Home Construction
# Tasks
1 Development 2 Land survey 3 4 Plan design Engineering
Days
6 1 6 1 1 1 5 1 1 1 1 1 3 1 1 1 4 1
Start
4/2/2007 4/2/2007 4/2/2007 4/4/2007 4/5/2007 4/6/2007 4/9/2007 4/9/2007 4/10/2007 4/11/2007 4/12/2007 4/13/2007 4/16/2007 4/16/2007 4/17/2007 4/18/2007 4/23/2007 4/23/2007
Finish
4/9/2007 4/2/2007 4/9/2007 4/4/2007 4/5/2007 4/6/2007 4/13/2007 4/9/2007 4/10/2007 4/11/2007 4/12/2007 4/13/2007 4/18/2007 4/16/2007 4/17/2007 4/18/2007 4/26/2007 4/23/2007
%
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Cost Assignments
$0.00 $0.00 Engineering/surveyo rs $0.00 Construction company $0.00 Engineering/surveyo rs $0.00 Sub $0.00 City $0.00 $0.00 Excavating contractor $0.00 Excavating contractor $0.00 Excavating contractor $0.00 Excavating contractor $0.00 Excavating contractor $0.00 $0.00 Plumbing contractor $0.00 Plumbing contractor $0.00 Electrical contractor $0.00 $0.00 Concrete contractor
5 Bidding 6 Permits 7 Site Planning 8 Grading 9 10 11 12 Excavation Install drain tile and gravel Backfilling Final grading
13 Utilities 14 Rough in main sewer 15 Rough in water main 16 Rough in electrical main 17 Foundation 18 Set forms for foundations/piers 19 Set steel for foundations/piers Pour foundation Strip foundation
1
4/24/2007
4/24/2007
0
$0.00 Concrete contractor
20 21
1 1 11 1 1 1 1 1 1 1
4/25/2007 4/26/2007 4/27/2007 4/27/2007 4/30/2007 5/1/2007 5/2/2007 5/3/2007 5/4/2007 5/7/2007
4/25/2007 4/26/2007 5/11/2007 4/27/2007 4/30/2007 5/1/2007 5/2/2007 5/3/2007 5/4/2007 5/7/2007
0 0 0 0 0 0 0 0 0 0
$0.00 Concrete contractor $0.00 Concrete contractor $0.00 $0.00 Construction company $0.00 Construction company $0.00 Construction company $0.00 Construction company $0.00 Construction company $0.00 Construction company $0.00 Construction company
22 Framing 23 Set sill plates 24 25 26 27 28 29 Set 1st floor joists Sheath first floor Build first floor walls (ext/int) Set 2nd floor joists Sheath 2nd floor Build 2nd floor walls (ext/int)
30 31 32 33
Build stairs Set trusses Sheath and paper
1 1 1 1 3 1 1 1 6 1 1 1 1 1 1 8 1
5/8/2007 5/9/2007 5/10/2007 5/11/2007 5/14/2007 5/14/2007 5/15/2007 5/16/2007 5/14/2007 5/14/2007 5/15/2007 5/16/2007 5/17/2007 5/18/2007 5/21/2007 5/15/2007 5/15/2007
5/8/2007 5/9/2007 5/10/2007 5/11/2007 5/16/2007 5/14/2007 5/15/2007 5/16/2007 5/21/2007 5/14/2007 5/15/2007 5/16/2007 5/17/2007 5/18/2007 5/21/2007 5/24/2007 5/15/2007
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Sheath and wrap walls 34 Concrete Work 35 Pour basement 36 37 Pour garage
$0.00 Construction company $0.00 Construction company $0.00 Construction company $0.00 Construction company $0.00 $0.00 Concrete contractor $0.00 Concrete contractor $0.00 Concrete contractor $0.00 $0.00 Construction company $0.00 Construction company $0.00 Construction company $0.00 Construction company $0.00 Sub $0.00 Construction company $0.00 $0.00 Construction company $0.00 Plumbing contractor, Electrical contractor, HVAC contractor, Phone, Cable $0.00 Sub $0.00 Construction company $0.00 Construction company $0.00 Construction company $0.00 Sub $0.00 Construction company $0.00 $0.00 Sub
Pour driveway and sidewalks 38 Exterior Finish 39 Shingle roof 40 41 42 43 44 Install soffit Install windows Install doors Set brick/stone Install siding
45 Interior Finish 46 Insulate walls/ceilings/floor s 47 Utilities
1
5/16/2007
5/16/2007
0
48 49 50
Sheetrock Hang doors Hang window/door casing Install cabinets Install flooring Install trim
1 1 1
5/17/2007 5/18/2007 5/21/2007
5/17/2007 5/18/2007 5/21/2007
0 0 0
51 52 53
1 1 1 1 1
5/22/2007 5/23/2007 5/24/2007 5/18/2007 5/18/2007
5/22/2007 5/23/2007 5/24/2007 5/18/2007 5/18/2007
0 0 0 0 0
54 Landscaping 55 Seed/Sod
Notes