOWING
                                                       DATE OF INSTALLATION AND SIGNATURE OF INSTALLER.




                                                                                              Page 9 of 23
                                                                                   Schedule Item Report - Gas

Trade   Sched Item Code   Short Title                      Specification                                        Unit of Measure Minimum Quantity Increment       Current Cost   Sch Item Eff   Sch Item Exp
                                                                                                                                                                                Dte            Dte
Gas     G66G              RENEW 90 LITRE GAS STORAGE       REMOVE EXISTING & INSTALL NEW GAS HOT WATER UNIT AND EA                             1             1           160.30 01/07/2012
                          HOT WATER UNIT (L.P.G.) T.B.S.   CONNECT TO EXISTING SERVICE. INACCORDANCE WITH GAS
                                                           AND WATER AUTHORITY REGULATIONS. UNIT T.B.S. PARTS
                                                           USED INPIPING ALTERATIONS TO BE CHARGED AT TRADE COST.
                                                           CONTRACTOR TO AFFIX STICKERTO NEW APPLIANCE SHOWING
                                                           DATE OF INSTALLATION AND SIGNATURE OF INSTALLER.




Gas     G66H              RENEW 135 LITRE GAS STORAGE REMOVE EXISTING & INSTALL NEW GAS HOT WATER UNIT AND EA                                  1             1           177.55 01/07/2012
                          HOT WATER UNIT (NATURAL GAS) CONNECT TO EXSITING SERVICE. INACCORDANCE WITH GAS
                          T.B.S.                       AND WATER AUTHORITY REGULATIONS. UNIT T.B.S. PARTS
                                                       USED INPIPING ALTERATIONS TO BE CHARGED AT TRADE COST.
                                                       CONTRACTOR TO AFFIX STICKERTO NEW APPLIANCE SHOWING
                                                       DATE OF INSTALLATION AND SIGNATURE OF INSTALLER.




Gas     G66I              RENEW 135 LITRE GAS STORAGE      REMOVE EXSISTING & INSTALL NEW GAS HOT WATER UNIT AND EA                            1             1           177.55 01/07/2012
                          HOT WATER UNIT (L.P.G.) T.B.S.   CONNECT TO EXISTING SERVICE. INACCORDANCE WITH GAS
                                                           AND WATER AUTHORITY REGULATIONS. UNIT T.B.S. PARTS
                                                           USED INPIPING ALTERATIONS TO BE CHARGED AT TRADE COST.
                                                           CONTRACTOR TO AFFIX STICKERTO NEW APPLIANCE SHOWING
                                                           DATE OF INSTALLATION AND SIGNATURE OF INSTALLER.




Gas     G67               RENEW GAS HOT WATER UNIT         REMOVE EXISTING & INSTALL NEW INSTANTANEOUS           EA                            1             1           830.90 01/07/2012
                          S.A.I. (EXTERNAL)                EXTERNAL GAS H.W.U ANDCONNECT TOEXISTING SERVICE. IN
                                                           ACCORDANCE WITH GAS AND WATERAUTHORITY
                                                           REGULATIONS. PARTSUSED IF PIPING ALTERATIONS ARE
                                                           REQUIRED TO BE CHARGED GMAT AT TRADE
                                                           COST.CONTRACTOR TO AFFIX STICKER TO APPLIANCE SHOWING
                                                           DATE OF INSTALLATION ANDSIGNATURE OF INSTALLER.




Gas     G67A              RENEW GAS HOT WATER UNIT         REMOVE EXISTING & SUPPLY AND INSTALL NEW             EA                             1             1           860.40 01/07/2012
                          S.A.I. (INST. INTERNAL)          INSTANTANEOUS INTERNAL GAS H.W.U ANDCONNECT
                                                           TOEXISTING SERVICE. IN ACCORDANCE WITH GAS AND
                                                           WATERAUTHORITY REGULATIONS. PARTSUSED IF PIPING
                                                           ALTERATIONS ARE REQUIRED TO BE CHARGED GMAT AT TRADE
                                                           COST RATE.CONTRACTOR TO AFFIX STICKER TO APPLIANCE
                                                           SHOWING DATE OFINSTALLATION ANDSIGNATURE OF
                                                           INSTALLER.




                                                                                               Page 10 of 23
                                                                                 Schedule Item Report - Gas

Trade   Sched Item Code   Short Title                  Specification                                             Unit of Measure Minimum Quantity Increment       Current Cost   Sch Item Eff   Sch Item Exp
                                                                                                                                                                                 Dte            Dte
Gas     G68               RENEW GAS HOT WATER UNIT     REMOVE EXISTING & SUPPLY AND INSTALL APPROVED         EA                                 1             1          1161.30 01/07/2012
                                                       EXTERNAL GAS STORAGE H.W.U (90LITRE) COMPLETE WITHALL
                                                       FITTINGS IN ACCORDANCE WITH GAS AND WATER AUTHORITY
                                                       REGULATIONS. CONTRACTORTO AFFIX STICKER TO APPLIANCE
                                                       SHOWING DATE OF INSTALLATION AND SIGNATURE
                                                       OFINSTALLER.




Gas     G68A              SAI 2XGRAVEL PITS FOR        SUPPLY AND INSTALL 2 X GRAVLE PITS FOR DISCHARGE FROM EA                                 1             1            57.60 01/07/2012
                          CONTAINMENT OF DISCHARGE     RELIEFDRAIN LINES FITTED TO STORAGE HOT WATER HEATER.
                          FROM RELIEF DRAIN LINES      CONTRACTOR TO INSTALL PITS DIRECTLY UNDER DRAIN LINES.
                          FITTED TO STOR. HWU          ITEM INCLUDES 2 X100MM FINISHING COLLAR AND 2 X 100MM X
                                                       250MM. ADDITIONAL HALF AN HOUR MAY BE CLIAMED WHEN
                                                       INSTALLING PITS INTO CONCRETE OR PAVING.




Gas     G69               RENEW GAS HOT WATER UNIT     REMOVE EXISTING & SUPPLY AND INSTALL APPROVED GAS         EA                             1             1          1281.05 01/07/2012
                          (STORAGE).                   STORAGE H.W.U (135 LITRE) COMPLETE WITH ALLFITTINGS. IN
                                                       ACCORDANCE WITH GAS AND WATER AUTHORITY
                                                       REGULATIONS. CONTRACTORTO AFFIX STICKER TO APPLIANCE
                                                       SHOWING DATE OF INSTALLATION AND SIGNATURE
                                                       OFINSTALLER.




Gas     G70               RENEW TEMPERING VALVE        SUPPLY AND INSTALL NEW TEMPERING VALVE FOR STORAGE        EA                             1             1           152.00 01/07/2012
                          STORAGE                      HOT WATERUNIT AND LEAVE IN WORKING CONDITION.




Gas     G70A              S.A.I. NEW CONTINUOUS FLOW   REMOVE EXISTING & SUPPLY AND INSTALL NEW EXTERNAL      EA                                1             1           986.25 01/07/2012
                          HOT WATER UNIT TO SINGLE     CONTINUOUS FLOW HOT WATERUNIT AND CONNECT TO
                          BATHROOM DWELLING            EXISTING SERVICE IN ACCORDANCE WITH GAS AND WATER
                                                       AUTHORITY REGULATIONS.UNIT TO BE PRE-SET AT 50 DEGREES
                                                       CELSIUS. ADDITIONAL PIPE AND FITTINGS TO BE CHARGED
                                                       GMAT AT TRADE COST. CONTRACTOR TO AFFIX STICKER TO
                                                       APPLIANCE SHOWING DATE OF INSTALLATION AND SIGNATURE
                                                       OF INSTALLER. LIAISE WITH ELECTRICIAN FOR WEATHERPROOF
                                                       POWER POINT.




                                                                                             Page 11 of 23
                                                                                            Schedule Item Report - Gas

Trade   Sched Item Code   Short Title                    Specification                                                              Unit of Measure Minimum Quantity Increment       Current Cost   Sch Item Eff   Sch Item Exp
                                                                                                                                                                                                    Dte            Dte
Gas     G70B              S.A.I. NEW CONTINUOUS FLOW     REMOVE EXISTING & SUPPLY AND INSTALL NEW EXTERNAL      EA                                                 1             1          1267.90 01/07/2012
                          HOT WATER UNIT TO DOUBLE       CONTINUOUS FLOW HOT WATER UNIT AND CONNECT TO
                          BATHROOM DWELLING              EXISTING SERVICE IN ACCORDANCE WITH GAS AND WATER
                                                         AUTHORITY REGULATIONS.UNIT TO BE PRE-SET AT 50 DEGREES
                                                         CELSIUS. ADDITIONAL PIPE AND FITTINGS TO BE CHARGED
                                                         GMAT AT TRADE COST. CONTRACTOR TO AFFIX STICKER TO
                                                         APPLIANCE SHOWING DATE OF INSTALLATION AND SIGNATURE
                                                         OF INSTALLER. LIAISE WITH ELECTRICIAN FOR WEATHERPROOF
                                                         POWER POINT.

Gas     G70C              RENEW TEMPERING VALVE          SUPPLY AND INSTALL NEW TEMPERING VALVE FOR                                 EA                             1             1           219.50 01/07/2012
                          INSTANTANEOUS                  INSTANTANEOUSHOT WATER UNIT AND LEAVE IN WORKING
                                                         CONDITION.




Gas     G72               SAI NEW PRESSURE REDUCING      Install RCM pressure reducing valve model SYR31215 to inlet of hot water   EA                             1             1           124.20 01/07/2012
                          VALVE WHERE REQUIRED           unit




Gas     G80               INSTALL NEW 16-18 LITRE NAT.   REMOVE EXISTING HOT WATER UNIT & INSTALL NEW 16-18                         EA                             1             1            74.00 01/07/2012
                          GAS CONTINUOUS FLOW HWU        LITRE EXTERNAL CONTINUOUS FLOW HOT WATERUNIT AND
                          FOR SINGLE BATHROOM AS         CONNECT TO EXISTING SERVICE. UNIT TO BE PRESET AT 50
                          DIRECTED. TBS                  DEGREES CELCIUS. CONTRACTOR TO AFFIX STICKER TO
                                                         APPLIANCESHOWING DATE OF INSTALLATION AND SIGNATURE
                                                         OF INSTALLER. LIASE WITH ELECTRICIAN FOR WEATHERPROOF
                                                         POWER POINT IF REQUIRED




Gas     G80A              RENEW ROOM HEATER              SUPPLY AND INSTALL NEW THERMOCOUPLE AND LEAVE IN                           EA                             1             1           183.50 01/07/2012
                          THERMOCOUPLE.                  WORKING ORDER.




                                                                                                            Page 12 of 23
                                                                                      Schedule Item Report - Gas

Trade   Sched Item Code   Short Title                        Specification                                           Unit of Measure Minimum Quantity Increment       Current Cost   Sch Item Eff   Sch Item Exp
                                                                                                                                                                                     Dte            Dte
Gas     G81               INSTALL NEW 16-18 LITRE L.P. GAS   REMOVE EXISTING HOT WATER UNIT & INSTALL NEW 16-18      EA                             1             1            74.00 01/07/2012
                          CONTINUOUS FLOW HWU FOR            LITRE EXTERNAL CONTINUOUS FLOW HOT WATERUNIT AND
                          SINGLE BATHROOM AS DIRECTED.       CONNECT TO EXISTING SERVICE. UNIT TO BE PRESET AT 50
                          TBS                                DEGREES CELCIUS. CONTRACTOR TO AFFIX STICKER TO
                                                             APPLIANCESHOWING DATE OF INSTALLATION AND SIGNATURE
                                                             OF INSTALLER. LIASE WITH ELECTRICIAN FOR WEATHERPROOF
                                                             POWER POINT IF REQUIRED




Gas     G82               INSTALL NEW 20-24 LITRE NAT.       REMOVE EXISTING HOT WATER UNIT & INSTALL NEW 20-24      EA                             1             1            74.00 01/07/2012
                          GAS CONTINUOUS FLOW HWU            LITRE EXTERNAL CONTINUOUS FLOW HOT WATERUNIT AND
                          FOR DOUBLE BATHROOM AS             CONNECT TO EXISTING SERVICE. UNIT TO BE PRESET AT 50
                          DIRECTED. TBS                      DEGREES CELCIUS. CONTRACTOR TO AFFIX STICKER TO
                                                             APPLIANCESHOWING DATE OF INSTALLATION AND SIGNATURE
                                                             OF INSTALLER. LIASE WITH ELECTRICIAN FOR WEATHERPROOF
                                                             POWER POINT IF REQUIRED




Gas     G83               INSTALL NEW 20-24 LITRE L.P. GAS   REMOVE EXISTING HOT WATER UNIT & INSTALL NEW 20-24      EA                             1             1            74.00 01/07/2012
                          CONTINUOUS FLOW HWU FOR            LITRE EX TERNAL CONTINUOUS FLOW HOT WATERUNIT AND
                          DOUBLE BATHROOM AS                 CONNECT TO EXISTING SERVICE. UNIT TO BE PRESET AT 50
                          DIRECTED. TBS                      DEGREES CELCIUS. CONTRACTOR TO AFFIX STICKER TO
                                                             APPLIANCESHOWING DATE OF INSTALLATION AND SIGNATURE
                                                             OF INSTALLER. LIASE WITH ELECTRICIAN FOR WEATHERPROOF
                                                             POWER POINT IF REQUIRED




Gas     G86               CLEAN AND ADJUST ROOM              CLEAN BURNERS, CHECK AND ADJUST HEATER AND LEAVE IN     EA                             1             1            52.05 01/07/2012
                          HEATER                             WORKING ORDER. AFFIX SERVICE STICKER.




Gas     G88G              INSTALL 13 MJ CONVECTION           REMOVE EXISTING & INSTALL NEW GAS ROOM HEATER AND       EA                             1             1            45.00 01/07/2012
                          ROOM HEATER (NAT. GAS) T.B.S.      CONNECT TO EXISTING CONNECTI ON. UNIT T.B.S.WHERE
                                                             ALTERATION TO CONNECTION IS REQUIRED PARTS TO BE
                                                             CHARGED GMAT. AT TRADE COST. (NOT INCLUDING
                                                             VENTILATION).CONTRACTOR TO AFFIX STICKER TO APPLIANCE
                                                             SHOWING DATEOF INSTALLATION AND SIGNATURE OF
                                                             INSTALLER.




                                                                                                  Page 13 of 23
                                                                                 Schedule Item Report - Gas

Trade   Sched Item Code   Short Title                   Specification                                           Unit of Measure Minimum Quantity Increment       Current Cost   Sch Item Eff   Sch Item Exp
                                                                                                                                                                                Dte            Dte
Gas     G88H              INSTALL 13 MJ CONVECTION      REMOVE EXISTING & INSTALL NEW GAS ROOM HEATER AND       EA                             1             1            45.00 01/07/2012
                          ROOM HEATER (L.P.G.) T.B.S.   CONNECT TO EXISTING CONNECTION. UNIT T.B.S.WHERE
                                                        ALTERATION TO CONNECTION IS REQUIRED PARTS TO BE
                                                        CHARGED GMAT. AT TRADE COST. (NOT INCLUDING
                                                        VENTILATION).CONTRACTOR TO AFFIX STICKER TO APPLIANCE
                                                        SHOWING DATEOF INSTALLATION AND SIGNATURE OF
                                                        INSTALLER.




Gas     G88I              INSTALL 21 MJ CONVECTION      INSTALL NEW GAS ROOM HEATER AND CONNECT TO EXISTING EA                                 1             1            45.00 01/07/2012
                          ROOM HEATER TO GROH           CONNECTION. UNIT T.B.S.WHERE ALTERATION TO CONNECTION
                          PROPERTY (NAT. GAS) T.B.S.    IS REQUIRED PARTS TO BE CHARGED GMAT. AT TRADE COST.
                                                        (NOT INCLUDING VENTILATION).CONTRACTOR TO AFFIX
                                                        STICKER TO APPLIANCE SHOWING DATEOF INSTALLATION AND
                                                        SIGNATURE OF INSTALLER.




Gas     G88J              INSTALL 21 MJ CONVECTION      REMOVE EXISTING & INSTALL NEW GAS ROOM HEATER AND       EA                             1             1            45.00 01/07/2012
                          ROOM HEATER TO GROH           CONNECT TO EXISTING CONNECTION. UNIT T.B.S.WHERE
                          PROPERTY (L.P.G.) T.B.S.      ALTERATION TO CONNECTION IS REQUIRED PARTS TO BE
                                                        CHARGED GMAT. AT TRADE COST. (NOT INCLUDING
                                                        VENTILATION).CONTRACTOR TO AFFIX STICKER TO APPLIANCE
                                                        SHOWING DATEOF INSTALLATION AND SIGNATURE OF
                                                        INSTALLER.




Gas     G88K              RENEW 13MJ GAS CONVECTION     REMOVE EXISTING & SUPPLY AND INSTALL NEW GAS ROOM    EA                                1             1           685.05 01/07/2012
                          ROOM HEATER (NAT. GAS)        HEATER AND CONNECT TO EXISTING CONNECTION.TYPE AS
                                                        APPROVED FOR HOMESWEST PROPERTIES. WHERE ALTERATION
                                                        TOCONNECTION IS REQUIRED PARTS TO CHARGED GMAT AT
                                                        TRADE COST. CONTRACTOR TO AFFIX STICKER TO APPLIANCE
                                                        SHOWING DATE OF INSTALLATION AND SIGNATURE OF
                                                        INSTALLER.




Gas     G88L              RENEW 21 MJ GAS CONVECTION   REMOVE EXISTING & SUPPLY AND INSTALL NEW GAS ROOM        EA                             1             1           996.75 01/07/2012
                          ROOM HEATER (GROH) - NAT.GAS HEATER AND CONNECT TO EXISTING CONNECTION.
                                                       ROOMHEATER TO BE G.R.O.H. STANDARD, I.E. A MINIMUM OF 21
                                                       MJ/HR GAS CONSUMPTION. TOBE FAN FORCED. WHERE
                                                       ALTERATION TO CONNECTION IS REQUIRED, PARTS TO BE
                                                       CHARGED GMAT AT TRADE COST. CONTRACTOR TO AFFIX
                                                       STICKER SHOWING DATE OF INSTALLATION AND SIGNATURE OF
                                                       INSTALLER.




                                                                                             Page 14 of 23
                                                                                               Schedule Item Report - Gas

Trade   Sched Item Code   Short Title                          Specification                                                        Unit of Measure Minimum Quantity Increment       Current Cost   Sch Item Eff   Sch Item Exp
                                                                                                                                                                                                    Dte            Dte
Gas     G88M              RENEW 13MJ GAS CONVECTION            REMOVE EXISTING & SUPPLY AND INSTALL NEW GAS ROOM    EA                                             1             1           685.05 01/07/2012
                          ROOM HEATER (L.P.G.)                 HEATER AND CONNECT TO EXISTING CONNECTION.TYPE AS
                                                               APPROVED FOR HOMESWEST PROPERTIES. WHERE ALTERATION
                                                               TOCONNECTION IS REQUIRED PARTS TO CHARGED GMAT AT
                                                               TRADE COST. CONTRACTOR TO AFFIX STICKER TO APPLIANCE
                                                               SHOWING DATE OF INSTALLATION AND SIGNATURE OF
                                                               INSTALLER.




Gas     G88N              RENEW 21 MJ GAS CONVECTION           REMOVE EXISTING & SUPPLY AND INSTALL NEW GAS ROOM        EA                                         1             1           996.75 01/07/2012
                          ROOM HEATER (GROH) - L.P.G.          HEATER AND CONNECT TO EXISTING CONNECTION.
                                                               ROOMHEATER TO BE G.R.O.H. STANDARD, I.E. A MINIMUM OF 21
                                                               MJ/HR GAS CONSUMPTION. TOBE FAN FORCED. WHERE
                                                               ALTERATION TO CONNECTION IS REQUIRED, PARTS TO BE
                                                               CHARGED GMAT AT TRADE COST. CONTRACTOR TO AFFIX
                                                               STICKER SHOWING DATE OF INSTALLATION AND SIGNATURE OF
                                                               INSTALLER.


Gas     G91A              S.A.I. SNAP VENT                     SUPPLY AND INSTALL NEW SNAP VENT WHERE DIRECTED.                     EA                             1             1           102.40 01/07/2012




Gas     G0TVLA            TRAVEL RATE FOR ASBESTOS     Travel to approved asbestos disposal site to dispose ofasbestos containing   HR                             1             1            17.25 01/07/2012
                          REMOVAL (HOURLY RATE PER 1/4 building materials removed from a rentalhousing property. This item is for
                          HOUR)                        return travel. (HOURLY RATE PER 1/4 HOUR). TIPPING FEES TO BE
                                                       CLAIMED USING MAT ITEM. INVOICE TO BE ATTACHED TO
                                                       RETURNED JOB ORDER.




Gas     G100              RENEW FLEXIBLE GAS LEAD 3.0M SUPPLY AND INSTALL NEW 3.0 METRE FLEXIBLE LEAD                               EA                             1             1            88.65 01/07/2012
                                                       INCLUDING FITTINGS TO ROOMHEATER AS DIRECTED.




                                                                                                              Page 15 of 23
                                                                                   Schedule Item Report - Gas

Trade   Sched Item Code   Short Title                    Specification                                             Unit of Measure Minimum Quantity Increment         Current Cost   Sch Item Eff   Sch Item Exp
                                                                                                                                                                                     Dte            Dte
Gas     G101              INSTALL GAS BAYONET            INSTALL C.P. BAYONET CONNECTION OUTLET WHERE              EA                             1              1             78.10 01/07/2012
                          CONNECTION ONLY.               REQUIRED AND MAKE GOOD.




Gas     G102              REPAIR LEAK IN GAS SUPPLY LINE LOCATE AND REPAIR LEAK IN GAS SUPPLY LINE, REPAIR LEAK,   EA                             1              1             51.70 01/07/2012
                          AND NOMINATE EXACT             RECONNECT AND CHECK.UNIT RATE ALLOWS A MAXIMUM OF
                          LOCATION OF LEAK.              0.75 HRS TO COMPLETE. ANY TIME IN EXCESS OF THISTO BE
                                                         CHARGED GMAT.




Gas     G102A             CUT AND SEAL GAS LINE AS       REMOVE APPLIANCE AND CUT AND SEAL GAS LINE EXTERNAL       EA                             1              1             52.45 01/07/2012
                          DIRECTED                       OF THEBUILDING.




Gas     G103              S.A.I. GAS SUPPLY LINE 15MM.   SUPPLY AND INSTALL NEW 15MM COPPER GAS SUPPLY LINE.       M                              1             0.1            39.00 01/07/2012
                                                         FITTINGSTO BE CHARGED GMAT.




Gas     G104              S.A.I. GAS SUPPLY LINE 20MM.   SUPPLY AND INSTALL NEW 20MM COPPER GAS SUPPLY LINE.       M                              1             0.1            44.20 01/07/2012
                                                         FITTINGSTO BE CHARGED GMAT.




                                                                                               Page 16 of 23
                                                                                           Schedule Item Report - Gas

Trade   Sched Item Code   Short Title                    Specification                                                            Unit of Measure Minimum Quantity Increment         Current Cost   Sch Item Eff   Sch Item Exp
                                                                                                                                                                                                    Dte            Dte
Gas     G104L             S.A.I. LAGGING PER METRE       First 500mm of Hot Water Pipe from Storage HWU to be lagged as per by-   M                              1             0.1            16.85 01/07/2012
                                                         laws




Gas     G105              S.A.I. GAS SUPPLY LINE 25MM.   SUPPLY AND INSTALL NEW 25MM COPPER GAS SUPPLY LINE                       M                              1             0.1            66.00 01/07/2012
                                                         AND FITTINGS.




Gas     G107              RENEW GAS REGULATOR PIG TAIL SUPPLY AND INSTALL NEW PIG TAIL AND FITTINGS TO GAS                        EA                             1              1             27.40 01/07/2012
                                                       BOTTLE REGULATOR.




Gas     G107A             S.A.I. GAS TESTING NIPPLE.     SUPPLY AND INSTALL GAS TESTING NIPPLE TO LPG                             EA                             1              1             44.35 01/07/2012
                                                         REGULATOR.




Gas     G108              RENEW GAS REGULATOR AND PIG SUPPLY AND INSTALL NEW MANUAL CHANGEOVER GAS                                ST                             1              1            130.10 01/07/2012
                          TAILS.                      BOTTLE REGULATOR AND PIG TAILS.




                                                                                                           Page 17 of 23
                                                                                 Schedule Item Report - Gas

Trade   Sched Item Code   Short Title                  Specification                                           Unit of Measure Minimum Quantity Increment       Current Cost   Sch Item Eff   Sch Item Exp
                                                                                                                                                                               Dte            Dte
Gas     G109              SECURE GAS BOTTLE HOOD AND   SECURE GAS BOTTLE HOOD AND REGULATOR TO WALL. USE       EA                             1             1            25.55 01/07/2012
                          REGULATOR.                   HILTI FASTENERS IF NECESSARY.




Gas     G110              RENEW SLAB UNDER GAS         SUPPLY AND INSTALL NEW 600 X 600 X 38MM CONCRETE SLAB   EA                             1             1            31.95 01/07/2012
                          BOTTLE.                      UNDER GAS BOTTLE. TOP ORSLAB TO BE AT LEAST 25MM
                                                       ABOVE GROUND LEVEL.




Gas     G111              S.A.I. L/P GAS BOTTLE        (WHERE DIRECTED IN CYCLONE AREAS) SUPPLY AND INSTALL  EA                               1             1           150.75 01/07/2012
                          RESTRAINER.                  NEW L.PGAS BOTTLERESTRAINER TO HOMESWEST DETAILS P10.




Gas     G112A             S.A.I. GAS WALL MOUNTED      SUPPLY & INSTALL GAS WALL MOUNTED METER BOX             EA                             1             1           153.60 01/07/2012
                          METER BOX                    COMPLETE, INCLUDING ALL MATERIAL AND LABOUR.




Gas     G112B             S.A.I. FREE STANDING GAS METER SUPPLY & INSTALL FREE STANDING GAS METER BOX          EA                             1             1           267.60 01/07/2012
                          BOX                            COMPLETE, INCLUDING ALL MATERIAL AND LABOUR.




                                                                                             Page 18 of 23
                                                                                Schedule Item Report - Gas

Trade   Sched Item Code   Short Title                 Specification                                            Unit of Measure Minimum Quantity Increment       Current Cost   Sch Item Eff   Sch Item Exp
                                                                                                                                                                               Dte            Dte
Gas     G177              RENEW PRESSURE VALVE TO GAS SUPPLY AND INSTALL A NEW PRESSURE RELIEF VALVE TO GAS    EA                             1             1           125.40 01/07/2012
                          STORAGE HOT WATER UNIT      HOT WATER UNIT AND LEAVE IN WORKING ORDER




Gas     G177B             RENEW RELIEF VALVE.         RENEW RELIEF VALVE TO GAS HOT WATER UNIT AND LEAVE       EA                             1             1            95.70 01/07/2012
                                                      INWORKING ORDER




Gas     G984A             THREE HOUR LABOUR CHARGE    THREE HOUR LABOUR RATE CHARGE TO BE USED WHEN            HR                             1             0           206.90 01/07/2012
                          FOR AFTER HOURS WORKS       CHARGING FOR AFTER HOURS WORKS




Gas     G984B             HOURLY LABOUR CHARGE FOR    HOURLY LABOUR RATE CHARGE TO BE USED WHEN CHARGING HR                                   1             0            68.95 01/07/2012
                          AFTER HOURS WORKS           FOR AFTER HOURS WORKS THAT EXCEED THREE HOURS.




Gas     G987              SAFE WORK PROCEDURE FOR     THIS FEE IS TO CONTRIBUTE TOWARD THE COSTS OF TRAINING   EA                             1             1            46.20 01/07/2012
                          WORKING ON ROOFS(SINGLE     AND MAINTAINING THE CORRECT WORK SAFE PROCEDURES
                          STOREY)                     AND EQUIPMENT FOR WORKING AT HEIGHTS (SINGLE STOREY).
                                                      TO BE USED ONCE ONLY PER JOB.




                                                                                            Page 19 of 23
                                                                                 Schedule Item Report - Gas

Trade   Sched Item Code   Short Title                  Specification                                            Unit of Measure Minimum Quantity Increment       Current Cost   Sch Item Eff   Sch Item Exp
                                                                                                                                                                                Dte            Dte
Gas     G988              SAFE WORK PROCEDURE FOR      THIS FEE IS TO CONTRIBUTE TOWARD THE COSTS OF TRAINING EA                               1             1            57.25 01/07/2012
                          WORKING ON ROOFS(2 STOREY)   AND MAINTAINING THE CORRECT WORK SAFE PROCEDURES
                                                       AND EQUIPMENT FOR WORKING AT HEIGHTS (DOUBLE STOREY).
                                                       TO BE USED ONCE ONLY PER JOB.




Gas     G989              TRADESPERSON, HOURLY RATE.   TRADESPERSON, HOURLY RATE AS DETERMINED BY            EA                                1             1            17.25 01/07/2012
                          (HOURLY RATE PER QUARTER     DEPARTMENT OF HO USING (PER QUARTER HOUR INCREMENTS).
                          HOUR). LABOUR / ATTENDANCE   A FULL DESCRIPTION OF WORK CARRIED OUT IS REQUIRED.
                                                       STANDARDAUTHORISATION AND NON-RELATED WORK
                                                       PRACTICES ARE TO BE FOLLOWED.




Gas     G990              INSPECT AND REPORT           INSPECT ITEM / APPLIANCE AS DIRECTED AND PROVIDE DETAILS HR                             1             1            34.50 01/07/2012
                                                       IN A WRITTEN REPORT. IF WORK HAS BEEN CARRIED OUT, THIS
                                                       ITEM CAN NOT BE CLAIMED ON THE SAME JOB ORDER.




Gas     G991              CLASS P1 OR P2 DISPOSABLE    CLASS P1 OR P2 DISPOSABLE RESPIRATOR FOR USE WHEN TASK   EA                             1             1            23.00 01/07/2012
                          RESPIRATOR.                  INVOLVES WORKING WITHASBESTOS CEMENT PRODUCTS.




Gas     G992              DISPOSABLE COVERALLS         DISPOSABLE COVERALLS SUITABLE FOR WORKING WITH           EA                             1             1            11.60 01/07/2012
                                                       ASBESTOS CEMENT PRODUCTS.




                                                                                             Page 20 of 23
                                                                                             Schedule Item Report - Gas

Trade   Sched Item Code   Short Title                         Specification                                                      Unit of Measure Minimum Quantity Increment         Current Cost   Sch Item Eff   Sch Item Exp
                                                                                                                                                                                                   Dte            Dte
Gas     G993              POLYTHENE SHEETING                 MINIMUM 200 MICRON THICK 2.0 M WIDE PLASTIC OR                      M                             0.1            0.1             2.65 01/07/2012
                                                             POLYTHENE SHEETING FORASBESTOS WASTE DISPOSAL.




Gas     G994              POLYTHENE BAGS                     MINIMUM 200 MICRON THICK, HEAVY DUTY POLYTHENE BAG                  EA                             1              1              3.40 01/07/2012
                                                             IMPRINTED, ATMANUFACTURE,WITH APPROPRIATE WARNING
                                                             FOR ASBESTOS WASTE DISPOSAL.




Gas     G994A             DISPOSABLE HEPA VACUUM BAG Disposable High Efficiency Particulate Air (HEPA) vacuum bag to be fitted to EA                            1              1             17.75 01/07/2012
                                                     an Australian Standards Approved(AS 3544 - 1988) HEPA vacuum cleaner.
                                                     This is to be used in all instances where work includesreplacement or removal
                                                     of existing Asbestos ContainingBuilding Materials. To be issued with a G994.




Gas     G995              ENGRAVE "DOH" ON SIDE OR           LETTERS TO BE ETCHED INTO METAL. LETTERS TO BE VISIBLE              EA                             1              1              5.95 01/07/2012
                          REAR OF APPLIANCE                  AT A QUICK GLANCE OF THE SIDE OR REAR OF THE APPLIANCE.
                                                             TO BE ISSUED IN CONJUNCTION WITH A RELATED SCHEDULED
                                                             ITEM.




Gas     G997              TRAVEL FEE ONLY PAID               TRAVEL FEE WILL ONLY BE PAID IN ACCORDANCE TO SECTION               EA                             1              1             34.50 01/07/2012
                                                             7.2 OFTHE CONTRACT. TO BE USED ONCE ONLY PER JOB.




                                                                                                           Page 21 of 23
                                                                                        Schedule Item Report - Gas

Trade   Sched Item Code   Short Title                      Specification                                             Unit of Measure Minimum Quantity Increment       Current Cost   Sch Item Eff   Sch Item Exp
                                                                                                                                                                                     Dte            Dte
Gas     G998              T.B.S. PICK UP FEE         (EX   T.B.S. PICK UP FEE (EX SUPPLIER)                          EA                             1             1            40.95 01/07/2012
                          SUPPLIER)




Gas     G999              T.B.S. PICK UP EX BRANCH STORE. T.B.S. PICK UP FEE (EX BRANCH STORE)                       EA                             1             1            21.30 01/07/2012




Gas     G36AKGH           RENEW GAS STOVE TOP - WHITE RENEW GAS STOVE TOP                                            EA                             1             1            34.50 01/07/2012
                          FINISH - NATURAL GAS.
                          (KIMBERLEY REGION ONLY) T.B.S.




Gas     G36AWES           RENEW GAS STOVE TOP - WHITE RENEW GAS STOVE TOP                                            EA                             1             1            69.00 01/07/2012
                          FINISH - NATURAL GAS.
                          (EXCLUDES KIMBERLEY REGION)
                          T.B.S.




Gas     G36BKGH           RENEW GAS STOVE TOP - WHITE      RENEW GAS STOVE TOP                                       EA                             1             1            34.50 01/07/2012
                          FINISH - L.P. GAS. (KIMBERLEY
                          REGION ONLY) T.B.S.




                                                                                                  Page 22 of 23
                                                                                Schedule Item Report - Gas

Trade   Sched Item Code   Short Title                     Specification                                      Unit of Measure Minimum Quantity Increment       Current Cost   Sch Item Eff   Sch Item Exp
                                                                                                                                                                             Dte            Dte
Gas     G36BWES           RENEW GAS STOVE TOP - WHITE     RENEW GAS STOVE TOP                                EA                             1             1            34.50 01/07/2012
                          FINISH - L.P. GAS. (EXCLUDES
                          KIMBERLEY REGION) T.B.S.




Gas     G37AKGH           RENEW GAS STOVE TOP -         RENEW GAS STOVE TOP                                  EA                             1             1            34.50 01/07/2012
                          STAINLESS STEEL FINISH - NAT.
                          GAS. (KIMBERLEY REGION ONLY)
                          T.B.S.




Gas     G37AWES           RENEW GAS STOVE TOP -           RENEW GAS STOVE TOP                                EA                             1             1            34.50 01/07/2012
                          STAINLESS STEEL FINISH - NAT.
                          GAS. (EXCLUDES KIMBERLEY
                          REGION)T.B.S.




Gas     G37BKGH           RENEW GAS STOVE TOP -           RENEW GAS STOVE TOP                                EA                             1             1            34.50 01/07/2012
                          STAINLESS STEEL FINISH - L.P.
                          GAS. (KIMBERLEY REGION
                          ONLY)T.B.S.




Gas     G37BWES           RENEW GAS STOVE TOP -           RENEW GAS STOVE TOP                                EA                             1             1            34.50 01/07/2012
                          STAINLESS STEEL FINISH - L.P.
                          GAS. (EXCLUDES KIMBERLEY
                          REGION)T.B.S.




                                                                                          Page 23 of 23

				