LAPORAN 4 BULANAN - WordPress.com - Get a Free Blog Here by LrnA8h4

VIEWS: 0 PAGES: 66

									         SELAMAT DATANG

 PESERTA SOSIALISASI IT INVENTORY, LAPORAN BULANAN DI
GUDANG BERIKAT, DAN LAPORAN EMPAT BULAN DI KAWASAN
                          BERIKAT



              Rabu-Kamis, 21-22 Maret 2012
          Lantai 3 Aula KPPBC Tipe Madya Bekasi
                    SOSIALISASI
IT INVENTORY , LAPORAN BULANAN DI GUDANG BERIKAT,
           DAN LAPORAN EMPAT BULAN DI
                  KAWASAN BERIKAT
            OLEH: DIREKTORAT AUDIT
            DASAR HUKUM
 PERATURAN DIREKTUR JENDERAL BEA DAN CUKAI
  NOMOR: PER-50/BC/2011 TENTANG GUDANG
  BERIKAT
 PERATURAN DIREKTUR JENDERAL BEA DAN CUKAI
  NOMOR: PER-57/BC/2011 SEBAGAIMANA TELAH
  DIUBAH   DENGAN   PER-2/BC/2012  TENTANG
  KAWASAN BERIKAT
                      LATAR BELAKANG
 ADANYA PERUSAHAAN PENERIMA FASILITAS GB DAN KB YANG MELAKUKAN
    KEGIATAN OPERASIONAL BAIK DALAM PENGELOLAAN SISTEM PERSEDIAAN
    MAUPUN PEMBUKUAN YANG BERSIFAT MANUAL SEHINGGA MENYULITKAN
    PENGAWASAN ATAS GB DAN KB TERSEBUT
   ADANYA KESULITAN PERUSAHAAN DALAM MEMBUAT LAPORAN DUA
    BULANAN (GB) DAN TRIWULAN KE KPPBC/KPU KARENA DILAKUKAN
    SECARA MANUAL
   ADANYA AKUMULASI TAGIHAN AUDIT YANG CUKUP BESAR YANG
    SEBENARNYA DAPAT TERDETEKSI SENDIRI OLEH PERUSAHAAN PADA SAAT
    MELAKUKAN STOK OPNAME
   TIDAK ADANYA MEKANISME PERTANGGUNGJAWABAN ATAS BARANG YANG
    TIDAK DAPAT DIPERTANGGUNGJAWABKAN YANG DISEBABKAN KURANG
    EFISIENNYA OPERASIONAL PERUSAHAAN SEHINGGA MENYEBABKAN
    TERJADINYA TAGIHAN AUDIT YANG BESAR PADA SAAT DILAKUKAN AUDIT
    KEPABEANAN
   TIDAK ADANYA KONSEKUENSI ATAS KESALAHAN DALAM PEMBUATAN
    LAPORAN DUA BULANAN ATAU LAPORAN TRIWULAN KE KPPBC/KPU
        HAL-HAL BARU DALAM PERATURAN DIREKTUR JENDERAL
          NOMOR: PER-50/BC/2011 TTG GUDANG BERIKAT PER-
               2/BC/2012 TENTANG KAWASAN BERIKAT

ADANYA KEWAJIBAN MELAKUKAN PENCACAHAN FISIK BERSAMA DENGAN PEJABAT
BEA DAN CUKAI DAN MENYAMPAIKAN HASILNYA BERSAMA DENGAN PENYAMPAIAN
                   LAPORAN PERTANGGUNGJAWABAN


ADANYA KEWAJIBAN MEMBUAT IT INVENTORY DAN AKSES OLEH PEJABAT BEA DAN
                               CUKAI




ADANYA KEWAJIBAN MENYAMPAIKAN LAPORAN PERTANGGUNGJAWABAN KE KPPBC


                    LAPORAN POSISI BARANG PER DOKUMEN PABEAN DAN
 GUDANG BERIKAT
                       LAPORAN PERTANGGUNGJAWABAN BULANAN

    KAWASAN
                       LAPORAN PERTANGGUNGJAWABAN 4 BULANAN
     BERIKAT
    MANFAAT YANG DIHARAPKAN DENGAN
      ADANYA KETENTUAN TERSEBUT
 MEMBERDAYAKAN TEKNOLOGI INFORMASI DALAM:
  KEGIATAN OPERASIONAL PERUSAHAAN
  PENYUSUNAN LAPORAN KE KPPBC/KPU
  PENGAWASAN ATAS KEGIATAN DI GUDANG BERIKAT DAN
   KAWASAN BERIKAT
 UNTUK MEMUDAHKAN CROSSCHECK DATA ANTARA KPPBC
  DENGAN PENERIMA FASILITAS KB/GB
 UNTUK MENGHINDARI PENYALAHGUNAAN FASILITAS
  GB/KB OLEH PIHAK TERTENTU.
      MANFAAT YANG DIHARAPKAN DENGAN ADANYA KETENTUAN TERSEBUT

 SEBAGAI EARLY WARNING       SYSTEMS BAGI PERUSAHAAN
  TENTANG SISTEM PENGENDALIAN ATAS PERSEDIAAN
  YANG DIMILIKINYA
 UNTUK MEMUDAHKAN PENGAWASAN OLEH KPPBC ATAU
  UNIT PENGAWASAN LAINNYA
 PERUSAHAAN       DAPAT MEMPERTANGGUNGJAWABKAN
  BARANG FASILITAS YANG TIDAK DAPAT DIPERTANGGUNGJAWABKAN
  SECARA SELF ASSESMENT SEHINGGA TERHINDAR DARI
  AKUMULASI TAGIHAN YANG BESAR APABILA DILAKUKAN
  AUDIT KEPABEANAN
 KPPBC/KPU DAPAT MELAKUKAN PROFILING ATAS
  PERUSAHAAN PENERIMA FASILITAS GB/KB BERDASARKAN
  LAPORAN YANG DISAMPAIKAN OLEH PERUSAHAAN
          PERBEDAAN SISTEM PELAPORAN
NO            URAIAN                291/KMK.05/1997      PER-50/BC/2011&PER-
                                                              2/BC/2012


1    PEMANFAATAN      TEKNOLOGI TIDAK ADA              ADA
     INFORMASI            DALAM
     PENGELOLAAN PERSEDIAAN DAN
     ADANYA SANKSI
2    ADANYA KEWAJIBAN MELAKUKAN TIDAK ADA              MINIMAL   SATU   TAHUN
     STOCK OPNAME                                      SEKALI
3    PENYAMPAIAN LAPORAN         GB = DUA BULANAN      GB = BULANAN
                                 KB=TRIWULAN           KB= 4 BULANAN

4    KONSEKUENSI LAPORAN         TIDAK ADA KONSEKUENSI TERDAPAT KONSEKUENSI
                                 APAPUN                APABILA SALAH MEMBUAT
                                                       LAPORAN     ATAU TIDAK
                                                       MENYAMPAIKAN LAPORAN
5    NAMA     LAPORAN         YANG LAPORAN DUA BULANAN LAPORAN
     DISAMPAIKAN KE KPPBC ATAU KPU (GB)  DAN     LAPORAN PERTANGGUNGJAWABAN
                                   TRIWULAN (KB)         MUTASI BARANG
           PERBEDAAN SISTEM PELAPORAN
NO             URAIAN              291/KMK.05/1997      PER-50/BC/2011&PER-
                                                             2/BC/2012


6    JENIS   LAPORAN         YANG 1. LAPORAN BAHAN   1. LAPORAN BAHAN BAKU
     DISAMPAIKAN KE KPPBC/KPU        BAKU            2. LAPORAN BARANG JADI
                                  2. LAPORAN WIP     3. LAPORAN SISA BAHAN DAN
                                  3. LAPORAN            SCRAP
                                     BARANG JADI     4. LAPORAN    MESIN   DAN
                                                        PERALATAN KANTOR
7    JENIS LAPORAN YANG HARUS ADA TIDAK ADA          1. LAPORAN     PEMASUKAN
     DALAM     SISTEM   KOMPUTER                        BARANG PER DOKUMEN
     PERUSAHAAN TETAPI      TIDAK                       PABEAN
     DILAPORKAN KE KPPBC/KPU                         2. LAPORAN PENGELUARAN
                                                        BARANG PER DOKUMEN
                                                        PABEAN
                                                     3. LAPORAN POSISI WIP
8    KEWAJIBAN PEJAWAB BEA DAN TIDAK            ADA HARUS          MELAKUKAN
     CUKAI   UNTUK     MELAKUKAN PEMERIKSAAN        PEMERIKSAAN ATAS LAPORAN
     PEMERIKSAAN ATAS LAPORAN
           PERBEDAAN SISTEM PELAPORAN
NO             URAIAN              291/KMK.05/1997      PER-50/BC/2011&PER-
                                                             2/BC/2012


9    FIELD DATA DALAM LAPORAN • KODE BARANG          •KODE BARANG
     YANG DISAMPAIKAN KE KPPBC • NAMA BARANG         • NAMA BARANG
                               • SAT                 • SAT
                               • SALDO AWAL          • SALDO AWAL
                               • PEMASUKAN           • PEMASUKAN
                               • PENGELUARAN         • PENGELUARAN
                               • SALDO AKHIR         • PENYESUAIAN
                                                     • SALDO AKHIR
                                                     • STOCK OPNAME
                                                     • SELISIH
                                                     • KETERANGAN
10   KONSEKUENSI JIKA ADA SELISIH TIDAK ADA          AKAN    DITERBITKAN      SPP
     KURANG PADA LAPORAN                             UNTUK SELISIH KURANG
11   LAPORAN    SEKALIGUS SEBAGAI TIDAK ADA          YA KARENA APABILA TERDAPAT
     BENTUK PERTANGGUNGJAWABAN                       SELISIH  KURANG     DALAM
     ATAS BARANG FASILITAS                           LAPORAN      MAKA    AKAN
                                                     DITERBITKAN SPP
KEWAJIBAN PENCACAHAN FISIK

                 WAJIB MELAKUKAN PENCACAHAN
                  FISIK MINIMAL 1 TAHUN SEKALI
                 SEBELUM PENCACAHAN FISIK HARUS
                  MEMBERITAHUKAN KEPADA KEPALA
                  KPPBC
                 HASIL PENCACAHAN DIBUATKAN
                  BERITA ACARA PENCACAHAN FISIK
                 HARUS      DISAMPAIKAN     KEPADA
                  KEPALA      KPPBC      BERSAMAAN
                  DENGAN PENYAMPAIAN LAPORAN
                  PERTANGGUNGJAWABAN
KEWAJIBAN MEMBUAT SISTEM INFORMASI PERSEDIAAN
             BERBASIS KOMPUTER

            WAJIB  MEMILIKI SISTEM INFORMASI
             PERSEDIAAN BERBASIS KOMPUTER
            PEJABAT BEA DAN CUKAI DIBERI AKSES
             KEPADA SISTEM TERSEBUT DALAM
             RANGKA PEMERIKSAAN
            MEMENUHI KRITERIA:
              HARUS    DIBUAT   SEDEMIKIAN RUPA
               SEHINGGA DAPAT MEMBUAT LAPORAN
               SESUAI CONTOH FORMAT
              MENCATAT RIWAYAT PEREKAMAN DAN
               PENULUSRAN KEGIATAN PENGGUNA
              HARUS MEMBERIKAN AKSES REAL TIME
               KEPADA PEJABAT BC
    HUBUNGAN ANTARA SISTEM INFORMASI PERSEDIAAN DENGAN
            SISTEM PELAPORAN KE KPPBC ATAU KPU

 SISTEM INFORMASI      LAPORAN YANG DIHASILKAN OLEH
                                                                           KPPBC
PERSEDIAAN BERBASIS SISTEM INFORMASI PERSEDIAAN BERBASIS
     KOMPUTER                    KOMPUTER

                                GUDANG BERIKAT:
                     1. LAPORAN SALDO BARANG PER DOK PABEAN   DISERAHKAN
                    2. LAPORAN PERTANGGUNGJAWABAN BULANAN


                               KAWASAN BERIKAT:
                      1. LAPORAN PEMASUKAN BARANG PER DOK
                                      PABEAN
                    2. LAPORAN PENGELUARAN BARANG PER DOK        TIDAK
                                                              DISERAHKAN
                                      PABEAN
                             3. LAPORAN POSISI WIP


                       4. LAPORAN PERTANGGUNGJAWABAN
                       BAHAN BAKU DAN BAHAN PENOLONG
                                  BARANG JADI
                             BARANG SISA DAN SCRAP            DISERAHKAN
                          MESIN DAN PERALATAN KANTOR
      PROSES PEMASUKAN DAN PENGELUARAN BARANG DI KAWASAN BERIKAT
                                     SAAT INI

               GUDANG BAHAN BAKU   PROSES PRODUKSI     GUDANG BARANG JADI


  IMPOR
   BC 2.3                                                                   EKSPOR
                           DOK                           DOK
                                                                  DOK        BC 3.0
                 DOK                                             PENGEL
                         PEMAKAI                       PRODUK
               PENERIM                                            URAN
                          AN BRG                          SI
               AAN BRG                                             BRG
  LOKAL                                                                      LOKAL
BC 2.7 & 4.0                                                                BC 2.5, 2.7,
                                                                                4.1


                                      SCRAP




                                    SISTEM INFORMASI
                                       PERSEDIAAN
                                                       LAPORAN TRIWULAN:
                                                          BAHAN BAKU
                                                          WIP
                                                          BARANG JADI
      PROSES PEMASUKAN DAN PENGELUARAN BARANG DI KAWASAN BERIKAT
                              PER-2/BC/2012 (IT INVENTORY)

                  GUDANG BAHAN BAKU    PROSES PRODUKSI     GUDANG BARANG JADI


  IMPOR
   BC 2.3                                                                        EKSPOR
                               DOK                           DOK
                                                                      DOK         BC 3.0
                     DOK                                             PENGEL
                             PEMAKAI                       PRODUK
                   PENERIM                                            URAN
                              AN BRG                          SI
                   AAN BRG                                             BRG
  LOKAL                                                                           LOKAL
BC 2.7 & 4.0                                                                     BC 2.5, 2.7,
                                                                                     4.1


                                          SCRAP


                                                                          DITAMBAHKAN
        DITAMBAHKAN
                                                                          FIELD DATA:
        FIELD DATA:
                                                                          1.   JENIS DOK
        1.   JENIS DOK
                                                                          2.   NOMOR
        2.   NOMOR
                                                                               DOK
             DOK
                                                                          3.   TGL DOK
        3.   TGL DOK
                                        SISTEM INFORMASI
                                           PERSEDIAAN
      CONTOH DOKUMEN PENERIMAAN BARANG
                  SAAT INI

                                            PT. ABC
                         ALAMAT : PARUNG KUDA, SUKABUMI, JAWA BARAT
                                  LAPORAN PENERIMAAN BARANG
                                        NOMOR:01/PB/2012
Diterima dari              : Dongjuo LTD
Tanggal                    : 12 maret 2012


     No              Uraian Barang          Kode Barang               Jumlah      Sat
 1          Cotton 20% Polyester 80%     10001                       10000     Yard
 2          Cotton 100%                  10002                       8000      Yard
 3          Polyester 100%               10003                       5000      Yard



Diterima Oleh:
Gudang                                         Supervisor


................                               ...................
      CONTOH DOKUMEN PENERIMAAN BARANG
                PER-2/BC/2012
                                         PT. ABC
                      ALAMAT : PARUNG KUDA, SUKABUMI, JAWA BARAT
                               LAPORAN PENERIMAAN BARANG
                                     NOMOR:01/PB/2012
Diterima dari           : Dongjuo LTD
Tanggal                 : 12 maret 2012                 Tambahan Field Data
Jenis Dok               : BC 2.3                       Sesuai PER-2/BC/2012
Nomor Dok               : 00123
Tanggal Dok             : 10 Maret 2012
   No            Uraian Barang             Kode Barang    Jumlah     Sat
 1      Cotton 20% Polyester 80%        10001            10000    Yard
 2      Cotton 100%                     10002            8000     Yard
 3      Polyester 100%                  10003            5000     Yard



Diterima Oleh:
Gudang                                    Supervisor


................                          ...................
     CONTOH DOKUMEN SLIP PEMAKAIAN BAHAN
                  SAAT INI

                                           PT. ABC
                         ALAMAT : PARUNG KUDA, SUKABUMI, JAWA BARAT
                                       SLIP PEMAKAIAN BAHAN
                                        NOMOR: 011/SPB/2012
                                         TGL : 12 MARET 2012


     No              Uraian Barang             Kode Barang               Jumlah      Sat
 1          Cotton 20% Polyester 80%        10001                       80000     Yard
 2          Cotton 100%                     10002                       6000      Yard
 3          Polyester 100%                  10003                       3000      Yard



DISERAHKAN Oleh:                                   DITERIMA Oleh
BAG. Gudang BAHAN                                 BAG. PRODUKSI


................                                  ...................
     CONTOH LAPORAN PRODUKSI BARANG JADI
                  SAAT INI

                                            PT. ABC
                          ALAMAT : PARUNG KUDA, SUKABUMI, JAWA BARAT
                                     LAPORAN PRODUKSI
                                     NOMOR: 011/LP/2012
                                     TGL : 12 MARET 2012


     No             Uraian Barang            Kode Barang               Jumlah      Sat
 1          Kemeja                        30001                       10000     Pcs
 2          Baju Anak                     30002                       8000      Pcs
 3          Baju Renang                   30003                       5000      PCs



DISERAHKAN Oleh:                                DITERIMA Oleh
BAG. PPIC                                       GUDANG BARANG JADI


................                                ...................
     CONTOH SURAT JALAN PENGELUARAN BARANG
                     SAAT INI

                                              PT. ABC
                          ALAMAT : PARUNG KUDA, SUKABUMI, JAWA BARAT
                                            SURAT JALAN
                                        NOMOR: 025/SJ/2012
Tujuan Pengiriman           : DOOSAN SINAR SUKABUMI
Tanggal                     : 12 maret 2012


     No             Uraian Barang            Kode Barang               Jumlah      Sat
 1          Kemeja                        30001                       7000      Pcs
 2          Baju Anak                     30002                       3000      Pcs
 3          Baju Renang                   30003                       1000      PCs



Dikeluarkan Oleh:
Gudang                                          Supervisor


................                                ...................
     CONTOH SURAT JALAN PENGELUARAN BARANG
                  PER-2/BC/2012
                                             PT. ABC
                         ALAMAT : PARUNG KUDA, SUKABUMI, JAWA BARAT
                                           SURAT JALAN
                                       NOMOR: 025/SJ/2012
Tujuan Pengiriman          : DOOSAN SINAR SUKABUMI
Tanggal                    : 12 maret 2012                 Tambahan Field Data
Jenis Dok                  : BC 2.7
Nomor Dok                  : 00135                        Sesuai PER-2/BC/2012
Tanggal Dok                : 11 Maret 2012


     No              Uraian Barang          Kode Barang               Jumlah      Sat
 1          Cotton 20% Polyester 80%     10001                       10000     Yard
 2          Cotton 100%                  10002                       8000      Yard
 3          Polyester 100%               10003                       5000      Yard



Dikeluarkan Oleh:
Gudang                                         Supervisor


................                               ...................
          CONTOH DOKUMEN PENERIMAAN SCRAP
                     SAAT INI

                                         PT. ABC
                       ALAMAT : PARUNG KUDA, SUKABUMI, JAWA BARAT
                                LAPORAN PENERIMAAN BARANG
                                    NOMOR:100/SCRAP/2012
Diterima dari            : BAGIAN PRODUKSI
Tanggal                  : 12 maret 2012

     No             Uraian Barang         Kode Barang               Jumlah        Sat
 1          SCRAP POTONGAN BAHAN       40001                       100       KG




Diterima Oleh:                               Diserahkan Oleh
Gudang                                       Bagian Produksi


................                             ...................
          CONTOH SURAT JALAN PENGELUARAN SCRAP
                         SAAT INI

                                              PT. ABC
                         ALAMAT : PARUNG KUDA, SUKABUMI, JAWA BARAT
                                            SURAT JALAN
                                       NOMOR: 025/SJ/2012
Tujuan Pengiriman          : H. ALADIN BIN SAMATH
Tanggal                    : 12 maret 2012



     No              Uraian Barang          Kode Barang               Jumlah      Sat
 1          Cotton 20% Polyester 80%     10001                       10000     Yard
 2          Cotton 100%                  10002                       8000      Yard
 3          Polyester 100%               10003                       5000      Yard



Dikeluarkan Oleh:
Gudang                                         Supervisor


................                               ...................
      CONTOH SURAT JALAN PENGELUARAN SCRAP
                     SAAT INI
                                            PT. ABC
                       ALAMAT : PARUNG KUDA, SUKABUMI, JAWA BARAT
                                          SURAT JALAN
                                     NOMOR: 025/SJ/2012
Tujuan Pengiriman        : H. ALADIN BIN SAMATH
Tanggal                  : 12 maret 2012                 Tambahan Field Data
Jenis Dok                : BC 2.5
Nomor                    : 00.152                       Sesuai PER-2/BC/2012
Tanggal                  : 12 Maret 2012


     No             Uraian Barang         Kode Barang              Jumlah        Sat
 1          SCRAP POTONGAN BAHAN       40001                        100     KG
 2
 3



Dikeluarkan Oleh:
Gudang                                       Supervisor


................                             ...................
   JENIS LAPORAN YANG DIHASILKAN OLEH SISTEM
    INFORMASI PERSEDIAAN BERBASIS KOMPUTER

                     GUDANG BERIKAT:
       1. LAPORAN SALDO BARANG PER DOKUMEN PABEAN
      2. LAPORAN PERTANGGUNGJAWABAN MUTASI BARANG


                        KAWASAN BERIKAT:
        1.LAPORAN PEMASUKAN BARANG PER DOKUMEN PABEAN
      2.LAPORAN PENGELUARAN BARANG PER DOKUMEN PABEAN
                     3.LAPORAN SALDO WIP
4.LAPORAN PERTANGGUNGJAWABAN MUTASI BAHAN BAKU DAN BAHAN
                           PENOLONG
       5.LAPORAN PERTANGGUNGJAWABAN MUTASI BARANG JADI
 6.LAPORAN PERTANGGUNGJAWABAN MUTASI BARANG SISA DAN SCRAP
   7.LAPORAN PERTANGGUNGJAWABAN MUTASI MESIN DAN PERLATAN
                         PERKANTORAN
                               CONTOH FORMAT
                       LAPORAN SALDO BARANG PER DOKUMEN PABEAN
                                   DI GUDANG BERIKAT


N
O               DOKUMEN PEMASUKAN                    DOKUMEN PENGELUARAN      SALDO BARANG
    JEN N TGL  KODE SERI  NAMA    SA JL NILAI JEN N TGL   NAMA    SA JL NILAI JM SA NILAI
    IS O MASUK BRG BRANG BARANG T H PABEAN IS O MASUK BARANG T H PABEAN L T PABEAN

1
2
3
                                    CONTOH FORMAT
              LAPORAN PERTANGGUNGJAWABAN MUTASI BARANG
                               DI GUDANG BERIKAT
               NAMA                                                     SALDO                          KETERAN
NO    KODE    BARANG   SAT   SALDO PEMASUKAN PENGELUARAN PENYESUAIAN    AKHIR      STOK OPNAME SELISIH   GAN

     BARANG                  AWAL                                      01-Mei-12    01-Mei-12
                               CONTOH FORMAT
                LAPORAN PENERIMAAN BARANG PER DOKUMEN PABEAN
                                    PT. ABC
                     PERIODE 01 JANUARI 2012 S.D 30 APRIL 2012
                           BUKTI PENERIMAAN                                                           Nilai
No      Dokumen Pabean          BARANG         Supplier    KODE    Uraian Barang   Sat   Jml   Valas Barang
     Jenis Nomor Tanggal   Nomor     Tanggal              BARANG
        CONTOH LAPORAN PENGELUARAN BARANG PER DOKUMEN PABEAN
                                 PT. ABC
                  PERIODE 01 JANUARI 2012 S.D 30 APRIL 2012

                                                                       Nama
No        DOKUMEN PABEAN         SURAT JALAN       PENERIMA    Kode    Barang Sat Jml VALAS   Jml
     JENIS NOMOR    Tanggal   NOMOR      Tanggal              Barang
                                    CONTOH FORMAT
                         LAPORAN PERTANGGUNGJAWABAN BAHAN BAKU
               NAMA                                                     SALDO                          KETERAN
NO    KODE    BARANG   SAT   SALDO PEMASUKAN PENGELUARAN PENYESUAIAN    AKHIR      STOK OPNAME SELISIH   GAN

     BARANG                  AWAL                                      01-Mei-12    01-Mei-12
                                     CONTOH FORMAT
                             LAPORAN PERTANGGUNGJAWABAN BAHAN JADI
               NAMA                                                      SALDO                          KETERAN
NO    KODE    BARANG   SAT    SALDO PEMASUKAN PENGELUARAN PENYESUAIAN    AKHIR      STOK OPNAME SELISIH   GAN

     BARANG                   AWAL                                      01-Mei-12    01-Mei-12
                               CONTOH FORMAT
               LAPORAN PERTANGGUNGJAWABAN BRANG SISA DAN SCRAP
               NAMA                                                     SALDO                          KETERAN
NO    KODE    BARANG   SAT   SALDO PEMASUKAN PENGELUARAN PENYESUAIAN    AKHIR      STOK OPNAME SELISIH   GAN

     BARANG                  AWAL                                      01-Mei-12    01-Mei-12
                                CONTOH FORMAT
        LAPORAN PERTANGGUNGJAWABAN MESIN DAN PERALATAN PERKANTORAN
               NAMA                                                     SALDO                          KETERAN
NO    KODE    BARANG   SAT   SALDO PEMASUKAN PENGELUARAN PENYESUAIAN    AKHIR      STOK OPNAME SELISIH   GAN

     BARANG                  AWAL                                      01-Mei-12    01-Mei-12
 HUBUNGAN ANTARA LAPORAN PEMASUKAN BARANG PER DOKUMEN PABEAN
       DENGAN LAPORAN PERTANGGUNGJAWABAN BAHAN BAKU

                    BISA SALING
                    CROSSCHECK




                                           LAPORAN
                                        PERTANGGUNGJA
 LAPORAN         TOTAL PENERIMAAN        WABAN MUTASI
PEMASUKAN      BARANG MENJADI TOTAL       BAHAN BAKU
BARANG PER     PEMASUKAN SEMESTINYA
 DOKUMEN       SAMA APABILA TIDAK ADA
                RETUR DARI PRODUKSI         “KOLOM
  PABEAN                                  PEMASUKAN”
 HUBUNGAN ANTARA LAPORAN PENGELURAN BARANG PER DOKUMEN PABEAN
        DENGAN LAPORAN PERTANGGUNGJAWABAN BARANG JADI

                     BISA SALING
                     CROSSCHECK




                                            LAPORAN
                                         PERTANGGUNGJA
  LAPORAN        TOTAL PENGELUARAN        WABAN MUTASI
PENGELUARAN     BARANG MENJADI TOTAL
                     PENGELUARAN           BARANG JADI
 BARANG PER    SEMESTINYA SAMA APABILA
  DOKUMEN        TIDAK ADA RETUR DARI       “KOLOM
   PABEAN               PEMBELI
                                         PENGELUARAN”
                                             CARA PENGISIAN
                                LAPORAN SALDO BARANG PER DOKUMEN PABEAN
                                            DI GUDANG BERIKAT

                                                                UNTUK MENGETAHUI NOMOR DAN TANGGAL
                                                                  DOKUMEN PEMASUKAN BARANG DI GB


N
O                     DOKUMEN PEMASUKAN                                   DOKUMEN PENGELUARAN                SALDO BARANG
             TGL     KODE   SERI    NAMA                                   TGL     NAMA             NILAI
    JENIS NO MASUK   BRG    BRANG   BARANG   SAT JLH NILAI PABEAN JENIS NO MASUK   BARANG   SAT JLH PABEAN   JML SAT NILAI PABEAN


1
2
3



       UNTUK MENGETAHUI NOMOR DAN TANGGAL                                     UNTUK MENGETAHUI BARANG YANG
          DOKUMEN PABEAN ATAS BARANG YANG                                     TELAH MELEWATI JANGKA WAKTU 12
       DIKELUARKAN DARI GB SERTA HUBUNGANNYA                                  BULAN SEJAK TANGGAL DOK PABEAN
          DGN NOMOR DAN TANGGAL DOKUMEN                                      DAN MENGONTROL JUMLAH DAN NILAI
          PEMASUKAN KE GB. SELAIN ITU UNTUK                                  PABEAN ATAS BARANG YANG ADA DI GB
      MENGONTROL NILAI PABEAN DAN JUMLAH BRNG
                                     CARA PENGISIAN
                       LAPORAN PERTANGGUNGJAWABAN MUTASI BARANG
                                   DI GUDANG BERIKAT

DIPEROLEH DARI SALDO                   DIPEROLEH DARI PEMAKAIAN
  AKHIR ATAU STOCK                     BAHAN, PENJUALAN BAHAN,            SALDO AWAL+PEMASUKAN-
                                        SCRAP, PEMUSNAHAN ATAU           PENGELUARAN+PENYESUAIAN
 OPNAME SEBELUMNYA                             SALAH TULIS


               NAMA                                                      SALDO                            KETERAN
NO    KODE    BARANG    SAT   SALDO PEMASUKAN PENGELUARAN PENYESUAIAN    AKHIR      STOK OPNAME SELISIH     GAN

     BARANG                   AWAL                                      01-Mei-12    01-Mei-12




DIPEROLEH DARI JUMLAH                     DIPEROLEH DARI HASIL
RIIL YG MASUK KE KB                     KETIDAKSESUAIAN ANTARA              DIISI DALAM HAL ADA
(IMPOR   ATAU   LOKAL)                 STOCK OPNAME DGN SALDO               STOCK OPNAME PADA
                                        BUKU BULAN SEBELUMNYA.                 AKHIR PERIODE
,RETUR DARI PRODUKSI
                                     DALAM TIDAK ADA STOK OPNAME           PELAPORAN. JIKA TIDAK
ATAU ADANYA KESALAHAN                DIBULAN SEBELUMNYA MAKA DIISI
TULIS                                                                       ADA MAKA TIDAK DIISI
                                           DENGAN ANGKA NOL
                                         CARA PENGISIAN
                    LAPORAN PENERIMAAN BARANG PER DOKUMEN PABEAN
                                        PT. ABC
                         PERIODE 01 JANUARI 2012 S.D 30 APRIL 2012

   DIISI DENGAN JENIS,                                               DIISI DENGAN URAIAN BRG YG
                                         DIISI DGN NAMA
  NOMOR DAN TGL DOK                                                       DIPERGUNAKAN DLM
                                         SUPPLIER ATAU               OPERASIONAL (BUKAN URAIAN
          PABEAN
                                         PENERIMA BRG                 BRNG DALAM DOK PABEAN


                            BUKTI PENERIMAAN                                                           Nilai
 No      Dokumen Pabean          BARANG         Supplier    KODE    Uraian Barang   Sat   Jml   Valas Barang
      Jenis Nomor Tanggal   Nomor     Tanggal              BARANG




 DIISI DENGAN NOMOR                 DIISI DENGAN KODE               DIISI DGN SATUAN           DIISI DGN
  DOKUMEN& TGL YG                       BARANG YG
                                                                       DAN JML YG             VALAS DAN
                                                                    DIPAKAI DLM DOK         NILAI BARANG
MENUNJUKAN BRG TELAH                 DIPERGUNAKAN                   PENERIMAAN BRG
     DITERIMA DI KB                 OLEH PERUSAHAAN                                          PEROLEHAN
                                                                                              (JIKA ADA)
                                   CARA PENGISIAN
              LAPORAN PENGELUARAN BARANG PER DOKUMEN PABEAN
                                   PT. ABC
                    PERIODE 01 JANUARI 2012 S.D 30 APRIL 2012
                                                                   DIISI DGN NAMA BRNG YG
  DIISI DGN JENIS, NOMOR               DIISI DGN NAMA
                                                                      DIPERGUNAKAN DLM
  &TGL DOK PABEAN ATAS                   PEMBELI ATAU               OPERASIONAL PRSHAAN
 BRNG YG DIKIRIM KE LUAR               PENERIMA BRNG               (SESUAI DOK PENERIMAAN
             KB                         (SUBKONTRAK)                         BRG)

                                                                       Nama
No        DOKUMEN PABEAN         SURAT JALAN       PENERIMA    Kode    Barang Sat Jml VALAS   Jml
     JENIS NOMOR    Tanggal   NOMOR      Tanggal              Barang




  DIISI DGN NOMOR             DIISI DGN KODE BRGN                                      DIISI DGN
                                                              DIISI DGN SATUAN
 &TGL SURAT JALAN              YG DIPERGUNAKAN                                        VALAS DAN
                                                                 DAN JML YG
ATAS BRNG YG DIKIRIM           DLM OPERASIONAL                DIPAKAI DLM DOK            NILAI
      KELUAR KB                    PERUSAHAAN                 PENERIMAAN BRG         PENYERAHAN
                                                                                      (JIKA ADA)
                                    CARA PENGISIAN
     LAPORAN PERTANGGUNGJAWABAN MUTASI BAHAN BAKU DAN BAHAN PENOLONG
                           DI KAWASAN BERIKAT

DIPEROLEH DARI SALDO                  DIPEROLEH DARI PEMAKAIAN
  AKHIR ATAU STOCK                    BAHAN, PENJUALAN BAHAN,            SALDO AWAL+PEMASUKAN-
                                       SCRAP, PEMUSNAHAN ATAU           PENGELUARAN+PENYESUAIAN
 OPNAME SEBELUMNYA                            SALAH TULIS


               NAMA                                                     SALDO                            KETERAN
NO    KODE    BARANG   SAT   SALDO PEMASUKAN PENGELUARAN PENYESUAIAN    AKHIR      STOK OPNAME SELISIH     GAN

     BARANG                  AWAL                                      01-Mei-12    01-Mei-12




DIPEROLEH DARI JUMLAH                    DIPEROLEH DARI HASIL
RIIL YG MASUK KE KB                    KETIDAKSESUAIAN ANTARA              DIISI DALAM HAL ADA
(IMPOR   ATAU   LOKAL)                STOCK OPNAME DGN SALDO               STOCK OPNAME PADA
                                       BUKU BULAN SEBELUMNYA.                 AKHIR PERIODE
,RETUR DARI PRODUKSI
                                    DALAM TIDAK ADA STOK OPNAME           PELAPORAN. JIKA TIDAK
ATAU ADANYA KESALAHAN               DIBULAN SEBELUMNYA MAKA DIISI
TULIS                                                                      ADA MAKA TIDAK DIISI
                                          DENGAN ANGKA NOL
                                    CARA PENGISIAN
                 LAPORAN PERTANGGUNGJAWABAN MUTASI BARANG JADI
                               DI KAWASAN BERIKAT

                                          DIISI DGN JUMLAH
DIPEROLEH DARI SALDO
                                        PENJUALAN LOKAL DAN
  AKHIR ATAU STOCK                                                       SALDO AWAL+PEMASUKAN-
                                        ESKPOR, REJECT/SCRAP,
                                                                        PENGELUARAN+PENYESUAIAN
 OPNAME SEBELUMNYA                      PEMUSNAHAN (TGL RIIL
                                           PENGELUARAN)


               NAMA                                                     SALDO                            KETERAN
NO    KODE    BARANG   SAT   SALDO PEMASUKAN PENGELUARAN PENYESUAIAN    AKHIR      STOK OPNAME SELISIH     GAN

     BARANG                  AWAL                                      01-Mei-12    01-Mei-12




DIISI DENGAN JUMLAH                      DIPEROLEH DARI HASIL
PRODUKSI YANG DIAKUI                   KETIDAKSESUAIAN ANTARA              DIISI DALAM HAL ADA
SEBAGAI BARANG JADI                   STOCK OPNAME DGN SALDO               STOCK OPNAME PADA
                                       BUKU BULAN SEBELUMNYA.                 AKHIR PERIODE
(TERMASUK         YG
                                    DALAM TIDAK ADA STOK OPNAME           PELAPORAN. JIKA TIDAK
DIPRODUKSI     OLEH                 DIBULAN SEBELUMNYA MAKA DIISI
SUBKONTRAK)                                                                ADA MAKA TIDAK DIISI
                                          DENGAN ANGKA NOL
                                     CARA PENGISIAN
              LAPORAN PERTANGGUNGJAWABAN MUTASI BARANG SISA DAN SCRAP
                               DI KAWASAN BERIKAT

                                           DIISI DGN JUMLAH
DIPEROLEH DARI SALDO
                                         PENJUALAN LOKAL DAN
  AKHIR ATAU STOCK                                                        SALDO AWAL+PEMASUKAN-
                                       ESKPOR, PEMUSNAHAN ATS
                                                                         PENGELUARAN+PENYESUAIAN
 OPNAME SEBELUMNYA                      SCRAP DAN SISA(TGL RIIL
                                            PENGELUARAN)


                NAMA                                                     SALDO                            KETERAN
NO    KODE     BARANG   SAT   SALDO PEMASUKAN PENGELUARAN PENYESUAIAN    AKHIR      STOK OPNAME SELISIH     GAN

     BARANG                   AWAL                                      01-Mei-12    01-Mei-12




DIISI DENGAN JMLH BRNG                    DIPEROLEH DARI HASIL
YG DINYATAKAN SISA DAN                  KETIDAKSESUAIAN ANTARA              DIISI DALAM HAL ADA
SCRAP (SATUAN BRNG                     STOCK OPNAME DGN SALDO               STOCK OPNAME PADA
                                        BUKU BULAN SEBELUMNYA.                 AKHIR PERIODE
SESUAI SOP PERUSAHAAN).
                                     DALAM TIDAK ADA STOK OPNAME           PELAPORAN. JIKA TIDAK
BISA DIPEROLEH DR BB, WIP            DIBULAN SEBELUMNYA MAKA DIISI
ATAU FG REJECT/SCRAP                                                        ADA MAKA TIDAK DIISI
                                           DENGAN ANGKA NOL
                                     CARA PENGISIAN
              LAPORAN PERTANGGUNGJAWABAN MUTASI MESIN DAN PERALATAN
                               DI KAWASAN BERIKAT

DIPEROLEH DARI SALDO                       DIISI DGN JUMLAH
  AKHIR ATAU STOCK                            PENJUALAN,                  SALDO AWAL+PEMASUKAN-
                                        PEMUSNAHAN/SCRAP DAN             PENGELUARAN+PENYESUAIAN
 OPNAME SEBELUMNYA                    SDH BERPINDAH KEPEMILIKAN


                NAMA                                                     SALDO                            KETERAN
NO    KODE     BARANG   SAT   SALDO PEMASUKAN PENGELUARAN PENYESUAIAN    AKHIR      STOK OPNAME SELISIH     GAN

     BARANG                   AWAL                                      01-Mei-12    01-Mei-12




                                          DIPEROLEH DARI HASIL
DIISI DENGAN JMLH MESIN                 KETIDAKSESUAIAN ANTARA              DIISI DALAM HAL ADA
DAN PERALATAN       YG                 STOCK OPNAME DGN SALDO               STOCK OPNAME PADA
MENJADI    HAK    MILIK                 BUKU BULAN SEBELUMNYA.                 AKHIR PERIODE
PERUSAHAAN YG MASUK KE               DALAM TIDAK ADA STOK OPNAME           PELAPORAN. JIKA TIDAK
KB                                   DIBULAN SEBELUMNYA MAKA DIISI
                                                                            ADA MAKA TIDAK DIISI
                                           DENGAN ANGKA NOL
                    CONTOH
                  PADA PT. ABC
CARA PEMBUATAN :
1.LAPORAN PEMASUKAN BARANG PER DOKUMEN PABEAN
2.LAPORAN PENGELUARAN BARANG PER DOKUMEN
PABEAN
3.LAPORAN PERTANGGUNGJAWABAN MUTASI BAHAN BAKU
4.LAPORAN PERTANGGUNGJAWABAN MUTASI BARANG JADI
5.LAPORAN PERTANGGUNGJAWABAN MUTASI MESIN DAN
PERALATAN
6.LAPORAN PERTANGGUNGJAWABAN MUTAS SCRAP DAN
SISA
                           CONTOH PEMASUKAN BARANG KE KAWASAN BERIKAT
                                               PT. ABC
                                 PERIODE 01 JAN 2012 S.D 30 APRIL 2012
No                Dokumen Pabean               Supplier            Uraian Barang          Sat   Jml     Valas   CIF     Negara Asal

          Jenis    Nomor       Tanggal



      1 BC 2.3    0001       05 Januari 2012 Dongjoeu       Poly 80% Cotton 20%        Yard      10000 USD       20000 Korea

      2 BC 2.3    0004       10 Januari 2012 Dongjoeu       Polyester 80% Cot 20%      Yard      20000 USD       40000 Korea

      3 BC 2.7    0007       15 Januari 2012 Doosan Cipta   Cotton 100%                Yard      15000 USD       37500 Indonesia

      4 BC 4.0    0012       20 Januari 2012 Aneka Busana Poly 100%                    Yard      20000 USD       30000 Indonesia

      5 BC 2.3    0020      03 Februari 2012 Dongjoeu       Poly 80% Cot20%            Yard      30000 USD       60000 Korea

      6 BC 2.7    0023      17 Februari 2012 Doosan Cipta   Cot 100%                   Yard      22000 USD       55000 Indonesia

      7 BC 2.3    0027      24 Februari 2012 Dongjoeu       Polyester 80% Cot 20%      Yard      25000 USD       50000 Korea

      8 BC 4.0    0028      25 Februari 2012 Aneka Busana Poly100%                     Yard      12500 USD       18750 Indonesia

      9 BC 2.3    0032        15 Maret 2012 Dongjoeu        Polyester 80% Cotton 20%   Yard      17500 USD       35000 Korea

     10 BC 2.7    0036        17 Maret 2012 Doosan Cipta    Cotton 100%                Yard      23500 USD       58750 Indonesia

     11 BC 4.0    0040        20 Maret 2012 Aneka Busana Polyester 100%                Yard      24500 USD       36750 Indonesia

     12 BC 2.3    0045         17 April 2012 Dongjoeu       Poly 80% Cot 20%           Yard      35000 USD       70000 Korea

     13 BC 2.7    0052         25 April 2012 Doosan Cipta   Cotton 100%                Yard      24100 USD       60250 Indonesia

     14 BC 4.0    0055         25 April 2012 Aneka Busana Polye100%                    Yard       7500 USD       11250 Indonesia
                                  LAPORAN PEMASUKAN BARANG PER DOKUMEN PEMASUKAN
                                                         PT. ABC
                                           PERIODE 01 JAN 2012 S.D 30 APRIL 2012
                                                                                                                                       Nilai
No              Dokumen Pabean        BUKTI PENERIMAAN BARANG Supplier           KODE        Uraian Barang        Sat   Jml   Valas   Barang
        Jenis    Nomor     Tanggal        Nomor         Tanggal                 BARANG

                            05 Januari                   08 Januari                      Polyester 80% Cotton
     1 BC 2.3    0001            2012 01/BPB/2012             2012 Dongjoeu        10001 20%                    Yard    10000 USD       20000
                            10 Januari                   13 Januari                      Polyester 80% Cotton
     2 BC 2.3    0004            2012 02/BPB/2012             2012 Dongjoeu        10001 20%                    Yard    20000 USD       40000
                            15 Januari                   18 Januari Doosan
     3 BC 2.7    0007            2012 03/BPB/2013             2012 Cipta           10002 Cotton 100%            Yard    15000 USD       37500
                            20 Januari                   23 Januari Aneka
     4 BC 4.0    0012            2012 04/BPB/2013             2012 Busana          10003 Polyester 100%         Yard    20000 USD       30000
                           03 Februari                  06 Februari                      Polyester 80% Cotton
     5 BC 2.3    0020            2012 05/BPB/2014             2012 Dongjoeu        10001 20%                    Yard    30000 USD       60000
                           17 Februari                  20 Februari Doosan
     6 BC 2.7    0023            2012 06/BPB/2014             2012 Cipta           10002 Cotton 100%            Yard    22000 USD       55000
                           24 Februari                  27 Februari                      Polyester 80% Cotton
     7 BC 2.3    0027            2012 07/BPB/2015             2012 Dongjoeu        10001 20%                    Yard    25000 USD       50000
                           25 Februari                  28 Februari Aneka
     8 BC 4.0    0028            2012 08/BPB/2015             2012 Busana          10003 Polyester 100%         Yard    12500 USD       18750
                                                                                         Polyester 80% Cotton
     9 BC 2.3    0032    15 Maret 2012 09/BPB/2016    18 Maret 2012 Dongjoeu       10001 20%                    Yard    17500 USD       35000
                                                                    Doosan
 10 BC 2.7       0036    17 Maret 2012 10/BPB/2016    20 Maret 2012 Cipta          10002 Cotton 100%            Yard    23500 USD       58750
                                                                    Aneka
 11 BC 4.0       0040    20 Maret 2012 11/BPB/2017    23 Maret 2012 Busana         10003 Polyester 100%         Yard    24500 USD       36750
                                                                                         Polyester 80% Cotton
 12 BC 2.3       0045     17 April 2012 12/BPB/2017    20 April 2012 Dongjoeu      10001 20%                    Yard    35000 USD       70000
                                                                     Doosan
 13 BC 2.7       0052     25 April 2012 13/BPB/2018    28 April 2012 Cipta         10002 Cotton 100%            Yard    24100 USD       60250
                                                                     Aneka
 14 BC 4.0       0055     25 April 2012 14/BPB/2018    28 April 2012 Busana        10003 Polyester 100%         Yard     7500 USD       11250




            SESUAI KODE BARANG DAN NAMA BARANG YANG DIPERGUNAKAN SECARA OPERASIONAL OLEH PERUSAHAAN
                           CONTOH
                 REKAPITULASI PEMAKAIAN BAHAN

No     SLIP PEMAKAIAN BAHAN            Tujuan    KODE          Uraian Barang        Sat   Jml
      Nomor         Tanggal                     BARANG

 1 01/SPB/2012    10 Januari 2012 Produksi        10001 Polyester 80% Cotton 20%   Yard    8000
 2 02/SPB/2012    15 Januari 2012 Produksi        10001 Polyester 80% Cotton 20%   Yard   20000
 3 03/SPB/2013    20 Januari 2012 Produksi        10002 Cotton 100%                Yard   13000
 4 04/SPB/2013    25 Januari 2012 Produksi        10003 Polyester 100%             Yard   19000
 5 05/SPB/2014   08 Februari 2012 Scrap           10001 Polyester 80% Cotton 20%   Yard    1000
 6 06/SPB/2014   22 Februari 2012 Produksi        10002 Cotton 100%                Yard   20000
 7 07/SPB/2015   29 Februari 2012 Produksi        10001 Polyester 80% Cotton 20%   Yard   22000
 8 08/SPB/2015     01 Maret 2012 Produksi         10003 Polyester 100%             Yard   12000
 9 09/SPB/2016     20 Maret 2012 Produksi         10001 Polyester 80% Cotton 20%   Yard   16000
10 10/SPB/2016     22 Maret 2012 Produksi         10002 Cotton 100%                Yard   21000
11 11/SPB/2017     25 Maret 2012 Produksi         10003 Polyester 100%             Yard   22000
12 12/SPB/2017       22 April 2012 Produksi       10001 Polyester 80% Cotton 20%   Yard   30000
13 13/SPB/2018       30 April 2012 Produksi       10002 Cotton 100%                Yard   22000
14 14/SPB/2018       30 April 2012 Produksi       10003 Polyester 100%             Yard    5000
                 LAPORAN PRODUKSI BARANG JADI
                           SAAT INI


No           PRODUKSI                   Kode          Nama Barang    Sat   Jml
     Dokumen        Tanggal            Barang

 1 01/SPB/2012      13 Januari 2012     20001 Kemeja                Pcs     7500
 2 02/SPB/2012      18 Januari 2012     20001 Kemeja                Pcs    19500
 3 03/SPB/2013      23 Januari 2012     20002 Baju Anak             Pcs    25600
 4 04/SPB/2013      28 Januari 2012     20003 Baju Renang           Pcs    37800
 5 05/SPB/2014     11 Februari 2012     20001 Kemeja                Pcs    25500
 6 06/SPB/2014     25 Februari 2012     20002 Baju Anak             Pcs    39000
 7 07/SPB/2015       03 Maret 2012      20001 Kemeja                Pcs    21200
 8 08/SPB/2015       04 Maret 2012      20003 Baju Renang           Pcs    23400
 9 09/SPB/2016       23 Maret 2012      20001 Kemeja                Pcs    15800
10 10/SPB/2016       25 Maret 2012      20002 Baju Anak             Pcs    41200
11 11/SPB/2017       28 Maret 2012      20003 Baju Renang           Pcs    42400
12 12/SPB/2017         25 April 2012    20001 Kemeja                Pcs    29400
13 13/SPB/2018          03 Mei 2012     20002 Baju Anak             Pcs    43600
14 14/SPB/2018          03 Mei 2012     20003 Baju Renang           Pcs     9600
                                             CONTOH
                                 LAPORAN PENGELUARAN BARANG JADI
                                             SAAT INI
                SURAT JALAN                          PENERIMA   Kode     Nama Barang   Sat   Jml     VALAS       Jml
        NOMOR                  Tanggal                          Barang


01/SJ/2012                     14 Januari 2012 FASHION TRANDY    20001 Kemeja          Pcs    7350 USD        73,500.00
02/SJ/2012                     19 Januari 2012 FASHION TRANDY    20001 Kemeja          Pcs   19000 USD       190,000.00
03/SJ/2013                     24 Januari 2012 FASHION TRANDY    20002 Baju Anak       Pcs   25000 USD       250,000.00
04/SJ/2013                     29 Januari 2012 FASHION TRANDY    20003 Baju Renang     Pcs   37000 USD       370,000.00
05/SJ/2014                    12 Februari 2012 BUSANA GARMENT    20001 Kemeja          Pcs   25000 USD       250,000.00
06/SJ/2014                    26 Februari 2012 FASHION TRANDY    20002 Baju Anak       Pcs   39500 USD       395,000.00
07/SJ/2015                     04 Maret 2012 FASHION TRANDY      20001 Kemeja          Pcs   21000 USD       210,000.00
08/SJ/2015                     05 Maret 2012 FASHION TRANDY      20003 Baju Renang     Pcs   23000 USD       230,000.00
09/SJ/2016                     24 Maret 2012 FASHION TRANDY      20001 Kemeja          Pcs   15000 USD       150,000.00
10/SJ/2016                     26 Maret 2012 FASHION TRANDY      20002 Baju Anak       Pcs   14000 USD       140,000.00
11/SJ/2017                     29 Maret 2012 FASHION TRANDY      20003 Baju Renang     Pcs   42000 USD       420,000.00
12/SJ/2017                       26 April 2012 FASHION TRANDY    20001 Kemeja          Pcs   29000 USD       290,000.00
13/SJ/2018                       29 April 2012 BUSANA GARMENT    20002 Baju Anak       Pcs   43000 USD       430,000.00
14/SJ/2018                       29 April 2012 FASHION TRANDY    20003 Baju Renang     Pcs    9000 USD        90,000.00
15/SJ/2018                       29 April 2012 H. ALIMIN         30001 SCRAP           KG      200 USD          200.00
                     LAPORAN PENGELUARAN BARANG PER DOKUMEN PABEAN
                                          PT. ABC
                           PERIODE 01 JANUARI 2012 S.D 30 APRIL 2012
No           DOKUMEN PABEAN                    SURAT JALAN                PENERIMA     Kode Nama Barang Sat     Jml   VALAS      Jml
     JENIS   NOMOR      Tanggal          NOMOR          Tanggal                        Barang


 1 BC 3.0 0001        13 Januari 2012 01/SJ/2012      14 Januari 2012 FASHION TRANDY    20001 Kemeja      Pcs   7350 USD       73,500.00
 2 BC 3.0 0002        18 Januari 2012 02/SJ/2012      19 Januari 2012 FASHION TRANDY    20001 Kemeja      Pcs 19000 USD       190,000.00
 3 BC 3.0 0003        23 Januari 2012 03/SJ/2013      24 Januari 2012 FASHION TRANDY    20002 Baju Anak   Pcs 25000 USD       250,000.00
 4 BC 3.0 0004        28 Januari 2012 04/SJ/2013      29 Januari 2012 FASHION TRANDY    20003 Baju Renang Pcs 37000 USD       370,000.00
 5 BC 2.5 0005       11 Februari 2012 05/SJ/2014     12 Februari 2012 BUSANA GARMENT    20001 Kemeja      Pcs 25000 USD       250,000.00
 6 BC 3.0 0006       25 Februari 2012 06/SJ/2014     26 Februari 2012 FASHION TRANDY    20002 Baju Anak   Pcs 39500 USD       395,000.00
 7 BC 3.0 0007         03 Maret 2012 07/SJ/2015        04 Maret 2012 FASHION TRANDY     20001 Kemeja      Pcs 21000 USD       210,000.00
 8 BC 3.0 0008         04 Maret 2012 08/SJ/2015        05 Maret 2012 FASHION TRANDY     20003 Baju Renang Pcs 23000 USD       230,000.00
 9 BC 3.0 0009         23 Maret 2012 09/SJ/2016        24 Maret 2012 FASHION TRANDY     20001 Kemeja      Pcs 15000 USD       150,000.00
10 BC 3.0 0010         25 Maret 2012 10/SJ/2016        26 Maret 2012 FASHION TRANDY     20002 Baju Anak   Pcs 14000 USD       140,000.00
11 BC 3.0 0011         28 Maret 2012 11/SJ/2017        29 Maret 2012 FASHION TRANDY     20003 Baju Renang Pcs 42000 USD       420,000.00
12 BC 3.0 0012          25 April 2012 12/SJ/2017        26 April 2012 FASHION TRANDY    20001 Kemeja      Pcs 29000 USD       290,000.00
13 BC 2.5 0013          28 April 2012 13/SJ/2018        29 April 2012 BUSANA GARMENT    20002 Baju Anak   Pcs 43000 USD       430,000.00
14 BC 3.0 0014          28 April 2012 14/SJ/2018        29 April 2012 FASHION TRANDY    20003 Baju Renang Pcs   9000 USD       90,000.00
15 BC 2.5 0015          28 April 2012 15/SJ/2018        29 April 2012 H. ALIMIN         30001 SCRAP       KG     200 USD         200.00




             SESUAI KODE BARANG DAN NAMA BARANG YANG DIPERGUNAKAN SECARA OPERASIONAL OLEH PERUSAHAAN
                              LAPORAN PERTANGGUNGJAWABAN BAHAN BAKU
                                                PT. ABC
                                 PERIODE 1 JANUARO 2012 S.D 30 APRIL 2012
           Diperoleh dari:                                 Diperoleh dari:
                                                                                                                             Saldo
                                                    • pemakain barang ke produksi     Jika perusahaan
         • pemasukan impor                                                                                              awal+pemasukan-
                                                        •Penjualan bahan baku        melakukan stock
          •Pemasukan lokal                                 •Pengirim scrap                                            pengeluaran+penyesu
        •Retur dari produksi                                                        opname secara rutin
                                                            •pemusnahan                                                       aian




NO    KODE       NAMA BARANG          SAT SALDO PEMASUKAN PENGELUARAN PENYESUAIAN SALDO AKHIR STOK OPNAME SELISIH                 KETERANGAN


     BARANG                                  AWAL                                          01-Mei-12      01-Mei-12



 1     10001 Polyester 80% Cotton 20% Yard     - 137.500,00      97.000,00          -2000 38.500,00            35000 (5.500,00) SELISIH KURANG


 2     10002 Cotton 100%             Yard      - 84.600,00       76.000,00            300 8.900,00              8700 100,00      SELISIH LEBIH


 3     10003 Polyester 100%          Yard      - 64.500,00       58.000,00           -550 5.950,00              5500 (1.000,00) SELISIH KURANG




  Angka-angka tersebut harus didukung dengan bukti
 tertulis seperti bukti penerimaan barang, bukti retur,
                                                                                                      TERBIT SPP UNTUK
  bukti pemakaian bahan, surat jalan penjualan bahan
                                                                                                       SELISIH KURANG
                           dll
                         LAPORAN PERTANGGUNGJAWABAN MUTASI BARANG JADI
                                              PT. ABC
                               PERIODE 01 JANUARI 2012 S.D 30 APRIL 2012

             Diperoleh dari:                    Diperoleh:                 Saldo
           • laporan produksi                    • ekspor             awal+pemasukan-            Penyesuaian+stock
                                                • jual lokal        pengeluaran+penyesu
           • hasil subkontrak                 • pemusnahan                                       opname-saldo akhir
                                                                            aian
                                                   • scrap



NO    KODE       NAMA BARANG   SAT SALDO PEMASUKAN PENGELUARAN PENYESUAIAN SALDO AKHIR STOK OPNAME SELISIH     KETERANGAN
     BARANG                        AWAL                                     01-Mei-12    01-Mei-12



 1     20001 Kemeja            PCS    - 118.900,00   116.350,00         -150 2.400,00         2400 (150,00)   SELISIH KURANG

 2     20002 Baju Anak         PCS    - 149.400,00   121.500,00         -200 27.700,00       27000 (900,00)   SELISIH KURANG

 3     20003 Baju Renang       PCS    - 113.200,00   111.000,00         -350 1.850,00         1800 (400,00)   SELISIH KURANG




  Angka-angka tersebut harus didukung dengan bukti
 tertulis seperti bukti penerimaan barang, bukti retur,
  bukti pemakaian bahan, surat jalan penjualan bahan                                      TERBIT SPP UNTUK
                           dll                                                             SELISIH KURANG
                      LAPORAN PERTANGGUNGJAWABAN MUTASI SCRAP
                                        PT. ABC
                         PERIODE 01 JANUARI 2012 S.D 30 APRIL 2012
NO    KODE      NAMA BARANG   SAT SALDO PEMASUKAN PENGELUARAN PENYESUAIAN SALDO AKHIR STOK OPNAME SELISIH    KETERANGAN
     BARANG                       AWAL                                     01-Mei-12    01-Mei-12



 1     30001 SCRAP            KG     -   250          100               -10   140             160   10      SELISIH LEBIH




                                                                                    TIDAK ADA SPP KARENA
                                                                                        SELISIH LEBIH
              LAPORAN PERTANGGUNGJAWABAN MUTASI MESIN DAN PERALATAN
                                       PT. ABC
                        PERIODE 01 JANUARI 2012 S.D 30 APRIL 2012



                 DIPEROLEH DARI:                  DIPEROLEH DARI:                   Saldo
                     • IMPOR                         • PENJUALAN               awal+pemasukan-
                     • LOKAL                       • PEMUSNAHAN              pengeluaran+penyesu
                       •AKB                              • DLL                       aian



NO    KODE       NAMA BARANG   SAT SALDO PEMASUKAN PENGELUARAN PENYESUAIAN SALDO AKHIR STOK OPNAME SELISIH    KETERANGAN
     BARANG                        AWAL                                     01-Mei-12    01-Mei-12



 1     40001 MESIN JAHIT       PCS    -   300          25                 0 275                    275 0     SESUAI




  Angka-angka tersebut harus didukung dengan bukti
 tertulis seperti bukti penerimaan barang, bukti retur,                             TIDAK ADA SPP KARENA
  bukti pemakaian bahan, surat jalan penjualan bahan                                       SESUAI
                           dll
      BAGAIMANA JIKA PERUSAHAAN TIDAK
   MELAKUKAN STOCK OPNAME PADA SAAT
    PELAPORAN TETAPI MELAKUKAN STOCK
      OPNAME PADA WAKTU LAIN CONTOH
  MELAKUKAN STOCK OPNAME PER 3 BULAN
YAKNI AKHIR BULAN APRIL, AKHIR JUNI, AKHIR
         SEPT DAN AKHIR DESEMBER ?
                  JAWABAN
 KOLOM PADA STOCK OPNAME TIDAK PERLU
DIISI NAMUN JIKA ADA KETIDAKSESUAIAN PADA SAAT
 STOCK OPNAME TERSEBUT MAKA PADA KOLOM
          PENYESUAIAN HARUS DIISI
                              LAPORAN PERTANGGUNGJAWABAN BAHAN BAKU
                                                PT. ABC
                                 PERIODE 1 JANUARO 2012 S.D 30 APRIL 2012



NO    KODE       NAMA BARANG          SAT SALDO PEMASUKAN PENGELUARAN PENYESUAIAN SALDO AKHIR STOK OPNAME SELISIH     KETERANGAN


     BARANG                                  AWAL                                    01-Mei-12   01-Mei-12



 1     10001 Polyester 80% Cotton 20% Yard     - 137.500,00   97.000,00       -2000 38.500,00                -2000   SELISIH KURANG


 2     10002 Cotton 100%             Yard      - 84.600,00    76.000,00        300 8.900,00                  300     SELISIH LEBIH


 3     10003 Polyester 100%          Yard      - 64.500,00    58.000,00        -550 5.950,00                 -550    SELISIH KURANG




                                                                                                     TERBIT
                                                                                                      SPP
                   LAPORAN PERTANGGUNGJAWABAN MUTASI BARANG JADI
                                        PT. ABC
                         PERIODE 01 JANUARI 2012 S.D 30 APRIL 2012
NO    KODE       NAMA BARANG   SAT SALDO PEMASUKAN PENGELUARAN PENYESUAIAN SALDO AKHIR STOK OPNAME SELISIH    KETERANGAN
     BARANG                        AWAL                                     01-Mei-12    01-Mei-12



 1     20001 Kemeja            PCS    - 118.900,00   116.350,00         -150 2.400,00             -150       SELISIH KURANG

 2     20002 Baju Anak         PCS    - 149.400,00   121.500,00         -200 27.700,00            -200       SELISIH KURANG

 3     20003 Baju Renang       PCS    - 113.200,00   111.000,00         -350 1.850,00             -350       SELISIH KURANG




                                                                                              TERBIT SPP
                      LAPORAN PERTANGGUNGJAWABAN MUTASI SCRAP
                                        PT. ABC
                         PERIODE 01 JANUARI 2012 S.D 30 APRIL 2012
NO    KODE      NAMA BARANG   SAT SALDO PEMASUKAN PENGELUARAN PENYESUAIAN SALDO AKHIR STOK OPNAME SELISIH    KETERANGAN
     BARANG                       AWAL                                     01-Mei-12    01-Mei-12



 1     30001 SCRAP            KG     -   250          100               -10   140                -10        SELISIH KURANG




                                                                                           TERBIT SPP
BAGAIMANA JIKA PERUSAHAAN HANYA MELAKUKAN STOCK
OPNAME SATU KALI SAJA DAN BERTEPATAN DENGAN STOCK
     OPNAME BERSAMA PETUGAS BEA DAN CUKAI ?

                    JAWABAN

  PADA KOLOM STOCK OPNAME TIDAK PERLU DIISI UNTUK
   LAPORAN 4 BULANAN YANG TIDAK DILAKUKAN STOCK
 OPNAME TETAPI PADA BULAN DILAKUKAN STOCK OPNAME
   MAKA KOLOM STOCK OPNAME HARUS DIISI. CONTOH
STOCK OPNAME BERSAMA DENGAN PEJABAT BEA DAN CUKAI
   DILAKUKAN PADA AKHIR DESEMBER MAKA LAPORAN 4
 BULANAN PERIODE SEPT S.D DES HARUS MENCANTUMKAN
          ANGKA PADA KOLOM STOK OPNAME
                              LAPORAN PERTANGGUNGJAWABAN BAHAN BAKU
                                                PT. ABC
                                 PERIODE 1 JANUARI 2012 S.D 30 APRIL 2012



NO    KODE       NAMA BARANG          SAT SALDO PEMASUKAN PENGELUARAN PENYESUAIAN SALDO AKHIR STOK OPNAME SELISIH   KETERANGAN


     BARANG                                  AWAL                                   01-Mei-12   01-Mei-12



 1     10001 Polyester 80% Cotton 20% Yard     -    137.500,00   97.000,00             40500


 2     10002 Cotton 100%             Yard      -    84.600,00    76.000,00              9200


 3     10003 Polyester 100%          Yard      -    64.500,00    58.000,00              6500




                                                                                            TIDAK DIISI
                              LAPORAN PERTANGGUNGJAWABAN BAHAN BAKU
                                                 PT. ABC
                                  PERIODE 1 MEI 2012 S.D 31 AGUSTUS 2012



NO    KODE       NAMA BARANG          SAT SALDO PEMASUKAN PENGELUARAN PENYESUAIAN SALDO AKHIR STOK OPNAME SELISIH   KETERANGAN


     BARANG                                  AWAL                                   01-Mei-12   01-Mei-12



 1     10001 Polyester 80% Cotton 20% Yard     -    137.500,00   97.000,00   0         40500


 2     10002 Cotton 100%             Yard      -    84.600,00    76.000,00   0          9200


 3     10003 Polyester 100%          Yard      -    64.500,00    58.000,00   0          6500




                                                                                                 TIDAK DIISI
                              LAPORAN PERTANGGUNGJAWABAN BAHAN BAKU
                                                PT. ABC
                              PERIODE 1 SEPTEMBER 2012 S.D 31 DESEMBER 2012



NO    KODE       NAMA BARANG          SAT SALDO PEMASUKAN PENGELUARAN PENYESUAIAN SALDO AKHIR STOK OPNAME SELISIH    KETERANGAN


     BARANG                                  AWAL                                   01-Mei-12   01-Mei-12



 1     10001 Polyester 80% Cotton 20% Yard     -    137.500,00   97.000,00   0         40500     40000      -500    SELISIH KURANG


 2     10002 Cotton 100%             Yard      -    84.600,00    76.000,00   0          9200      9000      -200    SELISIH KURANG


 3     10003 Polyester 100%          Yard      -    64.500,00    58.000,00   0          6500      6500       0         SESUAI




                                                          DIISI DENGAN HASIL STOCK
                                                          OPNAME BERSAMA DENGAN                               TERBIT
                                                           PEJABAT BEA DAN CUKAI                               SPP
   BAGAIMANA JIKA PERUSAHAAN MELAKUKAN STOCK
 OPNAME TIDAK PERSIS PADA AKHIR BULAN CONTOH BARU
    MELAKUKAN STOK OPNAME PADA TGL 3 MEI 2012

                      JAWABAN

     PERUSAHAAN DAPAT MELAKUKAN DUA HAL YAKNI :
• PERIODE LAPORAN DIUBAH MENJADI 01 JANUARI 2012 S.D 3
                       MEI 2012 ATAU
 • PERIODE LAPORAN TETAP MENJADI 01 JANUARI 2012 S.D 30
   APRIL 2012 TETAPI STOCK OPNAME TGL 2 MEI DITARIK KE
TANGGAL 30 APRIL 2012 DENGAN CARA STOCK OPNAME TGL
  2 MEI 2012 DITAMBAH PENGELUARAN DARI TGL 1 MEI S.D 2
 MEI DIKURANGI DENGAN PEMASUKAN DARI TGL 1 MEI S.D 2
                              LAPORAN PERTANGGUNGJAWABAN BAHAN BAKU
                                               PT. ABC
                                 PERIODE 1 JANUARO 2012 S.D 03 MEI 2012
           Diperoleh dari:                                 Diperoleh dari:
                                                                                                                             Saldo
                                                    • pemakain barang ke produksi     Jika perusahaan
         • pemasukan impor                                                                                              awal+pemasukan-
                                                        •Penjualan bahan baku        melakukan stock
          •Pemasukan lokal                                 •Pengirim scrap                                            pengeluaran+penyesu
        •Retur dari produksi                                                        opname secara rutin
                                                            •pemusnahan                                                       aian




NO    KODE       NAMA BARANG          SAT SALDO PEMASUKAN PENGELUARAN PENYESUAIAN SALDO AKHIR STOK OPNAME SELISIH                 KETERANGAN


     BARANG                                  AWAL                                          03-Mei-12      03-Mei-12



 1     10001 Polyester 80% Cotton 20% Yard     - 137.500,00      97.000,00          -2000 38.500,00            35000 (5.500,00) SELISIH KURANG


 2     10002 Cotton 100%             Yard      - 84.600,00       76.000,00            300 8.900,00              8700 100,00      SELISIH LEBIH


 3     10003 Polyester 100%          Yard      - 64.500,00       58.000,00           -550 5.950,00              5500 (1.000,00) SELISIH KURANG




  Angka-angka tersebut harus didukung dengan bukti
 tertulis seperti bukti penerimaan barang, bukti retur,
                                                                                                      TERBIT SPP UNTUK
  bukti pemakaian bahan, surat jalan penjualan bahan
                                                                                                       SELISIH KURANG
                           dll
BAGAIMANA MENGHITUNG KEKURANGAN PEMBAYARAN
BEA MASUK DAN PDRI ATAS SELISIH KURANG?
                        JAWABAN
PERHITUNGANNYA SAMA DENGAN SAAT PERUSAHAAN
MEMBUAT BC 2.5
1.BAHAN BAKU
        TENTUKAN APAKAH BAHAN BAKU BERASAL DARI
IMPOR ATAU LOKAL
        TENTUKAN NILAI PABEAN DAN TARIF
2. BARANG JADI
        KONVERSI BARANG JADI KE BAHAN BAKU
        TENTUKAN NILAI PABEAN DAN TARIF BAHAN BAKU
3. SISA DAN SCRAP
        TENTUKAN SESUAI DENGAN PMK 147/PMK.04/2011
                     PERTANYAAN?


               SEKIAN
     TERIMA KASIH DAN SEMOGA
PENJELASAN TERSEBUT DAPAT BERGUNA
       BUAT KITA SEMUA, AMIN

								
To top