wgrep_rural00005

Document Sample
wgrep_rural00005 Powered By Docstoc
					4.2          The Challenge                                             28

4.3          Finance Commissions’ Recommendations                      29

4.4          Issues in Rural Roads Maintenance                         30

4.5          Proposed Strategies for Sustainable Rural Roads           30
             Maintenance

4.6          Policy Framework - Rural Road Management Act              31

4.7          Policy Framework – Rural Roads as Productive Employment   32
             Opportunity

4.8          Funding for Rural Roads Maintenance                       33

4.9          Institutional Arrangements                                34

4.9.1        Involvement of the Panchayati Raj Institutions            34

4.9.2        Sustainable Road Maintenance through Convergence with     37
             MGNREGA

4.10         Paradigm Shift in Maintenance Implementation              39

4.10.1       Planning of maintenance works                             39

4.10.2       Schedule of Rates for Maintenance Activities              40

4.10.3       Construction / Maintenance Technology                     40

4.10.4       Relevance of Tractor-bound Technology for the Use of      41
             Local Materials

4.10.5       Use of Mobile Maintenance unit                            42

4.10.6       Adoption of Labour-Based Technology                       43

4.10.7       Use of Cold Mix - Emulsion Technology                     43

4.10.8       Low-end Technology                                        43

4.10.9       PPP Initiatives                                           44

4.11         Action Plan                                               44

Chapter-5: Adopting GIS Architecture in Rural Roads including R&D and
Environment
5.1           Introduction                                     48

5.2          Terms of Reference                                        49
5.2.1           Role of GIS in Planning, Designing, Maintenance and          49
                Monitoring of Activities of PMGSY/ Bharat Nirman.
5.2.2           GIS architecture and its compatibility to PMGSY and Bharat   49
                Nirman Schemes
5.2.3           Role of GIS at various stages on Rural Roads                 50

5.2.4           Role of R&D in Rural Roads                                   53

5.2.5           Environment                                                  55

5.2.6           Tree plantation along the Rural Roads                        56

5.3             Recommendation                                               56

Chapter 6 : Quality Assurance in Rural Roads (Other than GIS)

6.1             Introduction                                                 59
6.2.            Terms of Reference                                           59
6.2.1           Review of Existing Quality Assurance System for Rural        59
                Roads
6.3             Recommendation of the sub-group regarding improvement in     60
                Quality Assurance system in construction of Rural Roads
6.3.1           Quality assurance system for Rural Roads constructed under   61
                Non-PMGSY scheme-
6.3.2           Quality Assurance System in PMGSY Scheme                     61
6.3.3           Quality assurance system for Rural Roads constructed under   62
                Non-PMGSY scheme
6.4             Strengthening the second tire of quality mechanism           63
6.5             Modifications requirement in the sub-contracting clause of   63
                SBD prescribed under PMGSY to ensure good quality of
                construction and maintenance or Rural Roads
6.6             Management of over loaded trucks                             63

6.7             Facilitation of disabled road users                          64

Chapter 7 :Use of Marginal Aggregates, New Materials and Industrial Waste
7.1             Background                                                65

7.2             Use of marginal aggregate and other locally available        65
                material
7.3             Use of Industrial Waste                                      66

7.4             Use of New Materials                                         66

7.5             Reservations in the use of new / local materials             67

Chapter 8 :Road Safety
8.1            Background                                                    68
8.2           Engineering Measures in the Design phase                      68

8.3            Safety During Construction and Maintenance Operations        69

8.4            Road Safety During Use                                       70

8.5            Institutional Arrangement                                    71

Chapter 9 :Grievance Redressal, Sevottam, Citizen Charter and CPGRAM in Rural
Roads
9.1            Introduction                                         72

9.2.          SEVOTTAM Frame work                                           72

9.2.1         Frame work                                                    72

9.2.2         Framework is mandatory                                        73

9.2.3         Current focus                                                 73

9.3           Milestones achieved so far                                    73

9.3.1         SEVOTTAM implementation                                       73

9.3.2         Steps taken to strengthen GRM                                 73

9.4           The Task ahead                                                74

9.4.1         Spreading awareness among citizens                            74

9.4.2         Familiarization of frontline staff / Service delivery units   74

9.4.3         SEVOTTAM implementation review meetings with PMGSY            74
              in focus
9.4.4         Other steps                                                   75

9.5           Strategy to achieve the objectives of SEVOTTAM                75

9.6           Centralized Public Grievance Redressal and Monitoring         76
              System (CPGRAMS)
9.6.1         Grievances received through CPGRAMS portal                    76

9.6.2         Milestones achieved so far                                    76

9.6.3         The Task Ahead                                                77

9.7            Necessary Capacity Building                                  77

Chapter 10 :Development of LWE & IAP Area Rural Roads

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:6
posted:2/8/2013
language:English
pages:3