Hydro_Power_Projects_Progress_Report00021
Document Sample


Features : Barrage-4 bays of 15m HRT-6m x Mumbai 03/2011
13.85km P.Shaft-2x4mx500m P.House- Power House, Penstock Patel Engg. Ltd., 235.26 + Euro 09/2006
underground Turbine- Pelton Cost: Tunnels & Tail Race Channel Mumbai 22.69 m 02/2011
Original: 2895.104 Latest: 2895.104 E&M Turbine generating units and Voith Siemens 255.84 cr. + € 1/.2008 08/11
works associated auxiliaries 12.9m + $19.3m
H&M Manufacturing, erection & Texmaco, Kolkata 37.02 crs+ € 08/2007
works commng of various gates 0.244m 01/2011
21 Tapovan Vishnugad Uttarakhand Civil Package for Dam, & desilting SSJV Projects Pvt. 276..91 01/2007
NTPC NR works works Ltd. and ZVS, 07/2012
11.08.2004/Nov,2006 4x130 = 520 MW Russia
Broad Features : L&T Ltd. and Alpine 455.921 11/2006
Barrage-5 bays of 12m Mayreder Bau 08/2012
HRT-5.4m x 11.97km P.House- underground GmbH
Turbine- Pelton HRT Power House & Penstock Patel Engg. Pvt. Ltd. 221.28 crs +37.58m 005/2007
Cost: works package Euro 08/2012
Original: 2810.84 Latest: 2810.84
E&M Turbine generating units and BHEL 328.28 crs. 1/.2008 12/12
works associated auxiliaries
Manufacturing, erection & Om Metal 64.19 crs + €1.26m 10./007 09/12
commng of various gates Infraproject Ltd.
22 Teesta Low Dam-III W.B.. EE Civil Construction of Barrage, WCS, Patel Engg. Ltd, 239.11 28.10.2003
NHPC works Power House and Tail Race Mumbai 07/2007
25.06.2002/30.10.2003 works, Diversion works,
4x33 = 132 Switchyard etc.
Broad Features : E&M Generating Units, Main step up VA Tech Hydro India 222.78 30.07.2004
Barrage - 140m long , 32.5 m high works Transformers, Switch Yard, Pvt. Ltd. .Bhopal, 10/2007
Penstock-4x 7m x 50m EOT Crane
P.House- Surface H&M Various Gates Packages Texmaco & Alstom 41.53 cr + € 2.95 11.02.2005
125 mx 22mx56m works Ltd. Kolkata - (1st Contract) + 12/2007
Turbine- Kaplan Consortium 8.85 crs (Ilnd
Net head-21.34m Contract)
SWYD-11/220 kV
Cost:
Original: 768.92 (12/02)
Latest: 845.46
23 Teesta Low Dam-IV W.B.. ER Civil Construction of Diversion HCC Ltd., Mumbai 395.90 10.05.2006
NHPC works Arrangmt, Concrete Gravity 09/2009
23.12.2003/30.09.2005 4x40= 160 MW Broad Dam , P/H, TRT
Features : E&M Supply, erection, testing & BHEL 247.57 10.05.2007
Dam - 45m High, 511m long, concrete gravity works commissioning of TG unit 05/2010
Penstock-4x7m x45m P.House- Surface 130mx H&M Supply, erection, testing & Om Metals -SPML 88.80 09.05.2007
24mx 63m works commissng of gates JV 08/2009
Turbine- Kaplan Net head-25.05m SWYD-
11/220 kV
Cost:
Original: 1061.38 (03/2005) Latest: 1061.38
24 Subansiri Lower Ar.P/Assam Civil Dam/Barfage, Water conductor M/sBGS-SGS-Soma 1098.32 19.12.2003
NHPC NER works system JV, Hyderabad 12/2009
07.06.206i/09.09.03 8x250= 2000 MW Power House & Tail Race civil L & T LTD, Chennai 921.59 19.12.2003
Broad Features : works 12/2009
Dam 116 m High, concrete gravity Supply of CIF/CIP: Supply of all Consortium of Euro 76.80 million + 11.02.2005
HRT-8 x 9.5 m x 1145 m offshore equipments and Alstom Power US$ 6,779,760. 08/2010
P.Shaft-8x9.7 mx2153m material including general and Hydraulique, France
P.House- Surface specified spares. And
Turbine- Francis Alstom Project India
TRC- 206m x 35 m Ltd.
SWYD-16/400 kV E&M Ex-works supply of all Consortium of € 23.21 million + 11.02.2005
Cost: works equipment and material Alstom Power US$ 14,56 million + 08/2010
Original: 6285.33 (12/02) Latest: 5793.45 including general and specified Hydraulique, France Rs. 727.,97 cr
spares of Indian origin. And
Alstom Project India
Ltd.
Local transportation including Alstom Project India INR 11.02.2005
port clearance and port Ltd. 1,23,74,37,486.00 08/2010
charges and inland insurance
and installation services.
H&M Supply, erection & commng. Of Texmaco Ltd. Rs. 283.48 crores + 19.06.2006
works gates 2.22 M Euro 04/2010
25 Kameng Ar. Pradesh Civil Package-I Patel-Unity JV, 143.81 08.12.2004
NEEPCO 12 2004/ 4x150 = 600 NER works Bichom Dam & part of Bichom Mumbai 08.02.2009
Broad Features: E&M & Tenga tunnel
Dam: Bichom-96.5m High, 250m long works Package-II Patel Engg., Mumbai 116.39 08.12.2004
Tenga - 60.5m High, 140m long Tenga Dam & part of Bichom & 08.02.2009
Penstock- 2x 4m Tenga tunnel & part of Tenga
P.House- semi-underground kimi Tunnel
Turbine- Francis
Swyd-13.6/400 kV Package.-III P.H. civil works & Patel Engg., Mumbai 131.65 08.12.2004
Cost: Original: 2496.90 (03/2004) Latest: part of Tenga kimi tunnel 08.02.2009
2496.90 Package-V M/s. BHEL New 241.11 03.12.2004
Delhi.
H&M Hydro-mechanical works & OMML & JSC-JV, 236.23 17.12.2004
works penstock lining New Delhi
State Sector
26 Uhl-III, H.P. N Civil Neri Intake works & power SSJVPP Ltd. XII 8.68 18.04.05
BVPC Ltd. R works channel floor S.N. Tower 15.8.07
19.09.02/------- 25/2 M.G.Road, Re-awarded
(TEC -2x50 MW) 3x33.3 =100 Banglore on 25.10.08
Broad Features: Package re-awarded
HRT-4.15mx 8.477 km S.Shaft-13mx57m to:
Penstock-3.4m x 1860m Continental
P.House- Surface Turbine- V. Francis corporation Project
Cost: Ltd..
Original: 431.56 Latest: 43156 Head Race Tunnel (HRT) SSJVPP Ltd. 12th 69.58 02.04.03
floor S.N. Tower 30.04.07
25/2 M.G.Road, Re-awarded
Banglore 560001 on 30.09.08
Package re-awarded
to: Continental Corp
Project Ltd..
Rana Intake Works & Power TRG Industries 17.53 26.07.05
channel PvtLtdE-461 Greater 26.10.07
Kailash -II New
Delhi
Penstock fabrication, erection PES. Engineers Pvt. 57.26 27.05.05
Ltd. Hyderabad- 27.11.07
500016
Power House Pilot Engg., 9.87 19.6.2007
Ludhiana 12/2009
E&M Generating Equipnt & BHEL 117.36 15.02.07
works Associated Aux, Transformers 15.04.10
27 Sawara Kuddu H.P. NR Civil HRT works Power House Aban-Coastal JV 18.06.07
HP Power Corporation, H.P. 3x36.67=110 works 17.06.11
Broad Features: Barrage-15.5m height Desilting 10.02.09
Tank- Surface, size-80mxl9.5mxl0.5m HRT- 5m 09.06.12
dia, 11.30km. long P.Shaft-3.5m dia, 312m long E&M Design, manufacture, testing & VA Tech Hydro India 180.54 27.2.09
S. Shaft-14m dia, 73.1m high P.House- works commng of TG unit and Pvt. Ltd. 14.05.12
underground, 12m x 50m auxiliaries
Gross Head- 13.50m Turbine- Francis Tail
Race-5m dia, 440m long SWYD-220kV
Cost: Original -558.53 crs
6b Priyadarshini Jurala APGENCO A.P. SR Civil Power House, intake, DT Patel Engg. Ltd., 28.91 29.01.2005
07 02 (TEC Transfer) 6x39=234 Works structure Hyderabad 15.12.2007
Broad Features: Reach-I L&T Ltd. 7.63 01.11.2003
Barrage - 27.8m Height 30.05.2004
P.House- Surface Reach-II Rama Krishna 5.59 24.07.2004
Turbine- Bulb Reddy 31.05.2005
Swyd-11/220 kV Balance Length G. Venkata Reddy 3.28 . 30.01.2005
Get documents about "