					ARRA New Well Projects
Schedule B

INSTRUCTIONS: Please complete all cells that are highlighted green for each sheet of this workbook.
The workbook will automatically sum the amounts for each district and roll them up to this summary sheet.

                                                              Quantity
CLIN       Section        Services                            and Unit   Unit Price    Amount
           WBR
1          1452.232-81    Mobilization and Prepatory Work     For the Lump Sum of                           $0.00
                          New Wells for Byron Bethany
2          13 21 00       Irrigation District                 For the Lump Sum of                           $0.00
                          New Wells for Del Puerto Water
3          13 21 00       District                            For the Lump Sum of                           $0.00
                          New Wells for Fresno Slough
4          13 21 00       Water District                      For the Lump Sum of                           $0.00
                          New Wells for Grasslands Water
5          13 21 00       District                            For the Lump Sum of                           $0.00
                          New Wells for James Irrigation
6          13 21 00       District                            For the Lump Sum of                           $0.00
                          New Wells for San Luis Water
7          13 21 00       District                            For the Lump Sum of                           $0.00
                          New Wells for Tranquillity
8          13 21 00       Irrigation District                 For the Lump Sum of                           $0.00
                          New Wells for West Stanislaus
9          13 21 00       Irrigation District                 For the Lump Sum of                           $0.00

                          Reporting Requirements
                          Deliverable - In accordance with
                          the American Recovery and
                          Reinvestment Acot of 2009: The
                          contractor must provide a
                          deliverable that meets the
                          reporting requirements described
           FAR Clause     in FAR Clause 52.204-11, which is
10         52.204-11      located in this solicitation.       For the Lump Sum of

                                                              TOTAL FOR SCHEDULE                            $0.00
BYRON BETHANY IRRIGATION DISTRICT

SCHEDULE B5 - BBID Well No. 5

CLIN      Section               Services                                       Quantity Units      Unit Price Amount
B5-1      WBR 1452.232-81       Mobilization and Preparatory Work              For the lump sum of
B5-2      13 20 50              Test hole BBID Well No. 5                             750 LF                           $0.00
B5-3      13 21 00              Drill/Reaming BBID Well No. 5                         750 LF                           $0.00
B5-4      13 21 00              Casing BBID Well No. 5                                470 LF                           $0.00
B5-5      13 21 00              Screen BBID Well No. 5                                280 LF                           $0.00
B5-6      11 21 10              Motor BBID Well No. 5                                    1 Each                        $0.00
B5-7      11 21 10              Pump BBID Well No. 5                                     1 Each                        $0.00
B5-8      11 21 10              Column Pipe/Tube and Shaft BBID Well No. 5            460 LF                           $0.00
B5-9      13 21 00              Well Development and Testing BBID Well No. 5   For the lump sum of
B5-10     13 21 00              Pump Support BBID Well No. 5                   For the lump sum of
B5-11     11 21 10              Electrical Equipment BBID Well No. 5           For the lump sum of
B5-12     26 21 00              Utilities BBID Well No. 5                      For the lump sum of
B5-13     11 42 00              12-Inch Flow Meter BBID Well No. 5                       1 Each                        $0.00
                                                                               TOTAL FOR SCHEDULE                      $0.00 Excludes Mob and Prep
DEL PUERTO WATER DISTRICT

SCHEDULE D14 - DPWD Well No. 14

CLIN     Section             Services                                        Quantity Units      Unit Price Amount
D14-1    WBR 1452.232-81     Mobilization and Preparatory Work               For the lump sum of
D14-2    13 20 50            Test hole DPWD Well No. 14                             500 LF                           $0.00
D14-3    13 21 00            Drill/Reaming DPWD Well No. 14                         500 LF                           $0.00
D14-4    13 21 00            Casing DPWD Well No. 14                                340 LF                           $0.00
D14-5    13 21 00            Screen DPWD Well No. 14                                160 LF                           $0.00
D14-6    11 21 10            Motor DPWD Well No. 14                                    1 Each                        $0.00
D14-7    11 21 10            Pump DPWD Well No. 14                                     1 Each                        $0.00
D14-8    11 21 10            Column Pipe/Tube and Shaft DPWD Well No. 14            340 LF                           $0.00
D14-9    13 21 00            Well Development and Testing DPWD Well No. 14   For the lump sum of
D14-10   13 21 00            Pump Support DPWD Well No. 14                   For the lump sum of
D14-11   11 21 10            Electrical Equipment DPWD Well No. 14           For the lump sum of
D14-12   26 21 00            Utilities DPWD Well No. 14                      For the lump sum of
D14-13   11 42 00            12-Inch Flow Meter DPWD Well No. 14                       1 Each                        $0.00
                                                                             TOTAL FOR SCHEDULE D14                  $0.00 Excludes Mob and Prep

SCHEDULE D38 - DPWD Well No. 38

CLIN     Section             Services                                        Quantity Units      Unit Price Amount
D38-1    WBR 1452.232-81     Mobilization and Preparatory Work               For the lump sum of
D38-2    13 20 50            Test hole DPWD Well No. 38                             500 LF                           $0.00
D38-3    13 21 00            Drill/Reaming DPWD Well No. 38                         500 LF                           $0.00
D38-4    13 21 00            Casing DPWD Well No. 38                                300 LF                           $0.00
D38-5    13 21 00            Screen DPWD Well No. 38                                200 LF                           $0.00
D38-6    11 21 10            Motor DPWD Well No. 38                                    1 Each                        $0.00
D38-7    11 21 10            Pump DPWD Well No. 38                                     1 Each                        $0.00
D38-8    11 21 10            Column Pipe/Tube and Shaft DPWD Well No. 38            300 LF                           $0.00
D38-9    13 21 00            Well Development and Testing DPWD Well No. 38   For the lump sum of
D38-10   13 21 00            Pump Support DPWD Well No. 38                   For the lump sum of
D38-11   11 21 10            Electrical Equipment DPWD Well No. 38           For the lump sum of
D38-12   26 21 00            Utilities DPWD Well No. 38                      For the lump sum of
D38-13   11 42 00            12-Inch Flow Meter DPWD Well No. 38                       1 Each                        $0.00
                                                                             TOTAL FOR SCHEDULE D38                  $0.00 Excludes Mob and Prep
DEL PUERTO WATER DISTRICT


SCHEDULE D50 - DPWD Well No. 50

CLIN     Section             Services                                        Quantity Units      Unit Price Amount
D50-1    WBR 1452.232-81     Mobilization and Preparatory Work               For the lump sum of
D50-2    13 20 50            Test hole DPWD Well No. 50                             300 LF                           $0.00
D50-3    13 21 00            Drill/Reaming DPWD Well No. 50                         300 LF                           $0.00
D50-4    13 21 00            Casing DPWD Well No. 50                                180 LF                           $0.00
D50-5    13 21 00            Screen DPWD Well No. 50                                120 LF                           $0.00
D50-6    11 21 10            Motor DPWD Well No. 50                                    1 Each                        $0.00
D50-7    11 21 10            Pump DPWD Well No. 50                                     1 Each                        $0.00
D50-8    11 21 10            Column Pipe/Tube and Shaft DPWD Well No. 50            180 LF                           $0.00
D50-9    13 21 00            Well Development and Testing DPWD Well No. 50   For the lump sum of
D50-10   13 21 00            Pump Support DPWD Well No. 50                   For the lump sum of
D50-11   11 21 10            Electrical Equipment DPWD Well No. 50           For the lump sum of
D50-12   26 21 00            Utilities DPWD Well No. 50                      For the lump sum of
D50-13   11 42 00            12-Inch Flow Meter DPWD Well No. 50                       1 Each                        $0.00
                                                                             TOTAL FOR SCHEDULE D50                  $0.00 Excludes Mob and Prep

SCHEDULE D51 - DPWD Well No. 51

CLIN     Section             Services                                        Quantity Units      Unit Price Amount
D51-1    WBR 1452.232-81     Mobilization and Preparatory Work               For the lump sum of
D51-2    13 20 50            Test hole DPWD Well No. 51                             600 LF                           $0.00
D51-3    13 21 00            Drill/Reaming DPWD Well No. 51                         600 LF                           $0.00
D51-4    13 21 00            Casing DPWD Well No. 51                                360 LF                           $0.00
D51-5    13 21 00            Screen DPWD Well No. 51                                240 LF                           $0.00
D51-6    11 21 10            Motor DPWD Well No. 51                                    1 Each                        $0.00
D51-7    11 21 10            Pump DPWD Well No. 51                                     1 Each                        $0.00
D51-8    11 21 10            Column Pipe/Tube and Shaft DPWD Well No. 51            360 LF                           $0.00
D51-9    13 21 00            Well Development and Testing DPWD Well No. 51   For the lump sum of
D51-10   13 21 00            Pump Support DPWD Well No. 51                   For the lump sum of
D51-11   11 21 10            Electrical Equipment DPWD Well No. 51           For the lump sum of
D51-12   26 21 00            Utilities DPWD Well No. 51                      For the lump sum of
D51-13   11 42 00            12-Inch Flow Meter DPWD Well No. 51                       1 Each                        $0.00
                                                                             TOTAL FOR SCHEDULE D51                  $0.00 Excludes Mob and Prep
DEL PUERTO WATER DISTRICT

SCHEDULE D54 - DPWD Well No. 54

CLIN     Section             Services                                        Quantity Units      Unit Price Amount
D54-1    WBR 1452.232-81     Mobilization and Preparatory Work               For the lump sum of
D54-2    13 20 50            Test hole DPWD Well No. 54                             500 LF                           $0.00
D54-3    13 21 00            Drill/Reaming DPWD Well No. 54                         500 LF                           $0.00
D54-4    13 21 00            Casing DPWD Well No. 54                                300 LF                           $0.00
D54-5    13 21 00            Screen DPWD Well No. 54                                200 LF                           $0.00
D54-6    11 21 10            Motor DPWD Well No. 54                                    1 Each                        $0.00
D54-7    11 21 10            Pump DPWD Well No. 54                                     1 Each                        $0.00
D54-8    11 21 10            Column Pipe/Tube and Shaft DPWD Well No. 54            300 LF                           $0.00
D54-9    13 21 00            Well Development and Testing DPWD Well No. 54   For the lump sum of
D54-10   13 21 00            Pump Support DPWD Well No. 54                   For the lump sum of
D54-11   11 21 10            Electrical Equipment DPWD Well No. 54           For the lump sum of
D54-12   26 21 00            Utilities DPWD Well No. 54                      For the lump sum of
D54-13   11 42 00            12-Inch Flow Meter DPWD Well No. 54                       1 Each                        $0.00
                                                                             TOTAL FOR SCHEDULE D54                  $0.00 Excludes Mob and Prep

SCHEDULE D55 - DPWD Well No. 55

CLIN     Section             Services                                        Quantity Units      Unit Price Amount
D55-1    WBR 1452.232-81     Mobilization and Preparatory Work               For the lump sum of
D55-2    13 20 50            Test hole DPWD Well No. 55                             400 LF                           $0.00
D55-3    13 21 00            Drill/Reaming DPWD Well No. 55                         400 LF                           $0.00
D55-4    13 21 00            Casing DPWD Well No. 55                                240 LF                           $0.00
D55-5    13 21 00            Screen DPWD Well No. 55                                160 LF                           $0.00
D55-6    11 21 10            Motor DPWD Well No. 55                                    1 Each                        $0.00
D55-7    11 21 10            Pump DPWD Well No. 55                                     1 Each                        $0.00
D55-8    11 21 10            Column Pipe/Tube and Shaft DPWD Well No. 55            240 LF                           $0.00
D55-9    13 21 00            Well Development and Testing DPWD Well No. 55   For the lump sum of
D55-10   13 21 00            Pump Support DPWD Well No. 55                   For the lump sum of
D55-11   11 21 10            Electrical Equipment DPWD Well No. 55           For the lump sum of
D55-12   26 21 00            Utilities DPWD Well No. 55                      For the lump sum of
D55-13   11 42 00            12-Inch Flow Meter DPWD Well No. 55                       1 Each                        $0.00
                                                                             TOTAL FOR SCHEDULE D55                  $0.00 Excludes Mob and Prep
DEL PUERTO WATER DISTRICT

SCHEDULE D59 - DPWD Well No. 59

CLIN     Section             Services                                        Quantity Units      Unit Price Amount
D59-1    WBR 1452.232-81     Mobilization and Preparatory Work               For the lump sum of
D59-2    13 20 50            Test hole DPWD Well No. 59                             450 LF                           $0.00
D59-3    13 21 00            Drill/Reaming DPWD Well No. 59                         450 LF                           $0.00
D59-4    13 21 00            Casing DPWD Well No. 59                                270 LF                           $0.00
D59-5    13 21 00            Screen DPWD Well No. 59                                180 LF                           $0.00
D59-6    11 21 10            Motor DPWD Well No. 59                                    1 Each                        $0.00
D59-7    11 21 10            Pump DPWD Well No. 59                                     1 Each                        $0.00
D59-8    11 21 10            Column Pipe/Tube and Shaft DPWD Well No. 59            270 LF                           $0.00
D59-9    13 21 00            Well Development and Testing DPWD Well No. 59   For the lump sum of
D59-10   13 21 00            Pump Support DPWD Well No. 59                   For the lump sum of
D59-11   11 21 10            Electrical Equipment DPWD Well No. 59           For the lump sum of
D59-12   26 21 00            Utilities DPWD Well No. 59                      For the lump sum of
D59-13   11 42 00            12-Inch Flow Meter DPWD Well No. 59                       1 Each                        $0.00
                                                                             TOTAL FOR SCHEDULE D59                  $0.00 Excludes Mob and Prep

SCHEDULE D64- DPWD Well No. 64

CLIN     Section             Services                                        Quantity Units      Unit Price Amount
D64-1    WBR 1452.232-81     Mobilization and Preparatory Work               For the lump sum of
D64-2    13 20 50            Test hole DPWD Well No. 64                             600 LF                           $0.00
D64-3    13 21 00            Drill/Reaming DPWD Well No. 64                         600 LF                           $0.00
D64-4    13 21 00            Casing DPWD Well No. 64                                360 LF                           $0.00
D64-5    13 21 00            Screen DPWD Well No. 64                                240 LF                           $0.00
D64-6    11 21 10            Motor DPWD Well No. 64                                    1 Each                        $0.00
D64-7    11 21 10            Pump DPWD Well No. 64                                     1 Each                        $0.00
D64-8    11 21 10            Column Pipe/Tube and Shaft DPWD Well No. 64            360 LF                           $0.00
D64-9    13 21 00            Well Development and Testing DPWD Well No. 64   For the lump sum of
D64-10   13 21 00            Pump Support DPWD Well No. 64                   For the lump sum of
D64-11   11 21 10            Electrical Equipment DPWD Well No. 64           For the lump sum of
D64-12   26 21 00            Utilities DPWD Well No. 64                      For the lump sum of
D64-13   11 42 00            12-Inch Flow Meter DPWD Well No. 64                       1 Each                        $0.00
                                                                             TOTAL FOR SCHEDULE D64                  $0.00 Excludes Mob and Prep
DEL PUERTO WATER DISTRICT

SCHEDULE D67- DPWD Well No. 67

CLIN     Section             Services                                        Quantity Units      Unit Price Amount
D67-1    WBR 1452.232-81     Mobilization and Preparatory Work               For the lump sum of
D67-2    13 20 50            Test hole DPWD Well No. 67                             550 LF                           $0.00
D67-3    13 21 00            Drill/Reaming DPWD Well No. 67                         550 LF                           $0.00
D67-4    13 21 00            Casing DPWD Well No. 67                                330 LF                           $0.00
D67-5    13 21 00            Screen DPWD Well No. 67                                220 LF                           $0.00
D67-6    11 21 10            Motor DPWD Well No. 67                                    1 Each                        $0.00
D67-7    11 21 10            Pump DPWD Well No. 67                                     1 Each                        $0.00
D67-8    11 21 10            Column Pipe/Tube and Shaft DPWD Well No. 67            340 LF                           $0.00
D67-9    13 21 00            Well Development and Testing DPWD Well No. 67   For the lump sum of
D67-10   13 21 00            Pump Support DPWD Well No. 67                   For the lump sum of
D67-11   11 21 10            Electrical Equipment DPWD Well No. 67           For the lump sum of
D67-12   26 21 00            Utilities DPWD Well No. 67                      For the lump sum of
D67-13   11 42 00            12-Inch Flow Meter DPWD Well No. 67                       1 Each                        $0.00
                                                                             TOTAL FOR SCHEDULE D67                  $0.00 Excludes Mob and Prep

SCHEDULE D78- DPWD Well No. 78

CLIN     Section             Services                                        Quantity Units      Unit Price Amount
D78-1    WBR 1452.232-81     Mobilization and Preparatory Work               For the lump sum of
D78-2    13 20 50            Test hole DPWD Well No. 78                             600 LF                           $0.00
D78-3    13 21 00            Drill/Reaming DPWD Well No. 78                         600 LF                           $0.00
D78-4    13 21 00            Casing DPWD Well No. 78                                360 LF                           $0.00
D78-5    13 21 00            Screen DPWD Well No. 78                                240 LF                           $0.00
D78-6    11 21 10            Motor DPWD Well No. 78                                    1 Each                        $0.00
D78-7    11 21 10            Pump DPWD Well No. 78                                     1 Each                        $0.00
D78-8    11 21 10            Column Pipe/Tube and Shaft DPWD Well No. 78            360 LF                           $0.00
D78-9    13 21 00            Well Development and Testing DPWD Well No. 78   For the lump sum of
D78-10   13 21 00            Pump Support DPWD Well No. 78                   For the lump sum of
D78-11   11 21 10            Electrical Equipment DPWD Well No. 78           For the lump sum of
D78-12   26 21 00            Utilities DPWD Well No. 78                      For the lump sum of
D78-13   11 42 00            12-Inch Flow Meter DPWD Well No. 78                       1 Each                        $0.00
                                                                             TOTAL FOR SCHEDULE D78                  $0.00 Excludes Mob and Prep
DEL PUERTO WATER DISTRICT

SCHEDULE D80- DPWD Well No. 80

CLIN     Section             Services                                        Quantity Units      Unit Price Amount
D80-1    WBR 1452.232-81     Mobilization and Preparatory Work               For the lump sum of
D80-2    13 20 50            Test hole DPWD Well No. 80                             480 LF                           $0.00
D80-3    13 21 00            Drill/Reaming DPWD Well No. 80                         480 LF                           $0.00
D80-4    13 21 00            Casing DPWD Well No. 80                                280 LF                           $0.00
D80-5    13 21 00            Screen DPWD Well No. 80                                190 LF                           $0.00
D80-6    11 21 10            Motor DPWD Well No. 80                                    1 Each                        $0.00
D80-7    11 21 10            Pump DPWD Well No. 80                                     1 Each                        $0.00
D80-8    11 21 10            Column Pipe/Tube and Shaft DPWD Well No. 80            280 LF                           $0.00
D80-9    13 21 00            Well Development and Testing DPWD Well No. 80   For the lump sum of
D80-10   13 21 00            Pump Support DPWD Well No. 80                   For the lump sum of
D80-11   11 21 10            Electrical Equipment DPWD Well No. 80           For the lump sum of
D80-12   26 21 00            Utilities DPWD Well No. 80                      For the lump sum of
D80-13   11 42 00            12-Inch Flow Meter DPWD Well No. 80                       1 Each                        $0.00
                                                                             TOTAL FOR SCHEDULE D80                  $0.00 Excludes Mob and Prep

SCHEDULE D82- DPWD Well No. 82

CLIN     Section             Services                                        Quantity Units      Unit Price Amount
D82-1    WBR 1452.232-81     Mobilization and Preparatory Work               For the lump sum of
D82-2    13 20 50            Test hole DPWD Well No. 82                             200 LF                           $0.00
D82-3    13 21 00            Drill/Reaming DPWD Well No. 82                         200 LF                           $0.00
D82-4    13 21 00            Casing DPWD Well No. 82                                120 LF                           $0.00
D82-5    13 21 00            Screen DPWD Well No. 82                                  80 LF                          $0.00
D82-6    11 21 10            Motor DPWD Well No. 82                                    1 Each                        $0.00
D82-7    11 21 10            Pump DPWD Well No. 82                                     1 Each                        $0.00
D82-8    11 21 10            Column Pipe/Tube and Shaft DPWD Well No. 82            120 LF                           $0.00
D82-9    13 21 00            Well Development and Testing DPWD Well No. 82   For the lump sum of
D82-10   13 21 00            Pump Support DPWD Well No. 82                   For the lump sum of
D82-11   11 21 10            Electrical Equipment DPWD Well No. 82           For the lump sum of
D82-12   26 21 00            Utilities DPWD Well No. 82                      For the lump sum of
D82-13   11 42 00            12-Inch Flow Meter DPWD Well No. 82                       1 Each                        $0.00
                                                                             TOTAL FOR SCHEDULE D82                  $0.00 Excludes Mob and Prep
DEL PUERTO WATER DISTRICT

SCHEDULE D84- DPWD Well No. 84

CLIN     Section             Services                                        Quantity Units      Unit Price Amount
D84-1    WBR 1452.232-81     Mobilization and Preparatory Work               For the lump sum of
D84-2    13 20 50            Test hole DPWD Well No. 84                             500 LF                           $0.00
D84-3    13 21 00            Drill/Reaming DPWD Well No. 84                         500 LF                           $0.00
D84-4    13 21 00            Casing DPWD Well No. 84                                300 LF                           $0.00
D84-5    13 21 00            Screen DPWD Well No. 84                                200 LF                           $0.00
D84-6    11 21 10            Motor DPWD Well No. 84                                    1 Each                        $0.00
D84-7    11 21 10            Pump DPWD Well No. 84                                     1 Each                        $0.00
D84-8    11 21 10            Column Pipe/Tube and Shaft DPWD Well No. 84            300 LF                           $0.00
D84-9    13 21 00            Well Development and Testing DPWD Well No. 84   For the lump sum of
D84-10   13 21 00            Pump Support DPWD Well No. 84                   For the lump sum of
D84-11   11 21 10            Electrical Equipment DPWD Well No. 84           For the lump sum of
D84-12   26 21 00            Utilities DPWD Well No. 84                      For the lump sum of
D84-13   11 42 00            12-Inch Flow Meter DPWD Well No. 84                       1 Each                        $0.00
                                                                             TOTAL FOR SCHEDULE D84                  $0.00 Excludes Mob and Prep

SCHEDULE D86- DPWD Well No. 86

CLIN     Section             Services                                        Quantity Units      Unit Price Amount
D86-1    WBR 1452.232-81     Mobilization and Preparatory Work               For the lump sum of
D86-2    13 20 50            Test hole DPWD Well No. 86                             600 LF                           $0.00
D86-3    13 21 00            Drill/Reaming DPWD Well No. 86                         600 LF                           $0.00
D86-4    13 21 00            Casing DPWD Well No. 86                                360 LF                           $0.00
D86-5    13 21 00            Screen DPWD Well No. 86                                240 LF                           $0.00
D86-6    11 21 10            Motor DPWD Well No. 86                                    1 Each                        $0.00
D86-7    11 21 10            Pump DPWD Well No. 86                                     1 Each                        $0.00
D86-8    11 21 10            Column Pipe/Tube and Shaft DPWD Well No. 86            360 LF                           $0.00
D86-9    13 21 00            Well Development and Testing DPWD Well No. 86   For the lump sum of
D86-10   13 21 00            Pump Support DPWD Well No. 86                   For the lump sum of
D86-11   11 21 10            Electrical Equipment DPWD Well No. 86           For the lump sum of
D86-12   26 21 00            Utilities DPWD Well No. 86                      For the lump sum of
D86-13   11 42 00            12-Inch Flow Meter DPWD Well No. 86                       1 Each                        $0.00
                                                                             TOTAL FOR SCHEDULE D86                  $0.00 Excludes Mob and Prep
DEL PUERTO WATER DISTRICT

SCHEDULE D90- DPWD Well No. 90

CLIN     Section             Services                                        Quantity Units      Unit Price Amount
D90-1    WBR 1452.232-81     Mobilization and Preparatory Work               For the lump sum of
D90-2    13 20 50            Test hole DPWD Well No. 90                             600 LF                           $0.00
D90-3    13 21 00            Drill/Reaming DPWD Well No. 90                         600 LF                           $0.00
D90-4    13 21 00            Casing DPWD Well No. 90                                360 LF                           $0.00
D90-5    13 21 00            Screen DPWD Well No. 90                                240 LF                           $0.00
D90-6    11 21 10            Motor DPWD Well No. 90                                    1 Each                        $0.00
D90-7    11 21 10            Pump DPWD Well No. 90                                     1 Each                        $0.00
D90-8    11 21 10            Column Pipe/Tube and Shaft DPWD Well No. 90            360 LF                           $0.00
D90-9    13 21 00            Well Development and Testing DPWD Well No. 90   For the lump sum of
D90-10   13 21 00            Pump Support DPWD Well No. 90                   For the lump sum of
D90-11   11 21 10            Electrical Equipment DPWD Well No. 90           For the lump sum of
D90-12   26 21 00            Utilities DPWD Well No. 90                      For the lump sum of
D90-13   11 42 00            12-Inch Flow Meter DPWD Well No. 90                       1 Each                        $0.00
                                                                             TOTAL FOR SCHEDULE D90                  $0.00 Excludes Mob and Prep

SCHEDULE D91- DPWD Well No. 91

CLIN     Section             Services                                        Quantity Units      Unit Price Amount
D91-1    WBR 1452.232-81     Mobilization and Preparatory Work               For the lump sum of
D91-2    13 20 50            Test hole DPWD Well No. 91                             300 LF                           $0.00
D91-3    13 21 00            Drill/Reaming DPWD Well No. 91                         300 LF                           $0.00
D91-4    13 21 00            Casing DPWD Well No. 91                                180 LF                           $0.00
D91-5    13 21 00            Screen DPWD Well No. 91                                120 LF                           $0.00
D91-6    11 21 10            Motor DPWD Well No. 91                                    1 Each                        $0.00
D91-7    11 21 10            Pump DPWD Well No. 91                                     1 Each                        $0.00
D91-8    11 21 10            Column Pipe/Tube and Shaft DPWD Well No. 91            180 LF                           $0.00
D91-9    13 21 00            Well Development and Testing DPWD Well No. 91   For the lump sum of
D91-10   13 21 00            Pump Support DPWD Well No. 91                   For the lump sum of
D91-11   11 21 10            Electrical Equipment DPWD Well No. 91           For the lump sum of
D91-12   26 21 00            Utilities DPWD Well No. 91                      For the lump sum of
D91-13   11 42 00            12-Inch Flow Meter DPWD Well No. 91                       1 Each                        $0.00
                                                                             TOTAL FOR SCHEDULE D91                  $0.00 Excludes Mob and Prep
DEL PUERTO WATER DISTRICT

SCHEDULE D94- DPWD Well No. 94

CLIN     Section             Services                                        Quantity Units      Unit Price Amount
D94-1    WBR 1452.232-81     Mobilization and Preparatory Work               For the lump sum of
D94-2    13 20 50            Test hole DPWD Well No. 94                             600 LF                           $0.00
D94-3    13 21 00            Drill/Reaming DPWD Well No. 94                         600 LF                           $0.00
D94-4    13 21 00            Casing DPWD Well No. 94                                360 LF                           $0.00
D94-5    13 21 00            Screen DPWD Well No. 94                                240 LF                           $0.00
D94-6    11 21 10            Motor DPWD Well No. 94                                    1 Each                        $0.00
D94-7    11 21 10            Pump DPWD Well No. 94                                     1 Each                        $0.00
D94-8    11 21 10            Column Pipe/Tube and Shaft DPWD Well No. 94            360 LF                           $0.00
D94-9    13 21 00            Well Development and Testing DPWD Well No. 94   For the lump sum of
D94-10   13 21 00            Pump Support DPWD Well No. 94                   For the lump sum of
D94-11   11 21 10            Electrical Equipment DPWD Well No. 94           For the lump sum of
D94-12   26 21 00            Utilities DPWD Well No. 94                      For the lump sum of
D94-13   11 42 00            12-Inch Flow Meter DPWD Well No. 94                       1 Each                        $0.00
                                                                             TOTAL FOR SCHEDULE D94                  $0.00 Excludes Mob and Prep

SCHEDULE D96- DPWD Well No. 96

CLIN     Section             Services                                        Quantity Units      Unit Price Amount
D96-1    WBR 1452.232-81     Mobilization and Preparatory Work               For the lump sum of
D96-2    13 20 50            Test hole DPWD Well No. 96                             600 LF                           $0.00
D96-3    13 21 00            Drill/Reaming DPWD Well No. 96                         600 LF                           $0.00
D96-4    13 21 00            Casing DPWD Well No. 96                                360 LF                           $0.00
D96-5    13 21 00            Screen DPWD Well No. 96                                240 LF                           $0.00
D96-6    11 21 10            Motor DPWD Well No. 96                                    1 Each                        $0.00
D96-7    11 21 10            Pump DPWD Well No. 96                                     1 Each                        $0.00
D96-8    11 21 10            Column Pipe/Tube and Shaft DPWD Well No. 96            360 LF                           $0.00
D96-9    13 21 00            Well Development and Testing DPWD Well No. 96   For the lump sum of
D96-10   13 21 00            Pump Support DPWD Well No. 96                   For the lump sum of
D96-11   11 21 10            Electrical Equipment DPWD Well No. 96           For the lump sum of
D96-12   26 21 00            Utilities DPWD Well No. 96                      For the lump sum of
D96-13   11 42 00            12-Inch Flow Meter DPWD Well No. 96                       1 Each                        $0.00
                                                                             TOTAL FOR SCHEDULE D96                  $0.00 Excludes Mob and Prep
DEL PUERTO WATER DISTRICT

SCHEDULE D97- DPWD Well No. 97

CLIN      Section            Services                                         Quantity Units      Unit Price Amount
D97-1     WBR 1452.232-81    Mobilization and Preparatory Work                For the lump sum of
D97-2     13 20 50           Test hole DPWD Well No. 97                              600 LF                           $0.00
D97-3     13 21 00           Drill/Reaming DPWD Well No. 97                          450 LF                           $0.00
D97-4     13 21 00           Casing DPWD Well No. 97                                 270 LF                           $0.00
D97-5     13 21 00           Screen DPWD Well No. 97                                 180 LF                           $0.00
D97-6     11 21 10           Motor DPWD Well No. 97                                     1 Each                        $0.00
D97-7     11 21 10           Pump DPWD Well No. 97                                      1 Each                        $0.00
D97-8     11 21 10           Column Pipe/Tube and Shaft DPWD Well No. 97             280 LF                           $0.00
D97-9     13 21 00           Well Development and Testing DPWD Well No. 97    For the lump sum of
D97-10    13 21 00           Pump Support DPWD Well No. 97                    For the lump sum of
D97-11    11 21 10           Electrical Equipment DPWD Well No. 97            For the lump sum of
D97-12    26 21 00           Utilities DPWD Well No. 97                       For the lump sum of
D97-13    11 42 00           12-Inch Flow Meter DPWD Well No. 97                        1 Each                        $0.00
                                                                              TOTAL FOR SCHEDULE D97                  $0.00 Excludes Mob and Prep

SCHEDULE D101- DPWD Well No. 101

CLIN      Section            Services                                         Quantity Units      Unit Price Amount
D101-1    WBR 1452.232-81    Mobilization and Preparatory Work                For the lump sum of
D101-2    13 20 50           Test hole DPWD Well No. 101                             300 LF                           $0.00
D101-3    13 21 00           Drill/Reaming DPWD Well No. 101                         300 LF                           $0.00
D101-4    13 21 00           Casing DPWD Well No. 101                                180 LF                           $0.00
D101-5    13 21 00           Screen DPWD Well No. 101                                120 LF                           $0.00
D101-6    11 21 10           Motor DPWD Well No. 101                                    1 Each                        $0.00
D101-7    11 21 10           Pump DPWD Well No. 101                                     1 Each                        $0.00
D101-8    11 21 10           Column Pipe/Tube and Shaft DPWD Well No. 101            180 LF                           $0.00
D101-9    13 21 00           Well Development and Testing DPWD Well No. 101   For the lump sum of
D101-10   13 21 00           Pump Support DPWD Well No. 101                   For the lump sum of
D101-11   11 21 10           Electrical Equipment DPWD Well No. 101           For the lump sum of
D101-12   26 21 00           Utilities DPWD Well No. 101                      For the lump sum of
D101-13   11 42 00           12-Inch Flow Meter DPWD Well No. 101                       1 Each                        $0.00
                                                                              TOTAL FOR SCHEDULE D101                 $0.00 Excludes Mob and Prep
DEL PUERTO WATER DISTRICT

SCHEDULE D102- DPWD Well No. 102

CLIN      Section            Services                                         Quantity Units      Unit Price Amount
D102-1    WBR 1452.232-81    Mobilization and Preparatory Work                For the lump sum of
D102-2    13 20 50           Test hole DPWD Well No. 102                             600 LF                           $0.00
D102-3    13 21 00           Drill/Reaming DPWD Well No. 102                         600 LF                           $0.00
D102-4    13 21 00           Casing DPWD Well No. 102                                360 LF                           $0.00
D102-5    13 21 00           Screen DPWD Well No. 102                                240 LF                           $0.00
D102-6    11 21 10           Motor DPWD Well No. 102                                    1 Each                        $0.00
D102-7    11 21 10           Pump DPWD Well No. 102                                     1 Each                        $0.00
D102-8    11 21 10           Column Pipe/Tube and Shaft DPWD Well No. 102            360 LF                           $0.00
D102-9    13 21 00           Well Development and Testing DPWD Well No. 102   For the lump sum of
D102-10   13 21 00           Pump Support DPWD Well No. 102                   For the lump sum of
D102-11   11 21 10           Electrical Equipment DPWD Well No. 102           For the lump sum of
D102-12   26 21 00           Utilities DPWD Well No. 102                      For the lump sum of
D102-13   11 42 00           12-Inch Flow Meter DPWD Well No. 102                       1 Each                        $0.00
                                                                              TOTAL FOR SCHEDULE D102                 $0.00 Excludes Mob and Prep
FRESNO SLOUGH WATER DISTRICT

SCHEDULE F107 - FSWD Well No. 107

CLIN      Section           Services                                         Quantity Units      Unit Price Amount
F107-1    WBR 1452.232-81   Mobilization and Preparatory Work                For the lump sum of
F107-2    13 20 50          Test hole FSWD Well No. 107                             800 LF                           $0.00
F107-3    13 21 00          Drill/Reaming FSWD Well No. 107                         800 LF                           $0.00
F107-4    13 21 00          Casing FSWD Well No. 107                                480 LF                           $0.00
F107-5    13 21 00          Screen FSWD Well No. 107                                320 LF                           $0.00
F107-6    11 21 10          Motor FSWD Well No. 107                                    1 Each                        $0.00
F107-7    11 21 10          Pump FSWD Well No. 107                                     1 Each                        $0.00
F107-8    11 21 10          Column Pipe/Tube and Shaft FSWD Well No. 107            480 LF                           $0.00
F107-9    13 21 00          Well Development and Testing FSWD Well No. 107   For the lump sum of
F107-10   13 21 00          Pump Support FSWD Well No. 107                   For the lump sum of
F107-11   11 21 10          Electrical Equipment FSWD Well No. 107           For the lump sum of
F107-12   26 21 00          Utilities FSWD Well No. 107                      For the lump sum of
F107-13   11 42 00          12-Inch Flow Meter FSWD Well No. 107                       1 Each                        $0.00
                                                                             TOTAL FOR SCHEDULE F107                 $0.00 Excludes Mob and Prep
GRASSLANDS WATER DISTRICT

SCHEDULE G8 - GWD Well Nos. 8.1 - 8.5

CLIN      Section            Services                                               Quantity Units      Unit Price Amount
G8-1      WBR 1452.232-81    Mobilization and Preparatory Work                      For the lump sum of
G8-2      13 20 50           Test hole GWD Well Nos. 8.1 - 8.5                           2,000 LF                           $0.00
G8-3      13 21 00           Drill/Reaming GWD Well Nos. 8.1 - 8.5                       2,000 LF                           $0.00
G8-4      13 21 00           Casing GWD Well Nos. 8.1 - 8.5                              1,200 LF                           $0.00
G8-5      13 21 00           Screen GWD Well Nos. 8.1 - 8.5                                 800 LF                          $0.00
G8-6      11 21 10           Motor GWD Well Nos. 8.1 - 8.5                                    5 Each                        $0.00
G8-7      11 21 10           Pump GWD Well Nos. 8.1 - 8.5                                     5 Each                        $0.00
G8-8      11 21 10           Column Pipe/Tube and Shaft GWD Well Nos. 8.1 - 8.5          1,000 LF                           $0.00
G8-9      13 21 00           Well Development and Testing GWD Well Nos. 8.1 - 8.5   For the lump sum of
G8-10     13 21 00           Pump Support GWD Well Nos. 8.1 - 8.5                   For the lump sum of
G8-11     11 21 10           Electrical Equipment GWD Well Nos. 8.1 - 8.5           For the lump sum of
G8-12     26 21 00           Utilities GWD Well Nos. 8.1 - 8.5                      For the lump sum of
G8-13     11 42 00           12-Inch Flow Meter GWD Well Nos. 8.1 - 8.5                       5 Each                        $0.00
                                                                                    TOTAL FOR SCHEDULE G8                   $0.00 Excludes Mob and Prep
JAMES IRRIGATION DISTRICT

SCHEDULE J112.1 - JID Well No. 112.1

CLIN        Section           Services                                          Quantity Units      Unit Price Amount
J112.1-1    WBR 1452.232-81   Mobilization and Preparatory Work                 For the lump sum of
J112.1-2    13 20 50          Test hole JID Well No. 112.1                             600 LF                           $0.00
J112.1-3    13 21 00          Drill/Reaming JID Well No. 112.1                         600 LF                           $0.00
J112.1-4    13 21 00          Casing JID Well No. 112.1                                360 LF                           $0.00
J112.1-5    13 21 00          Screen JID Well No. 112.1                                240 LF                           $0.00
J112.1-6    11 21 10          Motor JID Well No. 112.1                                    1 Each                        $0.00
J112.1-7    11 21 10          Pump JID Well No. 112.1                                     1 Each                        $0.00
J112.1-8    11 21 10          Column Pipe/Tube and Shaft JID Well No. 112.1            360 LF                           $0.00
J112.1-9    13 21 00          Well Development and Testing JID Well No. 112.1   For the lump sum of                     $0.00
J112.1-10   13 21 00          Pump Support JID Well No. 112.1.                  For the lump sum of                     $0.00
J112.1-11   11 21 10          Electrical Equipment JID Well No. 112.1           For the lump sum of                     $0.00
J112.1-12   26 21 00          Utilities JID Well No. 112.1                      For the lump sum of                     $0.00
J112.1-13   11 42 00          12-Inch Flow Meter JID Well No. 112.1                       1 Each                        $0.00
                                                                                TOTAL FOR SCHEDULE J112.1               $0.00 Excludes Mob and Prep



SCHEDULE J112.2 - JID Well No. 112.2

CLIN        Section           Services                                          Quantity Units      Unit Price Amount
J112.2-1    WBR 1452.232-81   Mobilization and Preparatory Work                 For the lump sum of
J112.2-2    13 20 50          Test hole JID Well No. 112.2                             600 LF                           $0.00
J112.2-3    13 21 00          Drill/Reaming JID Well No. 112.2                         600 LF                           $0.00
J112.2-4    13 21 00          Casing JID Well No. 112.2                                360 LF                           $0.00
J112.2-5    13 21 00          Screen JID Well No. 112.2                                240 LF                           $0.00
J112.2-6    11 21 10          Motor JID Well No. 112.2                                    1 Each                        $0.00
J112.2-7    11 21 10          Pump JID Well No. 112.2                                     1 Each                        $0.00
J112.2-8    11 21 10          Column Pipe/Tube and Shaft JID Well No. 112.2            360 LF                           $0.00
J112.2-9    13 21 00          Well Development and Testing JID Well No. 112.2   For the lump sum of
J112.2-10   13 21 00          Pump Support JID Well No. 112.2                   For the lump sum of
J112.2-11   11 21 10          Electrical Equipment JID Well No. 112.2           For the lump sum of
J112.2-12   26 21 00          Utilities JID Well No. 112.2                      For the lump sum of
J112.2-13   11 42 00          12-Inch Flow Meter JID Well No. 112.2                       1 Each                        $0.00
                                                                                TOTAL FOR SCHEDULE J112.2               $0.00 Excludes Mob and Prep
SCHEDULE J112.3- JID Well No. 112.3

CLIN        Section           Services                                          Quantity Units      Unit Price Amount
J112.3-1    WBR 1452.232-81   Mobilization and Preparatory Work                 For the lump sum of
J112.3-2    13 20 50          Test hole JID Well No. 112.3                             600 LF                           $0.00
J112.3-3    13 21 00          Drill/Reaming JID Well No. 112.3                         600 LF                           $0.00
J112.3-4    13 21 00          Casing JID Well No. 112.3                                360 LF                           $0.00
J112.3-5    13 21 00          Screen JID Well No. 112.3                                240 LF                           $0.00
J112.3-6    11 21 10          Motor JID Well No. 112.3                                    1 Each                        $0.00
J112.3-7    11 21 10          Pump JID Well No. 112.3                                     1 Each                        $0.00
J112.3-8    11 21 10          Column Pipe/Tube and Shaft JID Well No. 112.3            360 LF                           $0.00
J112.3-9    13 21 00          Well Development and Testing JID Well No. 112.3   For the lump sum of
J112.3-10   13 21 00          Pump Support JID Well No. 112.3                   For the lump sum of
J112.3-11   11 21 10          Electrical Equipment JID Well No. 112.3           For the lump sum of
J112.3-12   26 21 00          Utilities JID Well No. 112.3                      For the lump sum of
J112.3-13   11 42 00          12-Inch Flow Meter JID Well No. 112.3                       1 Each                        $0.00
                                                                                TOTAL FOR SCHEDULE J112.3               $0.00 Excludes Mob and Prep



SCHEDULE J112.4- JID Well No. 112.4

CLIN        Section           Services                                          Quantity   Units   Unit Price Amount
J112.4-1    WBR 1452.232-81   Mobilization and Preparatory Work                 For the lump sum of
J112.4-2    13 20 50          Test hole JID Well No. 112.4                             600 LF                           $0.00
J112.4-3    13 21 00          Drill/Reaming JID Well No. 112.4                         600 LF                           $0.00
J112.4-4    13 21 00          Casing JID Well No. 112.4                                360 LF                           $0.00
J112.4-5    13 21 00          Screen JID Well No. 112.4                                240 LF                           $0.00
J112.4-6    11 21 10          Motor JID Well No. 112.4                                    1 Each                        $0.00
J112.4-7    11 21 10          Pump JID Well No. 112.4                                     1 Each                        $0.00
J112.4-8    11 21 10          Column Pipe/Tube and Shaft JID Well No. 112.4            360 LF                           $0.00
J112.4-9    13 21 00          Well Development and Testing JID Well No. 112.4   For the lump sum of
J112.4-10   13 21 00          Pump Support JID Well No. 112.4                   For the lump sum of
J112.4-11   11 21 10          Electrical Equipment JID Well No. 112.4           For the lump sum of
J112.4-12   26 21 00          Utilities JID Well No. 112.4                      For the lump sum of
J112.4-13   11 42 00          12-Inch Flow Meter JID Well No. 112.4                       1 Each                        $0.00
                                                                                TOTAL FOR SCHEDULE J112.4               $0.00 Excludes Mob and Prep
SAN LUIS WATER DISTRICT

SCHEDULE S43-SLWD Well No. 43

CLIN     Section           Services                                        Quantity Units      Unit Price Amount
S43-1    WBR 1452.232-81   Mobilization and Preparatory Work               For the lump sum of
S43-2    13 20 50          Test hole SLWD Well No. 43                           1,000 LF                           $0.00
S43-3    13 21 00          Drill/Reaming SLWD Well No. 43                       1,000 LF                           $0.00
S43-4    13 21 00          Casing SLWD Well No. 43                                600 LF                           $0.00
S43-5    13 21 00          Screen SLWD Well No. 43                                400 LF                           $0.00
S43-6    11 21 10          Motor SLWD Well No. 43                                    1 Each                        $0.00
S43-7    11 21 10          Pump SLWD Well No. 43                                     1 Each                        $0.00
S43-8    11 21 10          Column Pipe/Tube and Shaft SLWD Well No. 43            600 LF                           $0.00
S43-9    13 21 00          Well Development and Testing SLWD Well No. 43   For the lump sum of
S43-10   13 21 00          Pump Support SLWD Well No. 43                   For the lump sum of
S43-11   11 21 10          Electrical Equipment SLWD Well No. 43           For the lump sum of
S43-12   26 21 00          Utilities SLWD Well No. 43                      For the lump sum of
S43-13   11 42 00          12-Inch Flow Meter SLWD Well No. 43                        1 Each                       $0.00
                                                                           TOTAL FOR SCHEDULE S43                  $0.00 Excludes Mob and Prep



SCHEDULE S44-SLWD Well No. 44

CLIN     Section           Services                                        Quantity Units      Unit Price Amount
S44-1    WBR 1452.232-81   Mobilization and Preparatory Work               For the lump sum of
S44-2    13 20 50          Test hole SLWD Well No. 44                             250 LF                           $0.00
S44-3    13 21 00          Drill/Reaming SLWD Well No. 44                         250 LF                           $0.00
S44-4    13 21 00          Casing SLWD Well No. 44                                150 LF                           $0.00
S44-5    13 21 00          Screen SLWD Well No. 44                                100 LF                           $0.00
S44-6    11 21 10          Motor SLWD Well No. 44                                    1 Each                        $0.00
S44-7    11 21 10          Pump SLWD Well No. 44                                     1 Each                        $0.00
S44-8    11 21 10          Column Pipe/Tube and Shaft SLWD Well No. 44            200 LF                           $0.00
S44-9    13 21 00          Well Development and Testing SLWD Well No. 44   For the lump sum of
S44-10   13 21 00          Pump Support SLWD Well No. 44                   For the lump sum of
S44-11   11 21 10          Electrical Equipment SLWD Well No. 44           For the lump sum of
S44-12   26 21 00          Utilities SLWD Well No. 44                      For the lump sum of
S44-13   11 42 00          12-Inch Flow Meter SLWD Well No. 44                       1 Each                        $0.00
                                                                           TOTAL FOR SCHEDULE S44                  $0.00 Excludes Mob and Prep
SCHEDULE S47-SLWD Well No. 47

CLIN     Section           Services                                        Quantity Units      Unit Price Amount
S47-1    WBR 1452.232-81   Mobilization and Preparatory Work               For the lump sum of
S47-2    13 20 50          Test hole SLWD Well No. 47                             800 LF                           $0.00
S47-3    13 21 00          Drill/Reaming SLWD Well No. 47                         800 LF                           $0.00
S47-4    13 21 00          Casing SLWD Well No. 47                                480 LF                           $0.00
S47-5    13 21 00          Screen SLWD Well No. 47                                320 LF                           $0.00
S47-6    11 21 10          Motor SLWD Well No. 47                                    1 Each                        $0.00
S47-7    11 21 10          Pump SLWD Well No. 47                                     1 Each                        $0.00
S47-8    11 21 10          Column Pipe/Tube and Shaft SLWD Well No. 47            480 LF                           $0.00
S47-9    13 21 00          Well Development and Testing SLWD Well No. 47   For the lump sum of
S47-10   13 21 00          Pump Support SLWD Well No. 47                   For the lump sum of
S47-11   11 21 10          Electrical Equipment SLWD Well No. 47           For the lump sum of
S47-12   26 21 00          Utilities SLWD Well No. 47                      For the lump sum of
S47-13   11 42 00          12-Inch Flow Meter SLWD Well No. 47                       1 Each                        $0.00
                                                                           TOTAL FOR SCHEDULE S47                  $0.00 Excludes Mob and Prep



SCHEDULE S48-SLWD Well No. 48

CLIN     Section           Services                                        Quantity Units      Unit Price Amount
S48-1    WBR 1452.232-81   Mobilization and Preparatory Work               For the lump sum of
S48-2    13 20 50          Test hole SLWD Well No. 48                             750 LF                           $0.00
S48-3    13 21 00          Drill/Reaming SLWD Well No. 48                         750 LF                           $0.00
S48-4    13 21 00          Casing SLWD Well No. 48                                450 LF                           $0.00
S48-5    13 21 00          Screen SLWD Well No. 48                                300 LF                           $0.00
S48-6    11 21 10          Motor SLWD Well No. 48                                    1 Each                        $0.00
S48-7    11 21 10          Pump SLWD Well No. 48                                     1 Each                        $0.00
S48-8    11 21 10          Column Pipe/Tube and Shaft SLWD Well No. 48            460 LF                           $0.00
S48-9    13 21 00          Well Development and Testing SLWD Well No. 48   For the lump sum of
S48-10   13 21 00          Pump Support SLWD Well No. 48                   For the lump sum of
S48-11   11 21 10          Electrical Equipment SLWD Well No. 48           For the lump sum of
S48-12   26 21 00          Utilities SLWD Well No. 48                      For the lump sum of
S48-13   11 42 00          12-Inch Flow Meter SLWD Well No. 48                       1 Each                        $0.00
                                                                           TOTAL FOR SCHEDULE S48                  $0.00 Excludes Mob and Prep
TRANQUILLITY IRRIGATION DISTRICT

SCHEDULE T105.a - TID Well No. 105.a

CLIN        Section           Services                                          Quantity Units      Unit Price Amount
T105.a-1    WBR 1452.232-81   Mobilization and Preparatory Work                 For the lump sum of                     $0.00
T105.a-2    13 20 50          Test hole TID Well No. 105.a                             800 LF                           $0.00
T105.a-3    13 21 00          Drill/Reaming TID Well No. 105.a                         800 LF                           $0.00
T105.a-4    13 21 00          Casing TID Well No. 105.a                                480 LF                           $0.00
T105.a-5    13 21 00          Screen TID Well No. 105.a                                320 LF                           $0.00
T105.a-6    11 21 10          Motor TID Well No. 105.a                                    1 Each                        $0.00
T105.a-7    11 21 10          Pump TID Well No. 105.a                                     1 Each                        $0.00
T105.a-8    11 21 10          Column Pipe/Tube and Shaft TID Well No. 105.a            480 LF                           $0.00
T105.a-9    13 21 00          Well Development and Testing TID Well No. 105.a   For the lump sum of                     $0.00
T105.a-10   13 21 00          Pump Support TID Well No. 105.a                   For the lump sum of                     $0.00
T105.a-11   11 21 10          Electrical Equipment TID Well No. 105.a           For the lump sum of                     $0.00
T105.a-12   26 21 00          Utilities TID Well No. 105.a                      For the lump sum of                     $0.00
T105.a-13   11 42 00          12-Inch Flow Meter TID Well No. 105.a                       1 Each                        $0.00
                                                                                TOTAL FOR SCHEDULE T105.a               $0.00 Excludes Mob and Prep



SCHEDULE T105.b - TID Well No. 105.b

CLIN        Section           Services                                          Quantity Units      Unit Price Amount
T105.b-1    WBR 1452.232-81   Mobilization and Preparatory Work                 For the lump sum of                     $0.00
T105.b-2    13 20 50          Test hole TID Well No. 105.b                             800 LF                           $0.00
T105.b-3    13 21 00          Drill/Reaming TID Well No. 105.b                         800 LF                           $0.00
T105.b-4    13 21 00          Casing TID Well No. 105.b                                480 LF                           $0.00
T105.b-5    13 21 00          Screen TID Well No. 105.b                                320 LF                           $0.00
T105.b-6    11 21 10          Motor TID Well No. 105.b                                    1 Each                        $0.00
T105.b-7    11 21 10          Pump TID Well No. 105.b                                     1 Each                        $0.00
T105.b-8    11 21 10          Column Pipe/Tube and Shaft TID Well No. 105.b            480 LF                           $0.00
T105.b-9    13 21 00          Well Development and Testing TID Well No. 105.b   For the lump sum of                     $0.00
T105.b-10   13 21 00          Pump Support TID Well No. 105.b                   For the lump sum of                     $0.00
T105.b-11   11 21 10          Electrical Equipment TID Well No. 105.b           For the lump sum of                     $0.00
T105.b-12   26 21 00          Utilities TID Well No. 105.b                      For the lump sum of                     $0.00
T105.b-13   11 42 00          12-Inch Flow Meter TID Well No. 105.b                       1 Each                        $0.00
                                                                                TOTAL FOR SCHEDULE T105.b               $0.00 Excludes Mob and Prep
WEST STANISLUAS IRRIGATION DISTRICT

SCHEDULE WS28 - WSID Well No. 28

CLIN        Section           Services                                        Quantity Units      Unit Price Amount
WS28-1      WBR 1452.232-81   Mobilization and Preparatory Work               For the lump sum of
WS28-2      13 20 50          Test hole WSID Well No. 28                             500 LF                           $0.00
WS28-3      13 21 00          Drill/Reaming WSID Well No. 28                         500 LF                           $0.00
WS28-4      13 21 00          Casing WSID Well No. 28                                300 LF                           $0.00
WS28-5      13 21 00          Screen WSID Well No. 28                                200 LF                           $0.00
WS28-6      11 21 10          Motor WSID Well No. 28                                    1 Each                        $0.00
WS28-7      11 21 10          Pump WSID Well No. 28                                     1 Each                        $0.00
WS28-8      11 21 10          Column Pipe/Tube and Shaft WSID Well No. 28            300 LF                           $0.00
WS28-9      13 21 00          Well Development and Testing WSID Well No. 28   For the lump sum of
WS28-10     13 21 00          Pump Support WSID Well No. 28                   For the lump sum of
WS28-11     11 21 10          Electrical Equipment WSID Well No. 28           For the lump sum of
WS28-12     26 21 00          Utilities WSID Well No. 28                      For the lump sum of
WS28-13     11 42 00          12-Inch Flow Meter WSID Well No. 28                       1 Each                        $0.00
                                                                              TOTAL FOR SCHEDULE WS28                 $0.00 Excludes Mob and Prep



SCHEDULE WS29 - WSID Well No. 29

CLIN        Section           Services                                        Quantity Units      Unit Price Amount
WS29-1      WBR 1452.232-81   Mobilization and Preparatory Work               For the lump sum of
WS29-2      13 20 50          Test hole WSID Well No. 29                             600 LF                           $0.00
WS29-3      13 21 00          Drill/Reaming WSID Well No. 29                         600 LF                           $0.00
WS29-4      13 21 00          Casing WSID Well No. 29                                360 LF                           $0.00
WS29-5      13 21 00          Screen WSID Well No. 29                                240 LF                           $0.00
WS29-6      11 21 10          Motor WSID Well No. 29                                    1 Each                        $0.00
WS29-7      11 21 10          Pump WSID Well No. 29                                     1 Each                        $0.00
WS29-8      11 21 10          Column Pipe/Tube and Shaft WSID Well No. 29            360 LF                           $0.00
WS29-9      13 21 00          Well Development and Testing WSID Well No. 29   For the lump sum of
WS29-10     13 21 00          Pump Support WSID Well No. 29                   For the lump sum of
WS29-11     11 21 10          Electrical Equipment WSID Well No. 29           For the lump sum of
WS29-12     26 21 00          Utilities WSID Well No. 29                      For the lump sum of
WS29-13     11 42 00          12-Inch Flow Meter WSID Well No. 29                       1 Each                        $0.00
                                                                              TOTAL FOR SCHEDULE WS29                 $0.00 Excludes Mob and Prep
WEST STANISLUAS IRRIGATION DISTRICT
SCHEDULE WS31 - WSID Well No. 31

CLIN        Section            Services                                        Quantity Units      Unit Price Amount
WS31-1      WBR 1452.232-81    Mobilization and Preparatory Work               For the lump sum of
WS31-2      13 20 50           Test hole WSID Well No. 31                             750 LF                           $0.00
WS31-3      13 21 00           Drill/Reaming WSID Well No. 31                         750 LF                           $0.00
WS31-4      13 21 00           Casing WSID Well No. 31                                450 LF                           $0.00
WS31-5      13 21 00           Screen WSID Well No. 31                                300 LF                           $0.00
WS31-6      11 21 10           Motor WSID Well No. 31                                    1 Each                        $0.00
WS31-7      11 21 10           Pump WSID Well No. 31                                     1 Each                        $0.00
WS31-8      11 21 10           Column Pipe/Tube and Shaft WSID Well No. 31            460 LF                           $0.00
WS31-9      13 21 00           Well Development and Testing WSID Well No. 31   For the lump sum of
WS31-10     13 21 00           Pump Support WSID Well No. 31                   For the lump sum of
WS31-11     11 21 10           Electrical Equipment WSID Well No. 31           For the lump sum of
WS31-12     26 21 00           Utilities WSID Well No. 31                      For the lump sum of
WS31-13     11 42 00           12-Inch Flow Meter WSID Well No. 31                       1 Each                        $0.00
                                                                               TOTAL FOR SCHEDULE WS31                 $0.00 Excludes Mob and Prep



SCHEDULE WS32 - WSID Well No. 32

CLIN        Section            Services                                        Quantity Units      Unit Price Amount
WS32-1      WBR 1452.232-81    Mobilization and Preparatory Work               For the lump sum of
WS32-2      13 20 50           Test hole WSID Well No. 32                             750 LF                           $0.00
WS32-3      13 21 00           Drill/Reaming WSID Well No. 32                         750 LF                           $0.00
WS32-4      13 21 00           Casing WSID Well No. 32                                450 LF                           $0.00
WS32-5      13 21 00           Screen WSID Well No. 32                                300 LF                           $0.00
WS32-6      11 21 10           Motor WSID Well No. 32                                    1 Each                        $0.00
WS32-7      11 21 10           Pump WSID Well No. 32                                     1 Each                        $0.00
WS32-8      11 21 10           Column Pipe/Tube and Shaft WSID Well No. 32            460 LF                           $0.00
WS32-9      13 21 00           Well Development and Testing WSID Well No. 32   For the lump sum of
WS32-10     13 21 00           Pump Support WSID Well No. 32                   For the lump sum of
WS32-11     11 21 10           Electrical Equipment WSID Well No. 32           For the lump sum of
WS32-12     26 21 00           Utilities WSID Well No. 32                      For the lump sum of
WS32-13     11 42 00           12-Inch Flow Meter WSID Well No. 32                       1 Each                        $0.00
                                                                               TOTAL FOR SCHEDULE WS32                 $0.00 Excludes Mob and Prep



SCHEDULE WS33.1 - WSID Well No. 33.1
WEST STANISLUAS IRRIGATION DISTRICT

CLIN        Section            Services                                          Quantity Units      Unit Price Amount
WS33.1-1    WBR 1452.232-81    Mobilization and Preparatory Work                 For the lump sum of
WS33.1-2    13 20 50           Test hole WSID Well No. 33.1                             750 LF                           $0.00
WS33.1-3    13 21 00           Drill/Reaming WSID Well No. 33.1                         750 LF                           $0.00
WS33.1-4    13 21 00           Casing WSID Well No. 33.1                                450 LF                           $0.00
WS33.1-5    13 21 00           Screen WSID Well No. 33.1                                300 LF                           $0.00
WS33.1-6    11 21 10           Motor WSID Well No. 33.1                                    1 Each                        $0.00
WS33.1-7    11 21 10           Pump WSID Well No. 33.1                                     1 Each                        $0.00
WS33.1-8    11 21 10           Column Pipe/Tube and Shaft WSID Well No. 33.1            460 LF                           $0.00
WS33.1-9    13 21 00           Well Development and Testing WSID Well No. 33.1   For the lump sum of
WS33.1-10   13 21 00           Pump Support WSID Well No. 33.1                   For the lump sum of
WS33.1-11   11 21 10           Electrical Equipment WSID Well No. 33.1           For the lump sum of
WS33.1-12   26 21 00           Utilities WSID Well No. 33.1                      For the lump sum of
WS33.1-13   11 42 00           12-Inch Flow Meter WSID Well No. 33.1                       1 Each                        $0.00
                                                                                 TOTAL FOR SCHEDULE WS33.1               $0.00 Excludes Mob and Prep



SCHEDULE WS33.2 - WSID Well No. 33.2

CLIN        Section            Services                                          Quantity Units      Unit Price Amount
WS33.2-1    WBR 1452.232-81    Mobilization and Preparatory Work                 For the lump sum of
WS33.2-2    13 20 50           Test hole WSID Well No. 33.2                             750 LF                           $0.00
WS33.2-3    13 21 00           Drill/Reaming WSID Well No. 33.2                         750 LF                           $0.00
WS33.2-4    13 21 00           Casing WSID Well No. 33.2                                450 LF                           $0.00
WS33.2-5    13 21 00           Screen WSID Well No. 33.2                                300 LF                           $0.00
WS33.2-6    11 21 10           Motor WSID Well No. 33.2                                    1 Each                        $0.00
WS33.2-7    11 21 10           Pump WSID Well No. 33.2                                     1 Each                        $0.00
WS33.2-8    11 21 10           Column Pipe/Tube and Shaft WSID Well No. 33.2            460 LF                           $0.00
WS33.2-9    13 21 00           Well Development and Testing WSID Well No. 33.2   For the lump sum of
WS33.2-10   13 21 00           Pump Support WSID Well No. 33.2                   For the lump sum of
WS33.2-11   11 21 10           Electrical Equipment WSID Well No. 33.2           For the lump sum of
WS33.2-12   26 21 00           Utilities WSID Well No. 33.2                      For the lump sum of
WS33.2-13   11 42 00           12-Inch Flow Meter WSID Well No. 33.2                       1 Each                        $0.00
                                                                                 TOTAL FOR SCHEDULE WS33.2               $0.00 Excludes Mob and Prep



SCHEDULE WS35 - WSID Well No. 35
WEST STANISLUAS IRRIGATION DISTRICT

CLIN        Section           Services                                         Quantity Units      Unit Price Amount
WS35-1      WBR 1452.232-81   Mobilization and Preparatory Work                For the lump sum of
WS35-2      13 20 50          Test hole WSID Well No. 35                              500 LF                           $0.00
WS35-3      13 21 00          Drill/Reaming WSID Well No. 35                          500 LF                           $0.00
WS35-4      13 21 00          Casing WSID Well No. 35                                 300 LF                           $0.00
WS35-5      13 21 00          Screen WSID Well No. 35                                 200 LF                           $0.00
WS35-6      11 21 10          Motor WSID Well No. 35                                     1 Each                        $0.00
WS35-7      11 21 10          Pump WSID Well No. 35                                      1 Each                        $0.00
WS35-8      11 21 10          Column Pipe/Tube and Shaft WSID Well No. 35             300 LF                           $0.00
WS35-9      13 21 00          Well Development and Testing WSID Well No. 35    For the lump sum of
WS35-10     13 21 00          Pump Support WSID Well No. 35                    For the lump sum of
WS35-11     11 21 10          Electrical Equipment WSID Well No. 35            For the lump sum of
WS35-12     26 21 00          Utilities WSID Well No. 35                       For the lump sum of
WS35-13     11 42 00          12-Inch Flow Meter WSID Well No. 35                        1 Each                        $0.00
                                                                               TOTAL FOR SCHEDULE WS35                 $0.00 Excludes Mob and Prep



SCHEDULE WS120 - WSID Well No. 120

CLIN        Section           Services                                         Quantity Units      Unit Price Amount
WS120-1     WBR 1452.232-81   Mobilization and Preparatory Work                For the lump sum of
WS120-2     13 20 50          Test hole WSID Well No. 120                             600 LF                           $0.00
WS120-3     13 21 00          Drill/Reaming WSID Well No. 120                         600 LF                           $0.00
WS120-4     13 21 00          Casing WSID Well No. 120                                360 LF                           $0.00
WS120-5     13 21 00          Screen WSID Well No. 120                                240 LF                           $0.00
WS120-6     11 21 10          Motor WSID Well No. 120                                    1 Each                        $0.00
WS120-7     11 21 10          Pump WSID Well No. 120                                     1 Each                        $0.00
WS120-8     11 21 10          Column Pipe/Tube and Shaft WSID Well No. 120            360 LF                           $0.00
WS120-9     13 21 00          Well Development and Testing WSID Well No. 120   For the lump sum of
WS120-10    13 21 00          Pump Support WSID Well No. 120                   For the lump sum of
WS120-11    11 21 10          Electrical Equipment WSID Well No. 120           For the lump sum of
WS120-12    26 21 00          Utilities WSID Well No. 120                      For the lump sum of
WS120-13    11 42 00          12-Inch Flow Meter WSID Well No. 120                       1 Each                        $0.00
                                                                               TOTAL FOR SCHEDULE WS120                $0.00 Excludes Mob and Prep



SCHEDULE WS121 - WSID Well No. 121
WEST STANISLUAS IRRIGATION DISTRICT

CLIN        Section           Services                                         Quantity Units      Unit Price Amount
WS121-1     WBR 1452.232-81   Mobilization and Preparatory Work                For the lump sum of
WS121-2     13 20 50          Test hole WSID Well No. 121                             600 LF                           $0.00
WS121-3     13 21 00          Drill/Reaming WSID Well No. 121                         600 LF                           $0.00
WS121-4     13 21 00          Casing WSID Well No. 121                                360 LF                           $0.00
WS121-5     13 21 00          Screen WSID Well No. 121                                240 LF                           $0.00
WS121-6     11 21 10          Motor WSID Well No. 121                                    1 Each                        $0.00
WS121-7     11 21 10          Pump WSID Well No. 121                                     1 Each                        $0.00
WS121-8     11 21 10          Column Pipe/Tube and Shaft WSID Well No. 121            360 LF                           $0.00
WS121-9     13 21 00          Well Development and Testing WSID Well No. 121   For the lump sum of
WS121-10    13 21 00          Pump Support WSID Well No. 121                   For the lump sum of
WS121-11    11 21 10          Electrical Equipment WSID Well No. 121           For the lump sum of
WS121-12    26 21 00          Utilities WSID Well No. 121                      For the lump sum of
WS121-13    11 42 00          12-Inch Flow Meter WSID Well No. 121                       1 Each                        $0.00
                                                                               TOTAL FOR SCHEDULE WS121                $0.00 Excludes Mob and Prep



SCHEDULE WS122 - WSID Well No. 122

CLIN        Section           Services                                         Quantity Units      Unit Price Amount
WS122-1     WBR 1452.232-81   Mobilization and Preparatory Work                For the lump sum of
WS122-2     13 20 50          Test hole WSID Well No. 122                             600 LF                           $0.00
WS122-3     13 21 00          Drill/Reaming WSID Well No. 122                         600 LF                           $0.00
WS122-4     13 21 00          Casing WSID Well No. 122                                360 LF                           $0.00
WS122-5     13 21 00          Screen WSID Well No. 122                                240 LF                           $0.00
WS122-6     11 21 10          Motor WSID Well No. 122                                    1 Each                        $0.00
WS122-7     11 21 10          Pump WSID Well No. 122                                     1 Each                        $0.00
WS122-8     11 21 10          Column Pipe/Tube and Shaft WSID Well No. 122            360 LF                           $0.00
WS122-9     13 21 00          Well Development and Testing WSID Well No. 122   For the lump sum of
WS122-10    13 21 00          Pump Support WSID Well No. 122                   For the lump sum of
WS122-11    11 21 10          Electrical Equipment WSID Well No. 122           For the lump sum of
WS122-12    26 21 00          Utilities WSID Well No. 122                      For the lump sum of
WS122-13    11 42 00          12-Inch Flow Meter WSID Well No. 122                       1 Each                        $0.00
                                                                               TOTAL FOR SCHEDULE WS122                $0.00 Excludes Mob and Prep

				