NMSEOCT07Minutes

W
Shared by: yaoyufang
Categories
Tags
-
Stats
views:
0
posted:
2/18/2013
language:
Unknown
pages:
11
Document Sample
scope of work template
							                                                                                  NMSE
                                                                            OCTOBER 2007

                             UNCONFIRMED MINUTES
                               OCTOBER 22 – 24, 2007
                       PITTSBURGH MARRIOTT CITY CENTER
                           PITTSBURGH, PENNSYLVANIA


These minutes are not final until confirmed by the Task Group in writing or by vote at a
subsequent meeting. Information herein does not constitute a communication or
recommendation from the Task Group and shall not be considered as such by any agency.

MONDAY, OCTOBER 22, 2007 – WEDNESDAY, OCTOBER 24, 2007

1.0   OPENING COMMENTS

1.1   Call to Order/Quorum Check

      The meeting was called to order by Chairperson Mark Gleason at 1:00pm on Monday, 22
      OCT 2007. A quorum was established with representatives present.

1.2   New Task Group Members

1.3   Appointment of Secretary

      Since the Task Group has not received any volunteers from the members for a new
      secretary, one will be picked at the beginning of each Nadcap Meeting, based on
      alphabetical order of attending Task Group members by last name. Windsor Amundsen
      from Honeywell will be taking the minutes for this meeting.

1.4   Introductions and Routing of Attendance Roster

      ATTENDANCE

      User Members Present:

      Name                         Company
      Windsor Amundsen             Honeywell; Task Group Secretary
      Silvia Baeza                 Vought Aircraft
      Marc Belanger                Bombardier Aerospace
      Gary Burns                   GE Aviation
      Tara Campbell                Rolls Royce, PLC
      David Day                    GE Aviation; AQS Liaison
      Peter Edwards                Airbus
      Harold Finch                 Spirit Aero Systems
      William Fitzgerald           Northrop-Grumman
      Jacob Franklin               Bell Helicopter - Textron
      Mark Gleason                 GE Aviation; Task Group Chairperson
      Glen Heide                   Boeing

                                        Page 1 of 11
                                                                              NMSE
                                                                        OCTOBER 2007

Roland Hudon                  Pratt Whitney
Jim Kruba                     Boeing
Serge Labbe                   Heroux-Devtek
Marc-Andre Lefebvre           Heroux Devtek
Ross Lizee                    Bombardier
Tom Lowther                   Honeywell
Susan Margheim                Rockwell Collins
Scott Patterson               Goodrich
Jeremy Phillips               Cessna Aircraft; Task Group Vice Chairperson
K.T. Quader                   Boeing
Angelie Vincent               Spirit Aero Systems
Kirk Whalen                   Heroux Devtek


Other Participants/Members:

Name                          Company
Bryon Alter                   BG&S Peening
Dennis Berglund               Tri-Process Company
Starr Berglund                Tri-Process Company
Ernestine Cruz                Tri-Process Company
Susan Dika                    Moeller Aerospace
J Kim Ell                     Microtronics
Mark Finkeldei                Nex-Tech Processing
Del Harmon                    Cincinnati Thermal Spray
Dave Jones                    Nex-Tech Processing
Greg Judy                     PCC Airfoils
James Kernan                  Corpus Christy Army Depot
Li Li                         Barnes Aerospace
Kyle Lindsey                  Danville Metal Stamping
Ed Mayer                      Meyer Tool Inc.
Jay McMurray                  Metal Improvement Corp.
Mark Molden                   Ferco Tech
Harry Moser                   Agie Charmilles
KM Nosek                      Microtronics
Eric Oswald                   Unison Engine Components
Tim Scarlett                  Danville Metal Stamping
Richard Scott                 Rich Technology
Mark Singer                   Kessington Machine Products
Jackie Sternot                Pako Inc.
Gary Thompson                 Darchem Engineering
John Vanhouwe                 Eldim BV Sulzer Metco

PRI Staff:
Rick Sovich                   PRI
Jennifer Kornrumpf            PRI


                                    Page 2 of 11
                                                                                                             NMSE
                                                                                                       OCTOBER 2007

1.5   Approval of Minutes

      Motion is made to accept meeting minutes from the July quarterly meeting in Istanbul.
      Motion passes.


2.0   TASK GROUP METRICS AND STAFF REPORT

      Joe Barr has been hired by PRI to assist Richard Sovich with audit review. Joe Barr is not
      currently delegated. We are currently at 86% merit eligibility for NCMSE suppliers.
      Balloting by Primes of audits is discussed. We are getting excellent participation from
      NCMSE primes for audit review. Auditor verses auditor requirements was discussed. The
      goal is 130% auditor capacity to be able to cover all the requirements. Unrestricted
      auditors for ITAR audits have been an issue in the past.

      Two additional unrestricted auditors have been added to the Auditor base. We discussed
      the relative numbers of new audits compared to re-accreditation audits.
      We expect 2008 to peak for NMSE audits and to level out due to the effects of the merit
      program.



      Metric for NMSE      Sector Merit all     EUR Metrics all     Excess Auditor      Dashboard for all
        Sept 2007         Nadcap OCT2007      Nadcap OCT 2007      Capacity Oct 2007   NadCap Sept 2007




3.0   SSC PRESENTATION

      Jay McMurray presents his information on the Supplier Support Committee. The Supplier
      Support Committee provides an avenue for suppliers to get information about the Nadcap
      process. Ad hoc committees are formed for specific purposes e.g. communications and
      mentoring, 25 mile rule, etc. SSC has volunteer mentors to assist new suppliers with
      newcomer issues. SSC meeting sent out a survey in 2007, the results of which will be
      discussed this week. Checklist requirements that are not covered by specific specifications
      are an issue which is being discussed. Auditor consistency and redundant audits is
      discussed and brought to the attention of the NMC. The SSC meeting is to be held October
      23, 2007 from 4:15 to 6:15 PM.

      After four years of great service Jay Mc Murray will resign from his duties on the SSC
      effective this week.



      SSC Report - NMSE
          Oct 2007




                                                    Page 3 of 11
                                                                                        NMSE
                                                                                  OCTOBER 2007

4.0   CHECKLIST & HANDBOOK REVISIONS

      The ballot for Prime Specific Supplement Sheet AC7117S was reviewed for comment
      resolution line by line. The applicable Prime addressed the comment or the Task Group
      decided on comments that were non-persuasive. All of the Comments were either
      answered with no action or an update was recorded. The updated Supplement Sheets will
      be scrubbed for questions that are possibly a high risk for export control violations. The
      final version will be to Task Group under a 14 day affirmation ballot. The ballot resolution
      ran over the allotted time and was decided by the Task Group to continue through
      completion during opportune time slots over the next two days of the meeting.

ACTION ITEM: Rick Sovich/Don Buehler will review the AC7117S supplement sheets for
possible ITAR/EAR issues. Due Date: 30Nov07

ACTION ITEM: PRI Staff to issue 14 day affirmation Ballot for AC7117S within one week of
ITAR review and finalization.


5.0   NIP/NOP/NTGOP UPDATES

      Updates to NIP/NOP/NTGOP were reviewed.



       NIP-NOP-NTGOP
       Updates - 2007




6.0   SPECIFICATION CHANGES

      Jay McMurray reviewed latest meeting from the Surface Enhancement Division FD&E
      Meeting held on 08Oct2007. Ballot on changes to J444 (Cast Shot and Grit Size
      Specifications for Peening and Cleaning) is currently underway. Jay discussed zero block
      accuracy (Test Strip, Holder, and Gauge for shot peening) and the decision that the flatness
      call-out for gauges were too restrictive and did not add value. It was decided that
      paragraph 6.4 of J442 be modified to 0.002”. The following question is brought up at an
      SAE surface enhancement meeting: “On the question of equipment used to test media, it is
      a recommended practice to use the Ro-Tap machine”. The uses of a Ro-Tap equivalent
      machine is discussed but no actions were taken.



         Specification
      Changes Surface Enhancement Division




                                             Page 4 of 11
                                                                                          NMSE
                                                                                    OCTOBER 2007



7.0   SUPPLIER TRAINING

      Supplier training was limited to the presentation given by Eric Oswald, Smith’s Aerospace-
      Terra Haute, due to a lower supplier turn-out than expected. Eric presented helpful hints on
      audit preparation. Suggestions include total preventative maintenance for each machine,
      periodic testing being performed, verification that all new work meets customer
      requirements, checklists, sketches, routers, any other form of instruction is up to date and is
      being used, review of customer specifications for any changes or may have become
      obsolete. Verify that machines are calibrated and all media being used is also calibrated.
      Insure that all schedules are up to date and labs are current. All calibration equipment is to
      be current. Make specs available to the operators. Operators are the life blood of a
      company. Presentation is attached below.

      Rick Sovich briefly discussed upcoming training opportunities. Subject matter covers how
      to do pre-audit preparation, preparation of self audit, where all the information lies in e-
      audit.net, etc. The Training will be attached to eAuditNet. Jeremy Philips and Windsor
      Amundsen to form ad-hoc group to create supplier training for U.S. suppliers. Tara
      Campbell and Pete Edwards to create supplier training for European-UK suppliers



      NMSE Best Practices- How to prepare for a
       Suppliers Oct2007      Nadcap Audit




ACTION ITEM: PRI Staff to post supplier training to eAuditNet. Due Date: 30 Nov 2007.

ACTION ITEM: North American Ad Hoc Supplier Training Team to conference and frame out
scope and timeline for NCSI training. Due Date: 14 Dec 2007.

ACTION ITEM: European Ad Hoc Supplier Training Team to conference and frame out scope
and timeline for NCSI training. Due Date: 14 Dec 2007.


8.0   SUPPLIER – OPEN ISSUES

         Time required for conducting an audit is discussed. Some auditors seem to be dragging
          out the audit. It is a function of what you find, how job audits turn out, and how things
          work.
         The loss of merit for a supplier was discussed. Rick Sovich to discuss the issue
          privately with those concerned.
         The Task Group discussed the definition of major and minor findings. Systemic or
          potential product impact constitutes a major finding. Primes are to determine potential
          product impact. A minor is defined as any single system failure or lapse in
          conformance with the applicable standard or audit criteria. A major is defined as the
          absence of, or systemic breakdown of, the process control and / or the Quality

                                                  Page 5 of 11
                                                                                          NMSE
                                                                                    OCTOBER 2007

           Management System, or any non-conformance where the effect impacts, or has the
           potential to impact, the integrity of the product.
          The Task Group discussed auditor indiscretions, subjectivity, and inconsistencies.
           Auditors must show a link between the checklist and the finding. One auditor posed
           the question to an operator “Would you like photos if you could get them?” to which
           the operator responded, “Yes”.


9.0    NEW BUSINESS (Open Meeting)

       No new business


10.0   Review Agenda for Next Meeting

        Future meeting topics are discussed. One of which involved the extent to which Nadcap
         auditors should be discussing Quality issues, e.g. is supplier following their quality
         system. Sometimes there was no procedure or the procedure was not being followed.
        Auditors wanted to have the ability to investigate potential product impact.
        We discussed the new definition of major and minor findings. Systemic or potential
         product impact constitutes a major finding. Primes are to determine potential product
         impact. A minor is defined as any single system failure or lapse in conformance with the
         applicable standard or audit criteria. A major is defined as the absence of, or systemic
         breakdown of, the process control and / or the Quality Management System, or any non-
         conformance where the effect impacts or has the potential to impact the integrity of the
         product.
        Training requirements are mandated in AS9100.


11.0   AMS 2430 & AMS 2431 – ADDITION OF ROTAP REQUIREMENTS

       Due to the unavailability for the Task Group Member that was to report out on this subject,
       this topic is postponed until the Feb 2008 meeting in Rome.


12.0   FAILURE CRITERIA REVIEW

       Mark Gleason presented a comprehensive analysis of Failure criteria combined with
       auditor metrics. NOP-011 defines audit failure criteria. Audits resulting in major findings
       are discussed along with NM Initial Total NCR’s. If a supplier is failing the criteria but has
       numerous processes, the NMSE Task Group takes this into account during the failure ballot
       process. The numbers of NCR’s have gone down and NMSE has more reaccreditation than
       initial audits. The audit checklists were improved and the number of findings dropped as a
       result of the baseline effort, a great audit handbook, good corrective actions administered
       by the Staff Engineer and good supplier training. This data is being reviewed by the
       Standardization Committee as well, with an annual reassessment. There was no statistical
       variation between the current and most recent staff engineer. Auditors are not consistent,
                                           Page 6 of 11
                                                                                        NMSE
                                                                                  OCTOBER 2007

       some are tougher than others. There is a statistical difference between auditors; however
       some data is skewed due to several new auditors that are just getting up to speed. We are
       trying to minimize auditor variation through training. None of the auditors are outside of
       the two sigma limits within the NMSE Task Group. Weld and NDT task groups do have
       auditors outside of the two sigma region. We are seeking ways to further minimize auditor
       variation.



       Auditor Metrics and
         Failure Criteria


13.0   AQS SUMMARY OF AS9100 REQUIREMENTS

       This topic was postponed until the Feb 2007 meeting in Rome, due to the decision of the
       Task Group to continue the resolution of the Prime Specific Supplement Sheets.

ACTION ITEM: PRI Staff to update the RAIL to reflect this presentation from our AQS liaison.
Update due by 15 Nov 2007.


14.0   PRIME PARTICIPATION – AUDIT REVIEW

       As presented earlier in the NMC Metrics, participation in audit review is good, however it
       appears that a few individuals are carrying the load and we would like to see more
       participation from all primes. The act of audit review helps keep you in touch with your
       supplier base and the issues that can become NMSE topics for meetings. Without this
       participation in audit reviews, good opportunities for improvement are not being realized.


15.0   STAFF ENGINEER METRICS

       This is a closed session attended only by Primes. Rick Sovich presented to the Task Group
       a report of NM and SE audits over the past quarter, including information on major and
       minor findings.


15.1   Auditor Metrics

       Mark Gleason discussed differences between auditors considering how many major and
       minor findings are written per average audit. No one is outside of two sigma limits. In
       NM, Auditor No. 2 is low and Auditor No. 8 is high. These two outliers are no longer
       Nadcap Auditors. Auditors are cautioned by Richard Sovich, to not advise suppliers even
       in the interest of best practice, as the auditor job is to impartially and professionally
       administer the Nadcap checklist and support Task Group interpretations as expressed in the
       Audit handbook.


                                          Page 7 of 11
                                                                                         NMSE
                                                                                   OCTOBER 2007



15.2   Delegation Report

       The Delegation Report was presented by Rick Sovich; Concurrence rate was excellent at
       over 99%. The Delegation Report is attached.



       NMSE delegation
         10-OCT-07


15.3   Audits >90 Days

       There were no audits over 90 days that were not in Task Group Review.


16.0   AUDIT REVIEW

       Audits were suggested by Boeing, RR Plc, and a review of an audit that had exceeded
       failure criteria. The audit numbers will not be posted for confidential reasons however will
       be available on a need to know basis from the Staff Engineer.

          The failure review audit concerned export controlled parts and all restricted Task Group
           Members left the meeting room. The presentation of evidence and review resulted in
           the voiding of two NCR’s and sustaining of two other NCR’s that were questioned.
           Roland Hudon was very active in the decision making process as PW was the
           Prime/Customer for several parts in question.

          An Asian audit was reviewed. One previous NCR noted that laser power output was not
           being measured, nor was it being measured at the workpiece as required by Nadcap.
           Mark Gleason was able to explain to the group that laser power output was being
           measured, just not at the workpiece. The GE specification was not clear that power
           output be made at the workpiece. This resulted in some confusion with the supplier.
           Windsor Amundsen of Honeywell agrees to go back into eAuditNet and approve the
           audit.

          T K Quader discussed an SE Audit. TK Quader poses the question to the task group,
           “Are our auditors looking at enough job audits?” He would have expected someone to
           say that it was a systemic issue. Rick Sovich states that most auditors will sample for
           recurrence of the NCR if suspected, however this would be appropriate.

          Tara Campbell of Rolls Royce PLC requests that the task group discuss a European
           Audit. Tara was not satisfied with the risk mitigation efforts associated with the
           findings. Evidently there was a large range on the display for nozzle speed. It was
           reported that the supplier had a bad display. The display was wandering all over the
           place, though nozzle speed was set at, and in fact was running at, 200 mm/min. The
           display has since been corrected and the audit sent to Task Group Review.

                                           Page 8 of 11
                                                                                         NMSE
                                                                                   OCTOBER 2007

          Richard Sovich reports to the Task Group that he is working with Joe Barr on responses
           to NCRs to make sure that they get out in a timely fashion.


17.0   NEW BUSINESS (Closed Meeting)

       We discussed what to do in the event of a paper audit. We determined that there would not
       be two consecutive paper audits (job audits). Roland Hudon and KT Quader agree to
       review the procedure for audit guidelines and report back to the group.

ACTION ITEM: Roland Hudon and KT Quader will review and summarize the current audit
guidelines and report out at the Feb 2008 meeting in Rome. The presentation is due to PRI Staff
by 11 Jan 2008.

       Tara Campbell presented an MFN flyer advertising training in shot peen. The Nadcap
       “Partners in Education” logo was prominently displayed across the page from, and the
       same size as, an endorsement from another organization. The Task Group expressed
       concern that the “Partners in Education” trademark was too similar to the Nadcap logo and
       supplier confusion over endorsement may occur. It was reminded to the Task Group that
       this issue was reviewed at past meeting and has gone to the highest levels and has been
       closed. It was also reminded that this issue should not be raised at the Task Group level as
       it has been very disruptive. If individuals still have issues, it is suggested to go to your
       company representative on the NMC.

17.1   Task Group Leadership Succession Plan

       Task Group succession was discussed. Mark Gleason will step down as NMSE Task
       Group Chairperson after this meeting. Jeremy Phillips volunteered for the TG Chairperson,
       was nominated by Mark Gleason and was unanimously approved by quorum hand vote as
       the NMSE candidate for Task Group Chairperson. Windsor Amundsen volunteered for TG
       Vice-Chairperson, was nominated by Roland Hudon and was unanimously approved by
       quorum hand vote, as the NMSE candidate for Task Group Vice Chairperson. It was also
       agreed by the Task Group that a limit of three years will be considered the time limit for
       serving as the Task Group Chairperson and Vice Chairperson, but retained the flexibility to
       extend beyond that time if circumstances required otherwise. A review of procedures shall
       be conducted to assure all requirements have been met. The secretarial duties will be
       rotated amongst the participating primes.


ACTION ITEM: Rick Sovich will review the procedures governing the selection process for the
Chair and Vice Chair to assure all requirements for the selection process were fulfilled.




                                           Page 9 of 11
                                                                                          NMSE
                                                                                    OCTOBER 2007



18.0   AUDITOR TRAINING

       A discussion of the meaning of “training programs”, as it relates to training operators in
       NMSE processes. Training is not required currently for NM. Right now it is very
       subjective. Nothing in the handbook or in our specs specifies what should go into a
       training program.

       It was agreed that Auditors shall not judge content of training programs.


19.0   AC7116/1 ELECTROCHEMICAL DRILLING
       We reviewed the draft checklist for Electrochemical Drilling (7116/1). This checklist will
       soon be sent out for ballot. The technical content of the checklist will remain essentially
       unchanged. Information will be disseminated to the entire group, and then the checklist
       will go out for ballot.


ACTION ITEM: PRI Staff will send the checklist out to 45 day ballot along with information
summary provided by Mark Gleason. Due Date: 30 Nov 2007.


20.0   ITAR UPDATE

       Don Buhler gave a limited presentation and a lengthy question and answer period for an
       Open session of the NMSE. It was very well done and thought provoking. Don asked the
       NMSE Group to review their checklists for questions that may have answers that could
       potentially violate ITAR or Export Control regulations.


ACTION ITEM: Rick Sovich will coordinate an Ad Hoc Group to review the checklist questions
and supplement questions in accordance with Don’s instruction.


21.0   SSC REPRESENTATIVE REPORT

       Jay McMurray reviewed the pervious days SSC meeting and presented the 2007 Supplier
       Survey.



       2007 supplier survey
             results




                                           Page 10 of 11
                                                                                       NMSE
                                                                                 OCTOBER 2007



22.0   NEXT MEETING

       Meeting Date and Location

       The next meeting will be on 25–27 FEB 2008 in Rome, Italy


23.0   ADJOURNMENT

       The meeting was adjourned on 24 Oct 2007 at 12:00 PM.

       Minutes prepared by: Windsor Amundsen of Honeywell
       Email address: windsor.amundsen@honeywell.com

                         ***** For PRI Staff use only: ******

Are procedural/form changes required based on changes/actions approved during this
meeting? (select one)

YES*                                NO

*If yes, the following information is required:

Documents requiring          Who is responsible:                     Due date:
revision:




                                         Page 11 of 11

						
Other docs by yaoyufang
FAQs Contactors
Views: 22  |  Downloads: 0
The DIRECTV Group_ Inc
Views: 328  |  Downloads: 1
GM Korea’s Roadside Assistance
Views: 5  |  Downloads: 0
REGULAR COUNCIL MEETING A G E N D A
Views: 1  |  Downloads: 0
Music Listening Today Chapter 27-28 Questions
Views: 4  |  Downloads: 0
CORPUS CHRISTI RECTIFIER SEMINAR (DOC)
Views: 8  |  Downloads: 0
801
Views: 8  |  Downloads: 0
Spring Fling Basket Themes
Views: 10  |  Downloads: 0
Northern Arizona Behavioral Health Authority
Views: 2  |  Downloads: 0