MANAGEMENT ORDER OF CONSTRUCTION PLANNING AND ENVIRONMENT IN BACNINH INDUSTRIAL ZONNES Appendix 1 SUBGROUP OF PROJECTS WITH FOREIGN INVESTMENT CAPITAL (As regulated in Article 114, Decree No.24/2000/ND-CP dated 31/7/2000 of the Government of Vietnam) 1 - Projects of A group comprising: a/ Projects regardless of invested capital in the following sectors: - Infrastructure construction of industrial zones, export processing zones, hi-tech zones, urban area; BOT, BTO and BT projects; - Construction and business of sea-ports and air-ports; business of sea and air transportation; - Oil and gas; - Post and telecommunication services; - Culture; publication, press; radio and television broadcasting; medical examination and treatment establishments; education and training; scientific research and production of medicine for human diseases; - Insurance, finance, auditing and inspection; - Exploration and exploitation of rare and precious natural resources; - Construction of residential houses for sale; - National defence and security projects; b/ Projects with invested capital of at least forty (40) USSD million in the following fields: electricity, mining, metallurgy, cement, mechanical engineering manufacture, chemicals, hotels, apartments for sale, tourism – entertatinment areas. c/ Projects using at least five (5) hectares of urban land, or at least fifty (50) heatares of land of other categories. 2 - Projects of B group: being projects which are not stipulated in the list above.
Appendix 1a SUBGROUP OF PROJECTS WITH DOMESTIC INVESTMENT CAPITAL (As regulated in Decree No.16/2005/ND-CP dated 07/2/2005 of the Government of Vietnam)
WORK CONSTRUCTION - INVESTMENT PROJECT FORM TOTAL INVESTMENT CAPITAL
I
National level important project
In accordance with the Resolution of National Assembly Not to mention the capital extent Not to mention the capital extent > VND 600 billion
II 1
2 3
4
5
Work project (Group A) Construction projects of works: belonging to fields of security, defence with characteristics of the national security and important socio-politic meanings. Work construction projects specialize in: producing harmful substances, explosive; industrial infrastructure. Construction projects of work of: power industry, petroleum exploitation, chemical, fertilizer, machine manufacturing, cement, metallurgy, mineral exploitation and processing, transportation projects (bridges, seaports, river ports, airports, railways, national highways), resident construction. Construction projects of work of: irrigation, transportation (different from Point II-3), water supply - drainage and infrastructure, power technique, informatic devices manufacturing, electronics, informatics, pharmaceutical chemistry, medical equipments, other mechanic works, material production, post, telecommunication. Construction projects of work of: light industry, glazed terra-cotta and porcelain, glass, printing, national park, nature reserve, agri-forestry production, aquaculture, processing of agri-forestry products. 2
> VND 400 billion
> VND 300 billion
Construction projects of work of: public health, culture, education, broadcasting, television, other civil construction (excluding residents), treasures, tourism, gymnastics and sports, science research and other projects. III Work project (Group B) 1 Construction projects of work of: power industry, petroleum exploitation, chemical, fertilizer, machine manufacturing, cement, metallurgy, mineral exploitation and processing, transportation projects (bridges, seaports, river ports, airports, railways, national highways), resident construction. 2 Construction projects of work of: irrigation, transportation (different from Point II-3), water supply - drainage and infrastructure, power technique, informatic devices manufacturing, electronics, informatics, pharmaceutical chemistry, medical equipments, other mechanic works, material production, post, telecommunication. 3 Construction projects of work of: light industry, glazed terra-cotta and porcelain, glass, printing, national park, nature reserve, agri-forestry production, aquaculture, processing of agri-forestry products. 4 Construction projects of work of: public health, culture, education, broadcasting, television, other civil construction (excluding residents), treasures, tourism, gymnastics and sports, science research and other projects. IV Work project (Group C) 1 Construction projects of work of: power industry, petroleum exploitation, chemical, fertilizer, machine manufacturing, cement, metallurgy, mineral exploitation and processing, transportation projects (bridges, seaports, river ports, airports, railways, national highways), resident construction. 2 Construction projects of work of: irrigation, transportation (different from Point II-3), water supply - drainage and 3
6
> VND 200 billion
VND 30÷600 billion
VND 20÷400 billion
VND 15÷300 billion
VND 7÷200 billion
< VND 30 billion
< VND 20 billion
3
4
infrastructure, power technique, informatic devices manufacturing, electronics, informatics, pharmaceutical chemistry, medical equipments, other mechanic works, material production, post, telecommunication. Construction projects of work of: light industry, glazed < VND 15 billion terra-cotta and porcelain, glass, printing, national park, nature reserve, agri-forestry production, aquaculture, processing of agri-forestry products. Construction projects of work of: public health, culture, < VND 7 billion education, broadcasting, television, other civil construction (excluding residents), treasures, tourism, gymnastics and sports, science research and other projects.
4
Appendix 2 SOCIALIST REPUBLIC OF VIETNAM
Independence - Freedom - Happiness
APPLICATION FOR POSITION AGREEMENT AND ISSUANCE OF CERTIFICATE OF PLANNING
To: Director of Bacninh Industrial Zones Authority. 1- Full name: Title: On behalf of: Address: Tel: Fax: 2- Application for the position agreement and issuance of the planning certificate for preparation of work construction investment project (enclosed with diagram). Located at: Actual state: 3- Investment intention: Fuction of the work: Construction scale: (Total areas of construction floor m2 or capacity of the factory) Products: Intended height: Requirements of using land (m2): Requirements of city infrastructures: + Power supply: KW + Water supply: m3/h + Car parking: piece/m2 + Entrance: + Sewage and waste quantity: I commit to implement full of regulations of the State of Vietnam on construction planning./. Hanoi, day/month/year 5
Writer (Signature, seal)
Appendix 3 (Name of investment owner) No.:………………..
SOCIALIST REPUBLIC OF VIETNAM
Độc lập - Tự do - Hạnh phúc
Bacninh, day/month/year.
APPLICATION SUMMITED FOR APPRAISEMENT OF TECHNICAL DESIGN OF THE WORK:……………………………..
To: Bacninh Industrial Zones Authority. - Pursuant to the Decree no. 24/2000/ND-CP dated 31 July 2000 of the Government Providing Detailed Regulations on the Implementation of the Law on Foreign Investment in Vietnam. - Pursuant to the Decree no.16/2000/TT-BXD dated 11 December 2000 of Minister of Construction guiding the construction management to foreign investment activities and the management to foreign contractors who undertake construction and consult construction of the work in Vietnam. - Pursuant to the investment licence no……… day/month/year. The investment owner (or the legal representative of the investment owner) is……………………………………………………………………………………….. Submit to Bacninh Industrial Zones Authority for appraisement of technical design of the work (or the work item)…………………………………. - Belonging to the project named:……………………………………………………… - Building in:..…………………………………………………. - File submitted for assessment of technical design at the stage:……….including: 6
(List of documents as stipulated in items I.2.2.2 of the Circular no.………………of the Ministry of Construction and supplemental documents (if yes)). I commit that, all technical dossiers enclosed with this application: have been inplemented in accordance with technical criteria regulations, standards approved by Ministry of Construction; in accordance with planning and architecture assessed at the stage of issuance of the investment licence; and shall insure conditions of work safety, safety in protection and fight of fire/explosion and protection of environment.
INVESTMENT OWNER
(signature and seal) To: - As Article 3, - The investment owner, - Save ……
7
Appendix 4
The investment owner SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness ….., day …. month …… year……..
No.:………………… Ref: …………………
To: Bacninh Indsutrial Zones Authority. Pursuant to the Decree no.16/2005/ND-CP dated 7 February 2005 of the Government on management of work construction - investment project. Pursuant to the Decision no.209/2004/ND-CT dated 16 December 2003 of the Government on management of quality of the construction work. Pursuant to the Investment Licence no. …… day ……. issued by Bacninh Industrial Zones Authority. Pursuant to the excution technique design file of the work……………. made by the Company…………………………………………………………………………... Pursuant to the results of verification of the excution technique design file by ………….., enclosed herewith the verification report no …… day ……………. Aiming at deploying the excution of the wok according to rate of the progress, The Company …..…………submits to and suggests Bacninh Industrial Zones Authority to approve the excution technique design of the work…………………..(enclosed with file of technical design). We are looking forward the approval of the Authority ./.
To:
As above, ……………… …………….. Save………..
INVESTMENT OWNER
(Signature and seal)
8
Appendix 5
THE SUBMITITNG BODY
SOCIALIST REPUBLIC OF VIETNAM
Independence - Freedom - Happiness
No. ………….. …..,day……… month..…. year 200..
STATEMENT FOR ASSESSMENT OF BASIC DESIGN OF THE WORK……… BELONGING TO THE PROJECT NAMED…………….
To:
……………………………………..
Pursuant to the Decree no.16/2005/ND-CP dated 7 February 2005 of the Government on management of work construction - investment project. Pursuant to the Decision no.209/2004/ND-CT dated 16 December 2003 of the Government on management of quality of the construction work. Pursuant to the Circular no. 08/2005/TT-BXD dated May 6th 2005 of Ministry of Construction providing guidance on some contents of preparation, assessment, approval of work construction - investment project and on transition handling of implementation of Decree no.16/2005/ND-CP dated 7 February 2005 of the Government; Pursuant to other regulations related…………………………………………… (Name of submitting body) submits the basic design asseessment of the Work construction - investment project…..prepared by……with the following contents: 1. Name of the Work:………………………………………….. - Type and level of the Work…………………………………………………….. - Belonging to the project named………………………………………………… - Total invesment capital: . - The investment owner: ... - Building position:… 9
- Total land areas used:… - The basic design consulting contractor: … - The construction surveying contractor… - Construction scale, capacity, main specifications… - The applied criterion, standards… 2. The work design dossiers: - Document no. … day… of… on policy of the Work construction - investment (notarized copy); - The project Statement; - The design Statement; - The design drawings; - The report of results of the construction survey; - The minute of the investment owner on checking and taking over the basic design and results of the construction survey; - The documents of the competent bodies (if yes) on: construction planning, land using right, protection and fitgh of fire/explosion, protection of ecological environment, use of infrastructures outside the work, safety in running the underground work; and other related requirements. - The business registration of the designing contractor, the construction seuveying contractor. - The practice certificate of: the construction surveying Chairman, the designing Chairman and of the person in charge of presiding design. (Name of submitting body) sumbits to…… the basic design assessment of the work……..…
To: -… - Save
SUBMITTING BODY (Signature with full name,title and seal)
10
Appendix 6
THE APPROVING BODY No.: SOCIALIST REPUBLIC OF VIETNAM
Independence - Freedomo - Happiness
………, day… month … year 200
THE DECISION OF……. On approval of the work construction - investment project (Name of approving individual/body) Pursuant to the fucntions, tasks and organization structures of………………… Pursuant to the Law on Construction no.16/2003/QH11 dated 26 November 2003 of the eleventh National Assembly at the 4th session; Pursuant to the Decree no.16/2005/ND-CP dated 7 February 2005 of the Government on management of work construction - investment project. Pursuant to the Decision no.209/2004/ND-CT dated 16 December 2003 of the Government on management of quality of the construction work. Pursuant to the basic design prepared by ……(name of the designing contractor); Pursuant to the Report on basic design assessment made by……(name of the state body in competence with assessment). DECIDES: Article 1: To approve the work construction - investment project…… with the following contents: 1. Name of the project………………………………………………………….. 2. The investment owner……………………………………………………… 3. The organization consulting the project preparation…………………………. 4. Chairman of preparation of the project…………………………………….. 5. Targets of investment - construction………………………………………… 6. Contents and scale of investment - construction…………………………….. 7. Building position……………………………………………………………. 8. The used land areas :……………………………………………………… 11
9. Construction plan (basic design):………………………………………. 10. Type and level of the work……………………………………………….. 11. Technological equipments (if yes)………………………………………. 12. Plan of ground clearance, resettlement (if yes):………………………… 13. Total investment capital of the project: Total capital: Of which: - Costs of construction : - Costs of equipments: - Other costs: - Standby costs: 14. Sources of investment capital……………………………………………... 15. Form of management of the project:………………………………………. 16. Time of implemention of the project……………………………………….. 17. Other contents:………………………………………………………….. Article 2: Organizing the implementation. Article 3: Responsibilities of bodies relating to implementation of the Decision./.
To:
- As Article 3;
- Related bodies; - Save.
Approving body (Signature with full name and title, seal)
12
Appendix 6a
Investment owner:……… (name of individual/organization) Số: SOCIALIST REPUBLIC OF VIETNAM
Independence - Freedomo - Happiness
………, day… month … year 200
DECISION ON APPROVAL THE EXCUTION DRAWING DESIGN
OF THE WORK:…………………………………………………………
(LEGAL REPRESENTATIVE)
Pursuant to the fucntions, tasks and organization structures of……………… Pursuant to the Law on Construction no.16/2003/QH11 dated 26 November 2003 of the eleventh National Assembly at the 4th session; Pursuant to the Decree no.16/2005/ND-CP dated 7 February 2005 of the Government on management of work construction - investment project. Pursuant to the Decision no.209/2004/ND-CT dated 16 December 2003 of the Government on management of quality of the construction work. Pursuant to the basic design prepared by ……(name of the designing contractor) and approved together with the project by ……….(name of the state body in competence with the basic design assessment); Pursuant to the Report on basic design assessment made by……(name of the state body in competence with assessment). Pursuant to the Investment Licence no. ……day ……issued by…………………. Pursuant to the File of excution drawing design …….by……. Pursuant to the Report on results of verification no.….. day …. by. DECIDES: Article 1: To approve the excution drawing design of the work…… prepared by…….(name of the designing contractor) with the following main contents: 1. The Work:………………………………………………………………….. belonging to types of work:…………………at level of……………………….. 2. Belonging to the investment project:………………………………………. 13
3. Total capital forecast:…………………………………………….. 4. Building position: ………………………………………………………………….. 5. The land areas used:……………………………………………………….. 6. The construction scale, capacity, main specifications:……………………… 7. Applied technical critearion, standards for construction:……………………. 8. Technological lines and equipments:………………..…………………….. 9. The composed details and the drawings for excution of the work:……… 10. The methods of guarantee of the work safety, protection and fight the fire/explosion, environmental protection. Article 2: Conclusion 1. The approved excution drawing design shall be base for the excution. 2. Notes in progress of excution (if yes). Article 3: Responsibilities of bodies relating to implementation of the Decision./.
To:
- Save.
The legal representative of the investment owner (Signature with full name and title, seal)
14