Docstoc

chapters 6_7

Document Sample
chapters 6_7 Powered By Docstoc
					6.      REFERENCES

Allan Jack and Cottier, 2001. North Wentworthville Floodplain Management Study.
Report prepared for the Upper Parramatta River Catchment Trust and Parramatta City
Council.

Bewsher Consulting Pty Ltd, 2002. Metella Road, Toongabbie, Floodplain Risk
Management Study (in draft). Report prepared for Blacktown City Council.

Cardno Willing Pty Ltd. 2001. Review of UPRCT Catchment Flood Modelling. Final
Report. Report prepared for Upper Parramatta River Catchment Trust.

Don Fox Planning Pty Ltd. 2003. Upper Parramatta Floodplain Risk Management Plan
— Planning Issues and Outcomes. Report prepared as Volume 2 of Upper Parramatta
River Catchment Floodplain Risk Management Study and Plan (current study)

Department of Community Services NSW. 2003. Department of Community Services’
website www.community.nsw.gov.au/disaster/disaster.htm.

Department of Transport and Regional Services. 2003. Commonwealth Department of
Transport and Regional Services’ website www.dotars.gov.au.

Department of Water Resources NSW. 1989. Toongabbie Creek Flood Study Report.

DVA Consulting Pty Ltd. 2000. A Review of the Trust and Councils’ Flood Mitigation and
Trunk Drainage Program. Report prepared for Upper Parramatta River Catchment Trust.

Emergency Management Australia. 1995. Flood Warning — An Australian Guide.

New South Wales Government. 1986. Floodplain Development Manual.

New South Wales Government. January 2001. Floodplain Management Manual: The
Management of Flood Liable Land.

Perrens Consultants Pty. Ltd., 2002. Floodplain Management Review and Supplementary
Plan: North Wentworthville. Report prepared for Parramatta City Council, January 2002.

Sinclair Knight Merz Pty Ltd. 2001. Probable Maximum Flood Study — Upper Parramatta
River Catchment. Report prepared for Upper Parramatta River Catchment Trust.

Sinclair Knight Merz Pty Ltd. 2003. Seven Hills Industrial Area Floodplain Risk
Management Study and Plan (in draft). Report prepared for Blacktown City Council and
the Upper Parramatta River Catchment Trust.

State Emergency Service. 2002. Comments made on Draft Upper Parramatta River
Catchment Floodplain Risk Management Study. Personal communication from Mr. Peter
Cinque, Division Controller, SES Sydney Western Division dated 27 September 2002.




UPPER PARRAMATTA RIVER CATCHMENT         87                      BEWSHER CONSULTING PTY LTD
FLOODPLAIN RISK MANAGEMENT STUDY                            October 2003 J1105-Vol1-final-Oct03.doc
Upper Parramatta River Catchment Trust. 1999. Upper Parramatta River Catchment
Trust’s Report Card 1999.

Upper Parramatta River Catchment Trust. 2000. Upper Parramatta River Catchment Flood
Study (in draft). Internal document only.

Upper Parramatta River Catchment Trust. 2001a. Annual Report 2000–2001.

Upper Parramatta River Catchment Trust. 2001b. Upper Parramatta River Catchment
Management Study — Identified Problem Areas and Mitigation Measures. Data sheets
(‘UPPER2000 project data sheets.doc’ and ‘Sept 2000 new & amended project sheets.doc’)
and Spreadsheet (CDATA98.xls). Internal documents used to prioritise works and studies.

Upper Parramatta River Catchment Trust. 2001c.         On-site Stormwater Detention
Handbook.

Upper Parramatta River Catchment Trust. 2002a. Upper Parramatta River Catchment
Trust’s website — www.uprct.nsw.gov.au.

Upper Parramatta River Catchment Trust. 2002b (in draft). Annual Report 2001–2002.

Upper Parramatta River Catchment Trust. 2002c (in draft). Consultant Brief. Flood Study
Review and Floodplain Risk Management Study. Upper Parramatta River Catchment .

Upper Parramatta River Catchment Trust. 2002d. Comments on Draft Upper Parramatta
River Catchment Floodplain Risk Management Study. Personal communication from Dr.
Stephen Lees, UPRCT Executive Officer, dated 04 October 2002.

Upper Parramatta River Catchment Trust. 2003a. Upper Parramatta River Catchment
Management Study — Identified Problem Areas and Mitigation Measures, with all Original
Problem Areas Added. Last amended 07 March 2003. Spreadsheet (‘Flood affected
properties – changes over time update mar03.xls’). Internal document only.

Upper Parramatta River Catchment Trust. 2003b. Comments on Draft Upper Parramatta
River Catchment Floodplain Risk Management Study “Changes to be made to Draft
Volume 1 and 2. Personal communication from Dr. Stephen Lees, UPRCT Executive
Officer, dated 21 October 2003.

Webb, McKeown & Associates Pty Ltd. 1991a. Catchment Management Priorities Study.
Report prepared for Upper Parramatta River Catchment Trust.

Webb, McKeown & Associates Pty Ltd. 1991b. Catchment Management Priorities Study.
— Compendium of Data. Report prepared for Upper Parramatta River Catchment Trust.

Wollongong City Council, 2001. Conduit Blockage Policy (Section 7.3 of Wollongong
Council Drainage Design Code).




UPPER PARRAMATTA RIVER CATCHMENT          88                      BEWSHER CONSULTING PTY LTD
FLOODPLAIN RISK MANAGEMENT STUDY                             October 2003 J1105-Vol1-final-Oct03.doc
7.      BIBLIOGRAPHY

There have been more than 100 studies, investigation, designs and other documents
prepared about flood-related issues within the Upper Parramatta River catchment in the
past twenty-five years. These documents are presented in Table 8.1. The numbering
system presented in the bibliography was originally developed in the early 1990s and
was added to up until the late 1990s. The bibliography has not been formally updated
as part of this study.



TABLE 7.1:          BIBLIOGRAPHY OF FLOOD-RELATED DOCUMENTS FOR THE
                    UPPER PARRAMATTA RIVER CATCHMENT
 NO.       TYPE                        TITLE                           AUTHOR                     DATE
                                                                   Sinclair Knight And
  1        Report    North Parramatta Rezoning Drainage Study                                      1991
                                                                    Partners Pty Ltd
  2        Report    Parramatta River Basin Drainage Study               SMEC                      1991
  3        Report    Toongabbie Creek Flood Study (Draft No.2)            DWR                      1991
                     August 86 Flood Study Oakes Rd
                                                                   Sinclair Knight And
  4        Report    Toongabbie, Toongabbie Creek. Catchment                                       1990
                                                                    Partners Pty Ltd
                     Development
                     Greystanes Creek and Pendle Hill Creek.
  5        Report                                                                                  1991
                     Flood Mitigation Study
                     Excelsior Reserve Plan of Management –        Willing and Partners
  6        Report                                                                                  1990
                     Drainage Management Issue                            Pty Ltd
                     Toongabbie Creek Flood Mitigation Works
  7        Report                                                       Paterson                   1992
                     Stage 1
           Tech.     Toongabbie Creek Flood Mitigation Works       Willing and Partners
  8                                                                                                1991
           Spec.     Stage 1                                              Pty Ltd
                     Toongabbie Creek Flood Mitigation Works       Willing and Partners
  9        Report                                                                                  1991
                     Stage 2                                              Pty Ltd
           Tech.     Toongabbie Creek Flood Mitigation Works       Willing and Partners
  10                                                                                               1991
           Spec.     Stage 2                                              Pty Ltd
                     Toongabbie Creek Flood Mitigation Works       Willing and Partners
  11       Report                                                                                  1991
                     Stage 3                                              Pty Ltd
                     Toongabbie Creek Flood Mitigation Works       Willing and Partners
  12       Report                                                                                  1991
                     Stage 4                                              Pty Ltd
                     Toongabbie Creek Flood Mitigation Works       Willing and Partners
  13       Report                                                                                  1991
                     Stage 5                                              Pty Ltd
                     Drainage Strategy Report, Part I - Physical    Holroyd Municipal
  14       Report                                                                                  1991
                     Works                                                Council
                                                                   Sinclair Knight And
  15       Report    Parramatta Drainage                                                           1990
                                                                     Partners Pty Ltd
                     Parramatta River Flood Mitigation             SMEC/Willing and
  16       Report                                                                                  1990
                     Investigation                                   Partners Pty Ltd
                     Baulkham Hills Shire Flood Database
  17     Database                                                    Baulkham Hills                1991
                     Report
  18       Report    Shire Engineer's Report No. 88/59               Baulkham Hills                1988
                     Shire Engineer's Report, Special Meeting
  19       Report                                                    Baulkham Hills                1991
                     8/5/90
                     Blacktown, Grantham & Lalor Creeks Trunk
  20       Report                                                    Nichols, Watts                1991
                     Drainage Strategy Report
                     Lake Parramatta, Toongabbie Creek &
  21       Report                                                     John Laxton                  1991
                     Parramatta River Water Quality Monitoring



UPPER PARRAMATTA RIVER CATCHMENT                89                         BEWSHER CONSULTING PTY LTD
FLOODPLAIN RISK MANAGEMENT STUDY                                      October 2003 J1105-Vol1-final-Oct03.doc
 NO.       TYPE                         TITLE                          AUTHOR                     DATE
                                                                     Parramatta City
  22       Loose     Various submissions for flood relief funds                                    1991
                                                                         Council
                                                                    Holroyd Municipal
  23       Report    Engineer's Report 90/43 to Council 1/5190                                     1991
                                                                         Council
                                                                    Holroyd Municipal
  24       Report    Engineer's Report 90/16 to Council 20/2/90                                    1992
                                                                         Council
                     Catchment Maps Nos.
                                                                   Sinclair Knight And
  25       Plans     1,2,3,4,5,9,10,11,12,13,19,20,21,22,23,27,2                                   1992
                                                                    Partners Pty Ltd
                     8
                     Flood Prone Land Investigation Map 11454-       Parramatta City
  26        Plan                                                                                Oct 1991
                     K                                                   Council
                     Drainage & Flooding Constraints Map             Parramatta City
  27        Plan                                                                                May 1992
                     12889                                               Council
                     Working plans for various Local flooding                                    Feb &
  28       Plans                                                     Baulkham Hills
                     problems in Catchment                                                      Mar 1993
                     Upper Parramatta River Catchment Trust -
  29        Plan                                                           DWR                     1993
                     Area of Operation
                     Municipality of Hlroyd Stormwater Drainage     Holroyd Municipal
  30       Plans                                                                                May 1993
                     Register                                             Council
                     Greystanes Creek Retarding Basins –           Willing and Partners
  31       Report                                                                               Nov 1992
                     Design Report                                        Pty Ltd
                     Parramatta River Basin Flood Estimates        Willing and Partners
  32       Report                                                                               Jan 1994
                     Review                                               Pty Ltd
                     Retarding Basin 2B & Associated Channel       Willing and Partners
  33       Report                                                                               Aug 1993
                     Works - Design Report                                Pty Ltd
                                                                   SMEC/Willing and
  34       Report    Toongabbie Creek Retarding Basin 3                                         Sept 1994
                                                                     Partners Pty Ltd
                     Toongabbie Creek Retarding Basin3 -           Willing and Partners
  35       Report
                     Design Report                                        Pty Ltd
                     Pendle Hill Creek. Darting St. Reserve        Willing and Partners
  36       Report                                                                               Oct 1994
                     Basin 1 Stage 1 Specification                        Pty Ltd
                                                                   Willing and Partners
  37       Report    Greystanes Creek Trunk Drainage Study                                      Sep 1995
                                                                          Pty Ltd
                     Tech. Report on Calibration of RAFTS
  38       Report    Model of Toongabbie Creek. for April 88         Lyall & Macoun             Nov 1997
                     Flood
                     Tech. Report on Calibration of HEC-2
  39       Report    Model of Toongabbie Creek. For April 88         Lyall & Macoun             Sep 1998
                     Flood
                     Drainage Investigation of Lance               Bewsher Consulting
  40       Report                                                                               Dec 1999
                     Crescent/Adrian Place Greystanes                    Pty Ltd
                     Investigation of Potential Flood Retarding    Bewsher Consulting
  41       Report                                                                               Sep 2000
                     Basins Above Braeside Road                          Pty Ltd
                     Potential Flood Losses in the Parramatta        Environmental
  42       Report                                                                                  2000
                     Central Business District                     Management Pty Ltd
                                                                     Blacktown City
  43       Plans     Blacktown City Council Flood Maps                                             1989
                                                                        Council
                                                                     Blacktown City
  44       Plans     Blacktown City Council Drainage Maps
                                                                        Council
                     Blacktown Creek. Channel Improvements -         Blacktown City
  45       Plans                                                                                   1989
                     Lancelot St. to Tudor Ave. Basin                   Council
                     Proposed Retention 8asin Church                 Blacktown City
  46       Plans                                                                                   1988
                     Lane/Lorne St, Prospect                            Council
                     Contour & Detail Survey Blacktown Creek.        Blacktown City
  47       Plans                                                                                   1988
                     Myrtle St. to Lancelot St.                         Council
                     Drainage Amplification Foss St./Lorne St.,      Blacktown City
  48       Plans                                                                                   1988
                     Prospect to Blacktown Creek                        Council
  49       Plans     Mitchell Park Working Plans                    McDonald Wagner                1988
  50       Plans     1:16000 Aerial Photos                              QASCO                      1987

UPPER PARRAMATTA RIVER CATCHMENT                 90                        BEWSHER CONSULTING PTY LTD
FLOODPLAIN RISK MANAGEMENT STUDY                                      October 2003 J1105-Vol1-final-Oct03.doc
 NO.       TYPE                        TITLE                             AUTHOR                    DATE
                                                                     Holroyd Municipal
  51        Plan     Cooper's Creek Flood Map
                                                                          Council
                                                                     Holroyd Municipal
  52        Plan     Greystanes Creek Flood Map
                                                                          Council
                                                                     Holroyd Municipal
  53        Plan     Pendle Hill Creek Flood Map
                                                                          Council
                                                                     Holroyd Municipal
  54        Plan     Finlaysons Creek flood Map
                                                                          Council
                     Blacktown City Council Flooding "Black           Blacktown City
  55        Plan
                     Spot" Map                                            Council
                     Baulkham Hills Shire Council Flooding
  56        Plan                                                      Baulkham Hills
                     "Black Spot" Map
                                                                    Willing and Partners
  57       Report    Pendle Hill Creek Trunk Drainage Study                                         1983
                                                                            Pty Ltd
                     Holroyd Municipal Council Flooding "Black       Holroyd Municipal
  58        Plan                                                                                    1990
                     Spot" Map                                              Council
                     Meurants Lane Urban Release Drainage           Kinhill Engineers Pty
  59       Report                                                                                   1989
                     Study                                                    Ltd
                     Brickfield Creek. SWC No.18 Belmore Park
  60       Report                                                       Water Board                 1989
                     Branch Flooding Investigation
                     Proposed Improvements Pennant Hills
  61        Plan                                                      Baulkham Hills                1989
                     Road to Bettington Road
  62       Paper     Muirfield Golf Course Retarding Basin            Baulkham Hills                1990
  63       Loose     Council Response to Trust Sept. '90                Councils                    1990
  64       Letter    Letter from Trust                                   UPRCT                      1990
  65       Report    Drainage Engineer's Report 10/5/89               Baulkham Hills                1989
  66       Report    Drainage Engineer's Report 13/12/90              Baulkham Hills                1989
  67       Report    Drainage Engineer's Report 28/4/88               Baulkham Hills                1988
  68       Report    Drainage Engineer's Report 20/10/87              Baulkham Hills                1987
  69       Report    Drainage Engineer's Report 22/8/89               Baulkham Hills                1989
                     Darling Mills Creek Flood Mitigation Study     Bewsher Consulting
  70       Report                                                                                   1990
                     (Stage 1)                                           Pty Ltd
  71      Report     Trust Meeting 1/8/90                                UPRCT                      1990
  72      Report     Trust Tour 31/8/90                                  UPRCT                      1990
  73      Report     Trust Meeting 26/10/90                              UPRCT                      1990
  74      Survey     Drainage Problems Wentworthville Estate         Residents Group                1990
                     Design to Alleviate Flooding at Lennox
  75       Report    Bridge in Parramatta (Minimum Energy              R Woodward                   1991
                     Proposal).
                     Proposed Minimum Energy Structure for
  76       Report                                                          C Apelt                  1991
                     Lennox Bridge at Parramatta.
                     Objection to Development Proposal for
  77       Report    Demolition of Lennox Bridge (U Tube                B McMullen                  1991
                     Proposal)
                     Statement of Environmental Effects,
  78       Report    Proposal for Demolition and Replacement                RTA                     1990
                     of Lennox Bridge.
                     Planning Report for Redevelopment, Oakes
  79       Report                                                        N Nielsen                  1991
                     Road, Old Toongabbie.
                     Darling Mills Creek Flood Mitigation Study -   Bewsher Consulting
  80       Report                                                                                   1990
                     Stage 1                                             Pty Ltd
                     Darling Mills Creek Stormwater                 Bewsher Consulting
  81       Report                                                                                   1992
                     Management Strategy.                                Pty Ltd
                     Environmental Effects Report, Pendle Hill
  82       Report                                                        N Nielsen                  1991
                     Creek Floodway.



UPPER PARRAMATTA RIVER CATCHMENT                 91                         BEWSHER CONSULTING PTY LTD
FLOODPLAIN RISK MANAGEMENT STUDY                                       October 2003 J1105-Vol1-final-Oct03.doc
 NO.       TYPE                         TITLE                          AUTHOR                     DATE
                      Environmental Effects Report, Flood
  83       Report     Retardation Basin in Aldgate and Bolton           N Nielsen                  1991
                      Streets Reserve at Prospect.
                      Environmental Effects Report, Realignment
  84       Report     of Toongabbie Creek near Powers Road,             N Nielsen                  1991
                      Seven Hills.
                      Reconstruction of Toongabbie Creek,
  85       Report                                                    Gardiner Willis               1991
                      Powers Road to Basin 2B.
  86        Plan      Toongabbie Creek Realignment.                  Gardiner Willis               1991
                      Proposed Flood Mitigation Scheme, Pendle
  87       Plans                                                       D Nicholas                  1991
                      Hill Industrial Area.
  88       Plans      Pendle Hill Creek Channel Improvements.              GHD                     1991
  89       Plans      Pendle Hill Creek Floodway, Stages 1 & 2,       Rankine & Hill               1990
  90       Report     Coopers Creek Floodplain Study.                    Bewsher                   1990
  91       Report     Duncan Park Retarding Basin Design.                UPRCT                     1991
                      North Rocks Road, North Parramatta Flood
  92       Report                                                        Bewsher                   1988
                      Study.
                      Proposed F2 Freeway, Dam/Road
  93       Report                                                         SMEC                     1991
                      Embankment over Darling Mills Creek.
                      Renown Road, New Bridge over Darling
  94       Report                                                          RTA                     1991
                      Mills Creek.
  95       Report     The Flooding of Toongabbie Creek.               C Moir/Tasg                  1991
                      Upper Pendle Hill Creek, Old Prospect Rd,    Bewsher Consulting
  96       Report                                                                                  1991
                      Greystanes, Drainage Studies.                     Pty Ltd
                      Report on Flooding in Toongabbie Road,
  97       Report                                                    HCC Engineers                 1991
                      Toongabbie in the June 1991 Storm.
                                                                   Dalland & Lucas For
                      Report on Proposed Foundry Road Bridge
  98       Report                                                    Blacktown City                1992
                      at Seven Hills.
                                                                         Council
                      Brickfield Creek Flood Study. Connell        For Parramatta City
  99       Report                                                                                  1992
                      Wagner (Rankine & Hill)                            Council
 100       Report     Safety Study                                  SMEC For Trust              Oct 1991
                      Flood Review Study, Wentworthville Estate,   Dalland And Lucas
 101       Report                                                                               May 1992
                      Wentworthville                                Pty Ltd For Trust
         Developm
            ent       Greystanes Creek Restoration Project:        SMEC And Nielsen              Feb &
 102
         Applicatio   Stage 1 and 2 and Supplementary Report;         For Trust                 Mar 1993
             n
                      Creek Works on Metella Road Branch of
                                                                     Blacktown City
 103       Plans      Greystanes Creek, downstream of                                              1993
                                                                        Council
                      Blacktown Road,
                      Revision of Flood Damages Estimates for        Environmental
 104       Report                                                                               May 1993
                      the Parramatta Area .                        Management Pty Ltd
                                                                   Dalland & Lucas Pty
 105       Report     Clay Cliff Creek Catchment Flood Study.      Ltd For Parramatta           Nov 1992
                                                                       City Council
                      Gooden Reserve, Baulkham Hills,
 106       Report                                                    SMEC For Trust             Jan 1994
                      Catchment Drainage Study.
                                                                   Connell Wagner For
 107       Report     Brickfield Creek Flood Study.                  Parramatta City            Aug 1993
                                                                          Council
                      Toongabbie, Pendle Hill and Greystanes        Willing & Partners
 108       Report     Creeks Confluence Area, Flood Mitigation       For Trust, Final           Sept 1994
                      Study.                                              Report




UPPER PARRAMATTA RIVER CATCHMENT                 92                        BEWSHER CONSULTING PTY LTD
FLOODPLAIN RISK MANAGEMENT STUDY                                      October 2003 J1105-Vol1-final-Oct03.doc
 NO.       TYPE                        TITLE                            AUTHOR                    DATE
                     Toongabbie Confluence Area Flood
          Meeting
                     Mitigation. Agenda item 3.2 in Upper
 109      Agenda
                     Parramatta River Catchment Trust Business
           item
                     Papers for meeting of 24 March 1995.
                                                                   Gamtron Pty Ltd For
 110       Report    Oakes Road Flood Mitigation Study.                                         Oct 1994
                                                                           Trust
                                                                    Upper Parramatta
                     Brickfield Creek Flood Study: RAFTS-XP
 111       Report                                                    River Catchment            Sep 1995
                     and EXTRAN-XP Models. Draft No 1.
                                                                           Trust
                     Flood Mitigation Strategy for Pendle Hill     Dalland & Lucas Pty
 112       Report                                                                               Nov 1997
                     Creek Industrial Area. Job No. 1700/97                 Ltd.
                                                                    SMEC For Upper
                     Bridge over Blacktown Creek, Station Road,
 113       Report                                                    Parramatta River           Sep 1998
                     Seven Hills. Design Report.
                                                                     Catchment Trust
                                                                    Webb McKeown &
                     Blacktown Creek Orana Park (North) Flood       Associates Pty Ltd
 114                                                                                            Dec 1999
                     Management Options.                           For Blacktown City
                                                                         Council
                     Papers on Proposed Development of 8-10
 115       Paper     Metella Road, Toongabbie on Trust files                                    Sep 2000
                     Nos. 0264904 and 035693A
                     Design Report for Myrtle Street to Ollier
                                                                      Blacktown City
 116       Report    Crescent Flood Mitigation and Trunk                                           2000
                                                                         Council
                     Drainage Works ( in preparation).
                     Outstanding Flood Problem Areas Studies:
                     Stage 3 Report on Blacktown Creek Areas       Sinclair Knight Merz
 117       Report                                                                               Sep 2002
                     BLP4BL & BLP6BL (Hartley Road and             Pty Ltd for UPRCT
                     Cornell Street).
                     Outstanding Flood Problem Areas Studies:
                                                                   Sinclair Knight Merz
 118       Report    Stage 2A Report on Grantham Creek Area                                     Oct 2002
                                                                   Pty Ltd for UPRCT
                     BLP2GA (Michigan Road).
                     Outstanding Flood Problem Areas Studies:
                                                                   Sinclair Knight Merz
 119       Report    Stage 2B Report on Grantham Creek Area                                     Oct 2002
                                                                   Pty Ltd for UPRCT
                     BLP2GA (Santiago Place).
                     Outstanding Flood Problem Areas Studies:
                                                                   Sinclair Knight Merz
 120       Report    Stage 3/4 Report on Blacktown Creek                                        Jun 2003
                                                                   Pty Ltd for UPRCT
                     Areas BHP4DM Orange Grove, Castle Hill.
                     Seven Hills Industrial Area Floodplain Risk   Sinclair Knight Merz
 121       Report                                                                               Aug 2003
                     Management Study and Plan, draft report.       Pty Ltd for UPRCT
                     Outstanding Flood Problem Areas Studies:       Webb McKeown &
 122       Report    Stage 3 Report on Finlaysons Creek Area        Associates Pty Ltd          Dec 2002
                     HP4F.                                              for UPRCT
                     Outstanding Flood Problem Areas Studies:       Webb McKeown &
 123       Report    Stage 1 Report on Finlaysons Creek Area        Associates Pty Ltd          Jun 2003
                     HP3F.                                              for UPRCT
                                                                       W P Brown &
                     Watkins Road Drainage System, Baulkham         Partners Pty Ltd for
 124       Report                                                                               Dec 2003
                     Hills, Remedial Options (Area BHP2T).         Baulkham Hills Shire
                                                                   Council and UPRCT
                                                                   Bewsher Consulting
                     Five Areas Drainage Study, Area 1, Farnell
                                                                   Pty Ltd for Baulkham
 125       Report    Avenue to McDonald Street, North Rocks,                                    Oct 2002
                                                                    Hills Shire Council
                     Final Report. (Area BHP1H).
                                                                        and UPRCT
                                                                   Bewsher Consulting
                     Five Areas Drainage Study, Area 2, Gollan
                                                                   Pty Ltd for Baulkham
 126       Report    Avenue. Gowan Brae, Oatlands, Final                                        Mar 2000
                                                                    Hills Shire Council
                     Report. (Area BHP2BR).
                                                                        and UPRCT




UPPER PARRAMATTA RIVER CATCHMENT                 93                        BEWSHER CONSULTING PTY LTD
FLOODPLAIN RISK MANAGEMENT STUDY                                      October 2003 J1105-Vol1-final-Oct03.doc
 NO.         TYPE                              TITLE                        AUTHOR                     DATE
                                                                        Bewsher Consulting
                            Five Areas Drainage Study, Area 3,
                                                                        Pty Ltd for Baulkham
 127         Report         Roxborough Park Road, Baulkham Hills,                                    Oct 2002
                                                                         Hills Shire Council
                            Final Options Report. (Area BHP2QC).
                                                                             and UPRCT
                                                                        Bewsher Consulting
                            . Five Areas Drainage Study, Area 4,
                                                                        Pty Ltd for Baulkham
 128         Report         Lindsay Street, Baulkham Hills, Final                                    Nov 2002
                                                                         Hills Shire Council
                            Report. (Area BHP3QC).
                                                                             and UPRCT
                                                                        Bewsher Consulting
                            Five Areas Drainage Study, Area 5, Gooden
                                                                        Pty Ltd for Baulkham
 129         Report         Reserve, Baulkham Hills, Final Report.                                   Feb 2002
                                                                         Hills Shire Council
                            (Area BHP1T1).
                                                                             and UPRCT
Source:   Nos. 1 to 74        Webb, McKeown & Associates (1991b)
          Nos. 75 to 116      UPRCT (2001b)
          Nos. 116 to 129     UPRCT (2003b)




UPPER PARRAMATTA RIVER CATCHMENT                         94                     BEWSHER CONSULTING PTY LTD
FLOODPLAIN RISK MANAGEMENT STUDY                                           October 2003 J1105-Vol1-final-Oct03.doc

				
DOCUMENT INFO
Shared By:
Categories:
Tags:
Stats:
views:3
posted:2/2/2013
language:English
pages:8