                                           ADDENDUM NO. 1


PROJECT:                          IFB 11-B118-Mold Remediation Phase II

ISSUE DATE:                      May 9, 2011

BY:                              The Housing Authority of East St. Louis 700 North 20th Street East St.
                                 Louis Illinois 62205

DOCUMENT DATE:                   May 17, 2011

IFB DUE DATE:                    Friday, May 20, 2011 at 4:00 PM

The following revisions, modifications, and/or clarifications shall apply to the documents for this project.

                                            The Bid Due Date:

                Remains the Same                                           Has Been Rescheduled

This addendum is issued before the execution of the contract to inform bidders of revisions to the bid
documents referenced above. This addendum is hereby made a part of the bid documents and shall be
included in the contract.

The requirements contained in the bidding documents shall apply to this addendum. The work called for
in this addendum shall be the same as set forth in the applicable portions of the bid documents unless
otherwise specified in this addendum. All incidental work necessitated by this addendum, as required to
properly complete the work, shall be included in the bids even though not specifically stated in this
addendum.


Questions/Answers

    1. Question: Who will be responsible for the interior door trim that must be removed in order to
       get the drywall out?

        Answer: Include the cost of removing the door trim with care so that it can be reinstalled after
        new drywall is installed. Provide unit cost on bid sheet as well.


    2. Question: There are portions of the floor that have been removed in the bathrooms upstairs.
       Will the housing authority provide temporary covering to prevent someone from falling through
       the hole during the abatement work?

        Answer: Yes, the housing authority will ask the general contractor to place a temporary
        covering over the open holes in the floor as well as the excavations on the first floor prior to
        start of the abatement work.


1                                       5/17/2011                                       IFB-11-B118
    3. Question: Some of the building types are not included with the floor plans provided. Can we
       get the 5-bedroom unit building configuration floor plans?

         Answer: The additional floor plans are available for pick-up at ESLHA’s central office.


    4.    Question: In some of the bathrooms upstairs there are existing vanities. Do you want us to
         remove the vanities?

         Answer: Yes, the abatement contractor will be removing the vanities and setting them aside for
         reinstallation after the new drywall is installed.


    5. Question: Do ESLHA want two to four layers of drywall removed or only the first layer?

         Answer: For bidding purposes, please bid on the first layer only. The Unit Pricing will be used if
         a change order is needed.


    6. Question: Will ESLHA be removing the ceilings on the second floor?

         Answer: Yes. However, please see Revised Bidding Sheet attached which includes alternate
         deducts.

Note: There were three pages of the floor plan inadvertently omitted. If you would like the
remaining pages, or a complete set of floor plans, they are available for pick up only, at the central
office located at 700 North 20th Street, East St. Louis, IL 62205.




                                               END OF ADDENDUM




2                                       5/17/2011                                       IFB-11-B118
                                                                                                   REVISED BID SHEET
                                                                                                   MOLD REMEDIATION
                                                                                                   VILLA GRIFFIN , IL1-5
     BID PRICE

     Contractor is to provide pricing in accordance with the scope of work and shall include ALL Costs to complete the work.
           ITEM
     LABOR                                  $                                    UNIT PRICES
     MATERIALS                              $
     EQUIPMENT                              $                                   1. Provide unit price to demo and remove gypsum board and insulation.                                             $                per sq. ft.
     PERMITS                               $
     INSURANCE                             $                                    2. Provide unit price to demo and remove plywood flooring.                                                        $                per sq. ft.
     DISPOSAL FEES                         $
     MOBILIZATION                          $                                    3. Provide unit price to abate mold, vacuum inside wall, clean, disinfect and coat exposed wood studs.            $                per sq. ft.
     BOND                                  $
     OVERHEAD & PROFIT                     $                                    4. Provide unit price to remove bath tub surrounds.                                                               $                Ea. Panel
     TOTAL BID PRICE                       $
                                                                                5. Provide unit price to remove interior door trim for re-installation after new drywall installation.            $                Ea. Door
     DEDUCT ALTERNATES:
     1. Deduct removal of gypsum board in all ceilings on 2nd floor                                                                                                                               $
     2. Deduct removal of gypsum board in all ceilings on 1st floor except underneath 2nd floor bathrooms                                                                                         $
     3. Deduct removal of gypsum board in all interior walls except plumbing walls                                                                                                                $
     4. Deduct removal of gypsum board in all exterior walls                                                                                                                                      $


     BID BREAKDOWN BY BUILDING/UNIT
     Include per unit price on line 1 and per unit square footage breakdown on lines 2, 3, 4, 5
Line       BLDG. #              Apt. A             Apt. B           Apt. C           Apt. D              Apt. E             Apt. F              Apt. G             Apt. H                Apt. I         Apt. J
   1 BLDG. 1 Unit Price                                                                                                                     XXXXXXXXXX         XXXXXXXXXX          XXXXXXXXXX         XXXXXXXXXX
   2 Int Walls Sq. Ft.                                                                                                                      XXXXXXXXXX         XXXXXXXXXX          XXXXXXXXXX         XXXXXXXXXX
   3 Bath Ceiling Sq Ft                                                                                                                     XXXXXXXXXX         XXXXXXXXXX          XXXXXXXXXX         XXXXXXXXXX
   4 Rem Ceilings Sq Ft                                                                                                                     XXXXXXXXXX         XXXXXXXXXX          XXXXXXXXXX         XXXXXXXXXX
   5 Total Sq. Ft.                                                                                                                          XXXXXXXXXX         XXXXXXXXXX          XXXXXXXXXX         XXXXXXXXXX

   1 BLDG. 2 Unit Price                                                                                                                                                            XXXXXXXXXX         XXXXXXXXXX
   2 Int Walls Sq. Ft.                                                                                        1                                                                    XXXXXXXXXX         XXXXXXXXXX
                        REVISED BID SHEET
                        MOLD REMEDIATION
                        VILLA GRIFFIN , IL1-5
3 Bath Ceiling Sq Ft                            XXXXXXXXXX   XXXXXXXXXX
4 Rem Ceilings Sq Ft                            XXXXXXXXXX   XXXXXXXXXX
5 Total Sq. Ft.                                 XXXXXXXXXX   XXXXXXXXXX
1 BLDG. 3 Unit Price                            XXXXXXXXXX   XXXXXXXXXX
2 Int Walls Sq. Ft.                             XXXXXXXXXX   XXXXXXXXXX
3 Bath Ceiling Sq Ft                            XXXXXXXXXX   XXXXXXXXXX
4 Rem Ceilings Sq Ft                            XXXXXXXXXX   XXXXXXXXXX
5 Total Sq. Ft.                                 XXXXXXXXXX   XXXXXXXXXX

1 BLDG. 4 Unit Price
2 Int Walls Sq. Ft.
3 Bath Ceiling Sq Ft
4 Rem Ceilings Sq Ft
5 Total Sq. Ft.

1 BLDG. 10 Unit Price                           XXXXXXXXXX   XXXXXXXXXX
2 Int Walls Sq. Ft.                             XXXXXXXXXX   XXXXXXXXXX
3 Bath Ceiling Sq Ft                            XXXXXXXXXX   XXXXXXXXXX
4 Rem Ceilings Sq Ft                            XXXXXXXXXX   XXXXXXXXXX
5 Total Sq. Ft.                                 XXXXXXXXXX   XXXXXXXXXX

1 BLDG. 11 Unit Price                           XXXXXXXXXX   XXXXXXXXXX
2 Int Walls Sq. Ft.                             XXXXXXXXXX   XXXXXXXXXX
3 Bath Ceiling Sq Ft                            XXXXXXXXXX   XXXXXXXXXX
4 Rem Ceilings Sq Ft                            XXXXXXXXXX   XXXXXXXXXX
5 Total Sq. Ft.                                 XXXXXXXXXX   XXXXXXXXXX

1 BLDG. 12 Unit Price                           XXXXXXXXXX   XXXXXXXXXX
2 Int Walls Sq. Ft.                             XXXXXXXXXX   XXXXXXXXXX
3 Bath Ceiling Sq Ft                            XXXXXXXXXX   XXXXXXXXXX
4 Rem Ceilings Sq Ft                            XXXXXXXXXX   XXXXXXXXXX
5 Total Sq. Ft.                                 XXXXXXXXXX   XXXXXXXXXX

                                2
                                                                                           REVISED BID SHEET
                                                                                           MOLD REMEDIATION
                                                                                           VILLA GRIFFIN , IL1-5

  BID BREAKDOWN BY BUILDING/UNIT (con't)
1 BLDG. 13 Unit Price                                                                                                               XXXXXXXXXX   XXXXXXXXXX
2 Int Walls Sq. Ft.                                                                                                                 XXXXXXXXXX   XXXXXXXXXX
3 Bath Ceiling Sq Ft                                                                                                                XXXXXXXXXX   XXXXXXXXXX
4 Rem Ceilings Sq Ft                                                                                                                XXXXXXXXXX   XXXXXXXXXX
5 Total Sq. Ft.                                                                                                                     XXXXXXXXXX   XXXXXXXXXX



  METHODOLOGY
  Provide your methodology of accomplishing remediation work. Include mold removal process and names of any chemicals to be used.