Korea

Reviews
Shared by: keara
Stats
views:
2
rating:
not rated
reviews:
0
posted:
11/3/2009
language:
ENGLISH
pages:
0
Korea Flat Panel Display Committee Lotus Room 2nd Fl., Grand Intercontinental Hotel, 2008, Seoul Meeting Minutes Korea FPD Technical Committee Meeting Minutes Saturday, Sep. 6, 2008 Lotus Room 2nd Fl., Grand Intercontinental Hotel, Seoul Meeting Attendees Name Jongseo Lee (Co-Chairs) Sekwang Park Moojong Lim Don-Gyou Lee KyungJin Kang Jeongduk Ryeom KwangYoung Kim Company Samsung Electronics Kyungpook National University LG Display LG Display LG Electronics Soongsil Univ. KITEHC Name MeeRyung Choi Sangkyoo Jeon Seung Bae Lee Jungno Lee ChaYeon Kim Noh-Min Kwak Company KILT KILT Samsung SDI KETI ST&I Samsung SDI Staff: Hyun Cha, Natalie Shim/SEMI Korea, James Amano/SEMI HQ Summary: 1. Welcome, Reminders, and Introductions Committee co-chair Jongseo Lee (Samsung Electronics) called the meeting to order at 10:00 AM. After welcoming all attendees, the SEMI meeting reminders on Anti-Trust Reminder, Intellectual Property Reminder, and Effective Meeting Guidelines were presented and explained. Finally, the agenda reviewed. (A copy of the SEMI Standards Required Meeting Elements is available as Attachment 1) 2. Review and Approval of Previous Meeting Minutes Jongseo Lee requested the Committee to review the previous meeting minutes and solicited comments or amendments. As there were no further comments or changes brought to the committee’s attention, the following motion was made: (A copy of the FPD TC January 21, 2008 minutes is available as Attachment 2) Motion: By/2nd : Discussion: Vote: Approve the minutes of the previous MeeRyung Choi(KILT)/Sangkyoo Jeon(KILT) None 10/0 in favor. Motion passed. 3. HQ Overview & Liaison Reports 3.1. HQ Overview James Amano(SEMI HQ) presented the SEMI Standards Program Overview. This report contained information on: (The complete version of the SEMI Standards Headquarter Overview is available as Attachment 3)     History of SEMI Standards Program Characteristics PFD Standards Benefit of Standards Korea Flat Panel Display Committee Lotus Room 2nd Fl., Grand Intercontinental Hotel, 2008, Seoul Meeting Minutes  Impact of Standards 3.2. Japan Liaison Report (FPD Color Filter and Optical Elements Committee) Jongseo Lee(Samsung Electronics) presented the Japan FPD Color Filter and Optical Elements Committee instead of SEMI Japan staff. This report contained information on: (The complete version of the Japan C&O Liaison Report is available as Attachment 4)    3.3. Taiwan Liaison Report (FPD Committee) Next meeting: October 30, 2008 in conjunction with FPD International 2008 at Pacific Yokohama Recent publications : SEMI D13-0708, Terminology for FPD Color Filter Task Force activities: Various activities were reported Jongseo Lee(Samsung Electronics) presented the Taiwan FPD Committee instead of SEMI Taiwan staff. This report contained information on: (The complete version of the Taiwan FPD Liaison Report is available as Attachment 5)  4. Task Force and Subcommittee Reports 4.1. LCD SC  Next meeting: Sep.11, 2008 in conjunction with SEMI Taiwan 2008 at TICC103, Taipei, Taiwan) Task Force activities: Various activities were reported SC leaders presented each SC and TFs activities and these reports contained information on: (The complete version of the Task Force and Subcommittee Report is available as Attachment 6) 4.2. PDP SC Leader Leader, Jongseo Lee(Samsung Electronics) reported for LCD SC activities  Backlight TF: #4313 is drafting  Image Sticking TF: #4530 balloted cycle 3-08 SeKwang Park(Kyungpook National University) reported for PDP SC activities  EMI TF: Leader has been changed to Yoo Park(LG Electronics) to carry on the project. #4529 is drafting  Tone & Color TF: #4571 balloted cycle4-08 Jungno Lee(KETI) reported for PDP SC activities.  Encapsulation TF: #4531 is drafting  Roadmap is under development 4.3. OLED SC Leader 5. TFOF & SNARF Review 5.1. Backlight Unit The following 5 task forces were transferred to the FPD Metrology Committee, along with their SNARFs, as they better align with the scope of this committee Motion: By/2nd : Discussion: Vote: Motion: By/2nd : Discussion: Vote: Motion: By/2nd : Discussion: Vote: Motion: By/2nd : Discussion: Transfer to the FPD Metrology Committee MeeRyung Choi(KILT)/ Don-Gyou Lee(LG Display) None 10/0 in favor. Motion passed Transfer to the FPD Metrology Committee Don-Gyou Lee(LG Display)/ MeeRyung Choi(KILT) None 10/0 in favor. Motion passed Transfer to the FPD Metrology Committee KyungJin Kang(LG Electronics) /Sangkyoo Jeon(KILT) None 10/0 in favor. Motion passed Transfer to the FPD Metrology Committee KyungJin Kang(LG Electronics) /Sangkyoo Jeon(KILT) None 5.2. Image Sticking TF 5.3. EMI TF 5.4. Tone & Color TF Korea Flat Panel Display Committee Lotus Room 2nd Fl., Grand Intercontinental Hotel, 2008, Seoul Meeting Minutes Vote: 10/0 in favor. Motion passed Transfer to the FPD Metrology Committee Jungno Lee (KETI)/ Noh-Min Kwak(Samsung SDI) None 10/0 in favor. Motion passed 5.5. Encapsulation TF Motion: By/2nd : Discussion: Vote: 6. Ballot Review Ballot Review Summary [Committee adjudication of Cycle 3 and Cycle 4 ballots are detailed in the Audits & Review (A&R) Subcommittee Forms for procedural review. These A&R forms are available as attachments to these minutes. The attachment number for each document is indicated under the “Att#” column]  Cycle 3 Committee Approval Document Document Title Att# # Status New standards: Test Method for the Measurement of Image 4530 Failed - rework 7a Sticking Document 4530  Document # #of Accept 20 Cycle 4 #of Reject 7 #of Abstains 21 % Accepts 74.10% Total Votes 48 Total Comments 0 Total Rejects 7 Document Title New standards: Measurements For PDP Tone and Color Reproduction #of Accept 13 #of Reject 3 #of Abstains 10 % Accepts 81.25% Committee Approval Status Failed - rework Total Votes 26 Total Comments 1 Att# 7b Total Rejects 3 4571 Document 4571 7. Next Committee Meeting Next Committee Meeting is scheduled Jan.21, 2008 in conjunction with SEMICON Korea 2009 in COEX, Seoul 8. Adjournment Jongseo Lee (Samsung Electronics) moved to adjourn. The meeting adjourned Korea Flat Panel Display Committee Lotus Room 2nd Fl., Grand Intercontinental Hotel, 2008, Seoul Meeting Minutes ATTACHMENTS: Attachments that were usually sent with the minutes are now available upon request from SEMI Standards Staff. Below is a list of attachments generated from this report: Attachment #1 – SEMI Standards Meeting Elements Attachment #2 – Previous Meeting Minutes Attachment #3 – SEMI Standards HQ overview Attachment #4 – Japan C&O Committee Liaison Report Attachment #5 – Taiwan FPD Committee Liaison Report Attachment #6 – Task Force and Subcommittee Report Attachment #7 – Ballot Review for Document #  7a-4530  7b-4571

Related docs
Korea
Views: 3  |  Downloads: 0
North Korea
Views: 28  |  Downloads: 0
Korea
Views: 16  |  Downloads: 0
Korea
Views: 9  |  Downloads: 1
Korea
Views: 7  |  Downloads: 0
Korea
Views: 0  |  Downloads: 0
Korea
Views: 3  |  Downloads: 0
Korea University
Views: 2  |  Downloads: 0
Analysis of Korea
Views: 88  |  Downloads: 4
KOREA-REPORT-THREE-2007
Views: 0  |  Downloads: 0
webzen korea
Views: 94  |  Downloads: 0
KOREA WOMAN PICTURE1 AN CHI YONG
Views: 54  |  Downloads: 0
South Korea
Views: 9  |  Downloads: 0
premium docs
Other docs by keara
IVIG PHARMACY PROTOCOL
Views: 207  |  Downloads: 1
IT02
Views: 135  |  Downloads: 0
Istanbul Maltepe Military Hospitals Pharmacy
Views: 146  |  Downloads: 0
ISMP Survey Reveals Pharmacy Interventions
Views: 134  |  Downloads: 0
IRB Pharmacy Verification
Views: 144  |  Downloads: 0
IRB and Pharmacy Clarification
Views: 73  |  Downloads: 0